- FACILITY LAYOUT DESIGN - 5S WORKPLACE ORGANISATION BRIAN SAINSBURY / ROMAN ZAHHAROV 08/02/12
|
|
- Eleanore Holland
- 6 years ago
- Views:
Transcription
1 - FACILITY LAYOUT DESIGN - 5S WORKPLACE ORGANISATION BRIAN SAINSBURY / ROMAN ZAHHAROV 08/02/12
2 Agenda 5S workplace organization Facility layout design Summary 15 May 2012
3 Agenda 5S workplace organization introduction pilot overview and before / after conclusions / further steps Facility layout Summary 15 May 2012
4 Agenda 5S workplace organization introduction pilot overview and before / after conclusions / further steps Facility layout Summary 15 May 2012
5 5S Workplace Organization and Standardization
6 Agenda Introduction to 5S Sort / SORTEERI Set-in-order / SEA KORDA Shine / SÄRA Standardize / STANDARTISEERI Sustain / SÄILITA 5S and other Building Blocks of Lean A model for implementation
7 Agenda Introduction to 5S Sort / SORTEERI Set-in-order / SEA KORDA Shine / SÄRA Standardize / STANDARTISEERI Sustain / SÄILITA 5S and other Building Blocks of Lean A model for implementation
8 5S and Other Building Blocks of Lean
9 Agenda Introduction to 5S Sort / SORTEERI Set-in-order / SEA KORDA Shine / SÄRA Standardize / STANDARTISEERI Sustain / SÄILITA 5S and other Building Blocks of Lean A model for implementation
10 1. Define the Target Area Use masking tape, existing boundaries (walls, floors, etc.), chalk line, etc. to etc. mark the official boundaries of the target area Make sure the target area is sized appropriately for the event
11
12 0. VASTUTUSALAD
13 2. Draw a Spaghetti Diagram Have a (scaled) drawing of the target area Draw the typical flow of people, materials and information This identifies motion and transportation waste May use to help relayout area
14 MATERJALID TÖÖTAJAD INFO
15 3. Audit and Score Use an audit checklist to set a baseline score Train the auditors Understand that the first score typically is not high at the baseline Numerical (vs. yes/no) Use of 5S Levels Standardize and customize your audit checklists
16
17 4. Before Photos A picture is worth one- thousand words Issues pop off the picture Take overall area shots Safety issues Anything that would be a good Before and After photo Mark the locations on an area map or Photo Log to be able to take after photos
18 5. Communication Board Use to keep everyone informed Audit Scores Before and After photos Spaghetti diagram 5S News Have short meetings by the board Put it in a convenient location Keep it current!
19
20 Agenda 5S workplace organization introduction pilot overview and before / after conclusions / further steps Facility layout Summary 15 May 2012
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71 Agenda 5S workplace organization introduction pilot overview and before / after conclusions / further steps Facility layout Summary 15 May 2012
72 ALUSTATUD LÕPETATUD 1. SORTEERI
73 ALUSTATUD LÕPETATUD 2. SEA KORDA
74 ALUSTATUD LÕPETATUD 3. SÄRA
75 ALUSTATUD LÕPETATUD 4. STANDARTISEERI
76 ALUSTATUD LÕPETATUD 5. SÄILITA
77 5S KAS PARIM VOOG?
78 5S KES JÄRGMINE?
79 BORIS DIMA TIIT SERGEI DIMA 1.1 5S TSOONID JA VASTUTAJAD
80 Today 1S ISESEISVALT TEHTUD KOGU TOOTMISE ULATUSES S TOOTMISES JUURUTATUD VÄRVIMINE: OEE EFEKTIIVSUSE MÕÕTMINE SMED SEADISTAMISAJADE VÄHENDAMINE ' 12 veebr 2012 märts apr mai ' 12 1S DIMA S BORIS S SERGEI S TIIT S, 5S DIMA VÄRV OEE MÕÕTMINE PILOOT S JUURUTAMINE KOGU TOOTMINE VÄRV SMED SEADISTAMISAJADE VÄHENDAMINE S EDASISED SAMMUD Made with Office Timeline
81 5S and Other Building Blocks of Lean OEE seadmete efektiivne kasutus SMED kiired üleminekud Kanban voogu juhtimine MÕÕDAME PROTSESSI!
