1 TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete roadway reconstruction on Edinburgh Road from Speedvale Avenue to London Road. The hiring of Consultant Services is to be considered as an extension of City Staff and as such Consultant Staff are expected to conduct themselves as representatives of the City. City Staff will be part of the Project Team to provide limited support and guidance to the Consultant(s) as required. The Consultant(s) shall complete the preliminary design, final design, coordinate all related project needs, tendering, contract administration and resident services during construction of improvements to the roadway, underground services, drainage, traffic services and other related infrastructure. A dedicated and independent environmental Inspector is to be provided for to ensure that the environmental protection recommendations in any agency approval conditions are complied with during the Road reconstruction period. All design work must be completed in accordance with City of Guelph standards. In conjunction with the normal utility agencies affected by the proposed works, design considerations and streetscape improvements are to be coordinated with the Neighbourhood Association (if one exists), and any other special interest groups or County and City Committees and Departments. PROJECT MANAGEMENT REQUIREMENTS It is expected that the Project Manager for the consultant will coordinate all aspects of the preliminary design, final design, administrative, construction and maintenance phases of the Project. The Project Manager will be the primary contact for the City and Contractor and any related agencies. Quality Assurance will ultimately rest with the Project Manager. GENERAL SCHEDULE Final Design of Projects to be complete by December Anticipated construction tender to occur in January Public Information Centres shall be held at 60% design and prior to tender advertisement. Anticipated start of construction in April Warranty period to expire 2 years following the date of Substantial Performance. TR1

2 SCOPE EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD The scope of the project includes reconstruction of the existing 4-lane urban roadway between Speedvale Avenue and London Road including installation of bike lanes, replacement of the existing C&G and sidewalk, replacement of the existing 200mm cast iron watermain between Speedvale Avenue and London Road and replacement of the existing vitrified clay sanitary sewer between London Road and Willow Road. Stage 1 Design Services The consultant shall provide the following design services: Prepare base plans of above ground and below ground infrastructure from detailed topographic survey being undertaken by the City and to be provided to the Consultant. Coordinate and retain an Ontario Land Survey (OLS) to prepare a single compiled legal survey plan for the limits of the entire project. The OLS must provide ground control for the topographic survey and confirm that the legal survey and topographic surveys are precisely coordinated. Coordinate and retain a Geotechnical Consultant to prepare a geotechnical report, including SAR and electrical conductivity, for design purposes and materials testing during construction. The geotechnical report shall document subsurface soil and groundwater conditions and include geotechnical recommendations with regard to excavations and dewatering, pipe bedding, trench backfill, disposal of surplus material and pavement structure (refer to Appendix D for details). Prepare Contract Drawings to City of Guelph standards for City s review and tendering including but not limited to the following: Cover Page Existing Conditions & Removals Proposed Design Cross Sections Property Requirements and Grading permissions drawings, as required Erosion and Sediment Control Plans Tree Management Plan (refer to Appendix C for details) Tree Replacement (Planting Plan, details and special provisions) Traffic Signal Installation / Modification (as required) Detour/Temporary Road Closure Plans, Traffic and Transit Plans (Guelph Transit and emergency vehicle accommodation) Construction Phasing Plans (as required) Storm and Sanitary Drainage Area Plans Drawings and presentation materials as required for Public Information Centres Record Drawings TR2

