FACILITY PROJECTS. David Mashburn Director of Facility Services AIRPORT INFRASTRUCTURE MANAGEMENT

Similar documents
Business Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017

Planned Procurement Opportunities Report. November 2017

Aviation Capital Construction Program Update

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. May 2017

Planned Procurement Opportunities Report. August 2017

Planned Procurement Opportunities Report. April 2018

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Planned Procurement Opportunities Report. March 2018

CITY OF SAFETY HARBOR ENGINEERING

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

Planned Procurement Opportunities Report. January 2018

Bus Facilities System Infrastructure Rehabilitation

Planned Procurement Opportunities Report. February 2018

jmt.com INNOVATIVE PROJECT DELIVERY Part of a diversified family of solutions

Pavement Design and Construction of Taxilane S to Accommodate New Large Aircraft at LAX

Building an Enterprise GIS for SFO Then and Now

Construction Forecast

Assessment of Environmental Effects Seven-Year Capital Improvement Program

Facilities Council Minutes October 4, 2016

Airport Development Plan Update

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues

MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION FORUM

US-101 CORRIDOR ADVISOR S UPDATE

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

STANDARD OPERATING PROCEDURE NO. 3 Revision No. 1 WICHITA DWIGHT D. EISENHOWER NATIONAL AIRPORT

I-91 Viaduct Public Information Briefing

Outreach Meeting September 29, 2016

ENTERPRISE CAPITAL BROWARD COUNTY CAPITAL BUDGET

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

Shutdown Requests. Gian Catano Contract Administrator December 17, 2014

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

Started in Europe in the early 1980 s Developed & tested by the U.S. Military s Mainstream U.S.A.!!!

Maryland Transportation Authority (MDTA)

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Filing Plans and Specifications

Category Description Cost Year 1: 2015

A197-S4 Maximo Integration Services Asset Inventory and Maintenance Management System. ADDENDA & RESPONSES TO QUESTIONS February 1, 2016

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

SLC Terminal Redevelopment Program. Salt Lake City International Airport

Inspection, Operation, and Rehabilitation Strategies for PennDOT Tunnels (P )

Inner Doha Resewerage Implementation Scheme (IDRIS) Bill Van Wagenen- Programme Director Val S. Frenkel Principal PM

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

American Society of Military Engineers

The Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation:

Pond Closures: Solving a Complicated Puzzle

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

Semi skilled maintenance worker resume

LAX INTERNATIONAL AIRPORT

Bridge Development Update

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Performance Management & Goals

REQUEST FOR PROPOSALS

Port of Grays Harbor Capital Improvement Plan

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

Accelerating Capital Delivery: Streamlining Processes GEC Consultant Procurement. Tuesday, September 19, 2017

Minnesota Airport System Pavement Evaluation 2010 Update

ACE AGE Awards Submission 2017 Entry Form Category: Contractor: Project Name: Project Description: Solutions of Special Projects:

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Design-Build: Delivering Success. Time savings, cost savings and control make the delivery method attractive for all types of projects.

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Facility Improvements

Next PBDG Meeting: PBDG Holiday Gift Giving

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

REPORT Condition D19 Permanent Noise Barriers

Design-Build Capital Infrastructure Project

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

Chapter 18. Quality Assurance and Quality Control

PEPS Pre-RFQ Meeting. IH 10 and US 59 Freeway Expansion from 4 to 6 Lanes CEI Beaumont District. March 5, Date. Footer Text

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

METRO BOARD OF DIRECTORS Capital and Strategic Planning

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)

Challenges of Sustainable Infrastructure AAEES UCI

4 Desired Levels of Service (LOS)

Heavy Equipment Maintenance Building Project. Pre-Bid Meeting and Site Tour

Storm Water and Sanitary Sewer

TriMet Red Line Extension and Operational Improvements Project

Standard Guidelines for the Design, Installation, Maintenance, and Operation of Urban Subsurface Drainage, ASCE/EWRI 12-, 13-, 14-05

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis

KETTERING ICE ARENA STRUCTURAL & MEP STUDY

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

City of Lawrence, Kansas Capital Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Pavement Condition Report

ADDENDUM # 3 DATE: February 16, 2018

Transcription:

FACILITY PROJECTS David Mashburn Director of Facility Services AIRPORT INFRASTRUCTURE MANAGEMENT

FIS FINISH IMPROVEMENTS Image Ideas 2

CAPITAL PLAN FIS Finish Improvements - pictures of current condition 3

LEVEL 1 ENTRY LOBBY REPAIRS 4

CONVEYANCE REPLACEMENT PROGRAM DEN has 314 conveyances 5

LEVEL 4 HOTEL CONFERENCE CENTER Page 6

PUBLIC RESTROOM REMODELS DEN has 171 restrooms 7

2017 PLB REPLACEMENT Status/Schedule Proposed Program replaces five bridges per year Remove & replace five Jet bridges in 2017 as part of the annual PLB replacement program. Start: 4 th Quarter 2017 C48 Southwest (Finished) A30 Delta (November) A45 International ( December) B50 United (during GARDI 1Q 18) B52 United (during GARDI 1Q 18) DEN has 117 loading bridges 8

2018 PLB REPLACEMENT Significant mechanical modifications anticipated A37B- Will impact international traffic C43 B45 B46 A27 A32 9

Page 10 A EAST GROUND LOAD FACILITY EXTENSION 2018

USO REMODEL Replace worn furniture, update finishes, expand office space and entryway, and relocate/add power supplies 11

BOILER #1, 3, 4 REPLACEMENT Start: Kick-off design with Burns & McDonnell mid-august Finish: construction complete Q4 2018 12

R22 CUP CHILLER REPLACEMENT Chiller 1a/b Chiller 2a/b Chiller 3a/b Chiller 4a Chiller 4b Start: August 2016 Finish: Q1 2020 Complete: Contractor proposals are under review DEN Project Manager: Haven Cassidy, PE Haven.Cassidy@flydenver.com - (303) 342-2753 13

XCEL VAULT REPAIRS Figure 1: Figure 2: Figure 3: Figure 4: 14

PROJECT OVERVIEW: XCEL VAULT REPAIRS Concourse B Xcel utility transformers - Basement level Improvements to the eight (8) vault rooms 15

PRE-CONDITIONED AIR CHILLER REPLACEMENT Figure 1: Chiller Pad 6 High Figure 3: Heat exchanger Figure 4: Original pumps 16

ARFF TRAINING SIMULATOR 17

ON-CALL CONVEYANCE MODERIZATION On-call conveyance upgrade project Five year terms Prioritized modernization of critical units Start of multi year program to address all units First on-call to address approximately 25 to 30 units of the 314 Two conveyance companies selected Conveyance designer will be contracted separately to assist Units will be prioritized according to recommendations from the Operations group 18

ON-CALL ROOFING AND WATERPROOFING On-call roofing and waterproofing contract 19 Prioritized modernization of critical roofs at the end of their lives Start of multi year program to address all roofs Conditions assessments of terminal complex flat roofs going on now Will address approximately five to six roofs per season of the outlying buildings Will address waterproofing of the CUP cooling towers Will have a designer as part of the team Two commercially licensed roofing companies selected Five year term(s) Roofs will be prioritized according to recommendations from the stakeholder group

UPCOMING EVENTS DEN Business Education Classes: 10/11 - Basics for Required Computer Programs Unifier, Textura, LCP Tracker, B2G 10/18 - More Basics for Required Computer Programs BIM stuff 11/01 Review of the Yellow Book 11/15 USDOT Small Business Training for DEN (At Denver Public School Facility) 12/06 Collaboration and Project Delivery 12/20 Upcoming AIM Infrastructure Projects 01/10 New DEN project processes DRC, TRC, Capital Planning, and Project Life Cycle. 01/24 Upcoming AIM Facility Projects 02/18 USDOT Small Business Training for DEN (At Denver Public School Facility) 20

INFRASTRUCTURE PROJECTS Michelle H Martin, P.E. Director of Infrastructure AIRPORT INFRASTRUCTURE MANAGEMENT

PEÑA BLVD LEVEL OF SERVICE 22

PEÑA DESIGN-BUILD PROJECT Goals of the Project Improve capacity and level of service (LOS) Provide operational and safety improvements M/WBE Participation 25% for the design portion, and 15% for the construction portion Comprehensive Design-Build Services RFQ s were submitted on 09/19 Interviews in October Short list and the process for vetting design ideas 23

