AL13. Woodframe Guide. Vol 2 AL13. architectural panel system. Version 1. patent pending

Size: px
Start display at page:

Download "AL13. Woodframe Guide. Vol 2 AL13. architectural panel system. Version 1. patent pending"

Transcription

1 02 AL13 Woodframe Guide AL13 architectural panel system Vol 2 Version 1 patent pending

2 CLAD THE WORLDTM

3 How to Design for AL13 01 AL13 Architectural Panel System 1/2 MIN. SHEATHING (OSB OR PLYWOOD) STRUCTURAL FRAMING PANEL FRAME ASSEMBLY MEMBRANE PANEL PANEL SPACER WOODFRAME Sheathing is an ideal substrate to install the AL13 system upon. When designing for the system to be installed on a sheathed substrate, the following points are recommended: Membrane, 1/2 min. Sheathing (OSB or plywood), Structural framing, Panel, Panel Spacer Panel Frame Assembly. NOTES The panel frame assembly utilizes the snap lock technology and requires an impact to engage the two components. Ensure that the substrate is solid enough to sustain this impact. version 1.9 W01

4 02 Installation Guidelines 1 IMPORTANT: Failure to follow the guidelines herein will void the AL13 warranty Please read and understand the entirety of this guide. Any questions or inconsistencies should be directed to info@al13.ca Guidelines may vary depending on project particulars and conditions. Contact AL13 with questions regarding variance from this guide. Standard carpentry skills are required for optimum results. Good health and safety practices must be followed when installing AL13 ACM System. Key steps for a successful installation 01 Understand the various elements of the system 02 Plan the installation, work schedule, layout, and material usage 03 Ensure everyone working has read the installation guidelines 04 Execute work in the sequence set forth in the installation guidelines 05 Protection should be worn at all times; gloves, ear protection, safety glasses and hard hat 06 Protect the product by storing the material in a dry and clean environment 07 Ensure proper fit of the system 08 Upon completion of installation remove protective film and clean any debris on wall Pre-installation: Receiving materials When materials arrive on site, ensure that all panels, extrusions and other component packaging are in good condition and free of any defects. > Shipping or packaging issues should be noted on the waybill and then reported to the distributor. > Should any products be damaged, the receiving party is responsible for filing a freight claim to the shipping company within 24 hours of receiving product. > Defective materials should be reported to the distributor from which the product was dispatched from. version 1.9 W02

5 Installation Guidelines 2 02 AL13 Architectural Panel System Component Size / piece Material Price End Frame 8 length AL13 coated AA-6063-T5 aluminum extrusion please contact local distributor Inside Corner Frame 8 length AL13 coated AA-6063-T5 aluminum extrusion please contact local distributor Outside Corner Frame 8 length AL13 coated AA-6063-T5 aluminum extrusion please contact local distributor Panel Frame Assembly 8 length AL13 coated AA-6063-T5 aluminum extrusion please contact local distributor Perimeter Frame Assembly 8 length AL13 coated AA-6063-T5 aluminum extrusion please contact local distributor Panel spacer 8 length AL13 thin gauge formed aluminum please contact local distributor ACM Panel 4 x 8 sheet AL13 aluminum composite panel with PE or fire rated core please contact local distributor Adhesive Tape 108 roll AL13 double sided acrylic adhesive please contact local distributor Metal/Wood Fastener 500 per pkg. AL13 #12 Tredecim-coated with EPDM washer & mini drill-point please contact local distributor Metal Fastener 500 per pkg. AL13 #10 Tredecim-coated with drill-point please contact local distributor Concrete Fastener 100 per pkg. AL13 3/16 Tredecim-coated with matched tolerance drill bit please contact local distributor Product Legend: This installation guide will discuss various components of the system and use component reference blocks. Please refer to the following to verify the correct component. version 1.9 W03

6 02 Installation Guidelines 3 Inventory Once material is verified to be in good condition, take inventory of units according to the packing slip. Make sure all materials - panel, extrusions, panel spacers, fasteners, and adhesive tape - and quantities are present. - The distributor should be notified immediately if the order has any missing or incomplete components. Failure to do so may void re-fulfillment. Material handling AL13 ACM System panels are shipped on pallets in 50 sheets (or less) per unit. The sheets are secured in place with metal strapping and covered with protective wrap. Panels should be kept in their original packaging or similar and moved by a forklift or pallet jack. Once a pallet is unwrapped and metal straps are cut, panels may be moved individually. Ensure to use clean work gloves to protect from sharp edges and keep panels clean. Panels must be first lifted vertically away from panel, then away - DO NOT DRAG OR SLIDE panels across. Store all materials in a clean and dry environment, both before and after materials are unpacked. Wear gloves when handling materials, and use suction cups when mounting panels to wall. Ensure to wear eye and ear protection when cutting materials. Always wear approriate personal protective equipment. Tools AL13 is made to be installed with general tools, a recommended tool list is as follows: > Sawhorses/work table > Circular saw, handheld with guide > Table saw > Cordless electric impact with appropriate bits > Non-ferrous saw blades intended for cutting Aluminum > Jigsaw > File (for de-burring cut sheets) > Level/plumb line > Chalk line > Cordless electric drill > Drill bit set- Suction cups version 1.9 W04

7 02 Installation Guidelines 4 Panel layout It is important to commence work with good construction practice and schedule work with other trades to avoid delays. Once installation begins it must not be delayed for any length of time as damage may occur to the system, substrate or both due to exposure to the elements. Before any installation begins, it is imperative to plan the layout of the system. The architectural plans/elevations should be reviewed to determine the appropriate grid for the system. Should no such plans be available, measure areas to develop a pattern that will maximize panel size, aesthetics and minimize fabrication. VERTICAL JOINT 1 approx. layout dimension panel dimension Standard panel size is 4 x 8 (1220mm x 2440mm). Do not use these dimensions for determining layout lines, adequate space must be left between panels for extrusions. Note that between horizontal panels the upper panel may sit on the edge of the frame extrusion and decrease the gap from approx. 1 to approximately 3/4. Material use Once the layout has been determined, double check that there is an adequate amount of materials present for the application at hand. Since estimation takeoffs and quantities are based on panel layout, any installation varying from the original plan may affect quantities and cause material shortages. Make sure to check the cut plan to determine if this will result in any further shortages. When calculating material usage, note that vertical extrusions - in most cases - will carry through continuously, while the horizontals tuck and terminate under the tabs of the verticals. version 1.9 W05

8 02 Woodframe Install1 Example wall The first part of the installation guide will outline a basic install on a flat wall as illustrated below in its completed form. The subsequent drawings section will outline more intricate details like inside corners, outside corners, windows, doors, overhangs and build-outs. version 1.9 W06

9 02 Woodframe Install 2 Laying out the grid Using the chosen layout, determine the best suited datum - or starting point - shown here as the lower left corner. Lay out the panel grid using chalk lines (or similar) from the datum point, ensuring that all lines are plumb and level. version 1.9 W07

10 02 Woodframe Install 3 Fasten vertical perimeter extrusions Vertical Perimeter fastener End Frame The vertical perimeter extrusions are normally the first extrusions to be fixed to the wall - the building wrap/envelope must be complete to spec before anything goes on the wall. Lay out the End Frame extrusions according to the marked grid lines, ensuring frames are plumb before fastening. Consult the fastener specifications guide in this binder to determine fastener type and spacing. For optimum workflow it s best to work from left to right, bottom up. Place the first fastener near the bottom of the extrusion and continue fastening upwards according to the fastener guide spacing. Only fasten the extrusion up to the height of the first row of panels. An Outside Corner Frame, Inside Corner Frame, or a Perimeter Frame Assembly may be used in place of the End Frame in this situation. The End Frame is shown here only to keep the scope of this guide relatively simple. version 1.9 W08

11 02 Woodframe Install 4 Fasten baseline extrusion Baseline Perimeter weep hole fastener butt joint intersection End Frame A horizontal End Frame is the next component to be installed. This will establish the horizontal datum - and will be a reference to subsequent extrusions - so it is important that it is mounted level. Consult the fastener specification guidelines to establish fastener type and spacing.to allow for adequate water drainage, the extrusion will require weep holes to be drilled, 1/4 every 16 on center (or otherwise specified by the project plans). If one length of the End Frame extrusion is not long enough to span the distance required, it is necessary to use a second piece and butt the two together. Take care in aligning butt joints so that they are flush, shim as needed. At the intersection of vertical and horizontal End Frames, the horizontal End Frame shall sit under the tab of the vertical End Frame. version 1.9 W09

12 02 Woodframe Install 5 Fasten back plates Panel Frame The Panel Frame Assembly consists of two parts; the top cap, and the back plate. The first piece to be installed is the back plate. Consult the fastener specification guidelines to establish fastener type and spacing. To allow for adequate water drainage, when the back plate is installed horizontally, cut to segmented lengths mounted with 1.5 gaps between. In this example, the workflow is starting from the lower left corner and completes each row before moving up the wall. To accommodate the first panel, install the back plates on the grid lines. When back plates intersect each other, it is required to leave a minimum gap of 1.5 inches. When fastening the back plates, the fasteners must alternate flanges. version 1.9 W10

13 02 Woodframe Install 6 Fasten panel spacers Panel Spacer fastener Panel Spacer Adhesive Tape The Panel Spacers are installed vertically on the wall to space the panel away from the substrate and stiffen the panel across the center. Consult the fastener specification guidelines to establish fastener type and spacing. Ensure that the two centermost Panel Spacers are positioned closer together - approximately 6-8 on center - and apply the Adhesive tape full length to the outer flange of the Panel Spacers as illustrated. The Panel Spacers should be cut to fit so that they sit a 2 inches away from the nearest frame component. The ends of the outermost Panel Spacers may also be bent slightly away from the wall to increase the pressure acting on the panel towards the underside of the extrusion tabs. This helps to ensure that the panel sits tightly in the corners where the extrusions tuck under one another. version 1.9 W11

14 02 Woodframe Install 7 ACM panel fit Lower Panel ACM Panel The ACM Panel may need to be cut down if a smaller size from the standard (4 x 8 ) is required. This may be done on a standard circular saw, or table saw - so long as a metal blade is used - using a guide to ensure cuts are straight and clean. The protective film should be peeled back approximately 1 from the edges, but should remain on the panel otherwise. Gloves should be worn to keep panel clean and to protect hands from sharp edges. Once a panel is ready to be fit, it may be taken off the stack. Make sure not to drag sheets across, rather lift the sheet up off the stack then away. Although the panels have a protective film applied from the factory, reckless handling may cause damage to the panel through the wrap. It is recommended that at least two people carry one sheet. Step 1 - Position panel on its long edge, lift it up and place in the horizontal End Frame. Step 2 - rotate panel towards wall. Step 3 - once panel is flush, slide the panel under the tab of the vertical End Frame. The panel should sit halfway under each tab Suction cups are also recommended for installing panels version 1.9 W12

15 02 Woodframe Install 8 Horizontal top cap Fastening Lower Panel engage with w/ AL13 sled workflow Panel Frame Assembly After the ACM Panel has been shifted into the correct position, press panel down on the center to adhere the panel to the adhesive tape. The top cap is the second part of the two part Panel Frame Assembly which is snapped into place with a rubber mallet and the AL13 Engagement Tool. Once the top cap is cut to the appropriate length, it may be hammered into place with a rubber mallet and the AL13 Engagement Tool. When a horizontal top cap intersects a vertical End Frame, it should slide under the tab - allow for the same interface for when the vertical top cap is installed. Continue workflow to the right and repeat previous steps for remaining panels on the first row of wall. For all other remaining rows repeat steps W10 to W13. The horizontal top cap should sit halfway under the tabs of the vertical frame components, in the same manner as the panel. Therefore the horizontal top cap may be cut and positioned to match the panel. version 1.9 W13

