Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Size: px
Start display at page:

Download "Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Operation Name: Montenegro Institutional Development and Agriculture Project Stage: Implementation Seq.No: 3 Status: ARCHIVED Last Modified : 04-May-2011 Strengthening (MIDAS) (P107473) Country: Montenegro Approval FY: 2009 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Ministry of Agriculture, Forestry, and Water Management (MAFWM) Key s Board Approval 21-Apr-2009 Original Closing Planned Mid Term Review 15-Dec-2011 Last Archived ISR 29-Jun-2010 Effectiveness 23-Jul-2009 Revised Closing Actual Mid Term Review Project Development Objectives Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve delivery of government assistance for sustainable agriculture and rural development in a manner consistent with the EU's pre-accession requirements. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P110602) Global Environmental Objective (from Project Appraisal Document) The Global Environment Objective is to mainstream sustainable land use and natural resource management into MAFWM's policies, programs and investments. These efforts will be particularly critical for the north of Montenegro, where there are sensitive mountain ecosystems of global importance, and where poor rural residents are largely dependent on the natural resource base for their livelihoods. Has the Global Environmental Objective been changed since Board Approval of the Program? Yes Component(s) No Component Name Component Cost Component 1: Strengthening MAFWM's rural development program Component 2: Strengthening MAFWM's administrative and management capacity in accordance with EU pre-accession requirements Component 3: Project Management, Administration and Monitoring 0.86 Overall Ratings Page 1 of 9

2 Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview The Montenegro Institutional Development and Agriculture Strengthening (MIDAS) is progressing well with the Census completed and several activities initiated under the food safety component. However, several activities are also lagging behind the agreed time schedule, most notably the activities related to the establishment of the Farm Register and the implementation of the MIDAS Grants Program. Difficulties in attracting qualified applicants for assignments remain an issue under MIDAS, and could slow implementation in the future. Results Project Development Objective Indicators MAFWM capacity to disburse and track the use of rural development funds and to evaluate their impact in line with EU IPARD requirements. Limited coverage of monitoring and verification. Proto-Paying Agency and Rural Development Unit in place and receiving TA from parallel EU Twinning Project (two new person employed) 07-May-2010 Fully compliant monitoring and evaluation system, eligible for EU accreditation. EU IPARD compatible rural development measures fully integrated in MAFWM support programs. No EU IPARD compatible rural development measures in MAFWM support programs EU-IPARD compatible rural development measures currently being defined in detail, and draft sectoral analyses (which will be part of IPARD plan) almost finished. Rural development measures defined in EU IPARD program Page 2 of 9

3 Food safety system upgraded in EU compliant manner. Reference Labs lacking equipment and/or facilities, BIPs and food processing est ablishments not meeting EU standards, animal byproducts not safely disposed of - Vet lab applied for accreditation on July 2010 and this is now in process. Equipment is being procured. - Expert for BIP strategycompleted assignment and architects will be contracted later this year. - IMB Kotor nominated as a reference national body to implement monitoring of water for needs of mariculture, starting from spring Lab accreditation completed, supply of BIP equipment, full monitoring of water a nd aquaculture products, full disposal of animal by-products, food establishments meeting EU standards for approval Global Environmental Objective Indicators Agri-environmental measures integrated into MAFWM's rural development program. Limited integration of agrienvironmental measures in support programs; Rural De velopment Unit has no agri-environmental staff. Agri-environmental measures integrated in National MAFWM's rural development program. Consultant is contracted to support the client in drafting necessary background document and provide input for such measures. Evaluation and analysis of applications for agri-environmental measures continui ng. Page 3 of 9

