Innovations in Affordable Housing:
|
|
- Hilda Robbins
- 6 years ago
- Views:
Transcription
1 Innovations in Affordable Housing: The Hook & Ladder Project (Minneapolis, Minnesota) 10 th Annual Growing Sustainable Communities Conference October 3, 2017
2 Kevin Carroll Principal Project Coordinator Business Development Division Minneapolis Dept. of Community Planning and Econ. Dev (office) (cell)
3
4 Project Details 118 units of affordable, workforce housing (for incomes at or below 60% AMI) Development team includes Newport Partners, Landon Group, LHB (architects) and Precipitate (architects) Two apartment buildings with 59 units each Same number and mix of unit types in each building: 50% 1-bedroom, 50% 2-bedroom and 3-bedroom One of the two building will be conventional construction The other building will have Passive House elements
5 What does Passive House mean? Let s break that down: Passive
6 Passive voice?
7 Passive Aggressive?
8
9 Passive house?
10 Passive House II?
11 Passive Principles Minimize Loss/Gain Continuous Insulation Air-Tight Construction Proper location and durability of air barrier and vapor retarder High Performance Windows/Doors Optimize solar gain and shading Minimize overheating in winter Balanced Ventilation (ERV) Minimized Space Conditioning
12
13 Passive building comprises a set of design principles used to attain a quantifiable and rigorous level of energy efficiency within a specific quantifiable comfort level. Maximize your gains, minimize your losses.
14 A passive building is designed and built in accordance with five building-science principles: Employs continuous insulation throughout its entire envelope without any thermal bridging. Uses a building envelope that is extremely airtight, preventing infiltration of outside air and loss of conditioned air. Employs high-performance windows (typically triple-paned) and doors. Uses some form of balanced heat- and moisture-recovery ventilation and a minimal space conditioning system. Manages solar gain to exploit the sun's energy for heating purposes in the heating season and to minimize overheating during the cooling season.
15 Passive building principles can be applied to all building typologies from single-family homes to multifamily apartment buildings, offices, and skyscrapers. Passive design strategy carefully models and balances a comprehensive set of factors including heat emissions from appliances and occupants to keep the building at comfortable and consistent indoor temperatures throughout the heating and cooling seasons.
16 So where is the Hook & Ladder Passive House project?
17 It s in MINN-uh-SO-da
18 Here are our counties. We ve got a bunch of em.
19 The Hook & Ladder project is in the 7- county metro area, which includes the Twin Cities of Minneapolis (the largest city in the state) and St. Paul (the state capitol).
20 This shows the major regions of the City of Minneapolis. The Hook & Ladder project is in Northeast Minneapolis (shaded in yellow)
21 Northeast Minneapolis is a gathering place for the City s artists and art-related businesses
22
23
24 Art-A-Whirl Exhibition
25 Art-A-Whirl Concert
26
27 Hook and Ladder s site plan includes both private and public open space. The southern portion of the site features green space set back from the buildings and adjacent to a public trail. Place-making components will be incorporated, including public art, landscaping, and seating. An open space in the middle of the site will serve the apartment residents. The building interior will include exhibit space for artists residing at Hook and Ladder. Tenant common space will include an exercise room, management office and both indoor and outdoor gathering spaces. Hook and Ladder will incorporate sustainable, energy-efficient building techniques far beyond conventional affordable housing. One of the two new buildings will be designed to achieve Passive House (PH) certification. The buildings will be nearly identical in floor plans, unit mix and tenant population. This will provide a long-term, side-by-side analysis of the cost benefits of PH.
28
29
30
31
32
33
34
35
36 City Assistance? Yes! Awarded, 2016: Hennepin County ERF Grant -- $71,994 Awarded, 2016: Metropolitan Council TBRA Grant -- $211,610 Awarded, 2016: Metropolitan Council LCDA Grant -- $1,300,000 Pending, 2017: Hennepin County ERF Grant -- $300,000
37 Brownfield Grants What is a brownfield? The term brownfield site means real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant. --Section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601)
38 Greenfield Development: Rosemount Business Park
39 Brownfield Grants: Primary Funding Sources Environmental Protection Agency [EPA] State of Minnesota -- through DEED, the Department of Employment and Economic Development Metropolitan Council -- through its Tax Base Revitalization Account [TBRA] program; also provides general development funding through its Livable Communities Demonstration Account [LCDA] Hennepin County through its Environmental Response Fund [ERF] program Ramsey County through its Environmental Response Fund [ERF] program
40 DEED (since 1995) Brownfield Funding: Grants Awarded To City of Minneapolis To Date Grantor Metropolitan Council TBRA [Tax Base Revitalization Account] (since 1996) Hennepin County ERF [Environmental Response Fund] (since 2001) Number of Grants Grant Funding Awarded 385 $136,736, $100,557, $ 44,040,900 TOTAL: 1063 $281,334,896
41 Brownfield Grant Funding: Where can the funds be used? Grantor DEED Metropolitan Council TBRA Hennepin County ERF Ramsey County ERF Statewide Jurisdiction 7-county metro area (city must be participating in the Livable Communities Program) City of Minneapolis and suburban Hennepin County City of St. Paul and suburban Ramsey County
42 Grantor Brownfield Grant Funding: How much is typically awarded per year?? Spring Round (May 1 application deadline) Fall Round (November 1 application deadline) Total DEED $4.0 million $4.0 million $8.0 million Metropolitan Council TBRA Hennepin County ERF $2.5 million $2.5 million $5.0 million $1.5 million $1.5 million $3.0 million TOTAL $8.0 million $8.0 million $16.0 million
43 Brownfield Grant Funding: Who can apply? DEED Grantor Eligible Applicants Cities, counties, local public development authorities Metropolitan Council TBRA Hennepin County ERF Cities, counties, local public development authorities Cities, counties, local public development authorities, private and non-profit developers
44 Brownfield Grants: Eligible Costs Phase I Environmental Site Assessments [ESAs] Phase II Environmental Site Assessments [ESAs] Preparation of Response Action Plans [RAPs] Hazardous materials assessments (some grantors) Remediation [cleanup] of soil and/or groundwater contamination Soil vapor mitigation Abatement of asbestos and/or lead-based paint (some grantors) Demolition (some grantors, some situations)
45 Brownfield Grants: Eligible Projects Industrial Commercial (office, retail, etc.) Multi-Family Housing (affordable & market rate; rental and ownership) Mixed-Used Park and Open Space (Hennepin County only)
46 Increase in property tax base New and/or retained jobs New affordable housing units Brownfield Grants: Funding/Scoring Considerations Significant contamination cleanup (public health) Perceived project readiness Proximity to public transit and regional parks/trails On-site stormwater management Sustainability features/attributes
47 Passive Principles Minimize Loss/Gain Continuous Insulation Air-Tight Construction Proper location and durability of air barrier and vapor retarder High Performance Windows/Doors Optimize solar gain and shading Minimize overheating in winter Balanced Ventilation (ERV) Minimized Space Conditioning
48 Massing Minimizing surface area minimizes opportunity for heat transfer However, a narrower building will have better access to daylight and opportunity for solar control
49 Orientation Control how the sun interacts with your building Generally, a building with an east-west axis (+/- 15 ) allows for control of southern sun and minimizes east and west sun exposure north
50 Air-Tight Construction Top strategy for reducing energy consumption, but difficult to achieve Blower door tests before insulating aid in finding gaps PHI pa PHIUS cfm/sf 50 pa Holtkamp Heating & A/C, Inc. DOE site
51 Windows Size+Placement Glazing used for solar gain should be located on south, with less glazing to north, east, and west
52 Windows - Shading High summer sun is blocked from entering Lower winter sun enters windows, where it warms the space Sun must be stopped before it hits glazing interior blinds are not as effective summer winter
53 Windows Type Minimize U-Value (comfort vs. heat loss) Maximize Solar Heat Gain Coefficient on South
54 Energy Recovery Ventilation (ERV) Airtightness requires ventilation even when outside conditions are not ideal ERVs transfer heat to or from makeup air depending on the season Minimize space conditioning Michelle Penn, AIA Authenticity, LLC
55 Local Examples
56 BioHaus 2006 Concordia Language Villages, Bemidji, MN Intep (Stephan Tanner) PHI Certification Climate zone: 7 Heating load: 4.56 kbtu/(sf yr) Source energy: 26 kbtu/(sf yr) Air tightness (ACH50): ,316 Treated SF Cal Rice
57 Isabella Eco Home 2009 Ely, MN Nancy Schultz Certified Passive House, LEED Platinum Climate zone: 7 Air tightness (ACH50): 0.5 2,134 SF, 1,699 Treated SF Carly Coulson
58 Bagley Nature Center 2010 UMN Duluth, MN Salmela Architect LEED Platinum Climate zone: 7 Heating load: 4.56 kbtu/(sf yr) Source energy : 36 kbtu/(sf yr) Air tightness (ACH50): ,550 Treated SF Salmela Architects
59 Passive House in the Woods 2010 Hudson, WI TE Studio Passive House, PHIUS+, Minnesota GreenStar Gold Climate zone: 6 Heating load: 3.85 kbtu/(sf yr) Source energy (design): 20 kbtu/(sf yr) Air tightness (ACH50): ,940 SF, 1,770 Treated SF Chad Holder Photography
60 Habitat for Humanity Zero Energy Home 2011 UMN Lucas Alm Habitat for Humanity Princeton, MN 1,119 GSF $109,865 construction cost Learn more at gyandarchitecture.org/
61 Passive House Background
62 Passive House Development Milestones
63 Passivhaus Certification Criteria
64 Passive House Institute US (PHIUS) DOE-funded research in partnership with Building Science Corporation NREL BEopt optimizes upgrade package by climate
65 Climate-Specific Criteria
66 Windows Type Minimize U-Value (comfort vs. heat loss) Maximize Solar Heat Gain Coefficient on South
67 Climate-Specific Criteria
68 PHIUS+ Certification
69 Certification Criteria Comparison
70 PHIUS Criteria
71 Designing a Passive Building
72 Check Compliance and Troubleshoot
73 Integrated Approach Critical to Success Material Costs Construct -ability Air-tightness Windows + Doors Cost + Financing Mechanical Systems Energy Demand Assemblies Assemblies Program Site + Climate Massing + Orientation
74 PHIUS Criteria
75 Kevin Carroll Principal Project Coordinator, Business Development Division Minneapolis Dept. of Community Planning and Econ. Dev (office) (cell)
High-Performance Wood Structures: An Example of Increased Efficiency in Multi- Family Construction
High-Performance Wood Structures: An Example of Increased Efficiency in Multi- Family Construction Presented by: Michelle Apigian AIA, LEED AP, AICP, CPHC Disclaimer: This presentation was developed by
More informationPassive Design Solutions. Passive House The Road to Net-Zero
Passive House The Road to Net-Zero Net-Zero into the Future Net-Zero defined as producing as much energy onsite as the building uses annually. Using net-metering with the grid, so grid is acting as 100%
More informationPASSIVHAUS Designed for you to enjoy maximum comfort with minimum energy.
PASSIVHAUS Designed for you to enjoy maximum comfort with minimum energy. + Energy efficiency + Savings +Comfort WHAT IS PASSIVHAUS? The Passivhaus (Passive House) standard is the most stringent international
More informationPassive House and Advanced Energy Efficient Homes. Passive House Construction: CERTS Conference February
Passive House and Advanced Energy Efficient Homes Passive House Construction: CERTS Conference February 2013 1 What is Passive House? A type of certification that recognizes energy performance. It is based
More informationMultifamily Passive House: Into the Weeds
Multifamily Passive House: Into the Weeds Controlling Cooling Loads in Multifamily Passive House Jordan Dentz, Vice President, PHI CPHC Thomas Moore, PHIUS CPHC The Levy Partnership, Inc., New York City
More information14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction
Project Documentation 1 Abstract R-951 Residence: Three Family Passive House Building 1.1 Data of building Year of construction U-value external wall/ U-Wert Außenwand 2013 0.112 W/(m²K) Space heating
More informationPHIUS+2015 CLIMATE SPECIFIC PASSIVE BUILDING STANDARD: Cliff Notes PATHWAY TO ZERO CARBON
PHIUS+2015 CLIMATE SPECIFIC PASSIVE BUILDING STANDARD: Cliff Notes PATHWAY TO ZERO CARBON AGENDA: What is it? Development and Resulting Requirements PHIUS+ 2015 Certification Process & Stats PHIUS+ 2015:
More informationClassic Competition Weiting Residence
Classic Competition Single Family Homes - over 3,000 sqft Participant information Panelworks Plus, Inc. Curt Stendel 4861 Ambassador St. Francis, MN 55070 Phone: 763-360-3694 Email Address: curt@panelworksplus.com
More informationOverview of Green Home
Overview of Green Home Presented by Qian (Victoria) Chen, Ph.D., LEED AP Associate Professor of Construction Systems Management The Ohio State University Outline Why is Green Home Important? What is Green
More informationIntep In I t n e t g e r p a t eid n t P e la gr n a n t i e n d g PL l L a C n ni n 2 g 015 LLC Guten Morgen Chicago
Intep Integrated Intep Integrated Planning Planning LLC 2015 LLC Guten Morgen Chicago Bridging Building Cultures since 1998 Intep Integrated Planning LLC 2015 Optimizing the Whole A Life Cycle Approach
More informationBuilt for sustainability Built for the environment Built for fuel efficiency Built for life
Integrity and London s first and jointly England s first Certified Passivhaus Built for sustainability Built for the environment Built for fuel efficiency Built for life Coming Soon to Cambridge the City
More informationPASSIVE HOUSE FACT SHEET (pg 1 of 2)
PASSIVE HOUSE FACT SHEET (pg 1 of 2) INTRODUCTION The Passive House Standard is the highest building efficiency standard in the world, with the promise of reducing the energy consumption of buildings by
More informationHomesol Passive House Design Process
Homesol Passive House Design Process Passive Houses are residential, commercial and institutional buildings in which a comfortable temperature can be achieved year round with a 75% 85% reduction in energy
More informationCould a European Super Energy Efficient Standard Be Suitable for the U.S.? John Broniek, IBACOS BEST1 CONFERENCE June 12, 2008
Could a European Super Energy Efficient Standard Be Suitable for the U.S.? John Broniek, IBACOS BEST1 CONFERENCE June 12, 2008 Agenda European Passive House Program Creating Passive House Designs in U.S.
More informationThe Passive House Institute US
The Passive House Institute US Passive House Concept, History & Economic opportunities for the US Building Sector Katrin Klingenberg Director Passive House Institute US PHIUS ph: 217.819.7988 988 katrin@passivehouse.us
More informationNet Zero Construction with Sean Moran of Skender Getting to Net Zero with Solar Energy
Net Zero Construction with Sean Moran of Skender Getting to Net Zero with Solar Energy Tim Montague, M.S. Sean Moran, LEED AP Solar Works for Illinois! Free monthly solar energy webinar brought to you
More informationINTRODUCTION TO WUFI PASSIVE & PHIUS+ 2015
INTRODUCTION TO WUFI PASSIVE & PHIUS+ 2015 Lisa White: lisa@passivehouse.us 2017 Passive House Institute US PHIUS 1 PASSIVE BUILDING PRINCIPLES 2016 PHIUS 2017 Passive House Institute US PHIUS 2 PHIUS+
More informationPassivhaus in Australia
Passivhaus in Australia relevance to natural cooling Presentation by Kylie Mills Registered Architect - NSW ARB 7511, Director, Teacher, Tutor AIA A+, Director - Australian Passive House Association National
More informationEnergy Step Code requirements for Part 9 buildings. City of Richmond June 29, 2017
Energy Step Code requirements for Part 9 buildings City of Richmond June 29, 2017 BCBC 9.36.3 prescriptive pathway vs. performance-based Energy Step Code Section 9.36 Part 9 Energy Step Code 103 pages
More informationHigh Performance Consideration Columbia City Home
High Performance Consideration Columbia City Home Participant information Premier SIPs Becky Susan 1420 Washington Avenue Puyallup, WA 98375 Phone: 800-275-7086 Email Address: info@premiersips.com Website:
More informationEnergy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort
Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by
More informationIN THIS ISSUE INTRODUCTION BACKGROUND. March 2018 High Humidity in Winter: Analysis for Multi-Family Passive House Projects
Page 1 High Humidity in Winter: Analysis for Multi-Family Passive House Projects IN THIS ISSUE Passive House for multi-family residential applications Analysis of high humidity levels in winter Impact
More informationEnvironmental Principles
Environmental Principles The Ownership group and lead consultants commitment to sustainability has been a driving force for its design. The project will achieve, per council policy for rezoning, an equivalency
More informationThis Year s Annual Meeting Sponsors. Thank You
This Year s Annual Meeting Sponsors Thank You SIPA Building Award Categories Agricultural Commercial/Industrial/Institutional over 10,000 sq. ft. Commercial/Industrial/Institutional under 10,000 sq. ft.
More informationSingle Family Homes - over 3,000 sqft. Parfitt Residence
Participant information Zero-Energy Plan LLC/Clifton View Homes Ted L. Clifton 107 S. Main St. Ste. G201 Coupeville, WA 98239 Phone: 360-969-2363 Email Address: ted@zero-energyplans.com Website: www.zero-energyplans.com
More informationPassive House. An introduc+on to Western Technical College s wood built high performance building envelope project
Passive House An introduc+on to Western Technical College s wood built high performance building envelope project In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This
More informationProject Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb
http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce
More informationPASSIVE HOUSE IN STUDENT HOUSING
PASSIVE HOUSE IN STUDENT HOUSING WILLIAMS + WHEATON COLLEGE PHIUS NAPHC 2018 ARCHITECTURE PLANNING INTERIOR DESIGN VDC BRANDED ENVIRONMENTS ARCHITECTURE PLANNING INTERIOR DESIGN VDC BRANDED ENVIRONMENTS
More information5/8/2018. PHIUS+ 2018: What s New? Graham S. Wright. More nuance for different building types. Supports our overall transition to renewable energy.
PHIUS+ 2018: What s New? More nuance for different building types. Supports our overall transition to renewable energy. Graham S. Wright Public Comment Period Open Through April 15 PHIUS+ 2015 quite successful
More informationBullitt Center s Energy Performance
Bullitt Center s Energy Performance Introduction In 2007 Congress created a Zero Net Energy Commercial Buildings Initiative with a goal of achieving a market transition to Zero Net Energy for new commercial
More informationDesign Architect s/applicant s Certification Of Selection Criteria
Design Architect s/applicant s Certification Of Selection Criteria The Agency has requested certain certifications from the architect and applicant in connection with the submission of an application.
More information2018 SIPA Building Excellence Awards
SIPA Building Award Categories Agricultural Commercial/Industrial/Institutional over 10,000 sq. ft. Commercial/Industrial/Institutional under 10,000 sq. ft. Multifamily Affordable Housing Single Family
More informationPassivhaus Projects and Benefits
Passivhaus Projects and Benefits Andrew T. Arthur MPH CMCIEH Arthur Associates Passivhaus not Passive House Need to make distinction between: this and this Passivhaus Standard which was developed in Germany
More informationJEREMIAH PROGRAM, SAINT PAUL
Location: 932 Concordia Avenue Size: 1.36 acres Total TBRA Grant Award: $79,500 Funding Use: soil remediation Benefits: 38 units of supportive housing; on-site daycare; annual property tax increase of
More informationMID-RISE APARTMENT BUILDING PROTOTYPE PHIUS - WUFI PASSIVE
MID-RISE APARTMENT BUILDING PROTOTYPE PHIUS - WUFI PASSIVE 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 45.1 Baseline 13.0 High Performance 15.5 PHIUS - IES 25.2 PHIUS
More information4.2.3 MINERGIE ORIGIN AND ORGANISATION
As described earlier, the energy performance of a building is calculated and compared with the requirements for the chosen Minergie system. The calculations are then sent to a Minergie administrator who
More informationHigh Performance, Energy Efficient Design for Wood Frame Buildings
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board. Please add relevant logo here High Performance, Energy Efficient Design for Wood
More informationMarylebone s first Passivhaus
Marylebone s first Passivhaus The experience of the Portman estate Mark Hopkins, Associate Director The Portman Estate October 2018 Drivers for Passivhaus Maintain the Estate s position as a leading provider
More informationLEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP
LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations
More informationPassive House
Passive House Passive House for Multi-Family and Commercial Buildings PRESENTATION OBJECTIVES Introduction to Passive House Outline the Design Strategies for Passive House Commercial and Multi-residential
More informationUS building impacts. 72% electricity consumption 39% energy use 38% CO 2 emissions 40% raw materials 30% waste output 14% potable water use
US building impacts 72% electricity consumption 39% energy use 38% CO 2 emissions 40% raw materials 30% waste output 14% potable water use US building impacts 72% electricity consumption 39% energy use
More informationMay/June The Insulating Concrete Forms Magazine. Green Building. Zero Energy Homes Insurance Savings Optimal Insulation $5.
May/June 2018 The Insulating Concrete Forms Magazine Green Building Zero Energy Homes Insurance Savings Optimal Insulation $5.95 Built to LEED Platinum standards, CMTA office building is a recent example
More informationSpecial Mention, Architecture + Sustainability
Awards 2013 LOS ANGELES BUSINESS COUNCIL DESIGN AWARDS Grand Prize INTERNATIONAL INTERIOR DESIGN ASSOCIATION / SOUTHERN CALIFORNIA CALIBRE AWARDS Workplace Medium SAN FERNANDO VALLEY BUSINESS JOURNAL COMMERCIAL
More informationAM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y
Nearly zero-energy building and components of the DIRECTIVE on energy performance of buildings 2010/31/EU Albin Zsebik, PhD, CEM Improving university curricula in the areas of a) energy efficiency in the
More informationAllowance Table for: General:
Allowance Table for: Adopting Credits from LEED Canada for New Construction and Major Renovations (NC) 2009 and LEED Canada for Core and Shell Development (CS) 2009 for LEED Canada-NC v1.0 (with or without
More information2012 Green Homes Tour
Sunday, November 4 th 11AM-4PM Tour innovative sustainablydesigned homes throughout San Diego County. All homes feature high performance green design and construction features. Tour includes sustainably
More informationDuluth Energy Design Conference. Matthew Casavant Blumentals Architecture. Jorge Lopez Southwest Minnesota Housing Partnership
Orness Plaza: Integrating Health & Sustainability Charrette to Grand Opening and Beyond Integrated Design for Health and Environmental Improvement in Green Buildings The Orness Plaza Study Duluth Energy
More informationHOW TO CREATE AFFORDABLE PASSIVE HOUSE DESIGN. Andrew Lundberg Passivate
HOW TO CREATE AFFORDABLE PASSIVE HOUSE DESIGN Andrew Lundberg Passivate ABOUT US www.passivate.co.uk OVERVIEW www.passivate.co.uk 1. CERTIFIED PASSIVE HOUSE DESIGNER Engage an experienced Certified Passive
More informationWEST SIDE FLATS PHASE III DEVELOPMENT REHABILITATION, DENSITY AND INNOVATION ON THE MISSISSIPPI RIVER IN SAINT PAUL
WEST SIDE FLATS PHASE III DEVELOPMENT REHABILITATION, DENSITY AND INNOVATION ON THE MISSISSIPPI RIVER IN SAINT PAUL OUR EVOLVING RELATIONSHIP WITH THE MISSISSIPPI RIVER Historic place of entry for new
More informationIntep - Integrated Planning
Folie 1 Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene Intep - Integrated Planning Services and Strategies to Energy Efficiency in Buildings Stephan Tanner,
More informationProject Description. Projected build start date Projected date of occupation. Existing external wall construction.
http://lowenergybuildings.org.uk Project name Admirals Hard Project summary FINALIST of the UK Passivhaus Awards 2015 - Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals
More informationBPC Green Builders adds science to the art of home building
This 1980s colonial (left) was poorly insulated, uncomfortable, and expensive to heat. 2x3 studs were attached to the existing frame, but spaced off the house to eliminate thermal bridging. Three inches
More information71 kwh/(m²a) Project Documentation. 1 Abstract. Single family house in Bellbrae, Victoria, Australia. 1.1 Data of building. Year of construction
Project Documentation 1 Abstract Single family house in Bellbrae, Victoria, Australia 1.1 Data of building Year of construction U-value external wall 2015 Space heating 0.220 W/(m²K) 16 kwh/(m²a) U-value
More informationSenior Design Project for UNO. Design of the International Studies Building: An Environmental Analysis
Senior Design Project for UNO Design of the International Studies Building: An Environmental Analysis Design Intent Implement Passive & Active design strategies in order to make the building: More Energy
More informationAbove: Northwest corner Below: Southwest corner
Above: Northwest corner Below: Southwest corner Above: Northeast corner (Former Ice House) Below: Southeast corner (Parking garage) Above: Office main entry along Third Street Below: South courtyard showing
More informationcapacity) can absorb solar energy. This thermal energy is re-emitted in all directions as
Comfort on the cheap More on Trombe walls Trombe walls make good sense. When the sun shines, the masonry (which has a large heat capacity) can absorb solar energy. This thermal energy is re-emitted in
More informationResidential New Construction Passive House The Nordeast Nest Case Study Tim Eian, Dipl.-Ing., Certified Passive House Planner & Consultant
Residential New Construction Passive House The Nordeast Nest Case Study Tim Eian, Dipl.-Ing., Certified Passive House Planner & Consultant In accordance with the Department of Labor and Industry s statute
More informationProject name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles
http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date
More informationMinimum Energy Consumption 84% energy heating savings*
3 HOUSE DESIGNS OF 140m² A modern concept for energy efficiency ENERGY EFFICIENCY AND ENVIRONMENTAL QUALITY Minimum Energy Consumption 84% energy heating savings* * According to a home fulfilling thermal
More informationWaldsee BioHaus. First Certified Passivhaus in North America
Waldsee BioHaus First Certified Passivhaus in North America Our Mission: To prepare young people for responsible citizenship in our global community We ve been doing foreign language since 1961. A pre-collegiate
More informationCHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION
Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy
More informationSustainable Design Solutions for the Built Environment
Sustainable Design Solutions for the Built Environment John Carmody Center for Sustainable Building Research University of Minnesota www.csbr.umn.edu Impact of Buildings on People and the Natural Environment
More information6 th Annual North American Passive House Conference. Evaluation of Potential for Moisture in High R- value Walls in Cold Climates
IMPROVING THE BUILT ENVIRONMENT g 6 th Annual North American Passive House Conference Evaluation of Potential for Moisture in High R- value Walls in Cold Climates October 2011 Lois B. Arena Steven Winter
More informationAppendix B. Certification of Intent to Comply
Appendix B Certification of Intent to Comply Required: Submit this certification at time of application. The project applicant and project architect/project designer are required to sign the certification
More informationLEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT
LEED-CI ANALYSIS June 2015 1 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More informationGenentech Building 20 Office LEED-CI Gold XL CONSTRUCTION
Genentech Building 20 Office LEED-CI Gold Above and Beyond A LEED Gold 50,00 s.f. tenant improvement, the space was originally designed with a goal to achieve LEED silver certification. Innovative approaches
More informationLEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction
LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider
More informationCourse Title: A Place in the Sun: Why We (Still) Need Solar-Optimized Design. Speaker Name/s: Rachel Wagner
AIA Provider: Provider Number: Northeast Sustainable Energy Association G338 Course Title: A Place in the Sun: Why We (Still) Need Solar-Optimized Design Course Number: BE1528 Speaker Name/s: Rachel Wagner
More informationBUILT AROUND YOU ENERGY-EFFICIENT SOLUTIONS
BUILT AROUND YOU ENERGY-EFFICIENT SOLUTIONS ENERGY EFFICIENCY BUILT AROUND YOU. Marvin windows and doors are made-to-order to suit the aesthetic preferences and performance requirements of each customer.
More informationPassive House retrofit study for Carnegie Mellon 1950's dormitory in Pittsburgh
Towards Carbon Neutrality in existing buildings Passive House retrofit study for Carnegie Mellon 1950's dormitory in Pittsburgh Jimena Serra Callirgos Architect, CAP, LEED GA Master of Science in Sustainable
More informationNew Buildings Institute
New Buildings Institute Conduct building science research and technology assessments Develop technical best practices and design tools Partner with influential market actors Guide and influence national
More informationOptimization of air tightness and night ventilation for Passive houses in Italian climates under Fanger and Adaptive comfort models
L. Pagliano et al, I: Optimization of air tightness and night ventilation for Passive houses in Italian climates... 1 Optimization of air tightness and night ventilation for Passive houses in Italian climates
More informationLEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods
LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods
More informationProject Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings
http://lowenergybuildings.org.uk Project name Knights Place Project summary When the client, Exeter City Council, was offered a funding opportunity by the HCA to develop the first council housing in Exeter
More informationResearch Analysis: Building Envelope and LEED Credits Introduction
: Building Envelope and LEED Credits Introduction Green buildings are no longer a new idea and are quickly becoming the trend in the slowly changing industry of building construction. Even though the essence
More informationLEED Project Delivery Process Manual Appendices
LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process
More informationEcole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues
Ecole Connaught Community School Welcomes CaGBC Sask Chapter Members & Colleagues Who we Are as the Comets We are a Dual Track French Immersion School and with an enrollment of 435 students, 43 staff and
More informationPHPP Report. Beattie Passive Inchkeith Drive
PHPP Report Beattie Passive Inchkeith Drive 1. Introduction Passive House is the world-leading building standard in energy-efficient construction. It is comfortable, affordable and ecological at the same
More informationPV Generation Potential 17.1 kbtu/ft2/yr 15.4
TOWNHOME PROTOTYPE BASELINE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 54.4 kbtu/ 2/yr 21.8 High Performance 18.2 PHIUS - IES 60 MMBtu
More information2017 SeaBEC Symposium. Advancing Building Enclosures Beyond Code Conformance. Medgar Marceau, PE Principal, Senior Building Science Engineer
2017 SeaBEC Symposium Advancing Building Enclosures Beyond Code Conformance Medgar Marceau, PE Principal, Senior Building Science Engineer May 16, 2017 AIAMH123 2 Passive House and Commercial Construction
More informationIntroduction: Charlottesville Waldorf School
Introduction: Charlottesville Waldorf School The history and mission of the School Why the need for a new grade school? Why green building? What is the design program? Waldorf School Origins The questions
More informationDesigning and Constructing a High-Performance Building Envelope for Multi-Unit Affordable Housing
Designing and Constructing a High-Performance Building Envelope for Multi-Unit Affordable Housing Jeffrey Davis, AIA, LEED AP FortyEighty Architecture Debbie Clark, NCARB, LEED AP FortyEighty Architecture
More informationLEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT
LEED-CI ANALYSIS June 2015 4 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More informationBetter By Design Energy Efficiency in Needham s Public Construction Projects
Better By Design Energy Efficiency in Needham s Public Construction Projects Green Needham Monday, November 26 th, 2012 7:00PM Needham Public Library Energy Efficiency in Town Projects Presenters tonight
More informationHIGH-PERFORMANCE AFFORDABLE. Thor Peterson Synthesis Consultants LLC
HIGH-PERFORMANCE AFFORDABLE Thor Peterson Synthesis Consultants LLC thor@synthesisconsultants.com What's high-performance affordable? Optimizes both up-front costs and total cost of ownership: energy,
More informationPresenters: Dominick Balletta Managing Director Jacob Burns Film Center
Presenters: Dominick Balletta Managing Director Jacob Burns Film Center Erik A. Kaeyer, AIA, LEED AP Vice President Kaeyer, Garment & Davidson Architects & Engineers, PC James Dolan, P.E. LEED AP Principal
More informationCarbon Neutral 60% 70% 80% 90% Today
60% 70% 80% 90% Carbon Neutral Today 2015 2020 2025 2030 Fossil Fuel Energy Consumption Fossil Fuel Energy Reduction GBD Architects LEED PLATINUM + NET-ZERO ENERGY Location Hood River, Oregon Building
More informationPassiveDesign.org. Principles of Passive Design
PassiveDesign.org Principles of Passive Design About: This handout contains the information from the Principles of Passive Design topic pages on passivedesign.org. Name:... Principles of Passive Design
More informationModeling the Brillhart House
Modeling the Brillhart House Located in a neighborhood like this 1 In a climate like this: Where almost every day has hours in the adaptive comfort zone. And the most effective passive strategies are:
More informationProject Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales
http://lowenergybuildings.org.uk Project name Self Heating Social Housing- the zero carbon retrofit Project summary The target for this project is to create the first UK PassivHaus retrofit using low/zero
More informationBRE Bites: Passivhaus Ecobuild 20 th 22 nd March 2012
BRE Bites: Passivhaus Ecobuild 20 th 22 nd March 2012 Part of the BRE Trust What is Passivhaus? A Passivhaus may be defined as a building in which a comfortable internal temperature is achieved solely
More informationSecond and Delaware, Kansas City, MO Passive House Institute US PHIUS 1
Second and Delaware, Kansas City, MO 2017 Passive House Institute US PHIUS 1 2017 Passive House Institute US 2 FUTURE WORLDWIDE TRANSITION 1800 1600 1400 1200 1000 800 600 400 energy-efficiency new geo-/ozean.
More informationA L C H E M # $ % &
ALCHEMY! @ # $ % & BUILDING BLOCKS How much space are you looking for? 1x 300-850 SF 2x 1200-1600 SF 3x 1200-2000 SF 4x 1800-2400 SF H 8 or 9 interior 14 or 16 W L up to 60 The maximum dimensions for
More informationPhillips Exeter Academy
Phillips Exeter Academy Construction Standards and Guidelines Division of Work: Specification Section: Description of Material or System: Sustainability Design Guidelines Last Updated: 6/17/2013 Updated
More informationBuilt examples and project certification. Zeno Bastian, Passive House Institute
Built examples and project certification Zeno Bastian, Passive House Institute Passive House Standard for Retrofits? Photo Passive House Institute Shape Graphic Passive House Institute Thermal Bridges
More informationMID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr
MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 50 kbtu/sf/yr 45.1 PROJECT INFORMATION 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 13.0 kbtu/ft2/yr Baseline 10.8 kbtu/ft2/yr
More informationLEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT
LEED-CI ANALYSIS June 2015 6 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More informationBeyond Code Building Programs. What They are, and What They can Mean to Your Community
Beyond Code Building Programs What They are, and What They can Mean to Your Community What We are Covering What are some of the keys to successful programs? What do typical program include how do you reach
More informationSection 3.8.2, Regional Initiatives: update section on San Mateo County Green Building Ordinance to reflect ordinance language.
Memo To: Thomas Rogers, City of Menlo Park From: Mark Hoffheimer Date: March 6, 2012 Subject: Task H: Sustainability Revisions Purpose In accordance with the requirement that the Sustainability section
More informationThe Application of LEED Green Building Rating System in Indonesia
The Application of LEED Green Building Rating System in Indonesia Baharuddin Hasanuddin University, Faculty of Engineering, Department of Architecture, Makassar-Indonesia baharsyah@yahoo.com Abstract: