1 ITEM 416 DRILLED SHAFT FOUNDATIONS Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled shafts, with or without bell footings of the size and at the location shown on the plans Materials. All materials shall conform to the requirements of the pertinent items as follows: Item 421, "Portland Cement Concrete" Item 440, "Reinforcing Steel" Item 448, "Structural Field Welding" Unless otherwise shown on the plans, concrete for drilled shafts shall conform to the following: Drilled Shaft Type Nonreinforced Reinforced Slurry & Underwater Concrete Placement Concrete Class "A" Class "C" Class "SS" A Type D water-reducing, retarding admixture will be required in all concrete when casing is used or when shafts are placed underwater or under slurry Construction Methods. (1) Excavation. (a) General. The plans indicate the expected depths and elevations where satisfactory bearing material will be encountered. The Contractor shall perform the excavation required for the shafts and bell footings, through whatever materials encountered, to the dimensions and elevations shown on the plans or required by the site conditions. If satisfactory founding material is not encountered at plan elevation, the bottom of the shaft will be adjusted, or the foundation altered, as determined by the Engineer, to satisfactorily comply with design requirements. Shaft alignment shall be within a tolerance of one (1) inch per 10 feet of depth. The center of the shaft shall not be more than one (1) inch from the horizontal position shown on the plans. Any shafts in violation of this tolerance will be subject to a structural review by the Engineer. Where caving conditions and/or excessive ground water is encountered, no further drilling will be allowed until a construction method is employed which will prevent excessive caving that will cause the excavation to be appreciably larger than the size of casing to be used. Predrilling in disturbed soil as necessary to control ground water and caving until a casing is set or setting casing with a vibratory hammer, will be permitted. Casing will be required when necessary to prevent caving of the material or when necessary to exclude ground water. Casing shall be of sufficient strength to withstand handling stresses, the pressure of concrete and of the surrounding earth or backfill materials, and shall be watertight, smooth, clean and free of accumulations of hardened concrete.

2 When casing is used, the minimum shaft diameter below the casing shall not be less than the specified diameter of the shaft. The hole shall be drilled in such a manner that when the casing is inserted into the hole, a minimal amount of disturbed soil will be trapped outside the casing. This provision does not apply to temporary undersized casings used to protect workers inside shafts or for drilled shafts designed for point bearing only. If the elevation of the top of the shaft is below ground level or a problem exists with material caving into the excavation, a surface casing will be required from ground elevation to a point below the top of the shaft. Any surface casing used shall not remain in place unless otherwise indicated on the plans or permitted by the Engineer. It shall not be extracted until after the concrete placement has been completed. Under normal operations, a sufficient head of concrete shall be maintained at all times above the bottom of the casing to overcome hydrostatic pressure. Movement of the casing for short pulls of a few inches, rotating, exerting downward pressure and tapping it to facilitate extraction will be permitted. The total removal of the casing shall not be started until all concrete placement is completed in the shaft. When unusual conditions warrant, the casing may be pulled in partial stages. Casing extraction shall be at a slow, uniform rate with the pull in line with the axis of the shaft. Casing shall not be left in place unless otherwise shown on the plans or permitted by the Engineer. Bells shall be excavated to form a bearing area of the size and shape shown on the plans. Blasting will not be permitted. Bell shapes varying slightly from those shown on the plans are permissible provided the bearing area equals that specified. Material excavated from shafts and bells, including slurry, and not used in the backfill around the completed bents or piers shall be disposed of as directed by the Engineer. At the time concrete is placed, the excavation shall be free from accumulated seep water. All loose material shall be removed from the bottom of the excavation prior to placing concrete. The Contractor shall provide suitable access and lighting for proper inspection of the completed excavation, and to check the dimensions and alignment of shafts and bell excavation. Any required lighting shall be electric. Any mechanical equipment used within the excavation shall be operated by air or electricity. The use of gasoline driven engines within the excavation for pumping or drilling will not be permitted. In order that the Engineer may judge the adequacy of a proposed foundation, the Contractor, if requested, shall take cores to determine the character of the supporting materials. The minimum depth of such soundings or cores shall be five (5) feet below the proposed founding grade, or a depth equal to the diameter of the shaft, whichever is greater. It is the intent of this provision that cores shall be taken at the time the excavation is approximately complete. Unless otherwise shown on the plans, the Contractor may be required to provide one (1) core at his expense at each bent or abutment. Only cores in excess of the first core taken at each bent or abutment or in excess of those called for in the plans, will be measured for payment. When the plans require shafts in abutment bents, the embankment at the bridge ends shall be completed to grade and thoroughly compacted prior to drilling, unless otherwise shown on the plans or as permitted by the Engineer. (b) Additional Requirements for Slurry Displacement Method. Unless otherwise shown on the plans, drilled shafts may be constructed by the "Slurry Displacement Method" which is defined as a construction procedure whereby the sides of the excavation are supported by a processed bentonite slurry, which is then displaced by concrete to form a continuous concrete shaft. Casing, other than surface casing, will not be permitted.

3 Slurry shall consist of a commercial bentonite compatible with fresh water, and shall be mixed with water conforming to the requirements in Item 421, "Portland Cement Concrete" to produce a slurry. Nonsite mixed commercially supplied slurry shall conform to all the requirements herein. Slurry mixed at the project site shall be premixed in a reservoir adjacent to the excavation. Mixing of the slurry in the shaft excavation or other hole will not be permitted. The reservoir shall be of sufficient capacity to fill the excavation and for recovery of the slurry during concrete placement. Slurry shall conform to the following requirements: Bentonite Content (Percent by weight) 2% to 8% Specific Gravity 1.02 to 1.15 Viscosity (500 ml Marsh funnel) 40 second maximum Sand Content (Percent by volume) 10% maximum At the discretion of the Engineer, the specific gravity or sand content limits may be exceeded if it appears that the slurry consistency will not hinder concrete placement. Slurry shall be sampled from the bottom of the excavation and tested in accordance with Test Method Tex-130-E. A head of slurry shall be maintained in the shaft excavation during and after drilling operations, at or near ground level, or higher as necessary to counteract ground water pressure. When a surface casing is used, the slurry shall fill the excavation to at least two (2) feet above the bottom of the surface casing. The surface casing shall be smooth and shall extend approximately to the top of the shaft. The surface casing shall not be extracted until the concrete placing operation has been completed. Just prior to placement of reinforcing steel, a clean-out bucket of the proper size and/or other acceptable tool shall be passed down and up the excavation to remove loose cuttings or any material that may have fallen from its sides after the completion of drilling operations. If concrete placement is not started within four (4) hours of the completion of the shaft excavation, the hole shall be reprocessed with the auger as directed by the Engineer. The bottom shall then be recleaned with a cleanout bucket. The slurry at the bottom of the hole shall be rechecked for compliance with the above requirements. If the slurry "sets up" or forms a gel prior to concrete placement, the gelled slurry shall be agitated to liquefaction just prior to concrete placement and at other times when directed by the Engineer. (2) Reinforcing Steel. The cage of reinforcing steel, consisting of longitudinal bars and lateral reinforcement (spiral reinforcement, lateral ties or horizontal bands) shall be completely assembled and placed as a unit immediately prior to concrete placement, unless otherwise shown on the plans. If the shaft is lengthened, the longitudinal bars and lateral reinforcement required in the upper portion of the shaft shall be extended to the bottom unless otherwise shown on the plans. These bars may be lap spliced or spliced by welding. Any splices required shall be in the lower portion of the shaft. Where spiral reinforcement is used, it shall be tied to the longitudinal bars at a spacing not to exceed 12 inches. Welding of lateral reinforcement to longitudinal bars will not be permitted unless otherwise shown on the plans. In uncased shafts, concrete spacer blocks or steel chairs shall be used at sufficient intervals to insure concentric spacing for the entire length of the cage. In cased shafts, concrete spacer blocks shall not be used. Steel chair spacers or bent pieces of steel bars shall be placed at sufficient intervals around the steel cage to insure concentric spacing inside the casing.

