PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Similar documents
Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

Attachment D-1: Civil/Structural Scope of Work

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

TYPE "A" CATCH BASIN

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

SECTION FACILITY SANITARY SEWERS

Construction Documents (CDs) Required Signature Blocks and Standard Notes

SECTION TRENCHING & BACKFILLING

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

16. Design of Pipeline Structures.

SEWER FORCE MAIN HDPE PIPE

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Storm. Section. B. General Design and Drawing Standards Design

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

SECTION UTILITY MANHOLES AND STRUCTURES

Uwall UNIVERSAL CONSTRUCTION MANUAL

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

CHAPTER 6. Sanitary Sewer

SECTION CONSTRUCTION SERVICES

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

Current Standard Plates including Transmittal Letters are available on the web at:

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

Task Order Authorization

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

Fabrication and Installation Table of Contents

SECTION A1 EXCAVATION AND BACKFILL GENERAL

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

***************************************************************************************************************

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

C. Foundation stabilization for pipe and utility structures.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

PART 1 GENERAL REQUIREMENTS

4 EXTREME FOUNDATION PANELS

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

TYPICAL INSTALLATION INSTRUCTIONS

LANDSCAPE RETAINING WALLS

SERVICE LINES, METERS AND APPURTENANCES

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

02800 SHADE STRUCTURES

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

RETAINING WALL LEVEL BACKFILL

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

Hydrodynamic Separation Product Calculator

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Building Permit Submittal Requirements

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

Storm Drain Inlet Protection

SECTION TAPPING SLEEVES AND VALVES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

REROUTING DRAINAGE SYSTEMS

Preferred Elevated Tank Site

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

PRELIMINARY DEVELOPMENT PLAN INFORMATION

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)

Engineering Plan Submittal Requirements. Revised: October 6, 2017

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Transcription:

EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) THROUGHOUT DURATION OF PROJECT. 2. AT MINIMUM, THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP) SHALL BE IMPLEMENTED: PROTECTION OF ALL INLETS INTO THE STORM DRAIN SYSTEM PER WSDOT STANDARD PLANS I-40.20 (TYPICAL OF 4). SILT FENCE DOWNSTREAM OF ALL EXCAVATED AREAS PER WSDOT STANDARD PLAN I-30.5. COMPOST SOCK AND EROSION CONTROL BLANKET PER WSDOT STANDARD PLANS PER I-30.40 AND -60.0 ON ALL SLOPES THAT HAVE BEEN CLEARED / GRUBBED. FLAG NATURAL VEGETATION AND INSPECT REGULARLY. CONTROL DUST. MAINTAIN CONSTRUCTION ACCESS AND PREVENT SEDIMENT FROM BEING TRACKED ONTO PAVED SURFACES. HATCH LEGEND CLEARING LIMIT ASPHALT REMOVAL GRADING / EXCAVATION LIMIT EXISTING EDGE OF ASPHALT CLEARING LIMIT STA 2+02.9, 5.7' LT STA 2+3.3, 6.' LT PROTECT DRIVEWAY AND MAINTAIN ACCESS THROUGH DURATION OF CONSTRUCTION 800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405 STA +55.7, 6.5' LT EXISTING EDGE OF ASPHALT SAWCUT LIMIT ASPHALT REMOVAL STA 2+95.8, 8.4' LT EASEMENT (SEE NOTE, THIS ) APPROXIMATE GRADING/ EXCAVATION LIMIT PROVIDED APPROXIMATELY 00-LF OF TEMPORARY SILT FENCE EXISTING TREES TO BE REMOVED BY COUNTY FORCES CLEARING / GRUBBING LIMIT (5-FT WIDTH CENTERED ON PIPELINE ALIGNMENT) EXISTING TREES TO BE PRESERVED (DO NOT DISTURB), TYPICAL UNLESS NOTED OTHERWISE PROJECT NO.: ES3090-3 FED. AID NO.: N EXISTING SITE AND TESC PLAN INCH SCALE BAR 2 OF 7 RBNLEE - March 2, 208-4:03 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-02.DWG

