South Coast Water District

Size: px
Start display at page:

Download "South Coast Water District"

Transcription

1 South Coast Water District Providing Quality Water & Wastewater Services To the Coastal Communities SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Resolution of Necessity Hearing May 14, 2015

2 Resolution of Necessity Hearing Open Public Hearing Staff Report and Presentation Written and Oral Objections and Protests by Landowner Public Comments and Requests to be Heard Close Public Hearing 2

3 Findings Does the public interest and necessity require the Project? Is the Project planned or located in the manner that will be most compatible with the greatest public good and least private injury? Is each easement interest necessary for the Project? Has an offer of just compensation been made to each Property Owner? 3

4 Recommended Actions Make Findings Consider Adoption of Resolution of Necessity for the Property 4

5 Tunnel Facts Blasted, hand dug in 1954 Three Arch Bay to Aliso Beach, two miles long Generally 6 ft x 6 ft Sewage flows: 1 MGD average 2 MGD peak Timber supported sections Original sewer line replaced in 1974 Tunnel Failure Results in Large Sewer Spill into Ocean 5

6 Tunnel Condition Poor Tunnel Condition Studies (1997, ) Annual Inspections & Repairs Required Unlined & Unsupported in Sections Deteriorating Condition Unsafe for Entry, Repair, & Maintenance Work 6

7 Current Tunnel Conditions Deteriorating Tunnel tree roots, falling rocks & dirt Workers and sewer line at risk 7 All require constant repairs Decaying support beams

8 Current Conditions vs. Completed Project Existing 8 Completed

9 Summary of Project Benefits Tunnel stabilization & sewer pipeline replacement project will: Ensure reliable sewer service for next 100+ years Prevent worker injury or death Continue operation without generating greenhouse gases Avoid the disastrous consequences of millions of gallons of sewage spilling onto the beach and into the ocean Protect Marine Life Fisheries 9

10 Marine Refuges Adjacent to Tunnel Location State Marine Conservation Area State Marine Reserve State Marine Conservation Area (No-Take) Tunnel Location 10 Tunnel Location

11 Sewer Tunnel Location & Jurisdictional Areas Portal 2 4th Avenue Drop Manhole AREA UNDER CITY OF LAGUNA BEACH LCP AREA OF DEFERRED CERTIFICATION Aliso Beach 11 Tunnel Length = 10,400 feet CEQA certified by SCWD Board of Directors on November 11, 2010 by Resolution #11-10/11 Addendum 1 to EIR Tunnel Realignment at 90 South La Senda approved March 28, ,300 LF within City of Laguna Beach LCP (Coastal Development Permit approved on December 11, 2013) 4,100 LF within Area of Deferred Certification (CDP approved by Coastal Commission on December 10, 2014) Three Arch Bay

12 12 Project Alternatives evaluated in CEQA Process 1. No Project 2. Backfill and Abandon Tunnel, Pipeline Remains in Service 3. Abandon Tunnel, Replace with Pipe in PCH and Numerous Lift Stations 4. New Monarch Beach Pump Station and Smaller Pipe in Existing Tunnel 5. Slip Line Techite Pipe and Limited Tunnel Repairs 6. New Parallel Tunnel and Abandon Existing Tunnel Approved Project: Encase Pipe and Repair Tunnel

13 Project Alternatives Project Alternatives 1 thru 6 not selected Infeasible, Impractical Too Disruptive Cost Prohibitive Greater Impacts to Community Greater Impacts to Private Property 13

14 14 Approved Project: Encase Pipe and Rehabilitate Tunnel Feasible Mitigates Risk of Injury and Sewer Spills Least Disruptive Least Impacts to Community Least Private Injury Greatest Public Good

15 Approved Tunnel Rehabilitation Plan Enlarged Tunnel Existing Tunnel New Pipeline Existing Pipeline ~6 FT 15 ~6 FT

16 Tunnel Rehabilitation & Realignment Requires Easements Hired appraiser to value interests Easement offers to acquire made to 184 owners of private property 194 of 196 interests acquired Two remaining easements to be acquired 16

17 Location of Remaining Easements 90 South La Senda 90 South La Senda 17

18 Property Considered for Adoption of Resolution of Necessity 90 South La Senda Owner and APNs: SMULL APN SMULL APN Realigned Tunnel 18

19 Tunnel Realignment at 90 South La Senda in Three Arch Bay Issues Existing tunnel in Three Arch Bay passes in close proximity to past landslides Several hundred feet of the tunnel between Adit 25 and drop manhole have been previously backfilled and sealed with a bulkhead Solution Realign a portion of the tunnel inland away from the bluff and known prior landslide areas 19 Abandon bypassed section of the existing tunnel from Adit 25 to drop manhole

20 Alternatives Analysis (S. La Senda Drive) SCWD considered two alternatives for S. La Senda Drive Re-alignment portion of project: Alternative A Realigned tunnel diverted before Adit 25, with new tunnel turning inland beneath residence at 90 S. La Senda Drive. Tunnel will continue beneath South La Senda Drive to the drop manhole at beginning of existing tunnel, resulting in total length of 720 feet of new tunnel. 20 Alternative B Realign tunnel at inflection point beneath Bay Drive, cross under residence at 17 Bay Drive & continuing beneath Barranca Way & S. La Senda Drive, resulting in 1,310 feet of new tunnel. With no feasible way to connect 12 existing sewer laterals to new tunnel, reconstruction & continued maintenance of 702 feet of existing tunnel required in addition to 1,310 feet of new tunnel. Would present operational challenges (increased sewer gases & odors, with added potential for pipeline blockages & possible overflows).

21 Three Arch Bay Realignment Alt A Shorter new tunnel, passes under S. La Senda Dr. residence Allows for Greatest Public Good & Least Private Injury 21

22 Three Arch Bay Realignment Alt B Longer new tunnel, passes under Bay Drive residence Rehabilitate 702 feet of existing tunnel for lateral access 22

23 Three Arch Bay Realignment Alt A & B Sewer Service Connection South La Senda Drive Existing Residence Alternative B Option 1 Sump Pump Existing Ground Surface (typ.) Sewer Main Alternative B Option 2 Sewer Lateral Alternative B Tunnel Alignment Not Recommended Alternative A (Keep Existing Lateral) Alternative A Tunnel Alignment 23

24 Review of Alternatives A & B Alternative A recommended by experts and selected by SCWD; resulting in one tunnel, requiring least amount of new, realigned tunnel, fewer lateral modifications & significantly less disruption to individual Three Arch Bay residents and community 24

25 25 Questions?

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data

More information

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION 1.0 I NTRODUCTION 1.1 PURPOSE OF THE EIR The purpose of an Environmental Impact Report (EIR), as defined in Section 15121(a) of the State Guidelines for the implementation of the California Environmental

More information

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City of Los Angeles Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City Council Meeting November 14, 2006 The Challenges New

More information

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section April 20, 2015 Sanitation Districts of Los Angeles County Wastewater Collection

More information

Pipe-Bursting Success with AC Pipe

Pipe-Bursting Success with AC Pipe Texas Municipal Utilities Association Annual Conference Inn on Barons Creek January 26, 2012 Pipe-Bursting Success with AC Pipe Pre-chlorinated Pipe Bursting to Replace Potable Waterlines in Round Rock,

More information

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS Overview and Recommendations WATER SYSTEM Water System Background Central water system constructed in 1960 s as part of the subdivision. Only 67 lots

More information

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation INTRODUCTION This has been prepared in compliance with the requirements of

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Notice of Preparation of an Environmental Impact Report and Scoping Meeting Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings Tuesday, October 24, 2017 6:30 to 8:00 PM El Rincon Elementary School 11177 Overland Avenue Monday, October

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 87 th Annual WEFTEC Conference Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP Orange County Sanitation District

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

Project Purpose. Federal Railroad Administration

Project Purpose. Federal Railroad Administration Project Purpose To preserve the current functionality of Amtrak s Northeast Corridor service and NJ TRANSIT s commuter rail service between New Jersey and Penn Station New York by repairing the deteriorating

More information

CHAPTER 110 SEWAGE DISPOSAL

CHAPTER 110 SEWAGE DISPOSAL 110-1. Title. 110-6. System rehabilitation. 110-2. Purpose. 110-7. Liability. 110-3. Definitions. 110-8. Conflict with other 110-4. Applicability. regulations. 110-5. Applicable standards for sewage 110-9.

More information

HOMOSASSA WASTEWATER COLLECTION SYSTEM

HOMOSASSA WASTEWATER COLLECTION SYSTEM HOMOSASSA WASTEWATER COLLECTION SYSTEM Project Purpose To improve the water quality of the Homosassa River by removing septic tanks and package wastewater treatment plants from environmentally sensitive

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

4.3 AGRICULTURE AND FOREST RESOURCES

4.3 AGRICULTURE AND FOREST RESOURCES 4.3 AGRICULTURE AND FOREST RESOURCES 4.3.1 INTRODUCTION This section describes existing agricultural and forest resources within the project area, Federal, State and local regulatory setting, and analyzes

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road Fact Sheet C1 Performance & Cost for Decentralized Unit Processes COLLECTION SERIES DECENTRALIZED WASTEWATER SYSTEMS What is a Gravity Sewer System? A gravity sewer system is used to collect wastewater

More information

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015 Montecito Water District Desalination Facilities Status Update Board of Directors Meeting March 17, 2015 Desalination Studies Update 1) Desalination Feasibility Study 2) Desalination Technical Support

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection 4.15.3.1 ENVIRONMENTAL SETTING Wastewater Collection The City owns, operates, and maintains the local sewer lines that collect wastewater generated within the City. The existing sewer lines include a gravity

More information

SANITARY SEWER CHEMICAL GROUTING

SANITARY SEWER CHEMICAL GROUTING Specifications (As provided by Avanti International) The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Section Treatment of Sewage and Stormwater

Section Treatment of Sewage and Stormwater Section 300.6. Treatment of Sewage and Stormwater A. Definitions 1. Sewage: The Council has adopted the definition of sewage set forth under Title 46, Chapter 12, Section 1 or the General Laws, to wit:

More information

Large Decentralized Systems a Sustainable Wastewater Solution

Large Decentralized Systems a Sustainable Wastewater Solution Large Decentralized Systems a Sustainable Wastewater Solution Agenda The Good Fight Centralized Exposed in the Real World Decentralized Model System Examples Dennis F. Hallahan, P.E. Technical Director

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

LAFCO ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM RIVERBEND)

LAFCO ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM RIVERBEND) 4.a. 4/17/2014 TO: FROM: Local Agency Formation Commission Adriana Romo, Local Government Analyst II SUBJECT: LAFCO 2013-10-2 ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM 36391-RIVERBEND) PRIOR

More information

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72 January 2015, Issue 72 PipeLine Contents 1 I Increasing Sewer Capacity 4 I HOBAS Pipe Chosen for Large Diameter Force Main 6 I 26 Year Old Force Main Still Performing Well 8 I HOBAS Pipe Expands Field

More information

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER SECTION 7.0 RECLAIMED WATER 7.1 Introduction The use of highly treated wastewater effluent, or reclaimed water, has expanded greatly in Florida over the past several decades. In particular, the use of

More information

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax ATTACHMENT 4 Section 3.0 - Project Status Quarterly Report - Dec 31, 2015 Completed Projects Description Bicknell Avenue Green Street Pier Storm Drain Improvement Pier Water Quality Improvement Permeable

More information

Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera. A project of the Municipality of Puerto Galera

Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera. A project of the Municipality of Puerto Galera Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera A project of the Municipality of Puerto Galera Why do we need a sewage system? Brgy. SABANG, PUERTO GALERA, 2006 FECAL COLIFORM

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017 CONSENT ITEM 7 LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017 Proposal Phillips Street Reorganization (City of Vista) (RO17-06) Proponent City of Vista,

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6 UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN CONSTRUCTION, INC. PG. 6 TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT TRAUTWEIN CONSTRUCTION, INC. TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT

More information

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016 Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

CEE 371 May 14, 2009 Final Exam

CEE 371 May 14, 2009 Final Exam CEE 371 May 14, 2009 Final Exam Closed Book, two sheets of notes allowed Please answer questions 3, 6 and 7. In addition, answer either question 1 or 2, and answer either question 4 or 5. The total potential

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS NATURE OF SERVICE PROVIDED: VOTE: November 21, 2016 Effective Date: All billing after January 1, 2017 Service Area: All Wastewater service shall be provided for the purposes provided to users in accordance

More information

TECHNICAL PROCEDURE TABLE OF CONTENTS

TECHNICAL PROCEDURE TABLE OF CONTENTS TECHNICAL PROCEDURE No. Page DATE: 07/3/5 CATEGORY UNDERGROUND STRUCTURES SUBJECT OF SMUD s UNDERGROUND TRANSMISSION TABLE OF CONTENTS PURPOSE... 2 2 REFERENCES... 2 3 MINIMUM REQUIREMENTS... 2 4 RELATED

More information

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department 1

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department  1 Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department www.miamidade.gov/water 1 Miami-Dade Water and Sewer Department (WASD) Largest Water & Sewer Utility in the Southeastern United

More information

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER: FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: Lathrop, CA GEO. AREA: Northern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: MBR MANUFACTURER: Unknown OPERATED BY: FUNDED

More information

CHAPTER 5 WASTEWATER FLOWS

CHAPTER 5 WASTEWATER FLOWS CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the construction of sewer and/or water pipeline or watermain crossings of rivers and other

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 3E From: Date: Subject: Staff May 19, 2017 Council Meeting Local Government Comprehensive Plan Review Draft

More information

National Utility Contractors Association, Hawaii Chapter. Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014

National Utility Contractors Association, Hawaii Chapter. Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014 National Utility Contractors Association, Hawaii Chapter Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014 Project Background KAHUKU PAALAA KAI LAIE WAIANAE WAHIAWA HONOULIULI

More information

Choctaw Lake Property Owners Association DRAINAGE SPECIFICATIONS (Approved by the Board of Trustees January 9, 2018)

Choctaw Lake Property Owners Association DRAINAGE SPECIFICATIONS (Approved by the Board of Trustees January 9, 2018) ADOPTED BY CHOCTAW LAKE BOARD OF TRUSTEES ORIGINAL APPROVAL SEPTEMBER 20, 1990 REVISED AND APPROVED AUGUST 10, 2004, JANUARY 9, 2018 THIS DOCUMENT IS A PART OF THE CLPOA BUILDING CODE CHANGES TO THIS DOCUMENT

More information

2.0 PROJ ECT D ESCRI PTION

2.0 PROJ ECT D ESCRI PTION 2.0 PROJ ECT D ESCRI PTION 2.1 PROJECT LOCATION The proposed project is in the City of Los Angeles (Figure 2.1-1, Regional Project Location Map) in the communities of Venice and Playa Del Rey (see Figure

More information

AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS

AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS Ver.1 Date: October 2014 1. SCOPE This section covers the inspection of existing sewer and stormwater pipelines before and after the construction

More information

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

1.0 INTRODUCTION 1.1 EIR REQUIREMENT This Draft Environmental Impact Report (EIR) describes the potential environmental effects that could result from implementation of the proposed Sonoma County General Plan 2020 (Draft GP 2020), which provides

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

Approved August 12, 1991 Amended June 8, 2009

Approved August 12, 1991 Amended June 8, 2009 Approved August 12, 1991 Amended June 8, 2009 THIS PAGE INTENTIONALLY LEFT BLANK Page WW-0 W A S T E W AT E R G O A L S, O B JECTIVES & POLICIES GOAL 1 To provide efficient and economic wastewater services

More information

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that: 6.0 Comparison of Proposed Project and Alternatives This chapter summarizes the environmental advantages and disadvantages associated with the Proposed Project and the alternatives. Based upon this discussion,

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E' North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper MA-T4-02 Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

SPILL ESTIMATION. Not Just A Guess Anymore

SPILL ESTIMATION. Not Just A Guess Anymore SPILL ESTIMATION Not Just A Guess Anymore SPILL ESTIMATION Under current regulations accurate spill estimation has become critical to the operation and maintenance of a sanitary collection system Reporting

More information

The New Age for Sewer Planning at the City of Los Angeles

The New Age for Sewer Planning at the City of Los Angeles The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.

More information

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley SELECTION OF TUNNEL METHODS By: Dr. Gary S. Brierley Successful Tunnel Design 2 Produce a satisfactory finished facility for no more money and in no more time than is required for the existing ground conditions.

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS GRANDES, CHIHUAHUA Submitted: May 31, 2013 CERTIFICATION PROPOSAL CAP GRANT, NUEVO CASAS GRANDES, CHIH. CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS

More information

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS PRODUCT NAME: PRODUCT DESCRIPTION: DISTRIBUTOR'S NAME: DISTRIBUTOR'S ADDRESS: DISTRIBUTOR'S PHONE NUMBER: MANUFACTURER S NAME:

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado Dual Water Systems in Northern Colorado By Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado In northern Colorado, the cost of water rights acquisition has risen dramatically over the

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings

1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings G U I D E L I N E S F O R L A N D O W N E R S, D E V E L O P E R S A N D C O N T R A C T O R S T A B L E O F C O N T E N T S 1 Introduction 2 Office Locations/Map 3 General Requirements 4 Structures and

More information

CITY OF KODIAK. Downtown Water, Sewer, and Storm Drain Master Plan. February 2015

CITY OF KODIAK. Downtown Water, Sewer, and Storm Drain Master Plan. February 2015 CITY OF KODIAK Downtown Water, Sewer, and Storm Drain Master Plan February 2015 CITY OF KODIAK DOWNTOWN WATER, SEWER, AND STORM DRAIN MASTER PLAN Prepared for: City of Kodiak 2410 Mill Bay Road, 99615

More information

Gwinnett County Department of Water Resources

Gwinnett County Department of Water Resources Metropolitan North Georgia Water Planning District 2014 Implementation Survey WASTEWATER MANAGEMENT PLAN Name: Jurisdiction: Gwinnett County Department of Water Resources Email: Phone: Wastewater Collection

More information

SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE

SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE 5.1 Overview SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE The Crockett Community Services District (CCSD) was formed in 2006 through the reorganization of three agencies: Crockett-Valona

More information

City of Needles Waste Water

City of Needles Waste Water City of Needles Waste Water Sewer System Management Plan (SSMP) 817 Third Street Needles, CA 92363 March 2011 Table of Contents LIST OF ABBREVIATIONS... 3 Section I GOALS... 5 Section II ORGANIZATION...

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL EXPANSION OF WATER AND WASTEWATER SERVICES TO UNSERVED AREAS OF THE PIEDRA ANGULAR COLONIA TECATE, BAJA CALIFORNIA Published: November 7, 2014 EXPANSION OF WATER AND WASTEWATER SERVICES TO UNSERVED AREAS

More information

In the final EIR/EIS, FRWA commits to maintaining operational noise levels at or below existing background noise levels.

In the final EIR/EIS, FRWA commits to maintaining operational noise levels at or below existing background noise levels. Freeport Regional Water Authority and the U.S. Department of the Interior, Bureau of Reclamation Chapter 8. Responses to Comments from Individuals Mary McDonald (I40) Response to Comments of Mary McDonald

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

HAMPTON ROADS SANITATION DISTRICT CAPITAL IMPROVEMENT PROGRAM FY 2003 to 2007 PROJECT SUMMARY

HAMPTON ROADS SANITATION DISTRICT CAPITAL IMPROVEMENT PROGRAM FY 2003 to 2007 PROJECT SUMMARY 56 Nansemond Project Name Bowers Hill and Deep Creek Pressure Reducing Stations Generator Upgrades Line/PS No. Account No. 3-3325-XXXXX-2320 VRLF No. Replacement Design Underway This project will design

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

STAFF REPORT SAUSALITO CITY COUNCIL

STAFF REPORT SAUSALITO CITY COUNCIL STAFF REPORT SAUSALITO CITY COUNCIL MEETING DATE: June 14, 2016 AGENDA TITLE: Approving a Variance from the Elevation Requirements of the Floodplain Management Section of the Sausalito Building Code for

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information