1 PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION BLASTING & ROCK REMOVAL REQUIREMENTS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section To eliminate any controversy as to how much sub surface fixed rock currently exists on site and the removals required for the installation of all infrastructure and utilities outside the new STEM building footprint (including but not limited to) landscape site, drainage, storm, sanitary, gas, water, electric underground, building foundations, footings, other buried utilities, lamp posts and utility poles etc, The General Contractor shall base all excavation costs on existing grade elevations as top of fixed rock at all areas beyond 5 feet perimeter of the new building footprint. For areas within the building pad foot print, the site was previously cleared and prepared under separate contract. The rock was fractured and removed to elevations via a blasting method to elevations and depths identified on Drawing C-3 Excavation and Grading Plan Last Dated 11/18/16 Prepared by Comerro Coppa Architects (Enclosed). See also Drawing PC-043 Partial Topographical Survey, prepared by Boswell Engineering, dated 12/20/16. Grading at the building pad area is filled with blasted fractured rock varying in size with a 4-6 layer of crushed stone atop. Depths identified of fractured rock can be anticipated for excavation at the building pad area. Similar condition exists for the filled level area on the western portion of the site. Enclosed at the end of this section are the following reference documents as it relates to subsurface and existing topography conditions for the project: 1.) Geotechnical Report prepared by SESI Consulting Engineer s Dated September 8, 2016 and Drawing Fig-1 Boring and test Pit Location Plan Dated 9/23/16. 2.) Geotechnical Review Letter prepared by SESI Consulting Engineer s Dated October 14, ) Drawing C-3 Excavation and Grading Plan (building footprint) Last Dated 11/18/16 Prepared by Comerro Coppa Architects 4.) Drawing BP-1 Utility Boring Location Plan Dated 12/19/16 Prepared by Comerro Coppa Architects. 5.) Drawing PC-043 Partial Topographical Survey, prepared by Boswell Engineering, dated 12/20/16 The above listed documents are issued for information only. If the General Contractor bases cost on the pit/boring depths, and additional rock needs to be removed, under no circumstances will additional cost be incurred by the Owner. Each Contractor shall assume his own fluff factor as it pertains to fill quantities. All excessive site material left over after suitable fill and final grading, per the Civil Drawings, not used in the construction will be disposed of at the General Contractor s expense and included as part of the overall base bid. Refer to specification Earthwork for additional information. 1.2 SUMMARY A. All blasting must be performed in conformance with Federal and State ordinances. Compliance at these levels for vibration and air blast eliminates the probability of damage to structures as determined by the United States Department of Interior. BLASTING REQUIREMENTS AND ROCK REMOVAL
2 PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 B. The General Contractor is responsible to conduct pre-blast surveys of any on site and nearby off-site structures within 250 feet of blasting to avoid any unsubstantiated claims for damage from blasting vibration. In compliance with the State of New Jersey blasting regulations, all blasting must be monitored using approved seismographs placed adjacent to the closest buildings or other sensitive structures, like the hospital and high school. A copy of these recordings must be made available to the general contractor within 24 hours of a blast. Seismic monitoring must be done at nearest structure not owned by the County of Passaic. C. Related Sections: 1. Division 2 Section Earthwork. 2. Division 1 Section Coordination. 2.1 GENERAL BLASTING REQUIREMENTS: A. Explosives shall be stored, handled and employed in accordance with the federal and state regulations. B. All licenses and insurance requirements for the State of New Jersey must be met. C. No explosives will be stored overnight on site. D. No blasting shall be conducted on weekends or state holidays E. Before Drilling and Blasting, excessive overburden to the top of rock shall be removed. F. Blasting Mats should be utilized at the discretion of the person in charge of the blasting. G. A maximum diameter drill hole size of 3 ½ shall be utilized. H. Only standard explosives and blasting accessories prepared by appropriate manufacturing firms shall be used. No pumpable explosives shall be used to avoid the overloading of blast holes, particularly when voids are encountered. 2.2 BLASTING LIMITS A. Peak Particle Velocity Limits will be as per the site, the maximum peak particle velocity shall not exceed State of New Jersey Explosives regulations. B. Air Blast Limits The maximum air blast measured at the nearest structure should not exceed 130 decibels as measured by an approved instrument. C. Aside from these limits, All blasting shall comply with New Jersey Explosives regulations N.J.A.C 12:190. END OF SECTION BLASTING REQUIREMENTS AND ROCK REMOVAL
3 KATTAK PARKWAY VALLEY VIEW ROAD BUILDING MAIN F.F G.F GARAGE & TRAINING BLDG. F.F F.F BUILDING BURN EXERCISE BP-1 PASSAIC COUNTY TECHNICAL INSTITUTE NEW S.T.E.M. BUILDING WAYNE, NEW JERSEY
4 C-3 PASSAIC COUNTY TECHNICAL INSTITUTE NEW S.T.E.M. BUILDING WAYNE, NEW JERSEY
5
6 B B yy JP 1" = 80' B B-4 TP TP TP TP-4 B GAS GAS B GAS GAS GAS GAS B TP TP-6 BENCHMARK #2 BENCHMARK #1 TP TP TP TP TP TP TP TP TP-16 TP TP TP-19 TP SCALE: 1"=80' LEGEND: NEW S.T.E.M. BUILDING 45 REINHARDT ROAD WAYNE, NJ BORING AND TEST PIT LOCATION PLAN B-1 - APPROX. LOCATION AND NO. OF BORING TP-1 - APPROX. LOCATION AND NO. OF TEST PIT 9348 SESI CONSULTING ENGINEERS 2016 This drawing and all information contained heron is proprietary information of SESI CONSULTING ENGINEERS and may not be copied or reproduced, either in whole or in part, by any method, without written permission of SESI CONSULTING ENGINEERS. REFERENCE 1. BUILDING DATA TAKEN FROM PLAN PREPARED BY BOSWELL ENGINEERING. 2. SITE TOPOGRAPHY TAKEN FROM "SITE PLAN" PREPARED BY COMERRO COPPA ARCHITECTS, DATED AUGUST 11, BORING & TEST PIT LOCATION & ELEVATIONS PROVIDED BY GB ENGINEERING, SURVEY DATED AUGUST 15, GROUND SURFACE ELEVATION - APPROX. ROCK ELEVATION FIG-1 of 1
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 02010 - PROJECT SURVEY AND LAYOUT PART 1 GENERAL 1.01 WORK INCLUDED A. The Contractor shall employ a New Jersey Licensed Land Surveyor to do all necessary surveying required to construct all elements
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSECTION ROCK REMOVAL
SECTION 31 23 16.26 ROCK REMOVAL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to perform rock
More informationPOTENTIAL IMPACTS TO GROUNDWATER FLOW AND NYANZA SUPERFUND LINER AND CAP SYSTEM
File No. 116066-000 Community Health and Development Department 101 Main Street Ashland, MA 01721 Attention: Mr. Nathaniel Strosberg Subject: Blasting Impacts on Nyanza Cap and Groundwater Flow Proposed
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-5 Issue date: July 2012 SUBSURFACE (GEOTECHNICAL) INVESTIGATION PROCEDURE 1. General: Provide project specific foundation and soils (geotechnical) investigation as required to comply with
More informationSECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.
SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required
More informationDepartment of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA
Revised May 17, 2011 Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA INTRODUCTION These criteria are established to provide uniform construction practices and
More informationTOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements
TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves
More informationImplementation of this Special Provision requires a complete understanding of the following documents:
VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009
More informationPUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD
PUBLIC NOTICE The Township of Union has adopted the Fair and Open Process of the Pay-to-Play Law (N.J.S.A. 19:44A-20a, et seq.) in its request for proposals and awarding goods and services contracts with
More informationSection XXV Preconstruction Assessments and Damage Mitigation Procedures
Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding
More informationFile No Supplemental November Geotechnical and Environmental Consulting Engineers
Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction
More informationHDD Training. Mitigation. Mark Miller, PE Jon Robison, PE
HDD Training Mitigation Mark Miller, PE Jon Robison, PE Mitigating HDD Risks HDD construction risks need to be evaluated during the design process to reduce the risk of schedule delays, damage to existing
More informationMINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS
Planning and Community Preservation Department Public Works Department 232 West Sierra Madre Boulevard Sierra Madre, CA 91024 (626)355-7135 MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE
More informationThis specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.
SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and
More informationSECTION XXXXX STONE COLUMNS PART 1 - GENERAL
SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationGeotechnical, Hydrological and Environmental Assessment
Geotechnical, Hydrological and Environmental Assessment Presented by Moustafa Gouda, P.E., D. GE, F.ACSE Director of Geotechnical & Environmental Engineering Services Maser Consulting P.A. Planning Board
More informationSECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section
02011-1 of 5 SECTION 02011 SUBSURFACE INVESTIGATION 02011.01 GENERAL A. Description Subsurface investigation shall include, but not necessarily be limited to, drilling test holes (in rock), auguring holes,
More informationAztec Substation. Demolition Specifications. May 13, 2016
Aztec Substation Demolition Specifications May 13, 2016 GENERAL REQUIREMENTS I. Applicability of Requirements Requirements listed within shall apply to the earthworks involved with the demolition of the
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More information1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings
G U I D E L I N E S F O R L A N D O W N E R S, D E V E L O P E R S A N D C O N T R A C T O R S T A B L E O F C O N T E N T S 1 Introduction 2 Office Locations/Map 3 General Requirements 4 Structures and
More informationSECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.
SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction
More informationCITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:
CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST "THE FOLLOWING CHECKLIST IS ONLY A SUMMARY THAT IS PROVIDED FOR THE APPLICANT'S BENEFIT; HOWEVER, FULFILLING THE REQUIREMENTS OF THIS SUMMARY
More informationAPRIL 2017 UNDER CONSTRUCTION
APRIL 2017 UNDER CONSTRUCTION Highway construction is a complicated process that involves many tasks. Some of these, by nature, have an impact on nearby residents. To minimize these impacts, the Pennsylvania
More information20 North Main Alpine, UT (Phone) (Fax) SITE PLAN
Site Plan Instructions New Home Form #1 20 North Main Alpine, UT 84004 801-756-6347 (Phone) 801-756-1189 (Fax) www.alpinecity.org SITE PLAN A detailed site plan, drawn to scale, 1 = 20 min., shall be filed
More informationOrdinance No Lot Surface Drainage
Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section
More informationADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)
Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)
More informationTown of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /
Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationGENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 120 NOVEMBER 2014 GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES TABLE OF CONTENTS 120.01 SCOPE 120.02 REFERENCES 120.03 DEFINITIONS 120.04 DESIGN
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationMPA Project No. M545-C1 Project Title: New Berth 10 & Berth 11 Deepening Project Phase I Location: Conley Terminal, South Boston, Massachusetts
MPA Project No. M545-C1 Project Title: New Berth 10 & Berth 11 Deepening Project Phase I Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s Date: 04/27/18 The attention
More informationCOMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS
DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling
More informationREQUEST FOR CONSTRUCTION BIDS February 22, 2010
REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through
More information2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationDivision 02 - Site Work Section
NWIT-11-26 Page 1 1 GENERAL 1.1 REQUIREMENTS INCLUDED.1 Furnish all labour, material, services and equipment necessary to carry out and complete excavation work and shoring, as indicated on the drawings
More informationCUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN
SPIRIT LIVING GROUP 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA 100 HELENS LANE MILL VALLEY, CA 94941 415 388 9585 F 415 388 0412 CPD ENGINEERS / SURVEYORS / PLANNERS 1646 N CALIFORNIA BLVD SUITE 400 WALNUT
More informationFlorence County Government
Florence County Government Procurement Department April 29, 2016 ADDENDUM NO.1- CONSTRUCTION OF A BOARDWALK AND FISHING PIERS AT LAKE CITY PARK PROJECT (BID NO. 35-15/16) The following changes shall be
More informationSECTION 14 EMBANKMENT
SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationBUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE
BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE Please Note: No construction, including site preparation (grading, excavating, vegetation removal, etc.), will be allowed until a building permit or
More informationGRADING PLAN CHECKLIST. To: Date: Project: Site Address: Plan No.: Check No: Attn: Via:
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 GRADING PLAN CHECKLIST To: Date: Project: Site Address: Plan No.: Check No: Attn: Via: The attached plans
More informationGRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:
PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS
More information6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION
6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION SYSTEMS REQUIREMENTS SITE PREPARATION TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group
More informationSECTION STRUCTURE EXCAVATION AND EARTHWORK
SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES
More informationPROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203
October 4, 2017 Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 P: 888.900.3823 E: jscwab@schwabeng.com Re: Geotechnical Engineering Letter Report VAMC Bldg 202 Domiciliary C-D Entryway
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationNEW S.T.E.M. BUILDING NO
PROJECT MANUAL AND SPECIFICATIONS FOR PASSAIC COUNTY TECHNICAL INSTITUTE WAYNE, NEW JERSEY NEW S.T.E.M. BUILDING NO. 17-11 ARCHIT ECT: COMERRO COPPA ARCHITECTS, P.C. 97 LACKAWANNA AVENUE TOTOWA, NEW JERSEY
More informationGRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011
GRADING GUIDELINES Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011 County Surveyor - Building Inspection - Drainage - Floodplain - Special
More informationCITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL
CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor
More informationSTORMWATER AND EROSION CONTROL PERMIT
STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project
More informationSTORMWATER AND EROSION CONTROL PERMIT
STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project
More informationTECHNICAL NOTE HDPE Pipe and Utility Crossings
TECHNICAL NOTE HDPE Pipe and Utility Crossings TN 5.09 April 2008 Introduction Underground utilities include storm sewer, electric, sanitary sewer, gas, water, telephone and cable. Utility conflicts are
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationCity of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements
Table of Contents City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements General Requirements Application & Processing Procedures o Plan Requirements
More informationI. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT
Revised August 2005 I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Before the applicant submits improvement plans and reports for Engineering plan checking, the applicant shall contact
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationROBINSON TOWNSHIP th Avenue, Grand Haven, Michigan
ROBINSON TOWNSHIP 12010-120 th Avenue, Grand Haven, Michigan 49417 616-846-2210 REQUEST FOR EARTH CHANGE - CLASS A REQUEST FEE: $150.00 + ESCROW FEE MINIMUM OF $300.00 (Escrow fees cover additional Township
More informationSTANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000
DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories
More informationGRADING PERMIT APPLICATION
Butte County Department of Public Works Butte County Department of Development Services/Planning Division 7 County Center Drive, Oroville, CA 95965 (530) 538-7266 / (530) 538-7601 GRADING PERMIT APPLICATION
More informationCITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS
REQUIRED INSPECTIONS FOR GRADING CITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS The following is a list of normally required inspection to be made by the City Inspector: A.
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.
More informationCITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT
CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT The following checklist identifies the minimum requirements for acceptance of an application for
More informationA. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE
Chapter 17: Construction A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter discusses the various activities that would be involved in constructing Hamilton Green. The potential for significant adverse
More informationBelow are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.
Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red. Index Sec. 10-23. Solar Energy Systems Article 9. Use Matrix
More informationWHAT YOU SHOULD KNOW ABOUT CONTROLLED BLASTING LAS VIRGENES MUNICIPAL WATER DISTRICT WATER STORAGE TANK PROJECT
WHAT YOU SHOULD KNOW ABOUT CONTROLLED BLASTING LAS VIRGENES MUNICIPAL WATER DISTRICT WATER STORAGE TANK PROJECT By: Gordon F. Revey, P.Eng. MEETING OUTLINE AND SCOPE Description of Project Blasting Locations
More informationTERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD
TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete
More informationIncorporated Village of Lawrence
Incorporated 196 Central Ave Lawrence NY 11559 516-239-3987 Fax 516-239-9657 Building Department Permit Application Instructions Application must be complete Application must be accompanied by a filing
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More informationUNINCORPORATED JACKSON COUNTY BUILDING PERMITS
UNINCORPORATED JACKSON COUNTY BUILDING PERMITS May, 2014 Department of Public Works Planning and Environmental Health PREFACE The purpose of this manual is to provide an overview of the procedures to apply
More informationFrequently Asked Questions. Rebuilding After the 2017 Redwood Complex Fire
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 N. Bush Street- Ukiah, California 95482 Telephone 707-234-6650 Fax 707-463-5709 Rebuilding After the 2017 Redwood Complex Fire 1. When
More informationG&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.
Page 1 of 4 WORK INSTRUCTIONS FOR ENGINEERS Compiled by Checked by Approved by KYW : : TYC : LSS OP-3-57. (ROCK EXCAVATION) Page 2 of 4 NO. CHECKLIST ITEMS PROJECT Project Name : Project No.: Checked By
More informationUTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES
GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION
More information1 st Edition. Western Canada Chapter of the International Society of Explosives Engineers Best Practices Guide for Urban Blasting Operations
Western Canada Chapter of the International Society of Explosives Engineers Best Practices Guide for Urban Blasting Operations 1 st Edition Best Practices Guide for Urban Blasting Operations Draft Document
More informationSECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.
SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom
More informationPERMITTING AND CONSTRUCTION MANUAL
PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application
More informationCITY OF ST. MICHAEL WRIGHT COUNTY, MINNESOTA ORDINANCE NO THE CITY COUNCIL OF THE CITY OF ST. MICHAEL HEREBY ORDAINS:
CITY OF ST. MICHAEL WRIGHT COUNTY, MINNESOTA ORDINANCE NO. 1507 AN ORDINANCE AMENDING SECTION 155.073 OF THE ST. MICHAEL CODE TO ADD DEFINITIONS FOR SOLAR ENERGY SYSTEMS, AND ADD COMMUNITY SOLAR GARDEN
More informationAPPLICATION FOR A SITE CONSTRUCTION PERMIT
CITY OF KLAMATH FALLS PUBLIC WORKS ENGINEERING 226 S. 5 th St., Klamath Falls, OR 97601 Phone (541) 883-5368 Fax (541) 883-5287 APPLICATION FOR A SITE CONSTRUCTION PERMIT For City Use Only: APPLICATION
More informationSECTION 2 TRENCH AND STRUCTURE EXCAVATION, BACKFILL AND COMPACTION
SECTION 2 TRENCH AND STRUCTURE EXCAVATION, BACKFILL AND COMPACTION 2.01 GENERAL. A. Scope. This section covers excavation, trenching, backfilling and grading incidental to the construction of sewers, pipelines
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,
More informationCommercial Submittal Packet
Commercial Submittal Packet City of Pepper Pike Building Department 28000 Shaker Boulevard Pepper Pike, Ohio 44124 Phone: (216) 896-6134 Fax: (216) 831-6525 www.pepperpike.org Submitting for the Architectural
More informationSITE PLAN AND ARCHITECTURAL REVIEW APPLICATION
SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote
More informationDate: December 7, 2017 Project No.:
Date: December 7, 2017 Project No.: 608-5-2 Prepared For: Mr. Alberto Vasquez SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation
More informationTable Related Arlington County Standards, Specification and Policies
2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements
More informationThis section describes blasting procedures for excavation.
SECTION 312310 BLASTING PART 1 - GENERAL 1.01 DESCRIPTION This section describes blasting procedures for excavation. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Earthwork: 312300. B. Trenching, Backfilling,
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationTopographical & Geotechnical Surveys
STANDARD TEXT GUIDELINE FOR Topographical & Geotechnical Surveys for ELEMENTARY AND SECONDARY SCHOOLS Prepared by the Design Department DATE ISSUED MARCH 2002 REVISION NO. 1: JANUARY 2003 REVISION NO.
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationFrequently Asked Questions about Blasting at Richardson Ridge
Frequently Asked Questions about Blasting at Richardson Ridge 1. Who is Richardson Ridge? Richardson Ridge is a company formed to plan, develop and to provide building lots for the partnership consisting
More informationGRADING PLAN CHECKLIST
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 GRADING PLAN CHECKLIST To: Attn: Date: Project: Address: Plan Check #: Check #: VIA: The attached plans have
More informationSECTION HORIZONTAL DIRECTIONAL DRILLING
SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using
More informationZoning Ordinance Chapter 7
CHAPTER 7 - HILLSIDE SECTION 7.0 GENERAL A. Purpose: To allow for the reasonable use and development of hillside areas while promoting the public health, safety, and general welfare of the citizens of
More informationTECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma
10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore
More informationSECTION EXCAVATION AND FILL
SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to