1 AGILE COLLABORATION AS THE WAY TO BUILD UGANDA NATIONAL LAND INFORMATION SYSTEM CAROL ROFFER, SERGIY LIZENKO, MAKSYM KALYTA Innola Solutions, Inc., USA Paper prepared for Lightning Talk presentation at the 2017 WORLD BANK CONFERENCE ON LAND AND POVERTY The World Bank Washington, DC, March 20-24, 2017 Copyright 2017 by author(s). All rights reserved. Readers may make verbatim copies of this document for noncommercial purposes by any means, provided that this copyright notice appears on all such copies.
2 Agile Collaboration as the Way to Build Uganda National Land Information System Implementing a national scale land information system always poses challenges in keeping the client engaged, managing the significant change, and ensuring that all project activities and outcomes provide the most value. InnoLA Solutions is currently taking an agile approach to collaboration with the Customer and our development partners on the design, development and implementation of the Uganda National Land Information System. This project is Phase 2 ( ) of a Government of Uganda initiative, awarded to the IGN France International (IGN FI) consortium and funded by the World Bank. As subcontractor to IGN FI, we are configuring, customizing and integrating our InnoLA Software Framework to meet the registry, cadastral, land valuation, physical planning and public data access data needs of the Ministry of Lands, Housing and Urban Development (MLHUD). The developed solution and resulting National Land Information Infrastructure (NLISI) will be rolled out to 21 Ministry Zonal Offices (MZOs) in The new system, replacing the Pilot solution currently in 6 MZOs, is a fully integrated solution and is a result of collaborative analysis, business process re-engineering and design with the Customer and Supplier teams (IGN FI and GeoFit). The InnoLA Software Framework is based on open source components including, operational systems (CentOS, Ubuntu), DBMS system (PostgreSQL/PostGIS), GIS Server (GeoServer). The final NLISI will integrate data from existing systems and from a data conversion component of the project, and integrate with external systems, including the Uganda Revenue Authority to validate payments, the Uganda Registration Service Bureau to verity legal entities and the National Identification and Registration Authority to verify physical persons. Major implementation activities and customizations have included: 1. the extension of the data model to meet national needs and integrated business units including land valuation and physical planning; 2. a new replication approach for the distributed system architecture; 3. the development of tools and work processes for semi-automatic data quality control and data unification during migration, and to migrate current operational transactions in progress into the new system for smooth continuation of processing; 4. the implementation of a special component with administrative dashboards for tracking staff performance and activities, featuring an online drill down functionality to identify the operational bottlenecks and allow management to take necessary actions to resolve. Collaboration with Ministry staff and our development partners has been accomplished with the on-site meetings and workshops, but also with a rich collaborative development environment: Sparx Systems Enterprise Architect and BPMN 2.0 for formal business processes analysis and reengineering, data modelling; Atlassian JIRA (Web based) for project management, detailed task scheduling, issue reporting and development tracking; Atlassian Confluence (Web based) for planning and documents exchange and project repository for meeting notes, forums, input materials; TestRail (Web based) for management of QA/QC and testing efforts, for planning regression testing sessions of each released version of the System; On-Site Test Server Environment allowing for frequent review of development progress by Customer and Supplier teams, and testing and verification of the incremental builds before rolling out in production to zonal offices. Our approach to collaboration has allowed us to establish an open and transparent environment for discussion and analysis, design, and development by multiple teams. Engaging the Customer in this way has gone a long way in building permanent local expertise and ensures the Customer s ownership of the solution.