82 Agenda 5S workplace organization introduction pilot overview and before / after conclusions / further steps Facility layout Summary 15 May 2012
83 Agenda 5S workplace organization Facility layout sisejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary 15 May 2012
84 sissejuhatus tsükli aeg vajalik kapasiteet takti aeg takti kestus protsessi partii tsükli aeg tk. kohta balanseerimine / cycle time / desired capacity / tact time / tact duration / batch size / cycle time per pc / balancing
85 Agenda 5S workplace organization Facility layout sissejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary 15 May 2012
86 algandmed mahud
87 algandmed mahtude kasv
88 algandmed olevik vs tulevik
89 algandmed 2012 takt * 7 h/day
90 algandmed flush door
91 Agenda 5S workplace organization Facility layout sisejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary 15 May 2012
92 võimsuste arvestus flush door
93 võimsuste arvestus flush door
94 võimsuste arvestus flush door
95 võimsuste arvestus flush door
96 võimsuste arvestus flush door takt
97 Agenda 5S workplace organization Facility layout sisejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary 15 May 2012
98
99
100 5S workplace organization Facility layout sisejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary Agenda 15 May 2012
101 pudelikaelad Plekikeskus 1tk * 1,5 vahetust Painutuspink 2tk * 2,0 vahetust Liimimispress 1tk * 1,5 vahetust Enne värvimist pooltoodang Peale värvimist pooltoodang Värvimine 1tk * 3,0 vahetust
102 5S workplace organization Facility layout sisejuhatus / introduction algandmed / basic data võimsuste arvestus / capacity calculations tsehhi plaan / facility layout pudelikaelad / bottle necks kokkuvõte / conclusions Summary Agenda 15 May 2012
103 kokkuvõte Takti-põhine voogu määramine U-kujuga liinide kasutamine 1,5 jne ressurside hõivatus prognoositavate mahtude täpsus töömahukate prossesside analüüs otsustada: lisa masin või 3 vahetust? seadmete reaalne effektiivus OEE%? seadmete seadistamise ajad SMED?
104 Agenda 5S Facility layout Summary 15 May 2012
105 Agenda 5S Facility layout Summary 15 May 2012
106 - FACILITY LAYOUT DESIGN - 5S WORKPLACE ORGANISATION BRIAN SAINSBURY / ROMAN ZAHHAROV 08/02/12
Standardised work & 5S Improving safety & efficiency
Specify VALUE from the customer viewpoint Standardised work & 5S Improving safety & efficiency Pursue PERFECTION in quality & quantity by continuous Improvement Introduce Standard Working Remove Waste
More informationSafety Through 5S. Jeffrey Gilbert Vice President of Operations Packaging Division
The Opportunity to Improve Safety Through 5S Jeffrey Gilbert Vice President of Operations Packaging Division Flint Group North America Manufacturing Strategy & Facility Locations Vancouver Portland Winnipeg
More informationLab Quality Confab LEAN Principles. 4 Fundamental LEAN Tools to Transform your Laboratory. Rita D Angelo, Bonnie Messinger, Bill Krzisnik
Lab Quality Confab 2018 LEAN Principles 4 Fundamental LEAN Tools to Transform your Laboratory Rita D Angelo, Bonnie Messinger, Bill Krzisnik Learning Objectives The Learner will be able to: 1. Understand
More informationSession III. LEAN Enterprise and Six Sigma
Session III LEAN Enterprise and Six Sigma LEAN Enterprise Is a methodology that relies on a collaborative team effort to improve performance by systematically removing waste; combining Lean Manufacturing,
More information10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2
10 Steps to become a Lean Enterprise Level 2 Lean Practitioner In Manufacturing Training Course Step 1 - Part 2 Table of Contents Welcome to Lean Certification Online... 3 Course Objectives... 4 Elements
More informationLEAN MANUFACTURING & TPM.
LEAN MANUFACTURING & TPM www.fourprinciples.com BACKGROUND The core area of any manufacturing facility is the shop floor. Manufacturing is most often also the largest function within an organisation. In
More informationINTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe
INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later
More informationINTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe
INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later
More informationIntroduction to Lean
Introduction to Lean After completing this training, the learner will be able to: Explain what Lean is Understand Lean tools, including: Value Stream Mapping, waste identification, Kaizen, Kanban, and
More informationProduction process flow optimisation at. Euro-Plastifoam (Pty) Ltd
Production process flow optimisation at Euro-Plastifoam (Pty) Ltd by Ignatius Zietsman 26038562 Final Project Report Submitted in Partial Fulfillment of the Requirements for the Degree of BACHELORS IN
More informationLean Six Sigma Assembly Transformation
Lean Six Sigma Assembly Transformation Assembly Operation converted to one piece flow assembly lines to improve throughput and efficiency. Problem Statement The first issue was ramping production to meet
More informationLevel 2- Lean Practitioner in Healthcare Course Workbook Part 4 Step 3. Table of Contents
Table of Contents Introduction.... 3 Course Objectives.... 4 10 Steps to become a Lean Enterprise.... 5 Take the 30 Second Challenge.... 6 Step 3 Workplace Organization.... 8 The 5S Levels of Achievement....
More informationWhat is the Goal of 5S?
What is the Goal of 5S? 5S is a Lean method intended to implement order in the workplace. The goal of 5S is to improve efficiency by eliminating various wastes, including the waste of motion and time spent
More informationSupply Chain & Procurement Roundtable. Lean Supply Chain. Workshop
Supply Chain & Procurement Roundtable Lean Supply Chain Workshop Time Activity 08:45 Arrive, Coffee 09:00 Welcome 09:10 Overview of PBR Australia 09:30 Plant Tour 10:30 Break 10:45 Lean & Agile Supply
More informationTHE THREE THINGS. You Need to Know to Transform Any Sized Organization into an Agile Enterprise
THE THREE THINGS You Need to Know to Transform Any Sized Organization into an Agile Enterprise MIKE COTTMEYER mike@leadingagile.com 404-312-1471 www.leadingagile.com twitter.com/mcottmeyer facebook.com/leadingagile
More informationSEMBIT5-08 Recommend staff development and guidance for continuous improvement
Recommend staff development and guidance for continuous Overview This unit covers the competences required to generate and encourage to an organisation's continuous culture by identifying and recommending
More informationINTRODUCTION TO ISO 45001
INTRODUCTION TO ISO 45001 Course no.: IS451 A One-Day Awareness On The New ISO 45001 Occupational Health And Safety Management Systems And The Impact On The Work Place What is ISO 45001:2018 Occupational
More informationHow Lean Saves Money. Joe Margarucci January Copyright Bureau Veritas
How Lean Saves Money Joe Margarucci January 2016 Lean Initiative Objectives To Learn the 8 Wastes for Lean To understand several tools of Lean l 5S l Standardized Work l Quality @ the Source l Total Productive
More informationCOLUMBUS McKINNON CORPORATION MIDLAND FORGE DIVISION. 6S Training Overview
6S Training Overview Why Implement 6S? Customers needs constantly change. Companies compete to meet these needs. To survive, we must stay competitive. This means improving products and services and lowering
More informationCPI Event / Project Tollgate Template
CPI Event / Project Tollgate Template Template is to provide a starting point for new CPI practitioners. Final Out Briefs should include all DMAIC phases. Use background / format according to your command
More informationIt s Not Easy Being Lean. C G Clark Consulting Group
It s Not Easy Being Lean 1 It s Not Easy Being Lean or Lean - - it s not just for manufacturing anymore or Do I have to be Mean to be Lean? Abq INCOSE July 7, 2010 Sheri Clark Clark Consulting Group 2
More informationCPI Event / Project Tollgate Template
CPI Event / Project Tollgate Template Template is to provide a starting point for new CPI practitioners. Final Out Briefs should include all DMAIC phases. Use background / format according to your command
More informationContinuous Process Improvement & Lean Six Sigma in Humes
Strength. Performance. Passion. Continuous Process Improvement & Lean Six Sigma in Humes Presented at NCPAA 28/8/15 by: Damien Richards National Operations & Engineering Manager 2015 Holcim (Australia)
More informationELECTRONETICS. Scope: Prep Area
ELECTRONETICS 5S TRAINING Scope: Prep Area February 19, 2010 Sponsor Michael Quinn, VP Manufacturing Production & Assembly, Northwest Center Scott Patterson, Plant Manager, Electronetics What is 5S? It
More informationOperations Management - 5 th Edition
Chapter 15 Lean Production Operations Management - 5 th Edition Roberta Russell & Bernard W. Taylor, III Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lecture
More informationFinished goods available to meet Takt time when variations in customer demand exist.
