The bid opening has been extended to Thursday, May 3, 2018 at 2:00 p.m.

Similar documents
ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301)

ADDENDUM #1 INVITATION TO BID CITY OF CORINTH. March 21, Shady Shores Road Culvert Removal & Pavement Replacement BID #1114 PROPOSALS DUE:

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

BUREAU Joe Iuviene, AIA January 20, 2017

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Addendum No. 1 Page 1 of 2

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.


April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM

Specifications for Electrical Underground Residential Distribution Systems

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

SECTION TRENCHING & BACKFILLING

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

CHARLES COUNTY GOVERNMENT. ITB NO National Pollutant Discharge Elimination System (NPDES) Acton Lane

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

Highlands Housing Authority

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013

VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

BID FORM (LUMP SUM CONTRACT)

ADDENDUM NO. 1 APRIL 24, 2017

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

NORWEST ENGINEERING Consulting Engineers N.E. 122nd Ave., Suite 207 Portland, Oregon (503)

Forsyth County Procurement

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

BID FORM - LUMP SUM BID

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

2016 CONCRETE REPLACEMENT PROJECT

Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

Construction Contract Basics

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

February 1, 2018 ADDENDUM NO. 3 TO ALL BIDDER S:

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS

CITY OF MIAMI Capital Improvements Program BID NO.:

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

CITY OF LYNWOOD. Specification for Correlator-Based Leak Detection Study

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

JUDD STREET LIFT STATION DEWATERING CONTRACT

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

FAX TRANSMITTAL. Two (2) NOTICE TO BIDDERS

Request for Proposal Internet Access Columbus Urban League

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

GENERAL CONSTRUCTION

Section 2: Underground

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide)

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CHAPTER 11 CONDUITS AND FITTINGS

Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

BITUMINOUS MIXTURE # 13A BID SHEET

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

LI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2

ADDENDUM NO. 2. Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No DATE: August 31, 2017

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT

Forsyth County Procurement

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Transcription:

April 16, 2018 To: All Potential Bidders Re: ITB 18-12 Christopher s Crossing (Sanner) Roadway Construction Consisting of: RFIs and City Response, Bid Opening Extension This addendum is made part of the solicitation documents to the same extent as though it was originally included therein. In the event of conflict with the original contract documents, the addendum shall govern over all other contract documents to the extent specified. Subsequent addendums shall govern over prior addenda only to the extent specified. The bidder shall be required to acknowledge receipt of the informational addendum by signing the addendum and including it with the bid. Failure of a bidder to include a signed informational addendum in their bid shall deem their bid non-responsive, however, the City may waive this requirement if determined to be in its best interest. The City will not be responsible for any other explanation or interpretation made verbally or in writing by any other city representative. We look forward to receiving your bids. Sincerely, Keisha L. Brown, CPPB Purchasing Manager The bid opening has been extended to Thursday, May 3, 2018 at 2:00 p.m. *Note: Page 5 reads due at 3:00 p.m. This is incorrect. The bid opening is at 2:00 p.m. 1

ACKNOWLEDGEMENT OF ADDENDUM #5 The undersigned acknowledges that Addendum No. 5 for ITB 18-12 has been received by the undersigned and will be incorporated in all copies of said solicitation in the possession of the undersigned. It is understood that all bids submitted in response to this project will be presumed to be based upon full knowledge of the contents of Addendum No. 5. (Company Name) (Signature-Authorized Official) (Title) (Date) 2

Logan Englert Estimator Francis O. Day Company 850 East Gude Drive Rockville, MD 20850 Phone: (301) 652-2400 Ext. 165 e-mail: logane@foday.com Is the proposed guide rail to be installed using the new Mash Standards, or strictly following the Penn DOT RC- 52M standard detail? The guide rail needs to be installed per the standard detail and in accordance with all applicable guidelines. John Kelble, Estimator Gray & Son Inc. Excavating, Paving & Utility Contractor 430 West Padonia Rd. Timonium, MD 21093 Phone: 410.771.4311 ext. 2207 Cell: 443.340.9305 Fax: 410.771.8125 jkelble@graynson.com www.graynson.com (Questions in addition to those in Addendum 4) 12) Which MSHA specification section applies to bid item 2005, No. 67 Stone? What will this potentially be used for? Section 901. It could be used for anything as it is a contingent item. 13) Please confirm that the linear foot unit of measure for bid item 2008 and 2011 refers to the length of the trenches which contain multiple runs of pvc pipe and not to the total length of the pipe. Yes, items will be paid per linear feet of trench, not conduit. 14) Which MSHA specification section applies to bid item 2009, 4-6 Gravel and Rock? What will this potentially be used for? Section 901. This is a contingent item. 3

15) Please confirm that the scope of work to be included in bid item 1094 is limited to the testing requirements detailed in specification 02200 of the City Standard specs as well project specific on site testing required for the installation of the Con Span bridge. This will include City specification sections 02200, 02770-2, testing for the Con Span Bridge and asphalt density testing. 16) What are the limits of installation required for the gravel bedding and granular backfill noted in the description for bid items 1060 and 1061? Refer to the ConSpan installation details. 17) The answer to question 3 on page 8 of addendum 4 states that the quantity for bid item 2010 refers to the quantity of lime or dust not the quantity of soil being treated. A fairly typical use of soil cement is 5% cement to a depth of 12. At this rate the bid quantity is sufficient to treat the entire existing site to a depth of over two feet. Please confirm that this is the intent of this item. The intent of this item is for soil drying as listed. This is a contingent item and may or may not be used. Brett S. Wagner Project Manager Kline, LLC d/b/a Pleasants Paving Asphalt Plant and Field Operations 7700 Grove Road Frederick, MD 21704 (301) 662-8211 x 1464 *: bwagner@pleasantspaving.com Please point me to the specification and detailing of the 12-inch pressure zone division check valve [in] concrete vault which is paid for under bid item 1066 and located at Christopher Crossing CL 39+81. I can t find either a City standard detail or standard specification for this bid item. Neither does the item appear detailed on the plans or specified in the ITB by a special condition(s). Provide American Flow Control, swing check valve series 52SC. Install (2) mainline water valves on the outside of vault for future maintenance. 4

Jeremy Palmer Antietam Electric 1. The specifications (GP4.09.2) call for temporary electric and temporary lighting. Is this needed? This would only relate to the contractor s construction trailer if they deem one necessary, neither are requirements of this bid. 2. Item #1082 Calls for handboxes to be included in this pay item. I don t see any locations for them on the drawings, the City Standards call for the conduit to be from pole to pole. Can you confirm or clarify whether these are needed, and if so, the locations they are to be installed. Junction boxes are not required. 3. Item # 2007 is for trenching of utility conduit placement. Is the conduit to be supplied by others? Is this item ONLY for trenching? Please clarify. Item #2007 can be deleted; all trenching is included under item #2008 and #2011 for all contingent utility conduits. 4. Item #2008 Is there a depth requirement? Is there a detail for the duct bank that is applicable? Equal: 36 from the shallowest conduit within the trench. Conduits shall have 3 minimum concrete encasement, SHA mix #3. Gary S. Figallo 201 888 1553 gfigallo@faddis.com Faddis Concrete Products In accordance with the ITB requirements, Faddis submitted an alternate arch and UltraFlex instead of ArmorFlex. 5 These are currently being evaluated by the project team and an addendum conveying the decision will be issued shortly.