3 Specific Collaboration Principles To some degree, the active collaboration has been assisted by the earlier positive outcomes of Phase 1 of the project ( ) and availability of certain local operational capacity and domain expertise. To accelerate the momentum, the following principles have been systematically executed: 1. Availability of multi-party online tracking system to allow: Record all the tasks/requests/features; Schedule iterative deliverables with prioritized features to implement; Records all the feedbacks/bugs/requests; Track the velocity of the progress and re-prioritize base on the actual state. 2. Establishing on-site operational testing infrastructure and local Quality Assurance and Testing (QA/QC) Team to perform: Permanent testing of iterative system deliverables; Accumulating hands on experience with the system and provide early feedbacks; Test data migration procedures and verify the quality of the migrated and newly produced data; Validate workflows and rules with engagement of the local domain experts and stimulating re-engineering enhancements and processes improvements. 3. Availability of online wiki-type collaborative environment to specify: o Using templates to document each detail of the transactions and workflows; o Use modern technologies tools and standards to establish common lingua franca for presenting; o Details to the local experts and have their early inputs; o Define and store all input and output documents assumed to be caught in and produced by the system. Based on these collaboration principles the project team of experts and developers represented by IGN FI (France), Innola Solutions Inc. (USA), GeoFit (France), Land Equity International (Australia) on one side, and by the MLHUD executives, domain experts and the World Bank supervisor on the other side, we have established well-coordinated communication and efficient way of resolving any issues that arise. That process involved key steps of detailed analysis and specification of the workflows and transactions, and review of those specifications by all stakeholders before getting into the cycle of implementation. It has been mandated that the system implementation could be executed only after achieving major consent of the stakeholders concerning relevant specifications. Naturally, there were some feedback and iterations for certain functions and processes, but overall the transparency and clarity made the overall development life cycle quite efficient. An example of the efficiency and business value gained as a result of the re-engineering process that took place, we compare workflows implemented in the pilot system operationalized as result of the Phase 1 and the ultimate nation-wide system of the Phase 2. There were 130 transactions (40 never used) in the pilot system and as result of a detailed review and introduction of new system based on InnoLA Framework, less than 80 finally covered all land tenure operations cadastre, registration, land valuation, physical planning.
4 Figure 1. BMPM Workflow Diagram
5 Figure 2. WORKSTATION: Documents Panel with list of documents provided and scanned image
6 Figure 3. DASHBOARD: Monitoring of Registration Process
7 Figure 4.DASHBOARD: Tasks by Role and Tasks Ageing
8 Figure 5. PORTAL: Search on map
Visit California Digital Solutions, Drupal Development Website Experience. ITRS Case Study.
Visit California Digital Solutions, Drupal Development Website Experience ITRS Case Study www.appnovation.com ITRS CASE STUDY Contents 1.0 Project Overview P.3 P.4 2.1 Primary Project Solutions, Completed
More informationArchitecting JIRA for the Enterprise. JIRA is a powerful product, both flexible and highly configurable. Miles Faulkner
Architecting JIRA for the Enterprise JIRA is a powerful product, both flexible and highly configurable. Miles Faulkner Problem Statement and an Opportunity for Management JIRA is a tremendously powerful
More informationATLASSIAN TOOLS INCREASE PRODUCTIVITY AND ROI FOR LARGE RETAIL COMPANY 2016 ATLASSIAN TOOLS INCREASE PRODUCTIVITY AND ROI FOR LARGE RETAIL COMPANY
ATLASSIAN TOOLS INCREASE PRODUCTIVITY AND ROI FOR LARGE RETAIL COMPANY 2016 1 Global organizations that work with distributed teams and different IT solutions can face challenges if the tools in use don
More informationPrerequisites It is recommended that the participants have a working knowledge of traditional Business Analysis tasks and techniques.
BA31 - Unified Modeling Language (UML) for Business Analysts This course will provide Business Analysts with new capabilities to improve their skills with using visual modeling techniques to document requirements.
More informationWfMC BPM Excellence 2013 Finalist Copyright Bizagi. All rights reserved.
WfMC BPM Excellence 2013 Finalist Copyright 2002-2015 Bizagi. All rights reserved. WfMCBPM Excelence2013Finalist 2 1. Overview Initially, BBVA decided to set up a real-estate unit within the bank to manage
More informationAPPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS
APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS Shared denotes whether a Contractor Resource may be responsible for that in addition to another identified. Contractor Required
More information[Name] [ ID] [Contact Number]
[Name] [Email ID] [Contact Number] THIS IS ONLY MODEL RESUME - DO NOT COPY AND PASTE INTO YOUR RESUME. PROFILE SUMMARY 15+ years of IT experience in Consulting and worked with the Major clients for the
More informationStriking the Balance Between Risk and Reward
Experience the commitment Striking the Balance Between Risk and Reward in payments modernization Staying competitive in financial services requires meeting everincreasing customer expectations for digital
More informationFixed Scope Offering for Oracle Fusion Procurement. Slide 1
Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.
