Upgrade to Legacy Billing System
|
|
- Magdalen Patrick
- 6 years ago
- Views:
Transcription
1 Group Project, Alpha Group Bob Young, Group Leader Olga Botero Mike Lamb Cynthia Thompson Tim Watkins Professor Gigi Smith Project Planning, Execution, and Closure PM B-01-Group A-P5 T1 March 19, 2010 Upgrade to Legacy Billing System
2 Group leader helped assign sections to each member Group used , discussion boards, chats and Adobe Connect to have planning and other group meetings. Each group member shared their draft and final slides with the group for acceptance Project Scope and Plan (Charter) were done with group inputs but finalized by assigned people.
3 The Project Charter: Background conversion of legacy billing system to new web based version. The Problem Statement Old billing system and customer cannot pay or view on line. Justification New technology presents options for paying on line and viewing of customer accounts Slide Contributed by Tim Watkins
4 The Sponsor IRTC Billing Department and IRTC Senior Management. Stakeholders IRTC Senior Management, Billing Department, Program Manager, Project Team, Vendors and IRTC customers. Slide Contributed by Tim Watkins
5 Created in MS Project to be able to expand each item for project plan Slide Contributed by Olga Botero
6 A project scope progressively elaborates the characteristics of a product or service (PMBOK, 2008, p. 115) Slide Contributed by Olga Botero
7 Slide Contributed by Olga Botero Major Milestones Milestone Detail Changes to Schedule Deliverables Effort Resource Dependencies Duration Resource Escalation Resolution
8 Obtain number of customers Bill delivery time Bill pay average time Customer contact history CS response time Customer satisfaction rating Slide Contributed by Olga Botero
9 Planning Stage Vendor plan IRTC plan Acquire Human resources Acquire hardware Acquire software Slide Contributed by Olga Botero
10 Installation Part 1 Install system software Security programs Install vendor software Test with raw data
11 Migrate company data Test with current data Contact web security Certificate of Authority Contact beta testers (clients to test new system) Slide Contributed by Olga Botero
12 Documentation Customer announcements Training Close contracts Migrate final data Deactivate system Slide Contributed by Olga Botero
13 Change Management Approach Authorization Documentation Changes to project schedule Slide Contributed by Olga Botero
14 Slide Contributed by Mike Lamb Procedural errors with new software Vendor not meeting deadline Budget will be exceeded Identifying hardware and software problems Customer loss of information Double billing or not billing a customer Hackers and viruses
15 Slide Contributed by Mike Lamb Impact Low Low Med Medium Med. High High Probability Low Low Medium Medium Medium High High
16 Viruses and Hackers Causes Easy passwords Virus scanner not up to date Software exploits Risk Mitigation Efforts IT department ensures virus scanners are up to date Frequent virus scans Work with vendor to patch software exploits Strong customer passwords Use only approved software on computers Frequent checks of software logs Slide Contributed by Mike Lamb
17 Loss of Customer Data/Double billing Causes Data in wrong format Incorrectly entered data Risk Mitigation Efforts Continue to run legacy system Keep backups from legacy system Procedural Errors Causes New look and different data required Risk Mitigation Efforts Formal training, informal training, and on the job training Slide Contributed by Mike Lamb
18 Slide Contributed by Mike Lamb Software / Hardware Issues Causes Documented issue Failed parts Risk Mitigation Efforts Report software / hardware issues to IT department Work with vendor for patches List of known problems to end users Budget Exceeded Causes Unnecessary work Risk Mitigation Efforts Remove optional tasks Reduce material costs Vendor Off Schedule Causes Not prioritizing work Risk Mitigation Efforts Milestones vendor must meet Weekly status meetings
19 Slide Contributed by Mike Lamb
20 Slide Contributed by Cynthia Thompson
21 Slide Contributed by Cynthia Thompson
22 Slide Contributed by Cynthia Thompson
