1 Precision HSS Connection System For Modular Buildings by Entire contents protected by Copyright. US and International Patents Pending

2 Stacked and Bundled Vectorbloc Systems Explained! Entire contents copyright February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending

3 Because loads in a building vary, Vectorblocs are designed to support a wide range of column configurations This means that the minimum of steel and labour can be used to build a member which suits specific load conditions Each bolt in the standard connector series has a clamping strength of 60kips, so a group of 8 delivers over 400 kips, adequate for buildings well over 30 stories

4 Vectorbloc offers two ways to build modules, which we call Stacked and Bundled. The stacked system scales with load using modules with progressively larger HSS, while the bundled system adds horizontal tiers of HSS in ever wider assemblies. These wide assemblies also function as shear walls. Top: Stacked Bottom: Bundled Vector Praxis production office

5 The two systems are interchangeable, so designers can select the connection and member configuration that best suits each project, or even each part of a project.

6 Stacked Typical details

7 Typical transition block 4 x 4 to 6 x 6

8 The structural bundling of columns is similar to the story of the boy who was challenged to break a bundle of sticks and found it impossible because a group of members acting together are stronger than the sum of the parts..

9 Robust groupings can be created using one size of HSS welded corner to corner and joined in groups with flat-bar ears.

10 Bundled Typical details

11 Bundled Typical details

12 A Vectorbloc building designer using FEA software selects the column configuration that best suits the loading on each module. Section transitions

13 By joining bundled columns in adjacent modules, configurations ranging from a 24 lbs / foot grouping of 4 x 4 HSS, to massive built-up columns weighing over 400 lbs per foot, can all fit in a 10-1/2 wall

14 Vectorbloc Concept Building February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending

15 By examining a Vectorbloc-based concept building we can better understand the practical application of the Vectorbloc structural system

16 Vectorbloc concept building: Renders

17 Apartment buildings and condominiums are highly optimized and every square foot is utilized. Vectorbloc s bundled column reduces lost GFA by packing load-bearing structures in to the wall cavities, eliminating inconvenient bumpouts Plan of typical floor

18 Lateral brace frames (blue) are concentrated in the party walls, while the longitudinal system (pink) is loaded in to areas where the diagonal bracing does not obstruct openings Brace locations

19 Minimizing module size variants is not essential, but it is desirable Module size matrix

20 Vectorbloc sectional frame elevations showing conventionallyconstructed parking structure, podium and transfer beams

21 Vectorbloc Frame

22 Typical twomodule grouping

23 Typical two module grouping with finishes and furnishings

24 Typical single module frame construction

25 The brace frame is created when modules are interconnected to unite the integral diagonal bracing in the modules. Bracing can be integrated in locations such as the party walls, elevator shafts and stairwells.

26 Lateral Frame

27 Deep spandrel beams can be integrated in to the framing if required to eliminate diagonal bracing which obstructs openings Frame Details

28 The longitudinal brace frame is created on the upper floors by interconnecting modules to combine the moment action of the module frames. On lower floors, bracing is added to the shaft, stairwell and hallway modules. Longitudinal Frame

29 Vectorbloc modules incorporate the ideal vertical load bearing capacity at each level in the building, they provide a moment connection and they are interconnected connected horizontally. As a result, a separate brace frame or brace tower can be eliminated, saving valuable space and reducing construction complexity.

30 Vectorbloc Prototypes 3D Printing Casting and Machining February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending

31 Investment casting and machining

32 Checks of material quality, alignment and dimensions

33 Complete prototype of typical connection with cutaways

34 Prototype of typical module with detail of fireproofing and baseboard leave-out at Vectorbloc connection

35 Vectorbloc The sky s the limit Links to chatter about Vectorbloc and related subjects: comments/can_vectorblocs_patented_buildi ng_system_make_cities_more_energy_effic ient#.vcxab_ldu9j cated-broadway-stack-project-makes-headway/ -dispute-over-stalled-modular-tower.html

36 Disclaimer The Vectorbloc, Vectorig, Vectorloc, Vectorjig and Vectorsight systems, together with all derivatives and related consulting services (collectively the Vectorbloc Modular Construction System) are not standalone, pre-engineered and pre-qualified systems that can be used without the input, supervision and approval of professionals with appropriate experience and qualifications and who are licensed and insured in the applicable jurisdiction. It is the sole responsibility of the purchaser and / or user to determine the applicability of the system and its components and derivatives for any application. Prior to conceiving, designing, fabricating or erecting a structure of any kind using any of the above noted systems or their derivatives, the user must contract the services of any and all third-party licensed architects, engineers and all other professionals such as code consultants, welding inspectors and mechanical designers as may be required to properly conceive, design, engineer, erect and supervise work on the structure. Additionally, it is the responsibility of the user to determine what laws, standards and building codes apply to a project before, during and following construction and to seek and obtain all applicable evaluations, inspections and approvals required by all authorities and entities having jurisdiction. In this context the images and descriptions of the Vectorbloc Modular Construction System provided by Vector Praxis, its principals, employees, agents and subcontractors are entirely conceptual in nature. Vector Praxis makes no warranty for the fitness of the Vectorbloc Modular Construction System for any application and both Vector Praxis and its insurers disclaim all liability for the use of the Vectorbloc Modular Construction System by any user. Entire contents protected by Copyright US and International Patents Pending END

FrameFast Shoring System

FrameFast Shoring System FrameFast FrameFast Shoring System The FrameFast shoring system is engineered for maximum strength, labor productivity and reuse capabilities. FrameFast components feature high strengthto-weight ratios.

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

Standard Duty Cantilever Rack Installation and Assembly Guide

Standard Duty Cantilever Rack Installation and Assembly Guide Standard Duty Cantilever Rack Installation and Assembly Guide Steel King Industries, Inc. 2700 Chamber St Stevens Pont, WI 54481 (800) 826 0203 www.steelking.com info@steelking.com ASSEMBLY INSTRUCTIONS:

More information

Spring Hill Suites Marriott

Spring Hill Suites Marriott Spring Hill Suites Marriott Project Location: Amarillo, TX Prepared for: Girder Slab Technologies Contact: Daniel Fisher, Sr. January 15, 2008 Prepared by: Monica Stockmann Regional Engineer: Erika Winters-Downey

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

Detailer Training Series Instructions

Detailer Training Series Instructions Instructions Print this document to track your progress throughout the course (pages 2-15). Overview The DTS program provides an introduction and overview of the roles and responsibilities of the steel

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

Structural Technical Report #2 By Robert Whitaker

Structural Technical Report #2 By Robert Whitaker Structural Technical Report #2 By Robert Whitaker Robert Whitaker Structural ~ Parfitt Parkview at Bloomfield Station Bloomfield, NJ 10-31-05 Executive Summary This report covers the comparative redesign

More information

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical

More information

MITRE 3 Building McLean VA

MITRE 3 Building McLean VA Executive Summary: The MITRE 3 building is an eight story office building. Its current frame is composed of A992 wide flange shapes. The lateral resisting system is a moment frame. This moment frame consists

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

PRESENTATION CENTER SURREY, BC CANADA

PRESENTATION CENTER SURREY, BC CANADA PRESENTATION CENTER SURREY, BC CANADA 1 VIEW OF THE PROPOSED OPTIMA 3 TOWERS (AFTER OBTAINING THE HIGH DENSITY THAT IS UNDER STUDY) ALONG WEST WHALLEY RING ROAD 2 3 IHI WILL BUILD THE OPTIMA PRESENTATION

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement

More information

Council on Tall Buildings

Council on Tall Buildings Structure Design of Sino Steel (Tianjin) International Plaza Xueyi Fu, Group Chief Engineer, China Construction Design International 1 1 Brief of Project 2 Location: Tianjin Xiangluowan Business District

More information

ENGN 1380 Design Project

ENGN 1380 Design Project ENGN 1380 Design Project The Indy Residence Hall and Parking Garage at Brown University Knowledge District Campus Pikanstruction Inc. Arnold and Ives Street Providence, RI 02912 T 4018156955 pokemon@pikanstruction.edu

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

Frequently Asked Questions. ConX Modular Pipe Rack

Frequently Asked Questions. ConX Modular Pipe Rack Frequently Asked Questions ConX Modular Pipe Rack Product...3 1. How does the ConX System compare to conventional design in pipe rack applications?...3 2. How does the ConX System compare cost-wise to

More information

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools Table of Contents Executive Summary...2 Introduction...3 Structural Systems Foundation System...4 Gravity System...6 Lateral System...7 Problem Statement...9 Proposed Solution...10 Breadth Topics...11

More information

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 12.16.2002 THESIS PROPOSAL Executive Summary Architecture The Plaza at PPL

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections Statement Date: Project Name: Building Permit Number: Project Address: Design Professional in Responsible Charge (DPIRC): The following information is being submitted in

More information

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES CHAPTER 2 RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES 2.1 PURPOSE The purpose of this chapter is as follows: 2.1.1 To define and draw attention to the typical duties

More information

Identification of Structural Issues in Design and Construction of Multi- Story Modular Buildings

Identification of Structural Issues in Design and Construction of Multi- Story Modular Buildings Identification of Structural Issues in Design and Construction of Multi- Story Modular Buildings Issa J. Ramaji 1 and Ali M. Memari 2 1 Ph.D. Candidate, Department of Architectural Engineering, Penn State

More information

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038) ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO

More information

Shoring and Reshoring Fundamentals

Shoring and Reshoring Fundamentals Shoring and Reshoring Fundamentals by Mary Bordner Tanck, PE SHORING AND RESHORING FUNDAMENTALS Because it has such a significant impact on schedule and material movements, it is important for everyone

More information

High Piled Combustible Storage Guideline

High Piled Combustible Storage Guideline Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage

More information

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Executive Summary The proposed thesis will include an investigation of two different alternative structural

More information

Non-Structural Isolation QUAKEBASE - PLATFORMS - 3D ISOLATION - FLOORS - MODULAR SYSTEMS

Non-Structural Isolation QUAKEBASE - PLATFORMS - 3D ISOLATION - FLOORS - MODULAR SYSTEMS Non-Structural Isolation QUAKEBASE - PLATFORMS - 3D ISOLATION - FLOORS - MODULAR SYSTEMS Dynamic Isolation Systems DIS is the World Leader in Seismic Isolation - no other company has completed more isolation

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Totaling approximately 617,000

Totaling approximately 617,000 Totaling approximately 617,000 sq. ft, the mixed-use Embassy Suites hotel development is among the largest of several newly built hotels in the business district adjoining New York s bustling Wall Street

More information

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code. SECTION 05400 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION CLIMBING WALLS

SECTION CLIMBING WALLS SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

Best Buy Corporate Building D (4) Richfield, MN

Best Buy Corporate Building D (4) Richfield, MN Best Buy Corporate Building D (4) Thesis Proposal Professor Boothby December 12 th, 2008 Executive Summary: The Best Buy Corporate Building D is a 6 story building with a total area of 304,610 square feet.

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

INSTRUCTOR: ANNE NICHOLS

INSTRUCTOR: ANNE NICHOLS INSTRUCTOR: ANNE NICHOLS General information Location: Hong Kong, China General information BANK OF CHINA Architect I. M. Pei Structural engineer Leslie Robertson Height from street to roof 1028ft (367.4

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION SEISMIC CONTROL OSHPD

SECTION SEISMIC CONTROL OSHPD SECTION 01451 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all required seismic restraints and calculations in order to insure that the installation of all architectural, mechanical, and electrical equipment/components

More information

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign

More information

SJI Code of Standard Practice

SJI Code of Standard Practice Standard Practice CODE OF STANDARD PRACTICE FOR STEEL JOISTS AND JOIST GIRDERS SECTION 1 GENERAL 1.1 SCOPE Adopted by the Steel Joist Institute April 7, 1931 Revised to May 18, 2010 - Effective December

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Quality Control And Fabrication Manual Metal Stud Crete Metal Stud Crete Metal Stud Crete

Quality Control And Fabrication Manual Metal Stud Crete Metal Stud Crete Metal Stud Crete Metal Stud Crete Composite Concrete Panel System 6232 Santos Diaz Street Irwindale, California 91702-3267 (626) 334-6100 ext 229, FAX (626) 334-6106 E-Mail: paul@metalcrete.com Quality Control And Fabrication

More information

Design Example 2 Reinforced Concrete Wall with Coupling Beams

Design Example 2 Reinforced Concrete Wall with Coupling Beams Design Example 2 Reinforced Concrete Wall with Coupling Beams OVERVIEW The structure in this design example is a six story office building with reinforced concrete walls as its seismic force resisting

More information

Aluminum Beam Gang System

Aluminum Beam Gang System Aluminum Beam Gang Aluminum Beam Gang System Symons Aluminum Beam Gang Forming System offers computer-optimized aluminum beams with an extremely high strength-toweight ratio. The unique beam attachment

More information

Tech Tips SidePlate Connections FAQ 09/30/2017

Tech Tips SidePlate Connections FAQ 09/30/2017 Tech Tips SidePlate Connections FAQ 09/30/2017 Page 1 of 15 Introduction to SidePlate Connection Technology SidePlate Connection Technology is ideally suited to protect structures against seismic events,

More information

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E. The courthouse exterior. Courtesy of NLA/HLM Architects. United States Courthouse Sacramento, Robert D. McCartney, S.E. CA Modern Steel Construction / November 2001 Public entrances to courtrooms occur

More information

Industry Standard Terms & Definitions Of The Steel Deck Institute

Industry Standard Terms & Definitions Of The Steel Deck Institute Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass

Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass Dexco Cantilever Rack Systems offer the strength, durability and layout to store

More information

Modular Wood Framing Goes Vertical

Modular Wood Framing Goes Vertical Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

Wide Span Shelving M66

Wide Span Shelving M66 Wide Span Shelving M66 Innovation Technology Knowledge FOCO Lager- und Fördertechnik AG 4147 Aesch Beratung Telefon 061/ 756 26 00 Telefax 061/ 756 26 56 E-mail: info@foco.ch Internet: www.foco.ch Planung

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS 1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999. DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker

More information

DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM. By Pierre Gignac, P.Eng.

DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM. By Pierre Gignac, P.Eng. DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM By Pierre Gignac, P.Eng. June 2010 1 TABLE OF CONTENTS Diaphragm action at the roof level

More information

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system. APPENDIX B. LOAD FRAME This Appendix will describe the philosophy in the design and operation of the loading system. LOAD FRAME The large-scale gusset plate testing required a unique loading fixture. A

More information

CODE OF STANDARD PRACTICE

CODE OF STANDARD PRACTICE CODE OF STANDARD PRACTICE FOR STEEL JOISTS AND JOIST GIRDERS SECTION 1. GENERAL 1.1 SCOPE Adopted by the Steel Joist Institute April 7, 1931 Revised to Nov. 10, 2014 - Effective Jan.1, 2015 The practices

More information

Franklin Square Hospital Center Patient Tower

Franklin Square Hospital Center Patient Tower Thomas Weaver Structural Option Franklin Square Hospital Center Patient Tower Baltimore, MD Thomas Weaver Structural Option AE 481W Senior Thesis Consultant: Professor M. Kevin Parfitt 12/14/2009 Page

More information

Overview of the tubular test tower

Overview of the tubular test tower Chapter 5 Overview of the tubular test tower This chapter gives an overview of a new proposed tower cross arm and also discusses the connections used in the design and fabrication of the tubular test tower.

More information

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS Standard ADOPTED 1939; ADVANCED TO STANDARD, 1945. PREFACE The specifications have been prepared on the basis that they will be used

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Non-rated Curtain Wall Rated Concrete Floor Assembly

Non-rated Curtain Wall Rated Concrete Floor Assembly 2.4 PERIMETER FIRE CONTAINMENT PERIMETER FIRE BARRIER SYSTEMS A Perimeter Fire Barrier System is a specific assembly consisting of a fire resistance rated or non resistance-rated wall, the adjacent fire

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

FRICTION DAMPERS FOR SEISMIC UPGRADE OF A 14-STORY PATIENT TOWER WITH A 36-FOOT TALL SOFT-STORY

FRICTION DAMPERS FOR SEISMIC UPGRADE OF A 14-STORY PATIENT TOWER WITH A 36-FOOT TALL SOFT-STORY FRICTION DAMPERS FOR SEISMIC UPGRADE OF A 14-STORY PATIENT TOWER WITH A 36-FOOT TALL SOFT-STORY Dihong Shao, P.E., S.E. 1 Avtar Pall, PH.D. P.E. 2 Bharat Soli, P.E., S.E. 3 ABSTRACT The 14-story tower

More information

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

PRE-CAST HOUSE CONSTRUCTION

PRE-CAST HOUSE CONSTRUCTION PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads

More information

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Preparation of Seismic Design Manuals for Earthquake Disaster Mitigation Volume 1 HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Part I: A house and its behavior during earthquake A House? How

More information

Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage

Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage Contents About Colby Why use Drive-In Rack? Drive-In Rack Advantages The Colby DI Rack System Application Examples 2 About Colby

More information

WHITE PVC TRELLIS ASSEMBLY INSTRUCTIONS

WHITE PVC TRELLIS ASSEMBLY INSTRUCTIONS WHITE PVC TRELLIS 91761 ASSEMBLY INSTRUCTIONS 391 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at http://www.harborfreight.com Copyright 00 by Harbor Freight Tools. All rights reserved. No

More information

Reading. Between. the Lines

Reading. Between. the Lines Reading Between the Lines by Annie Vodenicharska, Derek Barnes and Stephen Capone A new library in East Boston is the focal point of a park that sits between a residential neighborhood and the waterfront,

More information

Item 442 Metal for Structures

Item 442 Metal for Structures Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings

More information

WELCOME TO THE PILE DRIVING INSPECTOR COURSE

WELCOME TO THE PILE DRIVING INSPECTOR COURSE Lesson 1 WELCOME TO THE PILE DRIVING INSPECTOR COURSE 1-1 Welcome to the Pile Driving Inspector Course. This is a course designed to assist students to understand the specifications and inspection practices

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

2016 Port of San Francisco Building Code

2016 Port of San Francisco Building Code PORT CODE PROCEDURE NO. : DATE : December 5, 2012 SUBJECT : Permit Process; Inspection TITLE : Special Inspection and Structural Observation Procedures PURPOSE : The purpose of this Port Code Procedure

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

Large cable sizes stronger than pipe/strut

Large cable sizes stronger than pipe/strut Legrand Seismic Wire Rope/Cable Bracing is the recommended seismic bracing for Legrand wire mesh and ladder tray systems. It is UL Listed, complies with all building codes and standards, and offers significant

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

CONCRETE & MASONRY SAFETY

CONCRETE & MASONRY SAFETY CONCRETE & MASONRY SAFETY Safety and Quality Relationship REINFORCING MISS-PLACED IN CONCRETE RESULTS IN WEAKEN STRUCTURE IMPROPER PLACEMENT OF LINTEL BEAMS INCORRECT MASONRY CEMENT OR GROUT MIX DESIGN

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Presentation notes: Ibis Hotel Case study evening 27 May 2014 Andre Vreugdenburg, Principal Structural Engineer, PT Design

Presentation notes: Ibis Hotel Case study evening 27 May 2014 Andre Vreugdenburg, Principal Structural Engineer, PT Design Presentation notes: Ibis Hotel Case study evening 27 May 2014 Andre Vreugdenburg, Principal Structural Engineer, PT Design INTRODUCTION SLIDE 1 IMAGE OF IBIS HOTEL Welcome everyone. Ibis is the brand name

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

Michael R. Lockwood Construction Management National Museum of the Marine Corps Quantico, VA

Michael R. Lockwood Construction Management National Museum of the Marine Corps Quantico, VA Soil Retention System Design and Analysis Executive Summary The National Museum of the Marine Corps has a unique design element that portrays an image that the building is built underground. In order to

More information

Hilton Baltimore Convention Center Hotel Western Podium

Hilton Baltimore Convention Center Hotel Western Podium Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Thesis Proposal TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..

More information

THE BRACE CONNECTION THE BOLTED OPTION FIGURE 1 MODEL SHOWING THE BOILER AND THE STRUCTURAL SUPPORT SYSTEM (BOILER BUILDING)

THE BRACE CONNECTION THE BOLTED OPTION FIGURE 1 MODEL SHOWING THE BOILER AND THE STRUCTURAL SUPPORT SYSTEM (BOILER BUILDING) Comparative Study of Bolted versus Welded SCBF Connections Authors: Robert P. Krumpen III P.E., Bechtel Corporation, rpkrumpe@bechtel.com Dr. Peter J. Carrato P.E. S.E., Bechtel Corporation, pcarrato@bechtel.com

More information

BUILDING STRENGTH ACCUBRACE TOTAL BRACING SYSTEM CONCRETE CONSTRUCTION SOLUTIONS

BUILDING STRENGTH ACCUBRACE TOTAL BRACING SYSTEM CONCRETE CONSTRUCTION SOLUTIONS BUILDING STRENGTH ACCUBRACE TOTAL BRACING SYSTEM CONCRETE CONSTRUCTION SOLUTIONS A Total Bracing System An integrated, in-line total bracing system designed to decrease labor costs and increase project

More information

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 7012 South Revere Parkway Suite 140 Centennial, Colorado 80112 Telephone (303) 792-9559 http://www.aitc-glulam.org AITC 115-2009 STANDARD FOR FABRICATED STRUCTURAL

More information

INS T A LLA T I O N G U I D E

INS T A LLA T I O N G U I D E INS T A LLA T I O N G U I D E TENSAR GEOGRIDS The System is a costeffective and easy-to-install alternative for projects with grade changes. The System owes its long-term performance and durability to

More information

Executive Summary Thesis Proposal

Executive Summary Thesis Proposal Executive Summary Thesis Proposal The Renick Education Building located on campus at North Carolina A&T State University in Greensboro, NC is a braced frame steel structure with concrete shear walls. The

More information

Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States

Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States Dan Sloat 1, Charles W. Roeder 2, Dawn E. Lehman 3, and Jeffrey W. Berman 4 1 Graduate Student, Dept. of

More information

Types Of Roofs - Vault

Types Of Roofs - Vault 1 Types Of Roofs - Vault Implementation Of the Concrete On Vault Implementation Of Vault Earthquake Damage 2 Types Of Roofs - Joist And Block 3 Types Of Coverage Roofs-Composite 4 5 Building Structure

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

INNOVATION IN PROP DESIGN. For propping enquiries Australia wide call:

INNOVATION IN PROP DESIGN. For propping enquiries Australia wide call: Propping Equipment INNOVATION IN PROP DESIGN A leader in innovative design, Coates Hire has designed the Universal Prop System 30 and 60 to meet challenging applications. Able to prop up to 30 and 60 tonne

More information

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format Basic Construction of the CANADACAR System The CANADACAR System is a prefabricated, engineered and constructed freestanding parking garage structure that utilizes superior technology combining pre-cast

More information