Forsyth County Procurement

Similar documents
10:00 AM, Wednesday, April 8, 2015

ADDENDUM NO. 1 APRIL 24, 2017

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

SECTION TRENCHING & BACKFILLING

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Table of Contents for Guide Specifications

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

2018 YEARLY BID FORMS SUPPLIER BID FORM. ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe.

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

Construction Documents (CDs) Required Signature Blocks and Standard Notes

PART 1 GENERAL REQUIREMENTS

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Addendum No. 1 Page 1 of 2

CURRENT NORTH LAS VEGAS ADDENDA

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Stormwater Local Design Manual For Houston County, Georgia

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

MODEL Stormwater Local Design Manual. City of Centerville

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

BID FORM - LUMP SUM BID

Project Type: Drainage and Storm Systems

Attachment D-1: Civil/Structural Scope of Work

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

DRAFT TECHNICAL SPECIFICATIONS FOR

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

SITE DESIGN ENGINEER'S STATEMENT:

Town of Fortville Utility Street Standards

TOWN OF GREENWICH, CONNECTICUT WILLIAM STREET BALL FIELD REMEDIATION WILLIAM STREET WEST, GREENWICH, CONNECTICUT

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Riverside County Transportation Department Summary of Bids

GENERAL CONSTRUCTION

Richland County Department of Public Works Engineering (Land Development) Division

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

ODOT Design & Construction Requirements for MSE Walls

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Installation and Maintenance of Erosion Control BMPs

LI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

PART VII - WATER SYSTEM DESIGN CRITERIA

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

COUNTY OF SAN JOAQUIN

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

GRADING PLAN CHECKLIST

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

JEFFERSON COUNTY STORM WATER MANAGEMENT

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SOIL EROSION CONTROL PERMIT APPLICATION

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

EXCAVATION PERMIT CHECKLIST

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Lump Sum L.S. (15") EA

Storm. Section. B. General Design and Drawing Standards Design

MATERIAL ALLOWANCES AND UNIT PRICES

The table below summarized the currently estimated total cost for the project.

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION EROSION AND SEDIMENTATION CONTROLS

City of Jacksonville Development Guide Building Permits

Alternative No. 1 Total Cost DRAFT

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Mecklenburg County Land Development Standards Manual (MCLDSM)

***************************************************************************************************************


PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Task Order Authorization

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

SAMPLE. Slab On Ground Construction. Carpentry - Residential Construction. Product Code: 5597

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Transcription:

August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank Site Grading. This addendum supersedes and supplements all portions of the bidding documents and becomes part of the contract documents for the above-referenced project. Where any item called for in the specifications or indicated on the drawings is supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect. Clarifications from Pre-Bid 7/20/17: 1. Sign in sheet is posted on the county website, www.forsythco.com 2. Forsyth County is in the process of obtaining a LDP. The contractor is responsible for the NOI fee based on the acreage. 3. Time to complete the project is 210 calendar days. 4. REPLACE the current bid schedule (pages 17 and 18) with the attached revised bid schedule. 5. Brown and Caldwell did not determine any issues with the drawing scales. 6. Forsyth County will hire a geotechnical firm as a 3 rd party to provide necessary geotechnical services and materials testing throughout the project. 7. Hand auger records for the site are attached to this addendum as information for the bidders. 8. Contractor shall provide a 24-inch undercut of rock to an elevation of 1380.00 underneath the future tank and drive around the tank; and then backfill with soil and compact to the tank finished floor elevation of 1382.00 and to the drive elevations indicated on drawings. 9. Tack coat for the asphalt drive shall be completed by others. The attached updated bid schedule has been revised to indicate this clarification. 10. The typical asphalt driveway section detail on sheet C-001 indicates 6 SUBGRADE STABILIZED WITH 150 LB OF STONE PER SQ. YD. (UNLESS MATERIAL IN PLACE WEIGHT 95 LB / CF). Since the existing material in place weight is unknown and shall be confirmed by a 3rd party geotechnical firm during construction, a bid item for 6 SUBGRADE STABILIZED WITH 150 LB OF STONE per square yard (SY) has been added to the attached revised bid schedule. 514 West Maple Street, Suite 104 Cumming, Georgia 30040 (770) 888-8872 forsythco.com