More informationOrganizational Change Through Metrics
Organizational Change Through Metrics Speaker: Allen Hurst and Heather Rainey Company: Improving Enterprises Website: www.improvingenterprises.com Welcome to the PMI Houston Conference & Expo 2015 Please
More informationExam C Foundations of IBM DevOps V1
Exam C5050 300 Foundations of IBM DevOps V1 1. DevOps enables which three enterprise capabilities? A. continuous metering B. continuous feedback C. continuous delivery D. continuous monitoring E. continuous
More informationRDF MINING SECTOR GOVERNANCE SOLUTIONS
RDF MINING SECTOR GOVERNANCE SOLUTIONS November 2016 RDF is a leader in implementing mining governance improvement projects by providing advanced mining cadastre and revenue systems, promoting efficiency,
More informationExam C Foundations of IBM DevOps V1
Exam C5050 300 Foundations of IBM DevOps V1 1. DevOps enables which three enterprise capabilities? A. continuous metering B. continuous feedback C. continuous delivery D. continuous monitoring E. continuous
More informationHow to Successfully Collect, Analyze and Implement User Requirements Gerry Clancy Glenn Berger
Esri International User Conference San Diego, California Technical Workshops July 24, 2012 How to Successfully Collect, Analyze and Implement User Requirements Gerry Clancy Glenn Berger Requirements Gathering
More informationConnecting Space and Time
Connecting Space and Time Presented by Francisco Urbina From Backroom to a Explosion of Uses, Users and Data Sources GIS Is Being Transformed Into a Location Platform Design Plan Prepare Decide Evaluate
More informationArchitecting Web Service Applications for the Enterprise
Architecting Web Service Applications for the Enterprise Michael Rosen Chief Enterprise Architect mike.rosen@iona.com March 5, 2002 Copyright IONA Technologies 2002 Slide 1 END 2 ANYWHERE Basic Web Service
More informationFixed scope offering. Oracle Fusion Financials Cloud Service. 22 February 2016 A DIVISION OF DIMENSION DATA
Fixed scope offering Oracle Fusion Financials Cloud Service 22 February 2016 A DIVISION OF DIMENSION DATA 2015 1 Oracle Fusion Financials Cloud Service Business objectives The solution Scope Methodology
More informationEnterprise GIS Projects: Challenges and Solutions
Enterprise GIS Projects: Challenges and Solutions Anil K. Jayavarapu ABSTRACT. Enterprise GIS projects are complex. These projects involve coordination and communications between multiple parties. These
More informationBACK-OFFICE TRANSFORMATION OF A GLOBAL INVESTMENT BANK
CASE STUDY Banking & Financial Services BACK-OFFICE TRANSFORMATION OF A GLOBAL INVESTMENT BANK Business Situation Investment banks today face a multitude of business and operational challenges. Apart from
More informationFixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud
Fixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage of CRM to attract new customers, develop
More informationApplication Lifecycle Management for Subversion
Application Lifecycle Management for Subversion What IT Analysts say about ALM ALM doesn t support specific life-cycle activities; rather, it keeps them all in sync An ALM solution is the integration of
More informationQUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)
QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program
More informationCOGNITIVE QA: LEVERAGE AI AND ANALYTICS FOR GREATER SPEED AND QUALITY. us.sogeti.com
COGNITIVE QA: LEVERAGE AI AND ANALYTICS FOR GREATER SPEED AND QUALITY ARTIFICIAL INTELLIGENCE vs. COGNITIVE COMPUTING Build a system that can generally perform any intellectual task so called Strong AI
More informationCRMS. Computerized Risk Management System C R M S 1
CRMS Computerized Risk Management System C R M S 1 Cotecna s approach to risk management Innovative approach Cotecna s risk management services are designed to assist Customs authorities in implementing
More informationREVENUE DEVELOPMENT FOUNDATION AND MINING SECTOR GOVERNANCE
REVENUE DEVELOPMENT FOUNDATION AND MINING SECTOR GOVERNANCE RDF is a leader in implementing mining governance improvement projects by providing an advanced mining cadastre system and promoting efficiency,
More informationecap Health Check Evaluation
ecap Health Check Evaluation ECAP utilizes a multi-faceted engagement approach with our clientele to provide more efficient and effective services. There are 3 phases to the engagement: Phase I: Onsite
More informationPortfolio and Program Management Taming the Many Headed Hydra!
