LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1

Size: px
Start display at page:

Download "LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1"

Transcription

1 March 22, 2013 LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1 This Addendum becomes a part of the Contract Documents and modifies them only to the extent herein set forth. Each prime bidder is responsible for distribution of information conveyed by this Addendum to its subbidders and suppliers. Attachments: Pre-Bid Meeting Agenda Bid Form (revised) Section Addendum Drawings M-1a, M-1b ITEM NO. 1: Pre-Bid Meeting A pre-bid meeting was held on March 19, The meeting agenda is attached as supplemental information and clarification. Attendees included Kraig Beilharz (Beilharz Architects, Inc.), Greg Williamson (LLSD Superintendent), David Miller (LLSD Treasurer), David Grismore (LLSD Building & Grounds Superintendent), Tim Frost (Baker-Shindler), Andrew Reinhart (McDonalds Design & Build), Tim Schroeder (Schroeder Masonry), Bob Luttfang (Schimmoeller Construction). ITEM NO. 2: Bid Form Replace the Bid Form in the Project Manual with the attached revised Bid Form. Refer to Section item below for revision of Alternates. ITEM NO. 3: Section Alternates Paragraph 1.02.C: Revise Alternate 3 to Alternate 3A. Revise description of alternate as follows: 1. Base Bid Item: Provide polished concrete floor finishes at scheduled locations; refer to Section and Drawing A Alternate Item: At locations scheduled to receive Exposed Concrete (E) or Polished Concrete (PC), provide epoxy resin flooring system in lieu of scheduled finish; refer to Section and Drawing A-2. Add Alternate 3B: Polished Concrete 1. Base Bid Item: Provide polished concrete floor finishes at scheduled locations; refer to Section and Drawing A CENTRAL AVENUE. CINCINNATI. OHIO (T) (F)

2 2. Alternate Item: At locations scheduled to receive Exposed Concrete (E), provide Polished Concrete (PC); refer to Section and Drawing A-2. ITEM NO. 4: Section Steel Joist Framing Add attached Section. ITEM NO. 5: Sheet AD-1 Demolition Plans South Locker Room Demolition Plan 1: Relocate one additional receptacle to new south wall of Hall 101 from existing room east of hall. Remove light switch and wiring to approved junction box location above ceiling. 1. Relocate diffuser and grille to new SAT ceiling; provide ductwork as required; refer to 3/M Existing individual shower rooms: Remove four switches and wiring to approved junction box location above ceiling. ITEM NO. 6: Sheet A-2 Schedules and Details Room Finish Schedule: 1. Floor Material Legend, mark E: Refinishing and sealing of exposed concrete shall include removal of existing paint. 2. Shower 104: Change south and east wall finishes to GB (new); remove existing Glazed Block and install new GB matching new GB on other walls. Patch ceiling at removed areas; paint. ITEM NO. 7: Sheet M-1 HVAC and Plumbing Plans and Details Add Structural Plans and Details to sheet title. Refer to attached Addendum Drawings M-1a and M-1b for structural framing modifications for rooftop unit support. END OF ADDENDUM

3 PRE-BID MEETING AGENDA PROJECT: Leipsic locker room renovations (Notes from meeting are in italics) LOCATION: Leipsic Local school DATE: Tuesday, March 19, 2013 A. SIGN-IN SHEET B. INTRODUCTIONS C. OBTAINING PLANS AND SPECIFICATIONS 1. Beilharz Architects, Defiance, Ohio; $50 (refundable less shipping) 2. Plan Rooms D. SITE VISITS 1. All visitors must register and obtain a visitor s pass at the School office 2. (confirm with Dave Grismore) a. Call ext 4007 to set up an appointment to visit the site. E. BIDDERS QUESTIONS 1. to Leon Ruch at leonr@beilharzarchitects.com 2. Administrative, plan request, bidder s list, etc. contact Cathy Cooley 3. Check website: 4. No later than 4-days prior to bid opening F. SUBSTITUTIONS 1. Substitution product requests must be made by Prime Bidders only a. This is a single General Contract project.(includes all trades) 2. Substitution Request Form; see Form No later than 5-days prior to bid opening G. AVAILABLE INFORMATION (see Section ) 1. General Conditions: Obtain copy from AIA H. BID FORMS (see Section ) 1. Submit in duplicate; including all attachments 2. Acknowledge receipt of all Addenda 3. Contracts: a. General Work (includes all trades) 4. Bid attachments: a. Bid Guaranty and Contract Bond (or certified check) b. Out-of-State Corporation Information; see Section c. Hourly Rates and Markups I. BID OPENING 1. 12:00 Noon EDT, Tuesday, April 2, Bid results will not be made available to Bidders for at least 24 hours after opening. 3. Bid tabulation shall be posted on website 1 P a g e

