Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Similar documents
CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

Davis Frame Co., Inc. Construction Budget Considerations

NAAHB Workgroup Index General Ledger Account

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

ADDENDUM 2 - JULY 14, 2015

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

BuildingAdvisor.com Estimating Checklist

APPLICATION AND CERTIFICATE FOR PAYMENT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Smokey Ridge, Christiansburg, Virginia

Appalachian Log Structures Construction Cost Estimating Guide

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

PAULDING COLLEGE & CAREER ACADEMY

BuildingAdvisor.com Estimating Checklist

Inspection Report. Property Address:

Inspection Report. 1 of 8

REHABILITATION WORK WRITE-UP. Physical Address: Administrator: Grantee:

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Schedule of Values Cruise Terminal 2 Expansion

Handyman & Maintenance Cost Estimator

Item # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Z & C Construction, Inc. Subdivision:

Walnut Creek Mutual Seventy

108 North Grant Street Westmont, IL

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

HC Homes at Tehaleh. Framing

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Helms Builders, Inc.

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Hawthorn Plan - Aspen Hills

Project Manual Index of Specifications Shenandoah Schools Concession Building

Equine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal

Job Cost Summary 11/27/08

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

The Ridgewood. Experience the Elegance of Barkei Drive Batavia, IL. Elevation E

BCT 102 Printreading SAMPLE DESCRIPTION OF MATERIALS #STORIES: WATER SUPPLY PUBLIC: WELL: BEARING SOIL TYPE FOOTING MATERIAL:

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

Property Inspection Checklist

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Exterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood

1634 W CATALPA 5 BED 3.1 BATH ANDERSONVILLE

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

HC Homes at Tehaleh Standard Features

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

REHABILITATION STANDARDS CHECKLIST

PROPOSAL NOTE: ALL SURFACES TO BE PROTECTED AT ALL TIMES. WE ALSO REMOVE AND REHANG DRAPES, MOVE ALL FURNITURE AND PUT IT BACK WHEN JOB COMPLETED.

SINGLE FAMILY HOME SPECIFICATIONS

The Inspector. Property Inspection Report

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Construction Summary

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications

Alabama Home Inspections

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

Newberry. Foundation Framing

PLYMOUTH CREEK HOME OWNERS ASSOCIATION

Quail Run Condominiums

I N C L U D E D F E AT U R E S Catherine s Cove Series

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

Included Features for The Meadows at Slate Run Single Family Homes - Bridgewater, Chelsey, Ashland

PROPERTY PRESERVATION AND CAPITAL PLANNING

Interior Remodeling Proposal

Pre-Listing Home Inspection Checklist

Welcome to Smithfield Crossing Condominiums

1234 Main St Denver CO 80210

Estimate Form for Bathroom Design and Installation

Concrete. Conveying Systems. Doors, Windows & Interiors

Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)

Construction Summary Worksheet

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Waikoloa Homesites. Kohala Coast, HI. Outline Specifications. Prepared By: 16 December 15

Décor Design Construction llc

FIELDS OF NANTERRE. c/o Omega Management, Inc th Avenue North #108 Plymouth, MN MAINTENANCE SERVICE POLICY

Transcription:

Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Pre-Design City Planning Research and Permit Schedule Report 2,500.00 2,500.00 100.00 2,500.00 Create and Review Initial Budget Printing and Document Fees Reimbursement Phase II: Architectural Schematic Design $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Initial Design Additional Code Research (Building/Engineering/Soils Requirements) As-Built Drawings and Site Assessment: Slope, Access Coordination of Surveyor by Architect Surveyor 2,500.00 1,800.00 72.00 1,800.00 Jumpstart Architectural Schemes A1, A2, and A3 6,000.00 6,000.00 100.00 6,000.00 Verification with City Planning - In Person Meeting with Architect and City Planner Schematic Designs B and C Additional Architectural Schemes Site Plan 3-D Massing Model General Contractor - Design and Schematic Budget Review Architect Discussion - Budget Review and Agreement Creation and Submittal of Planning Review Documents City Fee: Planning Permit Fees 4,057.65 4,057.65 100.00 4,057.65 Printing and Document Fees Reimbursement Phase III: Design Development and Details $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Feature and Detail Selections Structural, Mechanical, Plumbing, Heating, Cooling and Electrical Systems Integration Furniture, Fixures and Equipment Recommendations Printing and Document Fees Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 1 of 6 5,250.00 5,250.00 100.00 5,250.00

