ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS Replace Aboveground Fuel Tanks Saint Clair County MidAmerica Saint Louis Airport

Size: px
Start display at page:

Download "ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS Replace Aboveground Fuel Tanks Saint Clair County MidAmerica Saint Louis Airport"

Transcription

1 ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS Replace Aboveground Fuel Tanks Saint Clair County MidAmerica Saint Louis Airport DATE: August 26, 2015 BIDS CLOSE: September 14, 2015, at 2:30 p.m., Local Time TO ALL BIDDERS BIDDING ON THE ABOVE PROJECT: The Project Manual of Replace Aboveground Fuel Tanks, Solicitation Number is revised as follows. Addendum No. 1 becomes a part of the Contract Document. The General Table of Contents is revised to represent the changes below and is attached to this Addendum. Due to the addition of the additive alternate, Contractors are permitted an additional site visit. Contact Alice Tejada at or alice.tejada@flymidamerica.com to schedule the site visit. I. The following are revisions to the Advertisement to Bid: 1. Page AB-1, Paragraph entitled "TIME AND PLACE OF BID OPENING", delete the words "1 st day of September 2015," and replace with the words, "14 th day of September 2015". II. The following are revisions to the Bid Form: 1. Delete "BID FORM" in its entirety and replace with the "BID FORM" attached to this Addendum. III. The following are revisions to the Agreement: 1. Page 3, Article 2, delete the words Fifty-six (56) calendar days and replace with the words Seventy (70) calendar days. IV. The following are revisions to the Specifications: 1. Add the attached SECTION ALTERNATE BID ITEMS, as a new section to the Specifications. 2. Add the attached SECTION PRE-ENGINEERED FREE STANDING CANOPY, as a new section to the Specifications. 3. The following revisions shall be made to SECTION FUEL STORAGE AND DISPENSING UNITS: A. Page , Subparagraph 1.06.A, add the following sentence: "The entire system shall be warranted for no less than one year from the date of substantial completion." B. Page , Subparagraph 2.02.A, add the following as subparagraph 2.02, A, 14: Tanks shall be shop coated with no less than one coat of primer and one coat of enamel paint. Coatings shall be resistant to the contents of the tanks. V. The following are revisions to the Drawings: 1. None. Replace Aboveground Fuel Tanks ADD 1-1 MidAmerica St Louis Airport

2 VI. The following are revisions to the Appendix: 1. None. VII. Any revisions to any of the Contract Documents made by this Addendum shall be considered as the same revision to any and all related areas of the Contract Documents not specifically called out in this Addendum. VIII. The Bidder shall acknowledge receipt of this Addendum by inserting the date and number in the spaces provided in the BID FORM. MidAmerica St Louis Airport Department of Engineering & Planning 9768 Airport Blvd Mascoutah, IL Phone: Fax: END OF ADDENDUM NO. 1 Replace Aboveground Fuel Tanks ADD 1-2 MidAmerica St Louis Airport

3 GENERAL TABLE OF CONTENTS SECTION PAGE NO. DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS ADVERTISEMENT TO BID... AB-1 to AB-1 INSTRUCTIONS TO BIDDERS... IB-1 to IB-4 BID FORM... B-1 to B-3 AGREEMENT & GENERAL CONDITIONS (AIA DOCUMENT A105)... 1 to 10 SUPPLEMENTARY CONDITIONS... SC-1 to SC-5 DIVISION 1 - GENERAL REQUIREMENTS SECTION SUMMARY OF WORK to SECTION ALTERNATE ITEMS to SECTION SUBMITTALS to SECTION PROJECT RECORD DOCUMENTS to DIVISION 2 - SITEWORK SECTION DEMOLITION to DIVISION 10 - SPECIALTIES SECTION PRE-ENGINEERED FREE STANDING CANOPY to DIVISION 11 - EQUIPMENT SECTION FUEL STORAGE AND DISPENSING UNITS to APPENDIX APPENDIX A STANDARD INSURANCE CERTIFICATE REQUIREMENTS... App A-1 to App A-2 APPENDIX B SUBCONTRACTORS LIST... App B-1 to App B-1 DRAWINGS See cover sheet. SOLICITATION NO A1- TABLE OF CONTENTS

4 BID FORM BIDS TO BE OPENED: 2:30 p.m. (local time), September 14, 2015 PROJECT IDENTIFICATION: MidAmerica St. Louis Airport Saint Clair County, Illinois Solicitation No Name of Bidder THIS BID IS SUBMITTED TO: County of St. Clair, Illinois MidAmerica St. Louis Airport Department of Engineering & Planning 9768 Airport Blvd Mascoutah, IL (hereinafter called OWNER) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Advertisement to Bid and the Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will not be withdrawn for the period of time specified in the Advertisement to Bid after the day of Bid opening. The Bidder will sign the Agreement within 10 days after the date of OWNER'S Notice of Award and submit the Bonds and other documents required by the Contract Documents. 3. In submitting this Bid, the Bidder represents, as more fully set forth in the Agreement, that: a. The Bidder has examined copies of all the Bidding Documents and hereby acknowledges receipt of all which is hereby listed: Date Number b. Bidder has examined the site and locality where the Work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules, and regulations) and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as a reasonable and prudent Bidder deems necessary; c. This Bid is genuine and not made in the interest or on behalf of any undisclosed person, firm or corporation; and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; the Bidder has not solicited or induced any person, firm or a corporation to refrain from Bidding; and the Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER; and DIVISION 0 SOLICITATION NO A1-B-1

5 d. Bidder is not barred from bidding on the contract as a result of a conviction for either bid-rigging or bid rotating under the provisions contained in Sections 33 E-3, 33 E-4, and 33 E-11 of the Criminal Code of 1961 and Section E-4 of the Illinois Revised Statutes. 4. Bidder will complete the Work for the following price(s): LUMP SUM CONTRACT PRICE (Written) Dollars ($ ). (Figures) ALTERNATES - Include the following alternates as described in Section 01230: Alternate 1 Add For Free Standing Canopy Add (Written) Dollars ($ ). (Figures) 5. Bidder agrees that the Work on this Contract will begin as set forth in the Agreement and be substantially completed within 70 calendar days after the date when the Contract Time commences to run and completed and ready for final payment in accordance with Paragraph 12.6 of the General Conditions on or before the time set forth in the Certificate of Substantial Completion. The Bidder accepts the provisions of the Supplementary Conditions as to liquidated damages in the event of failure to complete the Work on time. OWNER reserves the right to reject any Bid for Contract in which all of the items in the Bid are not properly completed. 6. The following documents are attached to and made a condition of this Bid: a. Provide basic information on the proposed manufacturer and model of the free standing canopy. Information not to exceed 5 pages. 7. Communications to the Contractor concerning this Bid shall be addressed to the Bidder as indicated below: Name of Individual: Address: State: Telephone No.: Address: 8. The terms used in this Bid are defined in the General Conditions. SUBMITTED on, 20. CONTRACTOR'S LICENSE NO. (If required by state or municipal law) DIVISION 0 SOLICITATION NO A1-B-2

6 I hereby certify that as Bidder I/we have examined and carefully prepared this Bid from the Bidding Documents and have checked the same in detail before submitting this Bid, and that all statements herein are made on behalf of: An Individual: By (Written) doing business as Business address: (Individual's Name) (Firm Name) Phone No.: A Partnership: By (Firm Name) By (Written) Business address: (General Partner) A Corporation: By Phone No.: By (Written) (Title) Attest (Written) Business address: (Corporation Name) (State of Incorporation) (Name of Person Authorized to Sign) (Corporate Seal) (Secretary) Phone No.: A Joint Venture: By (Written) By (Written) (Name) (Address) (Name) (Address) (Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above). Sworn and subscribed to before me this day of, 20. Notary or other officer authorized to administer oaths My commission expires: (Bidders shall not add any conditions or qualifying statements to this Bid as Bid may be declared irregular as being not responsive to the advertisement. BIDDERS SHALL USE THIS BID FORM IN SUBMITTING THEIR BIDS. DIVISION 0 SOLICITATION NO A1-B-3

7 SECTION ALTERNATE BID ITEMS PART 1 - GENERAL 1.01 SUMMARY A. This section includes administrative and procedural requirements governing Alternates DEFINITIONS A. Alternate is amount proposed by Bidder and stated on Bid Form for certain work defined in Bidding Requirements that may be added to or deducted from Contract Price if OWNER decides to accept corresponding change in either amount of construction to be completed, or in materials, equipment, or installation methods described in Contract Documents. B. Cost or credit for each alternate is net addition or deduction from Contract price to incorporate Alternate into Work. No other adjustments will be made to Contract Price PROCEDURES A. Coordination: 1. Modify or adjust affected adjacent work as necessary to completely and fully integrate work of Alternate into Project. 2. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for complete installation whether or not indicated as part of Alternate. B. Execute accepted alternates under same conditions as other work of Contract. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.01 DESCRIPTION OF ALTERNATES A. Alternate 1: Free Standing Canopy 1. Add for furnishing and installing a pre-engineered free standing canopy to protect the new tanks as specified in Section The canopy must include any necessary adjustments to the tanks (venting, etc) to provide a complete and usable facility. 3. As noted on the bid form, bidder to supply basic information on the proposed manufacturer and model of the free standing canopy with their bid. Information not to exceed 5 pages. * * * END OF SECTION * * * SOLICITATION NO A SPECIFICATIONS DIVISION 1- GENERAL REQUIREMENTS

8 SECTION PRE-ENGINEERED FREE STANDING CANOPY PART 1 - GENERAL 1.01 SUMMARY A. This section includes all labor, equipment, and materials to furnish and install a freestanding, preengineered metal canopy. B. Work includes demolition, concrete foundations, steel framing, metal roof, roof drains and leaders, fascia components, and metal ceiling and accessories. C. The purpose of the pre-engineered free standing canopy is to protect the new tanks. D. The canopy must be of a dimension no less than that required to cover both fuel tanks, dispensers, etc. and height must be that as necessary to allow filling of the tanks and meet all codes. Contractor to determine canopy dimensions based on proposed tank layout and dimensions. It is assumed a canopy would be approximately 50 x 20. E. Price for the canopy must include any necessary demolition as well as adjustments to the tanks (venting, etc) to provide a complete and usable facility. F. Canopy may be designed to match roof pitch of existing vehicle shed such that canopy drains away from the parking lot. If so, gutters and downspouts may be avoided CODE A. The codes and specifications listed below will be referenced in the design and fabrication of the canopy system. 1. Saint Clair County Building Code 2. International Building Code (IBC), American Institute of Steel Construction, Inc. (AISC): AISC Specification for Structural Steel Buildings (copyrighted by AISC, ANSI approved). 4. American Society of Civil Engineers (ASCE): ASCE 7 - Minimum Design Loads for Buildings and Other Structures (copyrighted by ASCE, ANSI approved). 5. American Welding Society (AWS): AWS D1.1 - Structural Welding Code - Steel (copyrighted by AWS, ANSI approved). 6. ASTM International (ASTM): a. ASTM A 36/A 36M - Standard Specification for Structural Steel. 7. National Association of Architectural Metal Manufacturers (NAAMM): NAAMM MFM - Metal Finishes Manual. 8. National Fire Protection Association (NFPA): NFPA 70 - National Electrical Code (copyrighted by NFPA, ANSI approved) - hereinafter referred to as NEC PERFORMANCE REQUIREMENTS A. Structural Performance: Provide pre-engineered canopies capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated for the specific location where Canopy will be installed: 1. Uniform pressure as indicated on drawings - minimum design wind load per ASCE 7, CH. 6. B. Thermal Movements: Provide pre-engineered canopies that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing SOLICITATION NO A SPECIFICATIONS DIVISION 10- SPECIALTIES

9 buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. 1. Temperature Change (Range): 120 degrees F (67 degrees C), ambient; 180 degrees F (100 degrees C), material surfaces SUBMITTALS A. General: Submit under provisions of Section Submittal Procedures. B. Product Data: Submit manufacturer's data sheets on each product to be used, including: 1. Construction details, material descriptions, dimensions of individual components and profiles, and finishes. C. Shop Drawings: Submit shop drawings. Include plans, elevations, sections, details, and attachments to other work. Canopy supplier shall furnish complete canopy drawings signed and sealed by a professional engineer licensed in the state where the canopy shall be installed. D. Foundation Shop Drawings: Submit shop drawings indicating foundation design. Contractor shall furnish complete foundation drawings signed and sealed by a professional engineer licensed in the state where the canopy shall be installed. E. Samples: 1. Submit samples for initial color selection. Submit samples of each specified finish. Submit samples in form of manufacturer's color charts showing full range of colors and finishes available. Where finishes involve normal color variations, include samples showing the full, range of variations expected. F. Certificates: Submit product certificates signed by the manufacturer certifying material compliance with specified performance characteristics and criteria, and physical requirements. G. Warranty Data: Submit warranty documents specified herein QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in engineering and manufacturing pre-engineered canopies with a minimum documented experience of twenty years. B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NEC, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. C. Source Limitations: Obtain pre-engineered metal canopy through one source from a single manufacturer who shall manufacture and install the canopy DELIVERY, STORAGE, AND HANDLING A. Protect components and accessories from corrosion, deformation, damage, and deterioration when stored at job site. Keep materials free from dirt and foreign matter PROJECT CONDITIONS A. Field Measurements: The Contractor shall verify location and elevation of footings relative to finished grade, columns, and other construction contiguous with pre-engineered metal canopies by field measurements before fabrication and indicate measurements on shop drawings. 1. Established Dimensions: The Contractor shall, where field measurements cannot be made without delaying the work, establish dimensions and proceed with fabricating metal canopies without field measurements. Contractor is responsible to coordinate footer locations and elevations with any interferences with or attachments to abutting structures. SOLICITATION NO A SPECIFICATIONS DIVISION 10- SPECIALTIES

10 1.08 WARRANTY A. The canopy shall be warranted to be free of defects in materials, leaks, and workmanship for 1 year from date of substantial completion. 1. The canopy shall also include a 20-year limited warranty against peeling, flaking, chipping of canopy deck. PART 2 - PRODUCTS 2.01 MANUFACTURERS A. Manufacturer must have over 20 years experience in the manufacture of pre-engineered canopies of the type specified for the use specified MATERIALS A. Structural Steel: 1. Material and work shall conform to the latest AISC 360. B. Structural steel shall be painted with a rust inhibitive (red oxide) primer (std). C. Sheet Metal: 1. Decking: 3 inch by 16 inch by 20 gage smooth white, ASTM A 653/A 653M GR40, Fy = 40 ksi, galvanized steel with baked enamel finish. 2. Center and Tapered Gutter: 24 gage hot-dip galvanized steel baked enamel finish. 3. Perimeter Gutter: 20 gage hot-dip galvanized steel baked enamel finish. 4. Internal Downspout: 3 inch diameter PVC. 5. External Downspouts: 3 inch by 4 inch by 24 gage hot-dip galvanized steel with baked enamel finish PRE-ENGINEERED METAL CANOPY A. General: Provide a complete, integrated set of manufacturer's standard design canopy components using a flexible frame with fixed base. These mutually dependent components form a pre-engineered canopy, ready for construction on project site. Said pre-engineered metal canopy will be designed to meet all site structural wind, snow and seismic requirements. B. Canopy Fascia: 1. Aluminum Composite Panel (ACM): Available with a fluorocarbon paint finish, masked on one side. Shall be warranted for 10 or 20 years depending on color and finish. C. Canopy Finishes: Comply with NAAMM MFM for recommendations for applying and designating finishes. D. Fabrication: Fabricate pre-engineered canopies completely in factory. PART 3 - EXECUTION 3.01 EXAMINATION A. Verification of Conditions: Examine areas and conditions under which the work is to be installed, and notify the Contractor in writing, with a copy to the Owner and the Architect, of any conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected. 1. Construct and examine supporting foundations for compliance with manufacturer's requirements, SOLICITATION NO A SPECIFICATIONS DIVISION 10- SPECIALTIES

11 including installation tolerances and other conditions affecting performance of supporting members. 2. Verify the rough-in of required mechanical and electrical services prior to placement of the structure PREPARATION A. Clean surfaces thoroughly prior to installation. B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. C. Demolish pavement as necessary to construct foundations. Pour foundations flush with surrounding pavement and install self-leveling silicone sealants between existing pavement and new foundations as necessary INSTALLATION A. Set pre-engineered metal canopy plumb and aligned. Level base plates true to plane with full bearing on concrete bases. B. Fasten pre-engineered metal canopy columns to anchor bolts and/or foundation bolts. C. Provide and install anchor bolts per manufacturer s recommendations. D. Provide and install bolted connections per manufacturer s recommendations. E. Provide and install screws per manufacturer s recommendations F. Provide pedestrian protection and warnings during construction which comply with local, Federal, and OSHA codes. G. All anchor bolts and/or leveling plates shall be set within 1/4 inch tolerance on layout and grade level ADJUSTING AND CLEANING A. After completing installation, inspect exposed finishes and repair damaged finishes PROTECTION A. Protect installed products until completion of project. B. Touch-up, repair, or replace damaged products before Substantial Completion. * * * END OF SECTION * * * SOLICITATION NO A SPECIFICATIONS DIVISION 10- SPECIALTIES

SECTION CANOPIES. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved

SECTION CANOPIES. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved SECTION 10538 CANOPIES Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2009-2011 ARCAT, Inc. - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. Freestanding, pre-engineered

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient... BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs.

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. 1.2 PERFORMANCE REQUIREMENTS A. Structural

More information

Finance & Technology Administrator (815) ext 223

Finance & Technology Administrator (815) ext 223 2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative

More information

SECTION METAL ROOF PANELS

SECTION METAL ROOF PANELS SECTION 07 41 13 PART 1 GENERAL 1.1 SECTION INCLUDES A. Standing-seam roof panels. B. Metal roofing accessories. 1.2 RELATED SECTIONS A. Section 07 62 00 - Sheet Metal Flashing. B. Section 07 72 00 - Roof

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS Dimensions: Roof Dimensions 10-0 x 24 Column Dimensions (center to center) 6-7 x 22-9 Minimum Clearance 7-6 Minimum Clearance @ Front ±9-2 Roof Pitch 2:12 pitch

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

City of Port Orange Adult Activity Center Remodeling SSA Project No Volusia County, Florida October 8, 2009

City of Port Orange Adult Activity Center Remodeling SSA Project No Volusia County, Florida October 8, 2009 SECTION 10530 PRE-ENGINEERED ALUMINUM CANOPY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The extent of aluminum flat style walkway cover is shown on the drawings and as specified herein. 2. Definition:

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION BID FORM LICK RUN INTERCEPTOR REHABILITATION

SECTION BID FORM LICK RUN INTERCEPTOR REHABILITATION SECTION 00410 BID FORM LICK RUN INTERCEPTOR REHABILITATION ARTICLE 1 BID RECIPIENT 1.01 This Bid is submitted to: WESTERN VIRGINIA WATER AUTHORITY ATTN: Earl Smith, P.E. Engineering Services Third Floor,

More information

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via the e-mail noted in the solicitation, and will be accepted no later than

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

PIPE AND TUBE RAILINGS

PIPE AND TUBE RAILINGS SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

Quality Control and Quality Assurance for Installation of Steel Deck

Quality Control and Quality Assurance for Installation of Steel Deck s American National standards institute/ steel deck institute QA/QC - 2011 Standard for Quality Control and Quality Assurance for Installation of Steel Deck copyright 2012 steel deck institute 1. General

More information

SIERRA MODEL 12 X 24 SPECIFICATIONS

SIERRA MODEL 12 X 24 SPECIFICATIONS SIERRA MODEL 12 X 24 SPECIFICATIONS Dimensions: Roof Dimensions 12-0 x 24-0 Column Dimensions (center to center) 9-0 x 21-0 Minimum Clearance 8-0 Shed Roof 1:12 pitch Square Feet Under Roof 288 Columns

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Highlands Housing Authority

Highlands Housing Authority Highlands Housing Authority 215 Shore Drive, Highlands, New Jersey 07732 TELEPHONE: (732) 872-2022 FAX: (732) 291-8743 REQUEST FOR PROPOSALS for CONCRETE SIDEWALK REPAIRS at JENNIE PARKER MANOR HIGHLANDS,

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section.

A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section. Page 1 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section. 1.2 SUMMARY A. The shade structure

More information

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM SECTION 13 34 21 - STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. The structural retrofit roof sub-framing system will provide support for a new metal roofing system constructed

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

PRE-ENGINEERED METAL BUILDING SYSTEM

PRE-ENGINEERED METAL BUILDING SYSTEM PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,

More information

SECTION EXTERIOR GRILLS AND SCREENS

SECTION EXTERIOR GRILLS AND SCREENS SECTION 10 82 13 PART 1 GENERAL PART 1 1 SUMMARY A. Section Includes: 1. Exterior perforated aluminum screen wall system with Ombrae TM Optical Tile imaging technology. 2. Accessories including attachments,

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS)

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) SECTION 07412 COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS SECTION 07 44 50 FIBERGLASS REINFORCED POLYMER (FRP) PANELS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Design, Engineering, manufacturing and erection of fiberglass reinforced panels. Delegated Design of

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

SECTION CLIMBING WALLS

SECTION CLIMBING WALLS SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2

More information

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE SECTION 112429.18 - HORIZONTAL FALL PROTECTION - OVERHEAD CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide overhead horizontal cable fall protection system, including end anchors, energy absorbers,

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

02800 SHADE STRUCTURES

02800 SHADE STRUCTURES 02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Signature Series 5 Lap SECTION ALUMINUM WINDOWS Signature Series 5 Lap SECTION 08 51 13 ALUMINUM WINDOWS PART 1 GENERAL 1.01 SUMMARY A. Related Documents: Conditions of the Contract, Division 1 - General Requirements, and Drawings apply to Work of this

More information

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code. SECTION 05400 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

SECTION CONCRETE ROOF TILE

SECTION CONCRETE ROOF TILE SECTION 07321 CONCRETE ROOF TILE Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2005-2011 ARCAT, Inc. - All rights reserved PART 1 GENERAL 1.1 RELATED SECTIONS A. Section 06100

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,

More information

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying

More information

INVITATION TO BID CITY OF HOPKINSVILLE

INVITATION TO BID CITY OF HOPKINSVILLE INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,

More information

SECTION GUTTERS AND DOWNSPOUTS

SECTION GUTTERS AND DOWNSPOUTS SECTION 07712 GUTTERS AND DOWNSPOUTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Gutters and Downspouts. B. Related Accessories. 1.2 RELATED SECTIONS A. Section 07611 - Sheet Metal Roofing. B. Section 07220

More information

SECTION ROOF PEDESTAL PAVER SYSTEM

SECTION ROOF PEDESTAL PAVER SYSTEM SECTION 07 76 00 ROOF PEDESTAL PAVER SYSTEM ************************************************************************************************************************ Edit entire master to suit project requirements.

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Scott Eagle Attack Thermal Imaging Camera

Scott Eagle Attack Thermal Imaging Camera Scott Eagle Attack Thermal Imaging Camera Notice is hereby given that the City of Des Peres is seeking sealed bids from qualified vendors for the purchase of a Scott Eagle Attack Thermal Imaging Camera.

More information

SPECIFICATIONS SECTION FLOOD CONTROL GATES. A. ASTM C 39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

SPECIFICATIONS SECTION FLOOD CONTROL GATES. A. ASTM C 39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens. SPECIFICATIONS SECTION FLOOD CONTROL GATES PART 1 GENERAL 1.1 SECTION INCLUDES A. Flood Gates. 1.2 RELATED SECTIONS A. N/A. 1.3 REFERENCES A. ASTM C 39 - Standard Test Method for Compressive Strength of

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

Scope of Work Bid Package C-3 - West Precast Concrete

Scope of Work Bid Package C-3 - West Precast Concrete Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

SECTION HVAC GRAVITY VENTILATORS

SECTION HVAC GRAVITY VENTILATORS SECTION 23 37 23 HVAC GRAVITY VENTILATORS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

Guideline Specifications

Guideline Specifications Page 1 of 7 PART 1 Guideline Specifications Exterior Aluminum/Composite Wall Panels GENERAL ARROWHEAD 508 SYSTEM Pressure Equalized Rainscreen SECTION 07410 1.01 SUMMARY A. Work of this section included

More information

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM. Section BF Bid Form For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM. Bid Proposals will be received at the office of the Owner. Identified

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET This project is being readvertised due to the small number of prequalification packages received in response to the county's

More information

COMPLETE REVISION June Process Industry Practices Architectural. PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification

COMPLETE REVISION June Process Industry Practices Architectural. PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification June 2013 Process Industry Practices Architectural PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

Attachment A-Flagpole(s) Specifications

Attachment A-Flagpole(s) Specifications Attachment A-Flagpole(s) Specifications PART 1-GENERAL 1.1 SCOPE A. The scope of work includes the removal of existing flagpole(s) and associated concrete bases, and installation of a new flagpole(s) and

More information

SL150 Guide Specification

SL150 Guide Specification SL150 Guide Specification This is a suggested guide specification for metal roofing projects where the SL150 panel system is applicable. Questions regarding applicability should be discussed with Union

More information

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.*** ***This section has been updated to IBC. Verify for specific project conditions.*** PART 1 GENERAL 1.1 SUMMARY ***Edit to project requirements*** A. Section Includes: 1. Clear copper and preweathered copper

More information

ACOUSTICAL WALL TREATMENT SECTION 09840

ACOUSTICAL WALL TREATMENT SECTION 09840 ACOUSTICAL WALL TREATMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Site-fabricated, stretched fabric acoustical wall system built with rigid polymer stretching system to secure fabric over the wall

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 095113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 DEFINITIONS A. AC: Articulation

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

A. Product Data: For each type of deck, accessory, and product indicated.

A. Product Data: For each type of deck, accessory, and product indicated. SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95) SECTION 05 44 00 - PRE-ENGINEERED PRE-FABRICATED COLD-FORMED STEEL TRUSSES (Section 05425 in MasterFormat 1995) PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered cold-formed steel trusses. B. Cold-formed

More information

Page 1 of 5

Page 1 of 5 SPECIFICATIONS COMPOSITE MATERIAL PANEL SYSTEM ESTOLGA 1000 DRY SEAL SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary

More information