1 ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 904 JANUARY 1995 CONSTRUCTION SPECIFICATION FOR CONCRETE STRUCTURES SCOPE REFERENCES DEFINITIONS TABLE OF CONTENTS SUBMISSION AND DESIGN REQUIREMENTS Mix Design.02 Submissions General.02 Work Plan.03 Concrete Strengths 35 MPa and Greater.04 Cold Weather Concreting.05 Hot Weather Concreting.06 Field Curing, Handling and Delivery of Cylinders.07 Curing Compound.08 Spray Equipment - Curing Compound.09 Concrete Delivery Ticket.10 Bearings MATERIALS Concrete.02 Portland Cement.03 Sand.04 Bonding Agents Cement Paste.02 Cement-Sand.03 Latex Modified Latex Modifier.06 Sand-Cement Mortar.07 Non-Shrink Grout.08 Steel Reinforcement and Mechanical Connections.09 Epoxy Coated Steel Reinforcement and Epoxy Coated Mechanical Connections Page 1 Rev. Date: 01/1995 OPSS 904

2 Deck Joint Assemblies and Joint Materials.11 Burlap.12 Moisture Vapour Barrier.13 Curing Compound.14 Approach Slab Seat Elastomer.15 Insulation Material.16 Cylinder Moulds EQUIPMENT General.02 Placing Equipment Concrete Pump Consolidating Equipment.04 Mixer for Bonding Agents.05 Finishing Equipment Finishing Machine.02 Screed Rails.03 Screed Rail Chairs.04 Work Bridges Hand Finishing Equipment.07 Straight Edges.08 Tremie.09 Spray Equipment for Curing Compound.10 Compressor - Air Blasting CONSTRUCTION Formwork and Falsework.02 Steel Reinforcement.03 Concrete General.02 Miscellaneous Hardware.03 Concrete on Granular Base.04 Placing General.02 Permission to Place Concrete.03 On-Site Transportation.04 Placing Operations Over New Concrete.05 Consolidation Curing Unformed Surfaces General.02 Structure Decks.03 Curing with Burlap and Water.04 Curing with Moisture Vapour Barrier.05 Curing with Curing Compound Page 2 Rev. Date: 01/1995 OPSS 904

3 Curing Formed Surfaces.07 Hot Weather Concreting Concrete Placing Temperature.02 Placing Restrictions Cold Weather Concreting Concrete Placing Temperature.02 Placing Restrictions.03 Protection - General.04 Protection - Minimum Requirements.05 Housing and Heating.06 Temperature Records.07 Withdrawal of Protection Abrasive Blast Cleaning.10 Construction Joints General.02 Surfaces Requiring Abrasive Blast Cleaning.03 Surface Preparation.04 Bonding Agents at Joints Surface Finish - Unformed Surfaces General.02 Surface Tolerance Surface Finish - Formed Surfaces General.02 Exposed Surfaces.03 Surface Tolerance Alignment of Components.14 Removal of Formwork and Falsework.15 Field Sampling and Testing of Concrete General.02 Sampling and Testing - Slump, Air Content and Temperature.03 Frequency of Testing.04 Preparing Test Cylinders.05 Delivery of Test Cylinders.06 Testing for Uniformity of Mixed Concrete.07 Aggregate Discharge Test.08 Concrete Strengths 35 MPa or Greater.09 Testing for Early Strength Tremie Concrete Concrete in Footings.06 Concrete in Structure and in Deck.07 Parapet and Barrier Walls.08 Concrete in Approach Slabs Page 3 Rev. Date: 01/1995 OPSS 904

4 .09 Concrete in Slope Paving.10 Dowels into Concrete and into Rock QUALITY ASSURANCE General.02 Acceptance.03 Curing Compound MEASUREMENT FOR PAYMENT General.02 Actual Measurement Concrete in Culverts Mass Concrete Tremie Concrete Concrete in Footings Concrete in Barrier Wall Footings.02 Dowels into Concrete Dowels into Rock Plan Quantity Measurement Concrete in Culverts Mass Concrete Tremie Concrete Concrete in Footings Concrete in Barrier Wall Footings.02 Dowels into Concrete Dowels into Rock Non Measurement Concrete in Structure Concrete in Substructure Concrete in Substructure and Retaining Walls Concrete in Deck Concrete in Barrier Walls Concrete in Parapet Walls Concrete in Approach Slabs Concrete in Slope Paving BASIS OF PAYMENT General Concrete in Culverts - Item Mass Concrete - Item Tremie Concrete - Item Concrete in Footings - Item Concrete in Barrier Wall Footings - Item Concrete in Structure - Item Concrete in Substructure - Item Concrete in Substructure and Retaining Walls - Item Page 4 Rev. Date: 01/1995 OPSS 904

5 Concrete in Deck - Item Concrete in Barrier Walls - Item Concrete in Parapet Walls - Item Concrete in Approach Slabs - Item Concrete in Slope Paving - Item Dowels into Concrete - Item Dowels into Rock - Item.03 Formwork and Falsework.04 Chemical Admixtures.05 Working Slabs.06 Deck Joint Assemblies and Bearings.07 Reinforcing Steel and Other Steel Reinforcement SCOPE This specification covers the requirements for the construction of concrete structures REFERENCES This specification refers to the following standards, specifications or publications: Ontario Provincial Standard Specifications, Construction: OPSS 128 OPSS 501 OPSS 905 OPSS 919 OPSS 920 OPSS 922 OPSS 928 OPSS 929 OPSS 930 General Specification for the Supply of Materials from Designated Sources Compacting Concrete Reinforcement Formwork and Falsework Deck Joint Assemblies, Waterstops, Joint Fillers, Joint Seals and Joint Sealing Compounds - Structures Installation of Bearings Structure Rehabilitation - Concrete Removal Abrasive Blast Cleaning - Concrete Construction Structure Rehabilitation - Concrete Patches and Overlays Ontario Provincial Standard Specifications, Material: OPSS 1002 OPSS 1202 OPSS 1301 OPSS 1305 OPSS 1306 OPSS 1312 OPSS 1315 OPSS 1350 OPSS 1440 OPSS 1442 Aggregates - Concrete Bearings - Elastomeric Plain and Steel Laminated Cementing Materials Moisture Vapour Barrier Burlap Latex Modifiers for Use in Portland Cement Concrete White Pigmented Curing Compounds for Concrete Concrete Materials and Production Steel Reinforcement for Concrete Epoxy Coated Steel Reinforcement for Concrete Page 5 Rev. Date: 01/1995 OPSS 904

6 Canadian Standards Associations Standard: CAN/CSA A23.1-M90 - Concrete Materials and Method of Concrete Construction CAN/CSA A23.2-M90 - Methods of Test for Concrete CSA A Qualification Code for Concrete Testing Laboratories American Society for Testing and Materials: ASTM D , Method for Indicating Oil or Water in Compressed Air DEFINITIONS For the purpose of this specification, the following definitions apply: Bridge: means a structure which provides a roadway, carriageway or walkway for the passage of vehicles and/or pedestrians across an obstruction or gap or facility and which is greater than 3 metres in span. Cold Weather: means those conditions when the air temperature is at or below 5 C. It is also considered to exist when the air temperature is at or is likely to fall below 5 C within 96 h after concrete placement. Temperature refers to shade temperature. Cold Joint: means the interface surface other than at a formed joint which occurs when plastic concrete is placed against concrete which has taken its initial set. Culvert: means a structure which provides an opening through an embankment and in which roadway loads are distributed to the structure through fill or which is designated as a culvert in the contract. Designated Limits: means the dimensions of the component as shown on the plans or the limits of the component as revised in the field, in writing by the Contract Administrator. Hot Weather: means those conditions when the air temperature is at or above 28 C. It is also considered to exist when the air temperature is at or is likely to rise above 28 C within 24 h. Temperature refers to shade temperature. Miscellaneous Hardware: means a fabrication required to complete a component as shown on the plans that is not otherwise included in another tender item. "R" Value: means the metric thermal resistance value m 2. C/W per 1 mm of thickness, which is a measurement of the resistance to heat transfer of insulation. Structure: means any bridge, culvert, tunnel, retaining wall, wharf, dock or guideway. Tremie: means a hopper with a vertical pipe extending from the bottom, used to place concrete under water. Tremie Concrete: means concrete placed by means of a tremie. Page 6 Rev. Date: 01/1995 OPSS 904

7 SUBMISSION AND DESIGN REQUIREMENTS Mix Design The Contractor shall be responsible for the concrete mix design, except for the mix used in latex modified concrete overlays which the Owner will design. The quantity of chemical admixtures added shall be at least the specified minimum dose in conformance with OPSS Submissions General The submissions for concrete mix design data and the certificate of ready mixed concrete facilities and/or the certificate of mobile mix concrete production facilities shall be supplied as required in OPSS Work Plan Two weeks prior to commencement of placing concrete in bridge decks and placing concrete from new concrete, complete details of all equipment and the proposed methods and sequence of placing operations to be used on the Contract for that operation, including the location of transporting and placing equipment when placed on new concrete, shall be provided to the Contract Administrator Concrete Strengths 35 MPa and Greater When trial batches are not required to be made, the evidence qualifying the ready mix plant to supply the required class of concrete without trial batching shall be submitted to the Contract Administrator 30 d prior to placing the concrete Cold Weather Concreting Two weeks prior to beginning contract work under cold weather concreting conditions, details of the proposed cold weather protective measures shall be submitted in writing to the Contract Administrator. The submission shall be accompanied by samples of insulation if requested by the Contract Administrator. The proposal shall contain the following information: a. weather conditions for which the proposals apply; b. type of insulation, "R" value and number of layers including test data supporting the "R" value: c. i. number and capacity of heaters; ii. capacity of fuel tanks; iii. layout of heaters, fuel lines and fuel tanks; iv. design of housing; d. method of withdrawal of protection; e. method of ensuring cold weather protection measures are maintained when work requiring adjustment to the protective measure is being performed. f. method of curing of concrete, if method of curing is not included as part of the cold weather protection system. Page 7 Rev. Date: 01/1995 OPSS 904

8 Hot Weather Concreting One week prior to the commencement of concrete production, in hot weather, the details of the method to be used in the production of the concrete, to control the concrete temperature, shall be submitted to the Contract Administrator Field Curing, Handling and Delivery of Cylinders One week prior to commencement of concrete work, complete details of the method of field curing, handling and delivery of the test cylinders shall be provided to the Contract Administrator Curing Compound One week prior to the application of the curing compound, literature specifying the manufacturer's recommended rate of application shall be submitted to the Contract Administrator Spray Equipment - Curing Compound One week prior to the application of the curing compound a description of the equipment to be used, including a statement from the manufacturer of the curing compound approving the equipment, shall be submitted to the Contract Administrator Concrete Delivery Ticket One copy of the concrete delivery ticket shall be submitted to the Contract Administrator for each load of concrete delivered Bearings Two weeks prior to placing concrete in the substructure, the dimensions of bearings, bearing seat elevations, and the required adjustments to the reinforcing steel shall be submitted to the Contract Administrator MATERIALS Concrete Concrete shall conform to the requirements of OPSS Portland Cement Portland Cement shall conform to OPSS Sand Sand shall conform to OPSS Page 8 Rev. Date: 01/1995 OPSS 904

9 Bonding Agents Cement Paste Cement paste bonding agent shall consist of Portland Cement Type 10 and sufficient water to produce a consistency such that it can be applied with a stiff brush, to the existing concrete, in a thin even coating that will not run or puddle Cement-Sand Cement-sand bonding agent shall consist of Portland Cement Type 10 and sand in the ratio of 1.0:1.0 by volume and sufficient water to produce a consistency such that it can be applied with a stiff brush, to the existing concrete, in a thin even coating that will not run or puddle Latex Modified Latex modified bonding agent shall consist of Portland Cement Type 10, latex modifier and sand in the ratio of 1.0: 0.5: 2.0 by volume and sufficient water to produce a consistency such that it can be applied with a stiff brush, to the existing concrete, in a thin even coating that will not run or puddle Latex Modifier Latex modifier shall conform to OPSS Sand-Cement Mortar Sand-cement mortar shall be a 2:1 mixture by volume of sand and Portland Cement Type 10 and shall contain 12 percent entrained air, with sufficient water, to make a stiff mix Non-Shrink Grout Non-shrink grout shall conform to OPSS Steel Reinforcement and Mechanical Connections Steel reinforcement shall conform to OPSS Mechanical connectors shall conform to OPSS Epoxy Coated Steel Reinforcement and Epoxy Coated Mechanical Connections Epoxy coated steel reinforcement shall conform to OPSS Epoxy coated mechanical connectors shall conform to OPSS Deck Joint Assemblies and Joint Materials Deck joint assemblies, joint fillers, joint seals, joint sealing compounds and external waterstops shall conform to OPSS Burlap Burlap shall conform to OPSS Page 9 Rev. Date: 01/1995 OPSS 904

10 Moisture Vapour Barrier Moisture vapour barrier shall be white, opaque, polyethylene film, at least 100 µm thick conforming to OPSS Curing Compound Curing compound shall conform to OPSS Approach Slab Seat Elastomer The approach slab seat elastomer shall conform to the plain bearing requirements of OPSS 1202, except that the size shall be as specified on the Contract drawings Insulation Material Insulation material shall be mineral wool, glass fibre, plastic foam or other suitable material, having an "R" value not less than 0.02 m 2. C/W per 1 mm thickness. Straw insulation shall not be used. Loose or absorbent insulation material shall not be used unless it is completely contained within waterproof wrapping Cylinder Moulds The moulds shall have a nominal inside diameter of 150 mm and a nominal height of 300 mm. They shall be made of sheet metal or plastic conforming to CAN/CSA A23-2-1D. Plastic moulds shall have plastic lids. The lids shall be chemically and physically compatible with Portland Cement concrete, and shall provide a watertight closure for the moulds. Each sheet metal cylinder mould shall be supplied with a polyethylene bag. The polyethylene bag shall be white opaque polyethylene film at least 50 µm thick. The bag shall be of such dimensions as to provide watertight containment of the concrete filled mould when twisted and tied with a twist tie EQUIPMENT General Equipment made of aluminum material shall not come in contact with the plastic concrete Placing Equipment Concrete Pump The concrete pump shall be a reciprocating pump equipped to fit a pipeline at least 100 mm in diameter. Page 10 Rev. Date: 01/1995 OPSS 904

11 Consolidating Equipment Internal vibrators shall be of the high frequency type with 8000 minimum to maximum vibrations per minute when immersed in concrete. External vibrators shall have a minimum frequency of 3600 vibrations per minute. Internal vibrators used to consolidate concrete components containing epoxy coated steel reinforcement shall have a resilient covering that will not damage the epoxy coated reinforcement during use Mixer for Bonding Agents The mixer for the bonding agent shall be a stationary mixer, power driven, and capable of uniformly mixing the materials Finishing Equipment Finishing Machine The finishing machine shall: a. be self propelled and capable of forward and reverse movement under positive control; b. be fitted with wheels which travel on adjustable screed rails; c. be fitted with a reversing rotating cylinder screed, capable of finishing the concrete without subsequent hand finishing; d. be fitted with a reversing power screw auger, e. be capable of externally vibrating the surface of the concrete by means of a plate or roller mounted in front of the rotating cylinder screed and behind the power screw auger. f. be fitted with a means to raise all screeds to clear the screeded surface and to accurately reposition them without adjusting the legs; g. have adjustable legs fitted with locking devices; Screed Rails Maximum deflection of the screed rails under load shall be 2 mm in a 1.2 m length. The rails shall be straight to within 3 mm in a 3 m length Screed Rail Chairs Screed rail chairs shall be adjustable in height, made of metal and spaced at a maximum of 1.2 m and be placed under all rail joints Work Bridges Work bridges shall be provided to facilitate surface finishing unscreeded areas, concrete inspection and placing of curing materials. Where placements are longer than 40 m or wider than 10 m, a second work bridge shall be used. Page 11 Rev. Date: 01/1995 OPSS 904

12 Work bridges shall ride on screed rails and the top surface of the work bridge shall not be higher than 1.0 m above the finished surface Hand Finishing Equipment Floats shall be made of magnesium or wood. Magnesium bull floats shall be commercially made Straight Edges Two straight edges commercially made of metal, one 3 m and one 500 mm long shall be used Tremie The tremie shall be equipped with a foot valve at the bottom of the pipe. The pipe shall be 300 mm ± 50 mm I.D. and shall be long enough to extend to the lowest point of concrete deposit Spray Equipment for Curing Compound The curing compound shall be applied to the concrete surface by the means of motorized spraying equipment approved by the manufacturer of the curing compound. The equipment shall be equipped with an agitator Compressor - Air Blasting The compressor for air blasting shall have a minimum capacity of 3.5 m 3 /minute. The compressed air shall be free of oil or other contaminants when tested in conformance with ASTM D CONSTRUCTION Formwork and Falsework Formwork and falsework shall conform to OPSS 919. Barrier walls shall not be slip formed Steel Reinforcement The placing of steel reinforcement shall conform to OPSS 905. Where the superstructure is continuous over a support, the reinforcing steel shall be placed for the entire deck before any concrete is placed. The above requirement does not apply to the bottom slab of post tensioned box voided decks Concrete General Unhindered access to the work shall be provided for the purpose of inspection and testing of the concrete and its materials, both at the site of the work and at any plant used for the production of the concrete and its materials. The concrete mix design shall not be altered to accommodate the method of transporting and placing. Page 12 Rev. Date: 01/1995 OPSS 904

13 The consistency and air content of the concrete, at the point of discharge from the truck, shall be determined on the basis of slump and air tests conforming to OPSS Only concrete that meets the specification requirements for the air and slump tests shall be incorporated into the work. The temperature of the concrete at the time of placing shall be between 10 and 28 C. All additions made to the load of concrete, after delivery, shall be recorded on the concrete delivery ticket. When the concrete is delivered by means of agitating or mixing equipment, discharge of the concrete shall be completed within 1.5 h after introduction of the mixing water to the cement and aggregates. When there is an interruption in placing of the concrete greater than 20 min. the unfinished surface of the concrete shall be covered with wet burlap Miscellaneous Hardware Miscellaneous hardware shall be accurately placed and securely held in position to ensure that it will not be displaced during concrete placement Concrete on Granular Base Before placing concrete, the granular base shall be dampened immediately ahead of the concrete placement, by means of a uniform spray of water, sufficient to wet the granular base thoroughly without leaving standing water Placing General The method of transporting, placing and consolidating the concrete shall be such as to prevent segregation of the ingredients. Concrete shall be deposited within 1.5 m of its final position. Concrete shall be placed at a steady rate, suitable for the type of construction, such that a monolithic concrete is obtained without the formation of cold joints. When concrete is to be dropped more than 1.5 m fully enclosed vertical drop chutes, extending to the point of deposit, shall be used. Drop chutes are not required for placing concrete in steel tube piles of 0.6 m diameter or less. When concrete is to be placed on a surface that has a slope greater than 3% the placing operation shall begin at the lower end of the slope and progress upwards. Super-plasticizer to facilitate placing shall only be used when specified in the mix design. All curing material required for a concrete placement shall be on the site prior to that concrete placement. Except for tremie concrete, all concrete shall be placed in the dry. Page 13 Rev. Date: 01/1995 OPSS 904

14 Permission to Place Concrete Placing of concrete in the structure shall only commence after the Contractor receives permission to place, in writing from the Contract Administrator, prior to each placing operation On-Site Transportation Runways for buggies shall be of sufficient strength to prevent shaking and jarring of the buggies and reinforcing steel. Concrete placing and transporting devices shall not be supported by the reinforcing steel. Chutes shall have sufficient slope to deliver concrete of the approved consistency and shall have a maximum length of 15 m Placing Operations Over New Concrete Transporting or placing of plastic concrete from new concrete will only be permitted when the new concrete has: a. reached the specified strength; b. completed the specified curing period; and c. been protected where damage to the concrete is liable to occur Consolidation Internal or external vibrators or both shall be used to thoroughly consolidate concrete at the point of deposit within 15 min. of placing. Each layer of concrete shall be vibrated and vibration shall extend into the previous layer to produce a homogeneous mixture at the layer interface. Vibration shall not be used to make the concrete flow or spread into place more than 1.5 m from the point of deposit Curing Unformed Surfaces General All unformed surfaces and slip formed surfaces shall utilize one or more of the following curing methods: a. burlap and water; b. moisture vapour barrier c. white pigmented compound Structure Decks When the ambient air temperature is 0 C or higher at the time of placing, the structure decks shall be cured with burlap and water. When the ambient air temperature is below 0 C at the time of placing, the structure deck shall be cured with moisture vapour barrier. The deck shall be air dried for an additional 72 hours prior to waterproofing. Buried structure decks shall be cured using any of the curing methods detailed in this specification. Page 14 Rev. Date: 01/1995 OPSS 904

15 Curing with Burlap and Water Burlap shall be presoaked by immersing it in water for a period of 24 h immediately prior to placing. Two layers of burlap shall be applied to the surface of the concrete. Strips shall overlap 150 mm and shall be held down without marring the surface of the concrete. The burlap shall be applied immediately after finishing of the concrete surface, from 2 to 4 m from the pan or screed of the finishing machine or from the finishing operation. The burlap shall be maintained in a continuously wet condition throughout the 96 h curing period. The burlap shall be covered with a layer of moisture vapour barrier in a manner which will prevent deformation of the surface of the concrete. Air flow in the space between the moisture vapour barrier and the burlap shall be prevented in conformance with the requirements of curing with moisture vapour barrier. The moisture vapour barrier shall be placed within 12 h following placement of the concrete Curing with Moisture Vapour Barrier A moisture vapour barrier shall be placed immediately after finishing of the concrete surface, from 2 to 4 m of the finishing operation. Air flow in the space between the moisture vapour barrier and the concrete surface shall be prevented. To achieve this the moisture vapour barrier shall be held down at the edges and at all laps, 150 mm minimum, to prevent displacement. The material shall be kept in place for a minimum curing period of 96 h Curing with Curing Compound A curing compound shall not be used: a. on any construction joint; b. when cold weather concreting is in effect; c. on any structure deck; d. on any exposed formed surface. Immediately prior to application, the curing compound shall be agitated by mechanical means to provide a homogeneous mixture. It shall be applied immediately after finishing of the concrete surface, from 2 to 4 m of the finishing operation, completely covering the surface of the concrete. A second application of curing compound shall be applied within 30 to 60 min. after the first application. Each application shall be such that the membrane formed is uniform in thickness and colour and free of breaks and pinholes. The surface shall be maintained in this condition for a minimum period of 7 d. The rate of each application shall not be less than the rate specified by the manufacturer of the compound Curing Formed Surfaces Curing shall conform to the following: a. where the formwork is left in place for 96 h or more, no additional curing will be required; b. where the formwork is removed in less than 96 h, the concrete shall be cured with burlap and water for the remainder of the minimum curing period of 96 h. Curing compound shall not be used. Page 15 Rev. Date: 01/1995 OPSS 904

16 Hot Weather Concreting Concrete Placing Temperature The temperature of the concrete at the time of placement shall be between 10 C and 28 C Placing Restrictions The temperature of formwork, reinforcing steel or the material on which the concrete is to be placed, shall not exceed 30 C. When the air temperature exceeds 28 C and the concrete temperature exceeds 25 C, the concrete delivered by means of agitator or truck mixers shall be discharged within 1 h after the introduction of the mixing water Cold Weather Concreting Concrete Placing Temperature The temperature of the concrete at the time of placement shall be between 10 C and 28 C Placing Restrictions Ice and snow shall be removed from the area where concrete is to be placed. Deicing chemicals shall not be used. Concrete shall not be placed on or against frozen ground. Excavations prepared for concreting and any existing concrete, reinforcing steel, structural steel, forms or other surfaces against which concrete will be placed, shall be at a minimum temperature of 5 C for a period of 12 h prior to commencement of placing concrete. All cold weather protection material shall be on site prior to each concrete placement Protection - General The Contractor shall protect the concrete during cold weather. The protection system shall be designed for the worst conditions that can be reasonably anticipated from local weather records, forecasts, site conditions and past experience for the time period during which the protection is required. The Contractor shall monitor the conditions and modify the protection system as required Protection - Minimum Requirements During the seven days following placing, the concrete temperature shall not fall below 10 C or exceed 70 C. For cold weather conditions, protection of concrete shall at least conform to Table 1. Page 16 Rev. Date: 01/1995 OPSS 904

17 TABLE 1 MINIMUM COLD WEATHER PROTECTIVE MEASURES FOOTINGS AND SLABS ON THE GROUND Anticipated Minimum Thickness Air Temperature C >1.0 m m < m < 0.25 m + 5 to 0 pm1 pm1 pm1 pm2-1 to -10 pm2 pm2 pm2 pm3-11 to -20 pm3 pm3 pm4 pm5 less than -20 pm3 pm4 pm5 pm5 ALL OTHER CONCRETE + 5 to 0 pm1 pm1 pm1 pm2-1 to -10 pm2 pm2 pm3 pm4-11 to -20 pm3 pm3 pm4 pm5 less than -20 pm4 pm5 pm5 pm5 Maximum Allowable Drop in Concrete Temperature /24h >2.0 m 10 C m 15 C < 1.0 m 20 C pm1 - pm2 - pm3 - pm4 - pm5 - Protective Measure - Cover concrete with a moisture vapour barrier as specified for curing with moisture vapour barrier. Protective Measure - Cover concrete as for pm1, then cover the moisture vapour barrier with insulation having an R-Value of 0.67**. Protective Measure - Cover concrete as for pm1, then cover the moisture vapour barrier with insulation having an R-Value of 1.33**. Protective Measure - Cover concrete as for pm1, then cover the moisture vapour barrier with insulation having an R-Value of 2.00**. Protective Measure - House and heat as specified for housing and heating. **Note: All R values are metric The conversion factor from metric to imperial is Metric "R" value x = Imperial "R" value Housing and Heating The design of the protective housing shall take into account the effects of construction activities such as placing concrete, stressing and grouting. Heating equipment of sufficient capacity to establish and maintain the specified curing conditions shall be used throughout the curing period and for such time thereafter as is necessary for the completion of the work. Heating equipment used within the housing shall be vented outside the housing. Heating equipment having an open flame will not be permitted. The ambient air temperature adjacent to the concrete or formwork within the housing shall not be permitted to vary, from location to location, by more than 8 C. Page 17 Rev. Date: 01/1995 OPSS 904

18 Temperature Records The Contract Administrator will supply thermocouple wires and/or copper tubing. These thermocouple wires and/or copper tubing shall be installed at locations designated by the Contract Administrator. Access, to permit the Contract Administrator to measure the concrete temperature, shall be provided. The Contractor shall be responsible for any damage to the thermocouple wire and tubing Withdrawal of Protection The cold weather protection shall be gradually removed or reduced in such a manner that the maximum allowable drop of concrete temperature for each 24 h period as specified in Table 1 is not exceeded. The protection shall not be totally removed nor shall the concrete be fully exposed to the air until the average concrete temperature is within 10 C of the air temperature Abrasive Blast Cleaning Abrasive blast cleaning shall be done in conformance with OPSS 929. The abrasive blast cleaned area of concrete shall receive the next placement of concrete within 48 h or the surfaces shall be reblasted. All existing non-coated reinforcing steel that will be incorporated into the rehabilitation of a concrete structure component and all surfaces of existing structural steel against which new concrete will be placed for the rehabilitation of a concrete structure component shall be abrasive blast cleaned. The extent of cleaning both reinforcing steel and structural steel shall conform to the abrasive blast cleaning of reinforcing steel requirements of OPSS 929. The abrasive blast cleaning of structural steel shall be done immediately prior to placing the coated reinforcing steel Construction Joints General The Contractor shall form construction joints at the locations shown on the contract drawings. A straight 20 mm 'V' groove shall be formed at the exposed face of the concrete at all construction joints. 'V' grooves shall not be used on bridge deck surfaces except for the bottom slab of post tensioned box voided slabs. Concrete shall only be placed against vertical construction joints in barrier walls when the previously placed concrete has cured for at least 96 h. A bulkhead shall be used to form vertical or inclined construction joints. Page 18 Rev. Date: 01/1995 OPSS 904

19 Surfaces Requiring Abrasive Blast Cleaning The following surfaces shall be abrasive blast cleaned. 1. All faces of blockouts in concrete for deck joint assemblies; 2. All faces or recesses in concrete for stressing cable anchorages including the stressing anchorage surfaces; 3. All construction joint faces between precast segments requiring application of bonding agents; 4. All surfaces of concrete against which new concrete is to be placed in rehabilitation of a concrete structure component; Surface Preparation All construction joint faces shall be sound concrete, free of dirt, grease, dust, laitance and debris. The construction joint shall be air blast cleaned and then wetted for a period of one hour immediately prior to placing the concrete or bonding agent. Excess water shall be removed from the surface using compressed air Bonding Agents at Joints A thin coating of bonding agent shall be brushed onto the prepared surface immediately before placing fresh concrete. All surfaces against which the concrete is to be placed shall receive a thorough, even coating with no excess of bonding agent in any area. Bonding agent not used within 30 minutes of mixing shall be discarded. A cement-sand bonding agent shall be used for: a. Vertical construction joints in concrete deck slabs; b. Blockouts in concrete for installation and modification of deck joint assemblies; c. Stressing tendon anchorage recesses; d. Vertical surfaces of existing concrete against which new concrete is to be placed in the rehabilitation of concrete components; Bonding agents shall be mixed by means of a mixer Surface Finish - Unformed Surfaces General Finishing of the concrete surface shall be done while it is sufficiently plastic to achieve the desired grades, elevations and texture. The Contractor shall ensure that excessive fines and water are not drawn to the surface. No material shall be applied to the concrete surface to aid in the finishing. Page 19 Rev. Date: 01/1995 OPSS 904

20 The surface shall be smooth, free from open texturing, undulations, projections and ridges and shall be struck off true to grade and cross section and, except as specified for bridge deck placements, shall be hand finished with a float. The top surface of sidewalks and curbs shall be given a broomed finish. Bearing seats and deck joint assembly dams shall receive a wood float finish Surface Tolerance Except across the crown or drainage gutters, the surface shall be such that when tested with a 3 m long straight edge placed anywhere in any direction on the surface there shall be no gap greater than 6 mm between the bottom of the straight edge and the surface of the concrete. Across construction joints the gap shall not be greater than 3 mm. All unformed construction joint surfaces forming the underside of sidewalks, curbs, medians and barrier walls shall be such that, when tested with a 500 mm straight edge placed anywhere in any direction on the surface, there is no gap greater than 20 mm between the bottom of the straight edge and the surface of the concrete Surface Finish - Formed Surfaces General Concrete surfaces shall not be treated with cement slurry or paste. Within 3 d following the removal of forms, all holes left in surfaces by the removal of formwork and falsework and air holes which has a dimension greater than 15 mm shall be filled with sand-cement mortar or a non-shrink grout. The holes shall be moist at the time of filling, and the mortar shall be tamped into place. Honey-combing or cavities shall be repaired as follows: 1. Concrete shall be removed in conformance with OPSS Where the resultant cavity has an average depth greater than 100 mm and an area greater than 0.1 m 2 it shall be formed and patched with concrete equivalent to that used in the structure. The faces of the cavity shall be abrasive blast cleaned in conformance with the abrasive blast cleaning of concrete surfaces requirements of OPSS 929. The patch shall be placed within 24 h after blast cleaning. Immediately before placing the concrete, the faces of the cavity shall be wetted down for 1h and coated with a sand-cement bonding agent. 3. All other cavities shall be prepared as for the larger cavities and then shall be filled with sand-cement mortar or non-shrink grout. The surface of the patch shall be floated to a surface texture to match the adjacent concrete. 4. Patches shall be cured with burlap and water and protected as required for cold weather concreting. Page 20 Rev. Date: 01/1995 OPSS 904

21 Exposed Surfaces The appearance of the concrete shall be uniform as to colour, pattern and texture when viewed from a distance of 15 m. Where a patch is exposed to view, white Portland Cement shall be blended with the normal cement to achieve a uniformity of colour. To ensure this uniformity, trial mixes shall be made beforehand and sample panels compared with the main body of the concrete. The Contractor shall remove all projections such as fins and bulges and all blemishes such as stains and rust marks Surface Tolerance The surface shall be such that when tested with a 3 m long straight edge placed anywhere in any direction on the surface there shall be no gap greater than 6 mm between the bottom of the straight edge and the surface of the concrete. Across construction joints the gap shall not be greater than 3 mm Alignment of Components The position of the inner and outer top edges of the curb, sidewalk, barrier and parapet wall shall be set true to the elevations, alignment and camber called for on the plans without visible deviation, from one end of the structure to the other, with the following tolerances. The average slope or alignment shall be within 1:400 of that specified and the total variation for the total length of the structure shall not be greater than 40 mm. The allowable surface finish tolerance of the curb, sidewalk, barrier and parapet walls shall be ± 6 mm in any 3 m length when measured with a straight edge. The plumbness shall be within 1:400 of that specified Removal of Formwork and Falsework The removal of formwork and falsework shall conform to OPSS 919 and the contract drawings Field Sampling and Testing of Concrete General Concrete testing shall be done by personnel certified by the American Concrete Institute at the level of Concrete Field Testing Technician, Grade 1, or by personnel from a testing company certified by the Canadian Standards Association, CSA A283 Category O. Personnel from the CSA certified company shall have passed the CSA examination in concrete field testing that is required for certification Sampling and Testing - Slump, Air Content and Temperature The plastic concrete shall be sampled and field tested for slump, air content and temperature in conformance with OPSS 1350 and the results of these tests recorded. The air meter shall be calibrated at least once a year in conformance with CSA C and the certificate shall be available when requested by the Contract Administrator. Page 21 Rev. Date: 01/1995 OPSS 904

22 Frequency of Testing The minimum frequency of testing shall conform to Table 2 and the samples of the loads shall be taken directly from the load of concrete as directed by the Contract Administrator Preparing Test Cylinders The concrete test cylinders shall be made and cured in conformance with CSA Test Method A C for compressive tests to be performed by the Owner. The cylinders shall be formed in moulds. When sheet metal moulds are used they shall be enclosed in polyethylene bags closed with twist ties immediately after moulding. The Owner will supply forms on which shall be recorded the test information and the individual cylinder identification numbers. Page 22 Rev. Date: 01/1995 OPSS 904

23 TABLE 2 PRODUCTION SAMPLING AND TESTING MINIMUM FREQUENCIES CONSTRUCTION CATEGORIES I Abutment, Catchbasin and Maintenance Holes, Column, Culvert, Approach Slab, Footing, Pier, Wingwall, Retaining Wall, Slipformed Barrier Walls, Misc. Work Quantity for Each Class of Concrete per 28 Day Placement (m 3 ) Compressive Test Cylinders < > set/day 2 sets/day 3 sets/day FIELD TESTS (Note 1 and 2) Air, Slump and Temperature Tests (Note 4) One test for each load of concrete until satisfactory control (Note 3) is established daily; then 1 test for each 5 loads of concrete. (Note 5) II Curb and Gutter, Median Barrier, Sidewalk, Barrier or Parapet Wall. as above One test for each load of concrete. III Deck. < > 500 IV Concrete Overlay. < 30 > 30 2 sets/day 3 sets/day 4 sets/day 2 sets/day 3 sets/day One test for each load of concrete until satisfactory control (Note 3) is established daily and rate of placement > 35 m 3 per hour; then 1 test for each 3 loads of concrete. One test for each load of concrete or one test per hour for continuous mix plants. V Non-Structural Volume Batching. One set for each load. One test for each load of concrete. Notes: 1. Test Procedures: OPSS Minimum size of samples: Compressive strength - 15 litres, per set of standard cylinders Air test - 8 litres Slump test - 8 litres 3. Satisfactory control is considered to have been established when tests on five consecutive loads or batches of concrete are within specification requirements. 4. Air, slump and temperature tests shall also be done whenever compressive test cylinders are cast. 5. For slip formed barrier walls, field tests shall be taken as follows: The sample shall be directly from the load of concrete. When tested in place in a plastic state the air content of concrete shall not be less than 4.5%. Tests shall be done when requested by the Contract Administrator. Page 23 Rev. Date: 01/1995 OPSS 904

24 Delivery of Test Cylinders Concrete cylinders for compressive tests shall be transported and delivered in conformance with CAN/CSA A23.1 to a testing laboratory designated in the Contract. The forms, on which the field completed cylinder test information is recorded, shall be submitted with the concrete cylinders Testing for Uniformity of Mixed Concrete If, in the opinion of the Contract Administrator, there is evidence of non-uniformity of the mixed concrete from a particular mixer, tests shall be carried out by the Contractor on three samples of concrete obtained from widely separate portions of the batch while the mixer is being completely emptied at normal operating rate to evaluate the mixing equipment. No sample shall be taken before 10% or after 90% of the batch has been discharged. The minimum size of sample shall be 30 litres. Between samples, the mixer shall not be allowed to turn in the mixing direction. Water shall not be added to the batch at any time after sampling has started. The following criteria and that of Table 3 shall be used to judge whether or not the equipment under test is producing uniform concrete: a. Where the result of each test is equal to or less than the acceptance limit, the concrete shall be considered uniform. b. Where the result of any single test is greater than the rejection limit, the concrete shall be considered non-uniform. c. If a test result falls between acceptance limit and rejection limit, additional tests shall be made on the next consecutive batch or load delivered by that unit. If, after testing one additional batch or load, the test falls outside the acceptance limit, the equipment will be rejected. TABLE 3 DETERMINATION OF WITHIN BATCH UNIFORMITY OF THE CONCRETE TEST RANGE BETWEEN HIGHEST AND LOWEST VALUES OF THREE TEST SAMPLES Acceptance Limit Rejection Limit Density kg/m Air Content (%) in Plastic Concrete Slump (mm) d Compressive Strength (%) Aggregate Discharge Test When requested by the Contract Administrator, an aggregate discharge test for the continuous concrete mixing plant shall be done in conformance with OPSS 930. Page 24 Rev. Date: 01/1995 OPSS 904

25 Concrete Strengths 35 MPa or Greater When approved by the Contract Administrator, the concrete from trial batches made to determine the acceptability of the mix design for concrete with strengths of 35 MPa and greater may be incorporated into parts of the structure that require a lesser strength of concrete. When the source of concrete is a ready mix plant, a trial batch of concrete shall be supplied from each plant used for supplying the concrete. A trial batch shall be delivered to the site of the work and tested. Where access to the site of the work is not possible, the Contract Administrator will designate a suitable location for testing. The following information, for each trial batch, shall be provided to the Contract Administrator for each plant: a. Strength test data from the field trial batch which shall consist of data from tests conducted on at least one set of standard cylinders tested at 7 d and one set of standard cylinders tested at 28 d. b. The strength test data for mixes with supplementary cementitious materials which shall also include one set of standard cylinders tested at 3 d. c. The air content, temperature, and slump of concrete used in the trial batch which shall be tested and recorded. For an acceptable mix, the test cylinders, when tested, shall have an average compressive strength greater than the required strength at such a level above the required strength as to indicate that the concrete will consistently meet the requirements of the strength specification. When adjustments or changes are made to the mix design, further full size trial batches of concrete shall be completed to the satisfaction of the Contract Administrator. When agreed upon with the Contract Administrator, accelerated tests may be used in conformance with OPSS 1350, to predict the 28 d strength of the proposed concrete mix. In lieu of a trial batch the Contract Administrator may accept evidence in conformance with OPSS 1350, that the ready mix plant has been qualified to supply the class of concrete required in this contract to another one of the Owner's contracts within the last 12 months Testing for Early Strength The Contractor shall be responsible for all aspects of the making and transportation of cylinders required for early strength determination such as may be required to permit stressing or stripping of formwork and falsework. A minimum of four sets of cylinders representative of the concrete placed in the structure, at least one set from the start, middle and end of the deck section being placed, shall be cast. All cylinder test results must reach the minimum stressing strength shown on the contract drawings before stressing can commence. The Owner will test reasonable numbers of these cylinders at the laboratory designated in the Contract Tremie Concrete Concrete shall be placed using a tremie or a concrete pump. No air or water pockets shall be introduced into the tremie concrete by the placing equipment. The pipe shall be positioned vertical and shall be long enough to reach the lowest point of deposit. A continuous flow of concrete at a minimum rate of 15 m 3 /h shall be maintained through the pipe. The concrete shall be placed in its final position and to its full depth in a continuous placing operation. The top Page 25 Rev. Date: 01/1995 OPSS 904

26 surface of the concrete, under water, shall be kept level during concrete placement. After placement, the concrete shall not be disturbed, puddled or vibrated. Tremies shall be located a maximum distance of 5 m apart and a maximum of 2.5 m from forms. Concrete shall be supplied at a uniform rate to all tremies without interruption. Concrete shall only be placed in water that has a temperature 2 C or greater. The velocity of water flow inside the forms shall not be more than 3 m/min. At the start of the concreting operation, the tremie pipe shall be sealed at the bottom to prevent ingress of water. Once concrete is flowing through the pipe, the discharge end shall be kept continuously immersed in the freshly placed concrete. If the seal is lost, allowing the pipe to fill with water, the pipe shall be withdrawn, the seal re-established and the starting operation repeated. Separate cranes shall be used to deliver the tremie concrete and to move and position the tremie. Tremie concrete shall not be placed above the existing water level. When a placement operation is interrupted below water level, the surface laitance shall be removed to expose the coarse aggregate within 36 h after the interruption, and before continuation of the operation. When a placement operation is completed and work is to continue in the dry, the Contractor shall prepare the construction joint by removing surface laitance to expose the coarse aggregate. Unwatering will not be permitted until at least 24 h after the concrete placement is completed Concrete in Footings When it is specified in the Contract that the concrete is to be placed against undisturbed soil or set in rock, any over excavation shall be filled with concrete of the same strength as the footing concrete Concrete in Structure and in Deck All bridge deck placements 3 m or wider shall be finished using a finishing machine. The approval of the Contract Administrator shall be obtained before isolated areas are hand finished. Where the superstructure is continuous over a support, the finishing machine screed rails shall be placed for the entire structure before any concrete is placed. A dry run shall be carried out to ensure that the required camber, crown, slab thickness and concrete cover are achieved. In those areas of the deck where a finishing machine will be used to finish the concrete, the dry run shall be carried out by means of the approved finishing machine fitted with an attachment, suitable for checking the required cover, securely fastened to the finishing machine strike-off with the strike-off set in its lowest position. The strike-off with attachment shall be moved across the deck over the reinforcing steel with a minimum 3 mm clearance between the steel and attachment. This operation shall be repeated to cover the entire area to be concreted. Unless otherwise permitted by the Contract Administrator screed rails and the supports for the screed rails shall not be removed until the concrete has hardened sufficiently to withstand the weight of workmen and equipment used to remove them without marring the surface of the concrete. Any part of the screed rail supports which remain in the deck shall have 100 mm of concrete cover. Page 26 Rev. Date: 01/1995 OPSS 904

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

CONSTRUCTION SPECIAL PROVISION FOR STRUCTURE REHABILITATION - CONCRETE PATCHES, REFACING AND OVERLAYS

CONSTRUCTION SPECIAL PROVISION FOR STRUCTURE REHABILITATION - CONCRETE PATCHES, REFACING AND OVERLAYS AMENDMENT TO OPSS 930, MAY 1994 Special Provision No. 109S50 July 2007 CONSTRUCTION SPECIAL PROVISION FOR STRUCTURE REHABILITATION - CONCRETE PATCHES, REFACING AND OVERLAYS OPSS 930, Construction Special

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

Construction Specification for Concrete Bus Pad

Construction Specification for Concrete Bus Pad Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

SECTION SITE CONCRETE

SECTION SITE CONCRETE SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following: SECTION 321313 CONCRETE PAVING FOR PEDESTRIAN AREAS PART 1 GENERAL 1.1 SUMMARY A. This Section includes exterior cement concrete pavement for the following: 1. Walkways. 2. Courtyards. 3. Plazas. 4. Pedestrian

More information

By CTS Cement Manufacturing Corp.

By CTS Cement Manufacturing Corp. CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

Special Provision No. 399S43 July This Special Provision deletes and replaces the following specifications:

Special Provision No. 399S43 July This Special Provision deletes and replaces the following specifications: FAST TRACK FULL DEPTH CONCRETE REPAIR Item No. FULL DEPTH CONCRETE REPAIR Item No. PARTIAL DEPTH CONCRETE REPAIR Item No. FAST TRACK PARTIAL DEPTH CONCRETE REPAIR Item No. Special Provision No. 399S43

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

SECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS

SECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS CONTENTS SPECIFICATIONS SECTION NO. Scope 11.20 Codes and Standards 11.21 Form Release Agent 11.22 Supports, Chairs and Spacers 11.23 Reinforcement 11.24 Forms 11.25 Premoulded Joint Filler 11.26 Cement

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org Wikipedia.org Concrete Chapter 10 Properties of Fresh Concrete Materials of Construction-Concrete 1 What is Concrete? Concrete is a composite material that consists of a cement paste within which various

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION

City of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION January 2007 (Revision 2) Page 1 of 21 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 STANDARDS 1.05 QUALITY ASSURANCE The General Conditions of the Contract,

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work.

2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work. SECTION 2000 - CONCRETE 2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work. 2002 GENERAL. All cast-in-place concrete

More information

CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 905 APRIL 2007 CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE TABLE OF CONTENTS 905.01 SCOPE 905.02 REFERENCES 905.03 DEFINITIONS

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy

More information

MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION

MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1350 NOVEMBER 2008 MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION TABLE OF CONTENTS 1350.01 SCOPE 1350.02 REFERENCES 1350.03 DEFINITIONS

More information

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B391 JULY 2017 SPECIFICATION FOR CONCRETE PATCHING MATERIALS

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B391 JULY 2017 SPECIFICATION FOR CONCRETE PATCHING MATERIALS ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B391 JULY 2017 SPECIFICATION FOR CONCRETE PATCHING MATERIALS SCOPE - This specification contains approval procedures and requirements necessary for qualifying

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES PART 1: SCOPE CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES 1.1 An Approved Celcore Applicator shall furnish all labor, materials and supervision

More information

SECTION 941 PRECAST REINFORCED CONCRETE BARRIERS

SECTION 941 PRECAST REINFORCED CONCRETE BARRIERS 941.01 Scope - This Section covers the quality and manufacture of precast reinforced concrete roadside and median barriers for highway and other off-highway traffic confinement use. The concrete traffic

More information

Tolerances- Section

Tolerances- Section Tolerances- Section 346-6.4 Do not add water to delivered concrete when it is within the target Range for slump 1 346-6.4 Tolerances: Meet the following tolerances from target values for plastic concrete

More information

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials CSI SECTION 03 01 00 MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials EDITOR NOTE: The following guideline specification

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

This specification refers to the following standards, specifications, or publications:

This specification refers to the following standards, specifications, or publications: PRECAST CONCRETE SLAB REPAIR - Item No. Special Provision No 363S01 February 2013 Amendment to OPSS 363, April 2008 OPSS 363, Construction Specification for Repairing Rigid Pavement with Precast Concrete

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION 07 84 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 1 of 12 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE V/O CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

DIVISION 03 CONCRETE CONCRETE Maintenance of Concrete

DIVISION 03 CONCRETE CONCRETE Maintenance of Concrete DIVISION 03 CONCRETE 03 00 00 CONCRETE 03 01 00 Maintenance of Concrete 03 01 10 Maintenance of Concrete Forming and Accessories 03 01 20 Maintenance of Concrete Reinforcing 03 01 23 Maintenance of Stressing

More information

Con-Spec Industries Ltd.

Con-Spec Industries Ltd. CON-SPEC COUNTER-CRETE Con-Spec Counter-Crete is a unique preblended cementitious material for casting concrete countertops. It is a non-shrinking concrete that requires only potable water for mixing.

More information

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage. 03 10 00 CONCRETE FORMING AND ACCESSORIES Page 1 of 4 1 General 1.1 SECTION INCLUDES.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage..2 Form accessories..3 Form stripping. 1.2

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

ULTRA-HIGH STRENGTH SHEAR KEY GROUT

ULTRA-HIGH STRENGTH SHEAR KEY GROUT ULTRA-HIGH STRENGTH SHEAR KEY GROUT 187 April 30, 2015 SPECIFICATION FOR ULTRA-HIGH STRENGTH SHEAR KEY GROUT SCOPE This specification consists of the proper material selection and production of Ultra-High-

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

Amendment to OPSS.MUNI 1350 (Nov 2014) Material Specification for Concrete Materials and Production

Amendment to OPSS.MUNI 1350 (Nov 2014) Material Specification for Concrete Materials and Production Engineering & Construction Services Division Standard Specifications for Road Works TS 1350 September 2017 Amendment to OPSS.MUNI 1350 (Nov 2014) Material Specification for Concrete Materials and Production

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340 DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The General provisions of the contract, including GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

High performance shrinkage compensated cementitious grout

High performance shrinkage compensated cementitious grout Product Data Sheet Edition 4 March 2015 SikaGrout -212 HP High performance shrinkage compensated cementitious grout Description Uses Machine bedplates Anchor bolts. SikaGrout-212 HP is a ready mixed, high

More information

Concreting (UNDER CONSTRUCTION)

Concreting (UNDER CONSTRUCTION) Concreting (UNDER CONSTRUCTION) Clauses From IS 456 10.2 Batching To avoid confusion and error in batching, consideration should be given to using the smallest practical number of different concrete

More information

REVISED SECTION REINFORCING STEEL FOR CONCRETE STRUCTURES. Approved:

REVISED SECTION REINFORCING STEEL FOR CONCRETE STRUCTURES. Approved: To: SUPERSEDED BY EB 06-057 EFFECTIVE 05/03/07 New York State Department of Transportation ENGINEERING INSTRUCTION EI 03-030 Title: REVISED SECTION 556 - REINFORCING STEEL FOR CONCRETE STRUCTURES Approved:

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade. MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.

More information

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK INDUSTRY RECOMMENDATION for EXTERIOR CONCRETE FLATWORK Prepared by Ohio Concrete Inquires regarding this document may be addressed to: Ohio Concrete 2600 Corporate Exchange Dr., Ste. 165 Columbus, OH 43231

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

CONSTRUCTION SUMMARY REPORT

CONSTRUCTION SUMMARY REPORT Edison Engineers Inc. 89 King Street W. Suite 3 Dundas (Hamilton) Ontario Canada L9H 1V1 Info@edisonengineers.ca CONSTRUCTION SUMMARY REPORT To: Halton Condominium Corporation No. 70 c/o Wilson Blanchard

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

Method of Measurement for Road Works Series MM Structural Concrete

Method of Measurement for Road Works Series MM Structural Concrete Method of Measurement for Road Works Series MM 1700 - CC-RMP-01700 December 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION CONCRETE PAVING SLABS SET IN MORTAR SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints

More information

***************************************************************************************************************

*************************************************************************************************************** 09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as

More information

FIVE STAR PRODUCTS, INC.

FIVE STAR PRODUCTS, INC. FIVE STAR PRODUCTS, INC. www.fivestarproducts.com 1-800-243-2206 (in the US) +1 203-336-7900 (outside US) Page 1 of 8 DESIGN-A-SPEC GUIDELINES FIVE STAR CENTRI-CAST PIPE REPAIR MORTAR FIVE STAR CENTRI-CAST

More information

Appendix F. Checklist for Concrete Pre-Construction Conference. Best Practices Guidelines for Concrete Construction

Appendix F. Checklist for Concrete Pre-Construction Conference. Best Practices Guidelines for Concrete Construction Appendix F Checklist for Concrete Pre-Construction Conference 45 Introduction Pre-construction meetings are of prime importance in planning concrete construction work because many potential problems can

More information

SECTION CAST-IN-PLACE CONCRETE FOR UTILITIES

SECTION CAST-IN-PLACE CONCRETE FOR UTILITIES FOR UTILITIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Cast-in-place concrete for tunnel walls and slabs; steam manholes, chases, precast items and other miscellaneous structures; control, expansion and

More information

A. The scope of this standard includes recommendations for the specification of cast-in-place concrete.

A. The scope of this standard includes recommendations for the specification of cast-in-place concrete. PART 1: GENERAL 1.01 Scope of Standard A. The scope of this standard includes recommendations for the specification of cast-in-place concrete. 1.02 Related Standards A. Structural Systems (currently The

More information

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for

More information

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS SECTION 03 05 00 COMMON WORK RESULTS FOR CONCRETE 09 97 00 SSPECIALTY COATINGS Weld Crete ************************************************************************************************************************

More information

SPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN

SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN 1. SUMMARY A. Work includes: 1. Pavement removal, topsoil stripping, and site grading for concrete slab.

More information

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 16 19 (January 2007) ---------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-07 16 19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

Truck Mixer, Agitator and Front Discharge Concrete Carrier. Standards. TMMB Printing

Truck Mixer, Agitator and Front Discharge Concrete Carrier. Standards. TMMB Printing Truck Mixer, Agitator and Front Discharge Concrete Carrier Standards TMMB 100-01 2001 Printing Your Choice is Complete New Standards provide for mixing performance evaluated truck mixers with a size for

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as

More information

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing

More information

Adjusting approach to suit material leads to success. Silica Fume. for Concrete Bridge Decks By Tarif M. Jaber

Adjusting approach to suit material leads to success. Silica Fume. for Concrete Bridge Decks By Tarif M. Jaber Adjusting approach to suit material leads to success Silica Fume for Concrete Bridge Decks By Tarif M. Jaber lacing and consolidating concrete containing silica fume is P essentially the same as for concrete

More information

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1202 NOVEMBER 2016 MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED TABLE OF CONTENTS 1202.01 SCOPE 1202.02 REFERENCES

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 14 DESIGN-A-SPEC GUIDELINES FIVE STAR NOVOLAC GROUT CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

PART 1 - GENERAL. Section Cast-in-Place Concrete 1.3 REFERENCES

PART 1 - GENERAL. Section Cast-in-Place Concrete 1.3 REFERENCES CSI SECTION 32 13 13 CONCRETE PAVING 32 01 26 RIGID PAVING REHABILITATION DOT APPROVED PRODUCTS LIST OR SPECIAL PROVISIONS Very Early High Strength, Low Shrinkage, Powder Polymer-Modified Concrete Overlay

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 7 PRECAST CONCRETE UNITS

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 7 PRECAST CONCRETE UNITS SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 7 PRECAST CONCRETE UNITS TABLE OF CONTENTS 7.1 General... 7-1 7.2 Supply and Manufacture... 7-1 7.2.1 Standards... 7-1 7.2.2 Qualification... 7-1 7.2.3 Engineering

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 01 30.71 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-03930 (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

SECTION CONCRETE LINED CANALS AND RESERVOIRS

SECTION CONCRETE LINED CANALS AND RESERVOIRS SECTION 02511 CONCRETE LINED CANALS AND RESERVOIRS PART 1 GENERAL 1.01 SECTION INCLUDES Canal linings shall be constructed where shown on the drawings. The lining will be unreinforced concrete containing

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract. SPECIFICATIONS PART ONE - GENERAL ------------------------------------------------------------------------ 1.01 General Description A. The Cementitious capillary waterproofing materials specified herein

More information

Mix Design and Pumped Concrete

Mix Design and Pumped Concrete Mix Design and Pumped Concrete A simple method of concrete mix design for pumpable concrete based on an estimated weight of the concrete per unit volume is described in the paper. The tables and figures

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

BITUMEN-SET PRECAST CONCRETE PAVING SLABS SECTION 32 14 13.16 BITUMEN-SET PRECAST CONCRETE PAVING SLABS (1995 MasterFormat Section 02784) NOTE: This guide specification is the U.S. for concrete paving slabs adhered with a neoprene mastic to a

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES INTENT: To provide a system for reconstruction of concrete or masonry structures to stop inflow, infiltration, exfiltration, and

More information