23 DEFINE BUSINESS REQUIREMENTS EVALUATE VENDOR PROPOSALS ENGAGE & EMPLEMENT NEGOTIATE CONTRACT TERMS & CONDITIONS SELECT BEST VENDOR & PROPOSED SOLUTION Slide Contributed by Cynthia Thompson
24 Slide Contributed by Cynthia Thompson
25 Who are the Stakeholders? Project Sponsor (Senior Management) Project Manager Project Team Billing Department IT Department Vendor The Clients Slide Contributed by Tim Watkins
26 Communication type: Stakeholders All Project Team IT Team Billing Dept. Technical Staff Vendor PM Project Team Billing/IT Team Vendor Sponsor PM Project Team Type Kickoff Meeting Project Team Meetings Technical Staff Meetings Monthly Project Meetings Project Status Reports Slide Contributed by Tim Watkins
27 Medium Stakeholder Type Medium All Project Team IT Team Billing Dept. Technical Staff Vendor PM Project Team Billing/IT Team Vendor Sponsor PM Project Team Kickoff Meeting Project Team Meetings Technical Staff Meetings Monthly Project Meetings Project Status Reports Face to Face Face to Face Conference Calls Face to Face Face to Face Conference Calls Slide Contributed by Tim Watkins
28 Frequency Stakeholder Type Medium Frequency All Kickoff Meeting Face to Face Once Project Team IT Team Billing Dept. Project Team Meetings Face to Face Conference Calls Weekly Technical Staff Vendor Technical Staff Meetings Face to Face Weekly PM Project Team Billing/IT Team Vendor Monthly Project Meetings Face to Face Conference Calls Monthly Sponsor PM Project Team Project Status Reports Monthly Slide Contributed by Tim Watkins
29 Slide Contributed by Tim Watkins Responsible Party Stakeholder Type Medium Frequency Responsible Party All Project Team IT Team Billing Dept. Technical Staff Vendor Kickoff Meeting Project Team Meetings Technical Staff Meetings Face to Face Once Project Manager Face to Face Conference Calls Weekly Project Manager Face to Face Weekly Technical Team Lead PM Project Team Billing/IT Team Vendor Sponsor PM Project Team Monthly Project Meetings Project Status Reports Face to Face Conference Calls Monthly Project Manager Monthly Project Manager
30 Total Cost Budget Slide Contributed by Bob Young
31 Risk Cost Final Budget Scope Baseline Cost Baseline Project Schedule Time vs Cost HR Plan People Vendor Slide Contributed by Bob Young
32 Time People Application Cost Slide Contributed by Bob Young
33 Final Approval Determination Project Manager Team Leader Sponsor IRTC Internal cost IRTC Asset Other Vendor Cost Vendor Slide Contributed by Bob Young
34 Total Project Budget Internal IRTC Costs Vendor Costs IRTC Resources Budget People Software Vendor Budget People Software Slide Contributed by Bob Young
35 2001 the Denver International Airport started the Denver International Runway Project Fast Tracking Work done at the same time instead of sequentially Risk Management Runway collapse 9/11 terrorist attacks Loss of funding Completed project under budget and 18 days early Slide Contributed by Mike Lamb
36 The deliverable plain and simple will introduce expedited business transactions for IRTC clients, this will position the company in a COMPETITIVE ADVANTAGE Ultimately the success of any system implementation is dependent on the ability of the end users to use the system effectively. (Schindelbeck, F, Masterson, B, 2008, p.46) The project plan outlined on this document will accomplish these objectives with great clarity and with the commitment of a great project management team Slide Contributed by Olga Botero
37 CIO.Com, (2010), How to create a clear Project Plan, retrieved on March 14, 2010 from lear_project_plan Goal: Adjust costs to keep the project on budget. (2010). Retrieved March 14, 2010, from Microsoft Office Online: Haas, J. (2010). Upgrade. Retrieved on March 13, 2010 from de.htm
38 Human Resource Planning Process (2009). Retrieved on March 12, 2010 from Hussey, C. (2007). Technical Impacts: Selecting An IT Vendor. Retrieved on March 14, 2010 from impacts.com/downloads/itarticle_choosing_an_it_v endor.pdf Kerzner, H. (2009). Project Management: A systems approach to planning, scheduling, and controlling. Hoboken, New Jersey: John Wiley & Sons Inc.
