1 SECTION NONPRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 THE REQUIREMENT A. The Work in this Section consists of all construction operations relating to designing, furnishing, and installing, complete nonprestressed rock anchors. 1.2 SUBMITTALS A. Shop Drawings: 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout. B. Information Submittals: 1. Grout test results. 2. Volumes of grout take for each grouting of each anchor hole. 3. Pullout test results. 4. Calibration data for pullout test load measurement system. 5. Record drawings showing final location, elevation, and depth of each anchor bar hole. 1.3 SCHEDULING AND SEQUENCING A. Install and complete pullout tests for rock anchors for spillway construction prior to installing relief wells below the spillway slab in accordance with Section 02502, UNDERDRAIN SYSTEM. PART 2 PRODUCTS 2.1 ROCK ANCHORS FOR PORTAL CONSTRUCTION A. Rock anchors for portal construction at the outlet conduit shall be continuous upset threaded bars, such as manufactured by Dywidag or equal with manufacturer supplied nuts and washers. The rock anchors shall be of single length without splicing. Rock anchors shall have a steel plate nominally 6 inches by 6 inches NONPRESTRESSED ROCK ANCHORS
2 2.2 ROCK ANCHORS FOR SPILLWAY CONSTRUCTION A. Rock anchors for installation below the spillway slab shall be continuous deformed steel bar conforming to the requirements for Grade 60 steel as specified by ASTM A615. Furnish full length bars with applicable bends. B. Welding or splicing of steel bar will not be allowed. 2.3 ANCHOR GROUT A. Nonshrink cementitious grout for rock anchors shall be a pumpable, nonmetallic, nonshrink grout containing no chlorides, such as Masterflow 928 grout manufactured by Master Builders, Inc. of Cleveland, OH, or equal. The 28 day strength for the grout shall not be less than 7,000 psi. 2.4 CONSOLIDATION GROUT A. Composition: 1. Portland Cement: ASTM C150, Type II. 2. Sand: ASTM C33, fine aggregate, except 100 percent shall pass No. 8 sieve. 3. Water: Clean and free of deleterious substances. B. Compressive Strength: Minimum 3,500 psi at 14 days. C. Water-Cement Ratio: Range from 0.40 to 0.45 by weight. D. Water Loss: Control bleeding by adding sand. PART 3 EXECUTION 3.1 GENERAL A. All rock anchors for portal construction shall be installed in accordance with the recommendations of the rock reinforcement manufacturer. 3.2 DRILLING A. Anchor Locations, Elevations, Depths, and Orientation: 1. As shown, unless adjusted by CONSTRUCTION MANAGER subject to conditions encountered in field. 2. Final locations, elevations, and depths shall be as follows: a. Rock Anchors for Portal Construction: Within plus or minus 1 foot NONPRESTRESSED ROCK ANCHORS
3 b. Rock Anchors for Spillway Construction: Within plus or minus 0.3 feet. 3. Final orientations shall be within plus or minus 5 degrees. B. Method: 1. Coring, rotary drilling, or percussion-air-hammer type drilling. 2. Use water or air with sufficient moisture for dust control to remove cuttings. 3. Do not use rod dope, grease, or other lubricants in drilling operations. C. Minimum Hole Diameter: Largest of following. 1. Hole diameter as shown /2 times bar diameter. 3. As required to accommodate grout and vent tubes with bar centered in hole. 3.3 HOLE PREPARATION FORANCHOR INSTALLATION AND GROUTING A. If water or caving conditions are encountered, fill hole with consolidation grout and drill out grout after it sets. Repeat grouting and redrilling until dry and stable hole is achieved. B. After completion of dry and stable hole, wash sides of hole with nozzle that impinges water on sides of hole with sufficient velocity to remove loose or caked material from the hole. C. Immediately prior to anchor installation, reflush hole with water if necessary to saturate surfaces, sound hole for compliance with required depth, and remove standing water from hole. D. Prevent entry of unwanted grout, concrete, or debris into drilled holes until anchor installation and grouting is completed. 3.4 HOLE ABANDONMENT A. If hole is rejected by CONSTRUCTION MANAGER, fill hole with grout as specified for anchor grouting. B. Drill new hole in location determined by CONSTRUCTION MANAGER. 3.5 BAR PREPARATION A. Immediately prior to installation, remove dirt, grease, loose rust, or other deleterious substances from bar and check passages through hollow bars, if used, with air or water to ensure that they are clear NONPRESTRESSED ROCK ANCHORS
4 3.6 VENT AND GROUT TUBE PREPARATION A. Immediately prior to insertion, check vent and grout tubes with air or water to ensure that they are clear. 3.7 BAR INSTALLATION A. Install each bar prior to grouting. B. Rigidly support each bar centered in its hole during placement of grout and until grout sets. C. Alternatively, install bar after completely filling hole with grout, provided bar can be pushed into position without damage, and grout cannot flow out of hole by gravity. 3.8 VENT AND GROUT TUBE INSTALLATION A. For anchors installed in holes drilled horizontally or downward, insert grout tube with its discharge end at back or bottom of hole, respectively. B. Grout Tube Diameter: 1 inch, minimum. C. Vent Tube Diameter: 1/4 inch, minimum. 3.9 PLACING GROUT A. Equipment used and installation, proportioning and mixing of grout and grouting the rock reinforcement shall be in accordance with the equipment and procedures recommended by the manufacturer of the rock anchor, unless otherwise modified or permitted by the CONSTRUCTION MANAGER. B. Grouting equipment shall be capable of continuous mechanical mixing that will produce uniform and thoroughly mixed grout. Grouting equipment shall be capable of a high enough pressure to clear any obstructions in the tube, and shall prevent introduction of oil, air, or other foreign substance into the grout. C. Nonshrink grout shall be injected at a consistency with a 20 to 30 second flow period with the Corps of Engineers Flow Cone Method CRD-C611. The grout shall be pumped into the hole continuously until the flow from the hole is the same consistency as the grout being injected. D. Grout shall be injected such that all air or water can be vented from the hole during the injection process NONPRESTRESSED ROCK ANCHORS
5 3.10 TESTING GROUT A. Compressive Strength: 3.11 PULLOUT TESTS 1. Determine compressive strength of grout cubes sampled and tested in accordance with CRD-C Minimum of one test per day and whenever proportion of mix is changed. A. Frequency: 1. Rock Anchors for Portal Construction: Test a minimum of five anchors to verify adequate pullout resistance. 2. Rock Anchors for Spillway Construction: Test a minimum of 5 percent of anchors to verity adequate pullout resistance. B. CONSTRUCTION MANAGER will determine which anchors shall be tested. C. Test anchors after grout has achieved 4,000 psi compressive strength. D. Apply test load in tension equal to 80 percent of yield strength of bar. Maintain load for minimum of 10 minutes. If total bar movement between 1 minute and 10 minutes exceeds 0.08 inches (2 mm), or if application of full test load is not possible, anchor will be rejected. E. Test Apparatus: Conform to ASTM D4435 for each of following items. 1. Loading system. 2. Load transducer. 3. Displacement transducer. 4. Displacement transducer support. F. Load measurement systems shall be calibrated by independent testing laboratory and accurate to within plus or minus 5 percent of actual load. G. Method of load application shall not damage bar. H. Install replacement anchors for each failed anchor at location determined by CONSTRUCTION MANAGER. I. Retest one additional anchor bar for each failed bar in addition to number initially required. END OF SECTION NONPRESTRESSED ROCK ANCHORS
SECTION PRESTRESSED ROCK ANCHORS
SECTION 02262 PRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. ASTM International (ASTM): a. A153, Standard Specification
More informationSTANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION
Section 67.0 Knoxville, Tennessee March 2013 1. Description STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION a) This work shall consist of constructing micropiles as shown on the Contract plans in accordance
More informationSTANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000
DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories
More informationITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:
ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the
More informationSPECIAL SPECIFICATION 4492 Tie Back Anchors
2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance
More informationSPECIAL SPECIFICATION 4401 Prestressed Ground Anchors
2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationSECTION GROUT. A. American Society for Testing and Materials (ASTM):
SECTION 03600 GROUT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03600 - Grout. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C109-95
More informationNon-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method
Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-34 73 13 (April 2008) Change 1-11/14 -------------------------- Preparing Activity: USACE Superseding UFGS-34 73 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationSECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS
SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...
More informationSECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS
SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04
More informationSECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS
SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...
More informationA. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years.
NORWOOD HALL EXTERIOR RESTORATION MISSOURI S&T ISSUED FOR BID SECTION 316300 - BORED PILES PART 1 - GENERAL 1.1 SUMMARY A. Section includes resistance piers, couplings, and brackets. 1.2 ACTION SUBMITTALS
More informationBy CTS Cement Manufacturing Corp.
CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline
More informationA. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.
SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING
More informationSECTION PRECAST CONCRETE COVER SYSTEM
SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast
More informationSection TUNNEL GROUT. A. Mix design requirements, testing, furnishing, and production of grout for:
Section 02431 PART 1 GENERAL 1.01 SUMMARY This Section includes: A. Mix design requirements, testing, furnishing, and production of grout for: 1. Pressure grouting of bolted liner plates for shafts 2.
More informationSPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams
1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed
More informationSECTION UNIT MASONRY
SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.
More informationAC50 Silver Adhesive Anchoring System
General Information General Information AC50 Silver Adhesive Anchoring System Product Description The AC50 Sliver is a two-component, adhesive anchoring system. The system includes injection adhesive in
More informationSPECIFICATION 1035 M
MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",
More informationREINFORCED CONCRETE MASONRY SECTION
SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBAYFILTER SPECIFICATIONS
PART 1.00 GENERAL 1.1 DESCRIPTION BAYFILTER SPECIFICATIONS A. The BayFilter system s internal components manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor, materials,
More informationSECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES
GUIDE SPECIFICATION SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES PART 1 - SCOPE 1.01 WORK INCLUDED: 1.1.1 This guide covers the
More informationTORQUE TESTING & INSTALLATION INSPECTION OF DRILLED - IN ANCHORS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0501 Effective: 04/30/02 DOCUMENT NO. P/BC 2002-092 Revised: Previously Issued As: Guideline #3 TORQUE TESTING & INSTALLATION INSPECTION
More informationParagraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4
City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work
More informationSECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB #
SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationTILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More information2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION
2004 Specifications CSJ 0920-38-250 SPECIAL SPECIFICATION 7660 DIRECT FIXATION TRACK CONSTRUCTION 1. Description. This section specifies the construction of direct fixation (DF) track to the lines and
More informationEditing notes to assist users are included within bordered boxes. Delete these notes prior to final printing.
03600 GROUTS This guide specification has been prepared by Dayton Superior Corporation to assist design professionals in the preparation of a specification section covering nonshrink and epoxy grouts for
More informationSECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS
SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment
More informationFacility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14
SECTION 05 12 00 STRUCTURAL STEEL 05/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the
More informationSection REINFORCING STEEL
Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory
More informationSECTION UNIT MASONRY
SECTION 04200 UNIT MASONRY A. ACCEPTABLE MANUFACTURERS 1. Sound Absorptive Masonry Units: 12 inch wide Soundblox type RSC/RF as manufactured by the Proudfoot Company, Monroe, CT. 2. Concrete Masonry Units:
More informationSECTION DUCTILE IRON PILES
SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationSECTION CHAIN LINK FENCES AND GATES (PARK)
SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationTECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &
TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed
More informationB. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings.
SECTION 31 63 16 AUGER CAST GROUT PILES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division- 01 Specification
More informationCONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS TABLE OF CONTENTS 932.04 SUBMISSION
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-31 63 16 (November 2008) ----------------------------- Preparing Activity: USACE Superseding UFGS-31 63 16 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationCapstone C O N S U L T A N T S
Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this
More informationCHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10
194 ASTM A193 GRADE B7 HIGH-STRENGTH CARBON, ZINC PLATED (ASTM B 633 YELLOW DICHROMATE) B7 (AISI 414) anchor rod is supplied with nuts meeting the requirements of ASTM Specification A 194, Grade 2H (ASTM
More informationConstruction Specification 14 Pressure Grouting
Construction Specification 14 Pressure Grouting 1. Scope The work consists of drilling grout holes, exploratory holes, and check holes; pressure testing, pressure washing, and injecting suspension grout
More informationFIVE STAR PRODUCTS, INC. (800)
FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing
More informationSPECIAL SPECIFICATION 4491 Type CAC Concrete
2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.