11. A new 24 RCP is shown at the entrance drive of the site but not provided on the bid schedule. The attached revised bid schedule has been updated to include 24 RCP. 12. A bid item has been added to the attached revised bid schedule for additional bedding if approved by owner and required beyond standard bedding requirements. See specification section 31 23 00, 3.08 for bedding requirements. 13. Clearing chips from the trees can be used onsite for erosion control. The remainder chips or chips used for temporary erosion control shall be hauled off the site. 14. Permanent stabilization shall be achieved at the tank site in accordance with the Manual for Erosion and Sediment Control in Georgia, latest edition. 15. Forsyth County will set a 1-inch water meter for the site at the property right-of-way line. The water meter will be set at the County s expense and shall be used by the contractor for water source during construction. The contractor must set up a billing account, and will pay for water used during construction (including water used for pressure testing of the waterline). At project final completion, the contractor will close the account and the meter will be put in the County s name. 16. Contractor shall attend monthly progress meetings with the owner and engineer. 17. Forsyth County Water & Sewer Inspectors will be onsite, as well as Engineering Inspectors for erosion control. Brown & Caldwell will also provide periodic inspections. 18. Record drawings are to be provided in electronic and paper format 19. Hydrant meters are currently not available for dust control. The contractor shall obtain water from the tap at the meter (see item 15. above). Response to questions received: (response in italics) 1. When is this project scheduled to begin? It is anticipated this project will be taken to the Board of Commissioners for award at their September 12, 2017 Work Session; so it is anticipated the project will begin by the first of October 2017. 2. I am confused with the two different alignments A & B shown on sheets C-105 and C-106. The earthwork quantities are different. Please explain. Sheets C-105 and C-106 represent plan and profile views for the two water lines along the drive. Sheet C-105 is for Alignment A, which is the waterline along the west side of the drive. Sheet C-106 is for Alignment B, which is the waterline along the east side of the drive. 3. On the bid schedule it states at line item #25, 20' WIDE ACCESS ROAD, INCLUDING GAB, TACK COAT, NOT INCLUDING ASPHALTIC CONCRETE AND SUPERPAVE. However, on plan sheet C-001 detail #4, it shows the Tack Coat by

others. To better understand what is to be included in this bids scope of work. Are we only to clear, and add in the 6 stone and 8 G.A.B. rock and leave the asphalt and tack coat to others? Or are we to include everything into our quote and scope of work? Please explain. Contractor shall clear, add 6 subgrade where necessary, add 8 G.A.B., and leave the tack coat and asphaltic concrete to others (under a separate contract). See also Clarification 9. above. 4. On the drive around the tower is it paved or GAB only See response to question 3. above. 5. The Gate to be installed. Is it Electronic as Specifications describe? The swing gate is not electronic. End of Addendum #2

Jot Em Down Water Tank Grading Package, Bid # 17-72-3340 Bid Schedule Revised by Addendum #2 BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE 1 MOBILIZATION AND DEMOBILIZATION LS 1 2 RECORD DRAWINGS LS 1 3 CLEARING AND EARTHWORK LS 1 4 ROCK EXCAVATION CY 2000 EROSION AND SEDIMENT CONTROL 5 ORANGE BARRIER FENCE (Tr) LF 800 6 CONSTRUCTION EXIT (Co) EA 1 7 SILT FENCE TYPE S (Sd1-S) LF 4500 8 ROCK FILTER DAM (Rd) CY 100 9 STONE RIP RAP TYPE I, 24" IN PLACE CY 150 10 STONE RIP RAP TYPE III, 12" IN PLACE CY 100 11 STRAW BALES EA 100 12 ROLLED EROSION CONTROL BLANKET (RECP) SY 7500 SITE RESTORATION AND LANDSCAPING ITEMS 13 SWING GATE EA 1 14 PERMANENT SEEDING (FINAL STABILIZATION) LS 1 15 PERMANENT TURF REINFORCEMENT MAT SY 3500 PIPING AND STRUCTURES 16 17 24" DUCTILE IRON PIPE (INCLUDES FITTINGS AND THRUST BLOCKS) - CLASS 250 24" RESTRAINED JOINT DIP & FITTINGS (INCLUDES FITTINGS AND THRUST BLOCKS) - CLASS 250 LF 1300 LF 1200 18 8-MIL POLYETHYLENE SLEEVE FOR 24" DIP LF 100 19 RCP PIPE 18" DIAMETER LF 80 20 RCP PIPE 24" DIAMETER LF 60 21 HDPE, IN PLACE, 18" DIAMETER LF 50

BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE 22 PRECAST HEADWALL, 18" EA 1 23 PRECAST HEADWALL, 24" EA 2 24 HDPE FLARED END HEADWALL EA 1 25 PRECAST OUTLET STRUCTURE FOR STORMWATER POND EA 2 26 MANHOLE COVERS EA 2 27 ADDITIONAL BEDDING (ORDERED IN WRITING BY OWNER) DRIVEWAY CY 300 28 6" SUBGRADE STABILIZED WITH 150 LB OF STONE SY 4500 29 20' WIDE ACCESS ROAD, INCLUDING GAB (NOT INCLUDING TACK COAT, ASPHALTIC CONCRETE AND SUPERPAVE) SY 4500 Total Bid Amount: $ Total Bid (written): Authorized Signature Date