16 02 Woodframe Install 9 Installing upper panels Fastening Upper Panel End Frame Before fitting the panel ensure that all the required Panel Spacers, adhesive and back plates are installed. A horizontal End Frame must also be installed along the top of the wall before any panels are fitted. The top two panels in a column must be installed sequentially since the top of wall terminates under the Horizontal End Frame and would be unable to be installed if the top cap was already installed along the bottom edge as well. Step 1 - Install lower panel as per steps laid out in W12 and hold in place while second panel is fitted. Step 2 - Slide upper panel up under the tab of the horizontal End Frame. Step 3 - Rotate panel towards wall until flush. Step 4 - Slide panel underneath the vertical End Frame. version 1.9 W14

17 02 Woodframe Install 10 Top ACM panels Fastening Upper Level engage with w/ AL13 sled workflow Perimeter Frame Assembly Top Cap After the ACM Panel has been shifted into the correct position, press panels down on the center to adhere the panels to the adhesive tape. The top cap is the second part of the two part Panel Frame Assembly, and is snapped into place with a rubber mallet and the AL13 Engagement Tool. Once the top cap is cut to the appropriate length, it is to be hammered into place with a rubber mallet and AL13 Engagement Tool. When a horizontal top cap intersects a vertical End Frame, it should slide under the tab. Allow for the same interface for when the vertical top cap is installed. Continue workflow from left to right as required, installing the top two panels at one time. version 1.9 W15

18 02 Woodframe Install 11 Vertical top cap Vertical Fastening Top Cap Once two adjacent columns of panels have been installed, the top cap may be installed. The top cap is the second part of the Panel Frame Assembly which is snapped into place with a rubber mallet and the AL13 Engagement Tool. Step 1 - Slide the top cap underneath the tab of the lower horizontal End Frame. Step 2 - Rotate top cap towards wall. Step 3 - Hammer top cap in place with a rubber mallet and the AL13 Engagement Tool. If one length of the top cap extrusion is not long enough to span the distance required, it is necessary to use a second piece and butt the two together. Take care in aligning butt joints so that they are flush, shim as needed (do not butt two top caps at an intersection, where no back plate is present). version 1.9 W16

19 02 Woodframe Install 12 Finishing and inspect Once the install is complete, work from the top down to remove the protective plastic film and clean panels as required. Take note of any installation flaws and ensure all top caps are fully hammered into place. Protective film must be removed with in days after panels have been installed (or from first exposure to direct sunlight). version 1.9 W17

20 02 Woodframe Install 13 Further situations The Generic Install guide is intended to show the best practices for a basic install and how the various components work together. It is outside the scope of this manual and impossible to anticipate & outline every installation situation that may be encountered. In order to present the install in the most clear and direct manner, there are a few standard situations that are not covered in this guide. These situations are shown in detail in the following Drawings section, however the below guide will describe how they would install relative to this guide. Component 01 End Frame Generally installed in a vertical or horizontal orientation and is used to terminate the wall system or butt/transition to another wall surface. May be used to butt up to the frames of windows, doors or any other protrusions and recesses in the wall surface. 02 Inside Corner Frame Generally installed in a vertical orientation and is used to transition the wall system across a 90 inside corner. May be installed in the same sequence and manner as the Vertical End Frame. 03 Outside Corner Frame Generally installed in a vertical orientation and is used to transition the wall system across a 90 outside corner. May be installed in the same sequence and manner as the Vertical End Frame. 04 Panel Frame Assembly Installed both horizontally & vertically and is generally installed between adjacent panels. 05 Perimeter Frame Assembly Installed both horizontally & vertically to terminate the system, used as an alternate to the End Frame as desired. May be used to butt up to the horizontal or vertical frames of windows, doors or any other protrusions and recesses in the wall surface. In general, the vertical extrusions carry through and the horizontal extrusions are segmented and tuck under the tab of the verticals. Please consult AL13 should there be any questions regarding specialized configurations that are not covered in this installation guide or in the drawing section. version 1.9 W18

21 03 System Drawings Typical details: Woodframe A, 6B, 6C General details 1 Vertical 2 Vertical end of wall 3 Horizontal 4 Inside corner 5 Outside corner 6a Parapet - top of wall 6b Horizontal transition 6c Soffit - top of wall 7 Soffit - fascia 8 Bottom of wall 9 Non-perp. Ins. Cnr. 10 Non-perp. Out. Cnr. 11 Intersection cut 9 & 10 not vissible version 1.9 W19

22 03 System Drawings Vertical MECHANICAL FASTENER PANEL FRAME ASSEMBLY PANEL SPACER PANEL WOOD DETAIL Vertical connection between adjacent 1 panels. Primary connector for vertical joints between panels. Panel spacers position panel away from wall to the underside of panel frame tabs. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W20

23 03 System Drawings Vertical End 3/4 END FRAME ALTERNATIVE CLADDING PANEL MECHANICAL FASTENER PANEL SPACER ALTERNATE END CONDITION USING PERIMETER FRAME ASSEMBLY WOOD DETAIL 2 Vertical end of wall - transition. Used to vertically terminate the system or transition to butt to window/door frames flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W21

24 03 System Drawings Horizontal PANEL MECHANICAL FASTENER PANEL FRAME ASSEMBLY PANEL SPACER WOOD DETAIL 3 Horizontal connection between adjacent panels. Primary connector for horizontal joints between panels. Panel spacers Position panel away from wall to the underside of panel frame tabs. Note: The back plate of The Panel Frame Assembly is installed in 6 sections with 1.5 gaps to allow for water drainage. flashing may not be shown, or may not be shown correctly for your project. please consult local building code or project envelope engineer version 1.9 W22

25 03 System Drawings Inside corner PANEL SPACER INSIDE CORNER FRAME MECHANICAL FASTENER PANEL WOOD DETAIL 4 Inside corner connection between perpendicular panels. For connecting adjacent perpendicular panels. For any angle Other than 90, two End Frames (detail 9,10) may be used. flashing may not be shown, or may not be shown correctly for your project. please consult local building code or project envelope engineer version 1.9 W23

26 03 System Drawings Outside corner MECHANICAL FASTENER PANEL SPACER OUTSIDE CORNER FRAME PANEL WOOD DETAIL 5 Outside corner connection between perpendicular panels. For connecting adjacent perpendicular panels. For any angle other than 90, two End Frames (detail 9,10) may be used. flashing may not be shown, or may not be shown correctly for your project. please consult local building code or project envelope engineer version 1.9 W24

27 03 System Drawings Parapet - Top of wall END FRAME MECHANICAL FASTENER PANEL PANEL SPACER WOOD DETAIL 6A Horizontal top of wall - transition. End Frame used to horizontally terminate the system or transition to sit under parapet/flashing. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W25

28 03 System Drawings Horizontal transition ALTERNATIVE CLADDING END FRAME 3/4 MECHANICAL FASTENER PANEL ALTERNATE END CONDITION USING PERIMETER FRAME ASSEMBLY. PANEL SPACER WOOD DETAIL 6B Horizontal top of wall - transition. End Frame used to horizontally terminate the system or transition. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W26

29 03 System Drawings Soffit - Top of wall END FRAME MECHANICAL FASTENER PANEL PANEL SPACER WOOD DETAIL 6C Horizontal top of wall - transition. End Frame used to horizontally terminate the system or transition; butt to soffit. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W27

30 03 System Drawings Soffit - Fascia DRAINAGE WEEP HOLES MECHANICAL FASTENER END FRAME PANEL PANEL SPACER VENT MATERIAL ALTERNATIVE CONDITION FOR SOFFIT VENTILATION WOOD DETAIL 7 Overhang or build out. A series of horizontal terminations, using the End Frame for an overhang or build out. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W28

31 03 System Drawings Bottom of wall PANEL PANEL SPACER MECHANICAL FASTENER END FRAME DRAINAGE WEEP HOLES WOOD DETAIL 8 Horizontal bottom of wall - transition. End Frame used to horizontally terminate the system for the bottom of wall, weep holes allow for any moisture to escape. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W29

32 03 System Drawings Non-prependicular. inside corner PANEL PANEL SPACER END FRAME MECHANICAL FASTENER WOOD DETAIL 9 Non-perpendicular inside corner for connecting adjacent panels at an angle other than 90. Two End Frames may be used in tandem to create a corner of varying angles. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W30

33 03 System Drawings Non-prependicular. outside corner PANEL PANEL SPACER MECHANICAL FASTENER END FRAME WOOD DETAIL 10 Non-perpendicular inside corner for connecting adjacent panels at an angle other than 90. Two End Frames may be used in tandem to create a corner of varying angles. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W31

34 03 System Drawings Intersection cut-away PANEL FRAME ASSEMBLY TOP CAP BACK PLATE BACK PLATE TOP CAP PANEL SPACER PANEL FRAME ASSEMBLY WOOD DETAIL 11 Vertical/horizontal intersection connection cut away both vertical and horizontal back plates are cut short of intersection to allow for horizontal top cap to tuck under the vertical top cap. flashing may not be shown, or may not be shown correctly for your project please consult local building code or project envelope engineer version 1.9 W32

35 04 Fastener Specifications 1 BONDING SURFACE PANEL SPACER AL13 general installation specifications For sheathed wood frame, AL13 installs directly on building wrap. The mechanical fasteners anchor into building sheathing and studs where available. AL13 frame components System frame components are installed with mechanical fasteners, with a minimum of 2 fasteners per piece. See fastener specs for more details. AL13 panel spacers The panel spacers are installed with mechanical fasteners every 8 on center, mounted vertically every 12 to 18 on center with a minimum of 2 fasteners per piece - and the two middle hangers mounted 8 on center. For narrow panels, a minumum of two panel spacers are required. AL13 panels Panels are fastened by the frame tabs around the entire perimeter. No traditional mechanical fasteners are required in the panel itself. AL13 adhesive tape Acrylic adhesive tape (two sided) is applied full length to the two middle panel spacers - that are placed 8 inches apart - to secure the panel during installation*. See section 4 for specifications. The adhesive tape is redundant for fastening purposes. version 1.9 W33

36 04 Fastener Specifications 2 130(58) 120(54) 130(58) 90(40) 100(45) 110(49) 90(40) 7.93(0.38) 15.66(0.75) 9.81(0.47) 120(54) 110(49) 100(45) 16.70(0.80) 9.40(0.45) 13.15(0.63) 10.02(0.48) 10.44(0.50) 8.77(0.42) 10.02(0.48) 9.40(0.45) 11.07(0.53) 8.56(0.41) 12.53(0.60) 12.11(0.58) 85(38) 8.35(0.40) 8.56(0.41) 10.86(0.52) 90(40) 110(45) 110(49) 90(40) 90(40) 110(49) 120(54) 110(49) 120(54) North American Wind loads 90(40) 100(45) 110(49) 110(54) 130(58) 130(58) 140(63) Please refernce the states on this chart and the info on the next page to find out the approprite wind pressure design loads for your area. version 1.9 W34

37 04 Fastener Specifications 3 USA specs Canada specs Location Mph (m/s) Location KPA PSF Hawaii Victoria, BC Guam Vancouver, BC Virgin Islands Calgary, AB American Samoa Edmonton, AB Regina, SK USA notes Saskatoon, SK ) Values are nominal design 3-second guest wind speeds in miles per hour (m/s) at 33ft (10m) above ground Exposure C category. Winnipeg, MA Toronto, ON ) Linear interpolation contours permitted. Ottawa, ON ) Islands and coastal area outside the last countour shall use the last wind speed contour of the coasatal area. Montreal, QC Quebec City, QC ) Mountainous terrain, gorges, ocean promontories, and special wind regions shall be examines for unusal Fredericton, NB Halifax, NS Canada notes Charlottetown, PE Fastener layout will vary by project depending on the location and the subsequent wind loading for that region. The Canadian National Building Code specifies wind pressure design loads to be determined from statistically averaged wind speeds from across the country over a number of years. The wind load used for design is an hourly wind speed that has a chance of 1 in 50 of being exceeded in any given year plus a factor to take into account for structure height. The chart on page W34 depicts the hourly wind pressures in major centers in Canada (1 in 50). St. John's, NL Whitehorse, YT Yellowknife, NT Iqaluit, NU The structural design values must be determined by following procedures outlined by the local building code. The pressure values listed in the table above (for reference only) are then modified based on local topographical conditions, building construction, and building height (having the greatest effect on wind pressure). version 1.9 W35

38 04 Fastener Specifications 4 The table below provides the fastener spacing (in inches) for the frame components based on substrate and wind load design pressure. Maximum fastener spacing for system frame components ( inches ) DESIG PRESSURE SUBSTRATE PSF KPA 1/2 Plywood 1/2 OSB This table is to be used as a guideline only, and not for engineering purposes. Each project is unique and warrants a review of local building codes and/or hiring of an engineering consultant firm. For further questions pertaining to engineering or for consultant firm recommendations, please visit our engineering site at: version 1.9 W36

39 04 Fastener Specifications 5 Image 1 Image 2 When using the AL13 specified fasteners, care must be taken to install as per the manufacturer s recommendations to achieve the desired strength. All wood fasteners must fully penetrate the sheathing, with the point of the screw not included. Image 1 AL13 recommends the use of AL13 #12 Tredecim-coated mini drill-point fasteners with EPDM washers. Refer to the fastener table for center-tocenter spacing. Image 2 The fastener spacing table refers to the distance between fasteners on the same flange. For frame components with two flanges (inside corner frame, outside corner frame, and main panel frame assembly) the fastener layout is applied to each flange separatley, and it is important to stagger the fastener layout. version 1.9 W37

AL13. Furring Bar Guide. Vol 2 AL13. architectural panel system. Version 1. patent pending

AL13. Furring Bar Guide. Vol 2 AL13. architectural panel system.   Version 1. patent pending 04 AL13 Furring Bar Guide AL13 architectural panel system Vol 2 Version 1 www.al13.com patent pending CLAD THE WORLDTM How to Design for AL13 01 AL13 Architectural Panel System STRUCTURAL FRAMING INSULATION

More information

AL13. Intro. Vol 2 AL13. architectural panel system. Version 1. patent pending

AL13. Intro. Vol 2 AL13. architectural panel system.   Version 1. patent pending 01 AL13 Intro AL13 architectural panel system Vol 2 Version 1 www.al13.com patent pending CLAD THE WORLDTM 01 System Overview AL13 has changed the game. Our metal panel system is cut to fit and snaps together

More information

Exterior System installation instructions

Exterior System installation instructions Exterior System installation instructions 11/20/14 WPS ES-400 & 500 INSTALLATION INSTRUCTION. The WPS ES-400 & 500 systems Façade panels are designed for use as an external wall cladding in conjunction

More information

Siding and Soffit Installation Guidelines

Siding and Soffit Installation Guidelines Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field

More information

Siding and Soffit Installation Guidelines

Siding and Soffit Installation Guidelines Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

Chapter 7. Roof Framing

Chapter 7. Roof Framing Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING

More information

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER: THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

ENVELOPE The Ultimate In Performance In A Dry-Joint System RAINSCREEN (RS) SYSTEM TECHNICAL MANUAL

ENVELOPE The Ultimate In Performance In A Dry-Joint System RAINSCREEN (RS) SYSTEM TECHNICAL MANUAL ENVELOPE 2000 RAINSCREEN (RS) SYSTEM The Ultimate In Performance In A Dry-Joint System TECHNICAL MANUAL System Assembly Substrate Layouts CAD Sections/Details Physical Properties Performance Properties

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

Container Installation Guide

Container Installation Guide Container Insulation Container Installation Guide Panels and Inserts The InSoFast CX Container panel and the Inserts are designed to fit most shipping containers. Containers have three types of corrugations:

More information

ENVELOPE The Ultimate In Performance In A Wet-Sealed System ROUT & RETURN (RR) SYSTEM TECHNICAL MANUAL

ENVELOPE The Ultimate In Performance In A Wet-Sealed System ROUT & RETURN (RR) SYSTEM TECHNICAL MANUAL ENVELOPE 2000 ROUT & RETURN (RR) SYSTEM The Ultimate In Performance In A Wet-Sealed System TECHNICAL MANUAL System Assembly Substrate Layouts CAD Sections/Details Physical Properties Performance Properties

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

Installation Instructions

Installation Instructions Installation Instructions Roof edge trim profile Series TA-4F multi-piece extruded aluminium profile front face height series TA-4F: 150-200 mm with patented 4F brackets height-adjustable, horizontally

More information

DRY SEAL INSTALLATION GUIDE

DRY SEAL INSTALLATION GUIDE DRY SEAL INSTALLATION GUIDE Effective September 2015 Tech Support: 800.523.2347 LaminatorsInc.com TABLE OF CONTENTS Handling and Maintenance of Omega-Lite Panels 1 System Limitations and Pre-Installation

More information

a3 CERAMICSTEEL FLOW TECHNICAL GUIDE

a3 CERAMICSTEEL FLOW TECHNICAL GUIDE a3 CERAMICSTEEL FLOW TECHNICAL GUIDE PolyVision a3 CeramicSteel Flow provides an ideal blend of consistent performance, a variety of aesthetic choices and long-term durability. Whether used as a full height

More information

Resysta Wall Cladding Installation Guidelines

Resysta Wall Cladding Installation Guidelines Resysta Wall Cladding Installation Guidelines NOTE: Proper planning of the wall cladding layout is essential for ease of installation of wall cladding boards and wall cladding components. Thoroughly read

More information

DuraLife Capped Composite Decking Installation Instructions

DuraLife Capped Composite Decking Installation Instructions DuraLife Capped Composite Decking Installation Instructions Planning the design of the deck is the beginning of a successful project. 1. Read the application instructions carefully before starting the

More information

TruGrain 12 Inch Commercial Profile Installation Recommendations

TruGrain 12 Inch Commercial Profile Installation Recommendations TruGrain 12 Inch Commercial Profile Installation Recommendations o Delivery, Storage and Handling o General Requirements o Application of Stain & Sealer o Storage and Handling (Post-Treatment) o Installation

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

PORTA-FAB Cleanroom Wall Systems

PORTA-FAB Cleanroom Wall Systems PORTA-FAB Cleanroom Wall Systems FABLINE FURRING 500 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing Composite Decking Installation Guide Hidden Plastic Clip Fixing Table of Contents SECTION ONE: General Information Site Preparation......2 Site Storage.....2 Safety. 2 Tools....2 Foundation & Sub Structure.2

More information

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions Thank you for purchasing the Genesis Dura-Max Brick Panel system for your project. The system allows you to have the look

More information

maintenance-free free from painting easy to install Fixing Guide Cedral Click

maintenance-free free from painting easy to install Fixing Guide Cedral Click maintenance-free free from painting easy to install Fixing Guide Cedral Click www.cedralsidings.com CONTENT Step by step guide to installing your Cedral Click façade Required materials and tools 1. Prepare

More information

Cladding & Facade Installation Guide (888)

Cladding & Facade Installation Guide (888) TruOrganics Cladding & Facade Installation Guide (888) 788-2254 The Collection Decking Systems TRUORGANICS SQUARE EDGE 5-7/16 Wide Plank Dims: 192 L x 5-7/16 W x 7/8 H Available Colors SEDONA GLACIER DENALI

More information

rout & return INSTALLATION GUIDE

rout & return INSTALLATION GUIDE rout & return INSTALLATION GUIDE Effective October 2016 Tech Support: 800.523.2347 LaminatorsInc.com TABLE OF CONTENTS Handling and Maintenance of Omega-Lite Panels 1 System Limitations and Pre-Installation

More information

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers version 2.5 updated as of 08.04.2017 2 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers 2.0 ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

DuPont Tyvek Wall Underlay Install Guide

DuPont Tyvek Wall Underlay Install Guide DuPont Tyvek Wall Underlay Install Guide (For Residential & Light Commercial Buildings) Acceptable Solution to NZBC E2/AS1 New Zealand As at 1/4/15 Version 2 Subject to change without notice DuPont Tyvek

More information

INSTALLATION INSTRUCTIONS FOR PLASCORE L2550 LINER WALL

INSTALLATION INSTRUCTIONS FOR PLASCORE L2550 LINER WALL INSTALLATION INSTRUCTIONS FOR PLASCORE L2550 LINER WALL The following information is provided by Plascore, Inc., as a general guideline for the installation of the L2550 Liner Wall System. This information

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised February 6, 2015 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

Container Installation Guide

Container Installation Guide Continuous Insulation Container Installation Guide Panels and InSerts The InSoFast CX Container panel and the InSerts are designed to fit most shipping containers. Containers have three types of corrugations:

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Technical Data Sheet

Technical Data Sheet Technical Data Sheet ProGUARD Concrete Insulated Sheathing Specifications & Installation Table Of Contents Product Description... pg. 1 Basic Use... pg. 1 Exterior Finishes... pg. 1 Standard Sizes... pg.

More information

SPECIFICATIONS Section Cantilevered Walkway Cover

SPECIFICATIONS Section Cantilevered Walkway Cover Part 1: General 1.1 Related Documents SPECIFICATIONS Section 107301 Cantilevered Walkway Cover A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.2 Engineering

More information

Resysta Gold and Platinum Decking Installation Guidelines

Resysta Gold and Platinum Decking Installation Guidelines Resysta Gold and Platinum Decking Installation Guidelines NOTE: Proper planning of the deck layout is essential for ease of installation of deck boards and deck components. Thoroughly read the following

More information

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver. The Knife Edge Cove is a modular lighting system consisting of two parts: 1- An aluminum fixture housing extrusion 2- Drop-in lighting modules The fixture will provide a continuous knife edge architectural

More information

Sentry Buildings. Assembly Book. the Richmond. 16'x32' Building w/ Full Loft. Revised February 6, 2015

Sentry Buildings. Assembly Book. the Richmond. 16'x32' Building w/ Full Loft. Revised February 6, 2015 Sentry Buildings Assembly Book Revised February 6, 2015 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS Window Fastening Although all possible measures have been taken to insure the accuracy of the material presented, WIXSYS, and the author are not

More information

Installation Guide (888)

Installation Guide (888) BamDeck Pro360 Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK PRO360 5-1/2 Wide Plank Dims: 96 L x 5-1/2 W x 7/8 H BAMDECK PRO360 16FT. 5-1/2 Wide Plank Dims: 192 L x 5-1/2 W

More information

INSTALLATION INSTRUCTIONS LAMINATE

INSTALLATION INSTRUCTIONS LAMINATE INSTALLATION INSTRUCTIONS LAMINATE DROP LOCK GENERAL INSTRUCTIONS FOR LAMINATE HARDWOOD FLOORING ACCLIMATION Acclimation is a recommended procedure prior to installation of laminate flooring either on

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

Guideline Specifications

Guideline Specifications Page 1 of 7 PART 1 Guideline Specifications Exterior Aluminum/Composite Wall Panels GENERAL ARROWHEAD 508 SYSTEM Pressure Equalized Rainscreen SECTION 07410 1.01 SUMMARY A. Work of this section included

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SECTION 07 42 43 All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SPEC NOTE: Optional text is indicated by square brackets []. Delete unwanted items and

More information

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex

More information

AGA Roof Deck Pavers. AGA Concrete Paver. Technical. Pavers: Hydraulically pressed concrete pavers: 460 tons of pressure.

AGA Roof Deck Pavers. AGA Concrete Paver. Technical. Pavers: Hydraulically pressed concrete pavers: 460 tons of pressure. Cut Sheet AGA Roof Deck Pavers AGA Concrete Paver Overview: AGA Standard sized pavers are manufactured to meet project requirements. Custom: we offer a variety of custom sizes and a mixture of colors and

More information

The better way to build TM. Installation Manual NAILBASE PANELS

The better way to build TM. Installation Manual NAILBASE PANELS The better way to build TM Installation Manual PANELS November 2018 SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

SRP-AirOutshield UV Issued:

SRP-AirOutshield UV Issued: SECTION 07276: SRP-AirOutshield UV Ultra Violet (UV) resistant, Vapour Permeable Air Barrier Underlayment and Sheathing Membrane Guide Specification This specification is a guide only and may need editing

More information

WPC Vinyl Floor Installation Guide

WPC Vinyl Floor Installation Guide WPC Vinyl Floor Installation Guide Introduction This guide will take you through the necessary steps to install your Bel-Air WPC Vinyl Flooring. Make sure to carefully read through this guide so that you

More information

Guardian Wall Panel Installation Manual

Guardian Wall Panel Installation Manual Guardian 275 4 Wall Panel Installation Manual Guardian 275 4 Wall Panel Installation Manual This instructional manual provides General Installation Instruction. Installers should refer to the "as-built"

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Mbrico Tile Rooftop/Raised Floor Installation Guidelines

Mbrico Tile Rooftop/Raised Floor Installation Guidelines Mbrico Tile Rooftop/Raised Floor Installation Guidelines *The following information is the installation guidelines Mbrico recommends when installing the Mbrico Tile Rooftop system. Installation guidelines

More information

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.*** ***This section has been updated to IBC. Verify for specific project conditions.*** PART 1 GENERAL 1.1 SUMMARY ***Edit to project requirements*** A. Section Includes: 1. Clear copper and preweathered copper

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848

LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848 LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848 International Fireproof Technology Inc. 17528 Von Karman Avenue Irvine, CA 92614 This report is for the exclusive

More information

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:

More information

Installation Guidelines: Two Piece Molding Systems

Installation Guidelines: Two Piece Molding Systems Installation Guidelines: Two Piece Molding Systems WARNING: FAILURE TO FOLLOW THESE GUIDELINES WILL VOID THE STANDARD WARRANTY. BE SURE TO READ, UNDERSTAND AND FOLLOW ALL GUIDELINES. Manufacturer guidelines

More information

AXIOM Building Perimeter System Assembly and Installation Instructions

AXIOM Building Perimeter System Assembly and Installation Instructions CEILING SYSTEMS AXIOM Building Perimeter System Assembly and Installation Instructions 1 GENERAL 1.1 Description Axiom Building Perimeter Systems (ABPS) is a pre-engineered perimeter solution to accomplish

More information

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS Insulation First Revison October 2016 DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS 1. General Information This Guide describes the use of Kingspan GreenGuard DC14 Drainage

More information

SECTION EXTERIOR GRILLS AND SCREENS

SECTION EXTERIOR GRILLS AND SCREENS SECTION 10 82 13 PART 1 GENERAL PART 1 1 SUMMARY A. Section Includes: 1. Exterior perforated aluminum screen wall system with Ombrae TM Optical Tile imaging technology. 2. Accessories including attachments,

More information

Tremline. Fascia System. Installation Procedures

Tremline. Fascia System. Installation Procedures Tremline Fascia System Installation Procedures 5 TOP CAP MITERED TOP CAPS JOINT PLATE RIGHT-HAND END CAP PREFAB OUTSIDE CORNER 10 FASCIA FASCIA HOLDER 10 FASCIA CLAMPING RING DECK BRACKET SCUPPER PREFAB

More information

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description Ceiling Systems Between us, ideas become reality METALWorkS General Installation Instructions RH200 Custom Hook-on Panels 1.0 GENERAL 1.1. Product Description RH200 system is a downward accessible, metal

More information

Revision Date: April 01, Premier Vinyl Enclosure

Revision Date: April 01, Premier Vinyl Enclosure Premier Vinyl Enclosure www.urbanindustries.com 53 Urban Industries, Inc. 2008 Tools The following tools are recommended for the installation of the Premier Vinyl Enclosure and roof. 1 2 Level 1 4 Level

More information

Decking Installation Guide. v AUS

Decking Installation Guide. v AUS Decking Installation Guide v20180618 AUS IMPORTANT: Read All Sections Before You Start For the most up to date information, please visit our website @ www.newtechwood.com.au Prior to installing any composite

More information

DL-200. Specifications

DL-200. Specifications DL-200 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Structural Preformed Metal Roofing PART 1: GENERAL 1.01

More information

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT 2-2012 The PV-RoofTopRac System has been developed as a universal system for roof-mounting on pitched roofs.

More information

Façade Architectural Wall Panel System - Guide Specification 3/11/2017 SECTION FRAMED DECORATIVE PANEL SYSTEMS PART 1 - GENERAL 1.