3 Host 2 Public Information Centres including presentation materials (location provided by City). The consultant will be responsible for such tasks as distributing notices/correspondence through regular mail and/or hand delivery, preparing advertisements, arranging for advanced notice signage along the roadway, facilitating and making formal presentations at the meetings, providing the necessary staff to assist at meetings, maintaining mailing lists and preparing written responses to inquiries/comments to the City s satisfaction. Coordinate required Utility relocation work including arranging and attending meetings and preparation of agendas and minutes for all local and third party Utilities through preliminary design, final design and construction phases. For projects with Street Lighting components, the Consultant shall coordinate the design and purchasing of all street light hardware through Guelph Hydro. Coordinate project design with abutting development projects including providing developers with copies of the project design for their frontages at 60%, tender and approved for construction stages and providing estimated construction cost for any required services along their frontages. Prepare tender documents and drawings at the following stages: Draft review (60%); Final review (90%); and, Issue for tender. Prepare and submit MOE - Certificate of Approval Applications (Application fees will be paid by the City). Liaise with other relevant agencies including arranging and attending meetings, preparation of meeting agendas and minutes, and preparation and submittal of applications for agency approval as required (Application fees will be paid by the City). Liaise and coordinate services within the project area as required (e.g. waste management pick up and routing, Canada Post, Guelph Transit, Goderich Exeter Railway, Utilities, etc.). Provide an Engineer s Estimate for Total Project Construction Cost at the following stages: Preliminary estimate with Proposal for Consultant s Work Plan and Fee Estimate. Detailed estimate at 90% and 100% Design. Final Detailed estimates one week prior to the close of the tender. Reproduce tender documents and drawings (allow 10 sets hard copy) and submit digital drawings in both AutoCAD and PDF format. Answer questions from contractors during the bidding period and if required, prepare Addenda to be distributed by the City to all registered bidders. Review tender submissions for mathematical accuracy, check contractor references as required, provide a cost comparison for each bid item for all bidders and make a recommendation for tender award TR3

4 Stage 2 Construction Services (provisional, subject to City requirements) The consultant shall provide the following construction services: Organize, attend and document a pre-construction meeting and bi-weekly construction meetings. Provide full-time resident inspection of construction services. Provide environmental specialist inspection services as required for compliance with GRCA fill permit requirements, tree impact requirements and Migratory Bird Act requirements. Provide Contract Administration services including preparation and recommendation of progress payment certificates and change orders, review and recommendation of shop drawings and provide all public relations activities including but not limited to preparation of letters, mailing or hand delivery to all resident-owners, non-resident-owners and occupants in project area plus one block on side streets in all directions (refer to Appendix B - Capital Project Mailing requirements) and follow up on all complaints and claims. Provide post construction services, consisting of Construction Record drawings in printed and digital.autocad dwg file format, warranty inspection and administration. TR4

5 APPENDIX A Project Location Plans

6 Proposed Reconstruction from Speedvale Avenue to London Road

7 Proposed Reconstruction from Speedvale Avenue to London Road

8 APPENDIX B Capital Project Mailing Requirements

9 TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD (see Appendix A for Project Location Plan) Capital Project Mailing Requirements Document/Letter/ Survey Initial Notice of Project & Invitation to 1 st Public Information Centre Resident s Questionnaire Invitation to 2 nd Public Information Centre Confirmation of Construction Pre-condition Survey Letter (from City to residents accompanied by similar from contractor to residents) Timing Usually just prior to start of survey work (survey of existing condition Immediately prior to Tender call one week prior to construction Immediately following award of tender Property Owner (not necessarily residing within construction limits) Mailing Recipients Property Apartment Resident Unit (Occupant (Occupant)* s who are not owners) Peripheral properties (Occupants only) within one block of outside construction limits Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (Contractor discretion) Yes (plus 30 metres from project limits) *mail to Superintendent for distribution to tenants (note that owner will have received a mailing)

10 APPENDIX C Typical Tree Management Plan Details

11 TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD (see Appendix A for Project Location Plan) APPENDIX C Typical Tree Management Plan Details The Tree Management Plan shall include the following: The pickup of all city / border trees during the field survey within the construction zone. The physical location of each tree is to be shown on base drawings with the centre of the tree being shown (this requirement will make ownership issues clearer). The average width of the tree crown (drip line) is also to be determined and shown. This is to be a physical field measurement and not generated from a computer program. Drafting of the "Tree Management Plan", which will include the base map showing the trees, their serial numbers, charts showing tree condition and health, approved encroachments into Tree Protection Zones and additional Protective Measures for Significant Trees. Review of construction impacts on the trees and a recommendation for trees that require removal due to the proposed construction Preparation of a tree management report to be provided to the City as an information item where there are public tree concerns