Reimbursement Phase IV: Construction Documents and Building Permits $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Reports and Documentation Construction Documents 5,961.00 5,100.00 85.56 5,100.00 Civil Engineering Structural Engineering 4,000.00 6,465.35 161.63 6,465.35 Professional Consultant Coordination Arborist Report Hydrology and Drainage Report Recycling Waste Diversion Plan Energy Efficiency Report 300.00 400.00 133.33 400.00 Green Consultant and HERS Rating Hazardous Materials Report 200.00 Geotechnical Report Sewer Lateral Inspection Responses to City's Plan Check Comments and Submittals Plan Check Services Printing and Document Fees 750.00 417.31 55.64 417.31 City Building Permit Fees and Impact Fees Completion and Submittal of Building Permits 300.00 City Fees: Building Permit Plan Check Fee City Fee: Building Permits 2,425.00 3,135.66 129.31 3,135.66 City Fee: Mechanical, Electrical, and Plumbing Permits City and County Impact Fees Sewer or Public Works Fee School Fee Fire Department Plan Check Water Fee Fees 9,580.00 9,580.00 100.00 9,580.00 Reimbursement 482.91 460.61 95.38 460.61 Phase V: Construction $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Design Proposal Estimate Architectural Construction Administration Construction Administration Solicit, Review and Present Bids 250.00 250.00 100.00 250.00 Negotiation and Acceptance of Construction Agreement 250.00 250.00 100.00 250.00 Project Coordination 1,000.00 500.00 99.00 500.00 490.00 Progress Inspections and Site Visits 2,500.00 1,250.00 99.00 1,250.00 1,225.00 Requests For Information (RFIs) and Clarifications 500.00 150.00 99.00 150.00 345.00 Change Order Tracking Including Approval/Denial 500.00 125.00 90.00 125.00 325.00 Construction Progress Assessments & Reporting 500.00 150.00 95.00 150.00 325.00 Invoicing and Payment Administration 1,500.00 450.00 95.00 450.00 975.00 3rd Party Special Engineering Inspections (As Required) Pickups and Deliveries 1,000.00 400.00 95.00 400.00 550.00 Printing and Document Fees 100.00 75.00 100.00 75.00 25.00 Prime Contractor Supervision 1,000.00 750.00 95.00 750.00 200.00 Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 2 of 6

Contractor Mobilization and Set Up Mobilization Project Management 2,000.00 1,000.00 99.00 1,000.00 980.00 Foreman, onsite supervision 4,000.00 800.00 99.00 800.00 3,160.00 Sanitary Facilities 720.00 144.00 100.00 144.00 576.00 Temporary Fencing and Security Barriers Temporary Tree and Plant Protection 500.00 Progress Cleaning 1,500.00 600.00 100.00 600.00 900.00 Final Cleaning 500.00 Hazardous Material Assessment Demolition and Structure Moving 3,000.00 3,000.00 100.00 3,000.00 Hazardous Material Remediation Site Work and Earthwork Earthwork Site Clearing 2,000.00 1,600.00 100.00 1,600.00 400.00 Selective Tree and Shrub Removal Excavation and Fill 3,000.00 3,000.00 100.00 3,000.00 Trenching 1,000.00 1,000.00 100.00 1,000.00 Slope Protection Planting Sub drainage 1,500.00 1,500.00 100.00 1,500.00 Electrical Utilities Solid Waste Collection, Transfer, and Hauling Equipment Prime Contractor Supervision 1,000.00 900.00 100.00 900.00 100.00 Foundation and Concrete Foundation 5,000.00 5,000.00 100.00 5,000.00 Thermal and Moisture Protection of Foundation 1,500.00 1,500.00 100.00 1,500.00 Site Concrete 5,000.00 3,000.00 100.00 3,000.00 2,000.00 Sidewalk work Patio Retaining Walls Driveway Prime Contractor Supervision 750.00 750.00 100.00 750.00 Framing and Carpentry Rough Carpentry 15,000.00 15,000.00 100.00 15,000.00 Hardware and Framing Material 10,000.00 10,000.00 100.00 10,000.00 Entry Roof or Trellis Rough Ladder or Stair Framing Finish Carpentry 7,000.00 100.00 7,000.00 Exterior Window and Door Trim 1,000.00 100.00 1,000.00 Wood Door and Window Casings 1,000.00 100.00 1,000.00 Specialty Ladders, Finish Stairs and Railings Wood Stops, Stools, and Sills 500.00 100.00 500.00 Wood Base and Shoe Moldings 1,000.00 100.00 1,000.00 Wood Fasciae and Soffits 500.00 100.00 500.00 Interior trim 500.00 100.00 500.00 Fasteners Prime Contractor Supervision 750.00 562.50 100.00 562.50 187.50 Insulation and Moisture Protection Thermal Insulation 1,300.00 100.00 1,300.00 Damp proofing and Waterproofing Waterproofing of Shower/Bath Weather Barriers Roof Shingles, Shakes, Metal Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 3 of 6

Siding 1,500.00 100.00 1,500.00 Sheet Metal Flashings Misc. Flashings Manufactured Gutters and Downspouts Fire and Smoke Protection Prime Contractor Supervision 750.00 100.00 750.00 Windows and Doors Interior Doors - Doors 800.00 Interior Doors - Hardware Interior Doors - Install Doors 800.00 100.00 800.00 Interior Doors - Install Hardware Exterior Doors - Doors 600.00 Exterior Doors - Hardware Exterior Doors - Install Doors 800.00 100.00 800.00 Exterior Doors - Install Hardware Windows 2,500.00 Roof Windows, Skylights and SunTunnels Window Hardware Window Flashings Installation of Windows 1,500.00 100.00 1,500.00 Garage Door Prime Contractor Supervision 750.00 100.00 750.00 Finishes Drywall 5,000.00 100.00 5,000.00 Flooring 4,000.00 100.00 4,000.00 Exterior Painting 2,500.00 Interior Painting 4,000.00 100.00 4,000.00 Staining and Transparent Finishing Schedules for Storage Specialties Toilet, Bath, and Laundry Accessories 125.00 Tub and Shower Doors Mirrors Closet and Utility Shelving Kitchen Cabinets Bath Cabinets 200.00 Cabinets Cabinet and Drawer Hardware Cabinet Installation 1,760.00 100.00 1,760.00 Countertops Tile Installation 1,500.00 90.00 1,350.00 Tile Wall Materials Tile Trim Materials Tile Base Materials Tile Floor Materials 500.00 Tile Nooks and ledges for shampoo, soap etc.. Tile Trim Tile Grout Tile Sealer Prime Contractor Supervision 1,000.00 99.00 990.00 Plumbing Plumbing: All Rough and Finish Work 14,000.00 7,000.00 100.00 7,000.00 7,000.00 Water Connection to Main Home Gas Connection to Main Home Sanitary Sewer Pump Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 4 of 6

Sanitary Sewer Lateral Replacement Sanitary Sewer Plumbing Equipment 1,600.00 800.00 50.00 800.00 Water Heaters Lavatories 800.00 Sinks 200.00 Bathtubs Showers Faucets, Supplies, and Trim 100.00 Fire Sprinklers Prime Contractor Supervision 950.00 475.00 100.00 475.00 475.00 Heating, Ventilation, and Air Conditioning HVAC - Flashing HVAC - Ducting 3,000.00 100.00 3,000.00 Ventilation Hoods Vents Fireplaces and Stoves Heaters Radiant Heating Units Energy Recovery Unit Prime Contractor Supervision 300.00 100.00 300.00 Electrical Electrical - All Electrical Hardware and Installation 9,000.00 2,700.00 100.00 2,700.00 6,300.00 Interior Lights 1,200.00 Lighting Details Exterior Lighting Smoke Detection Sensors Oven/Stovetop Refrigerator Washer/Dryer Prime Contractor Supervision 850.00 255.00 100.00 255.00 595.00 Overhead and Profit Overhead and Profit 19,500.00 7,800.00 95.00 7,800.00 10,725.00 Reimbursement 3,076.12 3,076.12 100.00 3,076.12 Phase V: Home Improvements and Site Improvements $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Additional Work Water line Gas line Electrical Service Foundation Electrical service upgrade Phase V: Post Construction $ Budgeted $ Billed to Date % Billed to Date $ Paid to Date $ Due Additional Work Landscaping Patios Drainage Grey water Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 5 of 6

Project Summary and Final Invoice Grand Opening Party Project #1139 - Budget #82 - Version as of 2017-02-07 20:37:24 +0000 - Page 6 of 6