P Backfilling of deposition tunnels: Use of bentonite pel ets Svensk Kärnbränslehantering AB

Size: px
Start display at page:

Download "P Backfilling of deposition tunnels: Use of bentonite pel ets Svensk Kärnbränslehantering AB"

Transcription

1 P Backfilling of deposition tunnels: Use of bentonite pellets David Dixon, Atomic Energy of Canada Limited Torbjörn Sandén, Clay Technology AB Esther Jonsson, Svensk Kärnbränslehantering AB Johanna Hansen, Posiva Oy February 2011 Svensk Kärnbränslehantering AB Swedish Nuclear Fuel and Waste Management Co Box 250, SE Stockholm Phone

2 ISSN Tänd ett lager: SKB P P, R eller TR. Backfilling of deposition tunnels: Use of bentonite pellets David Dixon, Atomic Energy of Canada Limited Torbjörn Sandén, Clay Technology AB Esther Jonsson, Svensk Kärnbränslehantering AB Johanna Hansen, Posiva Oy February 2011 Data in SKB s database can be changed for different reasons. Minor changes in SKB s database will not necessarily result in a revised report. Data revisions may also be presented as supplements, available at A pdf version of this document can be downloaded from

3 Abstract The state of knowledge related to use of bentonite pellets as part of backfill or other gap filling components in repository applications is reviewed. How the pellets interact with adjacent sealing materials and the surrounding rock mass is a critical aspect in determining backfill behaviour. The key features and processes that determine how the pellet component of the KBS-3V deposition tunnel backfill will behave are discussed and recommendations related to what additional information needs to be developed are provided. Experiences related to pellet material composition, size, shape, placement options and more importantly, the density to which they can be placed all indicate that there are significant limitations to the achievable as-placed density of bentonite pellet fill. Low as-placed density of the pellet fill component of the backfill is potentially problematic as the outermost regions of tunnel backfill will be the first region of the backfill to be contacted by water entering the tunnels. It is also through this region that initial water movement along the length of the deposition tunnels will occur. This will greatly influence the operations in a tunnel, especially with respect to situations where water is exiting the downstream face of still open deposition tunnels. Pellet-filled regions are also sensitive to groundwater salinity, susceptible to development of piping features and subsequent mechanical erosion by throughflowing water, particularly in the period preceding deposition tunnel closure. A review of the experiences of various organisations considering use of bentonite-pellet materials as part of buffer or backfill barriers is provided in this document. From this information, potential options and limitations to use of pellets or pellet-granule mixtures in backfill are identified. Of particular importance is identification of the apparent upper-limits of dry density to which such materials can to be placed in the field. These bounds will determine what properties must be exhibited by adjacent swelling materials (Highly Compacted Bentonite or other densely compacted clay-based backfill blocks) in order that the backfill component meets its performance requirements once system equilibration has occurred. Although there is some information available from literature related to pellets, there is still a need to evaluate what optimization can be achieved with respect to density, shape, composition, gradation and as-placed properties. Studies completed to date show a typical as-placed dry density range of ~1,000 kg/m 3 for narrow gaps associated with the block and air-entrained pellet backfill to ~1,400 kg/m 3 for pellet-granule mixtures installed in a horizontal tunnel where equipment access is less problematic. The KBS-3V concept presently utilises pellets placed to ~1,000 kg/m 3 which makes qualification of adjacent sealing materials (HCB or other clay-based blocks) of high importance (ensuring system performance goals are met). These pellet materials also require that means of minimizing erosion caused by water flow along the pellet-rock interface be identified and technological means to protect the backfill from erosion be kept ready for use. SKB P

4 Summary Experiences related to manufacturing and installation of bentonite-based pellet materials for use in repositories for spent nuclear fuel have been reviewed. A considerable body of information related to placement of dense bentonite pellets is available from a variety of sources and has been collected to allow for evaluation of what bounds currently exist with respect to as-placed density of pellet materials in repository applications. It has been demonstrated that a number of installation options exist that have potential application in placing pellet materials within underground excavations of the type proposed in a KBS-3V repository. The experiences to date with regards to material placement and more importantly, the density to which it can be placed indicate that there are clear limits to the achievable as-placed density of the pellet fill. It should be noted that these limitations are based on use of a fairly limited range of materials that are relevant to backfill block rock gap filling for a KBS-3V geometry. Much work has been done on materials for use in filling the gaps in the deposition borehole or filling of larger voids (e.g. entire tunnels or shafts). Both of those geometries have different constraints with respect to placement and densification than for tunnel backfilling. Much of the work done to date shows that the density to which currently available materials and methods can be placed are potentially problematic with respect to the groundwater conditions (flow and salinity) anticipated to be present at either the Forsmark or Olkiluoto sites at the time of backfilling. Pellets used as part of tunnel backfill are susceptible to erosion by water entering the deposition tunnels and susceptibility increases as groundwater salinity and rate of water flow increases. Water uptake and movement into and past pellet fill materials are also affected by groundwater salinity, inflow rate, as-placed density and potentially the shape of the pellet materials. Field-related factors such as degree of tunnel over-excavation need to be quantified so that more accurate estimation of the quantity of pellet materials that will need to be installed and what the equilibrated density of the tunnel backfill will be. Associated with this is the need to determine if pellet optimization with respect to density, shape, composition, gradation will substantively alter the as-placed properties of the backfill. Ultimately, the materials and methods showing most promise for use in a repository will need to be tested in field trial(s) where repository type conditions are present. SKB P

5 Contents 1 Background SKB and Posiva Repository Concepts Use of clay pellets in KBS-3V concept Deposition Tunnel Backfilling Performance required of deposition tunnel backfill Design specifications for a KBS-3V deposition tunnel backfill Other Repository concepts that include use of bentonite pellets Background Horizontal Tunnel Placement (HTP) concept Other applications where HCB pellets are proposed for use 15 2 Pellet materials options and their use in a repository Methods to produce clay pellets Pelletizing using extrusion technique Pellet-making by roller compression Granulated bentonite Pellet manufacturing trials and material characterisation Laboratory and field demonstrations of bentonite pellet Placement Pellet placement studies in Sweden and Finland Pellet development and placement studies in Belgium Pellet development work in Canada Pellet development in Switzerland, France and Belgium Summary 35 3 Known or anticipated conditions at repository sites in Sweden and Finland and influence on deposition tunnel backfilling Site conditions at Forsmark and Olkiluoto that may affect backfill placement and performance Requirements of pellets in deposition tunnel backfilling Issues associated with use of clay pellets in deposition tunnel backfill under repository conditions Site conditions most likely to affect gap fill materials Operational considerations related to gap fill proposed for installation as part of backfill barrier 45 4 Addressing potential issues related to use of pellets in backfilling 47 References 49 SKB P

6 1 Background 1.1 SKB and Posiva Repository Concepts SKB and Posiva are in the process of evaluating options for backfilling in their repository concepts for used nuclear fuel. In both cases the repository is proposed to be located deep underground in crystalline rock. Over a period of nearly 4 decades, a range of repository concepts have been developed and examined. All of them include the use of corrosion-resistant copper canisters to hold the used fuel and adjacent to the canister, clay-based sealing materials (buffer) will be installed to isolate them from the surrounding rock mass as shown in Figure 1-1. Clay-based materials are also proposed for use in backfilling the excavations associated with the repository (e.g. deposition tunnels, access tunnels, ramps and shafts). The clay material proposed for use in the buffer and backfill is a montmorillonite-rich product sold under the generic product name of bentonite by various commercial suppliers. In order to have confidence in the long-term performance of the sealing system associated with these repository concepts it is important to have demonstrated both an ability to predict the behaviour of the individual components as well as an understanding of how they will interact with their surroundings. This document reviews the state of knowledge related to bentonite pellets proposed for use in the deposition tunnel backfill and how they will interact with adjacent sealing materials and the surrounding rock mass. Two generic concepts for canister installation were developed as part of repository concept development. In very basic terms these options can be described as follows: The vertical in-floor concept (KBS-3V) has been selected by SKB and Posiva as their reference for use in a repository for spent nuclear fuel (SKB 2007, Posiva 2010). This involves installation of long copper canisters in boreholes drilled in the floor of deposition tunnels (Figure 1-1). The majority of annular gap between the canister and the surrounding rock mass is occupied by highly compacted bentonite clay (and potentially also bentonite granules or pellets to fill annular gaps remaining Borehole containing canister, HCB rings, 2. HCB pellets installed between HCB and surrounding rock, 3. Deposition Tunnel, backfilled using clay blocks and bentonite pellets 4. Supercontainer enclosing HCB and canister 5. HCB distance blocks 6. Potentially also HCB pellets installed between supercontainer and rock Figure 1-1. Generic KBS-3V and KBS-3H emplacement concepts. SKB P

7 following buffer and canister installation). Following canister installation the deposition tunnels are backfilled. At present the reference concept for deposition tunnel backfilling involves use of precompacted clay blocks to fill the majority of the tunnel volume and then use of pellets composed of highly compacted bentonite (HCB) clay to fill the remaining volume (Figure 1-2). The horizontal borehole concept (KBS-3H) is described by Autio et al. (2008), Anttila et al. (2008) and Smith et al. (2007). This concept involves horizontal installation of supercontainer packages consisting of copper canisters and a pre-assembled surrounding of HCB that is essentially identical in composition and density to the buffer component proposed in the KBS-3V concept. Each supercontainer assembly is kept together through use of a perforated mesh and is installed horizontally in long (up to 300 m-long) boreholes. The geometry of this emplacement concept does not require the presence of a deposition tunnel backfill. It is possible that in order to backfill the access tunnels associated with the horizontal boreholes that pellet materials (HCB pellets) similar to those proposed for the KBS-3Vemplacement tunnels may be needed. If this is the case, then the information developed as part of the KBS-3V deposition tunnel backfill development could be transferred to a KBS-3H backfill. While both the KBS-3V and KBS-3H concepts are potentially suitable for development, the vertical emplacement concept has been selected as the primary reference geometry (SKB 2007, Posiva 2010). With the 3V concept comes the need to install backfill materials in the deposition tunnels running immediately above the buffer and canister filled boreholes. It is important to ensure that the backfill materials installed in these tunnels is capable of effectively isolating the boreholes and can effectively resist any swelling pressure applied to it by the buffer in the underlying boreholes. As part of developing and evaluating canister emplacement options a wide range of backfill materials and construction options have been studied. This work has been summarized by Gunnarsson et al. (2006) who recommended that the block and pellet backfilling concept for deposition tunnel backfilling be selected as the reference technique for a KBS-3V repository. Further work on involving materials option evaluation and development of backfill placement approaches is summarized by Keto et al. (2009a). Figure 1-2. Cross section of a backfilled KBS-3V deposition tunnel showing the three main components of the backfill. 1) precompacted blocks, 2) pellet fill and 3) material placed under the blocks to provide stable foundation for the blocks (Keto et al. 2009a). 10 SKB P-11-44

8 1.2 Use of clay pellets in KBS-3V concept Deposition Tunnel Backfilling It is important to ensure that the backfill materials installed in these tunnels are capable of isolating the boreholes and can effectively resist any swelling pressure applied to it by the buffer in the underlying boreholes. As part of developing and evaluating canister emplacement options a wide range of backfill materials and construction options have been studied. This work has been summarized by Gunnarsson et al. (2006) who recommended that the block and pellet backfilling concept for deposition tunnel backfilling be selected as the reference technique for a KBS-3V repository. Further work on involving materials option evaluation and development of backfill placement approaches is summarized by Keto et al. (2009a). From the work summarized by Keto et al. (2009a), the process of improving, optimizing and ultimately specifying backfill component materials and their means of manufacture/installation has been initiated. This includes preparation of a state of knowledge summary (this document), identifying how backfill pellet fill might be improved and developing suggestions of how pellet fill materials can be optimised such that the performance of the deposition tunnel backfill can be predicted. Additionally, development of improved materials and methods for their installation will be important in operational planning for a repository. Gap filling as part of backfill operations has been examined by Sweden, Finland and Canada, with conduct of several laboratory and field studies related to material options and their placement (Gunnarsson et al. 2004, Johannesson et al. 2008, 2010, Sandén et al. 2008, Dixon et al. 2008a, b, 2011, Keto et al. 2009a, Riikonen 2009, Kjartanson et al. 2003a, b, 2005, Martino and Dixon 2007). The pellets to be used in completing the deposition tunnel backfilling process must be such that the backfill barrier can be relied on to exhibit the swelling and hydraulic properties required of it Performance required of deposition tunnel backfill Several basic functional requirements associated with the backfill as a whole have been identified for the SKB and Posiva repository concepts. In both concepts, the use of clay-pellet materials is included in order to ensure that suitable isolation of the excavations is achieved once canister deposition has occurred. Several material options and generic backfilling approaches have been evaluated by Gunnarsson et al. (2006), and how well they met the established performance requirements were discussed in that document. SKB has developed long-term performance targets for the overall sealing system. This aids in the design and assessment of the performance of the sealing system (including backfill). The subsystem requirements developed are matched to quantitative values derived from the safety indicator criteria defined in the safety assessment SR-Can (SKB 2004). Subsequently the safety functions related to containment were outlined in the SR-Site document (SKB 2010). The SR-Site document summarised some of the key properties required of the backfill component as a whole and identified the following items as being needed for this component in SKB s repository: A need to counteract buffer swelling out of the borehole, thereby maintaining buffer density within desired limits (SR-Can Section 8.3.3). The backfill should not be a preferred pathway for radionuclide transport and so the following properties are identified as being required: Swelling pressure of > 0.1 MPa. Hydraulic conductivity of < m/s. Temperature of backfill in deposition tunnels must be > 2C. In Posiva s TKS-2009 report, the safety functions, preliminary system performance targets and target values for various components of a repository were defined. Table 1-1 summarises those associated with backfill and briefly describes the rationale for these requirements. While the information in Table 1-1 is defined for use in Posiva s program, it is consistent with the general goals identified by SKB. SKB P

9 It should be noted that SKB s and Posiva s performance requirements are for the backfill as a whole, there are no clearly defined specifications for the pellet component beyond a need to ensure that the entire backfill remains functional over the long-term. The main roles of the pellet component are to provide lateral support to the blocks, protect them from inflowing/dripping water during the initial stages of system evolution and limit the potential for unacceptable redistribution of the backfill from one region of the deposition tunnel to another by water entering the tunnel. The pellet materials also provide for a greater margin in the functional definitions for the block materials as the pellets occupy volume that the blocks would otherwise have to swell into (especially important in areas with large over-excavated volume). In addition to the performance requirements for the backfill as a whole there are factors associated with effectiveness and flexibility of the process. The backfilling rate required for the deposition tunnels for the KBS-3V concept is 6 8 m and 5 m per day for the SKB and Posiva repositories respectively (Gunnarsson et al. 2006, Keto and Rönnqvist 2007). Any materials and emplacement options considered or developed must therefore be able to be placed at a rate that meets the production requirements established and the installed materials must be physically stable throughout the operational activities. Keto et al. (2009b) summarized the deposition tunnel backfill design for a KBS-3V repository, based on identification of critical processes and technical issues. This summary includes much of the information discussed by Keto et al. (2009a) but also identifies inputs needed to resolve some of the outstanding questions and allow for establishment of clearer design bases for backfill and backfilling. Some of the critical processes and technical issues identified by Keto et al. (2009b) as related to backfill wetting, formation of piping features and their evolution, erosion of material following installation and related aspects of system evolution were examined in the ½-scale tests described by Dixon et al. (2011). Table 1-1. Performance targets for the backfill with possible target values, applicable timeframe and associated rationale as expressed in Posiva s TKS-2009 document (after Hansen et al. 2010). Performance target Applicable time window Rationale Backfill shall limit the water flow so that transport is diffusion dominated. Hydraulic conductivity < m/s. Backfill shall ensure a tight contact with the rock wall. Swelling pressure > 200 kpa. Backfill materials should have a sufficiently low compressibility. After the target state has been reached, up to one hundred thousand years at least. After the target state has been reached, up to one hundred thousand years at least. After the target state has been reached, up to one hundred thousand years at least. Backfill should contribute to favourable conditions for the buffer and canister and limit and retard radionuclide transport in case of canister failure. A sufficiently low hydraulic conductivity is required to avoid significant advective transport along the tunnel and any essential change in bedrock hydrology due to the presence of the tunnels (over the long-term). Backfill should contribute to favourable conditions for the buffer and canister and to the mechanical stability of the deposition tunnels and near-field rock. It should also limit and retard radionuclide transport in case of canister failure. Backfill should contribute to favourable conditions for the buffer and canister and limit and retard radionuclide transport in case of canister failure. The backfill should be able to limit the expansion of the buffer. It should keep the buffer in place so that the density requirements of the buffer are met. 12 SKB P-11-44

10 1.3 Design specifications for a KBS-3V deposition tunnel backfill The backfill performance requirements presented above can be used as a guide in identifying feasible solutions to selection of material(s), installation design(s), methodologies and quality assurance/ control processes that will provide a sufficient safety margin to long-term safety. A list of general design specifications needed for deposition tunnel backfill consisting of pre-compacted clay blocks and bentonite pellets was presented by Keto et al. (2009a) and design factors of particular relevance to the use of pellets in backfilling are summarized in Table 1-2. From Table 1-2 some general guidelines/constraints can be developed with respect to the pellet component of the tunnel backfill. The density specification for the backfill resulting from the guidelines in SR-Can (SKB 2004) means that the pellet component of the backfill must be able to interface effectively with both the rock and the backfill clay blocks and on saturation not leave any potential for this region to provide a preferential pathway for radionuclide migration away from the deposition holes. In order to accomplish this, the pellet materials must be selected, designed and installed in a manner that will result in effective placement and performance, efficiency in placement operations and long-term stability of the system. In order to accomplish the performance goals set for the backfill component it is necessary to evaluate both the environmental and operational constraints related to the pellet fill. These constraints are Features, Events and Processes (FEPs) that have an influence on the design and constrain the solutions that can be applied. The key site specific constraints so far identified include: total water inflow into and distribution within the tunnel, composition of the inflowing water (salinity, ph etc.), evolution of groundwater composition over time, and surface roughness of the rock walls and the floor that may be influenced both by the rock and the excavation method. Table 1-2. Design specifications related to pellet materials for backfilling of deposition tunnels (after Keto et al. 2009a). Design specifications required that affect installation of the backfill Density Geometry Backfilling rate - Average dry density of the backfill must be able to fulfil the function indicators stated in SR-Can. - Acceptable range/variations in dry density. - Bulk density of the pellet filled zone. - Placement of blocks into the tunnel and resulting degree of block filling. - Geometry of pellet filled volume. - Installation rate of blocks. - Installation rate of pellets. Design specifications concerning materials and manufacturing of pellets Pellets - Material: required amount of swelling minerals/smecite content, smectite composition, other minerals intentionally added, stray materials. - Dry density and water content of individual pellets. - Granule size or range of sizes (gradation). SKB P

11 The major constraints related to backfilling and pellet materials in particular identified from the repository design are associated with: technical feasibility, geometry of excavated tunnels, other repository operations that may induce material or process limits, e.g. logistics, and equipment and their limitations to the backfill design. How many of these FEPs and constraints will addressed is dependent on the pellet materials that are used in backfilling. In order to effectively address them it is necessary to more clearly define the options available for pellet fill. An important step in this process is to pull together a summary of knowledge related to use of pellet materials in similar geometries and applications. This document provides a brief summary of the work done by various organisations as it relates to use of pellet materials and relates them to the deposition tunnel backfill proposed for a generic KBS-3V repository. From this, consideration is given to the site-specific features known for the proposed repositories at Forsmark and Olkiluoto and how they may affect the design of pellet materials. Additionally, a discussion of what is needed in order to address some of these outstanding issues and ultimately develop a design specification for the pellet component is provided in Section 5 of this document. 1.4 Other Repository concepts that include use of bentonite pellets Background Many repository concepts being investigated internationally include use of bentonite pellet materials, either in association with backfill or to fill gaps between the canister and highly compacted bentonite (HCB) clay blocks. In many cases, these fill materials serve the function of both buffer and backfill (e.g. Nagra pedestal concept). The KBS-3V, KBS-3H concepts and variations on them, are being considered for use by several national programs including Sweden, Finland, Canada, Japan, China, India, Korea and Ukraine. As shown in Figure 1-1 and described in Section 1.1, bentonite pellets are proposed for use as part of both the buffer and the backfill system in most of these concepts. Much of the published work associated with HCB pellets as they relate to repository sealing in Sweden, Finland, Canada and Switzerland has focused on gap filling in the vicinity of the buffer. While often not intended for application in deposition tunnel backfilling, the information related to clay pellet utilisation as a buffer component has application to SKB and Posiva backfill development work. The evaluation of pellet properties and installation studies undertaken in association with backfill development have generally examined materials options that used commercially available materials. This resulted in limited ability to assess variables such as shape, density and materials as they affect the as-placed characteristics of pellet fill and how this might be engineered. 14 SKB P-11-44

12 1.4.2 Horizontal Tunnel Placement (HTP) concept An emplacement concept being considered by NAGRA and NWMO for use in a sedimentary rock environment involves use of a pedestal composed of HCB blocks to support a canister horizontally installed in a tunnel. Figure 1-3 shows the generic emplacement geometry proposed by Canada s NWMO, other programs such as NAGRA have similar geometries, varying in canister size and tunnel diameter as required by the canister dimensions, mass and heat output as well as the specifics of the geological medium considered. The volume not occupied by the canister and the HCB blocks will be filled with a material containing densely compacted bentonite pellets and a bentonite fines component. (Plötze and Weber 2007, De Bock et al. 2008). In a sedimentary host environment where water influx into the excavations is minimal the pellets still provide a long-term sealing function but more importantly, over the near- and intermediate-term they must be able to effectively conduct heat away from the canister to the surrounding rock mass. This is a challenge for a system where achieving substantive fill density is potentially problematic. Work has been ongoing to quantify the achievable density of the pellet fill and to develop potential material options that might aid in heat transfer and optimize material placement. Although the HTP geometry is much different than that of the KBS concepts, much of the information developed is of use in assessing the options available for the pellet backfill materials that could be used in a KBS-3V repository Other applications where HCB pellets are proposed for use The use of pellets to provide a gap sealing or backfilling function has been investigated by ANDRA and SCK/CEN for use both in sealing the annular gap between a canister and the surrounding geosphere in their horizontal tunnel placement concepts. These concepts vary slightly from those of NWMO and NAGRA in that they have a much smaller volume of initially empty tunnel around them and do not call for a pedestal of highly compacted blocks below them. Examples of these geometries are presented in Section Pellet materials have also been examined as a component for use in sealing vertical shafts through a sedimentary (clay) host medium. Work was done to characterise and select potentially suitable clay pellet and clay powder mixtures that could be used in sealing a vertical borehole. The results of these studies are presented and discussed in Section Figure 1-3. NWMO s horizontal tunnel placement concept. SKB P

13 2 Pellet materials options and their use in a repository As briefly outlined in Section 1, the use of bentonite-based pellet materials has been examined by several national programs considering deep geological disposal of nuclear fuel waste. This section briefly summarizes some of the work done and the results obtained and then discusses how this information can be used to provide a basis for focusing work on materials and installation approaches for pellet materials as it relates to deposition tunnel backfilling. These results also have application to the development of HCB and other pellet materials for use in association with HCB buffer materials in a variety of emplacement geometries. 2.1 Methods to produce clay pellets Pellets can be produced using two basic techniques; firstly by squeezing through a mould (Extrusion) and secondly by roller pressing. These two techniques are commonly used in industry to produce compacted pellets of various materials and have been demonstrated to be viable for production of bentonite materials Pelletizing using extrusion technique This technique is used in the agricultural industry for manufacture of animal feed pellets, making pellets from wood or bentonite. The aim of this pelletizing technique is normally not to achieve high density materials or consistent sized product (length varies) but to produce physically stable rods as a means of packaging the product in an easily handled and utilized form. This technique basically pushes the raw material though a matrix, normally a roll with holes, which results in a degree of compaction and formation of the cylindrical product, the diameter of these rods can be varied by changing the size of the opening but there are minimum and maximum values that can be practically achieved. Figure 2-1 shows an example of the product produced by this technique. The bentonite rods produced by extrusion have limitations regarding the density to which the individual rods can be produced and can vary considerably in their durability. Examples of some of the density measurements made for bentonite rods are provided in Table 2 1. As well, the non-uniform dimensions and general shape of these materials make achieving high as-placed density somewhat problematic and they tend to bridge during placement. They have been demonstrated to be durable enough to allow them to be blown into place using shotcreting equipment (Dixon et al. 2008a, b, Keto et al. 2009a, Riikonen 2009), and so have potential for use in backfilling, especially if some means of installing them in association with materials of differing size can be developed Pellet-making by roller compression This technique was used for making pellets used in numerous studies undertaken over the past 20 years. This is the same basic technology used to produce pharmaceutical tablets as well as a variety of industrial products (examples are coal pellets to provide ease of handling and more uniform burning characteristics and also charcoal briquettes). Using this type of machine, the bentonite is fed by a screw into a small void above to counter-rotating rolls, each containing matching hemispherical voids. The bentonite is compressed into pellets or briquettes between these rolls and exit by gravity from the bottom of the rollers. It is possible to vary the roller speed and the pressure from the screw to change the density of the pellets although beyond a certain rate of material supply and roller speed the improvement in pellet density is minimal and the pellets may actually become more friable. Conduct of trials to determine the optimal settings for the machine and water content for the feed material allows for a consistent product to be produced. Figure 2-2 shows examples of machines used for laboratory-scale pellet-making trials as well as an industrial-scale machine used to mass produce pellet materials. SKB P

14 Roller compression is a well developed technology used to manufacture bentonite pellets used for sealing water wells and has been used to manufacture high density pellets for repository sealing studies. This compaction technique has been demonstrated to be extremely flexible with respect to the range of pellet sizes and densities that can be achieved, see for example Figure 2-1. The bentonite pellets produced have few limitations regarding the density to which they can be produced. Examples of some of the density measurements made are provided in Table 2-1. As well, their highly uniform dimensions allow for blending with other sized materials to improve their as-placed density. They have been demonstrated to be durable enough to allow them to be poured, augered, blown, or compacted into place (De Bock et al. 2008, Nold 2006, Plötze and Weber 2007, Mayor et al. 2005) and so have high potential for use in repository backfilling. Figure 2-1. Examples of bentonite pellets used in repository sealing studies. (Upper row are pellets produced using roller compression (briquettes); Lower Left is example of typical extruded bentonite pellet; Lower Right are crushed HCB granules). Examples of roller-compression machines for use in laboratory-scale investigations Industrial-scale roller compression machine (Hosokawa Bepex GmbH) Figure 2-2. Pellet making using roller compression technique. 18 SKB P-11-44

15 2.1.3 Granulated bentonite Although not by definition pellets, granulated bentonite or other clay-based materials of preselected size can also be produced by crushing of either raw clay or pre-compacted materials of high density. Crushed materials can be sized and screened to provide graded products that can be used to fill the voids between pellet materials or else on their own as backfilling material. An example of the type of material produced by this crushing process is shown in Figure 2-1. Granulated bentonite has been demonstrated as being viable for installation either as in situ compacted flooring material for deposition tunnels or for blowing into gaps between backfill and rock (Wimelius and Pusch 2008, Dixon et al. 2005, 2008b, Martino and Dixon 2007). Although a usable material, there are some difficulties in using granular materials in backfilling of the non-floor regions. Problems are usually associated with maintaining desired particle size gradation, segregation of material sizes during transport and generation of excessive dust during placement. Granular materials also have limited potential for densification during installation and tend to clog installation equipment where water is added to the material during placement. Some success has been achieved in using fine granulated materials as a filler between larger pellets for gap filling in a dry environment (Figure 2-3). Installation of granulated materials will also prove more problematic in a moist environment where water could contact the particles before it reached its desired location within a pellet mass. a. As-placed Pellets b. Fines and New Layer c. Following Vibratory of Pellets added Compaction Figure 2-3. Fine-grained (30 mesh) Wyoming bentonite granules used as space-filler in a gap fill installation trial using HCB pellets produced from MX-80 bentonite (Martino and Dixon 2007). SKB P

16 2.2 Pellet manufacturing trials and material characterisation In the course of SKB s repository sealing studies and materials evaluations there have been numerous materials production trials and studies related to the ability to place bentonite pellet materials as buffer and backfill components. Several tests were commissioned by SKB in the late 1990 s with regards to manufacture of densely compacted bentonite pellets using the roller compression technique. The same type of laboratoryscale roller compactor as shown in Figure 2-2 was used to evaluate several materials and identify compaction parameters that might be important in determining the quality of pellets produced. The test objectives were: to determine if this compaction method was suitable for manufacturing bentonite pellets, to determine how the compression force affects the density, to determine the influence of water content in the bentonite on the pellets produced, and to investigate what pellet density can be achieved. Several compaction trials were performed as part of this initial screening study and the results are provided Table 3-1. Using the results of these initial pellet manufacturing trials materials were produced using roller compression that were used in several of the large-scale tests conducted at SKB s Äspö facility. As part of each of these applications, the basic physical properties of the pellet materials were measured and these are also listed in Table 3-1. A set of scoping tests were undertaken by AECL as part of a review of pellet materials screening to determine options for gap fill between the HCB buffer and the surrounding rock in the IFB concept being considered by NWMO (Martino and Dixon 2007). In these tests materials obtained from a variety of sources were evaluated to determine the density of the individual pellets/granules as well as determining the bulk density of material installed in simulated gaps. Some of the results obtained in the pellet manufacturing trials are provided in Table 2-1. The Effective Montmorillonite Dry Density (EMDD) values provided in Table 2-1 provide a means of normalizing the behaviour of swelling clay materials (or clay-aggregate mixtures), of various smectite contents based on their swelling clay content. Its significance to the pellet backfill is discussed in detail in Section The compaction trials completed in Canada found very similar results to those reported by SKB, the pellets produced are much more sensitive to the water content of the feed material than to the compactive force used to manufacture them. Additionally based on comparison to the results reported by SKB and others, application of very high compressive loads during compaction actually has only a marginal effect on the density achieved. This may be attributed to increasing resistance to closer particle packing as the pellet materials approach saturation. This is a combination of increasing interparticle repulsive forces as density increases (surface charge on clay particles), increasing degree of water saturation of the pellets resulting in more resistance to further compression and non-linear increase in mechanical resistance to particle realignment as the system density increases (more and more force is required to force individual particles into closer arrangement as density increases). Pellet manufacturing has also been reported in association with the work at Nagra s Horizontal Tunnel Placement concept as well as sealing studies related to work done at the Hades URL in Belgium. These studies have examined pellets manufactured using Serrata and FoCa (Ca-bentonites) and Boom Clay. The data listed in Table 2-1 shows that these materials typically compacted to a higher dry density than were observed for Na-bentonite materials but that is not unexpected given their lower swelling capacity (Ca, Mg dominated exchange sites in smectite clay component) and in the case of Boom clay, much lower swelling clay content (~48% versus > 75%). It is commonly observed that clays containing low/no swelling clay content or calcium-smectite are able to be compacted to higher dry density for a given compactive effort than are materials prepared using a material rich in sodium smectite. 20 SKB P-11-44

17 Table 2-1. Clay pellet manufacturing experiences. SKB P Material Tested Force on Rollers Pellet Size (mm) Water Content (%) Pellet Dry Density (kg/m 3 ) MX kn/cm ,910 1,749 Unpublished data; Clay Technology MX kn/cm 18 Nil* 1,740 1, kn/cm 18 MX kn/cm 10 1,850 1,682 MX kn/cm Nil* MX kn/cm NM* MX kn/cm ,750 1,573 MX kn/cm ,700 1,520 Martino and Dixon 2007 MX kn/cm ,900 1,738 Gunnarsson et al. 2001; Buffer gap fill BaPT MX kn/cm ,760 1,584 CRT: Dh1 MX kn/cm ,750 1,573 CRT: Dh2 MX kn/cm ,740 1,562 CRT: Dh3 MX kn/cm ,770 1,593 CRT: Dh4 MX MPa 5 2,000 2,100 1,850 1,966 Karnland et al MX ,320 2,230 Pellets subsequently crushed, sized and blended Blümling and Adams ,170 2,048 70% MX MPa 5 2,000 2,100 1,850 2,100 Karnland et al % sand MX MPa 2 2,060 2,160 1,919 2,037 Pusch et al MX ,780 1,606 Sandén et al Wyom MPa ,840 1,860 1,671 1,693 #16 and #30 mesh clay; Martino and Dixon 2007 Wyom MPa ,860 1,880 1,963 1,715 Martino and Dixon 2007 Wyom MPa ,900 1,738 10% crushed pellets; Martino and Dixon 2007 Wyom. Commercial ¼ tablets 1,420 1,620 1,230 1,435 Martino and Dixon 2007 Products ½ tablets 3/8 tablts 1,490 1,550 1,301 1,363 Serrata Roller ,130 2,000 Mayor et al Serrata Roller > ,130 2,000 Mayor et al Friedland Roller ,810 1,638 Friedland Granules/flakes ~ ,995 2,075 1,521 1,627 Sandén et al. 2008/Unpublished data; Clay Technology Cebogel Extruded Rods, d=6.5, L= ,720 1,541 Sandén et al. 2008/Unpublished data; Clay Technology Cebogel: Extruded 2,100 1,966 Keto et al. 2009a Cebogel: Extruded 16 1,810 1,638 Dixon et al. 2008a, b Kunigel VI Isostatic MPa ,000 2,250 1,850 2,144 Spheroids from blocks (Wada et al. 2002) Minelco Crushed ,670 1,488 Sandén et al FoCa Roller 2,100 Volckaert 2000 FoCa Roller ,890 Imbert and Villar 2006 Boom Clay Roller 2,100? Volckaert 2000 Pellet EMDD (kg/m 3 ) Notes * Pellets could not be produced, raw material was too wet or tended to split along axis. NM Property not measured; BaPT Backfill and Plug Test; CRT Canister Retrieval Test; PR Prototype Repository Test; Dh Deposition hole.? Mineralogy uncertain or smectite content too low for EMDD parameter to be useful.

18 The main conclusions that can be drawn from the data provided in Table 2-1 are: 1. A range of pellet sizes can be produced without altering the compactive effort needed to make them. 2. Sodium bentonites having high smectite content (> 75%) show similar compactive properties. 3. Pellet dry density of 1,700 to 1,900 kg/m 3 can be readily manufactured from sodium bentonite clay using available technology. 4. Pellet strength and density can be optimized through water content control and type of raw material fed into compactor. 5. Pellet density achieved for a particular material using roller compaction technology is not especially sensitive to compressive force once approximately 10 MPa is exceeded. In order to substantially increase the density achieved it is necessary to increase the compressive force by more than an order of magnitude (to > 100 MPa). 6. Clays having exchange sites dominated by Ca, Mg can be compacted into pellets having higher dry density than for Na-dominated clays. 7. Clays having a lower swelling clay content can be compacted into denser pellets. 8. Use of extrusion technology to produce densified bentonite rods is more susceptible to variation in the product produced, and the rods are not of uniform size. This may make development of a material that can be placed consistently problematic but does not eliminate this product from consideration. Only one reference could be found that related to production of pellet materials through blending with non-clay material (Karnland et al. 2008). That paper did not provide any details regarding pellet size, mechanical or other properties but that pellets could be produced is encouraging regarding the potential for developing specialty pellets for improving thermal, mechanical or erosion-resistance of gap fill materials for repository use. 2.3 Laboratory and field demonstrations of bentonite pellet Placement Pellet placement studies in Sweden and Finland A number of joint and independent studies examining use of bentonite pellets in association with both the buffer and the backfill have been completed by SKB and Posiva. These studies have examined HCB pellets for potential use in filling the buffer-related gaps in both the in-floor and horizontal emplacement geometries described in Section 1.1 as well as the spaces in the deposition tunnel perimeter which cannot be filled with precompacted backfill blocks. Buffer Gapfill The use of HCB pellets as a fill material between the buffer and the surrounding rock in the KBS-3H geometry has received considerable attention within SKB s program. HCB pellets have been installed in a variety of laboratory-scale mock-ups as well as in a number of full-scale experiments conducted at SKB s Äspö laboratory (e.g. the Temperature Buffer Test, Prototype Repository; Canister Retrieval Test). In these tests only a limited range of sizes could be examined due to limited options available from suppliers of these materials. Work related to filling the space between the buffer and the canister or rock has focused on roller-compacted pellets due to their higher initial density, uniform size and generally more robust nature. Studies also examined the key behavioural issues associated with the way in which water entering a pellet filled gap would move in the period prior to completion of deposition tunnel backfilling (water distribution, potential for erosion by inflowing water) (Sandén et al. 2008, Johannesson et al. 2010). All of the studies done on gap fill found that there were limitations with respect to the density to which they could be placed in a deposition borehole. This means that there are limitations regarding the ability for heat to be transferred from the canister to the surrounding rock mass, which affects (increases) the temperature developed at the canister surface. A listing of some of the typical as-placed 22 SKB P-11-44

19 density values obtained is included in Table 3-2. Based on the results currently available the only effective ways to improve the as-placed density of a pellet GF would be to: increase the density of the pellets; find a means of installing graded materials that avoids tendency for such materials to segregate during handling and installation; improve technological means to improve the density to which the pellet fill can be installed; or look at options that would allow for improvement of the thermal characteristics of these pellets. Pellets associated with deposition tunnel backfilling Pellets for use as a component in deposition tunnel backfilling have been examined in a number of SKB and joint SKB-Posiva studies and experiments (e.g. Gunnarsson et al. 2001, Börgesson et al. 2002, Dixon et al. 2008a, b), as well as similar studies undertaken in Finland by Posiva (Hansen et al. 2010, Riikonen 2009). Field and field-scale studies undertaken using mock-ups at 1/12 th and ½-scale were completed in the joint SKB-Posiva Baclo and Base projects. These studies included focussed work on the use of pellets to fill the gaps between the backfill and the surrounding rock and have been summarised in the report by Keto et al. (2009a). Posiva also undertook a series of mockup tests as part of their BACEKO project where backfill blocks composed of 60% aggregate and 40% Milos bentonite were used in association with Cebogel extruded bentonite pellets. These BACEKO tests were undertaken to examine materials options that were more Olkiluoto-specific (e.g. using a 3.5% percolating solution rather than the 1% used in the large-scale mock-ups of SKB and use of different materials for backfill block construction). The results of the Posiva study are reported by Riikonen (2009) and Hansen et al. (2010). Laboratory studies focussed on more generic behavioural evaluation of the backfill system undertaken in the joint Baclo project are summarised by Keto et al. (2009a). These examined some of the basic material characteristics of available materials (density, durability (mechanical and hydraulic), water uptake and movement). Only a limited range of pellet sizes were examined in the course of this backfill development work due to limited options for their acquisition from existing manufacturers, but materials produced by roller-compaction, extrusion and crushing techniques were examined in laboratory-scale studies. Laboratory tests on pellet materials considered for use as part of deposition tunnel backfilling have been reported on by Sandén and Börgesson (2008), Sandén et al. (2008) and Johannesson et al. (2008). Two important properties investigated regarding bentonite pellet when used in the slot between high compacted bentonite blocks and a tunnel wall were the wetting behaviour i.e. the ability of the pellet filling to store water and the sensitivity for piping and erosion. Other properties investigated are e.g. the healing ability after a piping scenario and the homogenization of backfill blocks and bentonite pellets. The materials investigated in these laboratory tests were both roller compacted pellet (MX-80 bentonite), extruded pellet (Cebogel QSE) and granules (Minelco and Friedland). The test equipment for the piping/erosion measurements consists of Plexiglas tubes with an inner diameter of 0.1 meter and a length of 0.5 meter, see Figure 2-4. The tubes can be connected to each other in order to vary the test length. The tubes were filled with the pellets material. In one end a steel lid was mounted from which different water flow could be applied. The other end was covered with a perforated plate. The discharged water was collected and the amount of eroded material determined. The wetting behaviour was tested in a simulated gap, m (Figure 2-5). The artificial slot, simulating a part of the slot between backfill blocks and tunnel surface, had walls made of Plexiglas which made it possible to follow the wetting development from outside. The slot was filled with pellets and water with constant flow rate was applied in a point flow as shown in the picture. Besides studying of the wetting development also erosion measurements were made in this test setup. An additional aim with this test was to check the stability of a pellets slope when exposed to a water inflow. In the course of these tests it was observed that water uptake and transmission characteristics changed with the nature of the pellet materials which indicates that the texture (mode of manufacturing) and shape will affect the hydration behaviour of dry, pellet-only systems. SKB P

20 Figure 2-4. Photo of the test equipment used for piping/erosion measurements. Figure 2-5. Photo of the test equipment used for studying the wetting behaviour. Despite some of the limitations related to gap dimensions and uniformity, intermediate to field-scale tests have provided valuable information related to materials selection, placement and subsequent interaction with inflowing groundwater. Trials have included installation of materials using dry-pouring and blowing using shotcrete technologies, as shown in Figure 2-6 and Figure 2-7. Some typical results from these trials are provided in Table 2-3. The as-placed density of the pellets is still lower than would be necessary for long-term performance of the backfill but the subsequent swelling of the adjacent, much denser clay blocks will result in compression and densification of the pellets. On equilibration, the pellet-block system is expected to meet or exceed the requirements set for the hydraulic and swelling properties of the deposition tunnel backfill. These ½-scale simulations confirmed that installation of any type of dry pellets in a KBS-3V deposition tunnel geometry will be problematic as pellet fill has a very low angle of repose and so very long distances are required before fill can be placed to tunnel roof elevations (Figure 2-6). Dry pellets placed by blowing rather than pouring have the same low angle of repose and blowing dry materials results in increased pellet damage during placement and increased dust generation (which is detrimental both operationally and with respect to worker safety). Associated with this is a lower as-placed density than can be achieved when water is added during installation and a much lower density of material in the uppermost regions of the tunnel. 24 SKB P-11-44

21 Figure 2-6. Placing dry Cebogel QSE pellet materials into space between backfill blocks and chamber wall in ½-Scale Experiment at Äspö. (Note slumping of pellets and need to install temporary wooden wall to keep dry pellets in place). If pellets are installed by blowing (shotcrete technology) there is the ability to add water to the material as it is being placed. The result of this is the ability to install pellets as near-vertical volumes and achieve a denser and more consistent material into the gap (Figure 2-7). Some of the typical results obtained in mock-ups done at SKB s Äspö laboratory are provided in Table 2-3. Pellets produced using both roller compression and extrusion have been used in the trials conducted by SKB. It has been noted that the extrusion-generated rods tend to be more variable in terms of their size, density and durability than were the roller-compressed materials. This may have importance with respect to as-placed densities and other hydro-mechanical properties of this component but as-yet there is insufficient information available to make a definitive judgement regarding this. Dense, single size pellets also have potential issues related with them, they have less fines and so can be more difficult to place in near-vertical orientation, they also are harder and more likely to bounce back from the installation face (rebounding), resulting in a more problematic installation process and the need to deal with the rebound materials. Finally, a single-sized fill material will tend to have a lower packing efficiency than materials that contain a range of sizes, resulting in a lower as-placed density for the single-size materials. Figure 2-7. Tests to evaluate ability to place Cebogel QSE backfill pellets in ½-Scale tunnel simulator. (Moisture added to pellets during blowing resulting in ability to place pellets easily and in near-vertical manner.) SKB P

22 2.3.2 Pellet development and placement studies in Belgium Work associated with clay pellets for use in backfilling was done in Belgium as part of two major studies related to sealing of vertical excavations. These sealing studies focussed on large-diameter vertical boreholes and so the results must be evaluated carefully when comparisons to what could be achieved in backfilling of deposition tunnels. This is largely associated with the geometric differences, the installation and compaction of materials in a vertical orientation is less problematic that in a horizontal application. In the vertical orientation, fill materials remain in the location they are installed and so compaction is possible without issues of pellet fill slumping that occurs when a horizontal opening is being filled. The pellet development work done as part of the Bacchus 2 and Reseal projects at the Hades URL at Mol is however of particular relevance to backfilling of the gap between HCB buffer and the surrounding rock in the deposition borehole. It also has application in potential for use of this type of materials in shaft sealing. Material production and behaviour-related issues identified and discussed as part of these projects also provide background information for use in guiding additional work. The Bacchus 2 project The Bacchus 2 Project was sponsored by European Commission in co-operation with ENRESA and ANDRA with CEA as the main subcontractor (Volckaert and Bernier 1996). This experiment was intended to optimize and demonstrate the installation of a clay-based backfill for use in sealing a large-diameter vertical borehole. The backfill material installed consisted of a mixture of high density clay pellets and powder and work done in support of this project included: Study and optimisation of potential backfill materials The sealing material installed in the borehole consisted of a mixture of clay pellets and clay powder. The preparatory studies examined the ratio of clay powder to pellets and the density, size and water content of the pellets were examined as part of the optimisation process. Laboratory experiments were done as part of this evaluation process in order to determine the hydraulic conductivity and the swelling pressure. In situ demonstration of backfill Installation and behaviour The field demonstration done as part of BACCHUS 2 involved the sealing of the large borehole (50 cm diameter) left after the retrieval of the BACCHUS 1 mock-up at the HADES URL (Mol, Belgium). In the backfilling process, granular backfill material was installed around a central filter tube that was used as support and access tube for the instrumentation. The production of the granular backfill material consisted of the following four steps: 1. drying of the unprocessed, excavated clay. 2. grinding of the dried clay. 3. compaction of the clay powder to pellets. 4. mixing the pellets with clay powder. Compaction trials were completed using the roller compression technique described in Section 3.1 and produced pellets of Boom clay (from the Mol site) and the French FoCa and Spanish S2 calcium bentonites and densities of about 2,100 kg/m 3 could easily be produced using these materials. The Boom Clay pellets were used in the field application and were mixed in equal mass ratios with dry powdered Boom clay and compacted by vibration, achieving an as-placed dry density of about 1,700 kg/m 3. A swelling pressure of 0.6 MPa and a hydraulic conductivity as low as m/s were measured for this material. 26 SKB P-11-44

23 The Reseal project The RESEAL project started in 1996 within the framework of the EC specific RTD programme on Nuclear Fission Safety (Volckaert 2000). The stated objective of the project was to demonstrate the sealing of a borehole and a shaft in plastic clay using bentonite-based materials. Reseal activities included selection of the clay to be used and then at the HADES URL (Mol, Belgium) to: demonstrate installation technique(s) for the backfilling and sealing of a 1.4 m diameter shaft, demonstrate that a low permeability bentonite seal can avoid preferential migration of water, gas, and radio nuclides along or through the seal or even through the excavation disturbed zone around the seal, validate models for the transfer of gas and water through the sealing system including geomechanical aspects, demonstrate sealing of boreholes. Two materials were initially studied for potential use in the field test, a French bentonite (FoCa clay), and a Spanish bentonite (Serrata clay). Both clays were studied in laboratory tests and the FoCa clay was used in the in situ shaft sealing test. Testing of these candidate materials included: production of pellets and optimisation of the powder/pellets mixture, laboratory experiments to determine their swelling and hydraulic properties, and shaft sealing demonstration test. Screening and characterisation tests related to the production of pellets determined that: the pellet production is most efficient (high density and physically robust pellets) when the granules are fine, (< 3 mm diameter), the settings of the compaction parameters of the compaction process, rotation speed, powder flow, etc., are important to obtain good quality and high density of the pellets, the water content of the clay fed into the compactor has a large influence on the quality of the pellets; but each material had different water-densification characteristics, and the highest dry density for the FoCa clay was obtained at a gravimetric water content of 7%. Powder/pellet mixture compaction trials using the FoCa clay found that a ratio of 65% pellets and 35% powder gave the best dry density under carefully controlled conditions but this ratio tended to segregate during handling and compaction and long hydration time. A 50/50 mixture was less prone to pellet-powder segregation and so was chosen for field installation. A dry density between 1,400 and 1,600 kg/m 3 was achieved in compaction trials and when the shaft was sealed a compacted dry density of 1,550 kg/m 3 was measured. Figure 2-8 shows the shaft sealing materials installed in the Reseal Project s field demonstration. The gravimetric water content of the clay powder was 7 +/ 1.5% and the grain size 0 2 mm. The compaction was made in 15 cm thick layers with a vibro-compactor designed for the test. The vibrocompactor is essentially a rod that is attached to a vibratory energy source (e.g. concrete vibrator used to deair and settle wet mix), the vibrations are transmitted via the rod to the surrounding pellets, resulting in an improved particle packing geometry. At the end of the vibratory process the rod is withdrawn from the clay mass. This technique has also been successfully utilized in several experiments undertaken by AECL (Section 3.3.3). The dry density of loosely poured material in the Reseal test was measured to be 1,400 kg/m 3. SKB P

24 Figure 2-8. Pellet clay material installed in Reseal Project s field demonstration (Gens et al. 2009) Pellet development work in Canada Pelletized and granular materials for use in filling the spaces between a canister/buffer installation and the surrounding rock mass (Gapfill) as well as using densely compacted pellets as a backfilling component in deposition tunnels are both relevant to NWMO s repository sealing concepts and have been the topic of ongoing studies in Canada. Gapfill (GF) For the repository concepts currently under consideration by NWMO, the GF, despite its small volume relative to the other sealing materials is recognized as being important with regards to determining the performance of the system. It is assumed that as the HCB buffer hydrates, swells and generates highswelling pressures, the adjacent gap-fill materials will compress and any other remaining gaps or voids will be filled. The amount of HCB expansion into adjacent regions is directly related to the volumes and densities of the HCB and adjacent GF. In time and following water saturation, compositionallysimilar HCB and GF portions will evolve towards a system that is more homogeneous with respect to density than was present at the time of installation. The degree to which such homogenisation will progress is still a topic of investigation. In order to provide the region surrounding the canister with adequately low permeability, sufficiently high swelling pressure and adequate thermal conductivity the density of the material occupying this volume needs to be maximized. Additionally, microbial activity at the surface of containers may lead to microbially induced corrosion (MIC) and to discourage such microbial activity, a high buffer density is needed (Stroes-Gascoyne et al. 2005, Kjartanson et al. 2003a). The only way to effectively accomplish these requirements is to find a material that can effectively fill these gaps without compromising the hydro-thermal-mechanical-chemical-microbial properties of the buffer, or adjacent sealing materials. Bench-scale studies of GF placement technologies and achievable densities were performed at AECL s Underground Research Laboratory (URL) with the intention of determining the EMDDs that could be achieved using simple and practical placement technologies. The results of these tests were then evaluated to determine what an equilibrated GF and HCB system would have in the way of thermal, hydraulic and swelling characteristics (Dixon et al. 2005). Based on these assessments and comparison to the requirements of the sealing system, it was possible to make a preliminary evaluation as to the suitability of potential GF materials options. A variety of filler materials were investigated including high-density precompacted pellets, crushed bentonite granules and blends of pellets and aggregate materials (Martino and Dixon 2007, Baumgartner and Snider 2002). GF placement trials were done at bench-scale using a range of granule/pellet sizes 28 SKB P-11-44

25 and gaps of 10 to 50-mm wide. These trials were conducted under dry conditions and made no attempt to simulate a borehole into which water was actively flowing. Into these dry gaps, particulate materials were poured either with or without subsequent mechanical vibration or tamping. GF materials consisting of densely compacted bentonite pellets and granular fines could be readily placed at EMDDs ranging from ~800 kg/m 3 for 10-mm gaps to ~900 kg/m 3 for 50-mm gaps (Kjartanson et al. 2005). Later studies by Martino and Dixon (2007) were able to improve the as-placed EMDD of the gap fill to 1,100 1,250 kg/m 3 for gaps of 50 mm dimension through use of pellet-fines mixtures and low-energy vibration (Figure 2-9). A summary of these results is included in Table 2-2. The results of GF placement studies undertaken in Canada are included in Table 3-2 and are very comparable to those obtain by studies undertaken by other organisations. These studies did not attempt to optimize the GF materials with respect to density or composition, factors recognized as being important to determining both the short-term thermal and longer-term T-H-M properties of the canister-buffer-gapfill system. Work is ongoing and planned that will focus on development of pellets composed of HCB or densely compacted bentonite-admixture blends. This will include consideration of pellet shapes, size gradation and non montmorillonite materials that could improve the as-placed characteristics of the GF materials. Deposition tunnel backfilling The work undertaken by AECL in developing bentonite-based backfill materials that could be used to fill crown and perimeter regions of a generic repository tunnel has direct application to the installation of materials into the perimeter and crown regions of the deposition tunnel in the KBS-3V concept. As outlined previously, the various repository concepts considered by in the Canadian program (excepting the HTP concept) all include a backfill component that filled volumes in the deposition tunnels that could not be dealt with using block or in situ compaction approaches. This backfill component is referred to as Light Backfill (LBF) in the Canadian concepts and the composition considered for this backfill component ranges from 30% clay 70% aggregate blends to 100% HCB pellets, depending on the particular deposition concept considered and the purpose of the fill at that location. In the course of developing these LBF materials AECL has undertaken several backfill development and installation exercises, ranging from small bench-scale tests through to field placement trials as shown in Figure Typical results obtained in the course of these trials are provided in Table 2-3. The densities attained in these trials were low relative to the HCB and buffer components of the sealing system but were sufficiently dense to provide constraint to the other sealing components. It should be noted that the results of these tests are comparable to those obtained by the various studies undertaken by SKB (see Table 2-3). Like the SKB results, the EMDD values of the LBF materials developed by AECL are not by themselves adequate to ensure that the system can provide the longterm swelling and hydraulic requirements of the backfill unless they are compressed by the adjacent backfill components. Further work to refine placement technologies and to improve densities for a. As-placed HCBPellets b. Fines Poured c. Following Vibratory Compaction Figure 2-9. Installation of pellet and fines materials (Dixon et al. 2005). SKB P

26 Figure Installation of bentonite-based LBF materials to fill rough-surfaced mock-up and real excavation at 420 m level at AECL URL. Upper: backfilling of a simulated deposition tunnel roof section (Martino and Dixon 2007); Lower: installation of bentonite-aggregate filler materials to provide a continuous contact between rock and clay blocks in AECL s Tunnel Sealing Experiment (Chandler et al. 2002, Martino et al. 2008). LBF were continued as surface and laboratory studies at AECL s Underground Research Laboratory (Baumgartner and Snider 2002, Dixon et al. 2005, Martino and Dixon 2007) and are the subject of ongoing studies Pellet development in Switzerland, France and Belgium Installation of pellet-type backfill for the NAGRA Pedestal concept was done in 2002 at Mont Terri as part of the Engineered Barriers Emplacement Experiment shown in Figure 2-11 (Mayor et al. 2005). In this study, an auger technique was used to install a graded mixture of bentonite pellets produced from the Spanish Serrata clay (Ca bentonite) that had a low (3.3%) water content using a commercial briquetting machine (Mayor et al. 2005). The size of the materials produced for use was either > 7 mm or else fell in the range of 0.4 to 2 mm. The coarse material had an average bulk density of 2,180 kg/m 3 with a gravimetric water content of 3.3% (dry density of 2.11 Mg/m 3 ). The fine materials had a pellet bulk density of 2,210 kg/m 3 with a water content of 3 7% (dry density of 2,130 kg/m 3 ) (Mayor et al. 2005). Despite the very high granule densities the field placement only achieved an overall dry density of 1,360 kg/m 3. This was less than the 1,400 to 1,500 kg/m 3 expected based on previous smaller-scale tests and was attributed to experimental obstructions that would not have been present in an actual repository situation and the way that the auger was operated during placement (Mayor et al. 2005). This auger placement method involves use of 2 (or more) auger-fed pipes that are pushed a short distance into the face of the region to be filled with bentonite granulate. The bentonite material exiting the pipes is compressed by their pushing against the passive resistance of the materials surrounding the mouth of the pipe. These pipes are gradually withdrawn resulting in a densified (relative to passive pouring of dry materials), bentonite fill. The less-thn-desired densification obtained in these initial trials indicate that some further material or technology improvements are still needed if higher as-placed densities are to be achieved using this technology. 30 SKB P-11-44

27 Figure NAGRA Engineered Barriers (EB) Test (Mayor et al. 2005). Work has been done in the laboratory and at the Grimsel test site to evaluate bentonite granules produced by crushing pellets manufactured by roller compacting MX-80 bentonite (Blümling and Adams 2008). These tests were largely associated with sealing of boreholes but the application does have relevance to filling larger voids. In these trials dry densities in the order of 1,500 1,600 kg/m 3 were reported for carefully blended materials and substantially lower (1,100 1,300 kg/m 3 ) for less ideally blended size distributions (Table 2-3). Given the ideal orientation for material placement and compaction (vertical, small diameter boreholes and subsequent in situ compaction) it is unlikely that graded materials of the type installed in these studies could be effectively placed in a horizontal tunnel to the densities reported by Blümling and Adams (2008) but the information does have potential relevance to gap filling in the KBS-3V borehole (provided it is dry). Recent work associated with improving the technologies that may have application to deposition tunnel backfilling has been reported within the ESDRED Project (Plötze and Weber 2007, De Bock et al. 2008). Within ESDRED, NAGRA has extended the work at Mont Terri to include testing and demonstration of granular buffer materials at full-scale to determine if the density specifications required for the buffer can be met in a field environment. These trials used Wyoming bentonite (MX-80) as the base material rather than the Ca-materials used previously. This bentonite was run through the same granulation process as was reported for the 2002 work and the individual granule dry density was raised from 1,170 kg/m 3 of raw bentonite to 2,100 kg/m 3 for compressed material. Using the same twin auger emplacement and compaction tool used previously (Figure 2-12), granulated, blends of granules of differing size, or blends of granules and pellets were installed at full-scale in Mont Terri. As-placed dry densities obtained for these materials are shown in Figure These data indicate that it may be possible to improve the as-placed density of the installed pellets through engineering of the size composition of the installed materials (De Bock et al. 2008). Figure Placement trials of tunnel fill using twin-auger technique. (De Bock et al. 2008: Note NAGRA canister-sized cylinder placed in tunnel.) SKB P

28 These pellet studies also included evaluation of the Horizontal Tunnel geometry considered by ONDRAF/NIRAS (Belgium) where pellets could be used to fill the gap between the supercontainer and the surrounding sedimentary medium as shown in a mockup used to evaluate pellet placement options (Figure 2-13). The mixtures examined in placement trials done using air-entrainment (blowing), showed an improvement over the single-sized materials examined previously. The density obtained was still found to be material and technique sensitive. Figure 2-14 shows some of the results obtained using the twin-auger technique shown in Figure This technique allowed for an improved as-placed dry density to be achieved (densities of 1,450 1,500 kg/m 3 ), but still exhibits variability within the as-placed mass of clay. Figure Emplacement trials for granular materials around supercontainer of type considered by ONDRAF/NIRAS, air-entrainment only (De Bock et al. 2008). Figure As-placed densities achieved using HCB pellet HCB granule mixtures in the Horizontal Tunnel Placement Geometry installed using twin auger technique (Nold 2006, Fries et al. 2008). 32 SKB P-11-44

R Deep repository engineered barrier systems

R Deep repository engineered barrier systems R-06-73 Deep repository engineered barrier systems Geotechnical behaviour of candidate backfill materials Laboratory tests and calculations for determining performance of the backfill Lars Erik Johannesson,

More information

DOMPLU - filter and seal design, construction and results (DOPAS Project)

DOMPLU - filter and seal design, construction and results (DOPAS Project) DOMPLU - filter and seal design, construction and results (DOPAS Project) Pär Grahm, Mattias Åkesson 2 Swedish Nuclear Fuel and Waste Management Co, Sweden 2 Clay Technology AB, Sweden The deposition tunnels

More information

Role of demonstration activities in the field of geological disposal. Monica Hammarström SKB

Role of demonstration activities in the field of geological disposal. Monica Hammarström SKB Role of demonstration activities in the field of geological disposal Monica Hammarström SKB 1 Content History Examples of demonstration projects supported by the EC The ESDRED project, February 2004 to

More information

Quantitative vs. Qualitative Performance Assessment of Closure

Quantitative vs. Qualitative Performance Assessment of Closure Quantitative vs. Qualitative Performance Assessment of Closure Heini Reijonen 1, Pirjo Hellä 1, Nuria Marcos 1, Barbara Pastina 2 1 Saanio & Riekkola Oy, Finland 2 Posiva Oy, Finland Safety functions set

More information

Johan Andersson * and Tiina Jalonen ** * Swedish Nuclear Fuel and Waste Management Co (SKB), Sweden ** Posiva Oy, Finland

Johan Andersson * and Tiina Jalonen ** * Swedish Nuclear Fuel and Waste Management Co (SKB), Sweden ** Posiva Oy, Finland Challenges in Developing the Basic Design of the KBS-3 System into a Qualified and Industrially Viable Operation 14465 ABSTRACT Johan Andersson * and Tiina Jalonen ** * Swedish Nuclear Fuel and Waste Management

More information

Designing, Commissioning and Monitoring of 40% Scale Bentonite Buffer Test 14260

Designing, Commissioning and Monitoring of 40% Scale Bentonite Buffer Test 14260 Designing, Commissioning and Monitoring of 40% Scale Bentonite Buffer Test 14260 Harri Kivikoski*, Pieti Marjavaara* and Pasi Rantamäki** * VTT Technical Research Centre of Finland, Espoo, Finland ** Posiva

More information

Safety functions, performance targets and technical design requirements for a KBS-3V repository

Safety functions, performance targets and technical design requirements for a KBS-3V repository Posiva SKB Report 01 January 2017 Safety functions, performance targets and technical design requirements for a KBS-3V repository Conclusions and recommendations from a joint SKB and Posiva working group

More information

Development of sprayed backfill technology

Development of sprayed backfill technology Ecosystems and Sustainable Development VII 523 Development of sprayed backfill technology J. Pacovský & J. Šťástka Centre of Experimental Geotechnics, Czech Technical University in Prague, Czech Republic

More information

THE ÄSPÖ HARD ROCK LABORATORY

THE ÄSPÖ HARD ROCK LABORATORY THE ÄSPÖ HARD ROCK LABORATORY A dress rehearsal for the construction of a final repository for spent nuclear fuel is currently being held deep down in the Swedish bedrock in the Äspö Hard Rock Laboratory

More information

Nordic Full-Scale Demonstrations of Tunnel Plugging Technologies for Repository Conditions 14282

Nordic Full-Scale Demonstrations of Tunnel Plugging Technologies for Repository Conditions 14282 Nordic Full-Scale Demonstrations of Tunnel Plugging Technologies for Repository Conditions 14282 ABSTRACT Erika Holt *, Johanna Hansen **, Petri Koho **, Marjatta Palmu **, and Pär Grahm *** * VTT Technical

More information

Äspö Hard Rock Laboratory. A unique place for experiments and research

Äspö Hard Rock Laboratory. A unique place for experiments and research Äspö Hard Rock Laboratory A unique place for experiments and research The rock in Äspö Hard Rock Laboratory is a fairly common granitic rock with both water-tight and waterconductive parts. We have extensive

More information

Evaluating the Performance of Engineered Barriers

Evaluating the Performance of Engineered Barriers Evaluating the Performance of Engineered Barriers Outcomes of the PEBS project Annika Schäfers (BGR), Irina Gaus (Nagra), Klaus-Jürgen Röhlig (TU Clausthal) 1 1 Introducing PEBS Long-term Performance of

More information

Development of long-term safety requirements for an alternative design variant (KBS-3H) for spent fuel disposal

Development of long-term safety requirements for an alternative design variant (KBS-3H) for spent fuel disposal Development of long-term safety requirements for an alternative design variant (KBS-3H) for spent fuel disposal Annika Hagros 1, Barbara Pastina 2, Margit Snellman 1, Jan-Olof Selroos 3 1) Saanio & Riekkola

More information

Horizontal bentonite backfilling and concrete plug for the Full-Scale Emplacement (FE) Experiment at the Mont Terri URL:

Horizontal bentonite backfilling and concrete plug for the Full-Scale Emplacement (FE) Experiment at the Mont Terri URL: Turku (Finland), 26.05.2016, DOPAS seminar Horizontal bentonite backfilling and concrete plug for the Full-Scale Emplacement (FE) Experiment at the Mont Terri URL: requirements, design, instrumentation

More information

Design and Performance of Engineered Barrier Systems for the Finnish Deep Geological Repository

Design and Performance of Engineered Barrier Systems for the Finnish Deep Geological Repository Design and Performance of Engineered Barrier Systems for the Finnish Deep Geological Repository 7. Essener Fachgespräch Endlagerbergbau 1.3.2018, DMT, Essen Source: Posiva Oy Dr.-Ing. Edgar Bohner VTT

More information

Thermal evolution of the repository the effect of heat generating waste

Thermal evolution of the repository the effect of heat generating waste Report R-18-04 November 2018 Thermal evolution of the repository the effect of heat generating waste Report for the safety evaluation SE-SFL SVENSK KÄRNBRÄNSLEHANTERING AB SWEDISH NUCLEAR FUEL AND WASTE

More information

IPR Äspö Hard Rock Laboratory. International Progress Report. Backfill and Plug Test. Sensor data report (Period: ) Reprot No:2

IPR Äspö Hard Rock Laboratory. International Progress Report. Backfill and Plug Test. Sensor data report (Period: ) Reprot No:2 International Progress Report IPR-01-05 Äspö Hard Rock Laboratory Backfill and Plug Test Sensor data report (Period: 990601-010101) Reprot No:2 Reza Goudarzi David Gunnarsson Lars-Erik Johannesson Lennart

More information

Use of natural analogues in the Finnish safety case status update on Complementary Considerations

Use of natural analogues in the Finnish safety case status update on Complementary Considerations Use of natural analogues in the Finnish safety case status update on Complementary Considerations Heini Reijonen, Geological Survey of Finland, Espoo, Finland, heini.reijonen@gtk.fi Marja Vuorio, Posiva

More information

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Current Status of the Nuclear Waste Management Programme in Finland 13441

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Current Status of the Nuclear Waste Management Programme in Finland 13441 Current Status of the Nuclear Waste Management Programme in Finland 13441 ABSTRACT Kimmo Lehto and Petteri Vuorio Posiva Oy, Olkiluoto, FI-27160 Eurajoki, Finland (kimmo.lehto@posiva.fi) Pursuant to the

More information

Regulatory Challenges in the Licensing of a Spent Nuclear Fuel Repository in Sweden 14483

Regulatory Challenges in the Licensing of a Spent Nuclear Fuel Repository in Sweden 14483 Regulatory Challenges in the Licensing of a Spent Nuclear Fuel Repository in Sweden 14483 Johan Anderberg Swedish Radiation Safety Authority (SSM), Stockholm, Sweden ABSTRACT Since March 2011, the Swedish

More information

How Spent Fuel Management Affects Geologic Disposal

How Spent Fuel Management Affects Geologic Disposal ?? Vitrified Waste?? Geologic Repository Spent Nuclear Fuel Stored or Processed Fuel How Spent Fuel Management Affects Geologic Disposal Peter Swift Senior Scientist Sandia National Laboratories, USA International

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Used Fuel Disposition R&D Campaign

Used Fuel Disposition R&D Campaign R&D Campaign Evaluating the Feasibility of Deep Borehole Disposal Peter Swift Sandia National Laboratories National Technical Director DOE Office of Nuclear Energy Used R&D Campaign 31 st Spent Management

More information

Geological Disposal Through Global Collaboration

Geological Disposal Through Global Collaboration Geological Disposal Through Global Collaboration Nuclear Waste Management Organization of Japan =Geological Disposal November 2016 NUMOʼs mission The safe and reliable disposal of radioactive waste produced

More information

NWMO CANADIAN USED NUCLEAR FUEL REPOSITORY

NWMO CANADIAN USED NUCLEAR FUEL REPOSITORY NWMO CANADIAN USED NUCLEAR FUEL REPOSITORY - 16314 Jennifer Noronha Nuclear Waste Management Organization 22 St. Clair Avenue East, Toronto, Ontario, M4T-2S3 jnoronha@nwmo.ca Abstract: A brief introduction

More information

Research and development needs in a step-wise process for the nuclear waste programme in Sweden

Research and development needs in a step-wise process for the nuclear waste programme in Sweden Research and development needs in a step-wise process for the nuclear waste programme in Sweden Ström A 1, Pers K 2, Andersson J 1, Ekeroth E 1, Hedin A 1 1 Swedish Nuclear Fuel and Waste Mgmt. Co. (SKB),

More information

Inspection of Friction Stir Welds using Triple Array Methods

Inspection of Friction Stir Welds using Triple Array Methods More Info at Open Access Database www.ndt.net/?id=16618 Inspection of Friction Stir Welds using Triple Array Methods Barend van den Bos 1, Sara Axelsson 1, Ulf Ronneteg 2, Thomas Grybäck 2 1 Exova Materials

More information

The Swedish NGO Office for Nuclear Waste Review. 0 Johan Swahn, The Swedish NGO Office for Nuclear Waste Review, MKG

The Swedish NGO Office for Nuclear Waste Review. 0 Johan Swahn, The Swedish NGO Office for Nuclear Waste Review, MKG The Swedish NGO Office for Nuclear Waste Review 0 Johan Swahn, The Swedish NGO Office for Nuclear Waste Review, MKG Considerations on nuclear waste management in Sweden Dr. Johan Swahn, Director The Swedish

More information

Material Solutions for Challenges in Underground Construction

Material Solutions for Challenges in Underground Construction Material Solutions for Challenges in Underground Construction Dr.-Ing. Edgar Bohner VTT beyond the obvious 1 VTT impact from excellence VTT Technical Research Centre of Finland Ltd is one of the leading

More information

Physical modelling URLs

Physical modelling URLs 30 rd May 07, Prague Physical modelling URLs Radek Vašíček Laboratory investigation Granulometry Particle size distribution (curve) Density (Bulk, Dry, Specific) Water content, Degree of saturation Consistency

More information

NUCLEAR WASTE MANAGEMENT OF THE OLKILUOTO AND LOVIISA POWER PLANTS

NUCLEAR WASTE MANAGEMENT OF THE OLKILUOTO AND LOVIISA POWER PLANTS NUCLEAR WASTE MANAGEMENT OF THE OLKILUOTO AND LOVIISA POWER PLANTS Summary 2017 Kuva: xxxx 2 NUCLEAR WASTE MANAGEMENT OF THE OLKILUOTO AND LOVIISA POWER PLANTS I Summary 2017 Photo: Posiva Oy SUMMARY This

More information

Need for PA in. Site Selection. The road to a final reposito. ory for spent nuclear fuel. Experience. the Swedish. Siting process

Need for PA in. Site Selection. The road to a final reposito. ory for spent nuclear fuel. Experience. the Swedish. Siting process Need for PA in Site Selection the Swedish Experience The road to a final reposito ory for spent nuclear fuel Accumulation of knowledge Siting process Hultsfred Malå Nyköping Oskarshamn Storuman Tierp Älvkarleby

More information

P Forsmark site investigation. Drill hole KFM01A: Indirect tensile strength test (HUT)

P Forsmark site investigation. Drill hole KFM01A: Indirect tensile strength test (HUT) P-04-171 Forsmark site investigation Drill hole KFM01A: Indirect tensile strength test (HUT) Pekka Eloranta Helsinki University of Technology, Rock Engineering June 2004 Svensk Kärnbränslehantering AB

More information

DOPAS EPSP Experiment

DOPAS EPSP Experiment DOPAS EPSP Experiment Jiří Svoboda 1, Radek Vašíček 1, Markéta Dvořáková 2, Václava Havlová 3 1 ČVUT v Praze, Czech Republic 2 SÚRAO, Czech Republic 3 ÚJV a.s., Czech Republic The Experimental Pressure

More information

Used Fuel Container Designs and Lifetime Prediction

Used Fuel Container Designs and Lifetime Prediction Used Fuel Container Designs and Lifetime Prediction CNS Conference on Waste Management, Decommissioning and Environmental Restoration for Canada s Nuclear Activities Toronto, Canada September 11-14, 2011

More information

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2 CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4

More information

The Enhanced Sealing Project, Monitoring a Full-Scale Shaft Seal at Canada s Underground Research Laboratory ( ) 16070

The Enhanced Sealing Project, Monitoring a Full-Scale Shaft Seal at Canada s Underground Research Laboratory ( ) 16070 The Enhanced Sealing Project, Monitoring a Full-Scale Shaft Seal at Canada s Underground Research Laboratory (2009-2015) 16070 Deni Priyanto *, Paul Thompson *, David Dixon **, Petri Korkeakoski ***, Radwan

More information

Location. Bure URL, France (Callovo- Oxfordian claystone-cox) Start date. December Characteristics of swelling clay

Location. Bure URL, France (Callovo- Oxfordian claystone-cox) Start date. December Characteristics of swelling clay Project Acronym NSC (Noyau de Scellement) Location Bure URL, France (Callovo- Oxfordian claystone-cox) Type Field scale experiment Scale ½ (diameter 4.5meters, length 5.1 meters Lead organiser Andra (France)

More information

Principles of Locating, Designing and Constructing Landfills of Hazardous Waste

Principles of Locating, Designing and Constructing Landfills of Hazardous Waste Journal of Earth Sciences and Geotechnical Engineering, vol. 3, no. 3, 2013, 215-221 ISSN: 1792-9040 (print), 1792-9660 (online) Scienpress Ltd, 2013 Principles of Locating, Designing and Constructing

More information

IPR Äspö Hard Rock Laboratory. International Progress Report. Backfill production for Prototype Repository. David Gunnarsson Clay Technology AB

IPR Äspö Hard Rock Laboratory. International Progress Report. Backfill production for Prototype Repository. David Gunnarsson Clay Technology AB International Progress Report IPR-02-20 Äspö Hard Rock Laboratory Backfill production for Prototype Repository David Gunnarsson Clay Technology AB May 2002 Svensk Kärnbränslehantering AB Swedish Nuclear

More information

THE EARLY EVOLUTION OF THE EBS IN SAFETY ASSESSMENTS

THE EARLY EVOLUTION OF THE EBS IN SAFETY ASSESSMENTS THE EARLY EVOLUTION OF THE EBS IN SAFETY ASSESSMENTS Includes PEBS deliverable D1.1 (and D1.2) A PEBS WP1 REPORT Version October 2012, updated after HLEC comments SKB ANDRA NAGRA ENRESA GRS BGR The research

More information

ESV EURIDICE GIE. European Underground Research Infrastructure for Disposal of nuclear waste in Clay Environment

ESV EURIDICE GIE. European Underground Research Infrastructure for Disposal of nuclear waste in Clay Environment 1 ESV EURIDICE GIE European Underground Research Infrastructure for Disposal of nuclear waste in Clay Environment 2 Different types of waste Heat! 4 Volume of radioactive waste based on 40 years of exploitation

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

Roller compactors for the pharmaceutical industry. BT 120 Pharma WP 120 Pharma WP 150 Pharma WP 200 Pharma

Roller compactors for the pharmaceutical industry. BT 120 Pharma WP 120 Pharma WP 150 Pharma WP 200 Pharma Roller compactors for the pharmaceutical industry BT 120 Pharma WP 120 Pharma WP 150 Pharma WP 200 Pharma Roller compactors for the pharmaceutical industry Compaction and granulation in the pharmaceutical

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Fracking - Prevention of Leakage of Oil and Gas from Abandoned Holes in Consolidated Rock

Fracking - Prevention of Leakage of Oil and Gas from Abandoned Holes in Consolidated Rock Journal of Earth Sciences and Geotechnical Engineering, vol. 6, no.1, 2016, 19-27 ISSN: 1792-9040 (print), 1792-9660 (online) Scienpress Ltd, 2016 Fracking - Prevention of Leakage of Oil and Gas from Abandoned

More information

Complementary considerations in the safety case, support from natural analogues and natural systems

Complementary considerations in the safety case, support from natural analogues and natural systems Complementary considerations in the safety case, support from natural analogues and natural systems Anne Lehtinen 13 th NAWG Workshop, May 13 th -16 th 2013, Nagoya www.posiva.fi/en Outline Introduction

More information

6. Annular Space & Sealing

6. Annular Space & Sealing (this age left intentionally blank) Chapter Description Chapter Table of Contents Chapter Description... 6 Regulatory Requirements Annular Space & Sealing of a New Well... 6 Relevant Sections The Wells

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

IPR Äspö Hard Rock Laboratory. International Progress Report

IPR Äspö Hard Rock Laboratory. International Progress Report International Progress Report IPR-01-34 Äspö Hard Rock Laboratory Compilation of laboratory data for buffer and backfill materials in the Prototype Repository Lennart Börgesson Clay Technology AB August

More information

Corrosion of copper in final disposal environments. Jari Aromaa Aalto Unversity Hydrometallurgy and Corrosion Research Group

Corrosion of copper in final disposal environments. Jari Aromaa Aalto Unversity Hydrometallurgy and Corrosion Research Group Corrosion of copper in final disposal environments Jari Aromaa Aalto Unversity Hydrometallurgy and Corrosion Research Group Contents The concept Corrosive environments Copper corrosion mechanisms Copper

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

DOPAS Training Workshop 2015

DOPAS Training Workshop 2015 DOPAS Training Workshop 2015 Requirements Management General Introduction Marjatta Palmu, Posiva Oy 14 September 2015 D1 1.2.2 The research leading to these results has received funding from the European

More information

Design of the Repository for High Level Waste in Sweden. Rolf Christiansson Swedish Nuclear and Fuel Waste Management Co (SKB)

Design of the Repository for High Level Waste in Sweden. Rolf Christiansson Swedish Nuclear and Fuel Waste Management Co (SKB) Design of the Repository for High Level Waste in Sweden Rolf Christiansson Swedish Nuclear and Fuel Waste Management Co (SKB) WWW.SKB.SE Content 1. Introduction. The system, the facility (construction

More information

DETAILED PROJECT PLAN Update 09/2011

DETAILED PROJECT PLAN Update 09/2011 DETAILED PROJECT PLAN Update 09/2011 Large Underground Concept Experiments LUCOEX Work Package 5: KBS- 3V Emplacement tests in ONKALO (EMP) Author: Posiva Oy / Keijo Haapala 2 Contents 1. General information...

More information

Deep Geological Disposal of Spent Fuel in Sweden

Deep Geological Disposal of Spent Fuel in Sweden Deep Geological Disposal of Spent Fuel in Sweden Christopher Eckerberg President Swedish Nuclear Fuel and Waste Management Corporation Early decisions Early decisions on: Direct disposal Independent interim

More information

Water Well Decommissioning Guidelines

Water Well Decommissioning Guidelines Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well

More information

International Bentonite Longevity (IBL) project: an introduction

International Bentonite Longevity (IBL) project: an introduction International Bentonite Longevity (IBL) project: an introduction H.M.Reijonen 1, M.Ito 2 & W.R.Alexander 3 1. Geological Survey of Finland (GTK), Espoo, Finland (heini.reijonen@gtk.fi) 1 2. Kunimine Industries,

More information

ABM PM December 04, Page 1. Welcome to Alternative Buffer Material Project meeting , Lund T C LAY ECHNOLOGY AB

ABM PM December 04, Page 1. Welcome to Alternative Buffer Material Project meeting , Lund T C LAY ECHNOLOGY AB Page 1 Welcome to Alternative Buffer Material Project meeting 2008-12-04, Lund Agenda 08:30 General project information Torbjörn Sandén Page 2 Introduction to Analysis and SKB part Daniel Svensson AECL

More information

BENTONITE AND ITS USES

BENTONITE AND ITS USES BENTONITE AND ITS USES The Bentonite range of products produced by JNJ Resources Company is a quality sodium bentonite comparable to the best of the known deposits in Australia. Bentonite is a generic

More information

Abandoned mines as hazardous waste repositories in Europe

Abandoned mines as hazardous waste repositories in Europe Abandoned mines as hazardous waste repositories in Europe Kaliampakos Dimitrios, Assistant Professor National Technical University of Athens 9 Heroon Polytechniou str. Athens, Greece mmesdk@central.ntua.gr

More information

Postclosure Assessment Modelling of a Deep Geologic Repository for Low and Intermediate Level Radioactive Waste in Ontario, Canada

Postclosure Assessment Modelling of a Deep Geologic Repository for Low and Intermediate Level Radioactive Waste in Ontario, Canada Postclosure Assessment Modelling of a Deep Geologic Repository for Low and Intermediate Level Radioactive Waste in Ontario, Canada - 15145 Russell C Walke*, Richard H Little*, Helen Leung** * Quintessa

More information

Experimental study of a swelling clay application to the radioactive waste storage R. Lahlou

Experimental study of a swelling clay application to the radioactive waste storage R. Lahlou Experimental study of a swelling clay application to the radioactive waste storage R. Lahlou Souterraines de Stockage (G.3S), Ecole Poly technique, 91 128 Palaiseau Cedex, France ABSTRACT The storage of

More information

Disposal Options for Radioactive Waste

Disposal Options for Radioactive Waste Disposal Options for Radioactive Waste Stefan Mayer, IAEA 8th edition of the International Summer School on Nuclear Decommissioning and Waste Management 1st Workshop on Planning R&D towards Geological

More information

Retrievability in the BAMBUS-II Project. J.B. Grupa. NRG, the Netherlands

Retrievability in the BAMBUS-II Project. J.B. Grupa. NRG, the Netherlands Retrievability in the BAMBUS-II Project J.B. Grupa NRG, the Netherlands Summary In the context of radioactive waste disposal retrievability can be defined as the capability of waste package retrieval afforded

More information

Initial Plug and Seal Design for the Dutch Repository Concept (PPT)

Initial Plug and Seal Design for the Dutch Repository Concept (PPT) Delft University of Technology Initial Plug and Seal Design for the Dutch Repository Concept (PPT) Vardon, Phil; Yuan, Jiao; Hicks, Michael; Li, Yajun Publication date 2016 Citation (APA) Vardon, P., Yuan,

More information

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS IAC 5/12/93, 4/8/98 Environmental Protection[567] Ch 39, p.1 IAC 5/12/93, 4/8/98 CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS 567 39.1(455B) Purpose. The purpose of this chapter is to

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA A Prototype Performance Assessment Model for Generic Deep Borehole Repository for High-Level Nuclear Waste 12132 Joon H. Lee, Bill W. Arnold, Peter N. Swift, Teklu Hadgu, Geoff Freeze, and Yifeng Wang

More information

Present status of the Swedish nuclear waste management programme

Present status of the Swedish nuclear waste management programme Present status of the Swedish nuclear waste management programme Peter Wikberg, SKB The Swedish system for nuclear waste disposal The Canister Laboratory Nuclear Power Plant (1972) Spent nuclear fuel CLAB

More information

gas production, consumption and transport in deep geological repositories

gas production, consumption and transport in deep geological repositories gas production, consumption and transport in deep geological repositories 2 Considering gas in the safety demonstration ENSI requires Nagra to demonstrate the longterm safety of a deep geological repository

More information

RADIOACTIVE WASTE AND MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES SWEDEN [2010] NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE AND MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES SWEDEN [2010] NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE AND MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES SWEDEN [2010] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Sweden started in 1972 and as of 2010 ten

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

WELL DECOMMISSIONING

WELL DECOMMISSIONING 351-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD WELL DECOMMISSIONING (No.) CODE 351 DEFINITION The sealing and permanent closure of a water well no longer in use. PURPOSE Prevent

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

Roadmap towards developing a DGR programme

Roadmap towards developing a DGR programme Roadmap towards developing a DGR programme Haeryong Jung Waste Technology Section Department of Nuclear Energy International Atomic Energy Agency (IAEA) 8th edition of the International Summer School on

More information

LUCOEX CONFERENCE OSKARSHAMN

LUCOEX CONFERENCE OSKARSHAMN LUCOEX CONFERENCE OSKARSHAMN FE/LUCOEX: QA/QC during granulated bentonite material production and emplacement Hanspeter Weber, Benoit Garitte, Sven Köhler, Herwig Müller (Nagra) Posiva, Andra, SKB, Nagra

More information

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad Soil Compaction Chapter (6) Instructor : Dr. Jehad Hamad 1 2017-2016 What is Compaction? In most instances in civil engineering and/or construction practice, whenever soils are imported or excavated and

More information

UNDERGROUND CHARACTERISATION AND RESEARCH FACILITY ONKALO ANTTI IKONEN, MIA YLÄ-MELLA, TIMO ÄIKÄS POSIVA Oy Olkiluoto, Finland

UNDERGROUND CHARACTERISATION AND RESEARCH FACILITY ONKALO ANTTI IKONEN, MIA YLÄ-MELLA, TIMO ÄIKÄS POSIVA Oy Olkiluoto, Finland UNDERGROUND CHARACTERISATION AND RESEARCH FACILITY ONKALO ANTTI IKONEN, MIA YLÄ-MELLA, TIMO ÄIKÄS POSIVA Oy 27160 Olkiluoto, Finland 1. Introduction ABSTRACT Posiva s repository for geological disposal

More information

DHI Sverige AB, Honnörsgatan 16, P.O. Box 3289, SE Växjö, Sweden, 3

DHI Sverige AB, Honnörsgatan 16, P.O. Box 3289, SE Växjö, Sweden,   3 Hydrological and Hydrogeological Effects of a Deep-Rock Repository for Spent Nuclear Fuel in Sweden: Application of a New Coupling Routine between MIKE SHE and MOUSE Erik MÅRTENSSON 1, Lars-Göran GUSTAFSSON

More information

Safe disposal of spent nuclear fuel The KBS-3 method. Olle Olsson SKB

Safe disposal of spent nuclear fuel The KBS-3 method. Olle Olsson SKB Safe disposal of spent nuclear fuel The KBS-3 method Olle Olsson SKB 1 Why SKB? The nuclear power industry is responsible for taking care of its own waste. The industry has formed SKB to fulfill this task

More information

Endex Foam Extrusion General Information Guide

Endex Foam Extrusion General Information Guide Endex International Innovation for the Future Endex Foam Extrusion General Information Guide Section 01 - Foam Extrusion Foam extrusion, in simple terms, consists of mixing a chemical foaming agent with

More information

Better wet granulation: development, scale-up and manufacture

Better wet granulation: development, scale-up and manufacture Better wet granulation: development, scale-up and manufacture By Tim Freeman, Freeman Technology Wet granulation is a common unit operation in the pharmaceutical industry yet accurate endpoint detection

More information

Nuclear waste management of the Olkiluoto and Loviisa power plants

Nuclear waste management of the Olkiluoto and Loviisa power plants Nuclear waste management of the Olkiluoto and Loviisa power plants Summary of the activities during 2009 Images in the cover demonstrate the welding of the copper canister lid, inspection station for canister

More information

Swedish Nuclear Fuel and Waste Management Company

Swedish Nuclear Fuel and Waste Management Company Swedish Nuclear Fuel and Waste Management Company Saida Laârouchi Engström, Vice President Whatever our beliefs... Nuclear power in Sweden Sweden has ten operational nuclear reactors. The nation's largest

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

Mix Design and Pumped Concrete

Mix Design and Pumped Concrete Mix Design and Pumped Concrete A simple method of concrete mix design for pumpable concrete based on an estimated weight of the concrete per unit volume is described in the paper. The tables and figures

More information

The interface between nuclear safeguards and radioactive waste disposal: Emerging issues

The interface between nuclear safeguards and radioactive waste disposal: Emerging issues The interface between nuclear safeguards and radioactive waste disposal: Emerging issues Experts are examining requirements and policies for applying safeguards at geological waste repositories and related

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

TEST PLAN. Constant Head Saturated Hydraulic Conductivity Measurements on Repacked Core Samples

TEST PLAN. Constant Head Saturated Hydraulic Conductivity Measurements on Repacked Core Samples NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE TEST PLAN TITLE: Constant Head Saturated Hydraulic Conductivity Measurements on Repacked Core Samples REVISION: 0 DATE: 4-1-04 PAGE: 1 of 8 TEST PLAN

More information

Wood Densification WHAT IS WOOD DENSIFICATION? 2. Pellets - small cylinders about 1/2 to 1-1/2 inches in diameter and about 1 to 2 inches

Wood Densification WHAT IS WOOD DENSIFICATION? 2. Pellets - small cylinders about 1/2 to 1-1/2 inches in diameter and about 1 to 2 inches West Virginia University Extension Service Publication No. 838 Wood Densification WHAT IS WOOD DENSIFICATION? Wood densification is the process of taking wood by-products (manufacturing residues) such

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

C-40 (May 13) Managing integration of pre-closure activities and post-closure safety in the Safety Case for Geological Disposal

C-40 (May 13) Managing integration of pre-closure activities and post-closure safety in the Safety Case for Geological Disposal C-40 (May 13) Managing integration of pre-closure activities and post-closure safety in the Safety Case for Geological Disposal FOREWORD One of the IAEA s statutory objectives is to seek to accelerate

More information

DOPAS TRAINING WORKSHOP Case Example of EPSP Experiment. Marketa Dvorakova SURAO

DOPAS TRAINING WORKSHOP Case Example of EPSP Experiment. Marketa Dvorakova SURAO DOPAS TRAINING WORKSHOP 2015 1.3.1 Case Example of EPSP Experiment Marketa Dvorakova SURAO 14.9.2015 Outline of the Lecture EPSP Project Goals Requirements on the EPSP Plug Design of the EPSP Experiment

More information

Crushing. Comminution

Crushing. Comminution Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully

More information

Nuclear Energy Fundamentals

Nuclear Energy Fundamentals Nuclear Energy Fundamentals PREPARED BY Academic Services April 2012 Institute of Applied Technology, 2012 Module Objectives Upon successful completion of this module, students will be able to: Identify

More information

Providing proper drainage system

Providing proper drainage system Environment Friendly and Cost Effective Alternative to Conventional Graded Filters Providing proper drainage system for structures such as earth retaining structures, pavements, water front structures,

More information

3- Highway Materials Aggregates

3- Highway Materials Aggregates 3- Highway Materials Aggregates Highway Materials/ Aggregates Aggregates are granular mineral particles that are widely used for highway bases, subbases, and backfill. Aggregate are also used in combination

More information

Instrumentation and Evaluation of the Concrete Dome Plug DOMPLU RICHARD MALM. Division of Concrete Structures KTH, SE Stockholm

Instrumentation and Evaluation of the Concrete Dome Plug DOMPLU RICHARD MALM. Division of Concrete Structures KTH, SE Stockholm i Instrumentation and Evaluation of the Concrete Dome Plug DOMPLU RICHARD MALM Stockholm 2015 TRITA-BKN, Report 147 KTH Civil and Architectural Engineering Division of Concrete Structures KTH, SE-100 44

More information

Monitoring programme for underground rock characterization facility

Monitoring programme for underground rock characterization facility Geo-Environment and Landscape Evolution II 423 Monitoring programme for underground rock characterization facility K. Lehto & J. Lahdenperä Posiva Oy, Finland Abstract Posiva is a Finnish nuclear waste

More information

Effect of Hydrogen Absorption on SCC of Copper in Deoxygenated Sulfide and Chloride Containing Water

Effect of Hydrogen Absorption on SCC of Copper in Deoxygenated Sulfide and Chloride Containing Water Effect of Hydrogen Absorption on SCC of Copper in Deoxygenated Sulfide and Chloride Containing Water Hannu Hänninen, Antti Forsström, Yuriy Yagodzinskyy Aalto University School of Engineering KYT2018 2

More information