CONSTRUCTION NOTES:. ALL CONSTRUCTION ACTIVITIES SHALL BE CONTAINED WITHIN RIGHT OF WAY OR EASEMENTS. 2. ALL SURFACE CONDITIONS SHALL BE RESTORED TO EXISTING OR BETTER CONDITIONS. 3. ACTUAL PIPE LOCATIONS SHALL BE VERIFIED IN THE FIELD. 4. EXISTING WATERLINE IS APPROXIMATELY 2.8' COVER. 5. ELEVATION OF EXISTING PRIVATE DRAIN LINE IS UNKNOWN. CONTRACTOR TO LOCATE THROUGH POTHOLING PRIOR TO CONSTRUCTION, AND NOTIFY SHOULD EXISTING LINE BE FOUND IN A DIFFERENT LOCATION AND/OR CONFIGURATION THAN SHOWN. MAY OPT TO LOWER INVERT OF CB-3 TO PROMOTE POSITIVE DRAINAGE TO CB-2 (.0% MINIMUM GRADE). CUT, CAP, AND ABANDON EXISTING PIPE RUNNING SOUTH ACROSS THE CB-3, STA +63.3A,.6' LT TYPE I CB WITH SOLID COVER Rim: 9.4' I.E. N: 6.0' (VERIFY) I.E. E: 5.9' CONNECT TO EXISTING PROPERTY OWNER DRAIN PIPE. CONTRACTOR TO POTHOLE AND LOCATE PRIOR TO CONSTRUCTION. 44 LF OF 2" DIAMETER CPE PIPE RESTORE ALL LANDSCAPED AREA DISTURBED WITHIN RIGHT OF WAY CB-2, STA 2+06.3A,.0' LT TYPE I CB WITH GRATED COVER Rim: 9.5' I.E. W: 5.0' I.E. E: 5.6' I.E. S: 2.5' 24 LF OF 2" DIAMETER CPE PIPE CB-4, STA 2+96.7A, 6.8' LT TYPE I CB WITH GRATED COVER Rim: 9.5' I.E. W: 7.5' 800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405 EDGE OF ASPHALT ASPHALT THICKENED EDGE STA 2+09.5. 5.2' RT 9 LF OF 2" DIAMETER CPE PIPE SEE WALL DETAIL 5 00 LF OF 2" DIAMETER FUSION WELDED SOLID WALL HDPE PIPE (SDR 2) CB-, STA 2+2.A, 2.8' RT TYPE I CB WITH GRATED COVER Rim: 8.2' I.E N: 2.' I.E. S: 2.0' ASPHALT THICKENED EDGE STA 2+4.8. 5.2' RT PROJECT NO.: ES3090-3 FED. AID NO.: PROVIDE VENT ACCESS STA 20+60.6 B 60 LF OF 2" DIAMETER FUSION WELDED SOLID WALL HDPE PIPE (SDR 2) N SITE AND STORM DRAIN PLAN DIFFUSER TEE INCH SCALE BAR MHHW 3 OF 7 RBNLEE - March 2, 208-4:05 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-03-04.DWG

PROFILE - ALIGNMENT A SCALE: :0 (HORIZONTAL), :0 (VERTICAL) 2 OUTFALL PROFILE - ALIGNMENT B SCALE: :0 (HORIZONTAL), :0 (VERTICAL) RBNLEE - March 2, 208-4:06 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-03-04.DWG P-5 60LF 2" DIAMETER SOLID WALL HDPE PIPE VENT ACCESS STA 20+60.6 B SEE DETAIL, 6 P- 00LF 2" DIAMETER SOLID WALL HDPE PIPE CB-3 RIM: 9.4' I.E. N: 6.0' I.E. E: 5.9' CB-2 RIM: 9.5' I.E. W: 5.0' I.E. E: 5.6' I.E. S: 2.5' CB- RIM: 8.2' I.E. N: 2.' I.E. S: 2.0' CB-4 RIM: 9.5' I.E. W: 7.5' P-2 24LF 2" DIAMETER CPE PIPE @.8% P-4 9 LF 2" DIAMETER CPE PIPE @ 2.% P-3 44LF 2" DIAMETER CPE PIPE @ 2.% BLOCK WALL, SEE 5 PROVIDE ANCHOR BLOCK IN BASE OF WALL. SEE DETAIL, 6 PROVIDE MINOR GRADING AS REQUIRED TO ACCOMMO PIPE INSTALLATION ON SURFACE SLOPE PIPE TO MATCH, APPROXIMATELY 70-PERCENT PROVIDE DIFFUSER TEE AT TERMINUS. SEE DETAIL, 6 CB- INCH SCALE BAR 4 OF 7 STORM DRAIN PROFILES PROJECT NO.: ES3090-3 FED. AID NO.: N/A 800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405

NOTES:. DRAINAGE SLOT (BELOW WALL) SHALL CONSIST OF PERMEABLE BALLAST FILLED TRENCHES (2 TOTAL). EACH TRENCH SHALL HAVE DIMENSIONS OF 2'W X 2'H AND EXTEND FROM BEHIND THE WALL TO DAYLIGHT AT SLOPE IN FRONT OF WALL.. 2. OWNER'S ENGINEER SHALL BE ON SITE TO CONFIRM APPROPRIATE WALL FOUNDATION SUBGRADE CONDITIONS, ASSIST WITH BLOCK LAYOUT, AND VERIFY BACKFILL AND DRAINAGE MEASURES PRIOR TO INSTALLATION. 3. CONTRACTOR SHALL PROVIDE 24-HOUR NOTICE TO ENGINEER PRIOR TO FOUNDATION PREPARATION. 4. CONTRACTOR SHALL BE PREPARED TO PROVIDE ADDITIONAL BLOCKS, AND/OR MODIFY THE LAYOUT OF THE WALL FROM THAT SHOWN HERE, BASED ON FIELD CONDITIONS AND RECOMMENDATIONS GIVEN BY THE OWNER'S ENGINEER. CORNER OF WALL STA +98.3A, 26.3' RT Elevation 20 5 0 05 00 S 68 0'0" E 5-FEET (TYP.) DRAINAGE SLOT LOCATIONS, SEE NOTE-, THIS PROPOSED DRAIN PIPE SHOWN FOR REFERENCE SEE 3 FOR LOCATION INFORMATION C' CLOSURE BLOCKS: SET BACK FROM WALL FACE (SEE PLAN) TOP WALL ELEV. 3.5 RBNLEE - March 2, 208-4:04 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-05.DWG EDGE OF ASPHALT 2.5-FEET (TYP.) 2-INCH HDPE PIPE (PASSING THROUGH 2.5' X 2.5' OPENING) D D' ACPT- ACPT-3/HA- CROSS SECTION C-C' ACPT-2/HA-3 WALL PLAN SCALE: :5 3X BEAM BLOCK WALL ELEVATION C CROSS SECTION D-D' WALL ELEVATION SECTION 2.5' X 2.5' X 5' (W X H X L) PRE-CAST RETAINING WALL BLOCKS (TYP) MIN. 6-INCH CRUSHED SURFACING BASE COURSE (CSBC) CAST IN PLACE CONCRETE ANCHOR (SEE DETAIL 5, 6) 95 95 0 0 20 30 40 SCALE: :5 (HORIZONTAL), :5 (VERTICAL) 2' W x 2' H DRAINAGE SLOT. SEE NOTE- THIS. (TYPICAL OF 2) CLOSURE BLOCK, SETBACK EQUAL TO WIDTH OF BLOCK 20 5 0 05 00 Elevation SAMISH ISLAND EXISTING FILL ACPT-3/HA- ACPT-3/HA- GLACIAL MARINE DRIFT ACPT- GLACIAL TILL 6-INCH MIN. CSBC PERMEABLE BALLAST H CROSS SECTION C-C' SCALE: :0 (HORIZONTAL), :0 (VERTICAL) SAMISH ISLAND SAMISH ISLAND RD, SECTION AT 2+0 A GLACIAL MARINE DRIFT EXISTING FILL GLACIAL TILL ACPT- 0.75 0.75.5.5 FINISHED GRADE 6V FINISHED GRADE H 6-INCH MIN. CSBC 6V ACPT-2/ HA-3 0 0 20 30 40 PERMEABLE BALLAST ACPT-2/ HA-3 -FOOT MIN. EMBEDMENT SAMISH ISLAND RD, SECTION AT 2+24 A 0 0 20 30 40 CROSS SECTION D-D' SCALE: :0 (HORIZONTAL), :0 (VERTICAL) -FOOT MIN. EMBEDMENT PROJECT NO.: ES3090-3 FED. AID NO.: N/A 800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405 BLOCK WALL DETAILS 5 OF 7 INCH SCALE BAR

2" DIA. HDPE PIPE SDR 2 3" MIN. 2:00 3" 5:00 PIPE SDR 2 2" DIA. HDPE FLOW NO HOLES OPPOSITE PIPE HOLE DIAMETER = 3" HDPE REMOVABLE CAP DIFFUSER HOLES: ORIENT TO BEST POSITION AFTER FIELD CHECK, (HOLES BETWEEN THE 2:00 AND 5:00 O'CLOCK POSITION) FLANGED CONNECTION (FLANGES WELDED TO PIPE ENDS). SEE NOTE, THIS. 2" DIAMETER HDPE TEE. SEE NOTE, THIS. 3" BRANCH LENGTH = 3' STAINLESS STEEL THUMB SCREWS SPACING = 3" FLOW FUSION WELD (FLANGED CONNECTION ALSO ACCEPTED) FLOW BEND ANGLE PER PLAN VENT/ACCESS NOTE:. VENT/ACCESS BEND TO BE FUSION WELDED TO HDPE PIPE. HDPE VENT/ACCESS (SEE VIEW A) FABRICATED HDPE VENT/ACCESS BEND, 2" DIA. HDPE PIPE SDR 2. SAWCUT (TYP) REMOVE TOP LAYER EXISTING HMA BEYOND TRENCH LIMIT CSTC, MATCH EXISTING THICKNESS 2" DIAMETER STAINLESS STEEL BOLTS & NUTS VENT VIEW A 2" (TYP) 5" 5" MIN 45" HMA CL /2" PG 64-22, MATCH EXISTING THICKNESS BANK RUN GRAVEL FOR TRENCH BACKFILL PIPE, CENTERED IN TRENCH PIPE ZONE BEDDING MATERIAL 800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405 DIFFUSER TEE DETAIL 2 VENT/ACCESS DETAIL 3 TRENCH DETAIL DIFFUSER TEE NOTES:. HDPE TEE FOR DIFFUSER MAY BE EITHER MOLDED OR WELDED/FABRICATED. 2. HDPE SHALL BE PROVIDED WITH IRON PIPE SIZE (IPS) FLANGED ADAPTERS MATCHING SDR OF HDPE PIPE. BOLT HOLE PATTERN OF FLANGE TO MATCH ANSI B6.. PROVIDE STAINLESS BACKING RINGS ON EACH FLANGE. PROVIDE WATERTIGHT GASKET AND STAINLESS STEEL BOLTING HARDWARE. CAST IN PLACE 3,000 PSI CONCRETE TO ENCAPSULATE AND SURROUND THE PIPE 2.5-FEET W x 2.5-FEET H x 5-FEET L 2" EPOXY DOWEL 5/8-INCH BAR (4 PLACES BETWEEN PRECAST BLOCK AND CAST IN PLACE ANCHOR BLOCK) SHORELINE 2-INCH HDPE DRAIN PIPE WITH IN-LINE FLANGE ANCHOR BOTTOM BLOCK COURSE TEMPORARY PLYWOOD FORM (TYP. BOTH ENDS) SHORELINE PRECAST CONCRETE BLOCKS, PER PLANS, SEE 5 TEMPORARY PLYWOOD FORM (TYP. BOTH ENDS) V 6H.5 H : V FILL SLOPE PERMEABLE BALLAST WALL BACKFILL HDPE DRAIN PIPE WITH IN-LINE ANCHOR FLANGE SLOPED TO DRAIN AND CENTERED IN BLOCK OPENING 2.5-FEET WIDE x 2.5-FEET TALL x 5-FEET LONG CAST IN PLACE CONCRETE 4" CRUSHED SURFACING BASE COURSE MATERIAL ASPHALT THICKENED EDGE 5 8" 2" EDGE OF EXISTING EXISTING BASE ASPHALT THICKENED EDGE DETAIL PROJECT NO.: ES3090-3 FED. AID NO.: N/A MISCELLANEOUS DETAILS PLAN VIEW SECTION VIEW PREPARED CSBC BEARING SURFACE INCH SCALE BAR 4 ANCHOR BLOCK DETAILS 6 OF 7 RBNLEE - March 2, 208-4:06 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-06.DWG

800 CONTINENTAL PLACE (360) 46-400 FAX (360) 46-405 PROVIDE "END WORK" SIGN, SEE NOTE 4, THIS PROVIDE " WORK AHEAD" SIGN, SEE NOTE 4, THIS EDGE OF ASPHALT PROVIDE " WORK AHEAD" SIGN, SEE NOTE 4, THIS TRAFFIC CONTROL NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY TRAFFIC CONTROL PLAN PER CHAPTER 6 TEMPORARY TRAFFIC CONTROL OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) FOR REVIEW AND APPROVAL BY OWNER. 2. CONTRACTOR SHALL MANAGE TRAFFIC PER MUTCD THROUGH DURATION OF CONSTRUCTION. 3. MINIMUM STANDARD FOR TEMPORARY TRAFFIC CONTROL SHALL BE FLAGGER METHOD OF ONE-LANE, TWO-WAY TRAFFIC CONTROL (SECTION 6C. OF MUTCD). 4. PROVIDE CLASS A CONSTRUCTION SIGNAGE CONSISTING OF THE FOLLOWING AT EACH END OF THE PROJECT SITE: WORK AHEAD (W20-, 3 x 3) END WORK (G20-2 8" x 3) 3. POSITION CLASS A CONSTRUCTION SIGNAGE OUTSIDE TRAVELED WAY, WITHIN RIGHT-OF-WAY AT LOCATION BETWEEN 00' AND 200' FROM THE PROJECT LIMITS. INSTALL SIGNS ON FIXED POSTS PER WSDOT STANDARD PLAN K-80.0. PROVIDE "END WORK" SIGN, SEE NOTE 4, THIS PROJECT NO.: ES3090-3 FED. AID NO.: N CLASS-A SIGN PLAN INCH SCALE BAR 7 OF 7 RBNLEE - March 2, 208-4:04 PM - Q:\_GEOTECH\50345 SLIDE\207-03 WALL DESIGN UP\50345-03-04.DWG