Portfolio and Program Management Taming the Many Headed Hydra! Miles Faulkner Certified Scrum Master B.Ec (Hons) MBA PMP ITIL Principal Blended Perspectives 416 816 5190 1 About Miles Faulkner Miles is
More informationQUICK FACTS. Integrating Multiple Databases for The Institutes TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES. Client Profile
[ Financial Services, Application Development ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Education Services Revenue: $27 million Employees: Approximately 100 Geographic
More informationThe Enterprise Architecture Review in Theory and Practice. John Sitarski Enterprise Architect, Baker Hughes
The Enterprise Architecture Review in Theory and Practice John Sitarski Enterprise Architect, Baker Hughes Learning Points The Value of an Architecture Review The Architect s Toolbox Describing a System
More informationEnterprise Portal Modeling Methodologies and Processes
Enterprise Portal Modeling Methodologies and Processes Tushar K. Hazra, Ph.D. tkhazra@bellatlantic.net (410) 960-2112 1 Objectives Introducing the case for Enterprise Portal Modeling (EPM) Do we need to
More informationThe Business Case for ALM Transformation ALM
ALM Application Lifecycle Management White Paper Out-of-Date; Out-of-Touch The Business Case for ALM Transformation Executive summary: The Business Case for Change Ultimately improve the quality and success
More informationTitling and Registration
and Brief History Key Stakeholders Objectives Enhancing Use of AVIS Replacing AVIS Maximizing Success and Understanding Risks Modular Approach KAVIS Scrum Process Discovery/Design Develop Test Delivery
More informationIPAS Business Processes and Workflows. Gregory Sadyalunda Project Manager, IP Offices Business Solutions Division
IPAS Business Processes and Workflows Gregory Sadyalunda Project Manager, IP Offices Business Solutions Division Pillars of Business processes & Workflow automation 61 Institutional framework legal framework
More informationBe a Hero in Boom Times Not Just in Bust Times
Be a Hero in Boom Times Not Just in Bust Times BE A HERO IN BOOM TIMES NOT JUST IN BUST TIMES Patrick Connaughton Research Director, The Hackett Group The Hackett Group The Evolving Business Environment
More informationRFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS
1.0 OVERALL PROPOSER EVALUATION CRITERIA 1.1 OVERALL PROPOSER EVALUATION AND CRITERIA The evaluation committee will select a best solution based on a weighted scoring system. The following table presents
More informationMicrosoft FastTrack For Azure Service Level Description
ef Microsoft FastTrack For Azure Service Level Description 2017 Microsoft. All rights reserved. 1 Contents Microsoft FastTrack for Azure... 3 Eligible Solutions... 3 FastTrack for Azure Process Overview...
More informationSYSTEM MODERNIZATION BEST PRACTICES
tl SYSTEM MODERNIZATION BEST PRACTICES SYSTEM MODERNIZATION WORKING GROUP C1 5912-C aamva_systemmodernization_dvd_insert.indd 1 6/7/17 11:01 AM System Modernization Best Practices provides a roadmap to
More informationSection 1: Project Communication Purpose and Objectives
Communications Management [Bluebonnet Supplier Portal Application] [v1.0] [] Communications Management The Communication Plan for Bluebonnet Supplier portal proposes the guidelines that would facilitate
More informationSYNTHETIC ACTIVE MONITORING. Copyright 2015 TestPoint All Rights Reserved
SYNTHETIC ACTIVE MONITORING Copyright 2015 TestPoint All Rights Reserved A COMPLETE VIEW OF YOUR APPLICATION/S Having a complete view, Means adopting an approach which allows you to measure the end-user
More informationInfinity Tech Group CASE STU DY: EN TER PR ISE TR AN SITION TO DISTR IB UTED AG IL E & CON T IN U OU S DEL IVER Y
Infinity Tech Group CASE STUDY: ENTERPRISE TRANSITION TO DISTRIBUTED AGILE & CONTINUOUS DELIVERY Version 1.2: Nov 16 th 2013 Presented by: Kamlesh Ranka INFINITY TECH GROUP PAGE 2 CASE STUDY FOR ABC BANK
More informationMDA Legacy Modernization Case Study: State of Wisconsin Unemployment Insurance Division
MDA Legacy Modernization Case Study: State of Wisconsin Unemployment Insurance Division ADM Workshop 2004 Adaptive Team Collaboration, Inc. 7402 Borman Avenue St. Paul, MN 55076 651.554.1771 www.atcprocess.com
More informationMastering CBAP V3. Adaptive Processes Consulting
Adaptive Processes Consulting Copyright notice All rights reserved. IIBA, BABOK, CBAP are registered Trademarks of International Institute of Business Analysis, Canada. All trademarks of copyrights mentioned
More informationREVENUE DEVELOPMENT FOUNDATION AND MINING SECTOR GOVERNANCE
REVENUE DEVELOPMENT FOUNDATION AND MINING SECTOR GOVERNANCE March 2018 RDF is a leader in implementing mining governance projects by providing advanced mining cadastre and revenue systems, promoting efficiency,
More informationSystem Development Life Cycle New Development Process For the Natural Resource Sector
Corporate Services for the Natural Resource Sector System Development Life Cycle New Development Process For the Natural Resource Sector Last Updated: December 1, 2014 Version: 1.0.0 Document: NRS_IMIT_SDLC_NewDevelopment_Process
More informationSOFTWARE DEVELOPMENT SOLUTION PORTFOLIO
SOFTWARE DEVELOPMENT SOLUTION PORTFOLIO WE ARE KIANDRA. We re an Australian IT company with a long history of delivering clients a competitive advantage through smart, business-critical software solutions.
More informationStreamline your business processes for far-reaching results. EY s Business Process Management Services practice
Streamline your business processes for far-reaching results EY s Business Process Management Services practice Introduction Today s financial services organizations are facing a number of pressures: Stressed
More informationIIBA, BABOK, CBAP are registered Trademarks of International. All trademarks of copyrights mentioned herein are the possession
Copyright notice All rights reserved. IIBA, BABOK, CBAP are registered Trademarks of International Institute of Business Analysis, Canada. All trademarks of copyrights mentioned herein are the possession
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationHP Quality Center 10 Overview
HP Quality Center 10 Overview Baselining, Versioning and Release Management John Fodeh Solution Architect, Global Testing Practice 2008 Hewlett-Packard Development Company, L.P. The information contained
More informationAras Accelerates Innovation at GETRAG FORD Transmissions
Aras Accelerates Innovation at GETRAG FORD Transmissions Aras is used as our PLM platform to not just automate, but to develop new business processes at GETRAG FORD Transmissions. The upshot is that because
More informationAptitude Accounting Hub
Aptitude Accounting Hub Achieve financial control, transparency and insight The Aptitude Accounting Hub empowers us to progressively transform finance while creating a detailed financial data foundation
More informationIBM Software IBM Business Process Manager
IBM Software IBM Business Process Manager An industry-leading BPM unified platform to help drive innovation at scale 2 IBM Business Process Manager Highlights Mobile New responsive user interface controls
More informationCadastre Technology: From Fit-for-Purpose to Multipurpose
Cadastre Technology: From Fit-for-Purpose to Multipurpose Brent Jones, PE, PLS bjones@esri.com System of Record Organizes and Manages the Legal Record of Ownership, Value and Location Cadastral History
More informationAchieving Application Readiness Maturity The key to accelerated service delivery and faster adoption of new application technologies
WHITE PAPER Achieving Application Readiness Maturity The key to accelerated service delivery and faster adoption of new application technologies Achieving Application Readiness Maturity Executive Summary
More informationIMENDOS EXPERIENCES: THE VALUE IN USING ARIS CONNECT
IMENDOS EXPERIENCES: THE VALUE IN USING ARIS CONNECT AGENDA Introduction ARIS Connect Overview ARIS Connect Implementation Strategies ARIS Connect examples (check out one goodie in last slides) Conclusions
More informationSmart Grid From System Trials to Business as Usual
A Vision White Paper Smart Grid From System Trials to Business as Usual Ian Freeman, Systems Architect, Scottish & Southern Energy Power Distribution Gillian Adens, Director, Hippo Software April 2012
More informationBusiness Process Modeling Information Systems in Industry ( )
Business Process Modeling Information Systems in Industry (372-1-4207 ) Arnon Sturm The material of this presentation is adopted from various people including:, Pnina Soffer, Iris Reinhartz-Berger 1 Outline
More informationState of Oklahoma CIO Assessment Study
in collaboration with State of Oklahoma CIO Assessment Study October 21, 2010 Government Modernization Committee Alex Z. Pettit Chief Information Officer State of Oklahoma Table of Contents Confirmation
More informationImproving the business process of software delivery for Financial Services
Improving the business process of software delivery for Financial Services Belinda Tee Senior Rational Technical Specialist The premiere software and product delivery event. 21 July, Sydney Belinda Tee,
More informationThe Merger and Acquisition Quandary
White Paper The Merger and Acquisition Quandary 3 Stages to Ensure M&A Success Table of Contents Stage 1: Alignment... 3 1. Recognizing Obstacles... 3 Perspective... 4 Cadence... 4 Staff Stability... 4
More informationProcess Improvement: Identify areas of improvement in the public procurement process to increase efficiency.
The Development Gateway The Development Gateway is a not-for-profit organization based in Washington DC. Its mission is to be an enabler of development. We help improve people s lives in developing countries
More informationWfMC BPM Excellence 2013 Winner Copyright Bizagi. All rights reserved.
WfMC BPM Excellence 2013 Winner Copyright 2002-2015 Bizagi. All rights reserved. Wf MCBPM Ex cel l ence201 3Wi nner 2 With nearly 1m cases and 28m activities performed in a month supporting $4bn financials
More informationTime 3:15-4:00 Session TBD: Better Processes Leading to Better Communication (Room 205)
Gloria Simas IT Division Architecture Team - Business Architect, Covered California Sean Hansen Director of Operations, Kiefer Consulting, Inc. Matt Greene Senior SharePoint Consultant, Kiefer Consulting,
More informationState of North Carolina
State of North Carolina Cronin Award Nomination July 28, 2015 Submitted by: Patti Bowers, State Purchasing Officer North Carolina Department of Administration Division of Purchase and Contract Executive
More informationA GUIDE TO FRICTIONLESS DELIVERY
A GUIDE TO FRICTIONLESS DELIVERY Aligning DevOps, ITSM and other tooling is the key to achieving frictionless delivery. This paper explains how to connect portfolio management, change and operate activities
More informationA Freshwater Partners White Paper
C r e a t i n g B u s i n e s s C a p a b i l i t y w i t h a P M O A Freshwater Partners White Paper Whether you view the coordinated management of multiple projects as program management, or portfolio
More informationInfor PM 10. Do business better.
Infor PM 10 Infor PM is designed for companies in all industries that seek to better monitor, measure, and manage their business performance in real time. Do business better. The speed, complexity, and
More informationProject Manager. KEY SKILLS Testing Mentoring Team Leading Business Process Reengineering JAD Session Facilitation
Project Manager PROFESSIONAL SYNOPSIS As a seasoned IT Project Manager, this individual possesses analytical skills focused on delivering solutions to business problems and is adept at translating business
More informationMODEL-DRIVEN MANUFACTURING EXECUTION SYSTEM BROCHURE
MODEL-DRIVEN MANUFACTURING EXECUTION SYSTEM A process centric approach to the digital transformation of best practices for reuse, sustainable standardisation and continuous improvement in plant and multi-site
More informationSolution Overview : The IBM Government Industry Framework
Meng Tay Software Consultant IBM Vietnam Solution Overview : The IBM Government Industry Framework 2010 IBM Corporation Challenges governments face in this economic environment Reduce costs Virtualization
More informationManaging Tax. Balancing current challenge with future promise Session 5. The Grand Hyatt, Singapore 16 February 2017
Managing Tax Balancing current challenge with future promise Session 5 The Grand Hyatt, Singapore 16 February 2017 Sen Elalingham, Deloitte Malaysia Indirect tax and technology Agenda Overview 4 Technology
More informationMigrate your Analytics Solutions to Azure faster with lower TCO and less risk
Migrate your Analytics Solutions to Azure faster with lower TCO and less risk Corent Technology Inc. 2017 www.corenttech.com E-mail: info@corenttech.com Phone: (949) 614-0634 Introduction Addressing Analytics
More informationReport on specific multi-level GPP approaches and strategies and implementation of G.PP.S
2018-02-02 GreenS - green public procurement supporters for innovative and sustainable institutional change H2020-EE-2014-3-MarketUptake Proposal: (649860) Topic: EE-08-2014 Type of action: CSA DELIVERABLE
More informationPillar II. Institutional Framework and Management Capacity
PILLAR II. INSTITUTIONAL FRAMEWORK AND MANAGEMENT CAPACITY Pillar II. Institutional Framework and Management Capacity Pillar II assesses how the procurement system defined by the legal and regulatory framework
More informationAn Overview of Modern Business Analysis
An Overview of Modern Analysis Sergey Korban, Aotea Studios, 2012 Background The feedback we receive from our readers and customers indicates that the business analysis framework described in the BABOK
More informationWhat's New With Rational Team Concert (TM)
What's New With Rational Team Concert (TM) Erich Gamma Distinguished Engineer, Rational Team Concert Lead 2009 IBM Corporation Agile at Scale: Agile Planning 1 Agenda Deliver Global Enterprise Readiness
More informationInstitutional Structure. Power Exchange India Limited
Capacity Building Programme on PAT Mechanism Workshop for Designated Consumers Institutional Structure Power Exchange India Limited August 2nd, 2011 Institutional Design Essentially a structure of entities
More informationAt the Heart of Connected Manufacturing
www.niit-tech.com At the Heart of Connected Manufacturing Transforming Manufacturing Operations to Drive Agility and Profitability The success of the new manufacturing network hinges on the agility of
More informationTHE FUTURE OF PROCESS HAS BEGUN
THE FUTURE OF PROCESS HAS BEGUN Get There Faster. Millions rely on ARIS when it comes to designing, publishing, analyzing and optimizing their processes. Now, ARIS 9 brings you even more innovations to
More informationAccelerate Your Riverbed
SteelCentral AppResponse Implementation Service Accelerate Your Riverbed SteelCentral AppResponse Deployment and Time to Value Proven Methodologies to Increase Adoption and Utilization Maintaining a holistic
More informationLeassons Learned EisMan project
Leassons Learned EisMan project Introduction This document describes the retrospective results of the pilot project Eisman App within the openk consortium. The retrospective workshop was conducted November
More informationSOCCI - Towards a Common Software Engineering Environment for Science Operations
SOCCI - Towards a Common Software Engineering Environment for Science Operations Vicente Navarro, 1 Kaarel Hanson, 2 Kaarel Lumi, 2 Ranpal Gill, 1 Jose Marcos, 1 Maria Garcia Reinaldos, 1 Juan Carlos Segovia,
More informationAXIO ProServ: Optimized Operations for the Global Project Management-based Enterprise
Technical Brief AXIO ProServ: Optimized Operations for the Global Project Management-based Enterprise AXIO for Professional Services from Velosio is an end-to-end business software solution for project
More informationPierce County Classification Description GIS PROGRAMMER/ENGINEER, LEAD
Pierce County Classification Description GIS PROGRAMMER/ENGINEER, LEAD Department: Information Technology FLSA: Exempt Job Class #: 632100 Represented: No Pay Range: Professional 17 Classification descriptions
More informationFlare Solutions Limited Rule-based Information Management
Flare Solutions Limited Rule-based Information Management Finding Petroleum Digital Oilfield Event, London 1 st December 2011 Copyright Flare Solutions Limited, 2011 Glenn Mansfield December 2011 Agenda
More informationAptitude Accounting Hub
Aptitude Accounting Hub Achieve financial control, transparency and insight The Aptitude Accounting Hub provides a strong tactical and strategic solution to the integration of data, technology, people
More informationFinancial Services Compliance
Financial Services Compliance Amidst frequently changing regulations, heightened risk, and a growing volume of disparate data, compliance has become complex, inefficient, and costly. Mitigating new risk
More informationDevOps Pipeline Assessment FAQs
DevOps Pipeline Assessment FAQs DevOpsGroup 2018 Why do I Need a DevOps Pipeline Assessment? How is the DevOps Pipeline Assessment Delivered? DevOpsGroup s approach for new technical client engagements
More informationPART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)
PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes
More informationGETRAG FORD TRANSMISSIONS
GETRAG FORD TRANSMISSIONS Aras Accelerates Innovation at GETRAG FORD Transmissions The Aras platform is used not just to automate, but to develop new business processes at GETRAG FORD Transmissions. The
More informationREPORT TO THE BOARD OF GOVERNORS UBC FINANCE AND IT GOVERNANCE EXTERNAL REVIEW
Agenda Item #5.3 CLOSED REPORT TO THE BOARD OF GOVERNORS SUBJECT UBC FINANCE AND IT GOVERNANCE EXTERNAL REVIEW MEETING DATE APRIL 14, 2014 Forwarded to the Board of Governors on the Recommendation of the
More informationRELEASING HIGH-QUALITY APPLICATIONS AND INFRASTRUCTURE FASTER WHITE PAPER OCTOBER 2017
RELEASING HIGH-QUALITY APPLICATIONS AND INFRASTRUCTURE FASTER WITH vrealize CODE STREAM WHITE PAPER OCTOBER 2017 Table of Contents Abstract 3 The Need for Speed 3 How to Accelerate Application Release
More informationPassit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2
Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our
More informationProcess Driven PPM. Getting the Most Out of Your New Product Development Projects Neil Stolovitsky
The PROJECT PERFECT White Paper Collection Abstract Process Driven PPM Getting the Most Out of Your New Product Development Projects Neil Stolovitsky From R&D to Customer Service, effectively serving the
More informationCENTRE (Common Enterprise Resource)
CENTRE (Common Enterprise Resource) IT Service Management Software designed for ISO 20000 ITSM ISO/IEC 20000 is the international IT Service Management (ITSM) standard that enables IT organizations (whether
More informationEnterprise DevOps with Plutora
SOLUTION BRIEF Enterprise DevOps with Plutora Large enterprise adoption of DevOps practices is limited to pockets of the organization or portions of the engineering functions and automation. This leaves
More informationIMPLEMENTATION OF A MINING CADASTRE AND REGISTRY SYSTEM (MCRS) INUGANDA. By: Agnes Alaba Ag. Assistant Commissioner-Geodata GSMD
IMPLEMENTATION OF A MINING CADASTRE AND REGISTRY SYSTEM (MCRS) INUGANDA By: Agnes Alaba Ag. Assistant Commissioner-Geodata GSMD PRESENTATION OUTLINE BACKGROUND MCRS DESIGN MCRS IMPLEMENTATION CHALLENGES/ISSUES
More informationDrug Safety Validation Services. Life Sciences Solutions for Pharmacovigilance
Drug Safety Validation Services Life Sciences Solutions for Pharmacovigilance Who We Are 2 HighPoint Solutions is a premier provider of specialized Management and IT services dedicated to the Life Sciences
More informationLife Cycle Plan (LCP)
Life Cycle Plan (LCP) < LEMA Pilot School Integrated Family Accountability System> PROJECT TITLE LEMA FAMILY ACCOUNTABILITY SYSTEM TEAM NO #04 TEAM MEMBERS & ROLES NAME ROLES Teawon Han Project Manager
More informationPLM APPLICATION TESTING
RETAIL PLM APPLICATION TESTING IN RETAIL DOMAIN Abstract Retail PLM application is an intuitive, web-based solution ideal for footwear, apparel, and consumer products. While every attempt is made to focus
More information