2017 ON-CALL CIVIL DESIGN Advertised on 08/23 Proposals are due back on 10/10 24

2017 ON-CALL CIVIL DESIGN 25

2017 ON-CALL CIVIL DESIGN 26

ANNUAL PAVEMENT REHAB LANDSIDE 2018 Peña Panel Replacements/Closures: Typically inbound 8 p.m. 4 a.m., outbound 11 p.m.-7 a.m. Daily Go/no go meeting at 4 p.m. 27

ANNUAL PAVEMENT REHAB LANDSIDE 2018 28

ANNUAL PAVEMENT REHAB LANDSIDE 2018 Panel replacements/closures on local roads Single lane and shoulder closures Daytime work hours 6 a.m. to 7 p.m. 29

ANNUAL PAVEMENT REHAB LANDSIDE 2018 Peña bridge joint repairs/closures: Typically Inbound 8 p.m. 4 a.m, Outbound 11 p.m.- 7 a.m. Daily go/no go meeting at 4 p.m. 30

PARRC (PARKING AIRPORT RESTORATION & RENEWAL CONSTRUCTION) PROGRAM Scope of Work: Restoration and renewal program for the six DEN surface parking lot facilities. Priority 1 Pikes Peak Design typically by consultant Fig.1: Project Location Construction by either on-call or by low bid procurement 31

PARRC (PARKING AIRPORT RESTORATION & RENEWAL CONSTRUCTION) PROGRAM Fig.1: Project Location 32

PARRC (PARKING AIRPORT RESTORATION & RENEWAL CONSTRUCTION) PROGRAM Fig.1: Project Location 33

PARRC (PARKING AIRPORT RESTORATION & RENEWAL CONSTRUCTION) PROGRAM Fig.1: Project Location 34

PARRC (PARKING AIRPORT RESTORATION & RENEWAL CONSTRUCTION) PROGRAM Fig.1: Project Location 35

ROADWAY EROSION CONTROL 2018 Scope of Work: Construction of water quality (WQ) Pond 2M-7 Decommission existing WQ ponds Erosion mitigation along roadway shoulder OB Peña Blvd & E 78 th Ave connector Status/Schedule: Construction Start: Spring/Summer 2018 Finish: Fall/Winter 2018 36

AIRFIELD CIP MAP??? RW 8-26 Paving & Lighting (2017) Conc. B SE Gate Paving (2017) Conc. B NW Gate Paving (2018) Pond #001 (2018) RW 7-25 Paving & Lighting (2018) TW F, G & H Paving, Lighting and Safety (2018) Annual Pavement Rehab (2018) Annual Pavement Rehab (2019) TW M & L: TW ED to AA (2019) RW 17R-35L Paving (2019/2020) RW 16L-34R Paving & Lighting (2021) 7 th Runway (TBD)? 37

RWY 7/25 LIGHTING & PAVEMENT REHAB Status/Schedule: Design: Approximately 60 % complete Construction: June 1 September 15, 2018 (planned) Scope: Airfield lighting & pavement rehab, Part 139 compliance, utility adjustments 38

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 39

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 40

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 41

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 42

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 43

TW F, G, & H PAVEMENT, LIGHTING & SAFETY AREA 44

DIW POND #001 Scope of Work: Increase DIW (De-icing & Industrial Wastewater) capacity for expansion & paving Fig.1: Manhole location and prioritization map Status/Schedule: Design 100% complete Construction bids Oct. 2018 Construction start Feb. 2018 Fig.3: After epoxy coating Fig.2: Before rehabilitation 45

ANNUAL PAVEMENT REHAB 46

AIRFIELD DRAINAGE IMPROVEMENTS 47

AIRFIELD DRAINAGE IMPROVMENTS 48

ON-CALL GENERAL CONTRACTORS 2017 solicitation in and under review now, interviews in October. 2018 solicitation for four at $25M going out in early 2018. Prequalification at $9M in 2A general building construction Typical work could include: enabling projects for concourse expansion, buildings, HVAC, restroom remodels, office remodeling, work in the CUP (Central Utility Plant), conveyance work, roofing, and utility work 50