Asbestos Procedures. Asbestos Abatement and Repair

Similar documents
Asbestos Elevator Industry Workshop November 25, 2015

McMaster University Asbestos Awareness

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS AWARENESS. What is Asbestos? Asbestos

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

Asbestos Management Program April 27, 2017

UNIVERSITY OF NORTHERN IOWA PRE-DEMOLITION ENVIRONMENTAL CHECKLIST

Office of Design & Construction State University Plaza Albany, New York

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

Where can I find Asbestos?

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Washington University Asbestos Operations and Maintenance Plan

Asbestos Management Plan

Explain in writing if the address of the building is different than the address on this form:

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

Asbestos Identification Survey for the Former Prime Tanning Facility Located in Berwick, Maine.

Asbestos Awareness Program

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

Limited Asbestos Demolition Survey

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

Explain in writing if the address of the building is different than the address on this form:

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL

ARTICLE 4: ASBESTOS CONTROL STANDARDS

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan

SURVEY FINDINGS Building: 1101

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

Asbestos in the Home

ASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Management Program

Safety Policy and Procedure

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

SCHOOL DISTRICT Telephone: (770) One Team, One Goal: Student Success

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

Demolition and Disposal Issues re: Mobile Homes

Learn Charter School Excel Campus

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs

Asbestos Inventory and Condition Assessment

TSI SAMPLE. Asbestos Producing Countries. Asbestos Uses. Asbestos Consuming Countries. Asbestos Uses. Training Services International, Inc

HERRON Enterprises USA, Inc.

Comprehensive Asbestos and Lead Survey

Asbestos Awareness OSHA Class IV

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

STUDIO 2LR ARCHITECTURE + INTERIORS

LOOSE FILL ASBESTOS INSULATION

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: COUGHLAN COLLEGE MEMORIAL UNIVERSITY OF NEWFOUNDLAND

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

COMPLIANCE ASSISTANCE BULLETIN July Revised July ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS SUMMARY

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

RESTRICTED ACCESS AREA'S (HIGHLIGHTED IN RED) & SURVEY STATUS - FSU MAIN CAMPUS

1.0 Executive Summary

Asbestos Survey Report

Comprehensive Asbestos & Lead Base Paint Survey

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

Procedure for Department Managed Repair and Renewal Projects Under $15,000

ASBESTOS BUILDING INSPECTION

UNIVERSITY OF MASSACHUSETTS LOWELL. Asbestos Materials. SAFETY AWARENESS ANNOUNCEMENT Standard Operation Procedure

UI Procedures for Asbestos Management

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

HAZARDOUS MATERIALS SURVEY. 947 Minnehaha Avenue St. Paul, Minnesota Prepared for: Prepared by:

April 12, 2011 (revised July 19, 2011) Project Number

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

REScheck Software Version Compliance Certificate

Guide for Asbestos Management

Explain in writing if the address of the building is different than the address on this form:

Asbestos Survey & Lead-Based Paint Inspection/Risk Assessment Report

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

SURVEY REPORT HAZARDOUS BUILDING MATERIALS AIR MOBILITY COMMAND PASSENGER TERMINAL REPAIR ELMENDORF AIR FORCE BASE, ALASKA

Explain in writing if the address of the building is different than the address on this form:

UNIVERSITY OF MASSACHUSETTS LOWELL. Asbestos Materials. SAFETY AWARENESS ANNOUNCEMENT Standard Operation Procedure

If the address on this form is different than the address of the building, submit a written explanation.

Rowan University Asbestos Management Program

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

ASBESTOS-CONTAINING MATERIALS SURVEY AND LEAD-BASED PAINT SURVEY OLD CITY HALL 229 WALNUT STREET GREEN COVE SPRINGS, CLAY COUNTY, FLORIDA

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION...

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

Training Certification Categories

Concrete. Conveying Systems. Doors, Windows & Interiors

City High Middle School pre-design recommendations. March 29, 2017

Asbestos Management Program and Procedures

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

1. Asbestos Facts NEW SOP

Report No: ACM October 29, 2012

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

Transcription:

Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see for a list of known asbestos containing materials located on the Olympia campus. Where else could asbestos be located? In addition to the materials listed in, all possible asbestos containing materials are assumed to contain asbestos until sampled by an asbestos inspector in an asbestos survey. Possible asbestos containing materials are listed in Appendix B, however, this is not an exhaustive list. Any material that is not solely uncoated concrete, glass, metal, plastic or wood should be assumed to contain asbestos and be sampled, even if it is not listed in Appendix B. Asbestos Survey When is an asbestos inspection needed? An asbestos inspection must be done prior to any renovation, construction, maintenance or demolition project that has the potential to disturb possible asbestos containing materials. Who can do an asbestos inspection? Only a certified asbestos inspector may take asbestos samples. Please contact The Evergreen State College (TESC) Environmental Health and Safety (EHS) at 867-6111 to request an asbestos inspection and samples prior to the start of the project. The analysis cost will be charged back to your project. Asbestos surveys are typically contracted out for large capital projects. Who gets a copy of the asbestos inspection? A copy of the asbestos inspection (also called a good faith survey) must be included in bid documents for all contracted projects. A copy of the asbestos inspection must be given to employees working on in-house construction, renovation, demolition or repair projects before the project starts. Please contact TESC EHS at 6111 if you have not received a copy of the asbestos survey for a project. Asbestos Abatement and Repair Who can remove, disturb or repair asbestos containing materials? Only a certified asbestos supervisor/worker can remove, disturb or repair asbestos containing materials. The Evergreen State College contracts out all asbestos abatement and repair services. What should be done if damage to known or possible asbestos containing material is discovered? Do not attempt to clean up the damaged asbestos containing material. Promptly report all damaged asbestos to TESC EHS. If the damaged asbestos containing material is friable (easily crumbled by hand), isolate the area by closing and locking doors, posting signs and/or shutting down ventilation to the area. Do not re-enter the area until cleared by EHS. Asbestos Procedures Page 1

What type of oversight is required for asbestos projects? For asbestos projects that are part of a larger contracted project, EHS oversight of the abatement job is typically contracted out. The outside EHS firm prepares the abatement specifications and drawings, reviews project submittals, inspects the abatement site, and conducts final visual inspections and air sampling. For smaller abatement or repair jobs, EHS oversight may be conducted in-house. Contact TESC EHS at 6111 to arrange this. All asbestos projects require some degree of EHS oversight. What type of documentation is required for asbestos projects? The following documents are required on all asbestos projects L&I and Olympic Region Clean Air Agency Notice of Intent to Remove or Encapsulate Asbestos, proof of insurance specifically covering asbestos work, copies of asbestos contractor, asbestos supervisor and asbestos worker cards, copies of current medical clearance certification, copies of current respirator fit test certification, and waste shipment record. The project manger needs to provide TESC EHS with a copy of the waste shipment record. Waste handling How is asbestos waste disposed? All asbestos waste is taken to Rabanco for disposal. The asbestos contractor will dispose of the waste as part of the project and will provide TESC with a copy of the waste shipment record Asbestos Procedures Page 2

Known Asbestos Containing Materials Olympia Campus The Evergreen State College 1. Library Building (remaining after Phase I and Phase II remodel) a. Thermal System Insulation (TSI) hard fittings Mechanical Rooms and abandoned in place piping B and C Wings b. TSI pipe runs covered with canvas c. Flange gasket material Mechanical Room d. Sheetrock joint compound - perimeter walls throughout B and C wings e. Black asphaltic window putty f. Gray HVAC seam sealant on original construction ducting. g. Elevator door core 2. Lecture Hall a. Thermal System Insulation (TSI) Hard Fittings b. TSI in the Mechanical Rooms d. HVAC cloth vibration isolation joints e. Sheetrock joint compound f. Vinyl tiles and mastic g. Fire door core h. Cable tray lining Cement Asbestos Board (CAB) 3. Lab I a. Mechanical Room TSI c. Vinyl tile throughout building except in first floor remodel area. d. Sheet vinyls throughout building except in first floor Lab area remodel. e. Vinyl floor mastic throughout building except in first floor Lab area remodel. f. Fume hood gray counter tops g. Fire door core throughout building except in first floor Lab area remodel. h. Black undercoating on lab sinks i. Sheetrock joint compound 4. Lab II a. Mechanical Room TSI c. Vinyl tile through out building except in CAL Lab Remodeled area d. Sheet vinyl through out building except in CAL Lab Remodeled area e. Vinyl floor mastic through out building except in CAL Lab Remodeled area f. Fume hood gray counter tops g. Fire Door core through out building except in CAL Lab Remodeled area Page 1

h. Black undercoating on lab sinks i. Sheetrock joint compound 5. Lab Annex (Note these materials likely to remain after current remodel) a. Hard TSI b. Fire door core 6. Seminar I Building a. Hard TSI in the Mechanical Room c. Vinyl tiles and mastic d. Sheetrock joint compound e. Fire door core f. Cable tray lining Cement Asbestos Board (CAB) 7. Seminar II Building a. Seminar II specification mandated construction using only asbestos free materials. 8. College Recreation Center a. HVAC cloth vibration isolation joints b. Thermal System Insulation (TSI) Hard Fittings Mechanical Rooms d. Elevator door core e. Cable tray lining Cement Asbestos Board (CAB) f. Vinyl tiles and mastic g. Sheetrock joint compound h. Smooth Hallway Ceiling Surface Second and Third floor Hallways (Phase I) i. Phase II specification mandated construction using only Asbestos free materials. 9. College Activities Building a. Thermal System Insulation (TSI) Hard Fittings Mechanical Room b. Cable tray lining Cement Asbestos Board (CAB) d. CAB Remodel for public areas specification mandated construction using only Asbestos free materials. Public areas and mechanical spaces within them are asbestos free 10. Communications Laboratory Building b. Thermal System Insulation (TSI) Hard Fittings Mechanical Rooms Page 2

11. Longhouse Education and Culture Center a. Roof Caulking Soft Grey b. Metal clad fire door. 12. Child Care Center a. Remodel specifications mandated construction using only Asbestos free materials. 13. Central Utility Plant a. Thermal System Insulation (TSI) b. Thermal System Insulation (TSI) lagging material. a. Cable tray lining Cement Asbestos Board (CAB) b. Ceiling tile mastic c. Fire door core d. Vinyl tiles and mastic e. Sheet vinyl and mastic f. Flange gaskets both steam and water flanges typical across campus. 14. Utility Tunnels a. Hard TSI b. Cable tray lining Cement Asbestos Board (CAB) c. Flange gaskets 15. Pump Station a. TSI on equipment exhaust c. Water Loop Piping is Cement Asbestos Piping 16. Maintenance Shops Building a. TSI b. HVAC cloth vibration isolation joints c. Vinyl tiles and mastic d. Flange gaskets 17. Motor Pool Garage Building a. TSI on roof drain piping b. TSI Plumbing 18. Organic Farm House 19. Presidents Residence b. Sheet vinyl and mastic c. Sheetrock joint compound d. Popcorn Ceiling Texture Page 3

20. Driftwood House a. Sheetrock joint compound b. Popcorn ceiling 21. Geoduck House b. Sheet vinyl and mastic Important Notice: The materials listed for these structures are categories of building materials that have tested positive for asbestos. The list of Asbestos Containing Materials is intended to make people aware of these products. This list of materials must not be considered adequate for, or used for, the code mandated Good Faith Inspection required previous to any construction, renovation, remodeling, maintenance, repair, or demolition. Page 4

Appendix B Possible Asbestos Containing Materials This list is not all-inclusive, as asbestos was used in a multitude of building products. It does provide examples of the types of products that may contain asbestos. Any possible asbestos containing material needs to be sampled by an asbestos inspector before the material is disturbed. Cement Pipes Laboratory Hoods/Table Elevator Brake Shoes Tops Cement Wallboard Laboratory Gloves HVAC Duct Insulation Cement Siding Fire Blankets Boiler Insulation Asphalt Floor Tile Fire Curtains Breaching Insulation Vinyl Floor Tile Elevator Equipment Ductwork Flexible Panels Fabric Connections Vinyl Sheet Flooring Caulking/Putties Cooling Towers Flooring Backing Adhesives Pipe Insulation (corrugated, air-cell, block etc.) Construction Mastics Heating and Electrical Wallboard (floor tile, carpet, Ducts ceiling tile etc.) Acoustical Plaster Joint Compounds Vinyl Wall Coverings Decorative Plaster Spackling Compounds High Temperature Gaskets Textured Roofing Shingles Roofing Felt Paints/Coatings Ceiling Tiles and Lay-in Base Flashing Thermal Paper Products Panels Spray-Applied Fire Doors Electrical Cloth Insulation Blown-in Insulation Electrical Panels Fireproofing Materials Taping Compounds Packing Materials (for (thermal) Electric Wiring Insulation wall/floor penetrations) Chalkboards Appendix B Page 1