4 Improved capacity of extension and advisory services to introduce agrienvironmental measures. Extension service has no training program for or staff specialized in agri-envir onment. Delay in recruiting consultants for this task. REoI for Agri Envirnmental Expert for Advisory Services published, and now in the phase of evaluation. All Extension Officers delivering comprehensive service for agri - environmental measures. Intermediate Results Indicators Investments in agricultural competitiveness among beneficiaries. Number of commercial oriented farmers availing of market driven support measures approx Govt. provides investment support to 1200 farmers. Total number of farmers in country unknown. Baseline to be established in PY1 after Ag Census. Num of applications for National fund increased, GOM for Midas grants drafted for measure On Farm Investments - in line with IPARD measure. Increase in adoption of measures by 30% of farm households. Adoption of agri-environmental measures among beneficiaries. Low awareness and use of agrienvironmental measures among farmers, processors, and rural communities. Baseline to be established in PY 1 Funds provided using national funds, but not yet MIDAS funding. The total number of farm households is unknown. This will be established after the Ag Census. Adoption of agri-environmental measures by 20% of agricultural households. Page 4 of 9

5 Investments in non-farm activities among beneficiaries. No support for income diversification available for farmers, processors, and rural communities. Baseline to be established in PY 1 A measure for this is not yet in place at this stage but is foreseen to be developed under the EC Twinning Project. A diversification measure is adopted under the National Fund. Adoption of non-farm activities by 20% of agricultural households. EU IPARD compatible Rural Development Plan, including agrienvironmental measures, approved and overseen by a Monitoring Committee. No EU IPARD compatible Rural Development Unit or Plan. Not yet, but have draft measures and draft sectoral analyses (which will be part of IPARD plan) are almost completed. Beneficiary guidelines completed and Monitoring Committee reviews outcomes. All agricultural and rural development payments executed through an EU IPARD compatible Proto-Paying Agency (as approved by the World Bank). Non-compliant system. Rural Development Unit will be established and Plan completed in PY2. The Guidelines are to be completed in PY3 and the Monitoring Committee should review outcomes from PY4. A Grants Operation Manual in line Proto-Paying Agency operational. with most IPARD requirements for Measure 1 has been reviewed by the EC Twinning team and approvedby the Bank. PA handling national support but not IPARD compliant yet. Page 5 of 9

6 Agricultural Census is implemented and results disseminated. No agricultural census data available. Agricultural Census carried out in June First book with results just published. Main agricultural census implemented. Statistical register established Integrated farm register and cadastres operational. No farm register or cadastres in place. Registration of farms, vineyards and olives, and organic producers ongoing, but no program for integrated register yet defined. Twinning project started with definition of current status of different agriculture registers in MNE. The main agricultural census should be implemented in PY1. The statistical register should be established by PY 3. 70% of farms registered in farm register. Cadastres operational. Page 6 of 9

7 Veterinary Diagnostic Laboratory in Podgorica ISO accredited. No accreditation at present, overlapping competence in food safety system. - Vet lab applied with all Process for accreditation finalized documentation prepared and for 100% of tests and methods. submitted, for accreditation in July Lab to be re-affirmed as NRL ina new veterinary law that is currently being drafted in elaboration, not adopted yet. Marine Biology Institute in Kotor functioning as NRL in adequate facilities. No suitable facilities in place. No clearly defined role in food safety system, no routine testing performed. IMB Kotor is through the Law on Full monitoring of sea and fresh Marine Fisheries and Mariculture waters and aquaculture products in (56/09) adopted in July 2009 (item line with EU requirements. 88.) nominated as a referent national body to implement monitoring of water for needs of mariculture. - National architect for reconstruction of the building contracted (draft inception report and full technical specifications for works - provided). Page 7 of 9

8 Veterinary and phyto-sanitary border controls performed in EUcompliant facilities. No suitable facilities in place Expert for BIP strategy and business plan was contracted. Final report and draft TOR for the architect now completed. TOR submittedto the Bank. Equipment procured and installed Safe, traceable and accountable disposal of animal by-products. National, non-eu compliant system in place REoI for the company for feasibility for disposal of ABPs announced twice and only one company applied. Assignment has again been readvertised. 100% of specified risk materials and 75% of animal biproducts collected and disposed of Food establishments classified and annual control plans implemented. Data on Financial Performance (as of 28-Apr-2011) Financial Agreement(s) Key s Check lists prepared. Initial screening in progress, to be completed by baseline date. New EU-like legislation being drafted. No action taken yet. Monitoring/verification of progress; 100% of food processing plants meeting EU standards. Project Loan No. Status Approval Signing Effectiveness Closing P IBRD Effective 21-Apr May Jul-2009 Page 8 of 9

9 Project Loan No. Status Approval Signing Effectiveness Closing P TF Effective 27-May May Jul-2009 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD P TF Effective USD Disbursement Graph Key Decisions Regarding Implementation n/a Restructuring History There has been no restructuring to date. Related Projects P Montenegro Institutional Development and Agriculture Strengthening (MIDAS) Page 9 of 9

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS

More information

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699) Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:

More information

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology

More information

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 05-Jan-2016 ISR22346 Implementing Agencies: BAPPENAS,

More information

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P86341) o C Operation

More information

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources

More information

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology

More information

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)

More information

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Operation Name: Energy Sector Technical

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban

More information

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation

More information

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global

More information

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Sector Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 22-May-2015 ISR18498 Implementing Agencies:

More information

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED

More information

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Transmission and Distribution Project

More information

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation

More information

Ivana Dulic Markovic FROM M&Е RD TO М&Е ARD

Ivana Dulic Markovic FROM M&Е RD TO М&Е ARD Ivana Dulic Markovic FROM M&Е RD TO М&Е ARD Outline Preparation for IPARD has been driver for monitoring in МОА M&E units located where ARD priorities and budgets are in Albania, Kosovo & Montenegro Indicators

More information

Name Previous Rating Current Rating

Name Previous Rating Current Rating Public Disclosure Authorized Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing

More information

The World Bank Sustainable Land Management Project (P133133)

The World Bank Sustainable Land Management Project (P133133) Public Disclosure Authorized AFRICA Ethiopia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 04-Dec-2017 ISR28418 Implementing Agencies:

More information

The World Bank KI: Telecommunications and ICT Development Project (P126324)

The World Bank KI: Telecommunications and ICT Development Project (P126324) Public Disclosure Authorized EAST ASIA AND PACIFIC Kiribati Transport & ICT Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 7 ARCHIVED on 15-Jun-2016 ISR23726 Implementing Agencies:

More information

The World Bank Pernambuco Rural Economic Inclusion (P120139)

The World Bank Pernambuco Rural Economic Inclusion (P120139) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE

More information

MACEDONIA: AGRICULTURE STRENGTHENING

MACEDONIA: AGRICULTURE STRENGTHENING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MACEDONIA: AGRICULTURE STRENGTHENING AND ACCESSION PROJECT ENVIRONMENTAL ASSESSMENT REPORT

More information

Session 3: Land consolidation and EU rural development policies - an overview

Session 3: Land consolidation and EU rural development policies - an overview Session 3: Land consolidation and EU rural development policies - an overview Richard Eberlin Land Tenure and Rural Development Officer FAO Regional Office for Europe and Central Asia richard.eberlin@fao.org

More information

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety 1. Basic information 2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety 1.1 CRIS Number: 2010/022-452 1.2 Title: Veterinary and food safety 1.3 ELARG Statistical code: 03.12

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014 Public Disclosure Authorized The World Bank REPORT NO.: RES27088 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized SUSTAINABLE PROD. IN

More information

REPUBLIC OF MACEDONIA MINISTRY FOR AGRICULTURE, FORESTRY AND WATER ECONOMY

REPUBLIC OF MACEDONIA MINISTRY FOR AGRICULTURE, FORESTRY AND WATER ECONOMY REPUBLIC OF MACEDONIA MINISTRY FOR AGRICULTURE, FORESTRY AND WATER ECONOMY FAO Workshop Rural Development in EU-Accession Countries, Prague, 23-26 February, 2009 RURAL DEVELOPMENT POLICY IN MACEDONIA Margarita