Façade Architectural Wall Panel System - Guide Specification 3/11/2017 SECTION FRAMED DECORATIVE PANEL SYSTEMS PART 1 - GENERAL 1. SECTION 09 7710 FRAMED DECORATIVE PANEL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Decorative ½ / ¾ (13mm/19mm) thick prefinished panel with preengineered attachment clip along with hardware

More information

WEIGHT PER PIECE (LBS.)

WEIGHT PER PIECE (LBS.) PRODUCT DESCRIPTION DATA SHEET 04 73 19-US BASIC USE ProGUARD DP is intended to be installed over sheathing and waterproofing over steel or wood studs or over concrete masonry units or poured concrete

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants.

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. Section 07 42 13 Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. 1.2 RELATED SECTIONS A. Section 06112 - Framing

More information

INSTALLATION GUIDE COMPOSITE DECKING

INSTALLATION GUIDE COMPOSITE DECKING INSTALLATION GUIDE COMPOSITE DECKING sales@ecoscapeuk.co.uk CONTENTS STORAGE & HANDLING 03 SAFETY & USE 04 TOOLS 05 CALCULATING BOARDS 06 DECKING COMPONENTS + ACCESSORIES 07 PRE INSTALLATION NOTES 09 FALLS

More information

Installation Guidelines: Two Piece Molding System

Installation Guidelines: Two Piece Molding System Installation Guidelines: Two Piece Molding System WARNING: FAILURE TO FOLLOW THESE GUIDELINES WILL VOID THE STANDARD WARRANTY. BE SURE TO READ, UNDERSTAND AND FOLLOW ALL GUIDELINES. Manufacturer guidelines

More information

HORIZON AND SYMMETRY CLADDING INSTALLATION INSTRUCTIONS

HORIZON AND SYMMETRY CLADDING INSTALLATION INSTRUCTIONS HORIZON AND SYMMETRY CLADDING INSTALLATION INSTRUCTIONS 1-800-573-8841 FIBERONCLADDING.COM GENERAL GUIDELINES 1. Only Fiberon Horizon and Symmetry products are approved for use in cladding and screen façade

More information

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N A M E R I C A N A R C H I T E C T U R A L AAMA 2410-13 Standard Practice for Installation of Windows with an Exterior Flush Fin Over an Existing Window Frame M A N U F A C T U R E R S A S S O C I A T I

More information

Installation Instructions

Installation Instructions Installation Instructions This document should be printed and readily available at the installation site. QDuct is a userfriendly system that will save installation time and labor. Installation videos,

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

Euro Corner Entry Shower Screen Installation Instructions

Euro Corner Entry Shower Screen Installation Instructions Euro Corner Entry Shower Screen Installation Instructions Corner Entry Space Saving Design Dual Sliding Doors, magnetic seals Silver Frame 6mm Clear Safety Glass Can be installed on shower base or tiled

More information

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09 PART 1 - GENERAL 1.01 SUMMARY A. Types of cold-formed metal framing units include the following: 1. C-shaped steel studs B. Related work specified elsewhere includes but may not be limited to: 1. Section

More information

Vertigo Cladding Board

Vertigo Cladding Board Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not

More information

PREMIER V Bucko Cast In Place

PREMIER V Bucko Cast In Place PREMIER V Bucko Cast In Place 28972 R. Ave Adel, Iowa 50003 800-343-9370 1850 West Adriatic Place Englewood, Colorado 80110 303-935-4679 Visit Monarch Materials Group, Inc. at www.monmatgrp.com Premier

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS)

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) SECTION 07412 COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Perm-A-Barrier VPS (Vapor Permeable Sheet)

Perm-A-Barrier VPS (Vapor Permeable Sheet) VPS (Vapor Permeable Sheet) Self-adhering vapor permeable air barrier membrane Product Description VPS (Vapor Permeable Sheet) is a vapor permeable air barrier membrane consisting of a proprietary breathable

More information

SPECIFICATIONS Section Gable Walkway Covers

SPECIFICATIONS Section Gable Walkway Covers Part 1: General 1.1 Related Documents SPECIFICATIONS Section 107303 Gable Walkway Covers A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.2 Engineering Design

More information

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain INSTALLATION INSTRUCTIONS Multi-Piece Shower with Trench Drain (For models requiring cut-out in floor) 1062 This packet includes installation instructions for the Bestbath products shown below. (These

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain INSTALLATION INSTRUCTIONS Multi-Piece Shower with Trench Drain (For models with standard pan) 105 This packet includes installation instructions for the Bestbath products shown below. (These instructions

More information

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Introduction: The ProVantage Glass Block Installation System is the easiest way to install Pittsburgh Corning Premiere

More information

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED RAINSCREEN SYSTEM

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED RAINSCREEN SYSTEM RAINSCREEN (H&J) SYSTEM INSTALLATION DATA & DETAILS Omnis Panels, Inc. Architectural Building Panels 22 East Chicago Avenue Suite 210 Naperville, Illinois 60540 (800) 450-6099 (630) 355-4040 Fax: (630)

More information

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED RAINSCREEN SYSTEM

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED RAINSCREEN SYSTEM RAINSCREEN (H&J) SYSTEM INSTALLATION DATA & DETAILS Omnis Panels, Inc. Architectural Building Panels 22 East Chicago Avenue Suite 210 Naperville, Illinois 60540 (800) 450-6099 (630) 355-4040 Fax: (630)

More information

Installation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.

Installation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational. Installation Guide IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.com Before installing a composite wall cladding, it is recommended

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual FORM FOOTWALL (floating) Installation Manual FORM FOOTWALL (floating) OVERVIEW The Form is a UL-listed configurable footwall system. This system can include any combination of base cabinets, upper cabinets,

More information