PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to instructions and invitations to bidders, the undersigned proposes to furnish all labor and materials as specified and perform the work required for the construction of pipelines and appurtenances San Antonio Water System Job No. 10-2507, in accordance with the plans and specifications for the following prices: 306.1 STRUCTURAL EXCAVATION 77.50 CUBIC YARDS $ $ 507.2A TEMPORARY CHAIN LINK WIRE FENCE (6 HIGH) 400 LINEAR FEET $ $ 515.1 TOPSOIL 188 CUBIC YARDS 516.1 BERMUDA SODDING 1123 SQUARE YARDS P-1
520 HYDROMULCHING 1123 SQUARE YARDS 530.1 BARRICADES, SIGNS AND TRAFFIC HANDLING 550.1 TRENCH EXCAVATION SAFETY PROTECTION 685 LINEAR FEET 553 STORM WATER POLLUTION PREVENTION PLAN 802.1 LEVEL 1 PRUNING, SOIL, AMENDMENT AND FERTILIZATION 802.2 LEVEL 2 PRUNING P-2
858 CONCRETE ENCASEMENT, CRADLES, SADDLES AND COLLARS 25 CUBIC YARDS 864 BYPASS PUMPING 866 SEWER MAIN TELEVISION INSPECTION (18"-24") 342 LINEAR FEET 866 SEWER MAIN TELEVISION INSPECTION >36" 343 LINEAR FEET 866A PRETELEVISE EXISTING 24" SEWER MAIN 342 LINEAR FEET 866A PRETELEVISE EXISTING 54" SEWER MAIN 343 LINEAR FEET P-3
868 SEWER MAIN CLEANING - MECHANICAL 685 LINEAR FEET 1010 FLOWABLE FILL 20 CUBIC YARDS 1040 TEMPORARY ACCESS ROAD AND CREEK CROSSING 1050 REPAIR 24" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL I 1050 REPAIR 54" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL I P-4
1055 REPAIR 24" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL II 1055 REPAIR 54" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL II 1060 REPLACE 24" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL IV 1060 REPLACE 54" R.C.P. SIPHON PIPE - OPEN CUT, AS PER DETAIL IV 1070 SIPHON STRUCTURE REPAIR 2 EACH P-5
Bid Summary SUBTOTAL SAWS JOB NO. 10-2507(SEWER): $ LINE ITEM A SUBTOTAL BASE BID (SEWER) $ 100 MOBILIZATION -Percent of the Line Item A Sub total Base Bid written in words Percent _xxxxxxx $ (Maximum of 10% of the Line Item A Sub-total Base Bid amount) 101 PREPARING R.O.W. - Percent of the Line Item A Sub total Base Bid written in words Percent _xxxxxxxx $ (Maximum of 5% of the Line Item A Sub-total Base Bid amount) MOBILIZATION AND PREPARING ROW SUB-TOTAL $ Mobilization lump sum bid shall be limited to a maximum 10% of the Line Item A Sub-total Base Bid amount. Preparing Right-of-Way lump sum bid shall be limited to a maximum of 5% of the Line Item A Sub-total Base Bid amount. The Line Item A Sub-total base bid is defined as all bid items EXCLUDING Item 100, Mobilization and Item 101, Preparing Right-of-Way. In the event of a discrepancy between the written percentage and dollar amount shown for Mobilization and Preparation of ROW bid items the written percentage will govern. If the percentage written exceeds the allowable maximum stated for mobilization and or preparation of ROW, SAWS reserves the right to cap the amount at the percentages shown and adjust the extensions of the bid items accordingly. TOTAL BID AMOUNT (Line Item A, Mobilization & Preparing Right of Way) $ AND CENTS BIDDER S SIGNATURE & TITLE FIRM S NAME (TYPE OR PRINT) P-6
FIRM S ADDRESS FIRM S PHONE NO. /FAX NO. The Contractor herein acknowledges receipt of the following: Addendum Nos. FIRM S EMAIL ADDRESS OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. The bidder offers to construct the Project in accordance with the Contract Documents for the contract price, and to complete the Project with 180 calendar days after the start date, as set forth in the Authorization to Proceed. The bidder understands and accepts the provisions of the contract Documents relating to liquidated damages of the project if not completed on time. Complete the additional requirements of the Proposal which are included on the following pages. P-7