MAINTENANCE OF TRAFFIC NOTES

Similar documents
LANE CLOSURE GUIDELINES

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Florida Department of Transportation District 4. To Design, Build, Finance, Operate and Maintain. The I-595 Corridor Roadway Improvements Project

APPENDIX I. Florida Department of Transportation and Florida Highway Patrol Open Roads Policy RFP-DOT-16/ JR

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

The Gateway Expressway FTBA Conference. February 2-3, 2017

CEI Services Transit Bus Stop Infrastructure

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS)

Introduction Who We Are

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

M D 355 [FR E D E R IC K R O A D] OVER

Maryland Transportation Authority (MDTA)

State of Ohio. Department of Transportation ~ Innovative Contracting Manual

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 1 TO: IN THE LETTING OF MARCH 17, 2011

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

INNOVATIVE CONTRACTING GUIDELINES

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

2011 Regional Asphalt Meetings. Frequently Asked Questions

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Florida Gas Transmission Section #3 Hydrostatic Test

RAPID INCIDENT SCENE CLEARANCE (RISC)

STATE AID GUIDE FOR: Updated: December 16, 2005

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

Ohio Department of Transportation

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

Hastings District Council. Whakatu Arterial Link Traffic Management Plan

October 1, Re: Contract ID A Plans, Proposal, EBS, Questions & Answers October 8, 2013 Letting

Table of Contents. List of Appendices

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

PAVEMENT MARKINGS. F. Grooves Cut for Pavement Markings, Symbols, and Legends

Construction Forecast

Standard Performance Attributes for Transportation Projects

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S) Seminole County. Florida s Turnpike Enterprise

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

Working with Transportation Concurrency Exception Areas

500 Interchange Design

Safety. Introduction. Total System

ROADWAY AND ROADSIDE MAINTENANCE

Field Guide on. Safe Maintenance and. Work Zone Operations

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

DOCUMENT CONTROL PANEL

Auckland Transport Code of Practice 2013

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Chapter 18. Quality Assurance and Quality Control

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

SECTION 5 EXCEPTIONS AND MODIFICATIONS

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

YORK TOLL PLAZA MAINE TURNPIKE AUTHORITY AIR QUALITY REPORT. September 28, 2016 NOISE ANALYSIS REPORT MAINETURNPIKE AUTHORI TY

Table of Contents. I-4 Express Lanes Concept of Operations

Executive Summary. Overview

Selecting Projects for Accelerated Bridge Construction

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

Request for Information from the Florida Dept. of Transportation

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

ROAD PAVEMENTS GENERAL

EXCAVATION PERMIT CHECKLIST

Origin-Destination Trips and Skims Matrices

0100 GENERAL 0200 PROJECT MANAGEMENT

SCOPE OF SERVICES TRAFFIC SIGNAL MAST ARMS & HIGH MAST LIGHT POLE INSPECTIONS IN MIAMI DADE COUNTY

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification.

II. Approval of June 23, 2015 Meeting Notes. IV. Recap of the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.

I-91 Viaduct Public Information Briefing

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

Maintenance of Traffic for Innovative Geometric Designs Work Zones

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings.

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four


2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

ITR CONCESSION COMPANY LLC

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

CITY OF SAFETY HARBOR ENGINEERING

Water Pollution Control for Work in Sensitive Areas

Transcription:

MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN. TURNPIKE FACILITY NAME SR 91 RAMP X RAMP X RAMP X REGULATORY SPEED 2. PREPARE AN INCIDENT MANAGEMENT PLAN (IMP) FOR EMERGENCY VEHICLE ACCESS WHILE TEMPORARY BARRIER WALL IS BEING UTILIZED ON THE PROJECT. SUBMIT PLAN 21 DAYS PRIOR TO THE INSTALLATION OF TEMPORARY BARRIER WALL ON SITE. 3. FHP TROOP K SHALL SERVE AS THE POINT OF CONTACT AND SCHEDULING FOR ALL TRAFFIC CONTROL NEEDS ON THE TURNPIKE. MAKE PROVISIONS FOR A TRAFFIC CONTROL OFFICER FOR TRAFFIC CONTROL AT THE SPECIFIC LOCATIONS CALLED OUT IN THE PLANS, BY CONTACTING THE REGIONAL DISTRICT AT (THE DESIGNER IS REQUIRED TO INSERT THE APPROPRIATE COUNTY CONTACT): COUNTY CONTACT NUMBER Palm Beach 561 357 4294 St. Lucie/Okeechobee/Indian River/Martin 772 873 6541 Broward 954 908 3872 Miami Dade 305 378 4235 Osceola/Orange/Lake/Sumter/Seminole 407 264 3225 Pasco/Hillsborough/Hernando/Polk 813 558 1117 4. MAKE PROVISIONS FOR A TRAFFIC CONTROL OFFICER (FHP TROOP K) FOR ALL LANE CLOSURES, RAMP CLOSURES REQUIRING DETOURS AND/OR AS DIRECTED BY THE ENGINEER. ALL COSTS ARE INCLUDED IN 102 14. IF THE CONTRACTOR ELECTS TO USE OFFICERS FOR ANY OTHER ACTIVITY, INCLUDE THE COST IN LUMP SUM MOT, PAY ITEM 102 1. 5. ACCELERATION AND DECELERATION OF ALL CONSTRUCTION VEHICLES WITHIN A TRAVEL LANE IS PROHIBITED. CONTRACTOR SHALL MAKE PROVISIONS FOR CONSTRUCTION VEHICLE ACCESS TO THE WORK AREAS INCLUDING MATERIAL DELIVERY. LANE CLOSURES MAY BE WARRANTED FOR CERTAIN CONSTRUCTION VEHICLES TO ACCESS THE WORK AREAS. COORDINATE ALL ACCESS LOCATIONS WITH THE ENGINEER. 1

6. ALL LANE CLOSURES AND CONSTRUCTION ACTIVITIES MUST COMPLY WITH PROVISIONS AS OUTLINED IN FLORIDA S TURNPIKE ENTERPRISE LANE CLOSURE POLICY (FTE Policy #0006). THIS POLICY IS AVAILABLE IN THE DOCUMENTS & PUBLICATIONS SECTION OF THE FLORIDA S TURNPIKE DESIGN WEBSITE, WHICH CAN BE ELECTRONICALLY FOUND AT http://floridasturnpike.com/design/docsandpubs.html OR BY CONTACTING THE TRAFFIC OPERATIONS CENTER IN POMPANO AT (954) 975 4855. 7. COMPLY WITH THE FLORIDA S TURNPIKE ENTERPRISE U TURN POLICY (FTE Policy #0008) THROUGHOUT THE DURATION OF THE CONSTRUCTION CONTRACT. THE U TURN POLICY IS AVAILABLE IN THE DOCUMENTS & PUBLICATIONS SECTION OF THE FLORIDA S TURNPIKE DESIGN WEBSITE, WHICH CAN BE ELECTRONICALLY FOUND AT http://floridasturnpike.com/design/docsandpubs.html. LANE/RAMP CLOSURE(S): 1. RAMP CLOSURES WILL BE REQUIRED TO COMPLETE SOME CONSTRUCTION ACTIVITIES HOWEVER; THESE CLOSURES ARE SUBJECT TO THE FOLLOWING RESTRICTIONS: WHEN IMPLEMENTING RAMP CLOSURES EITHER CLOSE BOTH ON RAMPS SIMULTANEOUSLY OR BOTH OFF RAMPS SIMULTANEOUSLY. CLOSURE OF ALL RAMPS SIMULTANEOUSLY OR IN ANY OTHER COMBINATION IS NOT PERMITTED. ONLY CLOSE THOSE RAMPS THAT ARE INTENDED TO BE WORKED ON EACH EVENING. COORDINATE RAMP CLOSURES WITH ANY ADJACENT CONSTRUCTION AT ADJOINING INTERCHANGES IN THE AREA. THE ANTICIPATED NUMBER OF CLOSURES IS XX NIGHTS EACH FOR THE ON RAMPS AND XX NIGHTS EACH FOR THE OFF RAMPS. 2. THE NUMBER OF LANES CLOSED AND THE HOURS LANE CLOSURES ARE PERMITTED ARE AS FOLLOWS: FACILITY NAME (TPK MAINLINE, RAMPS, SIDEROADS): ONE LANE CAN BE CLOSED IN ONE DIRECTION BETWEEN XX: XX AM/PM TO XX: XX AM/PM TWO LANES CAN BE CLOSED IN ONE DIRECTION BETWEEN XX: XX AM/PM TO XX: XX AM/PM THREE LANES CAN BE CLOSED IN ONE DIRECTION BETWEEN XX: XX AM/PM TO XX: XX AM/PM SINGLE LANE RAMPS CAN BE CLOSED BETWEEN XX:XX AM/PM TO XX:XX SINGLE LANE CLOSURE ON MULTILANE RAMPS CAN BE CLOSED BETWEEN XX:XX AM/PM TO XX/XX RAMP DETOURS CAN OCCUR BETWEEN XX:XX AM/PM TO XX/XX MARKINGS, SIGNING: 1. REMOVABLE PAVEMENT MARKINGS WILL BE PERMITTED ON BRIDGE DECKS ONLY OR WHERE INDICATED IN THE TRAFFIC CONTROL PLAN. 2

TEMPORARY SIGNALS: 1. AT LOCATIONS WHERE TEMPORARY SIGNAL HEADS ARE TO BE SUPPORTED ON THE NEWLY CONSTRUCTED MAST ARMS, THE TEMPORARY SIGNAL CABLE IS TO BE SECURED OUTSIDE OF THE MAST ARMS AND PROTECTED THROUGHOUT CONSTRUCTION. UNDER NO CIRCUMSTANCES WILL TEMPORARY HOLES BE DRILLED IN EITHER THE MAST ARMS OR POLES. TOLL PLAZA COORDINATION: TOLLS AET LANE CLOSURE RESTRICTIONS 1. WHEN IT IS NECESSARY TO CLOSE AET TRAFFIC LANES (AET LANES) IN ORDER TO FACILITATE CONSTRUCTION, TAKE RESPONSIBILITY TO SCHEDULE ACTIVITIES SO AS TO MINIMALLY IMPEDE TRAFFIC MOVEMENT AND/OR TOLL COLLECTION OPERATIONS. 2. NO AET LANE CLOSURES WILL BE PERMITTED DURING PEAK TRAFFIC PERIODS. PEAK TRAFFIC PERIODS AND TRAFFIC DIRECTION MAY VARY ON DIFFERENT DATES AND MUST BE CONFIRMED WITH THE TOLL FACILITIES ENGINEERING MANAGER AND THE TURNPIKE TRAFFIC OPERATIONS ENGINEER. 3. WHEN MOT DEVICES MUST BE PLACED IN AET LANES WITHIN OR IN THE IMMEDIATE VICINITY OF THE TOLLING LOOPS, THE MOT DEVICES SHALL NOT BE MADE OF METAL OR CONTAIN METAL. METALLIC DEVICES OR DEVICES CONTAINING METAL WILL INTERFERE WITH THE PERFORMANCE OF THE TOLLING LOOPS AND SHALL NOT BE USED WITHIN OR IN THE IMMEDIATE VICINITY OF THE TOLLING LOOPS. 4. SUBMIT A WEEKLY ACTIVITY SCHEDULE SHOWING TIME AND DATE OF ANTICIPATED AET LANE CLOSURES. A MINIMUM OF TWO WORKING DAYS NOTICE WILL BE REQUIRED TO CLOSE AET LANE(S). AET TOLL LANE CLOSURES MUST BE COORDINATED WITH AND APPROVED BY THE TOLL FACILITIES ENGINEERING MANAGER. TOLLS AET LANE MILLING AND RESURFACING RESTRICTIONS 1. ASSUME RESPONSIBILITY TO CLEAN AET LANE(S) WITH A DEPARTMENT APPROVED METHOD AS A RESULT OF PAVING (MILLING AND RESURFACING) OPERATIONS NEAR THE AET LANES. WATER BLASTING METHOD MAY BE USED TO REMOVE TAR AND TACK BUILD UP IN AREAS OUTSIDE OF THE TOLLING LOOPS. TAR AND TACK BUILD UP WITHIN THE TOLLING LOOP PAVEMENT AREA MUST BE CAREFULLY REMOVED MANUALLY BY A DEPARTMENT APPROVED METHOD THAT DOES NOT DAMAGE THE LOOPS AND THE LOOP SEALANT MATERIAL. THERE IS NO DIRECT COMPENSATION FOR THIS ACTIVITY AND THE PRICE IS TO BE INCLUDED IN THE OTHER ITEMS OF WORK. 2. PROTECT THE TOLLING LOOPS WHEN PAVING OPERATIONS REQUIRE EQUIPMENT TO TRAVEL THROUGH THE AET LANES. 3

3. IF MILLING AND RESURFACING WITHIN THE TOLLING LOOPS OF AET LANE(S), REPAIR AND REPLACE ALL FLEX DELINEATORS AND ASSOCIATED EQUIPMENT AND ALSO MAKE SURE THAT PROVISIONS ARE INCLUDED WHICH ADDRESS THE REPLACEMENT OF THE TOLLING LOOPS AND RE TUNING OF THE TOLLING SYSTEM. 4. IF MILLING AND RESURFACING WITHIN THE TOLLING LOOPS OF AET LANE(S), THE CONTRACTOR SHALL NOTIFY FTE TOLLS OF ANY IMPENDING MILLING AND RESURFACING OF TOLLING LOOPS UNDER THE AET GANTRY NO LESS THAN SIX (6) WEEKS PRIOR TO THE WORK BEING PERFORMED. THIS WORK (FURNISH AND INSTALL) MUST BE PERFORMED BY A CERTIFIED IDRIS TECHNOLOGY PARTNER (ITP) AND INSTALLATION SHALL BE OBSERVED BY A DEPARTMENT DESIGNATED REPRESENTATIVE FROM THE DEPARTMENT S TOLL OPERATIONS DEPARTMENT. ALL REQUIRED CORRECTIVE ACTIONS TO BRING THE AET LANES INTO OPERATION NO LESS THAN EQUIVALENT TO OPERATION PRIOR TO THE MILLING AND RESURFACING IS REQUIRED. THERE IS NO DIRECT COMPENSATION FOR THIS ACTIVITY AND THE PRICE IS TO BE INCLUDED IN THE OTHER ITEMS OF WORK. 5. IF MILLING AND RESURFACING WITHIN THE TOLLING LOOPS OF AET LANE(S), REPLACE THE VDAC TRANSVERSE PAVEMENT MARKING EXISTING AT AET LANES IF AFFECTED BY THE MILLING AND RESURFACING WORK. PAINT MANUFACTURER AND TYPE TO BE APPROVED BY THE DEPARTMENT. THERE IS NO DIRECT COMPENSATION FOR THIS ACTIVITY AND THE PRICE IS TO BE INCLUDED IN THE OTHER ITEMS OF WORK. SPECIAL NOTES FOR ALL RESURFACING WORK: 1. MEDIAN BARRIER IMPROVEMENT SHALL BE CONSTRUCTED WITH INSIDE LANE CLOSURES UNLESS OTHERWISE SPECIFIED. ANY GAPS IN THE MEDIAN BARRIER DUE TO CONSTRUCTION ACTIVITIES WILL BE PROTECTED DURING NON WORK HOURS. 2. SHOULDERS SHALL BE SWEPT AND CLEANED OF DEBRIS PRIOR TO SHIFTING TRAFFIC ONTO THEM. 3. ALL MILLED SURFACES SHALL BE PAVED PRIOR TO OPENING TO TRAFFIC. GENERAL MOT NOTES FOR LANDSCAPING PROJECTS: 1. (This note shall apply if the design plans do not include a traffic control plan.) PRIOR TO BEGINNING WORK THE CONTRACTOR SHALL SUBMIT, TO THE ENGINEER, A TRAFFIC CONTROL PLAN FOR INSTALLATION AND MAINTENANCE ACTIVITIES. 2. ACCELERATION AND DECELERATION OF ALL CONSTRUCTION VEHICLES WITHIN A TRAVEL LANE IS PROHIBITED. CONTRACTOR SHALL MAKE PROVISIONS FOR CONSTRUCTION VEHICLE ACCESS TO THE WORK AREAS INCLUDING MATERIAL DELIVERY. LANE AND/OR SHOULDER CLOSURES MAY BE WARRANTED FOR CERTAIN CONSTRUCTION VEHICLES TO ACCESS THE WORK AREAS. CONTRACTOR SHALL COORDINATE ALL ACCESS LOCATIONS WITH THE ENGINEER. 4

3. ALL LANE CLOSURES AND CONSTRUCTION ACTIVITIES MUST COMPLY WITH PROVISIONS AS OUTLINED IN FLORIDA S TURNPIKE ENTERPRISE LANE CLOSURE POLICY AND PROCEDURE. THIS POLICY IS AVAILABLE AT THE END OF CHAPTER 10, VOLUME 1 OF THE TURNPIKE PLANSPREPARATION AND PRACTICES HANDBOOK (TPPPH), WHICH CAN BE ELECTRONICALLY FOUND AT http://design.floridasturnpike.com WITHIN THE DESIGN MANUALS SECTION, OR BY CONTACTING THE TRAFFIC OPERATIONS CENTER IN POMPANO AT (954) 975 4855. COORDINATE ALL LANE CLOSURES REQUESTS ON TURNPIKE ENTERPRISE FACILITIES WITH THE TRAFFIC OPERATIONS CENTER. REQUESTS ARE TO BE SUBMITTED TWO (2) WEEKS IN ADVANCE OF ANY LANE CLOSURES. IN ADDITION, ALL LANE CLOSURES MUST BE COORDINATED WITH PUBLIC INFORMATION OFFICER AND TOLL OPERATIONS AS WELL AS LOCAL SPECIAL EVENTS. 4. DURING THE ESTABLISHMENT OF THE LANDSCAPE PROJECT, ALL MAINTENANCE ACTIVITIES THAT IMPACT THE TRAVELING PUBLIC ARE PROHIBITED DURING PEAK TRAFFIC PERIODS. PEAK TRAFFIC PERIODS AND TRAFFIC DIRECTION MAY VARY ON DIFFERENT DATES AND MUST BE CONFIRMED WITH THE ENGINEER THROUGH THE TRAFFIC OPERATIONS CENTER. 5. (This note may apply if the design plans include a traffic control plan.) RECOMMENDED ACCESS POINTS TO WORK ZONES, AS WELL AS LENGHTS AND LOCATIONS OF SHOULDER/SINGLE LANE CLOSURES HAVE BEEN PROVIDED IN THE TRAFFIC CONTROL PLANS. DEVIATION FROM THE ACCESS POINT LOCATION, THE LENGTH AND LOCATION OF SHOULDER/SINGLE LANE CLOSURES, OR TCP DEVICES DEPICTED IN THE PLANS IS PERMITTED AS LONG AS THEY ARE COORDINATED WITH THE ENGINEER AND ALL APPLICABLE REQUIREMENTS OF FDOT STANDARD PLANS FOR ROAD CONSTRUCTION (102 SERIES) HAVE BEEN MET. 6. (This note may apply if the project limits include tolling points.) WHEN IT IS NECESSARY TO CLOSE LANES AND/OR SHOULDERS NEAR TOLLING POINTS IN ORDER TO FACILITE CONSTRUCTION, TAKE RESPONSIBILITY TO SCHEDULE ACTIVITIES SO AS TO MINIMALLY IMPEDE TRAFFIC MOVEMENT AND/OR TOLL COLLECTION OPERATIONS. 7. (This note may apply if the project limits include tolling points.) NO AET LANE CLOSURES WILL BE PERMITTED DURING PEAK TRAFFIC PERIODS. PEAK TRAFFIC PERIODS AND TRAFFIC DIRECTION MAY VARY ON DIFFERENT DATES AND MUST BE CONFIRMED WITH THE ENGINEER THROUGH THE TOLL FACILITIES ENGINEERING MANAGER AND THE TURNPIKE TRAFFIC OPERATIONS ENGINEER. 8. (This note may apply if the project limits include tolling points.) WHEN MOT DEVICES MUST BE PLACED IN AET TRAFFIC LANES WITHIN OR IN THE IMMEDIATE VICINITY OF THE TOLLING LOOPS, THE MOT DEVICES SHALL NOT BE MADE OF METAL OR CONTAIN METAL. METALLIC DEVICES OR DEVICES CONTAINING METAL WILL INTERFERE WITH THE PERFORMACE OF THE TOLLING LOOPS AND SHALL NOT BE USED WITHIN OR IN THE IMMEDIATE VICINITY OF THE TOLLING LOOPS. 5

9. (This note may apply if the project limits include tolling points.) THE CONTRACTOR SHALL SUBMIT A WEEKLY ACTIVITY SCHEDULE SHOWING TIME AND DATE OF ANTICIPATED AET LANE CLOSURES. A MINIMUM OF TWO WORKING DAYS NOTICE WILL BE REQUIRED TO CLOSE AET LANE(S). AET TOLL LANE CLOSURES MUST BE COORDINATED WITH AND APPROVED BY THE ENGINEER THROUGH THTE TOLL FACILITIES ENGINEERING MANAGER. 6