More informationSECTION MORTAR
PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work
More informationITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS
DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer
More informationCity of Mesquite General Design Standards Revision Date:
SCREENING WALLS (Public and Private) Page 1 of 6 Section 1 General Design & Notes 1.1 Standards 1.1.1 All screening walls in the City of Mesquite and within its Extraterritorial Jurisdiction (ETJ), both
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing
More informationITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:
ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationInstallation and Maintenance Manual for EMH Freestanding Workstation Jib Cranes
1 Installation and Maintenance Manual for EMH Freestanding Workstation Jib Cranes Installation and Maintenance Manual for EMH Freestanding Workstation Jib Cranes Table of Contents Forward.... 3 Mast Installation...
More informationSECTION PRECAST CONCRETE MANHOLES
SECTION 02601 PRECAST CONCRETE MANHOLES PART 1 GENERAL 1.1 The work specified in this section shall include the furnishing, hauling, and placing of all precast manholes shown on the drawings and as specified
More informationBest Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association
For Concrete Slab Raising Prepared in conjunction with the Concrete Repair Association DETAILED SPECIFICATIONS 1. Description: 2. Slab Raising: These specifications cover the furnishing, boring, drilling,
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationSECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System
SECTION 05 5200 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install stainless steel railings and components. 1.02 REFERENCE
More informationSection WATER LINE IN TUNNELS
PART 1 GENERAL 1.01 SUMMARY Section 02517 This Section includes handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings
More informationSECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.
SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721
More informationSECTION STRUCTURAL STEEL
SECTION 05 12 00 STRUCTURAL STEEL PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divisions 1 Specification
More informationSECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:
SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing
More informationCONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL
13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.
More informationTypical Specifications of Compaction Grouting Scope
Typical Specifications of Compaction Grouting Scope This section covers compaction with Sand/Cement/Flyash grout including the installation of injection pipes. Compaction grouting is sometimes referred
More informationISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar
Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems
More informationCONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS
Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Decorative Wire Rope Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in
More informationA. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.
Product Specification for: Rapid Set DOT Repair Mix SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND
More informationWATER LINE IN TUNNELS
Section 02517 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings that
More informationICC-ES Evaluation Report. ESR-3342 Reissued July 1, 2013 This report is subject to renewal August 1, 2015.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-3342 Reissued July 1, 2013 This report is subject to renewal August 1, 2015. A Subsidiary of the International Code Council DIVISION:
More informationSPECIAL SPECIFICATION 4897 Repair Structural Concrete
1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationCONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures
Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction
More informationSECTION 706 AGGREGATES FOR PORTLAND CEMENT PRODUCTS SCOPE
706 706.01.01 MATERIALS COVERED SECTION 706 AGGREGATES FOR PORTLAND CEMENT PRODUCTS SCOPE A. This specification covers the quality and size of aggregates used in Portland cement products. 706.02.01 GENERAL
More informationSECTION FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable
More informationREMR MATERIAL DATA SHEET CM-PC-1,1 CONCRETE PATCHING MATERIAL: SET-45
REMR MATERIAL DATA SHEET CM-PC-1,1 CONCRETE PATCHING MATERIAL: SET-45 1. NAME 2. MANUFACTURER SET-45 a. Do not add any sand, aggregate fines, or portland cement to Set-45 concrete. b. Do not,use Set-45
More informationEditing notes to assist users are included within bordered boxes. Delete these notes prior to final printing.
03050 BASIC CONCRETE MATERIALS AND METHODS This guide specification has been prepared by Dayton Superior Corporation to assist design professionals in the preparation of a specification section covering
More informationCSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials
CSI SECTION 03 01 00 MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials EDITOR NOTE: The following guideline specification
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES
More informationSTANDARDIZED STRUCTURES
Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationConcrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout
Concrete 45 1.13.0 Prestressed Concrete Concrete in which internal stresses (forces) are induced by means of prestressing steel tendons such that tensile stresses resulting from loads are counteracted
More informationSECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.
SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationSECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960
More informationSECTION GRAVEL PACKED WATER WELL
SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean
More informationSECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine
More informationSPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket
1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial
More information