More information

POLAND Agriculture Policies and programmes to achieve food security and sustainable agriculture

POLAND Agriculture Policies and programmes to achieve food security and sustainable agriculture POLAND Agriculture Policies and programmes to achieve food security and sustainable agriculture These strategies and programmes incorporate in the present programming period: National Strategic Plan for

More information

EUROPEAN LIVESTOCK AND MEAT TRADING UNION / EUROPÄISCHE VIEH- UND FLEISCHHANDELSUNION

EUROPEAN LIVESTOCK AND MEAT TRADING UNION / EUROPÄISCHE VIEH- UND FLEISCHHANDELSUNION EUROPEAN LIVESTOCK AND MEAT TRADING UNION / EUROPÄISCHE VIEH- UND FLEISCHHANDELSUNION Brussels, 11 th October 2006 O/REF: note N-073-2006-EN RE: MONITORING REPORT ON THE STATE OF PREPAREDNESS FOR EU MEMBERSHIP

More information

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

The World Bank Ethiopia: Supporting Open Data Initiative (P156400) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ETHIOPIA: SUPPORTING OPEN DATA INITIATIVE APPROVED ON OCTOBER 15, 2015

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project

More information

Call for Nominations for the Expert Council on Citizen Engagement 2017 Briefing Note

Call for Nominations for the Expert Council on Citizen Engagement 2017 Briefing Note Call for Nominations for the Expert Council on Citizen Engagement 2017 Briefing Note (For Citizen Engagement Websites and Distribution Lists) There is a unique opportunity to serve on the Expert Advisory

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information PROJECT INFORMATION FORM Part A - General information Country Project submission Date Serbia and Montenegro, Republic of Montenegro February 2003 1 (updated June 2005) Sector Project Code (filled by the

More information

Standard Summary Project Fiche IPA centralised National and CBC programmes. Statistics

Standard Summary Project Fiche IPA centralised National and CBC programmes. Statistics Standard Summary Project Fiche IPA centralised National and CBC programmes 1. Basic information Statistics 1.1 CRIS Number: 2007/19300 1.2 Title: Assisting Montenegro in approximating EU standards in statistics

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Dragan Roganović. Kraljevo kajmak. Belgrade, Decembar 2008.

Dragan Roganović. Kraljevo kajmak. Belgrade, Decembar 2008. Dragan Roganović Kraljevo kajmak Belgrade, Decembar 2008. Shortly about Kraljevo Kraljevo is municipality in central Serbia (170km from Belgrade on the south) Surface 1,529 km 2 122,305 inhabitants The

More information

SCOPING STUDY TO DEVELOP STRATEGIC APPROACH FOR ENTERPRISE DEVELOPMENT IN COASTAL FISHING COMMUNITIES IN KENYA

SCOPING STUDY TO DEVELOP STRATEGIC APPROACH FOR ENTERPRISE DEVELOPMENT IN COASTAL FISHING COMMUNITIES IN KENYA Republic of Kenya MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE

More information

2011 Annual Programme Agriculture and Rural Development Support : /2

2011 Annual Programme Agriculture and Rural Development Support : /2 2011 Annual Programme Agriculture and Rural Development Support : 08-2011/2 1. Basic information 1.1 CRIS number: 2011/022-939 1.2 Title: Agriculture and rural development support 1.3 ELARG statistical

More information

IDA16 Results Measurement System

IDA16 Results Measurement System IDA16 Results Measurement System A I IDA16 Results Measurement System International Development Association THE WORLD BANK S FUND FOR THE POOREST B I IDA16 Results Measurement System What is the Results

More information

COUNTRY PROGRAMMING FRAMEWORK. in the REPUBLIC OF ALBANIA

COUNTRY PROGRAMMING FRAMEWORK. in the REPUBLIC OF ALBANIA COUNTRY PROGRAMMING FRAMEWORK in the REPUBLIC OF ALBANIA 2015 2017 2 JOINT STATEMENT This Country Programming Framework (CPF) describes the four priorities identified for collaboration between the Food

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information Part A - General information Country Serbia and Montenegro, Republic of Montenegro Sector WATER Project submission Date Project title 3 March 2003 Project Code (filled by the REC) MN-8 CONSTRUCTION OF

More information

Position Paper for Germany

Position Paper for Germany Position Paper for Germany Position of the Commission Services on the development of the Partnership Agreement and Programmes in Germany for the period 2014-2020 Berlin, 27.11.2012 2 Contents Introduction:

More information

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

M&E and Special Studies

M&E and Special Studies M&E and Special Studies Quarterly Progress Report: April to June 2016 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date to Closing Date Geographic Coverage

More information

Country fact sheet. Overview of national waste prevention programmes in Europe. Lithuania. October Photo: DrAfter123

Country fact sheet. Overview of national waste prevention programmes in Europe. Lithuania. October Photo: DrAfter123 Country fact sheet Overview of national waste prevention programmes in Europe Lithuania October 2016 Photo: DrAfter123 Waste prevention programme This country fact sheet was produced in the context of

More information

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+ Dominican Republic Mid-Term Report Pedro García Brito Climate Change Director Focal Point for REDD+ Dominican Republic and Climate Change The Dominican Republic s Constitution: declares as a national priority

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020618 Public Disclosure Authorized Public Disclosure Authorized Project ID P113402 Country Sri Lanka

More information

EU Agri-Environmental indicators and the Rural Development CMEF indicators (Common Monitoring and Evaluation Framework): a coherent system of analysis

EU Agri-Environmental indicators and the Rural Development CMEF indicators (Common Monitoring and Evaluation Framework): a coherent system of analysis EU Agri-Environmental indicators and the Rural Development CMEF indicators (Common Monitoring and Evaluation Framework): a coherent system of analysis Leysin (Switzerland) OECD Workshop on agri-environmental

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22361 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

12 Food safety, veterinary and phytosanitary policy. Questionnaire

12 Food safety, veterinary and phytosanitary policy. Questionnaire Government of Montenegro 12 Food safety, veterinary and phytosanitary policy Ministry of Agriculture, Forestry and Water Management Questionnaire Information requested by the European Commission to the

More information

Geoffrey Onen. Challenges and Benefits of International Guidelines, Standards and Regulations: The Uganda Case.

Geoffrey Onen. Challenges and Benefits of International Guidelines, Standards and Regulations: The Uganda Case. International Symposium on Food Safety and Quality: Application of Nuclear Related Techniques Challenges and Benefits of International Guidelines, Standards and Regulations: The Uganda Case. Geoffrey Onen

More information

Integrated Framework for Surveys and Modular Approach

Integrated Framework for Surveys and Modular Approach Integrated Framework for Surveys and Modular Approach Allan Nicholls Regional Coordinator Regional Office for the Asia-Pacific Regional Action Plan to Improve Agricultural and Rural Statistics 1 Overview

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020046 Public Disclosure Authorized Operation ID P132768 Country Brazil Operation Name BR-Pernambuco

More information

Philippines: Northern Mindanao Community Initiatives and Resource Management Project

Philippines: Northern Mindanao Community Initiatives and Resource Management Project Philippines: Northern Mindanao Community Initiatives and Resource Management Project Loan No. 77-PH Project Id. 1137 Board Date Dec 2001 Effectiveness Date 1 Apr 2002 Original Closing Date 31 Dec 2009

More information

Government of India R F D. (Results-Framework Document) for. Agricultural & Processed Food Products Export Development Authority, (APEDA) ( )

Government of India R F D. (Results-Framework Document) for. Agricultural & Processed Food Products Export Development Authority, (APEDA) ( ) Government of India R F D (Results-Framework Document) for Agricultural & Processed Food Products Export Development Authority, (APEDA) (2014-2015) Page : 2 of 17 Results-Framework Document (RFD) for Agricultural

More information

Scope and risks of the Asia Biogas Programme

Scope and risks of the Asia Biogas Programme Scope and risks of the Asia Biogas Programme Abstract Worldwide, about two million people lack clean and safe cooking fuel. They rely on traditional fuels like firewood, agricultural waste and dried dung.

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-56730) ON A CREDIT IN THE AMOUNT OF SDR 20.1 MILLION (US$29.2 MILLION EQUIVALENT)

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-56730) ON A CREDIT IN THE AMOUNT OF SDR 20.1 MILLION (US$29.2 MILLION EQUIVALENT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-42070 IDA-42080

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

Implementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709)

Implementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 30-Oct-2017

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America

More information

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal A. Basic Data Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal 1. Subproject Title: Calculating Carbon Benefits from Improved Land and Water Resource Management 2. Project

More information

I. Project Outline. Background. Objectives of the Project. Activities of the project

I. Project Outline. Background. Objectives of the Project. Activities of the project Internal Ex-Post Evaluation for Technical Cooperation Project conducted by Indonesia Office: March 2016 Country Name The Beef Cattle Development Project Utilizing Local Resources in the Eastern Part Republic

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Tajikistan Asian Development Bank (ADB)

Tajikistan Asian Development Bank (ADB) Water Resources Management in the Pyanj River Basin (Additional Financing) - Institutional Development of the State Agency for Hydrometeorology of Tajikistan Tajikistan Asian Development Bank (ADB) 07

More information

Setting up a Sustainable Training Center for Agricultural Consultancy in the North West and Central Region of Romania

Setting up a Sustainable Training Center for Agricultural Consultancy in the North West and Central Region of Romania Bulletin UASVM Agriculture, 67(1)/2010 Print ISSN 1843-5246; Electronic ISSN 1843-5386 Setting up a Sustainable Training Center for Agricultural Consultancy in the North West and Central Region of Romania

More information

Takuya HASHIGUCHI 1. Poster paper prepared for presentation at the EAAE 2014 Congress Agri-Food and Rural Innovations for Healthier Societies

Takuya HASHIGUCHI 1. Poster paper prepared for presentation at the EAAE 2014 Congress Agri-Food and Rural Innovations for Healthier Societies Current Status of Agriculture and Rural Areas in Japan and Prospect of New Policy Framework: Comparison with the Direct Payment System in Japan and Europe Takuya HASHIGUCHI 1 1 Meiji University, School

More information

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline ADB in Vietnam ADB s Climate Change Related Interventions in Vietnam Presentation for Mekong Delta Climate Change Forum Can Tho City, 12-13 November 2009 Ayumi Konishi, ADB Country Director for Vietnam

More information

Lao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017)

Lao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017) Public Disclosure Authorized I. General Lao PDR: Southeast Asia Disaster Risk Project Plan (As of November 15, 2017) Public Disclosure Authorized Public Disclosure Authorized II. 1. Project information:

More information

Summary Sheet for Terminal Evaluation

Summary Sheet for Terminal Evaluation Summary Sheet for Terminal Evaluation 1. Outline of Project Country: Republic of Benin Issue/Sector: Fishery sector Division in charge: Rural Development Department Period of Cooperati on May 2010 to May

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF TF-14063) ON A TRUST FUND GRANT

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF TF-14063) ON A TRUST FUND GRANT Public Disclosure Authorized Document of The World Bank Report No: ICR00003374 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-13973 TF-14063)

More information

Knowledge transfer and information actions

Knowledge transfer and information actions Measure fiche Knowledge transfer and information actions Measure 1 Article 14 of Regulation (EU) No 1305/2013 This fiche is based on the text of Regulation (EU) No 1305/2013 [EAFRD] and, when relevant,

More information

Introduction of identification systems in South Eastern Europe

Introduction of identification systems in South Eastern Europe Herd Recording Managers Workshop Traceability Electronic system applications Introduction of identification systems in South Eastern Europe Dr. Ferdinand Schmitt Managing Director ADT Projekt GmbH, Bonn,

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:

More information