City of Eagle Point Main Street Lighting Phase II Addendum No. 1 April 30, 2014

Similar documents
2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

BID FORM (LUMP SUM CONTRACT)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

SECTION BID FORM LICK RUN INTERCEPTOR REHABILITATION

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Forsyth County Procurement

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

2016 CONCRETE REPLACEMENT PROJECT

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

ADDENDUM NO. 1 APRIL 24, 2017

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

Addendum No. 1 Page 1 of 2

BUREAU Joe Iuviene, AIA January 20, 2017

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

Job Order Contracting (JOC) ITB JE Overview August 2016

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

Application for a Residential Building Permit

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

ADDENDUM NO. 2 FOR DOUGLAS COUNTY SCHOOL DISTRICT. January 20, 2015

CLARIFICATION, QUESTIONS AND RESPONSES AND DRAWINGS CLARIFICATION

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

DOCUMENT ADDENDUM No. 2

Highlands Housing Authority

Enclosed is Addendum No. 1 to the above reference contract documents. Please execute and attach this Addendum No. 1 to your Project Manual.

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

Stacey Camillo, Contract Administration. As-Needed Construction Contracting

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Scope of work (To be completed previously, shown here as reference.) DIVISION 2- SITEWORK: Site work (Scheduled to start September 18 th, 2017)

Residential Electrical Upgrade Permit Revised: 11/15/17

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

EXCAVATION / RIGHT OF WAY PERMIT

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

VANDERBILT UNIVERSITY

THE CITY OF STOCKTON DEPARTMENT OF PUBLIC WORKS SPECIAL PROVISIONS FOR CITY OF STOCKTON FIRE STATION NO DRIVEWAY AND PARKING LOT REPAIRS

BID SCHEDULE. COMPLETION of this project is expected PURSUANT TO CONTRACT DOCUMENTS. Description Scheduled Unit Total Value Unit Price Price.

ADDENDUM NO. 1 DES MOINES PUBLIC SCHOOLS WINDSOR ELEMENTARY SCHOOL EXTERIOR MASONRY RESTORATION PROJECT 5912 UNIVERSITY AVENUE DES MOINES, IOWA 50311

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

ADVERTISEMENT FOR BIDS

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.

Request for Proposal: Due October 11, :00 pm

Main Building Auditorium

FLORIDA DEPARTMENT OF TRANSPORTATION

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

SECTION MEASUREMENT AND PAYMENT

CITY OF ARLINGTON NOTICE TO BIDDERS

February 17 ADDENDUM No. 1

PURCHASING DIVISION BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY, FLORIDA. Terrazzo Floors at Concourse B, C and E ADDENDUM NO. 4

ADDENDUM NO. 1 DATE: August 7, BID TITLE: Calibrations, Maintenance, Repair, Leak Tests, and Trade0In of Nuclear Gauges- Statewide

BID FORM - LUMP SUM BID

City of Norwalk. Residential Development Permit Process

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

BUILDING INSPECTIONS 215 W HICKORY ST DENTON, TEXAS PHONE FAX. PERMIT AND FEE SCHEDULE (Effective October 1, 2016)

AGENDA ITEM NO. June 6, 2017

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST


PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

Addendum Number 1. August 31, Colcock Hall Windows. Owner Project Number: Prepared by:

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS

CITY OF GOODLETTSVILLE STREET SWEEPING SPECIFICATIONS

Request for Proposal Parking Lot Improvements

LI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

761, , ,

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

Pre-Bid Meeting Minutes Invitation to Bid #15-14-KO

REQUEST FOR PROPOSAL SCRAP TIRE TRANSPORTATION AND RECYCLING FOR THE CARROLL-COLUMBIANA-HARRISON SOLID WASTE DISTRICT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

Village of Arlington Heights. Sewer Back-up Rebate Program

APPLICATION FOR PORCH / DECK PERMIT

REPORT TO MAYOR AND COUNCIL

THIRD STREET WATER MAIN REPLACEMENT PROJECT

Finance & Technology Administrator (815) ext 223

Transcription:

City of Eagle Point Main Street Lighting Phase II Addendum No. April 0, 204 The following revisions and/or additions are made to the contract documents (plans and/or specifications) and are to be reflected in any bids received for the above project:. Revisions to attached plans to avoid impacts to existing trees, and clarifications on depth of install. 2. Revised Bid Schedule. City of Eagle Point Main Street and Bob Moore Park Lighting Addendum No. Page

84469PE OREGON WEST MAIN STREET EXPIRATION DATE: 6/0/5 FUTURE PHASE III IMPROVEMENTS PHASE II IMPROVEMENTS MATCH LINE, SEE SHEET C2 CONSTRUCTION NOTES: STREET LIGHT W/FOUNDATION, PER DETAILS (POLE MODEL 90 LED) 2 2" ELECTRICAL CONDUIT, INSTALL PER TRENCH DETAIL (A) FOR ALL NEW LIGHT POLES " ELECTRICAL CONDUIT, INSTALL PER TRENCH DETAIL (B) FOR FOUR OUTLETS (C) FOR FOUR OUTLETS 4 JUNCTION/PULL BOX, PER DETAIL 5 HEAVY DUTY WEATHERPROOF OUTDOOR GFI OUTLET 6 SAWCUT LINE (CUT APPROXIMATELY 2' OFF BACK OF CURB UNLESS OTHERWISE INDICATED) 7 EXISTING FLAG POLE 8 EXISTING FLAG POLE LIGHT 9 EXISTING 2" ELECTRICAL CONDUIT FOR FLAG POLE LIGHTS 0 CONTRACTOR TO REMOVE & RESET SIGN 4 2 MLG JJL MLG 40.00 STREET LIGHT CONTROLS BY OTHERS GENERAL NOTES: 2 EXISTING POWER POLE. ALL CONSTRUCTION IS TO BE COMPLETED IN COMPLIANCE WITH CITY STANDARDS AND ALL LOCAL, STATE AND NATIONAL BUILDING CODES. 2. PLACEMENT OF STREET LIGHTS AND OUTLETS SHOWN ON THIS PLAN ARE APPROXIMATE; CONTRACTOR TO COORDINATE AND RECEIVE APPROVAL FOR FINAL LOCATIONS WITH THE CITY PRIOR TO COMMENCING CONSTRUCTION.. CONDUIT PLACEMENT SHOWN ON PLANS IS APPROXIMATE COORDINATE WITH CITY ON FINAL ROUTES AND LOCATION OF ALL CONDUIT. 4. CONTRACTOR TO PRESERVE AND PROTECT ALL EXISTING SITE FEATURES. ALL AREAS DISTURBED BY CONTRACTOR TO BE REPAIRED OR REPLACED TO A PRE-CONSTRCUTION STATE. ALLEY City Of Eagle Point Jackson County, Oregon West Main Street Lighting - Phase 2 MAIN ST LIGHTING PLAN C C

84469PE OREGON EXPIRATION DATE: 6/0/5 MATCH LINE, SEE SHEET C WEST MAIN STREET NORTH ROYAL AVENUE MLG JJL MLG 40.00 GENERAL NOTES:. ALL CONSTRUCTION IS TO BE COMPLETED IN COMPLIANCE WITH CITY STANDARDS AND ALL LOCAL, STATE AND NATIONAL BUILDING CODES. 2. PLACEMENT OF STREET LIGHTS AND OUTLETS SHOWN ON THIS PLAN ARE APPROXIMATE; CONTRACTOR TO COORDINATE AND RECEIVE APPROVAL FOR FINAL LOCATIONS WITH THE CITY PRIOR TO COMMENCING CONSTRUCTION.. CONDUIT PLACEMENT SHOWN ON PLANS IS APPROXIMATE COORDINATE WITH CITY ON FINAL ROUTES AND LOCATION OF ALL CONDUIT. 4. CONTRACTOR TO PRESERVE AND PROTECT ALL EXISTING SITE FEATURES. ALL AREAS DISTURBED BY CONTRACTOR TO BE REPAIRED OR REPLACED TO A PRE-CONSTRCUTION STATE. MAIN ST LIGHTING PLAN C2 CONSTRUCTION NOTES: STREET LIGHT W/FOUNDATION, PER DETAILS (POLE MODEL 90 LED) 2 2" ELECTRICAL CONDUIT, INSTALL PER TRENCH DETAIL (A) FOR ALL NEW LIGHT POLES " ELECTRICAL CONDUIT, INSTALL PER TRENCH DETAIL (C) FOR FOUR OUTLETS 4 JUNCTION/PULL BOX, PER DETAIL 5 HEAVY DUTY WEATHERPROOF OUTDOOR GFI OUTLET 6 SAWCUT LINE (CUT APPROXIMATELY 2' OFF BACK OF CURB UNLESS OTHERWISE INDICATED) 7 EXISTING LIGHT 4 2 City Of Eagle Point Jackson County, Oregon West Main Street Lighting - Phase 2 C2

84469PE OREGON EXPIRATION DATE: 6/0/5 LIGHT POLE FOUNDATION DETAIL 004-00 West Main Street Lighting - Phase 2 LIGHTING PULL BOX DETAIL Jackson County, Oregon City Of Eagle Point MLG JJL MLG 2 MODEL - 90 LED POWER TRENCH DETAIL 4 TYPICAL STREET LIGHT POLE

City of Eagle Point Main Street Lighting Phase II Due Date: May 5, 205 This Bid is submitted to: Bid Submittal Revised City of Eagle Point Attn Robert Miller, Public Works Director 7 South Buchanan Avenue Eagle Point, OR 97524 Bid Schedule: Proposals may be submitted by filling in the table below or similar. Bid Item Item Description Estimated Quantity Unit of Measure Unit Price Extended Unit Price Mobilization, Bonds, Insurance LS 2 Temporary Traffic Control/ Temporary Signage LS Demolition and Site Preparation LS 4 Install Electrical LS 5 Install lights (supplied by City) 6 EA 6 Remove and Replace Sidewalk 600 SF 7 Pull Boxes 0 EA 8 Light Pole Foundation 6 EA 9 2" Electric Sch 40 PVC Conduit Installed 620 LF 0 to /2" Electric Sch 40 PVC Conduit Installed 50 LF Heavy Duty GFCI Weatherproof Electrical Outlets 8 EA TOTAL PROPOSAL Total of Item Prices in Numbers: $ Total of Item Prices in Words: City of Eagle Point Main Street Lighting Phase II Page 6

City of Eagle Point Main Street Lighting Phase II Bid Submittal Revised Page 2 Addendum Received: Addendum No. Date Bid Submitted By: Name (Typed or Printed): Signature: Title: Representing: Company/Partnership/Corporation Name Business Address: Phone No. Fax Email Contact: By signing this submittal bidder acknowledges and complies with all Instruction to Bidders, Special Provisions, and provisions of Oregon Revised Statutes, Oregon Administrative Rules, Oregon Standard Drawings and Specifications (ODOT/APWA), Oregon Electrical Specialty Code, and the Eagle Point Standard Details. Bidder is is not a resident bidder as defined by ORS 279A.20. Contractor License No. Attached to this Bid: A. Bid Bond B. First Tier Subcontractor Form, if required. City of Eagle Point Main Street Lighting Phase II Page 7