RAYMOND EDUCATION CAMPUS

Similar documents
LASALLE - BACKUS EDUCATION CAMPUS

POWELL ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL

STUART-HOBSON MIDDLE SCHOOL

LEWIS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL

NOYES EDUCATION CAMPUS

PATTERSON ELEMENTARY SCHOOL

WALKER-JONES EDUCATION CAMPUS

BARNARD ELEMENTARY SCHOOL

BALLOU SENIOR HIGH SCHOOL

GARFIELD ELEMENTARY SCHOOL

School Without Walls

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

KEY ELEMENTARY SCHOOL

COOLIDGE SENIOR HIGH SCHOOL

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Mills Elementary School Site Summary

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Biddeford School Department

Corsicana High School

Collins Middle School

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Board Work Session Feasibility Study. January 9, 2017

FACILITY COMPONENTS - MIDDLE SCHOOL

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

FACILITY COMPONENTS - ELEMENTARY SCHOOL

2016 BOND INFORMATION

Appendix J - Custom Uniformat for EDU Migration

Edmonton Public School District No. 7

Deferred Maintenance Plan

Timberglen Recreation Center Summary

School Assessment Report

K.B. Polk Recreation Center Summary

Facility Improvements

Stevens High School Pre Bond Presentation Claremont, NH

ADDENDUM 2 - JULY 14, 2015

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

Belington Elementary School Grades PK 5

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Thurgood Marshall Recreation Center Summary

Beckley-Saner Recreation Center Summary

Priority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools

Arts Center- Building needs

School Assessment Report

DENNIS TOWNSHIP FEASIBILITY STUDY

Minuteman Regional Vocational Technical School

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

Menchaca Elementary School Site Summary

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

NYC Department of Education

School Assessment Report

NYC Department of Education

School Assessment Report

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

Addendum to Agenda Item: SUPERINTENDENT S PROPOSED CAPITAL IMPROVEMEMT PLAN

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

NYC Department of Education

Mount Vernon Elementary School Grades PK 5

Columbia County Health Care Center Added Amenities

NYC Department of Education

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

School Assessment Report

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

NYC Department of Education

Delco Activity Center Site Summary

NYC Department of Education

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Table of Contents Hampton Dumont Community School District November 5, 2013

2006 FUSD Bond Information Guide

CITY OF NOVI. Police Department

NYC Department of Education

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School

10 Year Plan. Facilities Planning Guide. December 15, 2014

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

School Assessment Report

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Darlington Area Schools - Building Evaluations

NYC Department of Education

DESIGN & CONSTRUCTION GUIDELINES

PRESENTATION JANUARY 24, 2017

Transcription:

INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1

PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8 SQ. FT. (EXISTING) 73,600 SQ. FT. (ADDITION) 3,750 TYPE PROPOSED TYPE PROPOSED Pre-School 1 Pre-Kindergarten 2 Kindergarten 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 Gym Bleachers Locker Rooms Gym-Cafeteria Cafetorium 1 Gym-Cafetorium Gym-Auditorium Auditorium Multi-Purpose 1 Cafeteria 1 Kitchen Services 1 Special Education 2 Media Center 1 Administrative/Health Suite 1 Computer Lab 1 OT/PT 1 Science Lab 2 Art 1 Music 1 Teacher Workroom 1 Parent Resource 1 Proposed Planning Profiles The inventory of spaces listed here is intended to outline the program of educational and support spaces necessary to support the proposed program capacity. Individual educational specifications and facility programs will be developed with the School Improvement and School Planning / Design teams at the time of project initiation. RAYMOND - 2

CONDITION ASSESSMENT Building System ADA Compliance Conveying Systems Electrical Exterior Finish HVAC Interior Finish Plumbing Roof Structure Technology 2008 Rating Good Unsatisfactory Good Good Poor Condition Assessment The body of information summarized below is based on a detailed facility condition assessment completed in 2006 and updated by visual observations conducted in 2007. Improvement initiatives completed by OPEFM in 2007 and 2008 are noted in red text in each section. An overall summary of work completed under various OPEFM programs is provided at the end of the condition assessment. Comments: 1 Conveying System 2 Electrical 3 Exterior Finish 4 Structure 5 HVAC 6 Interior Finish 7 Plumbing 8 Roof Condition Scorecard These ratings reflect the overall condition and level of replacement need for an entire system, in adherence with the Facility Condition Index (FCI) System, categorizing systems as Good (FCI <.25), (FCI 0.25 0.50), Poor (FCI 0.51 0.85), or Unsatisfactory (FCI >.86). There is no elevator, escalator, or lift system present in the building. 2008 Receiving School (R/S): Elevator addition to exterior 1928 Wing. Panelboards and switchboards are too old and need to be replaced. Circuit breakers trip due to overloading; upgrades are needed. Classroom outlets are deficient in both number and proper grounding. Light fixture lenses are broken or missing. The fire alarm is old and does not meet code. To install air water coolers, need upgrade of electric power. 2008 R/S: Upgraded electrical outlets throughout building, replaced expired fluorescent ballast, tubes, replaced cracked, missing or broken light lens covers. Repaired and or installed new lighting fixtures in lavatories, classrooms, and other locations. Single glass windows leaking, need replaced. Replace damaged foundation vent louvers. 2007: Replace exterior lighting. 2008 R/S: Repointing & repair of brick walls, repair/replacement of gutters, downspouts, and cornice. Window replacement scheduled to complete by Thanksgiving. No major deficiencies were observed. Minor cracking, typical for concrete framing, can be repaired as part of routine building maintenance. The existing two pipe heating/cooling system is in fair condition. Many of the unit ventilator controls need to be repaired to function properly. The existing ventilation systems are beyond the service life and need to be replaced. There is no central A/C in the building. 2008: Repairs to boiler(s) and Classroom heating units completed. Asbestos floor tiles are not permitted. Most acoustic ceiling tiles should be repaired. Floor carpet may be encapsulating asbestos floor tiles below. 2007: Painting, window shades, plumbing, ceiling replacements, flooring, wall tile, stage curtain, misc. repairs. 2008 R/S: Patch and plaster with painting as required, new VCT flooring, repaired hardwood floors, new ceiling tiles, replaced damaged/defective doors and hardware. Most of the plumbing fixtures are working, but the existing plumbing piping needs to be replaced. There is no fire sprinkler system in this building. 2008 R/S: New Pre-K and K area restrooms, existing restrooms and fixtures repaired and renovated. Roof systems of both main building and auditorium require replacement. Flashing and gutters will require additional work as well. Metal roof cap in good condition. 2008 R/S: Repaired / replaced leaking roof portions, including shingles, flashing, gutters, downspouts and roofing membrane. RAYMOND - 3

9 ADA Compliance 10 Technology 11 Grounds Steel stair railings do not have extensions required by code. No strobe fire alarms in building. Conveying, access, door hardware, parking, and bathroom fixtures are all deficient per code standards. 2008 R/S: New door hardware, new restrooms are ADA-compliant, new exterior ramp at main entry. Inadequate outlets in classrooms; need additional, better receptacles. Computer labs have too many computers on one circuit- breakers trip. 2008 R/S: Added computer connectivity to new classrooms and spaces. Play area needs repaved. Ball fields and park owned and maintained by Department of Parks and Recreation. 2008 R/S: New parking area and driveway A/C paving and striping, new Pre-K playground area. RAYMOND - 4

RECENT HISTORY OF MODERNIZATION 2007 WHOLE SCHOOL BLITZ Interior Finishes - Drywall & Ceiling Repairs Interior Finishes - Select Carpet Replacements/Flooring Repairs Interior Finishes - Painting/Plastering Plumbing Repairs - Restrooms/Fixtures & Flush Valves; Water Fountains Other Work Orders 2008 STABILIZATIONS Heating Blitz - Boiler Repairs & Classroom Units Emergency Security Repair Work (Exterior Lighting Replacements) AC Window Units Installations & Electrical Upgrades SCHOOL CONSOLIDATIONS & RECEIVING SCHOOLS Classrooms Configurations Site Work - (concrete, masonry, painting, fencing) Wood and Plastics - (Carpentry) Thermal and Moisture Protection (Roofing) Doors and Windows Finishes - (Interior Painting) Mechanical Electrical Work Orders Planning Design Pre-Construction In Progress Completed RAYMOND - 5

First Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. RAYMOND - 6

Second Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. RAYMOND - 7

Third Floor Concept Plans These floor plans represent planning concepts for proposed facility use, aligning the proposed program capacity, the proposed planning profiles, and the conceptual reconfiguration of the building. Each project is subject to a formal design process, incorporating input from the School Improvement team at the time of project initiation. RAYMOND - 8