39 PMBOK (2008). Project Management Body of Knowledge Forth Edition. Newtown Square, Pennsylvania Project Management Doc.com (2010). Retrieved February 5, 2010 from Schindelbeck, F, Masterson, B, (2008) Journal of Property Management
40 Solutionsco.com, (2010) Project Budgeting, retrieved on March 15, 2010 from rojectbudgeting.pdf Writer, S. (2009). How to Allocate Funds in Your Business. Retrieved on march 13, 2010 from w-to-allocate-funds-in-your-business Xavier, V. (2010). Communication Management plan Case Study. Retrieved February 5, 2010 from
APDC Standard Customer Relationship Management Processes Project
APDC Standard Customer Relationship Management Processes Project Janele Boyles, Derrick Douglas and Olga Botero PM600-1001A-01 Project Management Processes in Organizations Professor Terry Northcraft January
More informationProcurement Management Processes
Procurement Management Processes Olga Botero PM630-1004A-01 Contracting and procurement in project management Dr. Tony Prensa October 8 th 2010 Project Procurement Management includes the processes necessary
More informationProject Integration Management
Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management
More informationDefining Project Scope
Defining Project Scope Casey Ayers PMP MBA CaseyAyers.com @caseyayers linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc. Module Overview Overview Project Scope
More informationProject Management Processes A process is a set of interrelated actions and activities performed to create a product, service, or result
HOLA Project Processes A process is a set of interrelated actions and activities performed to create a product, service, or result Each process is characterized by its inputs, the tools and techniques
More informationI - PROJECT STATUS OVERVIEW
Project Sponsor: Denise Arnold Project Manager: Naru Nayak Status Report : 10/1/2015 12/31/2015 Project R&C Category: Pre-Charter Phase - 3 Initiation/Planning Phase To Be Assessed Start : July 01, 2015
More information<Project Name> Business Case
Business Case Author(s) Contributors Department Campus DOCUMENT HISTORY Version Date Person Notes 1.0 ITS Portfolio Management Office Business Case Page 1 TABLE OF CONTENTS
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes PMI -- Project Management Institute» Leading global association for the project management profession»
More informationSeminar 6: Project Management Part 1 Semester 1, 2005
IMS 1501 Studio 1: Information Systems Foundations 1 Seminar 6: Project Management Part 1 Semester 1, 2005 Seminar 6.1 - Sem 1, 2005 IMS1501: Unit framework Ethics Documentation Efficiency Tools System
More informationSeminar 6: Project Management Part 1 Semester 1, 2005
IMS1501: Unit framework IMS 1501 Studio 1: Information Systems Foundations 1 Ethics Documentation Developing Information Systems Efficiency Tools Seminar 6: Project Management Part 1 Semester 1, 2005 System
More information10 weeks 36 hours. Hone your project management knowledge and take your career to the next level with our Project Management training.