12 APPENDIX D Geotechnical Investigation

13 TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD (see Appendix A for Project Location Plan) APPENDIX D Geotechnical Investigation Geotechnical services shall include the determination/confirmation of subsurface soil and groundwater conditions sufficient to prepare an engineering report with geotechnical recommendations pertaining to excavation and dewatering, pipe bedding, trench backfill and pavement structure for the project. During the field investigation, the geotechnical consultant is to visually examine the potential for contaminated or unsuitable materials and conduct further testing/chemical analysis as required to determine the removal and disposal requirements of the material during construction. The geotechnical consultant shall: Determine the number and location of boreholes to reasonably reflect existing subsurface conditions. Coordinate utility locates. Identify all borehole locations to be superimposed on design drawings provided by the consultant. Provide traffic control in accordance with Book 7 of the Ontario Traffic Manual. Complete necessary field investigations/testing to prepare an engineering report with recommendations pertaining to excavations and dewatering, pipe bedding, ground water control, trench backfill, roadway construction, pavement structure and compaction requirements. Identification of the presence of any potential contaminated or unsuitable material and recommendations with regard to further testing including applicable chemical testing. Please note that this type of issue would be considered unforeseen and a reasonable cost for testing would be considered. General - Consultant Responsibilities: The consultant shall immediately inform the City s Project Manager of any critical defects or deficiencies and unsafe conditions which are discovered in the field during the work. The consultant shall immediately inform the City s Project Manager of any contamination encountered during drilling and of any potentially contaminated sites based on site usage which are observed in the field during the inspection. Additional boreholes may have to be carried out by others (not part of this assignment) to determine the type, depth and limits of the contamination.

14 The geotechnical consultant shall remove any groundwater monitoring wells prior to constructions and no additional cost to the City. Final Documentation 1. Three (3) hard copies of the completed geotechnical investigation report for each road section. 2. One (1) digital copy of each completed geotechnical investigation report in PDF format to be provided on a CD at the end of the project. The Geotechnical report shall include: An introduction and background to include a description of the existing road section under investigation. A description of the investigation procedure and fieldwork. Subsurface conditions, including existing pavement structure, fill materials, topsoil, laboratory testing and groundwater. Borehole log sheets undertaken on roads and shoulders, where available. Borehole location plans. Grain Size Distribution consisting of grain size analysis tests, and where applicable, particle size (hydrometer) tests. Grain Size distribution shall be plotted against upper and lower band limits for various material such as Granular A and B, in accordance with Ontario Provincial Standards (OPS) materials. Based on the testing results, the report shall provide a recommendation relating to the suitability of the in-situ material being used for Granular A and B. Standard Proctor Moisture Density Test Results. Discussion and recommendations, when applicable, for excavation and dewatering, bedding for storm sewers, ground water control, trench backfill, roadway construction, pavement materials, thicknesses, and compaction requirements. The geotechnical report shall be appended to the construction tender.

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

The Standards referred to shall be the most recent edition.

The Standards referred to shall be the most recent edition. Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

Construction Specification for Trenching, Backfilling and Compacting

Construction Specification for Trenching, Backfilling and Compacting Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 401 November 2016 Amendment to OPSS.MUNI 401 (Nov 2015) Construction Specification for Trenching, Backfilling

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 1999 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 516 APRIL 1999 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required

More information

THE MUNICIPALITY OF SIOUX LOOKOUT

THE MUNICIPALITY OF SIOUX LOOKOUT THE MUNICIPALITY OF SIOUX LOOKOUT CONSULTANT TERMS OF REFERENCE TO PREPARE DETAILED DESIGN FOR PARK STREET LANE INFRASTRUCTURE UPGRADES IN URBAN SIOUX LOOKOUT RFP R013-2017 July 21, 2017 Terms of Reference

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY TO: FROM: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY 21 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR OF ENVIRONMENTAL AND ENGINEERING SERVICES & CITY ENGINEER SUBJECT: CONTRACT AWARD:

More information

CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS

CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 404 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS TABLE OF CONTENTS 404.01 SCOPE 404.02 REFERENCES 404.03 DEFINITIONS 404.04 DESIGN

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003 ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES Special Provision No. 199S38 March 2003 The following MTO specification is not based on or referenced to an OPS Specification.

More information

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections: Schedule H to Bylaw 7452, Subdivision Bylaw Page 1 1. INTRODUCTION 1.1 Contents of Engineering Specifications 1.1.1 The Engineering Specifications contains the following sections: 1. Introduction 2. General

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2

More information

B441 - WATERMAINS - OPSS GENERAL

B441 - WATERMAINS - OPSS GENERAL B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

THE MUNICIPALITY OF SIOUX LOOKOUT

THE MUNICIPALITY OF SIOUX LOOKOUT THE MUNICIPALITY OF SIOUX LOOKOUT CONSULTANT TERMS OF REFERENCE TO PREPARE AND ADMINISTER SPECIFICATIONS, CONSTRUCTION TENDERING AND CONTRACT ADMINISTRATION FOR PARK STREET LANE INFRASTRUCTURE UPGRADES

More information

B701 WATERMAINS- OPSS 701

B701 WATERMAINS- OPSS 701 B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX The Ottawa County Road Commission is seeking the submittal of written proposals

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

PROCEDURES MANUAL INFRASTRUCTURE DEVELOPMENT

PROCEDURES MANUAL INFRASTRUCTURE DEVELOPMENT City of Shepherdsville Shepherdsville, Kentucky June 3, 2013 Table of Contents Page DEFINITIONS... 4 INTRODUCTION... 7 APPLICATION OF TECHNICAL MANUALS... 9 Public Roads... 9 Private Roads, Parking Lots,

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required. Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...

More information

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender. No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Regional Roads and Traffic REVISED February 2010 PUBLIC WORKS REGIONAL ROADS AND TRAFFIC DESIGN CRITERIA TABLE

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

Town of Whitby Public Works Department

Town of Whitby Public Works Department Town of Whitby Public Works Department Guide to Site Alteration Pre-Screening Questionnaire and Site Alteration / Haul Route Permit Application NOTE: FOR AN ACCESSIBLE VERSION OF THIS DOCUMENT PLEASE CONTACT

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

INVITATION TO TENDER ITT / PS VANCOUVER LANDFILL FRONT ENTRANCE REDESIGN - PRELOAD QUESTIONS AND ANSWERS NO.1

INVITATION TO TENDER ITT / PS VANCOUVER LANDFILL FRONT ENTRANCE REDESIGN - PRELOAD QUESTIONS AND ANSWERS NO.1 FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / PS20161054 ISSUED ON OCTOBER 13, 2016 Schedule A - Item 3.01 references MMCD Section 03 40 01 Measurement and Payment Clause 1.4.3.

More information

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...

More information

DESIGN CRITERIA & CONSTRUCTION REGULATIONS

DESIGN CRITERIA & CONSTRUCTION REGULATIONS DESIGN CRITERIA & CONSTRUCTION REGULATIONS APRIL 2004 BY: TST, INC. CONSULTING ENGINEERS FORWARD PURPOSE OF THIS MANUAL The Town of Johnstown has prepared this manual to provide guidance to engineers and

More information

CITY OF GUELPH CONTRACT NO SUPPLEMENTAL SPECIAL PROVISIONS

CITY OF GUELPH CONTRACT NO SUPPLEMENTAL SPECIAL PROVISIONS CITY OF GUELPH CONTRACT NO. 2-1306 SUPPLEMENTAL SPECIAL PROVISIONS INDEX Contents 1. EXTERNAL CONTRACT DOCUMENTS AND DRAWINGS... 1 2. GENERAL INFORMATION... 4 3. UTILITY COORDINATION, TRAFFIC AND PEDESTRIAN