Delaware Valley Industrial Resource Center 2905 Southampton Road Philadelphia, PA 19154 Tel: (215) 464-8550 Fax: (215) 464-8570 www.dvirc.org Term Batch-and-Queue Processing Buffer Stock Catchball Cell
More informationWhy Agile Transformations Fail. What You Need to Know to Transform Any Sized Organization into an Agile Enterprise
Why Agile Transformations Fail What You Need to Know to Transform Any Sized Organization into an Agile Enterprise DEREK HUETHER Enterprise Transformation Consultant derek@leadingagile.com 301/639-4976
More informationAccessibility Survey Techniques John Salmen, AIA Andrew Yarrish, AIA Universal Designers & Consultants, Inc.
John Salmen, AIA Andrew Yarrish, AIA www. Outline of Program 1. Tools 2. Accessibility Checklists 3. Measurement Questions will be taken throughout 2 Objectives Become familiar with measuring techniques
More informationFueling the Fire of Kaizen throughout the Lean Enterprise. Mark Preston, cell
Fueling the Fire of Kaizen throughout the Lean Enterprise Mark Preston, mpreston@bellsouth.net 404-308-2898 cell Lean Foundations Elimination of Waste Success Foundation Operational Excellence or Lean
More informationCh 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.
Ch 26 Just-In-Time and Lean Production Sections: 1. Lean Production and Waste in Manufacturing 2. Just-in-time Production Systems 3. Autonomation 4. Worker Involvement What is Lean Production? Lean production
More informationInternational Lean Manufacturing Lessons National Localization Indaba Balázs Németh, Phd. Kvalikon Consulting
International Lean Manufacturing Lessons National Localization Indaba Balázs Németh, Phd. Kvalikon Consulting DAC Annual Grand Meeting 5 June 2014 Competition 2 Competing for Resources (Capital, Raw Material,
More informationLean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.
Lean Basics Overview EMC 2011 Training NCDENR April 2011 1 Topics Lean Six Sigma defined Why Lean Six Sigma? What s a process? Interrogating the process by identifying Value & Waste Brief overview of some
More informationLean Culture. Creating a Culture for continuous improvement to better serve our Customers
Lean Culture Creating a Culture for continuous improvement to better serve our Customers Purpose: To understand the need for improvement and outcomes we can achieve through a new way of thinking,, leadingl
More informationIntroduction. Steps to Lean IT. Sample Lean IT Processes
Introduction Topic: Making IT a Lean, Mean, Fighting Machine Presenter: John Frein, MBA, PMP Process Improvement Consultant Spectrum Health Grand Rapids, MI 1 Spectrum Health Steps to Lean IT 1.Organize
More informationAn Introduction to the Lean Process
An Introduction to the Lean Process CHARLES W LIEDTKE, PMP, EXEMPLAR GLOBAL QM, AU, TL CHARLES.LIEDTKE@ILLINOISBIS.ORG ILLINOIS BUSINESS INNOVATION SERVICES 1 ILLINOIS BUSINESS INNOVATION SERVICES 2 Our
More informationWAN-IFRA BERLIN 2013 NEWSPRINTERS CONTINUOUS IMPROVEMENT SYSTEM
WAN-IFRA BERLIN 2013 NEWSPRINTERS CONTINUOUS IMPROVEMENT SYSTEM Newsprinters What we do NEWSPRINTERS LEAN MANUFACTURING SERVICES How we do it Raw Materials (Paper, Ink, Font and Plates) Logistics Post
More informationHistorical Phases of Production
Lean 101 Overview Lean Background Taiichi Ohno and Shigeo Shingo developed Lean Manufacturing at Toyota over a period of 20-30 years. Their intention was not to develop some sort of unified field theory
More informationLean Transformation UTC Aerospace Systems, MRO 2/7/2017. Contains no technical or ITAR controlled data
Lean Transformation UTC Aerospace Systems, MRO 2/7/2017 Contains no technical or ITAR controlled data UTX Who are we? 2 UTC AEROSPACE SYSTEMS MIRAMAR Who are we? 3 LEAN TRANSFORMATION Agenda Why How Results
More information5S METHOD IN LEAN MANUFACTURING
5S METHOD IN LEAN MANUFACTURING Professor Virgil POPA Ph D Master degree student Alina BIDIREANU Master degree student Mihai TOADER Valahia University of Targoviste virgilp51@yahoo.com Abstract LEAN MANUFACTURING
More informationMetaOps Presents: APICS Student Case Competition. Thanks to: Ron Crabtree MetaOps, Inc. 1
MetaOps Presents: APICS Student Case Competition Thanks to: Ron Crabtree 2-16-07 2007 - MetaOps, Inc. 1 The situation Data provided Guidelines Open Q & A Agenda 2007 - MetaOps, Inc. 2 Situation Insurance
More informationGood Afternoon - We are a Core Team in the Stryker Neurovascular Organization. We Develop and Manufacture Precision Devices used for complete Stroke
Good Afternoon - We are a Core Team in the Stryker Neurovascular Organization. We Develop and Manufacture Precision Devices used for complete Stroke Care. We are pleased to be here and honored to represent
More informationDial-in Number: Access code: # Go to: Use the JOIN A SESSION button Enter the Access Code:
Dial-in Number: 209 647-1075 Access code: 1013004# Go to: http://www.gatherplace.net Use the JOIN A SESSION button Enter the Access Code: 8285433 This presentation may appear different on your computer
More informationANALYSIS ON THE PROCESSING TIME REDUCTION FOR AN AUTOMOTIVE INDUSTRY PRODUCTION FLOW
ANALYSIS ON THE PROCESSING TIME REDUCTION FOR AN AUTOMOTIVE INDUSTRY PRODUCTION FLOW Dan MIRICESCU 1 and Martin HEINISCH 2 ABSTRACT: One of the main objectives of production management was and has always
More informationLEAN PRODUCTION SYSTEM
LEAN PRODUCTION SYSTEM Introduction Lean Overview Process Control Tools 1. Flow Chart / Diagram 2. Check Sheet 3. Histogram 4. Pareto Chart / Diagram 5. Cause-and-Effect Diagram 6. Why-Why Diagram 7. Scatter
More informationLean Manufacturing Techniques
Lean Manufacturing Techniques Description What it is Case Study Objective Outcomes Expected Why Used Scope Where Used How Used Deployment Tool Training Generic Tasks Lean Manufacturing is a systematic
More informationCompany Business Excellence Self-Assessment
Company Business Excellence Self-Assessment Assessment Review Date: Danbury ISR Updated: 7/21/2011 1 Completing this Self-Assessment 1. Review each section as a separate assessment of your current state
More informationMaterials Management. Implementation Process. Marek Piatkowski. December Marek Piatkowski FSP Consulting
Materials Management Implementation Process Marek Piatkowski December 2010 1 Materials Management Strategy the Big Picture 1 Major Steps Create a Materials Management Organization Key Points Responsible
More informationOnline Student Guide Standard Work
Online Student Guide Standard Work OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 3 INTRODUCTION... 3 BENEFITS OF STANDARD WORK... 3 IMPLEMENTATION OF STANDARD WORK... 3
More informationProficiency and Certification in Fundamental Lean Tools
Proficiency and Certification in Fundamental Lean Tools Inventory Management by Kanban, Daily Management, Visual Management, Selecting and Using KPI s in the Laboratory Dr. Katja Lehmann Topics Introduction
More informationPLUS VALUE STREAM MAPPING
LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for
More informationEDMM Cycle Time Definitions and Line Balancing (Yamazumi) Charting
EDMM 487 Cycle Time Definitions and Line Balancing (Yamazumi) Charting 1 EDMM 487 2 EDMM 487 Ideal Cycle Time: The maximum time (generally in seconds) to perform a process; in terms of Standardized Work,
More informationContinuous Improvement Toolkit. Standard Work. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Standard Work The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking*** Interviews
More informationA PM on Lean Production Randel Ltd.
A PM on Lean Production Randel Ltd. RANDEL LTD. INDUSTRY STREET 8 38267 WOMANCHESTER ENGLAND Written by: Tobias Reith, BSc Course: Lean Production (2016) Linköping University, Sweden A PM ON LEAN PRODUCTION
More informationVisual Controls : Applying Visual Management to the Factory
Visual Controls : Applying Visual Management to the Factory Table Of Contents: Introduction xi Acknowledgments xix Chapter 1 Importance of the Visual Factory 1 (16) The Common Ground of Production 1 (6)
More informationHSE INDICATOR TOOL USER MANUAL
HSE INDICATOR TOOL USER MANUAL 1 Background The Indicator Tool is a 35-item questionnaire relating to the six primary stressors identified in the Management Standards on Work Related Stress. The items
More informationAn Application of Lean Manufacturing to Enhance the Runtime in the Machine Shop
An Application of Lean Manufacturing to Enhance the Runtime in the Machine Shop SAMIR SAMA PG Student, Department of Mechanical Engineering, S. P. B. Patel Engineering collage, Linch Mehsana Gujarat (India)
More informationLean, team-based medical device manufacturing. David Hurley Associate Director of Operations Alcon Research, Ltd.
Lean, team-based medical device manufacturing David Hurley Associate Director of Operations Alcon Research, Ltd. Agenda Alcon Starting our Lean journey Our Lean Change Process Lean Production Lean Management
More information6S Workplace Organization & Safety. Building a Lean and Safe Foundation
6S Workplace Organization & Safety Building a Lean and Safe Foundation Organized? Questions are the hallmark of disorganization Where does it go? Which one? What next? How many? What you don t know could
More informationIATF transition. Only 1 year to go for over 69,000 ISO/TS16949 certified organizations to transition to ISO9001: 2015 and IATF 16949: 2016.
ISO/TS16949:2009 IATF 16949:2016 Risk or Opportunity? Quality Partner Newsletter September 2017 For More Information Visit www.qualitypartner.co.uk Author: Paul Hardiman Welcome to the ninth edition of
More informationISO The International Energy Management Standard. esta.org.uk
ISO 50001 The International Energy Management Standard Background to Standard UK led development with British Standards Institute Based on committee member s experience and that of other advisors Based
More informationProficiency and Certification in Fundamental Lean Tools
Proficiency and Certification in Fundamental Lean Tools Inventory Management by Kanban, Daily Management, Visual Management, Selecting and Using KPI s in the Laboratory Dr. Katja Lehmann Topics Introduction
More informationIMPLEMENTATION OF LEAN TOOLS IN AN SME
IMPLEMENTATION OF LEAN TOOLS IN AN SME Hariram VR 1, V. Muthukumaran 2 1 Department of Mechanical Engineering, SNS College of Technology, Tamil Nadu 641035, India 2 Department of Mechanical Engineering,
More informationLean: Improve Your Shop Efficiency and Productivity January 30, Lean: Improve Your Shop Efficiency and Productivity Introduction to 5S
Lean: Improve Your Shop Efficiency and Productivity Introduction to 5S Mike Howell Technical Support Specialist Electrical Apparatus Service Association, Inc. +1 314 993 2220 mhowell@easa.com How to ask
More informationLean ITIL at Jazz Aviation April Professional Development Summit (PDS)
Lean ITIL at Jazz Aviation April 2014 Professional Development Summit (PDS) Agenda A bit about Jazz Lean at Jazz Six Sigma and Continuous Improvement How to know which tool to use Examples from the shop
More informationTPS Basics. What defines worth? Value: The key focus. Delivery. Worth Value= Cost. Functionality: what the product will do Performance Features
TPS Basics Value: The key focus. Worth Value= Cost Eyes of customer Incurred during production Toyota s strategy is achieve total quality and maximum cost reduction through variation and waste elimination
More informationmoving office checklist
moving office checklist shifting spaces seamlessly Outline Design 3 An exciting new canvas A change of space is exciting and promised-filled a fresh canvas, new interior and layout, and bigger, or smaller,
More informationFROM 5S METHODOLOGY TO LEAN LAYOUT: EVIDENCE FROM AUTOMOBILE INDUSTRY
FROM 5S METHODOLOGY TO LEAN LAYOUT: EVIDENCE FROM AUTOMOBILE INDUSTRY Pavla Otenšlégrová Felipe Martinez Abstract This paper proposes a complementary approach to implementing 5S and Lean Layout methodologies
More informationIT 470a Six Sigma Chapter X
Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor
More informationContinuous Improvement Toolkit. Value Analysis
Continuous Improvement Toolkit Value Analysis VA NVA The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***
More informationLEAN PRODUCTION FACILITY LAYOUT.
LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout
More information01/04/15 2
T O T A L Q U A L I T Y M A N A G E M E N T + S KAIZEN CONTINUOUS IMPROVEMENT IS THE RESULT OF CONTINUOUS INVOLVEMENT Oleh : Debrina P. Andriani Teknik Industri Universitas Brawijaya þ debrina@ub.ac.id
More informationIntegrated Clause-byclause Guidance
Integrated Clause-byclause Guidance ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018 Table of Contents 1 INTRODUCTION... 4 2 IMPLEMENTATION & DEVELOPMENT... 5 2.1 MANAGING THE CHANGE... 6 2.2 TOP MANAGEMENT
More informationLecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization
Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar L9: Lean synchronization 1 Lean operations Operations strategy Design Improvement Lean operations Planning and control The market requires
More information[Unique Reference Number] Leading continuous improvement (Kaizen) activities
Overview This unit covers the competences required for leading continuous improvement (Kaizen) activities in the workplace. It involves approving the plan for the Kaizen process for the agreed work area/activity,
More informationResponding to FTA Verification Requests: The Customs Broker's Perspective
Responding to FTA Verification Requests: The Customs Broker's Perspective Agenda: Introduction Overview Understanding your FTA and Trade Promotion Rules of Origin and Exceptions Origin vs Originating Situation
More informationThis application process is for the New Modernized Drive Clean Program that uses the new OBD II and/or TSI, and Heavy Duty test equipment.
DRIVE CLEAN ACCREDITATION CHECKLIST How to Become a Light Duty Test Only, Test & Repair, Repair Only, Heavy Duty Non-Diesel, or Heavy Duty Diesel (Mobile or Non-Mobile) Drive Clean Facility Important Complete
More informationEXCELLENCE SYSTEMS GROUP. Consultants. Lean Frontier. Freddy Ballé. EXCELLENCE SYSTEMS GROUP Consultants
Lean Frontier Freddy Ballé 1 MY START WITH LEAN 1975: Dumping in Africa? Toyota visits Not cultural, but logical and rational 2 WHAT I LEARNED WITH LEAN Once you change your paradigm, you learn to see:
More informationProcedure: Work health and safety audit
Procedure: Work health and safety audit Purpose This procedure describes how the University establishes, implements and maintains audits for the work health and safety, rehabilitation and claims (WHS)
More informationDane County Facilities Management is Talking Trash in 2016
Dane County Facilities Management is Talking Trash in 2016 Dane County Launches New and Improved Waste Reduction and Recycling Program in County Facilities Waste Reduction and Recycling Program Background
More informationToolkit user guide. All content ACTS version 1.0
Toolkit user guide All content ACTS 2018 version 10 About Green Impact is an international program hosted in Australia by ACTS (Australian Campuses Towards Sustainability) This guide has been developed
More informationChecklist for Internal Audit Organisational Set Up
Checklist for Internal Audit Organisational Set Up Objective Procedures to check and correct activities are a crucial part of every management system also within the Integrated Management System. One of
More informationChecklist for Internal Audit Organisational Set Up
Checklist for Internal Audit Organisational Set Up Objective Procedures to check and correct activities are a crucial part of every management system also within the Integrated Management System. One of
More informationTHE THREE THINGS. You Must Know to Transform Any Sized Organization into an Agile Enterprise
THE THREE THINGS You Must Know to Transform Any Sized Organization into an Agile Enterprise MIKE COTTMEYER mike@leadingagile.com 404-312-1471 www.leadingagile.com twitter.com/mcottmeyer facebook.com/leadingagile
More informationAvailable online at ScienceDirect. Procedia CIRP 40 (2016 )
Available online at www.sciencedirect.com ScienceDirect Procedia CIRP 40 (2016 ) 590 595 13th Global Conference on Sustainable Manufacturing - Decoupling Growth from Resource Use Re-engineering Assembly
More informationSouth Central. Course Catalog
Contents Lean Operations Solutions... 1 Principles of Lean Manufacturing 4 hr... 1 Value-Stream Management & Mapping - 4 hr, 24 hr... 1 5S: Workplace Organization 4 hr, 40 hr... 1 Total Productive Maintenance
More informationLearning Objectives. 1. Explain how lean systems improve internal and supply chain operations
CHAPTER EIGHT Lean Systems McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Learning Objectives 1. Explain how lean systems improve internal and supply chain operations
More informationProcess Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?
Process Mapping What It Means for You At Fastenal, we do much more than just ship products out of a catalog; we can work closely with you to uncover hidden sources of supply chain waste and provide total
More information5S IMPLEMENTATION IN APPAREL EDUCATIONAL INSTITUTION P. Siva kumar Industrial Engineer, Jay Jay Mills (India) Pvt. Ltd. India
ABSTRACT: 5S IMPLEMENTATION IN APPAREL EDUCATIONAL INSTITUTION P. Siva kumar Industrial Engineer, Jay Jay Mills (India) Pvt. Ltd. India idofsivakumar@gmail.com This article is mainly focused on the implementation
More informationCONDUCTING A WASTE AUDIT AT CONCORDIA
CONDUCTING A WASTE AUDIT AT CONCORDIA Drafted by: Faisal Shennib, Environmental Coordinator Environmental Health and Safety Last Edited: 2015-02-02 OVERVIEW Waste audits are a critical tool for assessing
More informationLean Flow Enterprise Elements
"Lean Flow" describes the performance of organizations that are effective enough to win consistently in the competitive global marketplace. To understand how to get there, it s useful to focus on Lean
More informationIncident Investigation Process
Incident Investigation Process Introduction An incident is an unplanned or undesired event that adversely affects a company s work operations. Incidents include work-related injuries, occupational illnesses,
More informationLeading High Reliability Organizations in Healthcare. Richard Morrow, MBA, MBB Author/Founder RPM Exec (847)
Leading High Reliability Organizations in Healthcare Richard Morrow, MBA, MBB Author/Founder RPM Exec (847) 989-3333 rpm@rpmexec.com www.rpmexec.com 1 Baseline Performance Healthcare Compared 2 Organizations
More informationWegmans Process Improvement DPM Fall 2011
Wegmans Process Improvement DPM Fall 2011 What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set our goal
More informationLean Systems Thinking: A Roadmap for Operational Excellence
Lean Systems Thinking: A Roadmap for Operational Excellence Professor Peter Hines BCCC 2011 Annual Conference 6 th & 7 th April 2011 Inspiring success through pioneering, process-based solutions S A Partners
More informationOPERATIONAL EXCELLENCE
OPERATIONAL EXCELLENCE Advanced methods for operational excellence Angel Albizu Mardones Leader Consultant at ASENTA MANAGEMENT CONSULTANTS 28/10/15 www.pharmaprocessforum.com 2 Track 2: OPERATIONS Advanced
More informationBusiness Process Kaizen
Time Based Management Business Process Kaizen Why focus on Business Process Improvement LeanSigma, The Perfect Engine, LeanStrategy, and the TBM Consulting Group logo are registered trademarks of TBM Consulting
More informationISO Food Safety Management System Implementation Workbook
This FSSC 22000 Implementation Workbook compliments our comprehensive FSSC 22000 Packaging Food Safety Management System package and guides you on the path to achieving FSSC 22000 Certification. We have
More informationProduction with an Efficient, Effective, and Green Workload. Andrew Espeseth Workload Coordinator The University of Texas at Austin
Production with an Efficient, Effective, and Green Workload Andrew Espeseth Workload Coordinator The University of Texas at Austin The University of Texas at Austin Custodial Services 2001-2009 Convert
More informationLean for Service. Presented by: Dennis Sowards, Quality Support Services, Inc
Lean for Service Presented by: Dennis Sowards, Quality Support Services, Inc. 480 835-1185 dennis@yourqss.com DENNIS SOWARDS 15 years experience in mechanical contracting 35 years helping companies improve
More information