2 Table of Contents INTRODUCTION TRANSPORT, LOADING, UNLOADING AND STORAGE FABRICATION/PROCESSING METHODS SAFETY PRIOR TO FABRICATION/PROCESSING SAW CUTTING PUNCHING GROOVING ROUTING CURVING/BENDING BOLTING/SCREWING RIVETING BOLTING DRILLING PERFORATING GLUING INSTALLATION SPECIAL CONSIDERATIONS THERMAL EXPANSION DIRECTION OF ASSEMBLY COMMON INSTALLATION METHODS HORIZONTAL JOINT DETAIL VERTICAL JOINT DETAIL SOFFIT DETAIL EXTERNAL CORNER PARAPET DETAIL WINDOW SILL DETAIL WINDOW HEAD DETAIL JAMB DETAIL SOFFIT DETAIL AT WINDOW HEAD CONCRETE WALL TO CLADDING INTERFACE HEAD DETAIL AT SLAB EDGE FLOOR SLAB DETAIL ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

3 INTRODUCTION This manual provides relatively simple and convenient fabrication and installation details on CLADEX Aluminium Composite Panels (ACP), provided that some simple rules are adhered to. The information contained in this guide, although being fairly comprehensive, is by no means exhaustive. Additional information is available from the CLADEX service team. Note: All design and construction of façade systems need to comply with the latest version of the Building Code of Australia (BCA) Standards and Regulations. Please note that the guidelines provided in this manual are of a general nature and that the onus remains with the purchaser to make an assessment on the conditions under which the CLADEX range of products will be used by their clients. 1. TRANSPORT, LOADING, UNLOADING AND STORAGE To ensure the CLADEX panels are protected during delivery, they are transported in solid wooden crates (see photo below), with the panels wrapped in a PE film and the crates sealed using steel strapping/bailing bands. Unloading of crates from containers or trucks can be accomplished with the use of forklift(s) or slings of adequate loading capacity. They should be lifted off the stack individually with care, to ensure that they do not scrape adjacent crates or cause damage to any panels. Upon delivery of your order, please check the inventory and inspect each panel, all accessories and packaging, noting any transport and moisture damage or unaccounted items. Panels that are moist should be dried immediately to prevent spotting/staining. 3 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

4 Should there be any signs of damage or missing items, make a note of the reference delivery docket at the time of delivery and have the details confirmed by the forwarding agent, since failure to do so will make it difficult to file a claim. Forward a list of the missing or damaged items to ISG Architectural and make contact with your ISG Architectural representative for further instructions. It is imperative that any damaged panels, accessories, or packaging be reported to ISG Architectural s representative immediately upon discovery. The following guidelines are provided to safeguard CLADEX ACP s from mechanical damages as well as the detrimental effects of moisture and weather conditions: CLADEX panels should only be transported using ISG Architectural solid wooden crates. The crates should be handled carefully during transportation and unloading. Note: do not handle open crates. Any strapping/bailing bands are to be removed upon receipt of delivery. The crates are to be lifted from each stack individually, taking care not to scratch or damage any adjacent crates when removing them from the stack. Crates and ACP s need to be stored in an area that is well protected from the elements, i.e. a cool, dry and ventilated location, where temperatures are relatively stable. Should storage of crates and ACP s be required for an extended period of time, they should be tarped (to remain dry and clean) and stored such that they are protected against water leakages, rain as well as penetration of moisture or condensation (likely to occur when cold panels are moved to a warmer room). Crates can be stacks one on top of another (not vertically), with heavy crates at the bottom. However there should be no more than three (3) crates per stack. No heavy objects are to be placed on top of the crates/panels. Individual panels should be lifted out of the crates by two people holding all four corners and not drawn over each other. Panels should be carried vertically, with gloves worn to avoid any staining of the panels. Conduct any unpacking and repacking work in a clean area. Should panels be stacked, nothing is to be placed in between them to avoid markings. They need to be placed horizontally on a clean, flat surface free of debris or onto pallets with adequate supports located at a maximum of 300 mm from the centre (to prevent sagging). Avoid the stacking of CLADEX panels of different sizes together, since the surface or panel can be scratched by the edges of the smaller panels. Preferably store them according to size in racks. All horizontal surfaces, including panels and crates, should be covered with a clean membrane or board to protect the panels from damage. All unwrapped stacks should be covered with plastic sheeting in order to minimize damage from dirt and moisture. Remember to remove all strapping/bailing bands prior to storage. Handle CLADEX panels on a worktable and not directly on the floor. 4 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

5 The following guidelines are provided to safeguard the effectiveness of the protective film on the CLADEX ACP s: Panels should not be stored for periods longer than six (6) months. Avoid severe temperature fluctuations and exposure to direct sunlight as they reduce the long-term durability of the protective film and could result in it being very difficult to remove. Do not mark the protective film with inks (marking pens/texters) or stick labels, PVC tapes (including duct tape, packing tape and insulation tape), polyurethane or modified silicon sealant onto it, since the solvents or plasticizers may penetrate the film and affect the lacquered surface. Should the protective film somewhat come off during processing or after assembly, stained edges can occur over time, which may be difficult to remove. Remove the protective film as soon as possible (or within three (3) months) after assembly. Protective film residue that remains on the panels for an extended period of exterior exposure may be very difficult to remove. Do not remove the protective film at temperatures below 10 C. 5 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

6 2. FABRICATION/PROCESSING METHODS Fabricating CLADEX panels is as easy as working with metal or wood, with no requirements for any special tools. CLADEX panels can be cut, curved, bent, routed, grooved, drilled, sawed, sheared, punched, trimmed and moulded into complex shapes with a range of conventional woodworking or metalworking tools. 2.1 Safety Various, individual protective equipment should be worn in accordance with the safety regulations enforced at the various workshops or building sites, when CLADEX ACP s are being handled, installed or worked on. Besides these requirements it is also recommended that gloves be worn when handling the panels at any given time, to prevent potential staining of the panels. Furthermore safety glasses should also be used with any fabrication operation that produces swarf (sawing, milling, drilling) and ear protection whenever very noisy machinery is being used, i.e. a panel saw/router. 2.2 Prior to fabrication/processing Prior to fabrication, ensure that: The panels are stored/conditioned at room temperature for at least one day. The worktable, temporary stand and both sides of the CLADEX panel is cleaned. To avoid scratching the panel finish, perform any cutting, routing, drilling etc. from the backside of the CLADEX panels. Ensure that any cutting chips generated from saws, routers, drills and any other tools are completely removed from the interface between the CLADEX panels and the tools. 2.3 Saw cutting CLADEX panels can be cut using various types of circular saws, i.e. table saws, hand/ circular saws and panel saws. An example of a suitable saw blade to use is as follows: 6 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

7 Blade diameter 255 mm No. of teeth 80 to 100 Cutting width 2.0 mm to 2.6 mm Rake angle 10 Tip material Fine tungsten carbide Operational parameters Saw blade rotational speed 2000 to (rpm) 4000 Feeding speed (m/min) 10 to 30 Note the following: Cut the panel with the external side facing upwards to prevent the panel from scratches and the protective film from peeling off; When processing large quantities, it is best to conduct a number of trial saw cuttings, to evaluate the tool working conditions as well the recommended cutting speeds. The panels can be marked up with the use of a soft pencil. The CLADEX substrate consists of a polyvinylidene fluoride (PVDF) paint finish and care should be taken during the sawing operation. It is therefore preferred that the saw blade be moved rather than the panels when sizing the panels. Saw blades need to be sharpened (or replaced) when they become dull. Dull blades result in large burrs or distortion of the carved edges of the panel. They also increase heat generation and applied pressure to the panel. Carefully remove all cutting chips from the panel after cutting to avoid dents and scratches during storage and assembly. After cutting the panel, make sure that the edges are deburred as they will be sharp and pose a cutting hazard. For CNC cutters, a spiral cutter is recommended to assist with swarf removal. No coolant is required on the cutter. CLADEX panels can be contour-cut with the use of water jets, CNC routers, copy routers and jigsaws. 2.4 Shear cutting 7 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

8 The shearing of CLADEX panels can easily be accomplished with the aid of rotary shears or a guillotine. Bear in mind that shearing causes a slight roll-down of the aluminium cover sheet (on the impact side). This roll-down area is often referred to as the edge zone, where the polyethylene core experiences compression, leading to increased stress between the core and the aluminium cover sheet. Shearing should be avoided when the edge of the panel is exposed to the environment due to this additional stress. To prevent any panel damage due to indentations to form on the panel surface (caused by the hold down pads), ensure that the blanking tools on the shear is padded or fitted with a shock absorbing rubber pad. For shear cutting of CLADEX panels the following can be used as a guide however it s best to always conduct a test before commencing full production: Thickness of CLADEX panel Clearance Rake angle 4 mm 0.05 mm 1.5 Applications that require visible cut edges, i.e. riveted facades, shearing of CLADEX panels does not satisfy the required decorative demands and therefore should be avoided. 2.5 Punching CLADEX panels can be punched using conventional sheet punching machines and dies. Press punching sometimes leads to shear droop in the aluminium surface of the panel, similar to shear cutting. For achieving clean cuts, ensure that evenly grounded tools are used and that the clearance of punch and die be made as small as possible (preferable 0.1 mm or as a general guide: thickness of panel x 5%). In the case of small diameter holes (< 3mm) the tool may require modification to ensure that the core material is completely removed in the process. 8 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

9 2.6 Grooving Grooving of CLADEX panels is fairly simple and an easy process to accomplish. A perfect solution to on-site routing, resulting in saving time is to utilise a V-Groove routing blade, since it allows fabricators to route and fold a range of CLADEX panels on-site, without the need to return the material to the workshop for CNC routing. The V-Groove routing blade mounts onto almost any circular saw making it completely portable. The ability to fabricate panels on site offers significant time and cost savings. With a CNC router one can accomplish an exact depth which just brushes up against the back of the skin on the aluminium face. It is recommended that a minimum of 0.3 mm Polyethylene should be left to ensure suitable strength and performance. 2.7 Routing CLADEX panels can be cut to size using portable, commercial or automated routing equipment. Furthermore CLADEX panels can be cold shaped, to form various shapes and sizes. A rectangular or V-shaped groove can be routered on the back of the panel by following potential fold lines. A thin layer (between 0.3 mm and 0.5 mm) of core should remain at the base of the routed groove. The panel can then be hand folded along this groove, creating a precise and even fold. Too much core material can result in delamination of the panel corners as well as result in a larger radius fold than desired. It also makes folding the panel more problematic and prevents the required fold angle from being obtained. The routing method should preferably be used if clean cut edges are required/desired. 9 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