4 4. Bids to be good for 60-days J. PROJECT DESCRIPTION & SCOPE OF WORK 1. Project estimate: $265,000 (all Primes) 2. Scope of Work: See Section K. CONTRACT TIME SCHEDULE 1. Notice to Proceed: a. After Board Meeting early April. (Board meeting is April 8, 2013 at 7:00 PM.) 2. Substantial Completion: July 1, Final Completion: 7 days after Substantial Completion 4. Liquidated Damages: see Section L. OWNER-SUPPLIED PRODUCTS (see Section ) Material receipt, storage, installation, etc by Contractor 1. Lavatories and faucets 2. Toilet paper, sanitary napkin, soap dispenser, paper towel dispenser and sanitary napkin dispenser 3. Note: Owner supplied products are only applicable to the alternate bids; otherwise they are furnished as scheduled under the base bid) M. WORK RESTRICTIONS 1. Interior work in existing building areas during school hours shall be strictly limited to the works and staging areas. 2. Interaction between contractors (including subcontractors) and School staff, students and personnel is strictly prohibited. (There will be zero tolerance regarding this matter) 3. This is a tobacco-free campus! 4. Loud music is prohibited during school hours 5. Hours of non-school activity: 6. Use of Site; limited to staging area. Parking as approved by School. a. All access / parking shall be by the SW corner of the work area adjacent to locker room 102. b. Owner will provide access to the school; no keys will be issued to contractors. c. There shall be no trailers utilized as existing area in the school has been designated for contractor use. d. Dumpsters shall be located in the parking area designated, however it shall be removed one week prior to graduation (May 19, 2013) and placed back in this location afterwards. e. Work hours shall be as follows: (unless otherwise agreed to by the School) i. 5:00 AM to 11:00 PM until May 22, ii. 6:30 AM to 4:00 PM for the remainder of the project. f. Attempt to avoid loud tools and equipment during school hours; however it is not a requirement. School starts at 8:00 AM and is out at 3:04 PM. g. Motorized vehicle / machinery are not permitted. Provide ventilation for any motorized power tools. N. PROJECT MANAGEMENT AND COORDINATION (see Section ) 1. The General Contractor is designated as the single prime and shall have responsibility for coordinating all contractors. 2. The GC is the custodian of the building and premises; protect existing finishes 3. The General Contractor shall conduct all construction progress meetings. 2 P a g e

5 O. QUALITY REQUIRMENTS (see Section ) 1. Perform work in accordance with Codes, Regulations and Standards 2. Tax exempt; request and obtain tax exempt certificate from Owner 3. Permits and fees: the architect has made application for state plan approval. 4. Any additional permits, taps, fees, inspections, etc shall be secured and borne by the Contractor. P. WORK OR SERVICES BY OTHERS (see project manual) 1. Special Inspections and Testing, pursuant to Section OBC a. Owner will contract directly with Independent Testing Firm (ITF) b. Contractor shall coordinate and schedule all required testing with ITF Q. TEMPORARY FACILITIES AND CONTROLS (see Section ) 1. Temporary Utilities a. From Owner s existing systems b. Toilet room west corridor accessible to contractors. R. SAFETY 1. OSHA 2. Ohio Industrial Commission, Chapter IC-3 3. Federal OSHA Safety and Health Regulations for Construction 4. OUPS X. INSURANCE 1. Refer to General Conditions Article Refer to Supplementary Conditions Article Owner to provide & maintain Builders Risk Insurance (excludes tools, trailers, equipment, scaffolding, etc.) AA. BB. CC. DD. PREVAILING WAGE 1. Not Applicable SPECIAL CONDITIONS 1. Progress cleaning; maintain a clean and safe jobsite at all times 2. Owner salvaged materials; see Sheet AD-1. (Owner reserves salvage rights to all materials prior to demolition by contractors) QUESTIONS SITE TOUR 3 P a g e

6 BID FORM (Submit two copies of Bid Form and all attachments) BIDDER: PROJECT: BIDS DUE AT: Leipsic Local Schools Leipsic Local Schools Locker Room Alterations 232 Oak Street 232 Oak Street Leipsic OH Leipsic OH BIDS DUE BY: Tuesday, April 2, 2013, 12:00 Noon EDT Having read the bid documents and specifications and examined the drawings prepared by the Architect, Beilharz Architects, Inc., Defiance, Ohio, for the item of work described above, and having inspected the site and the conditions affecting and governing the construction of the said project, and acknowledging that the bid documents, specifications and drawings are adequate for the performance of the Work, the undersigned hereby proposes to furnish all materials and perform all labor, as described in the specifications and shown on the drawings, for the following sum. Bid shall be good for 60 days. BASE BID: Complete Work for the Stipulated Sum of... $ ALTERNATE 1: Rooms ADD $ ALTERNATE 2: Reuse Lavatories and Accessories... DEDUCT $ ALTERNATE 3A: Resinous Flooring... ADD $ ALTERNATE 3B: Polished Concrete... ADD $ ALTERNATE 4: 2011 Building HVAC... ADD $ ALTERNATE 5: 2011 Building Storefront... ADD $ Addenda received and included in this Bid: No.,,,,. Attachments to Bid Form (submit 2 copies): Bid Guaranty and Contract Bond (or certified check) Out-of-State Corporation Information Hourly Rates and Markups List of Subcontractors SIGNED: (Signature) (Name of Company or Corporation) (Printed Name) (Business Address) (Title) (Date of Signature) (Phone) B LEIPSIC LOCAL SCHOOLS - LOCKER ROOM ALTERATIONS Addendum 1

7 SECTION STEEL JOIST FRAMING PART 1 GENERAL 1.01 SECTION INCLUDES: A. Open web steel joists, with bridging, attached seats and anchors. B. Loose bearing plates and anchors for site placement PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION: A. Section Unit Masonry: Bearing plates and anchors RELATED SECTIONS: A. Section Common Work Results for Masonry: Grouting base plates and bearing plates. B. Section Metal Fabrications REFERENCES: A. ASTM A36 Carbon Structural Steel. B. ASTM A325 Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength. C. ASTM F1554 Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength. D. AWS D1.1 Structural Welding Code - Steel. E. SJI Specifications, Load Tables, and Weight Tables for Steel Joists and Joist Girders. F. SSPC 15 Steel Joist Shop Primer SUBMITTALS: A. Submit under provisions of Section B. Shop Drawings: Submit 3 copies with Professional Engineer seal and signature, in addition to the number required by Section , for distribution to governing authorities. 1. Indicate joist manufacturer, grades of steel, standard designations, configuration, sizes, length of each joist, spacing, locations of joists, joist leg extensions. 2. Indicate field connections, panel point spacing, size of all members, primer, and shop welding details. 3. Indicate joist erection coding, bridging, connections, and attachments. 4. Indicate cambers. B LEIPSIC LOCAL SCHOOLS - LOCKER ROOM ALTERATIONS Addendum 1

8 5. Shop drawings for Special joists shall include loading conditions, stress diagrams, calculations, member sizes, types and sizes of gussets (if any), connectors, and an analysis of all combined compressive and tensile forces QUALITY ASSURANCE: A. Perform Work in accordance with SJI Specifications and tables, including headers and other supplementary framing. B. Erector Qualifications: Company specializing in performing the work of this section with minimum five years documented experience. C. Design Special joists, drift loads, concentrated loading conditions, field connections, and other special conditions indicated on the Drawings, under direct supervision of a Professional Structural Engineer experienced in design of this work and licensed at the place where the Project is located. 1. Live load deflection for Special joists shall not exceed SJI Specifications. Maximum allowable total load deflection shall be as follows: a. Roof Joists with Gypsum Board or Plaster: 1/360 of span. b. Other Conditions: 1/240 of span DELIVERY, STORAGE, AND HANDLING: A. Deliver, store, protect, and handle products to site under provisions of Section and in accordance with SJI requirements. B. Coordinate delivery schedule of built-in items, such as bearing plates and anchors, with installer. PART 2 PRODUCTS 2.01 FABRICATORS: A. New Columbia Joist Company. B. New Millennium Building Systems, LLC. C. Socar, Inc. D. Vulcraft Division, Nucor Corp. E. Substitutions: Refer to Section MATERIALS: A. Steel: In accordance with SJI Specifications. B. Structural Steel for Bridging, Supplementary Framing, and Joist Leg Extensions: ASTM A36. C. Bearing Plates: ASTM A36. B LEIPSIC LOCAL SCHOOLS - LOCKER ROOM ALTERATIONS Addendum 1

9 D. Bolts, Nuts and Washers: ASTM A325; plain, uncoated finish. E. Anchor Bolts, Nuts and Washers: ASTM F1554, Grade 36. F. Welding Materials: AWS D1.1; type required for materials being welded. G. Shop and Touch-Up Primer: SSPC 15, Type 1, red oxide; or manufacturer s standard shop primer with equivalent performance characteristics FABRICATION: A. Open Web Joist Members: SJI Type K, parallel chord; underslung ends with top chord bearing. B. Fabricate to achieve end bearing of 2½ inches on steel; 4 inches on masonry. C. Develop camber in accordance with SJI Specifications for all joists. Camber is not optional. D. Provide bridging for all joists in accordance with SJI Specifications for size, type, and spacing. 1. Provide bridging anchors at ends of bridging lines FINISH: A. Prepare joist component surfaces in accordance with SSPC procedures. B. Shop prime joists. 1. Do not prime surfaces that will be field welded, or in contact with concrete or grout. 2. Do not prime surfaces indicated to receive spray-applied fireproofing. PART 3 EXECUTION 3.01 EXAMINATION: A. Verify existing conditions prior to beginning fabrication or erection. B. Verify that supports are properly installed and braced prior to beginning erection ERECTION: A. Coordinate placement of anchors in masonry construction for securing bearing plates. B. Erect and bear joists on supports. C. Erect joists in accordance with SJI Specifications and OSHA requirements. D. Allow for erection loads. Provide sufficient temporary bracing to maintain framing safe, plumb, and in true alignment. E. Do not apply construction or erection loads until completion of bridging installation and anchorage. B LEIPSIC LOCAL SCHOOLS - LOCKER ROOM ALTERATIONS Addendum 1

10 F. After joist alignment and installation of framing, field weld joist seat to bearing plates or structural framing. G. Do not permit erection of decking until completion of erection and installation of permanent bridging and bracing. H. Do not field cut or alter structural members without approval of joist manufacturer. I. After erection, prime welds, abrasions, and surfaces not shop primed ERECTION TOLERANCES: A. Maximum Variation from Plumb: ¼ inch. B. Maximum Offset from True Alignment: ¼ inch. END OF SECTION B LEIPSIC LOCAL SCHOOLS - LOCKER ROOM ALTERATIONS Addendum 1

11

12

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.01 SECTION INCLUDES A. Structural steel framing members and support members. B. Base plates, shear stud connectors. C. Grouting under base plates. 1.02

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION STEEL JOIST FRAMING

SECTION STEEL JOIST FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: PART 1 GENERAL 1.1 WORK INCLUDED A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: 1.2 RELATED WORK 1. Metal Roof Deck. A. Structural Steel:

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

SECTION STRUCTURAL STEEL FRAMING

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 12 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // ---// if not applicable to project. Also delete any other item or paragraph

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as

More information

Commission No Section

Commission No Section Commission No. 1511 Section 05120-1 PART ONE - GENERAL 1.1 DESCRIPTION A. Work Included: Structural steel and grout. Furnish, fabricate, mark for erection identification, pack, crate, or otherwise properly

More information

STRUCTURAL STEEL FRAMING Section

STRUCTURAL STEEL FRAMING Section PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Structural steel. 2. Grout. 1.2 DEFINITIONS A. Structural Steel: Elements of the structural frame indicated on Drawings and as described in AISC 303,

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5. SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,

More information

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

A. Product Data: For each type of cold-formed steel framing product and accessory.

A. Product Data: For each type of cold-formed steel framing product and accessory. SECTION 05400 - COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior non-load-bearing wall framing. 1.2 ACTION SUBMITTALS A. Product Data: For each type of cold-formed

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

PAWLEYS ISLAND TOWN HALL

PAWLEYS ISLAND TOWN HALL DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

Plainview ISD High School Addition and Renovations 1501 Quincy Avenue Plainview, Texas

Plainview ISD High School Addition and Renovations 1501 Quincy Avenue Plainview, Texas August 8, 2011 Plainview ISD High School Addition and Renovations 1501 Quincy Avenue Plainview, Texas Chapman Harvey Architects, Inc. 612 Broadway Lubbock, Texas 79401 806-749-1153 CHA, Inc. Project #1029

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

FABRICATED FIREPROOFED STEEL COLUMNS

FABRICATED FIREPROOFED STEEL COLUMNS BLACK ROCK FIREPROOF COLUMN Black Rock Fireproof Column Co. 164 School Street East Hartford, CT 06108 Phone: (860) 936-3344 Fax: (860) 289-2908 Email: info@blackrockcolumn.com Website: www.blackrockfireproof.com

More information

2. Clarification: The building address is 801 Henderson Street.

2. Clarification: The building address is 801 Henderson Street. East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction

More information

DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND FAX:

DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND FAX: DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND 21740 301-733-5600 FAX: 301-733-5612 SECTION 05400 - COLD FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09 PART 1 - GENERAL 1.01 SUMMARY A. Types of cold-formed metal framing units include the following: 1. C-shaped steel studs B. Related work specified elsewhere includes but may not be limited to: 1. Section

More information

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING SUNY GENESEO 051200-1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment.

2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment. East Energy Chiller 1 Cooling Tower Addition State Project Number H27-1969 Addendum One June 28, 2012 NOTE: The following amendments, additions, and deletions shall be made to the Construction Documents

More information

DIVISION 5 METALS SECTION METAL DECKING

DIVISION 5 METALS SECTION METAL DECKING DIVISION 5 METALS SECTION 05 30 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install metal decking and accessories including shear connectors, closures,

More information

McPherson Contractors, Inc.

McPherson Contractors, Inc. McPherson Contractors, Inc. Construction Manager Manual Jardine K-8 Campus Bid Package #2 Building Package Invitation to Bid *****FROM***** McPherson Contractors, Inc. 3501 SW Fairlawn Rd., Suite 100 Topeka,

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO

CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO. 16-01 RESTORATION OF THE HISTORIC TRANSPORTATION CENTER PHASE III BID RECEIPT: o Sealed bids shall be received

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT DEVELOPMENT SERVICES DEPARTMENT BUILDING AND SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 SPECIAL INSPECTION AGREEMENT PERMIT NUMBER: DATE: OWNER:

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

BID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO

BID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO Bid Proposal Form C.I.P. NO. 2016-012 PROJECT: BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND ATTACHMENTS AS REQUIRED SUBMITTED BY: (Bidder s Name) In accordance with the City of Commerce s Notice

More information

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4 RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the

More information

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES CHAPTER 2 RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES 2.1 PURPOSE The purpose of this chapter is as follows: 2.1.1 To define and draw attention to the typical duties

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina Project Manual for Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina DWG Consulting Engineers 1009 Anna Knapp Blvd. Suite 202 Mt Pleasant, South Carolina 29464

More information

Mezzanines By Design Page 1

Mezzanines By Design Page 1 SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY

More information

WINDOW REPLACEMENT FOR ARCHITECT'S NO NORWOOD ELEMENTARY SCHOOL. A. Project Name: Window Replacement for Norwood Elementary School.

WINDOW REPLACEMENT FOR ARCHITECT'S NO NORWOOD ELEMENTARY SCHOOL. A. Project Name: Window Replacement for Norwood Elementary School. WINDOW REPLACEMENT FOR ARCHITECT'S NO. 2638 NORWOOD ELEMENTARY SCHOOL DOCUMENT 00 9113A - ADDENDUM NO. 1 1.1 PROJECT INFORMATION A. Project Name: Window Replacement for Norwood Elementary School. B. Owner:

More information

SECTION COMPOSITE METAL DECKING

SECTION COMPOSITE METAL DECKING PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Statement. Special Inspection

Statement. Special Inspection Statement of Special Inspection Special Inspection Approval Project Name: Location: Owner: Owner s address: Architect of Record: Structural Engineer of Record: The Statement of Special Inspections printed

More information

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY 140 John James Audubon Parkway, Suite 201, Amherst, New York 14228 P 716.688.0766 F 716.625.6825 ADDENDUM NO. 1 Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley,

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections Project: Location: Owner: Design Professional in Responsible Charge: This Statement of Special Inspections is submitted as a condition for permit issuance in accordance

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:

More information

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL CLEVELAND REGIONAL JETPORT 05 1200-1 PART 1 - GENERAL SECTION 05 1200 STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete

More information

A. Product Data: For each type of deck, accessory, and product indicated.

A. Product Data: For each type of deck, accessory, and product indicated. SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and

More information

SPECIAL INSPECTION AND TESTING AGREEMENT

SPECIAL INSPECTION AND TESTING AGREEMENT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections Project: Location: Owner: Design Professional in Responsible Charge: This Statement of Special Inspections is submitted as a condition for permit issuance in accordance

More information

Baysinger Design Group, Inc West DeYoung Street, Suite 100B Marion, Illinois Ph Fax

Baysinger Design Group, Inc West DeYoung Street, Suite 100B Marion, Illinois Ph Fax 4501 West DeYoung Street, Suite 100B Marion, Illinois 62959 Ph. 618-998-8015 Fax 618-998-8032 Addendum No. 1 to the Bidding Documents For: Toilet Partition Replacement Massac County High School Massac

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL A NEW ADMINISTRATIVE OFFICE & STATIONHOUSE FOR FIRE & RESCUE PART 1 GENERAL 1.1 SUMMARY: A. Section Includes: SECTION 05 1200 STRUCTURAL STEEL 1. Structural steel work including schedules, notes and details

More information

CODE OF STANDARD PRACTICE

CODE OF STANDARD PRACTICE SPECIAL PROFILE STEEL JOISTS, 1.1 SCOPE The practices and customs set forth herein are in accordance with good engineering practice and tend to insure safety in SP-Series joist construction. There shall

More information

SECTION (05300) - STEEL DECKING

SECTION (05300) - STEEL DECKING SECTION 05 31 00 (05300) - STEEL DECKING PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Roof Deck 2. Composite Floor Deck 3. Noncomposite Form Deck B. Related Sections: 1.02 SUBMITTALS 1. Section

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

A. Provide all wood trusses as indicated on the drawings or as required to do a complete job.

A. Provide all wood trusses as indicated on the drawings or as required to do a complete job. SECTION 06100 - PART ONE GENERAL 1.1 SECTION INCLUDES A. Provide all wood trusses as indicated on the drawings or as required to do a complete job. 1.2 QUALITY ASSURANCE A. Engineering drawings conforming

