1 FIELD MONITORING OF SHRINKAGE CRACKING POTENTIAL IN A HIGH-PERFORMANCE CONCRETE BRIDGE DECK By TIM WALKOWICH A Thesis submitted to the Graduate School New Brunswick Rutgers, The State University of New Jersey in partial fulfillment of the requirements for the degree of Master of Science Graduate Program in Civil and Environmental Engineering Written under the direction of Dr. Hani Nassif and approved by New Brunswick, New Jersey January 2011

2 ABSTRACT OF THE THESIS Field Monitoring of Shrinkage Cracking Potential in a High- Performance Concrete Bridge Deck Thesis Director: Dr. Hani H. Nassif Over the past decade many state engineers throughout New Jersey have reported cracking on High Performance Concrete (HPC) bridge decks at early ages. The presence of cracking early in the life of a high performance deck offsets the benefits gained in using the material as the potential for corrosion begins at the onset of cracking. While many factors apply to bridge deck cracking, the shrinkage of the concrete s mass is a primary concern. Because of shear studs and boundary conditions, among other causes that act in restraining the deck itself, it is important to understand the mechanics of concrete under restraint. The AASHTO Passive Ring Test (PP 34-06) is seeing an increase in use in studies analyzing restrained shrinkage. The test simulates a concrete member of infinite length and allows researchers to study the effects of various parameters on restrained shrinkage. This thesis presents the results of a study that analyzed the ring test s ability to simulate restrained shrinkage on HPC bridge decks. The investigation incorporated an instrumented, simply supported ii

3 composite bridge deck with laboratory samples taken on the day of the pour as well as a finite element analysis. The results suggest the AASHTO Passive Ring Test simulates the restrained shrinkage of simply supported HPC decks reasonably well. Fewer than 1% of all cracking present on the ring specimens saw complete penetration through the sample with 80-90% of all cracking considered to be micro cracking. While the presence of several cracks along the bridge deck itself showed no correlation with the shrinkage ring specimens, finite element analysis suggests these cracks are a result of adjacent live load. Also, the findings of this study highlight the importance of following design in the field as well as the effect of live load on staged construction of HPC bridge decks. iii

4 ACKNOWLEDGMENTS I would like to thank Dr. Hani H. Nassif for all the opportunities I have been fortunate enough to take as well as his support throughout my time at Rutgers. The knowledge and experience I have gained through my relationship with him has been and I am sure will continue to be invaluable. I would also like to thank Dr. Husam S. Najm and Dr. Kaan Ozbay for being on my committee and providing their insight. I would like to thank my father and mother, Anthony and Mary Ellen Walkowich for helping me to grow into the person I am today. Without their guidance I would not have achieved half of what I have at this point in my life. Special thanks to my sisters, Heather and Jessica, without whom I would not have the laughter and memories that keep me going when times are rough. I am forever in debt to Carl Fleurimond, Dan Su, Etkin Kara, Ufuk Ates and Gunup Kwan. Their friendship and guidance were critical in my success at Rutgers and I wish them all nothing but the best in their future efforts. Without the help and participation of both the NJ Turnpike Authority and the SHAW Group, Inc., this thesis would not be possible. Thank you in particular to Adel, Scott, and Paul for allowing me on site whenever my research required. Thank you to Mike, Chris, Alex, Parth, John, Peng and everyone and anyone that ever helped in the lab in any way big or small. The assistance you provided made my experience at Rutgers possible. iv

5 Last, I would like to thank my closest friends Artie, Eric, Chris, Bryan, Matt and Jake. Through the good times and the bad you have all stuck with me and I cannot put into words what that has meant to me. v

6 TABLE OF CONTENTS ABSTRACT OF THE THESIS ACKNOWLEDGMENTS ii vi CHAPTER I INTRODUCTION PROBLEM STATEMENT RESEARCH OBJECTIVES AND SCOPE THESIS ORGANIZATION 2 CHAPTER II LITERATURE REVIEW INTRODUCTION TYPES OF SHRINKAGE PLASTIC SHRINKAGE THERMAL SHRINKAGE AUTOGENOUS SHRINKAGE DRYING SHRINKAGE SHRINKAGE FACTORS RESTRAINED SHRINKAGE RING TEST RING TEST BACKGROUND RING TEST SETUP PREVIOUS WORK 12 CHAPTER III EXPERIMENTAL SETUP INTRODUCTION MATERIAL PROPERTIES OF MIX MIXING AND FRESH SAMPLING OF CONCRETE SLUMP TEST AIR CONTENT SAMPLING OF SPECIMENS AND CONSOLIDATION CURING INSTRUMENT DETAILS AND FIELD IMPLEMENTATION EMBEDDED VIBRATING WIRE STRAIN GAUGES PORTABLE DATA LOGGER ACCELEROMETERS LASER DOPPLER VIBROMETER STRUCTURAL TESTING SYSTEM LABORATORY TESTING PROCEDURES COMPRESSIVE STRENGTH OF CONCRETE SPECIMENS SPLITTING TENSILE STRENGTH OF CONCRETE SPECIMENS MODULUS OF ELASTICITY FREE SHRINKAGE TEST RESTRAINED SHRINKAGE TEST ENVIRONMENTAL CHAMBER 54 vi

7 CHAPTER IV TEST RESULTS INTRODUCTION MECHANICAL PROPERTIES COMPRESSIVE STRENGTH SPLITTING TENSILE STRENGTH ELASTIC MODULUS FREE SHRINKAGE LABORATORY TEST RESULTS SHRINKAGE RINGS FIELD TEST RESULTS FIELD STRAINS BRIDGE DECK CRACKING 76 CHAPTER V FINITE ELEMENT MODELING INTRODUCTION MODEL ELEMENT TYPES BEAM ELEMENT SHELL ELEMENT STEEL REINFORCEMENT SHEAR STUDS BOUNDARY CONDITIONS CONSTRAINT AND RELEASE ELEMENTS MATERIAL PROPERTIES FINITE ELEMENT ANALYSIS RESULTS BRIDGE DECK ANALYSIS FINITE ELEMENT CONCLUSION 102 CHAPTER VI SUMMARY AND CONCLUSIONS SUMMARY AND CONCLUSIONS FUTURE SCOPE OF WORK 104 REFERENCES 105 vii

8 LIST OF TABLES Table Phase I and II Mix Proportions (Whiting, et. al. 2000) 17 Table Time to First Crack for FDD Mixes (Whiting, et. al. 2000) 20 Table Time to First Crack for TDO Mixes (Whiting, et. al. 2000) 20 Table Time to First Crack for Phase II Mixes (Whiting, et. al. 2000) 21 Table North Eastern Ohio Field Survey Results (Delatte, et. al.) 23 Table Absorptive Light Weight Aggregate Mix Proportions (Delatte, et. al.) 23 Table Cracking Dates for Ring Specimens (Delatte, et. al.) 24 Table Time to Cracking of Ring, RE and RBE Test Samples (Weiss, et. al.) 26 Table NJ Turnpike Mix Design 37 Table NJ Turnpike Admixture Content 37 Table VWSG Orientations and Locations 44 Table Summary of Laboratory Tests Performed 49 Table Compressive Strength of Concrete Mix over Time 57 Table Compressive Strength of Concrete Mix over Time 58 Table Compressive Strength of Concrete Mix over Time 60 Table Free Shrinkage of Concrete Mix over Time 61 Table Crack Width Distribution Over All Samples 67 Table Crack Map Details 77 Table Strain Validation 88 Table Concrete Properties for New Concrete Sections 89 Table FE Model Strains Resulting from Case 1 Loading 91 Table FE Model Strains Resulting from Case 2 Loading 93 Table FE Model Strains Resulting from Case 3 Loading 95 Table FE Model Strains from Case 4 Loading 96 Table FE Model Strains from Case 4 Loading 97 Table FE Model Strains from Case 6 Loading 99 Table FE Model Strains from Case 7 Loading 100 Table FE Model Strains from Case 7 Loading 101 viii

9 LIST OF FIGURES Figure AASHTO Ring Test Geometry 11 Figure Shah, Ouyang, et. al. Element Mesh 14 Figure Tensile Strength Prediction (A) and Experimental (B) (Shah, Ouyang, et. al.) 16 Figure Shrinkage of HPC mixes with varying w/c and silica fume content (Whiting, et. al) 18 Figure Shrinkage of HPC mixes with varying geometry and w/c (Whiting, et. al) 19 Figure RE and RBE Test Method Setup (Weiss, et. al.) 25 Figure Typical Cracking Observed on NJ Bridge Decks (Saadeghvaziri and Hadidi) 27 Figure Bridge Survey Distribution throughout NJ (Saadeghvaziri and Hadidi) 27 Figure Bridge Survey Form (Saadeghvaziri and Hadidi) 29 Figure End Condition Effect on Deck Cracking (Saadeghvaziri and Hadidi) 30 Figure Site Plan and Cross-Section 35 Figure Measurement of Slump 39 Figure Type B Pressure Meter 40 Figure Free Shrinkage and Cylinder Sample Molds 41 Figure Restrained Shrinkage Ring Mold 41 Figure Sample Covered with Wet Burlap 42 Figure Sample Sealed in Polyethylene Sheet 42 Figure Geokon, Inc. VWSG for Embedment 42 Figure VWSG Installation 43 Figure VWSG Locations 44 Figure Portable CR1000 Data Logger 45 Figure Kistler Single Axis Accelerometer 46 Figure Laser Doppler Vibrometer (Polytec, Inc.) 47 Figure Installed Strain Transducer 48 Figure STS Transducer, Receiver Box and Collection Unit 48 Figure Forney One Million Pound Machine 50 Figure Tinius Olsen Compression Machine 50 Figure Concrete Sample under Loading 50 Figure Concrete Sample with Compressometer 51 Figure Free Shrinkage Prisms 52 Figure Length Comparator with Reference Bar (right) and Concrete Prism (left) 52 Figure Environmental Chamber 54 Figure Compressive Strength of Concrete Mix over Time 57 Figure Splitting Tensile Strength of Concrete Mix over Time 58 Figure Elastic Modulus of Concrete Mix over Time 59 Figure Free Shrinkage of Concrete Mix over Time 60 Figure Final Crack Mapping of Ring Specimen 1 (Side Profile) 62 Figure Final Crack Mapping of Ring Specimen 1 (Top/Bottom Profile) 63 Figure Final Crack Mapping of Ring Specimen 2 (Side Profile) 65 Figure Final Crack Mapping of Ring Specimen 2 (Top/Bottom Profile) 66 Figure Longitudinal Mid-span Strains at Top of Deck During Early Age of Concrete 68 Figure Transverse Mid-span Strains at Top of Deck During Early Age of Concrete 69 Figure Longitudinal Mid-span Strains at Bottom of Deck During Early Age of Concrete 69 Figure Transverse Mid-span Strains at Bottom of Deck During Early Age of Concrete 70 Figure Longitudinal Quarter-span Strains at Top of Deck During Early Age of Concrete 71 Figure Transverse Quarter-span Strains at Top of Deck During Early Age of Concrete 71 Figure Longitudinal Strains Along Top of Mid-span During Long-Term Period 72 ix

10 Figure Transverse Strains Along Top of Mid-span During Long-Term Period 73 Figure Longitudinal Strains Along Bottom of Mid-span During Long-Term Period 73 Figure Transverse Strains Along Bottom of Mid-span During Long-Term Period 74 Figure Transverse Strains Along Top of Quarter-span During Long-Term Period 75 Figure Transverse Strains Along Top of Quarter-span During Long-Term Period 75 Figure Crack Mapping of Bridge Deck with Sensor Locations 77 Figure Crack Microscope Used in Deck Crack Mapping 78 Figure VWSG Temperatures During Initial 36 Hour Period 80 Figure Four Node Shell Element Detailed with Integration Points 83 Figure Typical stress-strain curves of structural steel (Salmon and Johnson, 1997) 86 Figure ABAQUS FE Model Layout 89 Figure Loading Cases Considered in FE Analysis 90 Figure FE Diagram Index 91 Figure Deck Strains Due to Case 1 Live Load 92 Figure Deck Strains Due to Case 2 Live Load 93 Figure Comparison of Stress Distribution to Crack Orientation 94 Figure Deck Strains Due to Case 3 Live Load 95 Figure Deck Strains Due to Case 4 Live Load 96 Figure Deck Strains Due to Case 5 Live Load 98 Figure Deck Strains Due to Case 6 Live Load 99 Figure Deck Strains Due to Case 7 Live Load 100 Figure Deck Strains Due to Case 7 Live Load 101 x

11 1 CHAPTER I INTRODUCTION 1.1 PROBLEM STATEMENT Possibly the greatest threat to the integrity of concrete is the unavoidable cracking that occurs. Excessive cracking results in weakening from freeze-thaw cycles, corrosion of reinforcing steel because of chloride infiltration and increased maintenance costs. The ability of water and chlorides to penetrate through cracks reduces the service life of the structure and can affect the ability to function as designed. Cracking can occur for several reasons including concrete shrinkage during curing, temperature changes, lack of satisfactory support, magnification of applied loads and restraint conditions. Proposed in 1998 as a provisional standard the AASHTO Passive Ring Test simulates shrinkage cracking experienced by concrete under partially restrained conditions. The test consists of casting a concrete ring around an inner steel ring with foil strain gauges installed along the middle of the ring s inner circumference. As shrinkage occurs compressive stresses form in the steel while tensile stresses generate in the concrete. If the strains produced in the concrete exceed that of the splitting tensile strain, cracking will occur. Due to the many variables responsible for deck cracking the tests design is for comparison of mixes and selection of a mix that will perform well

12 2 under restraint. As of 2006 AASHTO has been balloting for the acceptance under full standards. Using mixes with low cracking potential is a great way to increase the service life of a bridge and reduce maintenance requirements. The ability to determine the performance of a mix prior to its use in the field would improve the integrity of partially restrained bridge decks. The goal of this thesis is to determine the validity of the laboratory ring tests method to simulate actual bridge deck restrained shrinkage. 1.2 RESEARCH OBJECTIVES AND SCOPE The goal of this research is to test the ring tests prediction of restrained shrinkage of high performance concrete bridge decks. Collection of field samples took place during the deck pouring. All samples underwent a fourteen-day wet-cure. Determination of basic properties was possible through testing of the samples. Properties necessary for analysis include compressive and splitting tensile strength, modulus of elasticity, and free and restrained shrinkage. 1.3 THESIS ORGANIZATION This thesis is structured into five chapters as follows: Chapter I covers the introduction, research objectives and scope as well as the organization of the thesis. Chapter II covers a general background as well as a literature review of the various types of shrinkage, the factors that affect the shrinkage of a concrete structure, the

13 3 performance of HPC as it pertains to free shrinkage and restrained shrinkage as well as similar work performed by others. Chapter III covers the experimental setup including all mechanical and field testing, field implementation and the material properties of the concrete mix analyzed. Chapter IV covers the finite element modeling employed in this study. Chapter V covers all test results. Chapter VI covers the summary and conclusions of the thesis as well as goals for future research.

14 4 CHAPTER II LITERATURE REVIEW 2.1 INTRODUCTION Concrete will always experience some change in volume. If located in a region with no restraint, this change will not result in any cracking. The concrete mass will merely change in volume. Foundations, subgrades, reinforcement and connecting members all act as partial restraint in field conditions. To examine the effects of volume change it is important to understand the reasons for this change to occur. Because most concrete elements are significantly longer in one dimension than the other two, volume change is described linearly when referring to concrete. Typically, volume reduction occurs because of changes in moisture and temperature. This change is termed shrinkage. The four types of shrinkage of concern to engineers are plastic, thermal, autogenous and drying shrinkage. 2.2 TYPES OF SHRINKAGE Shrinkage begins immediately after the pouring if fresh concrete. Volume change can continue for years after curing. Cement properties, type and gradation of aggregates, rate of drying and other reasons affect the type and rate of shrinkage. The following sections detail the types of shrinkage.

15 Plastic Shrinkage Plastic shrinkage of concrete occurs at the surface of fresh concrete. Shortly after pouring concrete, excess water makes way to the surface. Evaporation of surface water faster than the rate of bleeding results in plastic shrinkage, and therefore a reduction in volume of the fresh concrete. HPC displays a low rate of bleeding in comparison to normal concrete. This low rate of bleeding requires caution to avoid plastic shrinkage during pouring. Protection from evaporation removes plastic shrinkage as a concern. Fogging, windbreaks, shading, plastic sheet covers, or wet burlap help in protecting against plastic shrinkage Thermal Shrinkage Thermal shrinkage is a result of the generation of heat of hydration. Heat is a byproduct of the chemical process by which the cement paste hydrates. This can cause an expansion of the concrete during initial curing. As curing continues and this temperature begins to drop the concrete experiences a decrease in volume and undergoes thermal contraction. This can result in cracking if the concrete cannot dissipate heat effectively. In slender structures such as bridge decks, heat dissipation occurs rather rapidly. Therefore any thermal shrinkage is negligible Autogenous Shrinkage Autogenous shrinkage is a change in volume because of cement hydration. Curing requires water for cement hydration to occur. Without an external water supply

16 6 the cement will use pore water found through the concretes voids. Continued consumption of pore water results in self-desiccation. Concrete with a low water to cement ratio, such as HPC, is susceptible to autogenous shrinkage. Curing with an external water supply for a minimum of seven days will eliminate autogenous shrinkage. Specialized shrinkage reducing admixtures are an acceptable method as well Drying Shrinkage Drying shrinkage is the result of volumetric changes in hardened concrete because of evaporation. This occurs gradually and can continue for years after the pouring. Should there be no restraining conditions present the mass will shrink without any increase in stresses or cracking. Most field conditions, however, include some form of partial restraint (shear connectors, foundations, etc.) which result in shrinkage cracking. Larger masses exhibit lower rates of drying shrinkage because of their lower surface area to volume ratios. Bridge decks on the other hand, whose dimensions yield high surface areas, are more susceptible to volume change. The most controllable factor in minimizing drying shrinkage is the water to cement ratio of a concrete mix. Using the smallest possible water content will result in the lowest shrinkage. Similarly, aggregate properties play a role in concrete shrinkage. Harder aggregates such as quartz, granite, feldspar, limestone and dolomite resist the effects of drying shrinkage because of their high resistance to compression (ACI Committee 224). Various forms of wet curing will hold off drying shrinkage until curing has ended.

17 7 2.3 SHRINKAGE FACTORS The most important controllable variable in shrinkage is the water content. The water per cubic yard of concrete will contribute more to shrinkage than any other aspect of a mix. Higher the water content yields more evaporation during drying. This means greater overall levels of shrinkage. Keeping the water content as low as possible reduces shrinkage experienced by concrete. The water required in a mix is affected by several factors including, but not limited to, aggregate volume, aggregate size and gradation, cement content and fineness, chemical admixtures, and curing history. One way to regulate the water needed is to use more aggregate. Aggregates typically display higher resistance to compression than the surrounding cement paste. Added coarse aggregate resists the shrinking paste better and decreases the overall shrinkage experienced. The more aggregate used (within reasonable limits) the higher the concretes resistance to shrinkage. Similarly, the size and gradation of aggregate affects how much shrinkage will result. Using the largest practical size reduces the total surface area of aggregate that requires coating with cement. This results in lower water and cement demands in the mix effectively reducing shrinkage. Aggregate gradation is equally important in reducing shrinkage. A well graded concrete will have smaller and finer aggregate filling in voids leaving less room for cement. This overall decrease in void space translates to a lower cement and water content requirement of the mix.

18 8 2.4 RESTRAINED SHRINKAGE RING TEST There are several methods available for testing the restrained shrinkage performance of concrete mixes. These methods include the flat panel test, linear restrained test, and restrained shrinkage ring test. The most popular is the ring test as it is simplistic and economical Ring Test Background The restrained shrinkage ring test consists of casting a concrete ring around a steel ring of smaller diameter. As shrinkage occurs stresses form throughout the system. Within the steel these stresses are compressive and four foil strain gauges (FSG), installed along the inner circumference of the ring, measure the resulting strain. The concrete experiences tensile stresses that counterbalance the compressive stresses in the steel. Should these tensile stresses exceed the allowable stresses within the concrete cracking will occur. Installing VWSG along the top of the rings allows for quantification of concrete stresses even if cracking does not occur. The first testing using restrained rings were performed by R.W. Carlson and T.J. Reading (1988) in the study of shrinkage cracking in concrete building walls. At the time there were no standard methods for testing restrained shrinkage available. In the test concrete was cast around polished steel rings and dried 25, 50 and 75% relative humidity to discover the effects on restrained shrinkage. The rings were smaller than modern methods allowing the aggregate possible for testing to be no more than 3 / 8 (9 mm) in size. The steel rings used were coated with paraffin wax to allow slippage of concrete on the ring if cracking occurred. Two sides of the ring were sealed to allow drying only

19 9 from the outer surface. The investigation found the concrete exposed to lower humidity, and therefore more rigorous drying, withstood higher stresses before cracking. Cracking also occurred more quickly in these samples. The study found that aggregate type plays a large role in crack resistance and the ring test provided useful information and warranted further study as a possible standard test method. Grzybowski and Shah (1990) modified the previous test in their analysis of shrinkage cracking of fiber reinforced concrete. Incorporating two different types of fibers, steel and polypropylene, the study focused on the resistance to shrinkage cracking as a result of composite reinforcement. The findings stated introducing a small amount of steel fibers (0.25% by volume) reduced average crack widths by as much as 20% and maximum crack widths by 50%. Polypropylene fibers, on the other hand, were determined to be far less effective at reducing crack widths. In 2002, Weiss and Shah studied the role of shrinkage reducing admixtures as well as specimen geometry and their relationship to shrinkage cracking. The study used two different sizes of restraining rings. The tall group consisted of 9 rings with a height of 150 mm while the short group incorporated 9 rings with a height of 30 mm. Each group was further classified according to wall thicknesses of 25, 75, and 150 mm (the study consisted of three samples of each per group). Analysis of the samples showed cracking occurring in the 25 mm short rings at an average of 8 days as opposed to 11 days in the 50 mm ring. No cracking occurred on the 150 mm thick ring. Within the tall group only two of the three 25 mm thick rings showed signs of cracking while all other specimens remained uncracked. These results led the researchers to conclude the early age cracking behavior of concrete is geometrically dependent.

20 10 The work of Grzybowski and Shah was expanded on by Ahmed and Mihasi (2009) by applying the study of restrained shrinkage to High Performance Fiber Reinforced Cementitious Composites (HPFRCC). The test samples were prepared by casting a 40 mm thick concrete ring around a 150 mm steel ring. The drying environment consisted of a relative humidity of 60% and a temperature of 68⁰ F. A premix mortar specimen was cast for comparison to the fiber reinforced specimen. The study found that while the reinforced sample yielded many cracks (the premix mortar showed only 6 cracks), the crack widths were significantly smaller in the reinforced mortar. The higher number of cracks with smaller crack widths was credited to the strain hardening and toughness properties of the HPFRCC Ring Test Setup The AASHTO Ring Test was developed for testing the effects of concrete mix parameters on shrinkage under restrained conditions. Altering mix ingredients with the ring test provides researchers with the opportunity to understand the effects each component has on the restrained shrinkage of a particular concrete or cementitious composite. The advantage of this test lies in its simplicity of construction and versatility. The test allows customization to study nearly any variable of a concrete mix design. The ring setup consists of a concrete ring cast around an inner steel ring. The apparatus requires a steel ring with a wall thickness of 12.7 mm ± 0.4 mm (0.5 in ± 1 / 64 in), an outer diameter of 305 mm (12 in) and a height of 152 mm (6 in). The concrete mold should allow for the hardened concrete ring to have an outer diameter of 457 mm

21 11 (18 in). These dimensions will result in the desired 3 concrete wall thickness. The AASHTO geometric requirements can be seen in Figure Figure AASHTO Ring Test Geometry The AASHTO ring test uses a smaller steel ring than similar test methods (ASTM Ring Test). This allows for the use of larger aggregate sizes in testing. The increased concrete wall thickness causes cracking to occur at later ages than in similar test methods. Occasionally no cracking occurs at all. Installing FSGs along the inner circumference of the steel ring aids in determining the cracking age of a mix. These gauges measure the compressive strain in the steel throughout the test. Abrupt changes in strain are credited to cracking in the concrete. This allows for precise determination of cracking age. 2.5 Previous Work In an attempt to develop a method to predict the shrinkage cracking of concrete Shah, Ouyang, et. al (1998), used standard ring tests to assess shrinkage ring cracking. Up to that time ring testing had mainly been used for evaluation of concrete cracking as

22 12 opposed to crack prediction. The goal of the study was to produce a model that could be provide a guide for the design of concrete pavements and slabs. The model itself was founded on the principles of fracture mechanics. The assumption that cracking in concrete is related more to fracture energy than tensile strength was backed by fiber reinforcement. The research team sited introducing fiber reinforcement delays cracking without significantly affecting the allowable tensile stress of the concrete. Fiber reinforcement does however alter the fracture energy of a concrete specimen. This reasoning led the team to focus on fracture mechanics in their study as opposed to the more traditional allowable tensile stress method. The fracture resistance curve approach (R-curve) was used in the generation of the model. Fracture resistance theory is described as follows: By applying a load to a structure with an initial crack length of a 0, strain energy, U, is created. The rate of strain energy release with any arbitrary crack length, a, is known as the strain energy release rate, G. As load is applied some of the energy is also consumed as the crack tip propagates. This propagation energy is defined as W. The rate of change of W with respect to crack length, a, is known as the fracture resistance, R. A crack propagates unsteadily when the following two conditions are true: [Eq. 4.1] Equation 4.1 is considered the energy requirement for unstable crack growth where G is considered the crack driving force and R is considered the crack resistance force.

23 13 Linear Elastic Fracture Mechanics (LEFM) defines G as: [Eq. 4.2] where: = Stress Intensity Factor = Modulus of Elasticity R, as defined by a previously derived R-curve, is calculated as: [Eq. 4.3] where: 1 [Eq. 4.4] and:, [Eq. 4.5] where:, Constants Based on Material Fracture Parameters The stress intensity factor,, was computed using the boundary element method. By generating the element mesh in Figure it was possible for the researches to compute the required parameters for analysis. Figure Shah, Ouyang, et. al. Element Mesh

24 14 The stress intensity factor was found to be:. / [Eq. 4.6] where: = Ratio of External Ring Radius to Internal Ring Radius (r e /r i ) / = Geometric Function of Ring and: [Eq. 4.7] where: Stress at Cracking The final parameters required for the generation of the R-curve for the rings in the study, α and β, were found to be related to two fracture parameters. The critical stress intensity factor,, and the critical crack tip opening displacement,. Applying further principles of fracture mechanics allowed the research team to define the parameters as follows: [Eq. 4.8] where: = Critical Cracking Stress and:. E [Eq. 4.9]

25 15 By calculating the ratio of the squares of Eq. 4.9 to Eq. 4.8, α was determined: [Eq. 4.10]. At which point β could be solved for as well: [Eq. 4.11] The α and β parameters were used to calculate the respective R- and G-curves for the ring specimens under study. By substituting the resulting curves into Eq. 4.1 and 4.2 the team was able to predict the tensile stresses the concrete would exhibit over time. The theoretical values were found to match closely with experimentally obtained values from laboratory testing (Figure 2.5.2).

26 16 Figure Tensile Strength Prediction (A) and Experimental (B) (Shah, Ouyang, et. al.) Similarly, the cracking age was predicted by equating the difference between the measured free shrinkage and estimated creep and the maximum tensile strain. Predicted values were again found to be reasonably close to experimental. In 2000, Whiting, et al. aimed to determine the optimum silica fume content and w / c ratio for bridge deck applications. In order to do so the research program included Types I and II Portland cement as well as Type K shrinkage compensating cement. The Type K cement was incorporated in the study to evaluate its effectiveness at reducing the cracking tendency of selected mixes. Two cases were analyzed full depth decks (FDDs) and relatively thin deck overlays (TDOs). The mixes for each case followed AASHTO proportion requirements in order to best simulate field tendencies (370 kg / 3 m cementitious content and w / c of 0.35 to 0.45 for FDDs and 415 kg / 3 m and w / c of 0.3 to 0.4 for TDOs). The study was further

27 17 broken down into two phases in order to analyze the effect of silica fume on a concretes susceptibility to cracking. The proportions for Phases I and II can be seen in Table Table Phase I and II Mix Proportions (Whiting, et. al. 2000) Material Quantities ( kg / m 3 ) Phase I - FDD % Silica Fume w/c Cement Silica Fume Fine Aggregate Coarse Aggregate Water Phase I - TDO % Silica Fume w/c Cement Silica Fume Fine Aggregate Coarse Aggregate Water Phase II - FDD % Silica Fume w/c Cement Silica Fume Fine Aggregate Coarse Aggregate Water All specimens were consolidating by rodding and wet cured for 24 hours under wet burlap before being stored in an environmental chamber. Two sample types were cast drying shrinkage prisms (AASHTO T 160) and shrinkage rings (NCHRP Project 12-37) to evaluate cracking tendency. The prisms were measured at 4, 7, 14 and 28 days

28 18 as well as at 8, 16, 44 and 64 weeks while the rings were checked throughout the duration of the test cycle to monitor cracking. At the completion of the test cycle the researchers verified the relationship between the w/c of a HPC mix to the amount of shrinkage it experiences (Fig ). Figure Shrinkage of HPC mixes with varying w/c and silica fume content (Whiting, et. al) It was determined that the full depth mixes generally experienced less shrinkage than the thin deck overlays. This was attributed to the lower paste content of the FDD mixes as well as the longer curing time (FDD mixes were cured for 7 days, TDO mixes were cured for 3 days). This trend can be seen in Figure

29 19 Figure Shrinkage of HPC mixes with varying geometry and w/c (Whiting, et. al) Of interest in this study was the discovery made about the Type K shrinkage compensating cement. Observations yielded that those mixes using Type K cement showed significantly greater shrinkage at all test dates. While this goes against the conventional wisdom of why Type K cement would be used the initial expansion of the mix induced compressive stresses within the concrete. These stresses must be overcome by shrinkage for any tensile stresses to form. While the shrinkage of Type K cement was found to be higher the compressive stresses from expansion during initial set offset any tensile stresses that may have formed cracking. The test group samples (no silica fume) were found to crack around day 35. Adding silica fume to these mixes resulted in cracking of 1.8 to 4% later. It was also discovered that those mixes with the highest w / c and a silica fume content of 6% were found to crack sooner than the test group. This was to be expected because of the higher

30 20 w / c ratio. No cracking was noted in the Type K mixes at any point throughout the duration of the study. The observations of the FDD mix shrinkage can be seen in Table Table Time to First Crack for FDD Mixes (Whiting, et. al. 2000) Mixture w/c, % silica fume Specimen 1 Specimen 2 Average 0.40, 0% silica fume , 1.8% silica fume 42 No Crack 42* 0.43, 1.8% silica fume , 6.0% silica fume 51 No Crack 51* 0.40, 6.0% silica fume No Crack No Crack No Crack 0.45, 6.0% silica fume , 10.2% silica fume No Crack No Crack No Crack 0.43, 10.2% silica fume No Crack No Crack No Crack 0.40, 12% silica fume No Crack No Crack No Crack *Specimen 1 Data Only All TDO mixes were observed to crack during the test duration. In contrast with the FDD mixes the presence of silica fume in thin deck overlays was found to result in cracking sooner than experienced by the test group samples. As mentioned before this was attributed to the higher cement content of the TDO mixes which resulted in higher rates of shrinkage. The observations of the TDO mixes can be seen in Table Table Time to First Crack for TDO Mixes (Whiting, et. al. 2000) Mixture w/c, % silica fume Specimen 1 Specimen 2 Average 0.35, 0% silica fume , 6.0% silica fume , 6.0% silica fume , 12% silica fume

31 21 Phase I results for FDD mixes were determined to be limited in scope. Therefore Phase II was developed. Phase II incorporated the same variables found in Phase I ( w / c, % silica fume and curing time). Three w / c (0.35, 0.40 and 0.45), three silica fume contents (0, 6 and 9%) and two wet curing lengths (1 and 7 days) were used in analysis. The 1-day wet cure was used to simulate the worst case. This case was included to mimic when curing conditions were not adhered to (such as allowing the moist curing blankets to dry). The 7-day wet cure simulated adherence to common construction standards. The results of the Phase II cracking tendency analysis can be seen in Table

32 22 Table Time to First Crack for Phase II Mixes (Whiting, et. al. 2000) w / c One Day Wet Cure Seven Day Wet Cure Silica Fume Content w Silica Fume Content / c 0% 6% 9% 0% 6% 9% The presence of silica fume was determined to be damaging to the cracking resistance of concrete if only one day of wet curing is allowed. Given the specified seven day wet cure, concrete incorporated with silica fume was found to yield higher cracking resistance with lower w / c. This observation, as mentioned previously, agrees with accepted theory. Whiting, et. al. noted that silica fume content has a negligible effect on the longterm shrinkage experienced by bridge decks. Of concern is the effect of silica on early age shrinkage. Based on their findings the researchers concluded shrinkage during early ages shows increased sensitivity to w / c as the silica fume content is increased. To study the effects of internal curing Delatte, et. al. (2006) conducted a study into the use of absorptive lightweight aggregate (LWA) or superabsorbent polymers (SAP) as a means of reducing cracking of HPC bridge decks. Without external hydration

33 23 in the form of steaming or wet curing the low water-to-cement ratio of HPC mixes (typically 0.42 or less) will result in self-desiccation because of the lack of water for complete hydration. One possible remedy to this problem is the idea of internal curing. Internal curing is defined as a proposed increase in strength gain accompanied by a reduction in early age shrinkage. Soaking aggregates before use in mixing it is possible to introduce extra water into the pore spaces that aids in hydrating the cement internally. The initial concern over the effectiveness came from a field survey of six bridges found in North Eastern Ohio. The results of this survey are detailed in Table and on review it becomes clear there may be a connection between the use of absorbent aggregate and crack resistance. Table North Eastern Ohio Field Survey Results (Delatte, et. al.) Bridge Decks with Transverse Cracks Project Location Coarse Aggregate Absorption 281('99) WB I-480 over Rockside ('00) EB Fairmount over I ('00) Dover Center, Cahoon and Canterberry ('01) Wagar, Northview and W159 th 0.41 Uncracked Bridge Decks Project Location Coarse Aggregate Absorption 480('99) NB and SB I-271 over Tinkers Creek ('01) Highland Road over I To discover a trend between the use of absorptive LWA and crack reduction the team created 21 mixes. Following the seven mix proportions shown in Table 2.5-6, each was mixed using low, medium and highly absorbent LWA.

34 24 Table Absorptive Light Weight Aggregate Mix Proportions (Delatte, et. al.) Mixture CA # 57 CA # 8 FA LWA Cement SCM HP * 0.40 HP ** 0.40 HP4 Blend *** 0.42 HP3 Blend * 0.40 HP3 LWA * 0.40 HP$ LWA ** 0.40 HP4 Blend LWA *** 0.42 *HP3 150 lbs. of fly ash and 30 lbs. of silica fume p.c.y. **HP4 190 lbs. of ground granulated blast furnace slag and 30 lbs. of silica fume p.c.y. ***HP4 Blend 1 and Blend LWA 170 lbs. of ground granulated blast furnace slag and 30 pounds of silica fume p.c.y. All mixes were cast into standard ring specimens and monitored throughout the test duration to detail any cracking that occurred. A summary of the results is provided in Table w / c Table Cracking Dates for Ring Specimens (Delatte, et. al.) Mixture Minimum Time Maximum Time Average Standard Deviation HP Low Absorption HP Medium Absorption HP High Absorption HP Low Absorption with LWA HP Blend The mixtures with absorbent LWA were found to have a higher strength than those mixes without especially at early ages. The average increase in compressive strength at 7 and 28 days was found to be 6.4%. Regarding cracking resistance, however, the HP blends (no LWA) displayed the longest average days to cracking. The highly absorptive aggregate mixes were found to be the least resistant to crack formation while the low and medium aggregates were similar with the medium being slightly more resistant to crack

35 25 formation. These results do not reproduce the field data consistently enough to warrant any declaration of the effectiveness of absorbent LWA in crack reduction. However, the use of LWA is growing and a new experimental setup is underway that plans to incorporate core samples from the field as well. Trying to develop new test methods for assessing the shrinkage cracking potential of concrete mixes, Weiss, et. al (1998) performed a study of a new method for shrinkage crack analysis designed to consider bridge decks of finite length as well as subbase friction. Incorporating normal concrete and HPC mixes, the study used ASTM Type I Portland cement, graded river sand, and 9mm pea gravel aggregate (ASTM C-33) for all mixes. An evaluation of a non-expansive shrinkage reducing admixture was incorporated into the study as well. All specimens were wet cured for 24 hours before demolding and storage in an environmental chamber (40% R.H., 30 C). Compression and free shrinkage measurements were determined using standard testing methods. Measurement of restrained shrinkage were taken according to three setups the standard ring test, the restrained end test (RE test) and the restrained base and end test (RBE test). The ring test was included to simulate a bridge deck of infinite length. The RE test was developed to analyze slabs of finite length and the RBE test was developed to consider the effects of subbase friction on bridge deck shrinkage. The apparatus developed for the RE and RBE test setups can be seen in Figure

36 26 Figure RE and RBE Test Method Setup (Weiss, et. al.) Results of the time to first three test specimens can be seen in Table As can be seen the high strength specimens cracked earlier than the normal concrete samples. This was attributed to the higher initial strain, initial set and gain in stiffness of high strength concrete in comparison to normal concrete.

37 27 Specimen Geometry Table Time to Cracking of Ring, RE and RBE Test Samples (Weiss, et. al.) Experimental Average (0%) Model (0%) Experimental Average (1%) Model (1%) Experimental Average (2%) Model (2%) Normal Strength Concrete (NSC) Rings RE RBE High Strength Concrete (HSC) Rings RE RBE Adding shrinkage reducing admixtures (SRA) to the mixes was found to reduce the free shrinkage of all tested samples significantly (nearly 45% reduction for a 2% addition of SRA). The major advantage of SRA was its ability to delay the time to cracking which resulted in smaller crack widths which resulted in more durable concrete. The researchers also saw that theoretical predictions of the day to cracking (R-Curve Method, Shah, 1998) agreed reasonably with experimental results. In an attempt to understand the increased bridge deck cracking that has been discovered throughout New Jersey, Saadeghvaziri and Hadidi (2002) organized a field survey of 24 bridges throughout the state. An example of the typical cracking seen in many NJ bridges can be seen in Figure Cracking such as that shown in the figure can lead to corrosion of reinforcement and decreased structural integrity.

38 28 Figure Typical Cracking Observed on NJ Bridge Decks (Saadeghvaziri and Hadidi) The only requirements for consideration were the bridge must be five years old or younger and must span more than 75 feet (single or multiple spans). Most of the bridges analyzed were found to have cracked and a database was formed based on the survey results. During the evaluation crack spacing, width and location were recorded and all available design and construction documents were reviewed. The bridges surveyed can be seen in Figure Figure Bridge Survey Distribution throughout NJ (Saadeghvaziri and Hadidi)

39 29 The database was created for statistical analysis purposes and incorporated five categories general information, design information, material properties and mix design information, construction information and crack information. General information included items such as the bridge location as well as the year of construction. Design information included specifications such as dimensions, number of spans, traffic directions and girder type. Material properties and mix design information detailed components of the mix such as water content, cement content, admixtures and slump results. This information was taken from NJDOT Inspection and Testing Datasheets. Construction information taken from NJDOT Inspection and Testing Datasheets provided the air temperature and concrete temperature of the bridge decks during pouring. Cracking information was recorded during field surveying and included crack type, approximate location, crack spacing and crack width. The field study was created to identify causes of transverse cracking in bridge decks. During the survey four bridges were instrumented to discover the effects of ambient and hydration temperatures as well as the role of shrinkage on deck strains and stresses. Along with NJDOT Inspection and Testing Datasheets the information collected from the bridge survey forms (Figure 2.5.8) provided the researchers with enough information to conduct a statistical as well as finite element analysis.

40 Figure Bridge Survey Form (Saadeghvaziri and Hadidi) 30

41 31 Completion of the statistical and finite element analysis allowed the researchers to conclude the end conditions of a deck play a large part in transverse cracking (Figure 2.5.9). It was determined that increased fixity in a bridge leads to increased deck cracking. Figure End Condition Effect on Deck Cracking (Saadeghvaziri and Hadidi) The researchers also found that increases in deck thickness typically reduces crack formation. This agreed with similar research (Krauss and Rogalla, 1996). Finding that bridge decks with higher compressive strengths show higher rates of cracking, it was recommended that an upper limit be placed on the strength of a designed mix before pouring. As detailed in Figure 2.5.9, design boundary condition should be consistent with actual field conditions. Last, the research team suggests the use of restrained ring

42 32 testing before any implementation of concrete in the field to evaluate its cracking potential. It was noted, however, that while several agencies currently used restrained ring testing, little research has been performed on the quantification of results from such testing and more is needed before ring testing can be universally accepted. A similar study was performed in 1999 by French, Eppers, and others to examine the causes of early age cracking in Minnesota bridge decks. The study was divided into two phases. Phase one incorporated the field investigation of 72 bridges to find the correlation between observed cracking and available design, material and construction related data. Phase two included a shrinkage and parametric study to test variables not easily analyzed during field investigation. In the shrinkage study two field mixes were tested in a laboratory to study the shrinkage of the specimens over time. The parametric study was designed to explore the influence of various factors including end restraint, girder stiffness, cross frame and splice location as well as differential temperature between the girders and deck. The study used finite element analysis to control and adjust relevant variables. Three bridges were modeled and compared with field observations for the parametric study. The field investigation surveyed 72 bridges found throughout the state of Minnesota 34 composite simply supported prestressed girder bridges, 34 composite continuous steel plate girder bridges and 4 continuous steel rolled wide flange girder bridges. The selected bridges represented the variety of bridges found throughout the state as the population included both young and old bridges as well as local and interstate highway bridges.

43 33 The field survey found that simply supported prestressed girder bridges were in good condition as opposed to continuous steel girder bridges. This was attributed to the reduced end restrained and beneficial creep and shrinkage characteristics of prestressed bridge superstructures. The dominant design parameter found to have an effect on transverse cracking was the restraint coefficient, β. The restraint coefficient shows the degree of deck restraint provided by steel girders and is defined as the ratio of the cross sectional area of the girder to the effective area if the concrete slab. Typically, β values of 0.05 or less represent limited restraint and therefore a lower possibility of deck cracking. β values of higher than 0.12 represent high restraint and as a result have a higher chance of transverse cracking (Ducret, et al). Evaluation of construction documents also found that larger bar spacing (within design limits) of transverse top reinforcement correlated with lower cracking potential of those bridge decks surveyed. The dominant factors were determined to be cement content, aggregate type and quantity and the air content of the concrete used in construction. Increased cement content was found to result in higher levels of cracking along the deck. Also, those mixes with typical to moderately high cement contents were not dramatically affected by changes in water content or w / c ratio. Decks with higher quantities of aggregate typically required lower amounts of cement paste and were found to display lower levels of cracking than decks with lower aggregate quantities. As shrinkage occurs mainly in cement paste, the decrease in cement due to increased aggregate quantities results in concrete that experiences less shrinkage and therefore less cracking. It was noted, however, the use of aggregates with a high modulus could potentially increase the shrinkage of a mix and aggregates utilized in bridge decks should have lower moduli

44 34 (within design limits) to combat shrinkage cracking. The limited data obtained on the air content of design mixes showed that increased air content decreased observed cracking. While this data is limited (all decks fell within 5-6% air content) this observation agreed with the results of others research. Determination of the construction related parameters and their effect on deck cracking was determined by reviewing the high and low ambient temperatures experienced during the pouring of 18 bridge decks. The study found a slight trend between the ambient temperature and reduced cracking on bridge decks. Those decks poured on days that had a high temperature of 65 ºF to 75 ºF and a low of 45 ºF to 50 ºF showed lower levels of cracking than those bridges poured on warmer or cooler days. Of the 34 prestressed bridges surveyed 25 were rated as 8 / 10 or higher. The major cracking factors in prestressed bridge decks were found to be deck overlays and reconstructions. When decks are replaced on older bridges the prestressed superstructure has experienced most of the creep and shrinkage it will in its lifetime and as a result acts more like the rigid superstructure of steel girder bridges. Of the 38 steel bridges studied only 12 rated as 8 / 10 or higher which was attributed to the higher restraint present in steel bridges. The shrinkage study incorporated PBEAM, a finite element program that uses a fiber, or layer, approach. The critical variable in deck cracking due to shrinkage was determined to be the differential shrinkage between the deck and the girders. This movement and the restraint present in bridge decks was found to lead to transverse cracking at critical locations throughout the deck. While the shrinkage experienced by the deck was determined to have little effect on transverse cracking the initial rate of

45 35 shrinkage did have a large impact on the cracking potential. Reducing initial rates of shrinkage was determined to be a key way of preventing early age cracking in bridge decks. The greatest effect on the extent of cracking being the end restraint conditions was verified within the finite model. The most extensive cracking occurred on the most restrained bridges. Locations of cross frames and splices were varied throughout the analysis and it was inferred the location of these components have little effect on the cracking a bridge deck experiences.

46 36 CHAPTER III EXPERIMENTAL SETUP 3.1 INTRODUCTION The experimental setup consists of the testing of an HPC mix utilized by the Garden State Parkway in the Interchange 67 overpass (Figure 3.1.1) as well as laboratory samples taken during the pour. Figure Site Plan and Cross-Section

47 37 The bridge is located in Barnegat Township, NJ, and spanned the southbound New Jersey Turnpike at exit 67. Field strains were collected with embedded vibrating wire strain gages (VWSG). Readings were taken every five minutes for the first five days and every hour after day five. Strain readings were recorded with the use of a portable data logger stationed in the field and powered by a rechargeable battery. Acceleration of the bridge deck was observed with single axis accelerometers. Readings were taken just prior to pouring of the deck and immediately afterwards. This was done to record the deck acceleration during the two traffic phases of construction. Acceleration data was recorded with the use of the edaq data acquisition system. Displacement and velocity readings were collected with a Laser Doppler Vibrometer which allowed for the simultaneous collection of both values. Strain readings in the steel were obtained by installing strain transducers at predetermined locations throughout the steel superstructure of the overpass. 3.2 MATERIAL PROPERTIES OF MIX The NJ Turnpike mix included silica fume and fly ash as a percentage of the total cementitious content. The mix yielded a w / c ratio of 0.40 and contained 658 lb. of cementitious material. The mix design and all relevant details can be seen in Table

48 38 Table NJ Turnpike Mix Design NJ Turnpike Mixes for All Projects - HPC Component Specific Gravity Provider Location Quantity (lbs.) Water Cement 3.15 Essroc Type 1 - Nazareth, Pa. 501 Cement (Slag) Cement (Fly Ash) 2.15 Mineral Resources - Jersey City, NJ 25 Cement (Flume) 2.35 Nocchem - Haupauge, NY 1850 Coarse Aggregate 2.88 Trap Rock Industries - Pennington 1184 Sand 2.63 Clayton Sand - Lacey Total 3952 In addition to fly ash and silica fume, the mix included a variety of admixtures to aid in shrinkage resistance and to delay the set time in order to accommodate the large amount of concrete that was required. The admixtures used and their quantities can be seen in Table Table NJ Turnpike Admixture Content Admixtures Admixture Type Quantity (lb./yd 3 ) Setcon 6A - Air Entrainment 9.9 Chemstrong A - Water Reducer 19.7 Chemstrong R - Water Reducer/Retarder 6.6 Chemstrong - SP - High Range Water Reducer 79 Total MIXING AND FRESH SAMPLING OF CONCRETE Mixing was performed by Clayton Concrete Plant located in Toms River, New Jersey. Fresh concrete testing including slump (ASTM C a) and air content (ASTM C-231) were performed by the contractor on site to guarantee adherence to

49 39 NJDOT specifications. Samples were consolidated using the rodding technique and cured for 14 days in accordance with NJDOT field specifications. The mixing, sampling, and laboratory testing of the specimens are detailed in the following sections Slump Test (ASTM C a) The slump of a concrete mix is found using a slump cone. The cone is filled in three layers with each being roughly one-third the volume of the cone. Each layer is rodded twenty-five times through its depth to ensure adequate consolidation. Caution should be taken when rodding to avoid penetration into lower regions that have already been consolidated. The final layer fills the cone until overflow occurs to allow the complete volume be filled before rodding. At the culmination of consolidation any excess concrete is struck off the cone by rolling the tamping rod across the top in a fluid motion. Once filled and consolidated the cone is removed vertically, allowing the specimen to deform, or slump. When lifting the slump cone any motion that could result in lateral or torsional forces should be avoided. The cone is then inverted and placed next to the specimen and the tamping rod help flush against the rim of the cone. The slump is measured as the distance between the extended rod and the original center of the top surface of the concrete sample. An example of slump measurement can be seen in Figure

50 40 Figure Measurement of Slump Air Content (ASTM C 231) Air content of a mix is determined by using a Type-B pressure meter. After wetting the inside concrete is added to the pressure meter in three layers, similar to filling the cone in the slump test. Each layer is roughly one-third the volume of the bowl and each layer is rodded twenty-five times throughout its depth. Additionally, to ensure excess air is removed the bowl is tapped on its side with a rubber mallet after consolidation of each layer. After completion of the final layer any excess concrete is struck off in a manner similar to that of the slump test. The top of the pressure meter is checked and cleaned if necessary to make certain a pressure tight seal is possible. After securing the lid onto the bowl the valve between the chamber and the bowl is be closed and the petcocks opened. Water is then injected into one petcock with the use of a rubber syringe until it is seen escaping from the second petcock. After closing both petcocks air is pumped into the sealed meter until the gauge hand comes to rest on the initial line. Added time is taken before completion of the test to ensure the gauge

51 41 hand does not move from the initial position as a result of cooling of the air within the specimen. The final air content of the sample is found by releasing the air valve and reading the percentage of air off the meters gauge. The Type-B pressure meter can be seen in Figure Figure Type B Pressure Meter Sampling of Specimens and Consolidation Forty-five cylinders (4 x 8 ) were taken for standard ASTM tests. Two restrained shrinkage rings were cast for restrained shrinkage testing under AASHTO standards. Three free shrinkage prisms were also taken to determine the free shrinkage of the mix and for correlation with the restrained shrinkage results. All samples were consolidated by rodding. Figures and show free shrinkage prism and cylinder molds and restrained shrinkage molds used in casting field specimens, respectively.

52 42 Figure Free Shrinkage and Figure Restrained Shrinkage Cylinder Sample Molds Ring Mold Curing All collected samples were subjected to a fourteen day wet cure according to the NJDOT field specifications. Samples were cured for the first twenty-four hours in the field to allow for the initial curing conditions to be identical. All specimens were demolded after twenty four hours and covered with wet burlap and polyethylene sheets. The samples were placed in the curing chamber for the remainder of the fourteen day curing period. The curing chamber was held at a constant relative humidity of 50±4% and a constant temperature of 74⁰F. Examples of the wet cure method utilized can be seen in Figures and

53 43 Figure Sample Covered with Figure Sample Sealed in Wet Burlap Polyethylene Sheet 3.4 INSTRUMENT DETAILS and FIELD IMPLEMENTATION Embedded Vibrating Wire Strain Gauges To find the strain experienced in the HPC bridge deck fifteen vibrating wire strain gauges (VWSG) designed for embedment in concrete were used. The sensors (fig ) were provided by Geokon, Inc. and are capable of recording the strain as well as the temperature of the surrounding concrete. Figure Geokon, Inc. VWSG for Embedment The basis behind the VWSG is the vibrating wire principle. A steel wire in the gauge is tensioned between the two end blocks of the gauge which is set in the bridge deck. Any

54 44 deformations result in a change in overall gauge length which can then be used in calculating deck strain at a particular location. Tension readings are acquired by plucking the wire and measuring the resonating frequency with the use of an electromagnetic coil attached directly to the data logger. The gauges also include a thermistor that collects temperature readings as well. Installation of the gauges was performed by securing the sensors to the reinforcing cage with plastic ties (fig ). Styrofoam spacers were used to insure proper orientation and a secure connection to the cage. Figure VWSG Installation VSWG locations were selected to provide strain data for the mid and quarter span of the deck and can be seen in Figure Three sensors were installed at each mid-span location. One gauge was installed along the bottom of the cage and two along the top (transverse and longitudinal directions). Two sensors were installed at each quarter span location (top of cage only). A detail of gauge locations can be seen in Table

55 45 Figure VWSG Locations Table VWSG Orientations and Locations Sensor No. Girder No. Location Orientation 1 10 Mid-span Top Transverse 2 10 Mid-span Top Longitudinal 3 10 Mid-span Bottom Longitudinal 4 8 Mid-span Bottom Longitudinal 5 8 Mid-span Top Transverse 6 8 Mid-span Top Longitudinal 7 6 Mid-span Top Longitudinal 8 6 Mid-span Top Transverse 9 6 Mid-span Bottom Transverse Quarter span Top Longitudinal Quarter span Top Transverse 12 8 Quarter span Top Longitudinal 13 8 Quarter span Top Transverse 14 6 Quarter span Top Longitudinal 15 6 Quarter span Top Transverse

56 Portable Data Logger Data collection in the field was performed by a Campbell Scientific CR1000 data logger (Figure 3.4.4). With three multiplexors the unit collected data from a maximum of 48 simultaneous channels. Powered by a rechargeable battery the data logger could collect data continuously for fourteen days before needing a replacement battery. Figure Portable CR1000 Data Logger Able to store up to 4 megabytes of information internally, the collected data was downloaded by a laptop computer every two weeks while on location to replace the unit s battery. The unit recorded the strains and temperatures in the bridge deck every five minutes for the first week. The interval was changed to hourly collections from day 7 onward to save memory and reduce the overall amount of data for analysis.

57 Accelerometers Bridge deck acceleration due to bordering traffic was monitored with single axis accelerometers provided by Kistler (fig ). The instruments were clamped to the bottom flanges of the bridge girders and readings were taken both before pouring and immediately afterwards. Figure Kistler Single Axis Accelerometer This was done to analyze acceleration conditions from the two traffic patterns experienced during and after the pour. Before pouring both of the adjacent lanes remained open to traffic. Only the far lane remained open from the start of the pour until nine hours had passed. By recording values during both phases it was possible to determine the normal acceleration as well as altered traffic acceleration of the bridge deck Laser Doppler Vibrometer Stage one displacement and velocity were recorded with a Laser Doppler Vibrometer (Polytec, Inc.) (Fig ). The unit operates by bouncing light off installed targets and measuring shifts in the light spectrum as the target moves due to deflection.

58 48 Figure Laser Doppler Vibrometer (Polytec, Inc.) Reflective targets were placed near the mid-span of girders two and four and readings were taken during several tests both before and after the test to discover the normal deflection and velocity of the members during both traffic patterns Structural Testing System Collection of girder strain as a result of live load was possible through Bridge Diagnostics, Inc. Structural Testing System I (STS I). Designed for use on highway and railroad bridges the system allows for quick installation of transducers with little surface preparation. The robustness of the transducers allows the sensors to be clamped to the bridge girders with standard C-clamps (fig ).

59 49 Figure Installed Strain Transducer Data acquisition is possible through a network of STS I receiver boxes installed throughout the structure. Receiving information from up to four sensors, each box is wired in series before being connected to the main collection unit (Fig ). Figure STS Transducer, Receiver Box and Collection Unit

60 LABORATORY TESTING PROCEDURES A wide variety of laboratory tests were conducted on the collected samples to obtain the mechanical properties of the mix. A summary of all tests conducted can be seen in Table The specific test methods and procedures are discussed in greater detail in the following sections. Test No. of Samples Table Summary of Laboratory Tests Performed Applicable Standard Curing Conditions Sample Age at Testing (Days) Slump 1 ASTM C143 None 0, Fresh Fresh Air Content 1 ASTM C231 None 0, Fresh Free Shrinkage 3 ASTM C Day Wet Cure 1-91 Restrained Shrinkage 2 AASHTO PP34 14 Day Wet Cure 1 - Cracking Age (Max. 91 Days) Compressive Strength 15 ASTM C39 14 Day Wet Cure 3, 7, 14, 28, 56 and 91 Splitting Tensile 15 ASTM C Day Wet Cure 3, 7, 14, 28, 56 and 92 Strength Modulus of Elasticity 15 ASTM C Day Wet Cure 3, 7, 14, 28, 56 and Compressive Strength of Concrete Specimens (ASTM C-39-05) For each testing day two (4 x 8 ) specimens were subjected to compression testing. All samples were tested using a Forney One Million Pound Machine (fig ). Prior to testing each sample was capped with high strength sulfur to provide uniform application of compressive force. The loading rate was held constant throughout the duration of the procedure and the maximum strength for each cylinder was recorded.

61 51 Figure Forney One Million Pound Machine Splitting Tensile Strength OF Concrete Specimens (C e1) Similar to the compression testing two (4 x 8 ) cylinders were tested in splitting tension for each testing date. Splitting tension was applied by the Tinius Compression Machine rather than the Forney machine because of the former s longer head extension. Also, to minimize human error, a 250-kip digital load cell is applied to the apparatus. The splitting tensile strength test can be seen in Figures and Figure Tinius Olsen Compression Machine Figure Concrete Sample Under Loading

62 Modulus of Elasticity The elastic modulus was found by testing two samples each test day in compression with the use of a compressometer (Fig ). Each specimen capped with high strength sulfur and is secured to the compressometer and preloaded to ensure proper installation. Figure Concrete Sample with Compressometer Once the preloading was satisfactory the samples were loaded a minimum of two times at a constant rate of psi per second. Loading was increased until 40% of the compressive strength of the concrete (as calculated from compression testing) was reached. Throughout the test load and deformation were recorded regularly. By plotting the stress versus the strain experienced by the sample it was possible to determine the resulting slope, better known as the elastic modulus.

63 Free Shrinkage Test (ASTM C-157) The free shrinkage test required preparation of three (3 x 3 x 10 ) concrete prisms (Fig ). Each specimen was cast within a steel mold fitted with gauge studs at the extreme ends of the sample. Figure Free Shrinkage Prisms At the end of curing each sample was measured and compared to the a reference bar. All measurements involved in this test were performed with a length comparator (Fig ).

64 54 Figure Length Comparator with Reference Bar (right) and Concrete Prism (left) Samples were rotated when positioned in the comparator and the minimum measurements were recorded. Length change throughout the testing period was calculated using Equation [ Eq. 3.1 ] where: = Difference in length between specimen and reference bar at day x = Difference in length between specimen and reference bar at day 1 = Total length of specimen (10 )

65 Restrained Shrinkage Ring Test Measurement of restrained shrinkage was conducted following the provisions of the AASHTO PP34 test method. Molds were prepared and the rings were cast in the field on the day of the pour. The setup consisted of an inner steel ring around which concrete is cast. A combination of foil strain gauges (FSG) and vibrating wire strain gauges (VWSG) allow for quantification of strain. As the specimen shrinks compressive stresses are produced within the steel ring. These compressive stresses are offset by tensile stresses that occur in the surrounding concrete due to shrinkage. Should these tensile stresses at any point exceed the tensile allowable stress of the concrete cracking will occur. Cracks are monitored daily with the use of a crack microscope and a crack map of the ring is created for analytical purposes. The AASHTO procedure also requires installing four FSG and the center of the steel ring to monitor stress increases. Sudden changes in steel stress because of stress relief in the concrete due to cracking are an indicator of the precise date of cracking. Further, six VWSG are also installed across the top of the rings by embedding threaded bolts during casting of each ring. The VWSGs were arranged to note the stresses present in the concrete throughout the test period. Readings exceeding cracking strain signaled the location cracking was expected and aided in the crack surveying of the rings. An added advantage to the VWSG setup is the ability to quantify concrete stresses in those regions that do not experience cracking. This allows for better understanding of the results.

66 Environmental Chamber Shrinkage of concrete is affected by the temperature and relative humidity of its surrounding environment. As a result it is important to control these causes and therefore ensure the integrity of any collected data. Control of these elements was possible with an environmental chamber (Fig ). Consisting of aluminum insulated walls, the 24 x 16 by 8 room was managed by an external digital control unit. Figure Environmental Chamber Internal sensors regularly monitored the temperature and humidity of the room and communicate this information to the outside unit. Temperature adjustments were automatically made with the series of heating and cooling units. The room also had fans that helped to circulate the air and therefore maintained an acceptable temperature. The relative humidity of the chamber was controlled with a steam generator located within the fan system. Constant monitoring and adjustments made by the chamber control system allowed the room to be kept at a constant temperature of 74⁰ F and a constant relative humidity of 50 ± 4%.

67 57 CHAPTER IV TEST RESULTS 4.1 INTRODUCTION This chapter presents the test results of the testing performed on the NJ Turnpike HPC mix. Mechanical properties (compressive strength, splitting tensile strength and modulus of elasticity) are presented followed by the results of the free shrinkage and restrained shrinkage testing. 4.2 MECHANICAL PROPERTIES Compressive Strength Figure and Table depict the change in compressive strength of the mix over time. As can be seen in the figure the 28-day requirement of a compressive strength of at least 5,000 psi was met in accordance with NJDOT standards.

68 58 Compressive Strength of Concrete f ' c (psi) Time (Days) Figure Compressive Strength of Concrete Mix over Time Table Compressive Strength of Concrete Mix over Time Mechanical Properties TIME (Days) σ c (psi)

69 Tensile Splitting Strength The tensile strength of the mix can be seen in Figure and Table Splitting Tensile Strength of Concrete f 'c (psi) Time (Days) Figure Splitting Tensile Strength of Concrete Mix over Time Table Compressive Strength of Concrete Mix over Time Mechanical Properties TIME (Days) σ t (psi)

70 Elastic Modulus The modulus of elasticity of the mix can be seen in Figure and Table The rapid rise during the first seven days followed by a slow decrease over time is due largely to the curing history of the specimens. As the specimen are wet cured the pore network within the samples is constantly filled with water. At the culmination of curing the water gradually becomes replaced with air and the modulus ceases it increase and occasionally, as with the mix in this study, the modulus will even decrease slightly Elastic Modulus of Concrete f ' c (psi) Time (Days) Figure Elastic Modulus of Concrete Mix over Time

71 61 Table Compressive Strength of Concrete Mix over Time Mechanical Properties TIME (Days) Е (psi) Free Shrinkage The free shrinkage of the mix can be seen graphically in Figure and is summarized in Table The values obtained are close to the expected values provided by the concrete plant (around -470µε at day 56). 0 Free Shrinkage of Concrete Strain (Microstrain) Time (Days) Figure Free Shrinkage of Concrete Mix over Time

72 62 Table Free Shrinkage of Concrete Mix over Time Free Shrinkage TIME (Days) ε(µε) LABORATORY TEST RESULTS Shrinkage Rings The shrinkage ring specimens were monitored for 91 days. Throughout that period visual inspections were performed every two to three days and any crack observations were recorded. Cracking was typically found to begin along the outer circumference of the ring before penetrating the top or bottom. Each sample was divided into six regions based on location of the VWSGs along the top of the rings. Crack history was monitored by recording date of cracking, crack length and crack width. The final crack mappings for sample 1 can be seen in Figures and The FSGs and VWSGs applied to the concrete specimens proved unreliable and all findings were based on visual analysis.

73 Figure Final Crack Mapping of Ring Specimen 1 (Side Profile) 63

74 Figure Final Crack Mapping of Ring Specimen 1 (Top/Bottom Profile) 64

75 65 Of importance to note are the cracking widths of the observations. While there were a few cracks measuring 0.002mm and one measuring 0.003mm the majority were less than 0.001mm. As a result accurate measurements could not be given due to the limits of the cracking microscope scale (the smallest possible measurement was 0.001mm). Nearly all cracks were difficult to see with the human eye and the microscope was needed extensively to make observations. The observations of ring specimen 1 show forming initial cracking to occur on day 40 with a crack width of less than 0.001mm (side profile, VWSG region 4, (5/24)). The largest crack formation was noted on day 84 with a cracking width of 0.003mm (top profile, VWSG region 5, (7/7)). This was one of only two cracks to have penetrated mostly or entirely through the ring to the steel core. The final crack mapping for sample 2 can be seen in Figures and

76 Figure Final Crack Mapping of Ring Specimen 2 (Side Profile) 66

77 Figure Final Crack Mapping of Ring Specimen 2 (Top/Bottom Profile) 67

78 68 Similarly, first cracking was observed around day 40 with a crack width of 0.002mm (side profile, VWSG region 5, (5/24)). The largest crack occurred on day 76 with a crack width of 0.004mm (side profile, VWSG region 5, (6/29)). Three cracks reached the steel inner core all with crack widths of 0.002mm and each occurred on day 105. As mentioned previously, while the crack mappings clearly show the details of the cracking the specimens looked nearly flawless to the human eye. To provide a better understanding of the distribution of cracking widths Table is provided. Table Crack Width Distribution Over All Samples Crack Width Distribution Over All Samples Based on 156 Observed Crack Widths Crack Width Total No. % < mm mm mm mm mm As seen in the distribution, 88.47% of all crack widths were 0.001mm or less and only 1.92% of all cracks reached the steel ring. This statistic expresses the difficulty it was to view most of the cracking. The smooth surface of the samples provided easier observation than the more porous surfaced concrete experienced in the field.

79 FIELD TEST RESULTS Field Strains To assess the accuracy of the AASHTO ring test it was important to analyze the field data both during the early age as well as longer term. The early age period considered in this study was defined as the first 36 hours beginning from the start of the pour. The concrete strain observed along the deck at mid-span can be seen graphically in Figures The earliest cracking strain was determined from laboratory testing at three days. The cracking strain curve presented on the following figures was interpolated from this data. Figure Longitudinal Mid-span Strains at Top of Deck During Early Age of Concrete

80 70 Figure Transverse Mid-span Strains at Top of Deck During Early Age of Concrete Figure Longitudinal Mid-span Strains at Bottom of Deck During Early Age of Concrete

81 71 Figure Transverse Mid-span Strains at Bottom of Deck During Early Age of Concrete As can be seen in Figure all strains present along mid-span were compressive and remained so immediately after the pour was completed (at 6-8 hours) as well as during the following 24 hours. The spike in strain during the first hour in Figures and can be explained by the workers and equipment moving along mid-span while preparing and pouring the deck. Similarly, the transverse strains were compressive throughout the pour as well as the rest of the 36-hour early age period. These strains have been plotted in Figure and

82 72 Figure Longitudinal Quarter-span Strains at Top of Deck During Early Age of Concrete Figure Transverse Quarter-span Strains at Top of Deck During Early Age of Concrete

83 73 Apart from the early age period it is also important to oversee the longer term after the concrete has had enough time to cure. Previous researchers have found that HPC mixes typically exhibit long time to cracking (over 56 days). To analyze this the longer term for this study was defined as a 91-day period beginning at the end of curing. The concrete strains present at mid-span throughout this period are plotted in Figures Dotted sections of the plots are a result of a faulty battery which caused lost data for that duration of time. Those dotted sections are simply linear connections between the last point before data loss and the first point after a new battery was replaced. Figure Transverse Strains Along Top of Mid-span During Long-Term Period

84 74 Figure Transverse Strains Along Top of Mid-span During Long-Term Period Figure Longitudinal Strains Along Bottom of Mid-span During Long-Term Period

85 75 Figure Transverse Strains Along Bottom of Mid-span During Long-Term Period Review of the previous figures shows that all strains along the mid-span of the instrumented region of the bridge deck remained in compression from the beginning of the pour through the 91-day Long-Term period. Figures and graphically show the transverse strains during the Long- Term period.

86 76 Figure Longitudinal Strains Along Top of Quarter-span During Long-Term Period Figure Longitudinal Strains Along Top of Quarter-span During Long-Term Period

87 77 As with the mid-span the quarter-span strains remained largely in compression throughout the Long-Term period. The spike in transverse strain seen in Figure , while not more than cracking strain, is likely the result of adjacent traffic having moved over the section of the bridge open to traffic while readings were being taken. This possibility is discussed in further detail in the following section on bridge deck cracking Bridge Deck Cracking Several trips were made to the field throughout the duration of this study to monitor any cracking on the surface of the bridge deck. It was important to detail crack locations and widths for correlation with the restrained shrinkage ring data acquired in the lab. The final crack mapping of the bridge deck (Figure and Table 4.4-1) details the locations of cracks as well as sensor locations. The first cracks (cracks A, B and H) were observed at day 29. The largest crack (H) began near mid-span at the border of Stage I and extended close to 8 feet into Stage II. Crack A formed eight feet from the west abutment, beginning roughly four feet from the border of Stage I and extending 24 inches. Crack B formed a few inches from the end of crack A and had a cracking length of 39 inches.

88 78 Figure Crack Mapping of Bridge Deck with Sensor Locations Crack Letter Table Crack Map Details Crack Details Crack Length (in) A B C D E F G H Crack Width (mm)

89 79 Cracks C, E and F were observed on day 37 and were located near the quarterspan of the bridge deck. Crack C formed seventeen feet from the west abutment and had a cracking length of 71 inches. Cracks E and F were observed twenty-seven feet from the west abutment and were found to have cracking lengths of 21 and 20 inches, respectively. Cracks G and D were observed on day 57, the final day of observation possible. Crack G was located thirty-four feet from the west abutment and had a cracking length of 42 inches while crack D was found to be 16 inches long and was located fifteen feet from the west abutment. Most crack widths were 0.002mm with the only exceptions being crack C (0.003mm) and crack H (0.004mm). Measurements were taken using a cracking microscope (Figure ). The apparatus magnified the surface of the deck and crack widths were recorded using the metric scale engraved on the instrument lens. Figure Crack Microscope Used in Deck Crack Mapping The deck crack map shows all cracking to have occurred on the non-instrumented half of the structure. One half remained un-instrumented because of economic concerns

90 80 and as a result no data for the cracked half of the deck was recorded that could be used to analyze this unusual phenomenon. To do so finite element analysis with review of the concrete mix design was employed for further investigation. Review of the mix design yielded no additional information until the contractor was contacted in the process of the investigation. As a result of that conversation it was learned that while the mix design called for 6.6 lbs. 3 / yd the concrete delivered on the day of the pour had used the maximum allowable 18 lbs. / 3 yd, three times the design amount. This, would lead to a delay in the set time of the concrete which could have resulted in a much lower f c than expected. When traffic patterns returned to normal nine hours after completing the pour this weakened concrete would have been more susceptible to cracking. The contractor further explained that at the time normal traffic patterns opened the concrete was still wet and soft to the touch. While more time was requested for the alternative traffic pattern this was denied. To verify the possibility the increased retarder could have delayed the set time the temperatures of the concrete at gauge locations (Figure ) was analyzed.

91 81 Figure VWSG Temperatures During Initial 36 Hour Period Figure is divided into separate regions by four dotted lines of differing colors. The purple line marks the start of the pour (beginning at the east abutment). The red line signals the end of the pour (culminating at the west abutment). The green line specifies the increase in concrete temperature associated with heat of hydration and setting. Finally, the blue line shows the time at which traffic was returned from the construction pattern (single lane, farthest from Stage II) to its normal pattern (both lanes open to alternating traffic). As is seen in the figure the heat of hydration was delayed for roughly five hours after completing the pour and nearly thirteen hours from the beginning. As a result, despite the additional nine hour delay in returning to normal traffic patterns, the extra

92 82 retarder pushed the set time of the concrete back between 4-6 hours. This allowed the concrete delivered during the first half of the pour (the un-cracked, instrumented section) an average of 6 hours of set time before being subject to adjacent traffic loads. Similarly, the second half of the deck (cracked, non-instrumented section) was allowed to set for an average of only 3 hours before subjection to adjacent traffic loads. Verification of this scenario was performed with the use of ABAQUS, a finite element program. The findings of that analysis are detailed in the following chapter.

93 83 CHAPTER V FINITE ELEMENT MODELING 5.1 INTRODUCTION Finite element programs are commonly used to study the cracking behavior of bridge decks. For this study the general purpose software ABAQUS was used. The program allows for definition of material behavior and properties, boundary conditions, reinforcement and bond behavior among other variables. It is critical the user have an understanding of the model elements and constraint conditions for maximum accuracy to be gained. A description of each model element used as well as the constraint/release conditions is provided in the following section Model Element Types While the program s libraries contain various elements beam and shell elements have been determined to be the most reliable in the analysis of bridges. Although solid element analysis is possible in ABAQUS it requires increased computer resources without any rise in accuracy of results. It was this reason that beam and shell elements were used in this research.

94 Beam Element The beam element is useful when modeling stringers and plate girders as it is a one dimensional element that typically cannot deform out of its plane. This restriction allows for plane sections to remain plane throughout analysis Shell Element Shell elements are most commonly used for modeling concrete bridge decks because of the thickness of deck slabs being significantly thinner than the other two dimensions of the slab. ABAQUS possesses many shell elements in its libraries though the four node shell element is the most common for bridge deck modeling. The four node shell element is a fully integrated, general purpose, finite membrane-strain shell that allows in plane bending as well as transverse shear deformation in accordance with thickshell theory. In short, as a shell thickness is increased the thin shell behavior it displays (as determined by the Kirchhoff-Love hypothesis) decreases. Each node has six degrees of freedom and there are four integration points for each element. An example of a four node shell element and its integration points can be seen in Figure Figure Four Node Shell Element Detailed with Integration Points

95 Steel Reinforcement All steel reinforcement was modeled using the rebar element. The rebar element is an ABAQUS template that allows embedment within beam or shell elements. Within a shell it is possible to orient the rebar in layers both transversely as well as longitudinally. The rebar can only be oriented along the longitudinal length. For all analysis grade 60 steel was specified throughout the model Shear Studs When modeling shear studs two element types can be selected breakable bond or unbreakable bond. Breakable bond shear stud elements allow for failure of the shear stud to occur while unbreakable bond elements restrict the stud s ability to fail during analysis Boundary Conditions Boundary conditions within ABAQUS are idealized to simulate piers and abutments. No effect from live load was assumed (no occurrence of side-sway or settlement within the model). Pinned supports are created by restricting the x and y planes of the girders cross section while roller supports are produced by restricting only the y plane of the cross section Constraint and Release Elements The ABAQUS model is merely an assembly of individual structural components (beams, shells, studs, etc.). Until these elements are connected to form the entire bridge

96 86 structure analysis cannot be performed. To bind elements to one another constraint elements must be used. The most common constraint element used is known as a multipoint constraint (MPC). Beam MPCs provide rigid connections simulating a beam between two nodes and are mainly used in slab and beam elements to cause composite action. The displacement and rotation of one node is constrained to the other. Pin MPCs are used in pinned connections and are typically reserved for stringers and floor beams as well as other non-composite connections. Some components within the model require sharing nodes such as connecting diaphragms to stringers. In this case rotation of the starting and ending nodes (of the diaphragm) must be released with the use of a release element Material Properties GSP overpasses typically employ the use of concrete and steel. For accurate results the properties of these materials must be determined and input into the program. Steel has been used for decades and as a result accepted values can be used for the elastic modulus (29,000 ksi) as well as Poisson s ratio (0.30). To perform plastic analysis the yield strength and ultimate strength of the steel must be known. Therefore a full stress-strain curve of the steel used is needed for acceptable accuracy. For this study two types of steel were used structural steel and reinforcing steel. For the structural steel A36 carbon steel and A572 high strength, low alloy carbon steel was used for the girders and diaphragms. A36 steel typically exhibits a minimum yield strength of 36,000 psi and an ultimate of between 58,000 and 80,000 psi. A572 steel possesses a minimum yield strength of 50,000 psi and an ultimate of between 70,000 psi

97 87 and 100,000 psi. Typical stress-strain curves for the two types of steel used in FE analysis can be seen in Figure Figure Typical stress-strain curves of structural steel (Salmon and Johnson, 1997) Unlike steel, the strength of concrete can range from 100 psi to 35,000 psi. Typically in bridge decks the design strength falls between 4,000 and 6,000 psi with HPC exhibiting a higher compressive strengths and lower water to cement ratios that normal concrete. For this reason the deck slab was considered to have a compressive strength of 5,000 psi. The elastic modulus of concrete varies due to several factors such as aggregate size, properties of cement, and compressive strength among others. Under the ACI

98 88 Building Code (ACI 318 Article 8.5.1, 2005) the elastic modulus for concrete can be taken as: 1.5 [Eq. 5.1] where: = Unit weight of concrete ( lb / ft 3 ) = Compressive strength of concrete ( lb / ft 2 ) The tensile strength of concrete can be approximated as 10-20% of the compressive strength. If the element is subject to bending, as opposed to tension alone, the modulus of rupture should be used in analysis instead. The modulus of rupture can be estimated under ACI 318 Article and AASHTO LRFD Article , both of which specify (for normal weight concrete): 7.5 [Eq. 5.2] where: = Compressive strength of concrete ( lb / ft 2 ) 5.2 FINITE ELEMENT ANALYSIS RESULTS Bridge Deck Analysis Before any analysis it was required the model be verified with results from field testing. Strain data was collected throughout the day of the pour to do so. Weigh-inmotion testing was not possible due to the construction schedule limitations and as a result no truck weights were recorded in the field. To determine an accurate truck weight for analysis the model was run with a typical HS20-44 vehicle loading and strain results from the model were compared with the field data. Initial comparison showed the HS20 loading was too high and the axle weights were adjusted accordingly until the model

99 89 strain agreed reasonably with field strains. A comparison of these values can be seen in Table Table Strain Validation Steel Strain Comparison Girder 3 Girder 4 Girder 5 FE Model Strain Field Strain Additionally, the model required a minimum of three regions: the older concrete deck open to traffic, the first half of the new deck and the second half of the new deck. The new deck required separate regions in order to attribute different properties to account for the disparity in set time. It was determined that a higher accuracy could be obtained if the new concrete were to be split into six regions (as opposed to two) in order to simulate the gradient of concrete properties that resulted from the delay in set time. The model layout can be seen in figure (pre-existing concrete is green, new concrete is multi-colored). Figure ABAQUS FE Model Layout

100 90 Concrete properties for the newer concrete sections were interpolated from the laboratory data and are presented in Table Table Concrete Properties for New Concrete Sections Region Color Age at Traffic Opening (Hours) f' c (psi) E (psi) f R (psi) 1 Red Blue Yellow Purple Orange Pink Eight loading scenarios were applied to the model in order to analyze the various live load strains the deck may have endured. These eight cases can be seen in Figure Cracking strain was assumed to be one-third of the calculated allowable tensile strain based on the principle that one-third of tensile strain comes from live load, onethird from shrinkage and one-third from temperature change.

101 91 Figure Loading Cases Considered in FE Analysis There is a lack of substantial literature on the strength of concrete at very early ages and as a result the early compressive strength was determined through the interpolation of laboratory testing. The tensile strength used in analysis was considered to be 10% of the respective compressive strength at the age in consideration. Analysis was performed for each loading scenario and the results were compared with the cracking strain to determine the effect of adjacent traffic on the new concrete. To better understand the FE diagrams presented in this chapter Figure has been included to detail the orientation of Stage I and Stage II construction within the FE results.

102 92 Figure FE Diagram Index (Stage I Concrete Not Outlined, First Section of Stage II Poured Outlined in Orange, Second Section Poured Outlined in Pink) The strain results at each crack location experienced with Case 1, in which a truck passes in the outermost lane, are presented in Table and can be seen visually in Figure Table FE Model Strains Resulting from Case 1 Loading Case 2 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 1.09E E E E E E E E E E-05

103 93 Figure Deck Strains Due to Case 1 Live Load Case 1 loading could only have occurred ten hours or more after the pour concluded. As detailed previously, in Figure , this allowed the fresh concrete to set for 3-6 hours depending on the region under consideration. Review of Figure shows little strain at the locations of cracks A G (crack distribution shown previously in Figure ). The strain concentrated at mid span due to the loading exceeds that of the allowable plastic limit (considered to be 40% of f c ). While this may not have resulted in immediate cracking of the deck the plastic deformations that occurred during curing likely led to the eventual cracking observed at mid-span (Crack H). Case 2 was the traffic pattern experienced from the beginning of the pour until the reopening of normal traffic patterns. These results suggest altering traffic to this specific pattern during construction was adequate in reducing the potential for early age cracking due to adjacent traffic though a further reduction in strain is desirable. The strain results

104 94 at each crack location experienced with Case 2, in which a truck passes in the outermost lane, are presented in Table and can be seen visually in Figure Table FE Model Strains Resulting from Case 2 Loading Case 1 Crack ε MAX A 2.00E-05 B 1.66E-05 C 9.75E-06 D E 8.28E-06 F 8.76E-06 G 4.45E-06 H 2.28E-08 ε Cracking ε Plastic Limit 2.82E E-05 Figure Deck Strains Due to Case 2 Live Load

105 95 Of importance to note is that although the model strains did not exceed plastic or cracking limits the stress distribution is in relative agreement with the crack locations. The crack mapping shown in Figure has been aligned with Figure to detail this observation (Figure 5.2.6). Figure Comparison of Stress Distribution to Crack Orientation (Orientation Point Included (Arrows)) As can be seen in Figure 5.2.6, the strain distribution begins at the right corner of the newest concrete near the abutment. Similarly, all cracks but that located at mid-span propagate diagonally outward from the abutment. This observation suggests the cracking pattern is related to the strains resulting from adjacent traffic. Case 3 considered the passing of two trucks, one in each lane, at mid-span. This loading scenario could only have occurred following the return of traffic to normal patterns. Strain results at each crack location occurring as a result of a Case 2 loading are presented in Table and can be seen visually in Figure

106 96 Table FE Model Strains Resulting from Case 3 Loading Case 3 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 2.55E E E E E E E E E E-05 Figure Deck Strains Due to Case 3 Live Load While the strains produced by a Case 3 live loading generally follow the distributions seen in Cases 1 and 2, no locations of observed cracking experience strains in excess of allowable plastic and cracking limits.

107 97 Case 4 analyzed two trucks traveling in the lane furthest from Stage II construction. The results of this analysis are presented in Table and can be seen visually in Figure Table FE Model Strains from Case 4 Loading Case 4 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 3.26E E E E E E E E E E-05 Figure Deck Strains Due to Case 4 Live Load

108 98 Strain distributions from a Case 4 loading are similar to those seen in Case 2, the only difference being higher strain values because of the additional live load. Case 5 considered two vehicles in series traveling along the lane closest to the freshly poured concrete. Strain distribution was again similar to a single truck loading with higher strain values at mid-span due to the increased load. Strain values at each crack location occurring as a result of a Case 5 loading are presented in Table and can be seen visually in Figure Table FE Model Strains from Case 4 Loading Case 5 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 1.60E E E E E E E E E E-05

109 99 Figure Deck Strains Due to Case 5 Live Load The results of the Case 5 loading show strain at mid-span clearly in excess of the plastic limit and approaching the tensile limit of the deck. This loading was observed on several occasions during field visits and provides an explanation for the largest crack recorded in the field analysis. While Cases 1 5 do not provide strains over allowable limits for all crack locations the strain distributions provides strong evidence in support of adjacent live loads being the cause of the observed cracking. The FE analysis did not include any lane load and the presence of additional passenger vehicles would further increase the strains presented. Cases 6 8 were not regularly observed during field observations and are considered rare cases. Strain values and distributions are similar to previous cases and are provided for cases 6, 7 and 8 in Tables 5.2-8, and , respectively. Visual analysis for those cases can also been seen in Figures

110 100 Table FE Model Strains from Case 6 Loading Case 6 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 4.19E E E E E E E E E E-05 Figure Deck Strains Due to Case 6 Live Load

111 101 Table FE Model Strains from Case 7 Loading Case 7 Crack A B C D E F G H ε Cracking ε Plastic Limit ε MAX 3.86E E E E E E E E E E-05 Figure Deck Strains Due to Case 7 Live Load

Fundamentals of Concrete

Fundamentals of Concrete Components Cement Water Fine Aggregate Coarse Aggregate Fundamentals of Range in Proportions Advantages of Reducing Water Content: Increased strength Lower permeability Fundamentals of Increased resistance

More information

Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete

Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete. Properties of Concrete CIVL 1112 Contrete Introduction from CIVL 1101 1/10 Concrete is an artificial conglomerate stone made essentially of Portland cement, water, and aggregates. While cement in one form or another has been

More information

Laboratory Assessment of Drying Shrinkage of Concretes Containing Shrinkage Reducing Agents Compared with a New Low shrinkage Concrete

Laboratory Assessment of Drying Shrinkage of Concretes Containing Shrinkage Reducing Agents Compared with a New Low shrinkage Concrete Laboratory Assessment of Drying Shrinkage of Concretes Containing Shrinkage Reducing Agents Compared with a New Low shrinkage Concrete Bob Bornstein, Tony Song 2, and Valentin Mukhin 3 Manager Technical

More information

Concrete Shrinkage Testing and Challenges

Concrete Shrinkage Testing and Challenges Concrete Shrinkage Testing and Challenges Presented by Jafar Allahham MS student University of Utah NC2 Meeting April 26 th, 2017 Little America Hotel Acknowledgements Others at Univ. of Utah Assisting

More information

Types of Cracking and Influencing Causes

Types of Cracking and Influencing Causes Types of Cracking and Influencing Causes TRB Cracking Webinar May 25, 2016 R. Doug Hooton NSERC/ Cement Association of Canada, Senior Industrial Research Chair in Concrete Durability & Sustainability hooton@civ.utoronto.ca

More information

MnDOT s Experience With High Performance Concrete Bridge Decks & Reinforcement

MnDOT s Experience With High Performance Concrete Bridge Decks & Reinforcement 2017 Minnesota Concrete Council MnDOT s Experience With High Performance Concrete Bridge Decks & Reinforcement Ed Lutgen Bridge Construction & Maintenance Engineer Minnesota Department of Transportation

More information

EFFECT OF MATERIALS AND CURING PERIOD ON SHRINKAGE OF CONCRETE. By Maria West David Darwin JoAnn Browning. A Report on Research Sponsored by

EFFECT OF MATERIALS AND CURING PERIOD ON SHRINKAGE OF CONCRETE. By Maria West David Darwin JoAnn Browning. A Report on Research Sponsored by EFFECT OF MATERIALS AND CURING PERIOD ON SHRINKAGE OF CONCRETE By Maria West David Darwin JoAnn Browning A Report on Research Sponsored by CONSTRUCTION OF CRACK-FREE BRIDGE DECKS TRANSPORTATION POOLED-FUND

More information

Internal Curing. Improving Concrete Durability and Sustainability Using Internal Curing. Using Prewetted Lightweight Aggregates

Internal Curing. Improving Concrete Durability and Sustainability Using Internal Curing. Using Prewetted Lightweight Aggregates Internal Curing Using Prewetted Lightweight Aggregates Improving Concrete Durability and Sustainability Using Internal Curing Presented to: LA DOTD Transportation Conference February, 2013 Jeff Speck,

More information

Shrinkage Development in High Performance Concrete. Ammar Yahia, P.Eng., Ph.D.,

Shrinkage Development in High Performance Concrete. Ammar Yahia, P.Eng., Ph.D., Shrinkage Development in High Performance Concrete Ammar Yahia, P.Eng., Ph.D., Outlines 1. Introduction 2. High-performance concrete 3. Autogenous shrinkage 4. Autogenous shrinkage stress 5. Autogenous

More information

Influence of Specimen Thicknesson Cracking Behaviorin Restrained Shrinkage Ring Test

Influence of Specimen Thicknesson Cracking Behaviorin Restrained Shrinkage Ring Test Influence of Specimen Thicknesson Cracking Behaviorin Restrained Shrinkage Ring Test W. Dong, X. M. Zhou, and Z. M. Wu Abstract The standard test method using circular ring is adopted to assess the potential

More information

100-YEAR SERVICE-LIFE BRIDGE DECKS USING LOW-SHRINKAGE HIGH-PERFORMANCE CONCRETE

100-YEAR SERVICE-LIFE BRIDGE DECKS USING LOW-SHRINKAGE HIGH-PERFORMANCE CONCRETE 100-YEAR SERVICE-LIFE BRIDGE DECKS USING LOW-SHRINKAGE HIGH-PERFORMANCE CONCRETE Daniel Cusson, Ph.D., P.Eng. National Research Council Canada, Ottawa, Ontario, Canada Abstract: Highway bridges and parking

More information

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org Wikipedia.org Concrete Chapter 10 Properties of Fresh Concrete Materials of Construction-Concrete 1 What is Concrete? Concrete is a composite material that consists of a cement paste within which various

More information

Evaluation of Performance Based Concrete For Bridge Decks. DeWayne Wilson WSDOT Bridge Asset Management Engineer

Evaluation of Performance Based Concrete For Bridge Decks. DeWayne Wilson WSDOT Bridge Asset Management Engineer Evaluation of Performance Based Concrete For Bridge Decks DeWayne Wilson WSDOT Bridge Asset Management Engineer National Concrete Consortium Columbus, Ohio 4/26/2016 Problem - WSDOT has observed abnormal

More information

Plastic Shrinkage Cracking in Steel and Polypropylene Fiber Reinforced Concrete

Plastic Shrinkage Cracking in Steel and Polypropylene Fiber Reinforced Concrete Plastic Shrinkage Cracking in Steel and Polypropylene Fiber Reinforced Concrete Abstract Aminath Ali and Prasert Suwanvitaya Department of Civil Engineering, Faculty of Engineering, Kasetsart University

More information

Evaluation of Shrinkage Induced Cracking in Concrete with Impact of Internal Curing and Water to Cement Ratio

Evaluation of Shrinkage Induced Cracking in Concrete with Impact of Internal Curing and Water to Cement Ratio Evaluation of Shrinkage Induced Cracking in Concrete with Impact of Internal Curing and Water to Cement Ratio Jun Zhang, Yudong Han, Jiajia Zhang Journal of Advanced Concrete Technology, volume 14 ( 216

More information

Studying of Floating Concrete Report Fall

Studying of Floating Concrete Report Fall Studying of Floating Concrete Report 2017 Fall Instructor: Dr. Tzuyang Yu Submitted by Jie Hu Haoyu Lin George Xanthopoulos Haoxiang Yu Marven S Pigeot 1 Table of Contents 1. Introduction... 3 2. Approach...

More information

HIGH PERFORMANCE CONCRETE - HPC

HIGH PERFORMANCE CONCRETE - HPC HIGH PERFORMANCE CONCRETE - HPC Fahim Al-Neshawy & Esko Sistonen 23.10.2015 Outlines Introduction Materials used in HPC Methods used for making HPC HPC - mix design Properties of HPC Advantages and disadvantages

More information

SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS

SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS Kejin Wang (1), Surendra P. Shah (2) and Thomas Voigt (3) (1) Department of Civil, Construction and Environmental Engineering,

More information

ICRI 2017 Spring Convention March 15-17, 2017

ICRI 2017 Spring Convention March 15-17, 2017 ICRI 2017 Spring Convention March 15-17, 2017 Evaluating Shrinkage Cracking Potential of Concrete Using Ring Test Bruce G. Menu, PhD candidate, Laval University, Canada Marc Jolin, professor, Laval University,

More information

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup HIGH PERFORMANCE CONCRETE by John J. Roller CTLGroup Early Louisiana HPC Research Law & Rasoulian (1980) Adelman & Cousins (1990) Bruce, Russell & Roller (1990-1993) Law & Rasoulian (1980) Concrete strengths

More information

The Importance of the Factors Affecting Concrete Shrinkage

The Importance of the Factors Affecting Concrete Shrinkage TMC Tinni Management Consulting PAVEMENT INFORMATION NOTE Issue No. 20 Edited by Arvo Tinni. Email arvo@tinni.com.au 11 11 2008 The Importance of the Factors Affecting Concrete Shrinkage 1 Purpose This

More information

Experimental investigation of the use of CFRP grid for shear strengthening of RC beams

Experimental investigation of the use of CFRP grid for shear strengthening of RC beams Journal of Asian Concrete Federation Vol. 2, No. 2, Dec. 2016, pp. 117-127 ISSN 2465-7964 / eissn 2465-7972 http://dx.doi.org/10.18702/acf.2016.12.2.2.117 Experimental investigation of the use of CFRP

More information

Akhter B. Hossain,P. Abstract

Akhter B. Hossain,P. Abstract Paper accepted for presentation and publication in the Proceedings of Conference on Fiber Composites, High-Performance Concretes, and Smart Materials organized by International Center for Fiber Reinforced

More information

FIBER ADDITION AND ITS EFFECT ON CONCRETE STRENGTH

FIBER ADDITION AND ITS EFFECT ON CONCRETE STRENGTH FIBER ADDITION AND ITS EFFECT ON CONCRETE STRENGTH Aiswarya Sukumar M.Tech CE, MACE MG university, Kerala Elson John Asso. Professor, MACE MG University, Kerala Abstract Fibers are generally used as resistance

More information

EVOLUTION OF HIGH STRENGTH CONCRETE OF M80 GRADE

EVOLUTION OF HIGH STRENGTH CONCRETE OF M80 GRADE EVOLUTION OF HIGH STRENGTH CONCRETE OF M80 GRADE D.VASAVI SWETHA Assistant Professor, Civil Department, Dadi Institute of Engineering and Technology. ABSTACT The primary difference between high-strength

More information

Design of Rigid Pavements

Design of Rigid Pavements Traffic and Highway Engineering (ІІ) CVL 4324 Chapter 20 Design of Rigid Pavements Dr. Sari Abusharar Assistant Professor Civil Engineering Department Faculty of Applied Engineering and Urban Planning

More information

Bridge Deck Cracking and Composite Action Analyses. FINAL REPORT March Submitted by

Bridge Deck Cracking and Composite Action Analyses. FINAL REPORT March Submitted by FHWA-NJ-2008-010 Bridge Deck Cracking and Composite Action Analyses FINAL REPORT March 2010 Submitted by Hani Nassif 1 Associate Professor Nakin Suksawang 2 Assistant Professor Husam Najm 1 Associate Professor

More information

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK INDUSTRY RECOMMENDATION for EXTERIOR CONCRETE FLATWORK Prepared by Ohio Concrete Inquires regarding this document may be addressed to: Ohio Concrete 2600 Corporate Exchange Dr., Ste. 165 Columbus, OH 43231

More information

Characterization and performance of high performance concrete for pavements

Characterization and performance of high performance concrete for pavements Characterization and performance of high performance concrete for pavements D. G. Goulias Department of Civil and Environmental Engineering, University of Maryland, USA Abstract Several states in the U.S.

More information

Overview of Problems with Deicer Scaling Test Methods

Overview of Problems with Deicer Scaling Test Methods Overview of Problems with Deicer Scaling Test Methods Doug Hooton NSERC/CAC Chair in Durable & Sustainable Concrete UNIVERSITY OF TORONTO DEPARTMENT OF CIVIL ENGINEERING De-Icer Salt Scaling ASTM C672-12

More information

ULTRA HIGH PERFORMANCE AND HIGH EARLY STRENGTH CONCRETE

ULTRA HIGH PERFORMANCE AND HIGH EARLY STRENGTH CONCRETE ULTRA HIGH PERFORMANCE AND HIGH EARLY STRENGTH CONCRETE Mehdi Sadeghi e Habashi, Seraj Higher Education Institue, Iran 36th Conference on OUR WORLD IN CONCRETE & STRUCTURES: 14-16 August 2011, Singapore

More information

Keywords: Drying Shrinkage of Concrete, Autogenous Shrinkage, Design Shrinkage Strain

Keywords: Drying Shrinkage of Concrete, Autogenous Shrinkage, Design Shrinkage Strain A Discussion on the Shrinkage Interpretation from the Experimental Shrinkage Measurement Based on the Australian Testing Procedure AS1012.13 William A. Thomas¹, James Mohammadi² and Dr Warren South³ ¹Chief

More information

PCC Pavement Mixture Selection

PCC Pavement Mixture Selection PCC Pavement Mixture Selection A. General Information Design Manual Chapter 5 - Roadway Design 5E - PCC Pavement Mixture Selection 5E-1 Concrete is basically a mixture of two components, paste and aggregates.

More information

BRIDGE DECK CONCRETE VOLUME CHANGE

BRIDGE DECK CONCRETE VOLUME CHANGE FINAL CONTRACT REPORT VTRC 10-CR5 BRIDGE DECK CONCRETE VOLUME CHANGE ANDREI RAMNICEANU Research Associate RICHARD E. WEYERS Charles E. Via Jr. Professor DAVID W. MOKAREM Research Associate Charles E. Via

More information

INDOT/ACPA Technical Committee 2009 Specification Revisions 2009 Test Method Revisions Studies

INDOT/ACPA Technical Committee 2009 Specification Revisions 2009 Test Method Revisions Studies PCCP Workshop INDOT INDOT/ACPA Technical Committee 2009 Specification Revisions 2009 Test Method Revisions Studies INDOT/ACPA Technical Committee Materials Management FHWA Construction Management District

More information

EVALUATION REPORT OF HESS PUMICE

EVALUATION REPORT OF HESS PUMICE EVALUATION REPORT OF HESS PUMICE June 11, 212 By Uma Ramasamy and Paul Tikalsky CONCRETE AND MATERIALS RESEARCH AND EVALUATION LABORATORY DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING 1 INTRODUCTION

More information

AC : INTRODUCING CIVIL ENGINEERING UNDERGRADUATES TO THE PREMATURE CRACKING OF CONCRETE BRIDGE DECKS

AC : INTRODUCING CIVIL ENGINEERING UNDERGRADUATES TO THE PREMATURE CRACKING OF CONCRETE BRIDGE DECKS AC 27-27: INTRODUCING CIVIL ENGINEERING UNDERGRADUATES TO THE PREMATURE CRACKING OF CONCRETE BRIDGE DECKS Akhter Hossain, University of South Alabama Akhter B. Hossain, Ph.D. is an assistant professor

More information

FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA. Michael M. Sprinkel, P.E.

FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA. Michael M. Sprinkel, P.E. FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA Michael M. Sprinkel, P.E. Research Manager Celik Ozyildirim, Ph.D. Principal Research Scientist (The

More information

Practical Experiences on Cracking of Concrete Slabs on Ground

Practical Experiences on Cracking of Concrete Slabs on Ground 11 Practical Experiences on Cracking of Concrete Slabs on Ground Jukka Lahdensivu Lic. Tech., Senior Research Scientist Tampere University of Technology Tekniikankatu 12, P.O. Box 600, FI-33101 Tampere

More information

Nair, Ozyildirim, and Sprinkel 1 REDUCING CRACKS IN CONCRETE BRIDGE DECKS USING SHRINKAGE REDUCING ADMIXTURE

Nair, Ozyildirim, and Sprinkel 1 REDUCING CRACKS IN CONCRETE BRIDGE DECKS USING SHRINKAGE REDUCING ADMIXTURE Nair, Ozyildirim, and Sprinkel 0 0 0 0 REDUCING CRACKS IN CONCRETE BRIDGE DECKS USING SHRINKAGE REDUCING ADMIXTURE Harikrishnan Nair, Ph.D., P.E. Research Scientist Virginia Center for Transportation Innovation

More information

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1 THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter

More information

Compound and Engineering Application of Fiber Reinforced Concrete with Low Shrinkage

Compound and Engineering Application of Fiber Reinforced Concrete with Low Shrinkage Advanced Materials Research Online: 2014-06-06 ISSN: 1662-8985, Vols. 941-944, pp 873-876 doi:10.4028/www.scientific.net/amr.941-944.873 2014 Trans Tech Publications, Switzerland Compound and Engineering

More information

Control of Concrete Cracking in Bridges Thursday, August 17, :00pm to 3:30pm ET

Control of Concrete Cracking in Bridges Thursday, August 17, :00pm to 3:30pm ET TRANSPORTATION RESEARCH BOARD Control of Concrete Cracking in Bridges Thursday, August 17, 2017 2:00pm to 3:30pm ET The Transportation Research Board has met the standards and requirements of the Registered

More information

Durability Performance of Australian Commercial Concrete Modified with Permeability Reducing Admixture

Durability Performance of Australian Commercial Concrete Modified with Permeability Reducing Admixture Durability Performance of Australian Commercial Concrete Modified with Permeability Reducing Admixture Robert L Munn, Gary Kao*, Z Tian Chang, ACCI, School of Civil & Environmental Engineering, UNSW *

More information

CONCRETE MIX DESIGN WORKSHOP FOR NORMAL CONCRETE MIXTURES 3/21/2017 1

CONCRETE MIX DESIGN WORKSHOP FOR NORMAL CONCRETE MIXTURES 3/21/2017 1 53 th Quality Concrete School New Mexico State University Concrete Mix Design Workshop January 13 14, 2017 CONCRETE MIX DESIGN WORKSHOP FOR NORMAL CONCRETE MIXTURES 3/21/2017 1 Mix Design is the Recipe

More information

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Route 360 Inverted T-beams Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Background Outline Scope and Objectives Development and Testing Topping

More information

Test 1 : Standard Slump and Flow Table Tests

Test 1 : Standard Slump and Flow Table Tests Test 1 : Standard Slump and Flow Table Tests Objective To determine the reference slump value for Kistner concrete mix design and to calibrate it against an equivalent measure using a flow table. Materials

More information

LIGHTWEIGHT AGGREGATES AS AN INTERNAL CURING AGENT FOR LOW-CRACKING HIGH-PERFORMANCE CONCRETE

LIGHTWEIGHT AGGREGATES AS AN INTERNAL CURING AGENT FOR LOW-CRACKING HIGH-PERFORMANCE CONCRETE LIGHTWEIGHT AGGREGATES AS AN INTERNAL CURING AGENT FOR LOW-CRACKING HIGH-PERFORMANCE CONCRETE By Diane Reynolds JoAnn Browning David Darwin A Report on Research Sponsored by CONSTRUCTION OF CRACK-FREE

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

The Mechanical Properties of High Strength Concrete for Box Girder Bridge Deck in Malaysia

The Mechanical Properties of High Strength Concrete for Box Girder Bridge Deck in Malaysia Adnan et al. Concrete Research Letters Vol. 1(1) 2010 www.crl.issres.net Vol. 1 (1) March 2010 The Mechanical Properties of High Strength Concrete for Box Girder Bridge Deck in Malaysia Azlan Adnan 1,

More information

Course Concrete Technology Course Code Theory Term Work POE Total Max. Marks Contact Hours/ week

Course Concrete Technology Course Code Theory Term Work POE Total Max. Marks Contact Hours/ week Course Concrete Technology Course Code 43588 Examination Scheme Theory Term Work POE Total Max. Marks 100 50 -- 150 Contact Hours/ week 3 2 -- 5 Prepared by Mr. C.S. Patil / Mr. S.P. Patil Date Prerequisites

More information

Tensile Bond Between Substrate Concrete and Normal Repairing Mortar under Freeze Thaw Cycles

Tensile Bond Between Substrate Concrete and Normal Repairing Mortar under Freeze Thaw Cycles 4 th International Conference on the Durability of Concrete Structures 24 26 July 2014 Purdue University, West Lafayette, IN, USA Abstract Tensile Bond Between Substrate Concrete and Normal Repairing Mortar

More information

Performance Engineered Mixtures Program

Performance Engineered Mixtures Program Performance Engineered Mixtures Program Dr Peter Taylor, PE (IL) 1 2 PEM - What is it? A program to Understand what makes concrete good Specify the critical properties and test for them Prepare the mixtures

More information

ALKALI AGGREGATE REACTIVE MORTAR CYLINDERS PARTLY RESTRAINED BY EXTERNAL CFRP FABRIC EXPANSION AND CONFINEMENT

ALKALI AGGREGATE REACTIVE MORTAR CYLINDERS PARTLY RESTRAINED BY EXTERNAL CFRP FABRIC EXPANSION AND CONFINEMENT ALKALI AGGREGATE REACTIVE MORTAR CYLINDERS PARTLY RESTRAINED BY EXTERNAL CFRP FABRIC EXPANSION AND CONFINEMENT B. J. WIGUM SINTEF Civil and Environmental Engineering, Cement and Concrete N-7465 Trondheim,

More information

STRENGTH PERFORMANCE AND BEHAVIOR OF CONCRETE CONTAINING INDUSTRIAL WASTES AS SUPPLEMENTARY CEMENTITIOUS MATERIAL (SCM)

STRENGTH PERFORMANCE AND BEHAVIOR OF CONCRETE CONTAINING INDUSTRIAL WASTES AS SUPPLEMENTARY CEMENTITIOUS MATERIAL (SCM) www.arpapress.com/volumes/vol12issue1/ijrras_12_1_3.pdf STRENGTH PERFORMANCE AND BEHAVIOR OF CONCRETE CONTAINING INDUSTRIAL WASTES AS SUPPLEMENTARY CEMENTITIOUS MATERIAL (SCM) Felix F. Udoeyo 1, Serrano

More information

Mass concrete placements often require significant

Mass concrete placements often require significant A Low Temperature Rise Mixture for Mass Fly ash-based hydraulic cement generates significantly less heat than portland cement by John Gajda, Michael Weber, and Ivan Diaz-Loya Mass placements often require

More information

Pumice Pozz vs. Fly Ash

Pumice Pozz vs. Fly Ash Pumice Pozz vs. Fly Ash Extensive ASTM-standard Research Quantifies Pumice as the Ideal Replacement for Fly Ash in Concrete IN EACH AND EVERY ONE of the concrete performance categories that matter, clean,

More information

Transportation Research Record: Journal of the Transportation Research Board

Transportation Research Record: Journal of the Transportation Research Board Transportation Research Record: Journal of the Transportation Research Board Drying shrinkage behavior of mortars made with ternary blends Submission Date: November, 0 Word Count: (including six figures

More information

DEGRADATION MECHANISMS AND SERVICE LIFE OF CONCRETE SLABS OF COMPOSITE BRIDGES

DEGRADATION MECHANISMS AND SERVICE LIFE OF CONCRETE SLABS OF COMPOSITE BRIDGES DEGRADATION MECHANISMS AND SERVICE LIFE OF CONCRETE SLABS OF COMPOSITE BRIDGES J.- C. DOTREPPE Laboratory of Bridges and Structural Engineering, Civil Engineering, University of Liège, Belgium Durability

More information

Center for By-Products Utilization

Center for By-Products Utilization Center for By-Products Utilization EFFECT OF DIFFERENT TYPES OF AGGREGATES ON SHRINKAGE IN CONCRETE CONTAINING SHRINKAGE-REDUCING ADMIXTURES By Tarun R. Naik, Rudolph N. Kraus, Yoon-moon Chun, and Fethullah

More information

PROPORTIONING CONCRETE MIXES

PROPORTIONING CONCRETE MIXES TOKYO INSTITUTE OF TECHNOLOGY Department of Civil Engineering ATCE ADVANCED TOPICS IN CIVIL ENGINEERING Professor Kamran M. Nemati PROPORTIONING CONCRETE MIXES ATCE Advanced topics in Civil Engineering

More information

MECHANICAL PROPERTIES OF HIGH-PERFORMANCE CLASS C FLY ASH CONCRETE SYSTEMS

MECHANICAL PROPERTIES OF HIGH-PERFORMANCE CLASS C FLY ASH CONCRETE SYSTEMS MECHANICAL PROPERTIES OF HIGHPERFORMANCE CLASS C FLY ASH CONCRETE SYSTEMS By Shiw S. Singh*, Tarun R. Naik**, Robert B. Wendorf***, and Mohammad M. Hossain**** Abstract The influence of inclusion of Class

More information

A Study on Mechanical Properties of Sisal Fiber Reinforced Concrete

A Study on Mechanical Properties of Sisal Fiber Reinforced Concrete A Study on Mechanical Properties of Sisal Fiber Reinforced Concrete 1. INTRODUCTION 1.1 GENERAL Durability of a material is defined as the Mr.S.Sabarinathan 1 service life of a material under given environmental

More information

Prediction of shrinkage cracking age of concrete with and without expansive additive

Prediction of shrinkage cracking age of concrete with and without expansive additive Songklanakarin J. Sci. Technol. 32 (5), 469-480, Sep. - Oct. 2010 Original Article Prediction of shrinkage cracking age of concrete with and without expansive additive Dung Tien Nguyen 1, Raktipong Sahamitmongkol

More information

Effects of Steel and Polypropylene Fiber Addition on Interface Bond Strength between Normal Concrete Substrate and Self-Compacting Concrete Topping Slamet Widodo Doctoral Student at Department of Civil

More information

FLEXURAL IMPROVEMENT OF PLAIN CONCRETE BEAMS STRENGTHENED WITH HIGH PERFORMANCE FIBRE REINFORCED CONCRETE

FLEXURAL IMPROVEMENT OF PLAIN CONCRETE BEAMS STRENGTHENED WITH HIGH PERFORMANCE FIBRE REINFORCED CONCRETE Nigerian Journal of Technology (NIJOTECH) Vol. 36, No. 3, July 17, pp. 697 74 Copyright Faculty of Engineering, University of Nigeria, Nsukka, Print ISSN: 331-8443, Electronic ISSN: 2467-8821 www.nijotech.com

More information

CONCRETE MIXTURE WITH PLASTIC AS FINE AGGREGATE REPLACEMENT

CONCRETE MIXTURE WITH PLASTIC AS FINE AGGREGATE REPLACEMENT CONCRETE MIXTURE WITH PLASTIC AS FINE AGGREGATE REPLACEMENT 1 CHIEN-CHUNG CHEN, 2 NATHAN JAFFE, 3 MATT KOPPITZ, 4 WESLEY WEIMER, 5 ALBERT POLOCOSER 1,2,3,4,5 Purdue University Calumet, Missouri University

More information

PRESTRESSED CONCRETE PLATES WITH HIGH STRENGTH FABRIC

PRESTRESSED CONCRETE PLATES WITH HIGH STRENGTH FABRIC PRESTRESSED CONCRETE PLATES WITH HIGH STRENGTH FABRIC H.W. Reinhardt, M. Krueger Constructions Materials Institute, University of Stuttgart, Germany Abstract Tests on fine grain concrete plates with textile

More information

Properties of Concrete Incorporating Recycled Post-Consumer Environmental Wastes

Properties of Concrete Incorporating Recycled Post-Consumer Environmental Wastes International Journal of Concrete Structures and Materials Vol.8, No.3, pp.251 258, September 2014 DOI 10.1007/s40069-013-0065-9 ISSN 1976-0485 / eissn 2234-1315 Properties of Concrete Incorporating Recycled

More information

HANDS-ON TRAINING: MATERIALS AND MIX DESIGN

HANDS-ON TRAINING: MATERIALS AND MIX DESIGN Fundamentals of Concrete HANDS-ON TRAINING: MATERIALS AND MIX DESIGN LEARNING OBJECTIVES Upon completing this program, the participant should be able to: 1. Identify the common materials used for concrete

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

METHODS OF REDUCING EARLY-AGE SHRINKAGE

METHODS OF REDUCING EARLY-AGE SHRINKAGE METHODS OF REDUCING EARLY-AGE SHRINKAGE Erika E. Holt and Markku T. Leivo VTT Building Technology, Technical Research Centre of Finland Abstract Concrete shrinkage is typically measured after 1 day, though

More information

NUMERICAL ANALYSIS OF REINFORCED LIGHTWEIGHT AGGREGATE CONCRETE HOLLOW CORE SLABS

NUMERICAL ANALYSIS OF REINFORCED LIGHTWEIGHT AGGREGATE CONCRETE HOLLOW CORE SLABS NUMERICAL ANALYSIS OF REINFORCED LIGHTWEIGHT AGGREGATE CONCRETE HOLLOW CORE SLABS Adel A. Al-Azzawi and Basma M. Abdul Al-Aziz Department of Civil Engineering, Factually of Engineering, Al-Nahrain University,

More information

NEW HYBRID GLULAM BEAM REINFORCED WITH CFRP AND ULTRA-HIGH-PERFORMANCE CONCRETE

NEW HYBRID GLULAM BEAM REINFORCED WITH CFRP AND ULTRA-HIGH-PERFORMANCE CONCRETE NEW HYBRID GLULAM BEAM REINFORCED WITH CFRP AND ULTRA-HIGH-PERFORMANCE CONCRETE L. MICHEL Associate Professor Université Lyon 1-INSA LYON 1 82 bd Niels Bohr 69622 VILLEURBANNE Emmanuel.ferrier@univ-lyon1.fr

More information

SECTION 904 AGGREGATES

SECTION 904 AGGREGATES SECTION 904 AGGREGATES 904.01 Aggregates. Aggregates shall consist of natural or manufactured materials produced from but not limited to limestone, dolomite, gravels, sandstones, steel furnace slag (SF),

More information

OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT

OPTIMIZED 3/4 GRADATION LIGHTWEIGHT AGGREGATE REPORT OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT PREPARED BY: JODY WALL, P.E. DIRECTOR OF RESEARCH AND DEVELOPMENT CAROLINA STALITE COMPANY RESEARCH LAB GOLD HILL, NORTH CAROLINA Optimized 3/4" Gradation

More information

Bridge Deck Cracking Investigation and Repair

Bridge Deck Cracking Investigation and Repair UNF Digital Commons UNF Theses and Dissertations Student Scholarship 2012 Bridge Deck Cracking Investigation and Repair Vidal Velez Vargas University of North Florida Suggested Citation Vargas, Vidal Velez,

More information

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures Journal of Civil Engineering and Architecture 9 (2015) 213-224 doi: 10.17265/1934-7359/2015.02.010 D DAVID PUBLISHING Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation,

More information

NLFEA Fire Resistance of 3D System Ceiling Panel

NLFEA Fire Resistance of 3D System Ceiling Panel NLFEA Fire Resistance of 3D System Ceiling Panel Rajai Z. Al-Rousan 1 Department of Civil Engineering, Jordan University of Science and Technology, Irbid, Jordan E-mail: rzalrousn@just.edu.jo 2 Department

More information

I-64 DUNLAP CREEK BRIDGE REHABILITATION JOINTLESS BRIDGES, DECK OVERLAYS, AND CONCRETE MATERIALS

I-64 DUNLAP CREEK BRIDGE REHABILITATION JOINTLESS BRIDGES, DECK OVERLAYS, AND CONCRETE MATERIALS I-64 DUNLAP CREEK BRIDGE REHABILITATION JOINTLESS BRIDGES, DECK OVERLAYS, AND CONCRETE MATERIALS June 8, 2016 Celik Ozyildirim, PhD, PE, Principal Research Scientist, VTRC, Charlottesville, VA Rex Pearce,

More information

Creep and shrinkage behavior of high-strength concrete and minimum reinforcement ratio for bridge columns

Creep and shrinkage behavior of high-strength concrete and minimum reinforcement ratio for bridge columns Creep and shrinkage behavior of high-strength concrete and minimum reinforcement ratio for bridge columns Halit Cenan Mertol, Sami Rizkalla, Paul Zia, and Amir Mirmiran The use of high-strength concrete

More information

Center for By-Products Utilization

Center for By-Products Utilization Center for By-Products Utilization Testing and Evaluation of Concrete Using High- Carbon Fly Ash and Carbon Fibers By Rudolph N. Kraus and Tarun R. Naik Report No. CBU-2006-16 REP-615 June 2006 Report

More information

ENGINEERING MATERIALS Assignment #8: Concrete Mix Design

ENGINEERING MATERIALS Assignment #8: Concrete Mix Design 14.310 ENGINEERING MATERIALS Assignment #8: Concrete Mix Design PROBLEM #1: GIVEN: Concrete is required for a pavement slab that will be exposed to severe freeze-thaw climate as well as deicing chemicals.

More information

Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE

Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE Delaware DOT s Use of Slag Cement Jim Pappas, P.E. Chief Materials & Research Engineer Materials & Research Section Outline

More information

Tolerances- Section

Tolerances- Section Tolerances- Section 346-6.4 Do not add water to delivered concrete when it is within the target Range for slump 1 346-6.4 Tolerances: Meet the following tolerances from target values for plastic concrete

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

LARSA 2000/4th Dimension: Staged Construction Analysis

LARSA 2000/4th Dimension: Staged Construction Analysis LARSA 2000/4th Dimension: Staged Construction Analysis LARSA 2000/4th Dimension: Staged Construction Analysis for LARSA 2000 Finite Element Analysis and Design Software Larsa, Inc. Melville, New York,

More information

A Review on the Study of Green Concrete

A Review on the Study of Green Concrete A Review on the Study of Green Concrete PandeyShivam, DalviAnkit, ChaurasiaBrijesh, Patel Arshan ABSTRACT: Green concrete is nothing but concrete made with eco friendly wastes. In concrete industries green

More information

Non-Destructive Evaluation of Concrete using Ultrasonic Pulse Velocity

Non-Destructive Evaluation of Concrete using Ultrasonic Pulse Velocity Research Journal of Applied Sciences, Engineering and Technology 3(6): 499-504, 2011 ISSN: 2040-7467 Maxwell Scientific Organization, 2011 Received: February 10, 2011 Accepted: May 13, 2011 Published:

More information

Bridge Deck Preservation Treatment Options

Bridge Deck Preservation Treatment Options Western Bridge Preservation Partnership May 17-18, 2016 Salt Lake City, Utah Bridge Deck Preservation Treatment Options Gregg Freeman - Kwikbond Polymers Rob Johnson - Transpo Industries Clay Christiansen

More information

Development of low-shrinkage high-performance concrete with

Development of low-shrinkage high-performance concrete with http://www.nrc-cnrc.gc.ca/irc Development of low-shrinkage high-performance concrete with improved durability NRCC-52622 Cusson, D.; Margeson, J.C. July 2010 A version of this document is published in

More information

MATERIAL CHARACTERISTICS OF HIGH-STRENGTH CONCRETE UP TO 18 KSI

MATERIAL CHARACTERISTICS OF HIGH-STRENGTH CONCRETE UP TO 18 KSI MATERIAL CHARACTERISTICS OF HIGH-STRENGTH CONCRETE UP TO 18 KSI H. C. Mertol, North Carolina State University, Raleigh, NC A. Logan, North Carolina State University, Raleigh, NC W. Choi, North Carolina

More information

REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES

REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES Benjamin Raison R; Freeda Christy C PG student, School of Civil Engineering, Karunya University. Associate Professor, School of Civil Engineering, Karunya

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

Kinds of Mortars. Mortar. Specifying Mortar. Proportion Specifications. M a S o N w O r K. Specification for Mortar Cement

Kinds of Mortars. Mortar. Specifying Mortar. Proportion Specifications. M a S o N w O r K. Specification for Mortar Cement ASTM C9 ASTM C44 ASTM C270 ASTM C780 ASTM C329 ASTM C586 Mortar Specification for Masonry Specification for Aggregate for Masonry Mortar Specification for Mortar for Unit Masonry Method for Preconstruction

More information

EFFECT OF COAL BOTTOM ASH AS SAND REPLACEMENT ON THE PROPERTIES OF CONCRETE WITH DIFFERENT W/C RATIO

EFFECT OF COAL BOTTOM ASH AS SAND REPLACEMENT ON THE PROPERTIES OF CONCRETE WITH DIFFERENT W/C RATIO EFFECT OF COAL BOTTOM ASH AS SAND REPLACEMENT ON THE PROPERTIES OF CONCRETE WITH DIFFERENT W/C RATIO M.P.KADAM 1, DR.Y.D. PATIL 2 1 Department of civil engineering, NDMVP S KBTCOE, Gangapur road, Nashik-42213,

More information

2014 Concrete Materials Laboratory Test Study

2014 Concrete Materials Laboratory Test Study 2014 Concrete Materials Laboratory Test Study A laboratory test study examining the plastic properties of concrete mixes at normal (20 C) and cold temperatures (5 C) April 24, 2015 INDEX Introduction 3

More information

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No.

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. 1. Report No. FHWA/TX-07/0-5197-2 Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. Accession No. 4. Title and Subtitle An Investigation of the Tensile Strength of Prestressed

More information

A-4 TEST DATA FOR MATERIALS v) Cement used : OPC 43 grade confirming to IS 8112 w) Specific gravity of cement : 3.15 x) Specific gravity of

A-4 TEST DATA FOR MATERIALS v) Cement used : OPC 43 grade confirming to IS 8112 w) Specific gravity of cement : 3.15 x) Specific gravity of A-2 SELECTION OF WATER CEMENT RATIO From Table 5 of IS:456-2000, maximum water cement ratio = 0.50 (Moderate exposure) Based on experience adopt water cement ratio as 0.45 as the cement is 53 grade 0.45

More information

USE OF SUPER ABSORBENT POLYMERS (SAPs) IN CONCRETE.

USE OF SUPER ABSORBENT POLYMERS (SAPs) IN CONCRETE. USE OF SUPER ABSORBENT POLYMERS (SAPs) IN CONCRETE. An overview of some aspects of superabsorbent polymers (SAPs) in concrete technology. The use of superabsorbent polymers as a crack sealing and crack

More information