Hone your project management knowledge and take your career to the next level with our Project Management training. 2018 Fall Course START: Monday 10/1 6-9:40pm 10 weeks 36 hours The Schoolcraft College
More informationPROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1
PROCESS TRAINING 1 PM Lite (Project Management Lite) is a project management process made up of tools, templates, and best practices that empowers its users to be more efficient and effective in project
More informationFLORIDA DEPARTMENT OF JUVENILE JUSTICE PROCEDURE. Title: Information Technology (IT) Project Management and Governance Procedures
PROCEDURE Title: Information Technology (IT) Project Management and Governance Procedures Related Policy: FDJJ 1270 I. DEFINITIONS Agency for State Technology (AST) Rule Rules 74-1.001 through 74-1.009,
More informationContract Finalization
Contract Finalization Olga Botero PM630-1004A-01 Contracting and procurement in project management Dr. Tony Prensa Where do you want to be? Procurement Management Be part of the team Bidding Techniques
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationEstablishing a Program Management Office
Establishing a Program Management Office Agenda Why companies need Program Management 3 Objectives of Program Management 4 Program and Project Management definitions 5 Program Management infrastructure
More informationProject Management (BPM1313) Project Charter
Project Management (BPM1313) by Dr. Adekunle Qudus Adeleke Faculty of Industrial Management adekunle@ump.edu.my Aims To further broaden the students knowledge on project charter and elements Expected Outcomes
More informationIntroduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6
Successful Projects don t Happen by Chance. Project XYZ Configuration and Change Control Plan Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6 Introduction This configuration
More informationProject Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam
Project Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam Slide 1 Application & Exam Types of Questions PM Basics Ten Knowledge Areas Professional Responsibility Practice Exams Slide
More informationIII PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview
III PMF MANAGEMENT SOLUTIONS Course Number Project Management Course Overview House Keeping Beep beep (prepare to evacuate): Whoop whoop (evacuate): Follow the red hat (fire warden). Designated evacuation
More informationIII PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview
III PMF MANAGEMENT SOLUTIONS Course Number Project Management Course Overview House Keeping Beep beep (prepare to evacuate): Whoop whoop (evacuate): Follow the red hat (fire warden). Designated evacuation
More informationPROJECT MANAGEMENT. By Pompeyo Rios
PROJECT MANAGEMENT By Pompeyo Rios PROJECT A project is a temporary endeavor undertaken to create a unique product, service, or result. Por example, constructing a building or plant, or implementing, improving,
More information1.0 PART THREE: Work Plan and IV&V Methodology
1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring
More informationCity of Markham. Report of the Auditor General Human Resources Information System ( HRIS ) Implementation Audit. Presented to:
City of Markham Report of the Auditor General Human Resources Information System ( HRIS ) Implementation Audit Presented to: General Committee of Council, City of Markham Date: June 18, 2018 AGENDA Background
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More informationA PROJECT MANAGER S BOOK OF FORMS. Second Edition
A PROJECT MANAGER S BOOK OF FORMS Second Edition A PROJECT MANAGER S BOOK OF FORMS Second Edition A Companion to the PMBOK Guide, Fifth Edition Cynthia Stackpole Snyder Cover Design: John Wiley & Sons,
More informationOE PROJECT CHARTER PROJECT NAME: PREPARED BY: PROJECT CHARTER VERSION HISTORY VERSION DATE
PROJECT : PREPARED BY: Josh Blatt DATE (MM/DD/YYYY): 1/9/2012 Institutional Data Council Project Manager PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED CURRENT STATUS) (MM/DD/YYYY)
More informationProject Management Advisory Board Deep Dive Study of Program Management
Project Management Advisory Board Deep Dive Study of Program Management Purpose The purpose of this study is twofold: 1. Understand how Saint Louis companies are managing programs 2. Study the maturity
More informationSenior Design Documentation Library
Project Charter Department of Computer Science and Engineering The University of Texas at Arlington Taekwondo Match Management System TK Force Team Members: Richard Sherrill Robert Castillo David Odhiambo
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More informationRequirements: Eliciting, Analyzing and Modeling for Success!
Requirements: Eliciting, Analyzing and Modeling for Success! Sonja Almlie, CCBA, PMP, PMI-ACP RMC Senior Instructor 2013 RMC Project Management, Inc. Eliciting and Modeling Requirements Who uses requirements?
More informationProject Management Process Groups. Monitoring & Controlling. Initiating Planning Executing. Closing. Check & Act. Rita: A project ends here!
(Semaphore) Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing Rita: Start Plan Do Check End & Act A project ends here! Project Management Process Groups Initiating
More informationAppendix D : Pricing Schedule. Table of Contents. Authorized Users please note the following:
SEVEN SEAS TECHNOLOGIES, INC. D/B/A S2TECH Contract # Appendix D : Pricing Schedule Cover Page Agreement between the New York State Office of General Services and for Project Based Information Technology
More informationQUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)
QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program
More informationReference B Project Management Requirements
Reference B State of Alaska TABLE OF CONTENTS 1... 2 1.1 Project Life Cycle Methodology... 2 1.2 Preliminary Project Management Narrative and Work Plan... 2 2 Master Project Management Plan and Master
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationWDVA EMR Project Readiness Assessment Report
WDVA EMR Project Readiness Assessment Report 1 Prepared by: Marcus Bailey Project QA Assurance Consultant New Compass Consulting, LLC marcus@newcompassconsulting.com Tele: 360-239-4607 Transformation Leadership
More informationUCD IT Services. <Project ID> ITRM. Project Initiation Document. Version 1.0 8th Dec Version History
UCD IT Services ITRM Project Initiation Document Version 1.0 8th Dec 2014 Version History Version Date Summary of Changes Changed by 1.0 08/12/14 Initial doc Paul Barry Project
More informationState of Oklahoma CIO Assessment Study
in collaboration with State of Oklahoma CIO Assessment Study October 21, 2010 Government Modernization Committee Alex Z. Pettit Chief Information Officer State of Oklahoma Table of Contents Confirmation
More informationINFORMATION TECHNOLOGY SERVICES
INFORMATION TECHNOLOGY SERVICES Information Technology Services: Service Level Agreement (SLA) SLA Number: 100 Related Service Level and Operating Level Agreements: Comments: SLA Revision History Date
More informationVirtualized Educational Lab Setup Project Plan and Supporting Project Documentation
Dakota State University Beadle Scholar Masters Theses & Doctoral Dissertations Spring 4-2013 Virtualized Educational Lab Setup Project Plan and Supporting Project Documentation Aaron Napierala Dakota State
More informationTitle: Project Director Location: Tallahassee, FL Clearance: none required
Title: Project Director Location: Tallahassee, FL Clearance: none required Position Overview: The Project Director (PD) shall define, establish, and direct the planning and operations of the Project Management
More informationProject Management Professional (PMP) Exam Prep Course 1 - Application and the PMP Exam
Project Management Professional (PMP) Exam Prep Course 1 - Application and the PMP Exam Slide 1 Course Structure Application & Exam Types of Questions PM Basics Ten Knowledge Areas Professional Responsibility
More informationISACA Systems Implementation Assurance February 2009
ISACA Pressures Today Pressure to increase realization of value from IT spending Pressure to deliver on IT projects at a time when resources/budgets are constrained Pressure from risk of technology-based
More informationProject Management. Risk Management
Brandt s History of IV&V Success Using over 30 years of experience supporting local, state, and federal agencies, Brandt provides IV&V services using proven, strategic methodologies to ensure project success
More informationProject Management for the Supply Professional
Project Management for the Supply Professional Dr. Rene G. Rendon, CPSM, C.P.M., CPCM, PMP U. S. Naval Postgraduate School (831) 656-3464 rgrendon@nps.edu 95 th Annual International Supply Management Conference,
More informationPMO Services Checklist
PMO Services Checklist by IMPACTbyLaura.com Services Checklist This resource is a list of possible services and categories that you can consider when determining how you will drive IMPACT with your PMO.
More informationManagement Consulting and Project Management: Hand in Glove
Service. Accountability. Better Government. Consulting and Project : Hand in Glove J. Kendall Lott President, M Squared Strategies The Task: Rock the PMBOK The Charge Why is PM important for you? It is
More informationThrough Collaboration with the Business Analyst & Project Manager. Hosted by Michael Kennedy Senior Consultant, DevelopMentor
Managing Scope Through Collaboration with the Business Analyst & Project Manager Hosted by Michael Kennedy Senior Consultant, DevelopMentor Presented by Dave Bieg Executive Vice President, DevelopMentor
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline April 2015 Published by: Project Management
More informationM3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan
M3 Playbook Guidance Phase 1: Readiness This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration
More informationIDENTIFY STAKEHOLDERS BEST PRACTICES 1. Identify Stakeholders Best Practices. Bill Carswell
IDENTIFY STAKEHOLDERS BEST PRACTICES 1 Identify Stakeholders Best Practices Bill Carswell IDENTIFY STAKEHOLDERS BEST PRACTICES 2 Abstract Identifying stakeholders is an enabling activity, leading to development
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationProgram Management. a practical application. November 19 th, Project Management Symposium Breakout Session D
0 Program Management a practical application November 19 th, 2010 2010 Project Management Symposium Breakout Session D 1 Overview As projects become larger and more complex, the effective management of
More informationIBM Infrastructure Security Services - Managed Security Information and Event Management (Managed SIEM)
IBM Infrastructure Security Services - Managed Security Information and Event Management (Managed SIEM) DK_INTC-8838-00 11-2011 Page 1 of 17 Table of Contents 1.Scope of Services...3 2.Definitions...3
More informationHead of Business Strategy
Empower Limited Job Description empower.co.tz info@empower.co.tz +255 758 778 886 9th Floor Tanzanite Park, Victoria, Dar es Salaam, Tanzania Roles and Responsibilities Head of Business Strategy Strategic
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationGREEN BAY METROPOLITAN SEWERAGE DISTRICT
GREEN BAY METROPOLITAN SEWERAGE DISTRICT REQUEST FOR PROPOSAL (RFP) FOR COMPUTER MAINTENANCE MANAGEMENT SYSTEM (CMMS) REPLACEMENT IMPLEMENTATION PROJECT A. INTRODUCTION NEW Water, the brand of the Green
More informationProject Management Professional (PMP) Exam Prep Course 3 - The Basics of Project Management - Part 1
Project Management Professional (PMP) Exam Prep Course 3 - The Basics of Project Management - Part 1 Slide 1 Organizations and Project Management Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447
More informationFundamentals of Project Management
Fundamentals of Project Management 40 1-1 Version 4.0a Based on the PMI PMBOK Guide Fourth Edition Integrated Process Developers, Inc. Page: 1 For permissions and other rights Module 1: The Basics Project
More informationOverview: Status Reports/Dashboards provide program leadership and governance with updates on program progress, and strategic program risks/issues.
M3 Playbook Guidance Phase 4: Migration This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration
More informationProject Management CSC 310 Spring 2018 Howard Rosenthal
Project Management CSC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:
More informationProject Plan. For Building a Data Management System for FORCE. Prepared for: Andrew Lowery Fundy FORCE
Project Plan For Building a Data Management System for FORCE Prepared for: Andrew Lowery Fundy FORCE Submitted by: SEG Consulting Inc. www.segconsulting.ca Version 1.0 June 29, 2017 Version Log The following
More informationCUSTOMER BANK ACCOUNT MANAGEMENT SYSTEM PROJECT PLAN 10 TH FEB Approved On. 20 Feb 2015 Page 1 of 11 Project Plan Approved By.
CUSTOMER BANK ACCOUNT MANAGEMENT SYSTEM PROJECT PLAN 10 TH FEB 2015 Approved On. 20 Feb 2015 Page 1 of 11 Project Plan Contents 1. INTRODUCTION 3 1.1. Project Overview 3 1.2. Scope of Work 3 1.3. Project
More informationJob Titles and Skill Categories
Application Developer Architect Business Analyst CADD/GIS Administrator Data Entry Operator Database Administrator Functional Architect Help Desk Analyst Intern Mobile Specialist Network Engineer Product
More informationCITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES
CITY OF KOTZEBUE REQUEST FOR PROPOSAL 18-01 ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Vendors are required to provide as much detail as possible in
More informationPROJECT PLAN. For Project: IST 420 Class Project. Project Plan Page 1 of 23. Project Sponsor(s): York County Area Agency on Aging
Page 1 of 23 PROJECT PLAN For Project: IST 420 Class Project Version No: V11 Final as of 8/16/2006 Project Sponsor(s): York County Area Agency on Aging CHANGE LOG 2/13 ADJUSTED MILESTONE GANTT Page 2 of
More information<PROJECT NAME> PROJECT MANAGEMENT PLAN
PROJECT MANAGEMENT PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Management Plan was controlled and tracked.
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationProject Management Knowledge Areas SECTION III
Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all
More informationProject Plan City of Newport News; Department of Health and Human Services
Project Plan City of Newport News; Department of Health and Human Services 7/14/2010 Harmony Information Systems, Inc. 12120 Sunset Hills Road, Suite 500 Reston, VA 20190 MAIN: 703-674-5100 www.harmonyis.com
More informationQNX Priority Support Plans User s Guide
QNX Priority Support Plans User s Guide Version 3.1 Bronze, Silver, and Gold Plan Subscribers Contents Introduction.......................................2 Priority Support Levels.............................2
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More informationThe Project Management Discipline: An Introduction. JoAnn W. Klinedinst CPHIMS, FHIMSS, PMP Director, Healthcare Information Systems HIMSS
The Project Management Discipline: An Introduction JoAnn W. Klinedinst CPHIMS, FHIMSS, PMP Director, Healthcare Information Systems HIMSS January 26, 2007 Project Management is considered both an art and
More informationDisampaikan Oleh: Muhammad Azani Hs
Disampaikan Oleh: Muhammad Azani Hs Catatan: Slide ini disadur dari Buku Teks oleh Schwalbe, Kathy. Managing Information Technology Project Seventh edition. Boston, MA: Thomson Course Technology, 2014.
More information5 C s Project Management. By Vivek Dixit
5 C s Project Management By Vivek Dixit Agenda What is Project Management? 5 C s of Project Management Processes required Essentials of a process Importance of Project Management Essentials of Project
More informationIntroduction to IT Project Management
Adapted from Managing Information Technology Projects, Chapter 1, Schwalbe Introduction to IT Project Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Sep 22th, 2016 Outline
More informationUNC School of Medicine IT. Service Level Agreement
UNC School of Medicine IT Service Level Agreement 1 Table of Contents Purpose... 2 Scope of Agreement... 2 Services Provided under this Agreement... 2 Service Catalog... 2 Changes to Service Level Agreement...
More informationColorado Family Support Council Project Management Tools and Techniques. Joe Mamlin, PMP. June 2, 2014
Colorado Family Support Council Project Management Tools and Techniques Joe Mamlin, PMP June 2, 2014 Presentation Agenda Defining a Project Organizing by Process Groups The Role of the Project Manager
More informationRequirements Engineering and Software Architecture Project Description
Requirements Engineering and Software Architecture Project Description Requirements Engineering Project Description This project is student-driven. There will be external sponsors, users, and others that
More informationT Software Testing and Quality Assurance Test Planning
T-76.5613 Software Testing and Quality Assurance 10.10.2007 Test Planning Juha Itkonen Outline Test planning, purpose and usage of a test plan Topics of test planning Exercise References: IEEE Std 829-1998,
More informationJoint IMO Kickoff Acquirer and Acquired Co.
Joint IMO Kickoff Acquirer and Acquired Co. Understand how we will work together: Review rules of engagement to ensure pre-close compliance with HSR guidelines Review our integration process, structure,
More informationCity of Markham. Human Resource Information System ( HRIS ) Implementation Audit. June 18, Richmond Street West Toronto, ON M5H 2G4
City of Markham Human Resource Information System ( HRIS ) Implementation Audit June 18, 2018 PREPARED BY: MNP LLP 300-111 Richmond Street West Toronto, ON M5H 2G4 MNP CONTACT: Geoff Rodrigues, CPA, CA,
More informationProject Management CSC 310 Spring 2018 Howard Rosenthal
Project Management CSC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:
More informationINTEGRATION of PROJECT MANAGEMENT and SYSTEMS ENGINEERING
Copyright 2018 by Yves Theriault. Permission granted to INCOSE to publish and use. INTEGRATION of PROJECT MANAGEMENT and SYSTEMS ENGINEERING San Diego INCOSE Mini-Conference December 1, 2018 John Wood,
More informationOffice of Inspector General Applications Development
Office of Inspector General Applications Development Report #A-1516-024 August 2017 Executive Summary In accordance with the Department of Education s fiscal year (FY) 2015-16 audit plan, the Office of
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationStep 1: Perform Blueprint Project Management
Step 1: Perform Blueprint Project Management Version 1.5, December 2006 1. Step Description and Purpose The Perform Blueprint Project Management step is intended to establish the key supporting project
More informationNothing in this job description restricts management s right to assign or reassign duties and responsibilities to this job at any time.
S22230, page 1 Nothing in this job description restricts management s right to assign or reassign duties and responsibilities to this job at any time. FUNCTIONAL DUTIES Serves as IT Service Delivery Manager
More informationAPPROACH AND STRUCTURE FOR A SUCCESSFUL INTEGRATION
APPROACH AND STRUCTURE FOR A SUCCESSFUL INTEGRATION About this Document Objectives To communicate the current thinking on the integration approach and structure for successful integration To solicit feedback
More informationPRINCE2 VS PMBOK FRIEND OR FOE LEARNING OBJECTIVES INTRODUCTIONS: PRINCE2 Management Overview. Page 1
PRINCE2 VS PMBOK FRIEND OR FOE Presented by: Julie Grabb PMP Prince2 Practitioner Prince2 Authorized Trainer LEARNING OBJECTIVES A definition of what PRINCE2 is and its key components. A comparison between
More informationCourse ID October 2015 COURSE OUTLINE. Business Administration 210 Foundations of Project Management
Page 1 of 5 Degree Applicable Glendale Community College Course ID 010247 October 2015 I. Catalog Statement COURSE OUTLINE Business Administration 210 Foundations of Project Management BUSAD 210 covers
More informationCopyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1
Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different
More informationV3 Pension Administration System Solution. January 2014 Monthly Board Update
V3 Pension Administration System Solution January 2014 Monthly Board Update Agenda V3 Monthly Update Page Project Overall Status Update 3 V3 PASS Project Status Gantt Chart 4 PASS V3 Project Milestones
More informationUIC Human Resources. Strategies for Managing Projects
UIC Human Resources Strategies for Managing Projects UIC Office of Human Resources 715 South Wood Street 1 Strategies for Managing Projects Jack McEnery Director, HR Shared Services Alan Scott Training
More informationREQUEST FOR PROPOSAL. Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014
REQUEST FOR PROPOSAL Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014 This Request for Proposal (RFP) is being sent to consulting firms to act as the Consultant in the
More informationPROJECT STANDARDS AND GUIDELINES
PROJECT STANDARDS AND GUIDELINES A Guide to DTAS Project Management Abstract This document defines our DTAS project management terminology and the outlines the standards and guidelines of our project management
More informationPlanning the Work How to Create a Manageable Enterprise GIS Project Plan
Planning the Work How to Create a Manageable Enterprise GIS Project Plan Mirjam Stadelmann Esri UC 2014 Technical Workshop Topics Why do we plan How do we plan Planning for project completion How to use
More informationPRINCE2 VS PMBOK FRIEND OR FOE WOULDN T IT BE NICE:
PRINCE2 VS PMBOK FRIEND OR FOE A presentation to: PMI Vancouver Island Chapter May 21, 2009 Presented by: Julie Grabb PMP Prince2 Practitioner Prince2 Authorized Trainer WOULDN T IT BE NICE: Let the Project
More information