4 It shall be the Contractor's responsibility to support or hold down the cage to control vertical displacement during concrete placement and/or extraction of the casing. The support shall be concentric with the cage to prevent racking and distortion of the steel. An adequate number of the vertical bars shall be supported. The elevation of the top of the steel cage shall be checked before and after concrete placement or after casing extraction when casing is used. Generally, downward movement of the steel not exceeding six (6) inches per 20 feet of shaft length will be acceptable. Upward movement of the steel not exceeding six (6) inches will be acceptable. Displacement of the steel beyond the above limits shall be cause for a structural review. The minimum length of steel required for lap with column steel shall be maintained. Dowel bars may be used if the proper lap length is provided both into the shaft and into the column. All dowel bars shall be adequately supported and may be inserted after concrete placement. (3) Concrete. (a) General. All work shall be performed in accordance with the provisions of Item 420, "Concrete Structures," and with the requirements herein. Concrete shall be placed as soon as possible after all excavation is complete and reinforcing steel placed, and shall be of such workability that vibrating or rodding will not be required. Portions of drilled shafts which are formed shall be vibrated. Concrete placing shall be continuous for the entire length of the shaft. Concrete shall be placed through a suitable tube or tremie to prevent segregation of materials. The tube or tremie may be made in sections to provide proper discharge and permit raising it as the placement progresses. A nonjointed pipe may be used if concrete is not allowed to discharge from the side openings. Free fall of concrete a maximum of 15 feet will be allowed provided the Contractor can demonstrate that the concrete may be directed such that it does not strike the reinforcing cage or sides of the hole during placement. The elapsed time from the beginning of concrete placement in the cased portion of the shaft, until extraction of the casing is begun, shall not exceed one (1) hour. A riser block of equal diameter as the column and of a maximum height of six (6) inches may be cast at the top of the completed shaft. The top surface shall be cured and any construction joint area shall be treated in accordance with Item 420, "Concrete Structures." (b) Additional Requirements for Slurry Displacement or Underwater Placement Methods. Provisions shall be made for a sump, or other approved method, to channel displaced fluid away from the shaft excavation. Slurry shall be recovered and disposed of as approved of by the Engineer. Displaced fluids shall not be discharged into streams or other bodies of water. Concrete shall be placed as soon as possible after all excavation is completed and reinforcing steel is placed, and within the same day's operation as the shaft excavation. The concrete shall be placed through a closed tremie or pumped to the bottom of the excavation. Placement of the concrete shall be continuous from the beginning of placing until the shaft is completed. If a tremie is used, it shall be kept full of concrete and well submerged in the previously placed concrete at all times. If a pump is used, the discharge tube shall be submerged in the previously placed concrete at all times. Additional concrete shall be placed to assure the removal of any contaminated concrete at the top of the shaft.

5 If concrete placement is interrupted due to withdrawal of the submerged end of the tremie or pump discharge tube prior to completion, the tube shall be removed, resealed at the bottom, forced well into the concrete already placed and recharged prior to progressing further Test Load. Any required test loading of shafts shall be in accordance with Item 405, "Foundation Test Load." Measurement. Drilled shaft foundations will be measured by the linear foot to the bottom of the shaft. Shafts for interior bents and piers will be measured from a point approximately six (6) inches below the finished earthwork elevation at the center of each shaft unless specific elevations or dimensions are indicated on the plans or unless the Engineer directs otherwise to meet unusual conditions. (The bent height shown on the plans is for estimating purposes only and does not control the top of shaft measurement.) For abutment bents and retaining walls, the length of each shaft shall be measured from the bottom of footing or cap elevation. For sign structures and illumination poles, the length of each shaft shall be measured from the top of shaft elevation shown on the plans. The quantity of concrete for bell footings as shown on the plans and in the proposal shall consist of the volume outside of the plan dimensions of the shaft and shall be considered as final quantities and no further measurement will be required, unless revised by the Engineer during construction. Core holes to determine the adequacy of a founding strata will be measured by each core hole drilled. Only core holes in excess of one (1) per bent or abutment or in excess of those called for in the plans will be measured for payment Payment. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per linear foot of "Drilled Shaft," or "Drilled Shaft (Nonreinforced)," of the specified diameter, subject to the following limitations for overruns authorized by the Engineer: (1) Payment for individual completed shaft lengths up to and including five (5) feet in excess of the maximum plan length shaft, as defined herein, will be made at the unit price bid per linear foot of the specified diameter of "Drilled Shaft." (2) Payment for that portion of individual completed shaft length in excess of five (5) feet and up to, and including, 15 feet more than the maximum plan length shaft, as defined herein, will be made at a unit price equal to 115 percent of the unit price bid per linear foot of the specified diameter of "Drilled Shaft." (3) Payment for that portion of individual completed shaft length in excess of 15 feet more than the maximum plan length shaft, as defined herein will be made at a unit price equal to 125 percent of the unit price bid per linear foot of the specified diameter of "Drilled Shaft." Payment as described above shall be subject to the following provisions: (1) For extra depth drilling at interior bents and piers, the maximum plan length shaft shall be the maximum length shaft, regardless of diameter, for any interior pier or bent of any bridge included in the contract. (2) For extra depth drilling for abutment bents and retaining walls, the maximum plan length shaft shall be the maximum length shaft, regardless of diameter, for any abutment bent of any bridge or of any retaining wall included in the contract. (3) For extra depth drilling for overhead sign structures, the maximum plan length shaft shall be the maximum length shaft, regardless of diameter, for any overhead sign structures included in the contract.

6 (4) For extra depth drilling for high mast illumination poles, the maximum plan length shaft shall be the maximum length shaft, regardless of diameter, for any high mast illumination pole included in the contract. Bell footings constructed to the specified dimensions will be paid for at the unit price bid per cubic yard for "Bell Footings." The quantity to be paid for will be the quantity shown on the plans unless revised by the Engineer in accordance with "Measurement." Core holes will be paid for based on a price to be determined as follows: the price bid for the drilled shaft size of greatest quantity in the contract shall be divided by two times the shaft diameter in feet and then multiplied by five (5). The unit prices bid for the various classifications of drilled shafts and bell footings shall be full compensation for making all excavations and soundings; for any necessary pumping; for furnishing, predrilling, placing and removing any required casing; for furnishing and placing all concrete including additional concrete required to fill an oversize casing or oversize excavation; for furnishing and placing reinforcing steel; for furnishing and processing any slurry; for all backfilling; for disposing of cuttings and slurry; and for furnishing all tools, labor, equipment and incidentals necessary to complete the work. When the bottom of any drilled shaft is ordered to be placed at an elevation below plan grade and a splice of reinforcement is required, no direct payment will be made for the extra reinforcement required, but it will be considered subsidiary to the price bid per foot of shaft. No extra payment will be made for casings left in place. placed. No payment will be allowed for "Bell Footing" or for "Drilled Shaft" until the concrete has been

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

704 - PILING SECTION 704 PILING

704 - PILING SECTION 704 PILING SECTION 704 PILING 704.1 DESCRIPTION Drive the specified types of piles to the penetration and bearing values shown in the Contract Documents. BID ITEMS UNITS Piles (*)(**) Test Piles (*) (**) Test Piles

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Delete SECTION 703 and replace with the following: SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Lesson 7 REINFORCING CAGE. Version 1-1/

Lesson 7 REINFORCING CAGE. Version 1-1/ Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain

More information

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers. SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION Section 67.0 Knoxville, Tennessee March 2013 1. Description STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION a) This work shall consist of constructing micropiles as shown on the Contract plans in accordance

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES Page 1 of 8 PILING PART-VI OF RCC BORED CAST IN-SITU PILES REV. NO. PRAPARED APPROVED DATE 00 Marina P Mishra COPYRIGHT AND CONFIDENTAL The information on this document is the property of BHARAT HEVY ELECTRICAL

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

SPECIAL SPECIFICATION 4897 Repair Structural Concrete

SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,

More information

Quality Assurance Review for Bridge Construction

Quality Assurance Review for Bridge Construction Quality Assurance Review for Bridge Construction March 7, 2000 Date Project No. County-Route-Section Project Contacts Contractor TABLE OF CONTENTS Reinforcing Steel... 2 Concrete... 2 Structural Steel...

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION INDEX SECTION 1 GENERAL PROVISIONS... 1-1 1.0 GENERAL... 1-1 SECTION 2 - PRESTRESSED CONCRETE

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items:

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items: RIVERSIDE MEDICAL CENTER EAST EXPANSION KANKAKEE, ILLINOIS SECTION 02382 - DRILLED PIERS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Work Included: Provide all labor, materials, equipment, transportation

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219. ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes

More information

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the

More information

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section 02011-1 of 5 SECTION 02011 SUBSURFACE INVESTIGATION 02011.01 GENERAL A. Description Subsurface investigation shall include, but not necessarily be limited to, drilling test holes (in rock), auguring holes,

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES TABLE OF CONTENTS 3.1 General... 3-1 3.2 Materials... 3-1 3.2.1 Steel "H" Piling... 3-1 3.2.2 Steel Pipe Piling... 3-1 3.2.3 Timber Piling...