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

Both envelopes must have the following information in the lower left hand corner:

Both envelopes must have the following information in the lower left hand corner: SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 23 - STEEL ROOF DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades Dayton Metropolitan Housing Authority 111071 Rosemont/Hoch Electrical Upgrades Addendum No. 3 August 10, 2011 DMHA 400 Wayne Ave. Dayton, OH 45410 Re: 1432-1438 Rosemont oh5-12b 261 Hoch Street oh5-18d

More information

A. Structural Steel: Elements of structural-steel frame, as classified by AISC 303, "Code of Standard Practice for Steel Buildings and Bridges.

A. Structural Steel: Elements of structural-steel frame, as classified by AISC 303, Code of Standard Practice for Steel Buildings and Bridges. SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman LUKE STRONG, JR District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified. SECTION 05450 LIGHT GAUGE STEEL FRAMING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings

More information

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:.

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:. DOCUMENT 004120 - BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) BID INFORMATION Bidder:. Project Name: Remodeling for Urban Style Apartments 409 N. Broadway Green Bay, WI 54303 Owner: Architect:

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

ADDENDUM #1. for the. Physical Security (Phase II), #31336 Bid #G San Jose City College

ADDENDUM #1. for the. Physical Security (Phase II), #31336 Bid #G San Jose City College ADDENDUM #1 for the Physical Security (Phase II), #31336 Bid #G2010.0179 at San Jose City College San Jose Evergreen Community College District San Jose, California September 8, 2017 SAN JOSE EVERGREEN

More information

ADDENDUM ITEMS: This addendum consists of 2 pages and the following attachments: Pre-Bid Conference Sign-in Sheets, and SE-330, Lump Sum Bid Form.

ADDENDUM ITEMS: This addendum consists of 2 pages and the following attachments: Pre-Bid Conference Sign-in Sheets, and SE-330, Lump Sum Bid Form. 1330 Lady St., Suite 500 (29201) P.O. Box 5695 Columbia, SC 29250 803 799 0247 p 803 771-6844 f Addendum No. 1 Project: Coastal Carolina University - University Place Dining Hall Project No.: C-805-15

More information

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016. ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,

More information

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project. SECTION 14654 WALL BRACKET JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect. GADSDEN STATE COMMUNITY COLLEGE OPEN-END AGREEMENT FOR MISC. PROJECTS, PKG. H RENOVATION OF THE VALLEY STREET STUDENT CENTER FOR DENTAL HYGIENE ADDENDUM #1 PART 1 - GENERAL Project: Open-End Agreement

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 1: Stairs DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

MASTER GUIDE SPECIFICATION

MASTER GUIDE SPECIFICATION COMPOSITE TOTALJOIST (CTJ) GUIDE NOTE: This master specification section includes COMPOSITE TOTAL JOIST GUIDE NOTES identified as CTJ GUIDE NOTE for information purposes and to assist the specification

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,

More information

Statement of Special Inspection Requirements

Statement of Special Inspection Requirements Statement of Special Inspection Requirements California Building Code Chapter 17 Construction plans shall include a statement of special inspection in accordance with CBC chapter 17. The statement of special

More information

CEILING MOUNTED ARTICULATING JIB CRANE

CEILING MOUNTED ARTICULATING JIB CRANE SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 06192 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification

More information

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3 WAKELY ASSOCIATES, INC. ADDENDUM NO. ONE ARCHITECTS 30500 Van Dyke Avenue Suite 209 Warren, Michigan 48093 NEW LED LIGHTING Page 1 of 1 (write up only) January 23, 2018 ADDENDUM NO. ONE to the plans and

More information

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES SECTION 05 44 00 (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES PART 1 GENERAL 1.1 SUMMARY A. Section includes pre-engineered, pre-fabricated cold-formed steel framing

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information