10 To prevent pressure marks from appearing on the surface, plastic or wood vice jaws should be used when chucking the panels. Use vacuum tables with medium-density fibreboard (MDF) as sacrificial boards. 2.8 Curving/Bending CLADEX panels can be curved using any of the following processes: Press Break, Roll Bender, Folding Table and Pipe Fixture. The following are guidelines and limitations associated with the curving of CLADEX panels. Press Break The minimum bending radius using a press brake is shown in the following table. Thickness of CLADEX panel Traverse (Width in mm) Parallel (Length in mm) (mm) The following precautions associated with the bending process are recommended to prevent the panels from being scratched: Place a protective pad on the die of the press brake; Check that there are not any scratches on the punch and that a fully polished punch is used; Leave the factory supplied protective film on the CLADEX panel during processing and ensure there are no wrinkles or air bubbles present; The volume of recoil varies somewhat in relation to the bending direction, thickness of panel, material temperature and the radius of the required bending angle. Roller bender CLADEX panels can be bent with a roll-bending machine. Roller benders allow for a larger bending radius than a press brake. The bending angle is a function of the diameter of the roll and the distance between the rolls. The inside bending radius is roughly 10 times the Cladex panel thickness. Unfortunately a flat surface will appear at the beginning and the end of the panel. When this is not acceptable it will be necessary to cut off and remove the flat surface, in the finish fabrication process. Use protective foils to prevent damage to the panel surface as 10 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

11 well as polished rollers free of imperfections. For mass production, trials should be conducted on sample panels. Clamped pipe fixture CLADEX panels can be bent over a pipe of the proper inside diameter that is securely clamped to a table. Bending can be made easier using a hinged leaf attached to the end of the table. Bending beyond 90 may be required to counteract for any recoil of the material. 2.9 Bolting/Screwing CLADEX panels can be screwed together by means of standard processes used in metal and plastics technology. Should CLADEX panels be joined to structural parts of metals other than aluminium, or if fasteners (e.g. bolts, screws) are to be used, the following material guidelines should be observed: a) Fasteners and structural parts made of aluminium, plastic or stainless steel should be suitable for the assembly with CLADEX panels. b) In the case where aluminium materials come into contact with dissimilar metals, a proper insulator or caulking tape should be applied to insulate between the dissimilar materials to prevent corrosive and/or electrolytic action from occurring. c) Thermal expansion of the panel needs to be taken into consideration for outdoor use of CLADEX panels to avoid jamming or deformation Riveting Riveting of CLADEX panels is possible with the use of a riveter as well as rivets common to aluminium constructions, i.e. solid or blind rivets. For outdoor use allow for thermal expansion. Note that countersink rivets do not allow for panel expansion and are therefore unsuitable for outdoor use Bolting Considering the deformation limit, formula e > 2D is the best way to calculate the aperture and the distance from hole centre to the end of the plate. 11 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

12 2.12 Drilling CLADEX panels can be drilled with twist drills commonly used for aluminium and plastics, and on drilling machines customarily used for metals. Working parameters Drill bit Twist drill made from high speed steel (HSS) Tip angle 100 to 140, alternatively counter-bore grind with centering tip Cutting speed 164 to 984 rpm Speedy removal of chips can be accomplished by using a high RPM, slow feed speed drill and occasional lifting of the bit Perforating CLADEX panels that are exclusively used for interior and ceiling designs can be perforated using CNC punching machines. Holes with a minimum diameter of 4 mm can be punched, with the minimum width of webbing between the hole edges also being 4 mm. The best results will be obtained using a punch die for single punching, however multi-station punching machines are more economical. After punching operations the panel flatness will generally require further processing due to indentations Gluing High strength contact adhesives that do not require lengthy setting times can be used for interior design purposes. Where moderate cure times are adequate, construction adhesives and silicones can be used to obtain a stronger bond, instead of contact adhesives. Care must be taken in the selection of an adhesive regarding the thermal expansion of the materials to be joined. Where significant thermal expansion can occur, i.e. exterior applications, adhesives should be of medium or low modulus materials to allow for movement without shear or loss of bond. Usually metal adhesives or double-sided, very high bonding (VHB) tape, for indoor use should be used. Note: Adhesives and sealants do not adhere to the plastic core. Apply adhesive to aluminium surface only and consult sealant manufacturer for correct application. Note: Tape fixing of the Cladex cladding system is only permitted on Type C construction, on walls that do not require a fire resistance level in accordance with 3M VHB Tapes design guidelines. 12 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

13 3. INSTALLATION The versatility of CLADEX panels makes it readily flexible to other standard systems available from a variety of vendors, including rout & return systems, glazed-in systems as well as highly-creative custom designed systems. In addition, complex assemblies can be created with CLADEX panels in combination with polyethylene welding as well as a range of support systems attached using structural adhesives. Surfaces can be connected to one another as well as to other materials through conventional methods of attachments using rivets, bolts or screws. For interior installations the surface of the panels can be attached to such substrates as drywall, gyprock and plasterboard with double-faced tape or non-hardening adhesives. 3.1 Special considerations Thermal expansion CLADEX panels will thermally expand or contract in a similar manner to that of solid aluminium plate or sheet. This thermal expansion must be considered when choosing the fastening system and calculating dimensions and joint widths (refer to CLADEX Technical Specifications). Some consideration should be given to the following: The minimum tolerance requirements depends on the expected expansion of the panel, support, joinery, wall openings etc.; Larger panel hole diameters must be taken into account when the panel is fixed with screws and rivets; Panel holes and holes in the substructure must be drilled centrically (drilling jigs to be used); The distance between panel and rivet head is approximately 0.3 mm (rivet attachment jigs to be used); Take care not to over-tighten the screws on the panel; Position the butt joints of the supporting sections with the panel joints to avoid jamming, as a result of opposing thermal expansions. Bear in mind that panels with outer coatings in darker colours, absorb more heat than lighter coloured panels. Account must be taken of this when calculating the 13 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

14 temperature differential (about 20 C more for a black panel, compared to a white or metallic panel). Expansion is only one of the tolerance factors to be taken into consideration during design calculations. Tolerances of the support (masonry, structural steel) as well as the installation tolerances (joinery, wall openings) must also be considered Direction of assembly Note that CLADEX panels are directional, i.e. during manufacturing of the panels the paint is applied to the composite panels in one uniform direction. Solid Colours Solid colours present the best case for panel to panel and batch to batch consistencies. However it is likely that there will be variations in colours from one batch to another. The industry standard for allowable colour variation with solid colours is Delta E 1.0 or less. The brighter colours (reds, yellows, blues, etc.) tend to be less opaque. They depend somewhat on film building (paint thickness) to achieve their appearance and are likely to exhibit more variation than subdued colours. Metallic Colours The industry standard for allowable colour variation with metallic colours is Delta E 2.5 or less. This is significantly larger than the standard for solid colours. The reason for this is that in the coating process the flakes will tend to align in one direction, greatly increases the directionality of the panel s appearance. The larger the flake size the greater the probability that the lots/batches will not be able to be mixed. CLADEX panels have arrows displayed onto the protective film, indicating the direction in which the finish was applied. It is therefore recommended that CLADEX panels are installed in the same direction as marked on the protective film, with lots/batches not to be mixed on a building face (unless deliberately required otherwise), to avoid any possible reflective differences. Subtle colour variations could occur between panels originating from different production batches, therefore to ensure panel colour homogeneity, the total panel requirement (with a couple of extra/spare panels) for a project should be ordered in one batch, i.e. the front of a building should be composed of panels of the same batch (see label attached to the pallet or stamp on the reverse side). Notes should be made on the drawings to verify the direction in which to install the panels. 14 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

15 3.1.3 Panel fixing CLADEX panels can be mechanically fixed (Type A, B or C buildings) or flat stick adhesive fixed (Type C buildings) directly to the wall frame or be connected via a top hat sub-frame. The fixing technique is dependent on the fixing location and wind impact. Where fixed in high wind areas the system design is to be reviewed by an appropriately qualified façade engineer. Where the top hat sub frame system is used, they are to be spaced at intervals no greater than 600 mm, with the panel fixed on one side no greater than 1200 mm. The various installation and approved fixing systems are detailed further below Accessories The accessories for installation of CLADEX ACP s include the following items and are generic items that can be interchanged: 1. Aluminium profile and angles 2. Hangers 3. Weather resistant silicon sealer 4. Anchor bolts 5. Backing rods 6. Rivets 15 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

16 7. Self-tapping screws Images for illustrative purposes only. 4. COMMON INSTALLATION METHODS The methods detailed below are examples of approved fixing techniques. As the core is a low combustible hazard, its exposure to free air does not present a fire hazard. The panel in the following fixing methods can be installed within the horizontal or vertical plane, to the interior or exterior of a building. 4.1 Horizontal Joint Detail 16 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

17 17 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

18 4.2 Vertical Joint Detail 18 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

19 4.3 Soffit Detail External Corner 19 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

20 4.4 Parapet Detail 20 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

21 4.5 Window Sill Detail 21 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

22 4.6 Window Head Detail 22 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

23 4.7 Jamb Detail 23 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

24 4.8 Soffit Detail at Window Head 24 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

25 4.9 Concrete Wall to Cladding Interface 25 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

26 4.10 Head Detail at Slab Edge 26 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

27 4.11 Floor Slab Detail During the process of installation, it is important to make sure all the panels are being installed in the same direction, as illustrated on the protective film. Otherwise, it will result in a serious problem to the visual impact of the whole curtain-wall, especially for those panels with metallic color coating. Usually, our panel with size of width no more than 1600mm and length unlimited, however, specific offers are available for those customers who have special purpose, with the consideration of transportation convenience. The installation details provided in this manual are for conceptual purposes only. By no means are they the only methods that can be utilised to attach CLADEX panels, neither can they be used generically without consideration for each unique and individual application. Proper design engineering may prevent/exclude the choice of installation method being selected. 27 ISG Architectural, Kirkham Rd West, Keysborough, VIC, Copyright 2017 All rights reserved.

Exterior System installation instructions

Exterior System installation instructions Exterior System installation instructions 11/20/14 WPS ES-400 & 500 INSTALLATION INSTRUCTION. The WPS ES-400 & 500 systems Façade panels are designed for use as an external wall cladding in conjunction

More information

TECHNICA L INF ORM ATION

TECHNICA L INF ORM ATION TECHNICA L INF ORM ATION W W W. F V. C O M. A U CONTENTS 1. ABOUT THIS MANUAL 2. INTRODUCTION 2.1 PREFACE 2.2 COMPANY AND BACKGROUND 2.3 PRODUCT DESCRIPTION 2.4 ADVANTAGES OF VITRABOND 3. QUALITY 3.1 MANUFACTURING

More information

For more information on Pictura visit CI/SfB (41) R December New. Pictura. High performance cladding

For more information on Pictura visit   CI/SfB (41) R December New. Pictura. High performance cladding New CI/SfB (41) R December 2008 Pictura High performance cladding Introduction The new Pictura coating system incorporates an additional surface treatment for Fibre Cement panels. The main characteristic

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

Kingspan Day-Lite Klick

Kingspan Day-Lite Klick Insulated Panel Envelope Systems Roof Wall Façades Lighting Rooftop PV Coldstore Structural Products Cleanrooms UK & Ireland Kingspan Day-Lite Klick Installation Guide Page 2 Accessories Overview Designation

More information

Fairview TECHNICAL INFORMATION A1 RATED NON-COMBUSTIBLE CLADDING PANELS

Fairview TECHNICAL INFORMATION A1 RATED NON-COMBUSTIBLE CLADDING PANELS Fairview TECHNICAL INFORMATION A1 RATED NON-COMBUSTIBLE CLADDING PANELS ABOUT THIS MANUAL This manual has been developed to effectively assist fabricators and contractors to work with Fairview s Aluminium

More information

Expertise in Plastics

Expertise in Plastics Expertise in Plastics The ideal material for almost any decorative or cladding application, including signage, point of sale, exhibition stands, displays, internal cladding, portable buildings, kiosks,

More information

Installation Guide. PAROC panel solutions

Installation Guide. PAROC panel solutions Installation Guide PAROC panel solutions Panel System 4.00 INT January 2008 THESE INSTRUCTIONS ARE FOR NORMAL APPLICATIONS Work safety Preparation Wear protective gloves and clothing when handling the

More information

Installation and Fabrication Guidelines Sensitile Terrazzo - Terrazzo Lumina - PIXA

Installation and Fabrication Guidelines Sensitile Terrazzo - Terrazzo Lumina - PIXA Released August 2012 Sensitile Terrazzo, Terrazzo Lumina, and PIXA slab installation guidelines for horizontal and vertical use (tabletops, countertops, wall cladding etc). General Information Sensitile

More information

DIBOND 3A COMPOSITES. The ultimate aluminum composite Material (Acm) Sales Training Presentation by 3A Composites Level 201

DIBOND 3A COMPOSITES. The ultimate aluminum composite Material (Acm) Sales Training Presentation by 3A Composites Level 201 DIBOND The ultimate aluminum composite Material (Acm) Sales Training Presentation by 3A Composites Level 201 2 0 10 USA, INC. Introduction Welcome to the Sales Training Presentation by 3A Composites In

More information

AS Certified ALCADEX

AS Certified ALCADEX A1 AS1530.1 Certified www.alcadex.com.au 1800 ALCADEX ALCADEX A1 AS1530.1 Certified Non Combustible Aluminium Composite Made for the Australian Construction Industry www.alcadex.com.au Recent fire related

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

Cembrit Windstopper Basic Cembrit Windstopper Extreme

Cembrit Windstopper Basic Cembrit Windstopper Extreme Cembrit Windstopper Basic Cembrit Windstopper Extreme Installation Table of Contents Product Description 2 Dimensions 3 Accessories 4 Applications 5 Fixing Details 6 Joint Details 8 Storing, Handling and

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

Guideline Specifications

Guideline Specifications Page 1 of 7 PART 1 Guideline Specifications Exterior Aluminum/Composite Wall Panels GENERAL ARROWHEAD 508 SYSTEM Pressure Equalized Rainscreen SECTION 07410 1.01 SUMMARY A. Work of this section included

More information

SECTION EXTERIOR GRILLS AND SCREENS

SECTION EXTERIOR GRILLS AND SCREENS SECTION 10 82 13 PART 1 GENERAL PART 1 1 SUMMARY A. Section Includes: 1. Exterior perforated aluminum screen wall system with Ombrae TM Optical Tile imaging technology. 2. Accessories including attachments,

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

Page 1. Energy Saving skylights. PolyCarbonate Panels

Page 1. Energy Saving skylights. PolyCarbonate Panels Page 1 Energy Saving skylights PolyCarbonate Panels Page 2 PRODUCT RANGE AKYVER is a light and impact resistant insulating Polycarbonate glazing. The 4, 6, 8 and10 mm depth sheets are available in twin

More information

MATERIALS INSTALLATION GUIDE R3000 R4000 W

MATERIALS INSTALLATION GUIDE R3000 R4000 W MATERIALS INSTALLATION GUIDE R3000 R4000 W5000 www.ceimaterials.com Table of Contents 04 04 04 04 05 07 08 09 09 10 11 12 13 14 14 Understanding the Function of Panel Systems Initial Inspection of Building

More information

4257M METALCRAFT INSULATED PANEL SYSTEMS

4257M METALCRAFT INSULATED PANEL SYSTEMS 4257M METALCRAFT INSULATED PANEL SYSTEMS 1. GENERAL This section relates to the fabrication, supply and installation of prepainted steel clad, insulating panels and cladding system for ambient controlled

More information

Cl/SfB 1 (4-) RJ July Cempanel BUILDING BOARD CEMENT PARTICLE BOARD.

Cl/SfB 1 (4-) RJ July Cempanel BUILDING BOARD CEMENT PARTICLE BOARD. Cl/SfB 1 (4-) RJ7 1 1 1 July 2010 Cempanel BUILDING BOARD CEMENT PARTICLE BOARD Cempanel Class 0 cement particle board with excellent impact, fire and acoustic properties. Its durability, consistently

More information

Sheet Metal Protective Films

Sheet Metal Protective Films Sheet Metal Protective Films Protective films manufactured by R-FOLL based on an adhesive polyethylene film are designed for protecting surfaces from mechanical and chemical damage. Our films form a temporal

More information

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 GENERAL REQUIREMENTS 185 FRAMING 185 PLASTERBOARD LAYOUT 189 PLASTERBOARD FIXING 190 EXTERIOR

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE: BioPrism wall cladding must be stored flat and fully supported with no sagging or bowing. The pallets that BioPrism wall cladding are shipped

More information

Textura Façade panel Product information sheet 1

Textura Façade panel Product information sheet 1 Textura Façade panel Product information sheet 1 1 Product range Textura fibre cement facade panels are made from: Portland cement Mineral filler Natural organic fibres (cellulose), synthetic organic fibres

More information

SPECIFICATIONS FOR. CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System. Section Aluminum Composite Panels

SPECIFICATIONS FOR. CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System. Section Aluminum Composite Panels SPECIFICATIONS FOR (1/13 Edition) CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System Section 074243 Aluminum Composite Panels (Based upon CEI Composite Materials R4000

More information

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels Assembly instructions Handling Receiving of goods Check that the material has not been damaged in transit

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Installation Instructions

Installation Instructions Please read all instructions before installing products. STORAGE: BioPrism wall cladding must be stored flat and fully supported with no sagging or bowing. The pallets that BioPrism wall cladding are shipped

More information

Facade panel PICTURA Product Information Sheet

Facade panel PICTURA Product Information Sheet Facade panel PICTURA Product Information Sheet 1 Product range PICTURA fibre cement facade panels are made from: Portland cement Mineral filler Natural organic fibres (cellulose), synthetic organic fibres

More information

Page 1 of 5

Page 1 of 5 SPECIFICATIONS COMPOSITE MATERIAL PANEL SYSTEM ESTOLGA 1000 DRY SEAL SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary

More information

PRODUCT FEATURES. APPLICABLE STANDARDS, RELATED REFERENCES ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

PRODUCT FEATURES. APPLICABLE STANDARDS, RELATED REFERENCES ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials. PRODUCT FEATURES BASIC USES/RELATED USES Interior decorative tile. Architectural tile for decorative wall surfaces, backsplashes and other applications. Custom architectural and décor applications. PRODUCT

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS 1 of 6 INSTALLATION INSTRUCTIONS IMPORTANT! Store the floorboards at room temperature for at least 48 hours, still in their packaging, prior to commencing installation. Ideal room temperature is 18-22

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

Symonite Decorative Panelling

Symonite Decorative Panelling Symonite Decorative Panelling WHY SYMONITE? Symonite is the only Australian manufactured aluminium composite panel. An Australian owned company whose continuous composite panel research and development

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

Installation Instructions

Installation Instructions Warning: Do not remove outer shrink wrapping from the Fire Rated Foam stick until you have read and understand the FULL instructions for proper installation. Failure to follow these directions may degrade

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SECTION 07 42 43 All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SPEC NOTE: Optional text is indicated by square brackets []. Delete unwanted items and

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent. SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

rout & return INSTALLATION GUIDE

rout & return INSTALLATION GUIDE rout & return INSTALLATION GUIDE Effective October 2016 Tech Support: 800.523.2347 LaminatorsInc.com TABLE OF CONTENTS Handling and Maintenance of Omega-Lite Panels 1 System Limitations and Pre-Installation

More information

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N A M E R I C A N A R C H I T E C T U R A L AAMA 2410-13 Standard Practice for Installation of Windows with an Exterior Flush Fin Over an Existing Window Frame M A N U F A C T U R E R S A S S O C I A T I

More information

CLADDING INSTALLATION GUIDE

CLADDING INSTALLATION GUIDE CLADDING INSTALLATION GUIDE CREATE A LASTING IMPRESSION FRIENDLY BUILDING PRODUCT ON THE PLANET INSTYLE TIMBER CLADDING HAS BEEN DEVELOPED TO PROTECT AND BEAUTIFY ANY BUILDING DESIGN OR STYLE. THE FOLLOWING

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 074243- METAL COMPOSITE MATERIAL WALL PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. What are the benefits of Decorative Wall Panels? 2. Where can these decorative panels are used? 3. Are the panels waterproof?

1. What are the benefits of Decorative Wall Panels? 2. Where can these decorative panels are used? 3. Are the panels waterproof? 1. What are the benefits of Decorative Wall Panels? Decorative Wall Panels are made from precision extruded PVC and decorated with unique designs ranging from marble, onyx to wood grain patterns. Other

More information

SECTION TRANSLUCENT PANEL SYSTEM

SECTION TRANSLUCENT PANEL SYSTEM SECTION 084523 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.*** ***This section has been updated to IBC. Verify for specific project conditions.*** PART 1 GENERAL 1.1 SUMMARY ***Edit to project requirements*** A. Section Includes: 1. Clear copper and preweathered copper

More information

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN SECTION 08350 MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 074243 - METAL COMPOSITE MATERIAL WALL PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene INSTALLATION MANUAL METAL INSULATED PANELS -ROXUL -Expanded Polystyrene Insulated Metal Panels London Eco-Metal Manufacturing Inc. **Also see Eco-Metal s Handling Manual** These instructions are provided

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6 DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00

More information

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2 Contents BCA Codes 3 General 4 Fire Performances Thermal and Acoustic Insulation Wall Installation 4 Timber Frame Separation Walls 5 Steel Frame Separation Walls 6 External Fire Rated Walls 7 Floor Installation

More information

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>.

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>. SECTION 074213.23 METAL COMPOSITE MATERIAL WALL PANELS PART 1 GENERAL 1.1 SUMMARY A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary supports and anchors to structure,

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

Impression Graphic panels

Impression Graphic panels Impression Graphic panels Installation Guidelines 6003.I Rev. 02 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to

More information

Installation Instructions For Overly Acoustical / Bullet Resistant Window

Installation Instructions For Overly Acoustical / Bullet Resistant Window 574 West Otterman Street Greensburg, PA 15601 Toll Free: (800) 979-7300 Local: (724) 834-7300 Fax: (724) 830-2871 Email: overly@overly.com DOOR COMPANY Installation Instructions For Overly Acoustical /

More information

Parabond 600 Elastic adhesive sealant with high initial bonding strength.

Parabond 600 Elastic adhesive sealant with high initial bonding strength. Parabond 600 Elastic adhesive sealant with high initial bonding strength. Product: Parabond 600 is an MS-polymer based, durable and fast curing elastic adhesive. Applications: Parabond 600 has a very high

More information

Parabond 600 Elastic adhesive sealant with high initial bonding strength.

Parabond 600 Elastic adhesive sealant with high initial bonding strength. Parabond 600 Elastic adhesive sealant with high initial bonding strength. Product: Parabond 600 is an MS-polymer based, durable and fast curing elastic adhesive. Applications: Parabond 600 has a very high

More information

Installation Instructions

Installation Instructions Installation Instructions Roof edge trim profile Series TA-4F multi-piece extruded aluminium profile front face height series TA-4F: 150-200 mm with patented 4F brackets height-adjustable, horizontally

More information

Bi-Folding Door Installation Guide

Bi-Folding Door Installation Guide Bi-Folding Door Installation Guide Sub Cill Installation: Drainage paths through the sub cill and drainage tray must be left unobstructed by the sub structure and sealing. When applying the frame to the

More information

Resysta Wall Cladding Installation Guidelines

Resysta Wall Cladding Installation Guidelines Resysta Wall Cladding Installation Guidelines NOTE: Proper planning of the wall cladding layout is essential for ease of installation of wall cladding boards and wall cladding components. Thoroughly read

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

SECTION PREHUNG WOOD DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION PREHUNG WOOD DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08 14 00 PREHUNG WOOD DOORS Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2014-2016 ARCAT, Inc. - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. French Doors.

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

Type II Environmental Declaration according ISO 14021:2001/A1:2011

Type II Environmental Declaration according ISO 14021:2001/A1:2011 Type II Environmental Declaration according ISO 14021:2001/A1:2011 Product: Hunter Douglas Panels Module 200-600mm Product code: 26005 Module 601-900mm Product code: 26025 Module 901-1200mm Product code:

More information

COLLEGE OF STATEN ISLAND

COLLEGE OF STATEN ISLAND SECTION 07415 ALUMINUM PLATE CEILING PANELS PART 1 GENERAL 1.01 SUMMARY A. Section Includes 1. The extent of panel system work is indicated on the drawings and in these specifications. The following specification

More information

Absco Premier Garden Shed Assembly Instructions Model: 30232G

Absco Premier Garden Shed Assembly Instructions Model: 30232G Absco Premier Garden Shed Assembly Instructions FRONT: 3.00m SIDE:.6m HEIGHT:.00m 360mm CONCRETE SLAB 3100mm CONCRETE WHEN LAYING YOUR CONCRETE SLAB, ENSURE THERE IS A REBATED EDGE 5mm DEEP AROUND THE

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION METAL WALL PANEL SYSTEM

SECTION METAL WALL PANEL SYSTEM CSI Format for Metal Wall Panel System Specification SECTION 07410 METAL WALL PANEL SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Exterior Metal Plate Wall Panels B. Substructure and Framing C. Structural

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 095133 - ACOUSTICAL METAL PAN CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

This Addendum forms part of the Tender Documents and amends the Tender Documents as described below.

This Addendum forms part of the Tender Documents and amends the Tender Documents as described below. BRAMALEA SECONDARY SCHOOL ARCHITECTURAL ADDENDUM NO. 1 ADULT EDUCATION - CLASSROOM & OFFICE RENOVATIONS PEEL DISTRICT SCHOOL BOARD Tender No. L18-4165 February 23, 2018 This Addendum forms part of the

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

GM-CM30078-RevA. Metalcraft Insulated Panel Systems I Specification Guide V1 NZ I June

GM-CM30078-RevA. Metalcraft Insulated Panel Systems I Specification Guide V1 NZ I June GM-CM30078-RevA Metalcraft Insulated Panel Systems I Specification Guide V1 NZ I June 2017 2 Metalcraft Insulated Panel Systems I Specification Guide V1 NZ I June 2017 INDEX 1. General 2 2. Documents 2

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

Rev. 08 9/15 Please Read Disclaimers:

Rev. 08 9/15 Please Read Disclaimers: NuPoly panels Guidelines 6006.NP Rev. 08 9/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to help prevent any problems

More information

Commercial Flashing Details

Commercial Flashing Details This technical note illustrates many of the most common flashing details for commercial buildings. The purpose for flashing is to direct moisture to the exterior and in so doing, prevent moisture from

More information

a3 CERAMICSTEEL FLOW TECHNICAL GUIDE

a3 CERAMICSTEEL FLOW TECHNICAL GUIDE a3 CERAMICSTEEL FLOW TECHNICAL GUIDE PolyVision a3 CeramicSteel Flow provides an ideal blend of consistent performance, a variety of aesthetic choices and long-term durability. Whether used as a full height

More information

INSTALLATION MANUAL FOR WOOD ALUMINIUM GLAZED STRUCTURES. AILE COto

INSTALLATION MANUAL FOR WOOD ALUMINIUM GLAZED STRUCTURES. AILE COto INSTALLATION MANUAL FOR WOOD ALUMINIUM GLAZED STRUCTURES AILE COto CONTENT 1. Components of a window 3 2. Unloading and storage of elements 3 2.1. On arrival 3 2.2. Storage of windows/ doors 4 2.3. Storage

More information

Wabo FireShield Model: FSH

Wabo FireShield Model: FSH Wabo FireShield Model: FSH Horizontal Expansion Control Fire Barrier System The following installation procedure is very important and must be fully understood prior to beginning any work. To ensure proper

More information

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing Composite Decking Installation Guide Hidden Plastic Clip Fixing Table of Contents SECTION ONE: General Information Site Preparation......2 Site Storage.....2 Safety. 2 Tools....2 Foundation & Sub Structure.2

More information

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION SQUARE SUN TUNNEL INSTALLATION INSTRUCTION Please leave these installation instructions with the owner of the Sun Tunnel. This will enable them to carry out the straightforward maintenance mentioned below.

More information

aquapanel InstallatIon GuIde

aquapanel InstallatIon GuIde Installation Guide AQUAPANEL BEFORE YOU START It s a good idea to stand the AQUAPANEL sheets in the area for 2 days prior to cutting and installing, to allow the sheets to breathe and reach moisture equilibrium.

More information

Siding Installation Manual for: Color Natura Rustica Rivets

Siding Installation Manual for: Color Natura Rustica Rivets Siding Installation Manual for: Color Natura Rustica Rivets 1 Ventilated Siding, Principle For easy handling of the Panels use when mounting Ventilated Siding systems consist of five main components: 1

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 095113-1 SECTION 095113 - PART 1 - GENERAL 1.1 M.S.U. ISSUES 1. It the intent of MSU that all joint sealants used on its projects will comply with LEED NC 3 Credit Requirements

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

SPECIFICATION. ~ (project name) ~ (project address) ~ (owners name)

SPECIFICATION. ~ (project name) ~ (project address) ~ (owners name) SPECIFICATION of work to be done and materials to be used in carrying out the works shown on the accompanying drawings ~ (project name) ~ (project address) ~ (owners name) Job Number: ~ Date: ~ 4257MO

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

Installation Instructions

Installation Instructions Note: Seals are delivered in either wooden reels or large steel reels depending on order size and contractor storage ability. Store reels under a tarpaulin (tarp) to keep the seals clean and free from

More information

Aluminum Composite Panel for Architecture

Aluminum Composite Panel for Architecture Aluminum Composite Panel Aluminum Composite Panel for Architecture PIVOT DECORATIVE MATERIALS CO., LTD. Brief Introduction IBOND---The Professional Supplier of Aluminum Composite Panel Technology Applications

More information

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: If you require a Walk In shower base for timber floors, please go to our support page at www.hydroblok.com.au IMPORTANT:

More information

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>.

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>. SECTION 074213.23 METAL COMPOSITE MATERIAL WALL PANELS PART 1 GENERAL 1.1 SUMMARY A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary supports and anchors to structure,

More information

Pilkington Suncool One Handling and Processing Guidelines

Pilkington Suncool One Handling and Processing Guidelines Pilkington Suncool One Handling and Processing Guidelines Pilkington Suncool One * As Pilkington Suncool One 30/21 is a darker and more absorbing product we recommend using it in a toughened format to

More information

DRY SEAL INSTALLATION GUIDE

DRY SEAL INSTALLATION GUIDE DRY SEAL INSTALLATION GUIDE Effective September 2015 Tech Support: 800.523.2347 LaminatorsInc.com TABLE OF CONTENTS Handling and Maintenance of Omega-Lite Panels 1 System Limitations and Pre-Installation

More information

Arcwall. Rain Screen Wall System

Arcwall. Rain Screen Wall System Rain Screen Wall System is an economical drained and back-ventilated rain screen system for both walls and soffits manufactured from formed aluminum or stainless plate. The system combines excellent performance

More information

INSTALLATION INSTRUCTIONS LAMINATE

INSTALLATION INSTRUCTIONS LAMINATE INSTALLATION INSTRUCTIONS LAMINATE DROP LOCK GENERAL INSTRUCTIONS FOR LAMINATE HARDWOOD FLOORING ACCLIMATION Acclimation is a recommended procedure prior to installation of laminate flooring either on

More information