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

THE CORPORATION OF THE TOWNSHIP OF SOUTH GLENGARRY BY-LAW NO FOR THE YEAR 2014

THE CORPORATION OF THE TOWNSHIP OF SOUTH GLENGARRY BY-LAW NO FOR THE YEAR 2014 THE CORPORATION OF THE TOWNSHIP OF SOUTH GLENGARRY BY-LAW NO 28-14 FOR THE YEAR 2014 BEING A BY-LAW FOR THE PURPOSE OF REGULATING THE OBSTRUCTING, ENCUMBERING, INJURING OR FOULING OF HIGHWAYS AND BRIDGES

More information

Municipal Engineering Standards Development Agreement Request Form

Municipal Engineering Standards Development Agreement Request Form Appendix A-1 Development Agreement Request Form Development Agreement Request Form To: Project Leader, Approvals and Technical Services : City of Spruce Grove, Planning and Infrastructure 315 Jespersen

More information

406 - PIPE SEWERS - MTC FORM 406

406 - PIPE SEWERS - MTC FORM 406 406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength

More information

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 490 NOVEMBER 2018 (Formerly OPSS 490, April 2016) Note: The MUNI implemented in November 2018 replaces OPSS 490 COMMON, April 2016 with no technical

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

INVITATION TO BID NUMBER ITB/DA-17/18-36 REBID STORM WATER IMPROVEMENTS AT THE PLANT CITY STATE FARMERS MARKET

INVITATION TO BID NUMBER ITB/DA-17/18-36 REBID STORM WATER IMPROVEMENTS AT THE PLANT CITY STATE FARMERS MARKET ADDENDUM 1 TO: FROM: RE: Vendors Salena Yarbrough INVITATION TO BID NUMBER ITB/DA-17/18-36 REBID STORM WATER IMPROVEMENTS AT THE PLANT CITY STATE FARMERS MARKET This addendum is to provide all potential

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 Additional Fees Additional fees may be charged by PennDOT consistent with Sections 411 and 420 of the State Highway Law and Regulations 441.4(d)

More information

SCHEDULE 3 OF BYLAW 7900 CITY OF KELOWNA QUALITY CONTROL AND ASSURANCE

SCHEDULE 3 OF BYLAW 7900 CITY OF KELOWNA QUALITY CONTROL AND ASSURANCE SCHEDULE 3 OF BYLAW 7900 CITY OF KELOWNA QUALITY CONTROL AND ASSURANCE (November 2 nd, 1998) QUALITY CONTROL AND ASSURANCE Schedule 3 Page 1 of 4 This Schedule sets out the City s minimum standards for

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical

More information

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1. INTRODUCTION EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1.1. The objective of this Project includes: 1.1.1.

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017 TO: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017 FROM: SUBJECT: KELLY SCHERR, P. ENG, MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER CONTRACT AWARD:

More information

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 503 NOVEMBER 2009 CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF CONTENTS 503.01 SCOPE

More information

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS B1 B 1.00 B 1.01 CLASSIFICATIONS STREET CLASSIFICATION All roadways in new developments shall be classified according to the traffic volume expected and

More information

Transportation Contributed Assets Review January 28, 2015

Transportation Contributed Assets Review January 28, 2015 Transportation Contributed Assets Review January 28, 2015 Office of the City Auditor The Office of the City Auditor conducted this project in accordance with the International Standards for the Professional

More information

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 1 CONCRETE MATERIALS, CONSTRUCTION METHODS AND TESTING PROCEDURES A. MATERIALS... 3 1. CONCRETE FOR SIDEWALK AND CURBS

More information

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 760 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS TABLE OF CONTENTS 760.01 SCOPE 760.02 REFERENCES 760.03 DEFINITIONS 760.04 DESIGN

More information

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT TABLE OF CONTENTS Sections Description No. of Return with Pages Submittal COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT 1 YES SECTION A CHANGES TO THE CONTRACT DOCUMENTS 1 NO SECTION B PRE-BID

More information

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing 2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements December 11, 2017 Public Improvement Hearing Project Objectives Reconstruct Deteriorated Streets Upgrade City Underground

More information

REQUEST FOR QUOTES: # LE

REQUEST FOR QUOTES: # LE REQUEST FOR QUOTES: #15-07-1391LE Navajo Division of Transportation Department of Airports Management ADOT GRANT #E5S2R - Independent Fee Estimate - Reconstruct Runway 15/33 (Approximately 2,000 x 75 )

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

AMENDMENT D TO THE CONTRACT FOR INDEPENDENT CONTRACTOR SERVICES BETWEEN THE CITY OF FERNLEY AND NCE

AMENDMENT D TO THE CONTRACT FOR INDEPENDENT CONTRACTOR SERVICES BETWEEN THE CITY OF FERNLEY AND NCE AMENDMENT D TO THE CONTRACT FOR INDEPENDENT CONTRACTOR SERVICES BETWEEN THE CITY OF FERNLEY AND NCE This Amendment D to the Contract for Independent Contractor between the City of Fernley and NCE is entered

More information

Add: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator.

Add: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator. Corporate Finance epartment Materials Management ivision 342-2013 AENUM 1 Page 1 of 5 PLESSIS ROA TWINNING AN GRAE SEPARATION AT CN REITT SUBIVISION: RAIL SHOOFLY GRAE PREPARATION AN MISCELLANEOUS WASTEWATER

More information

The Corporation of The City of London

The Corporation of The City of London The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

Beaumont Lot Grading Guidelines

Beaumont Lot Grading Guidelines Beaumont Lot Grading Guidelines Updated: 2019-01-14 CONTENTS LOT GRADING OVERVIEW... 3 INTRODUCTION... 3 PURPOSE... 3 DEFINITIONS... 3 LOT GRADING REQUIREMENTS... 3 DESIGN GRADES AND EXISTING GRADES...

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 I. CONSTRUCTION PREREQUISITES 1.0 Pre-construction Survey A pre-construction survey of all existing infrastructure within

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction REQUEST FOR PROPOSAL Third Party Testing and Special Inspections Parking Lots and Ramps Arts Campus Parking Reconfiguration Phase 2 Project #0674501 Addendum

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

7.00 INTRODUCTION... 1

7.00 INTRODUCTION... 1 SITE PLANS, REZONING, LAND DIVISION AND CONDOMINIUM SECTION 7 GENERAL REQUIREMENTS INDEX Page 7.00 INTRODUCTION... 1 7.01 SITE GRADING AND MECHANICAL PLANS... 2 7.01.01 Submission Procedures... 2 7.01.02

More information

Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018

Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018 Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018 The City of Glendale, Wisconsin is requesting engineering proposals from qualified consultants for the design

More information

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria INTERIM PROTOCOL Authority Meeting #10/07, Res. #A293/07, January 4, 2008 1. The works outlined in Table 1 must classify

More information

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION

More information

BONDING REQUIREMENTS AND PROCEDURES

BONDING REQUIREMENTS AND PROCEDURES Town of Apex Development Services 73 Hunter Street, 3 rd Floor Apex, NC 27502 (919) 249-3394 BONDING REQUIREMENTS AND PROCEDURES ORDINANCE RATIFYING THE REQUIREMENT FOR BONDING: (From the Unified Development

More information

Attachment No. 1 Council Report Attachment

Attachment No. 1 Council Report Attachment Attachment No. 1 Council Report Attachment 19T-03E01 Part Lots 16 to 19, Concession 2, Town of East Gwillimbury Re: Draft Plan of Subdivision prepared by KLM Planning Partners Inc. Project No. P-466, dated

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS Village of La Grange Phase II Design Engineering Services for Submission Deadline: No later than 10:00 am on October 19, 2018 Published on: October 5, 2018 on the Village of

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura