The World Bank Vietnam Renewable Energy Development Project (P103238)

Similar documents
The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank KI: Telecommunications and ICT Development Project (P126324)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Name Previous Rating Current Rating

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

The World Bank Sustainable Land Management Project (P133133)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

The World Bank Pernambuco Rural Economic Inclusion (P120139)

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

Implementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-42150,IDA-42160,IDA-42170,IDA-46450,IDA- 30-Jun ,000,000.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-51229) ON A

Thailand Power Development Plan ( ) TANONGSAK WONGLA

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

Financial Results of PGNiG SA Q August 13th 2008

SREP Operational and Results Report TITLE SLIDE. DATE December 14, 2017 PLACE Washington, DC VENUE SREP Sub-Committee Meeting

Electric Forward Market Report

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

Evolution of SWIFT pricing. September 2015

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

Public Disclosure Copy

Japan s Assistance for the Reconstruction of Iraq

Emissions Trading in China Progress on the Path towards a Unified National System

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Learnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 50,000,

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( )

Wind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am

Terms of Reference Governance Committee

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00

For Bandon Utilities Commission

Wairakei site tour. 22 October 2015 Dennis Barnes, Chief Executive Officer

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

PROJECTS & ACHIEVEMENTS in Energy Efficiency and Renewable Energies in Lebanon

Renewable Energy and Climate Change: The CIF Experience TITLE SLIDE

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

People s Republic of China: Fujian Pacific Electric Company Limited

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Contents. Introduction. Introduction. First Power Plant based on AC Tesla s s principles 1900! Recent Energy Sector Development

PJM EIS Generation Attribute Tracking System (GATS)

Renewable Energy and Climate Change: The CIF Experience TITLE SLIDE

The World Bank Market Instruments for climate change mitigation in Chile (P130378)

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

SECTOR ASSESSMENT (SUMMARY): POWER Sector Performance, Problems, and Opportunities

Electric Price Outlook April 13, 2017

Financial Results Meeting: The 1st 3 Months of FY Ending March (April 1, 2016 June 30, 2016) August 9, 2016

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT

BUSINESS PLAN COVER PAGE

Alumina in focus Supply, Demand and Pricing

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

ENERGY AND WATER STATISTICS 2016

Transcription:

Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies: Ministry of Industry and Trade, The Renewable Energy Dv Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:05-May-2009 Planned Mid Term Review Date:03-Dec-2012 Original Closing Date:30-Jun-2014 Project Development Objectives Effectiveness Date:14-Sep-2009 Actual Mid-Term Review Date:26-Nov-2012 Revised Closing Date:30-Jun-2018 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The objective of the proposed project is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally and socially sustainable basis. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Renewable Energy Investments - IDA funds:(cost $202.00 M) Public Disclosure Authorized Regulatory Development:(Cost $1.03 M) Pipeline Development:(Cost $3.35 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions 2/14/2018 Page 1 of 9

As of January 15, 2018, the project has fully achieved and exceeded two main development objective indicators: (i) 960 GWh/year of renewable electricity supplied to the grid; and (ii) 5.1 GWh/year of electricity supplied to the grid by grid-connected renewables projects using avoided cost tariff (ACT). Nineteen subprojects have been approved under REDP providing an estimated amount of 1,250 GWh renewable electricity annually to the grid under REDP and exceeding the PDO target of 960 GWh/year. Among them, 14 subprojects have been completed with total capacity of 250.2 MW, 960 GWh/year. The five remaining subprojects are in progress to be completed in 2018 and early 2019; most of the proposed activities under SECO grant have been completed by the Grant closing date (June 30, 2017). MOIT will use the IDA credit to complete three ongoing and new activities, and seek other grant sources to implement remaining tasks; (iii) Carbon Partnership Facilities (CPF) progressed satisfactorily. The fifth verification is expected to be conduction in March 2018. The IDA credit amount has been fully committed. The cumulative IDA disbursement was US$146.5 million (74%). The figure for the SECO Grant was US$1.524 million (67%) and an unused amount of US$ 822,243 has been returned to SECO. CPF disbursement was US$ 0.53 million or 6% of CPF fund. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Moderate Moderate Environment and Social -- Moderate Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators PHINDPDOTBL Electricity supplied to the national grid by renewable energy project financed under REDP (Gigawatt-hour (GWh), Custom) 0.00 960.00 960.00 960.00 Date 31-Dec-2008 30-Jun-2017 31-Dec-2017 31-Dec-2018 2/14/2018 Page 2 of 9

PHINDPDOTBL Electricity supplied to the national grid by grid connected renewable energy projects using Avoided Cost Tariff (Gigawatt-hour (GWh), Custom) 0.00 3,344.00 5,100.00 1,250.00 Date 31-Dec-2008 30-Jun-2017 31-Dec-2017 30-Jun-2018 PHINDPDOTBL Percentage renewable energy projects (small hydro) meeting new environment and social best practices (Percentage, Custom) 0.00 80.00 90.00 100.00 Overall Comments Intermediate Results Indicators Renewable energy capacity installed under REDP (Megawatt, Custom) 0.00 250.20 250.20 250.00 Date 31-Dec-2008 30-Jun-2017 31-Dec-2017 30-Jun-2018 2/14/2018 Page 3 of 9

Generation Capacity of Hydropower constructed or rehabilitated under the project (Megawatt, Custom) 0.00 250.20 250.20 250.00 Generation Capacity of Hydropower constructed under the project (Megawatt, Custom Breakdown) 0.00 250.20 250.20 250.00 Date 05-May-2009 30-Jun-2017 15-Jan-2018 30-Jun-2018 Renewable energy capacity financed using ACT by non IDA sources (Megawatt, Custom) 0.00 680.63 1,544.39 150.00 Date 31-Dec-2008 30-Jun-2017 31-Dec-2017 30-Jun-2018 Proportion of commissioned subprojects under REDP meeting appraised budget, timetable and performance (Percentage, Custom) 0.00 70.00 80.00 70.00 2/14/2018 Page 4 of 9

Law on Energy Conservation (Text, Custom) Under preparation Passed Passed Passed Renewable Energy Deverlopment Stratery (Text, Custom) Not in place Approved Approved Approved Adoption of technical standards for small hydro (Text, Custom) Not in place Technical standard for small hydro adopted Technical standard for small hydro adopted Technical standard for small hydro adopted Environmental guideline for small hydro (Text, Custom) Not in place Approved and launched Approved and launched Issued at the MTR and implemented at ICR 2/14/2018 Page 5 of 9

Social guideline for small hydro (Text, Custom) Not in place Approved and launched Approved and launched Issued at the MTR and implemented at ICR Annual updating of the ACT (Text, Custom) Approved Updated for 2009, 2010, 201, 2012, 2013, 2014, 2015, 2016 and 2017. New circular on ACT has been issued Updated for 2009, 2010, 201, 2012, 2013, 2014, 2015, 2016 and 2017. New circular on ACT has been issued Implemented Number of SPPAs signed for grid-connected renewables (Number, Custom) 0.00 301.00 244.00 30.00 Date 05-May-2009 30-Jun-2017 15-Jan-2018 30-Jun-2018 National Renewable Energy Database (Text, Custom) No national renewable energy database is available Under preparation Under preparation A national renewable energy database is developed Date 30-Jun-2014 30-Jun-2017 31-Dec-2017 30-Jun-2018 2/14/2018 Page 6 of 9

Capacity of pipeline of RE subprojects supported by the facility (Megawatt, Custom) 0.00 25.00 25.00 25.00 Number of improved/new training courses offered on a cost-sharing basis (Number, Custom) 0.00 13.00 13.00 8.00 Number of trainees from banks and sponsors (Number, Custom) 0.00 110.00 110.00 50.00 Study on financing needs for pipeline of renewable energy projects (Text, Custom) None Completed Completed Completed Overall Comments 2/14/2018 Page 7 of 9

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P103238 IDA-45640 Effective USD 202.00 202.00 0.00 146.36 50.29 74% P103238 TF-98460 Closed USD 2.27 1.52 0.75 1.52 0.00 100% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P103238 IDA-45640 Effective 05-May-2009 16-Jun-2009 14-Sep-2009 30-Jun-2014 30-Jun-2018 P103238 TF-98460 Closed 20-Dec-2010 25-Apr-2011 25-Apr-2011 30-Jun-2014 30-Jun-2017 Cumulative Disbursements Restructuring History Level Approved on 02-Jul-2014,Level 2 Approved on 30-Jun-2016 2/14/2018 Page 8 of 9

Related Project(s) P110476-Vietnam Renewable Energy Development Project 2/14/2018 Page 9 of 9