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

CONTRACTOR AND EQUIPMENT ARRIVE ON-SITE

CONTRACTOR AND EQUIPMENT ARRIVE ON-SITE Lesson 5 Inspector CONTRACTOR AND EQUIPMENT ARRIVE ON-SITE Drilled Shaft Installation Plan 5-1 Version 1-1/15 5-1 Learning Outcomes Identify and understand the Role and Duties of the Inspector Verify and

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

SECTION GRAVEL PACKED WATER WELL

SECTION GRAVEL PACKED WATER WELL SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean

More information

Dril ed Shaft Inspector CBT Lesson 5 Contractor and equipment Arrive On-Site Learning Objectives Inspector s Role

Dril ed Shaft Inspector CBT Lesson 5 Contractor and equipment Arrive On-Site Learning Objectives Inspector s Role Drilled Shaft Inspector CBT Lesson 5 Contractor and equipment Arrive On-Site Welcome to the Drilled Shaft Inspector Course. This is Lesson 5, Contractor and equipment Arrive On-Site. Learning Objectives

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

SPECIAL SPECIFICATION 5989 Settlement Gauge

SPECIAL SPECIFICATION 5989 Settlement Gauge 2004 Specifications CSJ 0047-14-067 SPECIAL SPECIFICATION 5989 Settlement Gauge Description. Install, maintain, and subsequently abandon settlement gauges as indicated for the purpose of obtaining foundation

More information

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT PORTLAND CEMENT CONCRETE PAVEMENT This Specification consists of furnishing and placing full-panel replacement of Portland Cement Concrete Pavement on Bellevue Avenue. Portland Cement Concrete Pavement

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000 DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL 36.1 36-2 PIPEMAKING EQUIPMENT 36.1 36-3 TRENCH EXCAVATION 36.1 36-4 SPECIAL FOUNDATION TREATMENT 36.1 36-5

More information

ITEM 522 PORTLAND CEMENT CONCRETE PLANTS

ITEM 522 PORTLAND CEMENT CONCRETE PLANTS ITEM 522 PORTLAND CEMENT CONCRETE PLANTS 522.1. Description. This Item shall govern for the plant facilities, equipment and operation of portland cement concrete plants. 522.2. Class of Plants. The class

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 02514 MANHOLES 1.0 GENERAL 1.1 SCOPE This section provides for construction of sewer manholes complete in place, including the furnishing and adjusting to grade of an existing

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

Drill Shaft Contractor and Equipment Arrive On-Site CBT Script

Drill Shaft Contractor and Equipment Arrive On-Site CBT Script Drill Shaft Contractor and Equipment Arrive On-Site CBT Script Welcome to the Drilled Shaft Inspector Course. This is Lesson 5, Contractor and equipment Arrive On-Site. To begin, select the start button

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Section 704. STEEL SHEET PILING AND COFFERDAMS

Section 704. STEEL SHEET PILING AND COFFERDAMS Section 704. STEEL SHEET PILING AND COFFERDAMS 704.03 704.01. Description. This work consists of the following: A. Providing and driving permanent steel sheet piling, B. Designing, providing, installing,

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

SECTION SHEET PILES. A. This section covers the contract item Sheet Piles. This work includes:

SECTION SHEET PILES. A. This section covers the contract item Sheet Piles. This work includes: SECTION 02250 SHEET PILES PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Sheet Piles. This work includes: 1. Furnishing, coating, and installing steel sheet piles for the working

More information

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special

More information

APPENDIX A MEASUREMENT AND PAYMENT

APPENDIX A MEASUREMENT AND PAYMENT P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

Section WATER LINE IN TUNNELS

Section WATER LINE IN TUNNELS PART 1 GENERAL 1.01 SUMMARY Section 02517 This Section includes handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

WATER LINE IN TUNNELS

WATER LINE IN TUNNELS Section 02517 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings that

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled.

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled. I - Measurement and payment Mobilization and Demobilization: Payment will be made for costs for assembling all plant and equipment at the site preparatory to initiating the work and for removing it there

More information

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

SECTION 1208 CHAIN LINK FENCING DESCRIPTION SECTION 1208 CHAIN LINK FENCING 1208-1 DESCRIPTION This item covers the requirements for furnishing materials and constructing new chain link fences and gates in accordance with the details included herein

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial