HOMOSASSA WASTEWATER COLLECTION SYSTEM

Size: px
Start display at page:

Download "HOMOSASSA WASTEWATER COLLECTION SYSTEM"

Transcription

1 HOMOSASSA WASTEWATER COLLECTION SYSTEM

2 Project Purpose To improve the water quality of the Homosassa River by removing septic tanks and package wastewater treatment plants from environmentally sensitive areas adjacent to the river. Septic tanks and package wastewater treatment plants in close proximity to the river were identified as a major source of nutrients and bacteria affecting water quality (Homosassa Water Quality Study 1989).

3 What Has Been Done So Far? Phase 1 - constructed a wastewater forcemain and pumping stations to take the failing Riverhaven WWTP offline and connect to the County s central sewer system Phase 2 constructed additional forcemains to take the subaqueous line under the river out of service and provide a point of connection for future projects on the south side of the river and US 19 (wildlife park) Phase 3 constructed wastewater collection system to serve all of Halls River Road Phase 4 constructed wastewater collection system to serve Chassahowitzka

4 Who is connected? Riverhaven All properties adjacent to Halls River Road Sweet Bay Shopping Center Publix Shopping Center Winn Dixie Shopping Center Riverside Inn Homosassa Elementary MacRae s The Freezer Homosassa Wildlife State Park Camp n Water Riverview MHP

5 Properties Connected to Sewer 2,326 Total improved lots 1,104 Lots with sewer connection 1,222 Lots with no sewer connection 47% of improved lots are connected

6 Grant Funding to Date Phase 1 (Riverhaven to Meadowcrest WWTP) - $3,500,000 Phase 2 (Yulee Drive) - $2,500,000 Phase 3 (Halls River Road) - $2,201,800 Phase 4 (Chassahowitzka) - $8,150,300 Phase 5 (Blue Water Forest/Spring Cove Rd) - $1,000,000 ($827,096 available) TOTAL = $17,352,100 (through 2/2008)

7 Why Now??? County recently received notification from the State that the remaining funds in the grant are not likely to be certified forward past this June. The County is working to preserve the funding for this project and to acquire additional funding.

8 Recent Funding Requests SWFWMD Cooperative Funding Application for FY 2014 funding Restore Act (BP Oil Spill) Funding Application submitted December 2012.

9 Assessments Riverhaven $1,258 (covered upgrades of existing system) Halls River Road $5,160 (covered project costs over and above grants) Chassahowitzka - $ (covered project costs over and above grants)

10 Proposed Phase 5 Project System expansion is targeted for areas that are in close proximity to the springs Proposed project would serve Blue Water Forest, certain homes on Fishbowl Drive, Bob Court, and Spring Cove Road (approx. 106 total properties) Project would be funded through a combination of available grant funds and assessments of benefiting property owners

11

12 Type of Sewer Options Area could be served by two different types of sewer systems, conventional gravity sewer or low-pressure sewer

13 GRAVITY SEWER Gravity sewer systems rely on gradually sloping pipelines to allow the wastewater to flow naturally downhill, away from your property and into the collection network. This network ultimately transports flows to a local or regional treatment plant.

14 Advantages and Disadvantages of Gravity Sewer Advantages: Minimal facilities in front of individual homes Low maintenance costs and high reliability due to fewer mechanical systems System functions reasonably well during power outages Disadvantages: Higher initial construction costs due to deep excavation to meet slope requirements

15 Gravity Sewer Manhole

16 Cleanout on sewer lateral

17 LOW PRESSURE SEWER Low pressure sewer systems rely on individual lift stations at each connection to pump wastewater into a shared forcemain, which ultimately pumps into the larger central wastewater collection system leading to a regional treatment plant.

18 Advantages and Disadvantages of Low Pressure Sewer Advantages: Lower initial construction costs due to shallower excavation and smaller pipe sizes Disadvantages: Requires that a small pump station be sited on each lot Electric costs are paid by the individual property owners Requires easements for pump station siting and access to electrical panel mounted on the exterior of the home May be less reliable during power outages

19 Typical Low Pressure Pump Station

20 Individual Pump Station

21 Low pressure pump stations in Harbor Isle

22 Electrical Control Panel on side of home

23 Cost Comparison of Sewer Options Conventional Gravity Sewer: Typical Capital Costs for prior projects west of US 19 Halls River Road - $10,082/connection (426 connections) Chassahowitzka - $13,661/connection (600 connections) Homosassa Ph5 estimate - $19,055/connection (106 connections) Low Pressure Sewer: Typical Capital Costs for low pressure sewer based on the recent Harbor Isle project - $15,831/connection Homosassa Ph5 estimate - $13,050/connection

24 Estimated Assessments for Sewer Options Conventional Gravity Sewer: Total project cost $2,019,830 FDEP Grant funds available ($ 827,096) SWFWMD Cooperative Funding - ($??? ) Total to be assessed $1,192,734 Per lot assessment (106 lots) $ 11,252 Low Pressure Sewer: Total project cost $1,383,300 FDEP Grant funds available ($ 827,096) SWFWMD Cooperative Funding - ($??? ) Total to be assessed $ 556,204 Per lot assessment (106 lots) $ 5,247

25 Other Fees Associated with Sewer Connections County Wastewater Connection Fee - $3,380 County Plumbing Permit Fee - $100 Estimated Plumbing cost to connect from house to new system - $1,400 to $2,000 Septic Tank Abandonment Permit Fee - $50 Estimated cost for a septic tank contractor to pump out and demolish septic tank - $500 to $1,200

26 The Bottom Line Per lot assessment County Wastewater Connection Fee Financeable Subtotal - $5,247 to $11,252 $3,380 $8,627 to $14,632 County Plumbing Permit Fee $100 Estimated Plumbing cost$1,400 to $2,000 Septic Tank Abandonment Permit Fee - $50 Estimated cost to demolish septic tank - $500 to $1,200 Out of pocket Subtotal - $2,050 to $3,350 GRAND TOTAL - $10,677 to $17,982 (New septic costs are around $12,000 plus $350 permit fee)

27 Questions

North Easton Village Sewer Plan Public Meeting Presentation. Original October 7, 2010 Updated October 26, 2010

North Easton Village Sewer Plan Public Meeting Presentation. Original October 7, 2010 Updated October 26, 2010 North Easton Village Sewer Plan Public Meeting Presentation Original October 7, 2010 Updated October 26, 2010 Easton s Wastewater History 1970 s Region wide plan 1999 Wastewater Study Committee created

More information

Public Sewer System Informational Meeting

Public Sewer System Informational Meeting Public Sewer System Informational Meeting May 22, 2018 History Previous Studies 1998 Sewer District #1 1999 Village of Leicester Sewer Study 2002 Mount Morris Main Street Sewer 2002 Sewer District #1 2017

More information

Springs Initiative Grant Application by FGUA

Springs Initiative Grant Application by FGUA Springs Initiative Grant Application by FGUA Projects Submitted for FY2020 Funding Applicant Priority: 1. Burkitt Road Septic to Sewer Project 2. Chatmire Septic to Sewer Project 3. Rainbow River & Rio

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

WATER/WASTEWATER/REUSE MASTER PLAN UPDATE

WATER/WASTEWATER/REUSE MASTER PLAN UPDATE WATER/WASTEWATER/REUSE MASTER PLAN UPDATE Background Summary Citrus County Water/Wastewater/Reuse Master planning efforts have not been updated since 2000. During this time, the County s utility system

More information

Springs Initiative Grant Application by City of Ocala

Springs Initiative Grant Application by City of Ocala Springs Initiative Grant Application by City of Ocala Projects Submitted for FY2020 Funding Applicant Priority: 1. Foxwood Farms Water Quality Improvement Project Presented Separately 2. Fairfield Village

More information

Project Summary. Utilities Division. Sources of Funding. Total Funding Capital Expenditures. Total Expenditures Capital Improvement Projects:

Project Summary. Utilities Division. Sources of Funding. Total Funding Capital Expenditures. Total Expenditures Capital Improvement Projects: Project Summary Sources of Funding Water Connection Fees 8,234,594 1,508,000 5,541,319 795,000 3,536,419 250,000 3,156,169 250,000 5,279,794 1,914,000 25,748,295 4,717,000 Wastewater Connection Fees 45,000

More information

Ellis County Environmental Office

Ellis County Environmental Office Ellis County Environmental Office 718 Main Lower Level, Hays, KS 67601 P (785) 628-9449 F (785) 628-9448 E karen@ellisco.net W ellisco.net ELLIS COUNTY Wastewater Construction Procedures 1. Contact the

More information

Public Information Centre No. 1

Public Information Centre No. 1 Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation

More information

Town of Sewall s Point Septic Tank to Sanitary Sewer. History

Town of Sewall s Point Septic Tank to Sanitary Sewer. History November 15, 2016 History In 2015, Martin County Utilities completed a Septic to Sewer conversion study which illustrated the need to remove septic tanks from the Indian River Lagoon and St. Lucie Estuary.

More information

Carnuel Waste Water System Improvements Project Public Hearing March 27, 2013

Carnuel Waste Water System Improvements Project Public Hearing March 27, 2013 Carnuel Waste Water System Improvements Project Public Hearing March 27, 2013 Current Status on Wastewater Project Preliminary Engineering Report (PER) FINAL PER has been reviewed and approved by the NM

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

BERRY CREEK WASTEWATER INTERCEPTOR PROJECT. December 11, 2018

BERRY CREEK WASTEWATER INTERCEPTOR PROJECT. December 11, 2018 BERRY CREEK WASTEWATER INTERCEPTOR PROJECT December 11, 2018 Project Team City of Georgetown Owner Walker Partners Design Consultant SWCA Environmental and Hydrogeology Cambrian Geologic Assessment and

More information

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE Water and Wastewater Servicing Alternatives Public Information Meeting No. 2 March 20, 2018 1 MSP Update Objectives Develop water and wastewater

More information

UTILITY HISTORY 2015 DESOTO COUNTY, FLORIDA

UTILITY HISTORY 2015 DESOTO COUNTY, FLORIDA UTILITY HISTORY 2015 DESOTO COUNTY, FLORIDA Background and History On May 21, 1991, DeSoto County, Florida, (the "County") signed an agreement with the Peace River Manasota Regional Water Supply Authority

More information

Charlotte County Utilities

Charlotte County Utilities Charlotte County Utilities Past, Present, and Future Board Workshop - April 16, 2013 Past CHARLOTTE COUNTY UTILITIES ESTABLISHED 1991 CCU Beginnings General Development Utilities (GDU) A Florida Corporation

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS VILLAGE OF CORRALES WASTEWATER UTILITY (SEWER) SYSTEM AND INDIVIDUAL PROPERTY OWNER SERVICE CONNECTIONS I. AVAILABILITY OF SEWER SERVICE; WHEN CONNECTION IS REQUIRED. Q. Where

More information

Comparison State Policy Requirements, Proposed LAMP and Current County Regulations

Comparison State Policy Requirements, Proposed LAMP and Current County Regulations Connection to a Public Sewer STANDARD: Prohibits installation of new or replacement Systems when a public sewer is located within 200 feet from a building or a lot that abuts and is served by a public

More information

MINIMUM STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR WATER AND WASTEWATER SYSTEMS PREFACE

MINIMUM STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR WATER AND WASTEWATER SYSTEMS PREFACE MINIMUM STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR WATER AND WASTEWATER SYSTEMS PREFACE The Citrus County Water Resources Department, Utilities Division is committed to providing cost effective, quality

More information

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No Sawmill Road Area Sanitary Sewer Feasibility Study Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9 November 2008 Project No. 104258 Table of Contents SECTION TITLE PAGE

More information

Springs Coast Basin Management Action Plans (BMAPs)

Springs Coast Basin Management Action Plans (BMAPs) Springs Coast Basin Management Action Plans (BMAPs) January 2018 Terry Hansen P.G., Basin Coordinator 850-245-8561 terry.hansen@dep.state.fl.us Springs Coast BMAP Study Areas and Priority Focus Areas (PFAs)

More information

Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill

Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill Appendix B Addendum 1 - Revisions to the Operation and Training Plan (dated November 2015) for the Indian River County Class I Landfill The IRC Landfill 20-year Construction/Operation Permit Nos. 0128769-022-SC

More information

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA ABSTRACT SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA Daniel G. Burden, Ph.D., P.E., and Damann L. Anderson, P.E. Hazen and Sawyer, P.C. Patrick Zoeller, P.E. Sarasota

More information

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New

More information

Northern Region. Final Project Evaluations and Rankings

Northern Region. Final Project Evaluations and Rankings SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT Northern Region Cooperative Initiative Final Project s and Rankings 2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES

CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES This chapter evaluates alternative wastewater collection system technologies. Each technology is described along with the relative advantages and drawbacks for

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT A. Project Identification Name: Murray City Sewer Facilities Project (CS390037-0008) Carbon Hill Sewer Facilities Project (CS390037-0011) Address: Hocking County Commissioners

More information

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO. 2017-031 WELCOME PUBLIC MEETING NO. 2 February 21, 2018 CITY OF ANN ARBOR RIVERVIEW DRIVE SANITARY SEWER AND WATER

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,

More information

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO. 2017-031 WELCOME CITY OF ANN ARBOR RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT FILE NO. 2017-031

More information

Joint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments

Joint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments Opus DaytonKnight Consultants Ltd North Vancouver Office 210-889 Harbourside Drive North Vancouver BC V7P 3S1 Canada TO Joint Liquid Waste Management Advisory Committee COPY Bob Macpherson, District of

More information

Procedures for Connecting to Central Sewer System

Procedures for Connecting to Central Sewer System Procedures for Connecting to Central Sewer System These procedures and requirements are taken from the Taney County Regional Sewer District s appoved Sewer Use Regulation, Article 4 Building Sewers and

More information

2014 Regional Water Supply Plan

2014 Regional Water Supply Plan 2014 Regional Water Supply Plan SWFWMD Springs Coast Management Committee December 10, 2014 wrwsa.org Chapter 373, Florida Statutes Water Supply Authority Charge Plan for future water supplies for member

More information

Onsite Wastewater Treatment and Disposal Systems in Florida s Springsheds

Onsite Wastewater Treatment and Disposal Systems in Florida s Springsheds Onsite Wastewater Treatment and Disposal Systems in Florida s Springsheds Dr. Mary Lusk University of Florida Gulf Coast Research and Education Center Objectives Explain how a conventional septic system

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page

More information

2012 WASTEWATER PROJECTS

2012 WASTEWATER PROJECTS WASTEWATER PROJECTS 1 PROJECT NAME TABLE 1b - Wastewater Projects PROJECT STATUS SUMMARY UP PROJECT NUMBER PROJECT PHASE PERCENT COMPLETION Ocean Outfall Rule Change (Pilot) 10-9086 Design 10% Headworks

More information

APPLICATION FOR GRAVITY SEWER SERVICE CONNECTION

APPLICATION FOR GRAVITY SEWER SERVICE CONNECTION APPLICATION FOR GRAVITY SEWER SERVICE CONNECTION Permit Number ---------------------------- TO: Board of Sewer Commissioners 41 Highland Avenue Cohasset, MA 02025 (To be completed by Homeowner.) APPLICANT:

More information

I. Environmental Impacts of the HDD Method (Backyard Alignment)

I. Environmental Impacts of the HDD Method (Backyard Alignment) I. Environmental Impacts of the HDD Method (Backyard Alignment) The WSSC design team reviewed the Environmental Impacts of the proposed Horizontal Directional Drilling (HDD) construction method. The HDD

More information

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11 A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards 11 1. General 11 a. Future Extensions 11 b. Design Calculations 11 c. Easements and Property 12

More information

2013 WASTEWATER PROJECTS

2013 WASTEWATER PROJECTS WASTEWATER PROJECTS 1 PROJECT NAME TABLE 1b - Wastewater Projects PROJECT STATUS SUMMARY UP PROJECT NUMBER PROJECT PHASE April 2013 PERCENT COMPLETION Ocean Outfall Rule Change (Pilot) 10-9086 Design 50%

More information

Demolition Permit Procedure

Demolition Permit Procedure Building Permits & Inspection Division General Information: (916) 875-5296 www.building.saccounty.net Full Service Center 827 7th Street, Room 102 Sacramento, CA 95814 M-F 8:30am - 4:30pm Bradshaw Center

More information

City of Naples. Utilities Department Operation and Maintenance Budgets Fiscal Year Water & Sewer Solid Waste Equipment Services

City of Naples. Utilities Department Operation and Maintenance Budgets Fiscal Year Water & Sewer Solid Waste Equipment Services City of Naples Water & Sewer Solid Waste Equipment Services Utilities Department Operation and Maintenance Budgets Fiscal Year 2016-17 August 15, 2016 Water and Sewer Fund Total department expenses $21,859,133

More information

South Coast Water District

South Coast Water District South Coast Water District Providing Quality Water & Wastewater Services To the Coastal Communities SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Resolution of Necessity Hearing

More information

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply: SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works

More information

SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO. 6004R NOTICE TO CONTRACTORS

SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO. 6004R NOTICE TO CONTRACTORS SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO. 6004R NOTICE TO CONTRACTORS Notice is hereby given that the Board of Directors of Sacramento Area Sewer District of Sacramento

More information

SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO NOTICE TO CONTRACTORS

SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO NOTICE TO CONTRACTORS SACRAMENTO AREA SEWER DISTRICT FREEPORT SEPTIC CONVERSION PROJECT CONTRACT NO. 6004 NOTICE TO CONTRACTORS Notice is hereby given that the Board of Directors of Sacramento Area Sewer District of Sacramento

More information

GUIDELINE FOR PROVIDING WATER AND SEWER SERVICE TO DEVELOPER PROJECTS AND PUBLIC OR PRIVATE PROPERTIES

GUIDELINE FOR PROVIDING WATER AND SEWER SERVICE TO DEVELOPER PROJECTS AND PUBLIC OR PRIVATE PROPERTIES Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 GUIDELINE FOR PROVIDING

More information

Potable Water & Wastewater Element

Potable Water & Wastewater Element Goals, & Potable Water & Wastewater Element TO PROVIDE ADEQUATE, SAFE, ECONOMIC, RELIABLE AND ENVIRONMEN- TALLY SOUND WATER AND WASTEWATER UTILITY SERVICES. GOAL 1 Water and wastewater services shall be

More information

Summary of Outstanding Florida Springs Basin Management Action Plans June 2018

Summary of Outstanding Florida Springs Basin Management Action Plans June 2018 Summary of Outstanding Florida Springs Basin Management Action Plans June 2018 Prepared by the Howard T. Odum Florida Springs Institute (FSI) Background The Florida Springs and Aquifer Protection Act (Chapter

More information

CHAPTER FIVE INFRASTRUCTURE ELEMENT

CHAPTER FIVE INFRASTRUCTURE ELEMENT CHAPTER FIVE INFRASTRUCTURE ELEMENT SANITARY SEWER SUBELEMENT Updated: EAR BASED AMENDMENTS July 11, 2006, Ord. No. 2006-A12 December 11, 2007, Ord. No. 2007-A37 (Sanitary Sewer Sub-element) September

More information

Application for LIVINGSTON REGIONAL SANITARY SEWER (LRSS) Connection with GRINDER PUMP or Step System

Application for LIVINGSTON REGIONAL SANITARY SEWER (LRSS) Connection with GRINDER PUMP or Step System -7581 WWW.LIVGOV.COM/DRAIN (E-Mail: drain@livgov.com ) Application for LIVINGSTON REGIONAL SANITARY SEWER (LRSS) Connection with GRINDER PUMP or Step System Site Address: City: Zip: Lot Number: Parcel

More information

Decentralized Wastewater Collection and Treatment Alternatives

Decentralized Wastewater Collection and Treatment Alternatives Decentralized Wastewater Collection and Treatment Alternatives Bethel Heights, Arkansas A Case Study 9/9/09 #1 Introduction and Background Introduction and Background Introduction and Background 2000 Census

More information

DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS

DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS VI-1.000 DESCRIPTION 1.010 General A. Any extension of the Kitsap County sanitary sewer extension shall be completed in accordance with the applicable

More information

8. Vertical Alignment (Profiles).

8. Vertical Alignment (Profiles). 8. Vertical Alignment (Profiles). a. Cover Over Pipeline. 1) Normal depth for sewer pipelines is eight (8) to ten (10) feet measured from the lowest profile grade or ground line. 2) Provide a minimum of

More information

CHAPTER 18: SANITARY SEWER SYSTEMS Introduction and Goals Administration Standards Standard Attachments 18.

CHAPTER 18: SANITARY SEWER SYSTEMS Introduction and Goals Administration Standards Standard Attachments 18. 18.00 Introduction and Goals 18.01 Administration 18.02 Standards 18.03 Standard Attachments 18.1 18.00 INTRODUCTION AND GOALS The purpose of this chapter is to provide guidance and outline specific standards

More information

Partners in Water Quality

Partners in Water Quality Partners in Water Quality Presentation to the Treasure Coast Regional Planning Council Mayor Gregory J. Oravec Port St. Lucie is a Safe, Beautiful and Prosperous City for All People When they laid out

More information

City Hall ADA Ramp Grand Prairie, TX Cooper Square Addition Land Planning and Development Mansfield, TX Cavender s Boot City Hurst, TX January 2015

City Hall ADA Ramp Grand Prairie, TX Cooper Square Addition Land Planning and Development Mansfield, TX Cavender s Boot City Hurst, TX January 2015 Civil Engineering City Hall ADA Ramp Grand Prairie, TX Project involved the design of a new ADA ramp for Grand Prairie s City Hall. Services included land planning, storm sewer installation, site erosion

More information

Public Notice for Comment

Public Notice for Comment Water Pollution Control District Public Notice for Comment The Logan County Water Pollution Control District is revising its Construction Standards regarding the installation, repair and inspection of

More information

City of Benicia Water and Sewer Rate Questions and Answers September 5, 2017

City of Benicia Water and Sewer Rate Questions and Answers September 5, 2017 City of Benicia Water and Sewer Rate Questions and Answers The following are a list of questions that were asked at the August 15, 2017 City Council meeting and the answers. 1. Why were the water meters

More information

Your Place in the Watershed

Your Place in the Watershed Your Place in the Watershed Subject Area: Natural Resources Unit Title: Colorado Watersheds Grade Level: 4th & 5th grade Objectives: To help students understand the concept of watersheds and the importance

More information

ENVIRONMENTAL ASSESSMENT: DASHWOOD/LAKESHORE SANITARY SEWAGE COLLECTION SYSTEM

ENVIRONMENTAL ASSESSMENT: DASHWOOD/LAKESHORE SANITARY SEWAGE COLLECTION SYSTEM THE CORPORATION OF THE MUNICIPALITY OF BLUEWATER ENVIRONMENTAL ASSESSMENT: DASHWOOD/LAKESHORE SANITARY SEWAGE COLLECTION SYSTEM FREQUENTLY ASKED QUESTIONS (Last updated March 24, 2011) Compiled by: Brent

More information

SANITARY SEWER COLLECTION SYSTEM and March 12, 2015 RE-USE LINE

SANITARY SEWER COLLECTION SYSTEM and March 12, 2015 RE-USE LINE MATTHEWS INDUSTRIAL PARK Request For Bid No. FY15-0401 SANITARY SEWER COLLECTION SYSTEM and March 12, 2015 RE-USE LINE ADDENDUM #2 The following items shall take precedence over the drawings and specifications

More information

Water Service Connection/Alteration Permit Application

Water Service Connection/Alteration Permit Application Water Service Connection/Alteration Permit Application Application Date: Applicant Name : Company Name (if applicable) : Address : City, State, ZIP : Phone : ( ) Site Information : Site Address : Permanent

More information

Small Community Wastewater Collection and Treatment Alternatives

Small Community Wastewater Collection and Treatment Alternatives Small Community Wastewater Collection and Treatment Alternatives A Case Study on a Water & Wastes Digest 2015 Top Projects Award Winning System at Christiansburg, OH Julie Barown, P.E. Orenco Systems,

More information

Northfield Township Sanitary Sewer System 2550 Waukegan Road, Suite 100 Glenview, IL

Northfield Township Sanitary Sewer System 2550 Waukegan Road, Suite 100 Glenview, IL Overhead Sanitary Sewer Conversion Cost-sharing Reimbursement Program Who? Residents who are connected to a Northfield Township Sanitary Sewer System-maintained sanitary sewer with gravity sewer service

More information

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road Fact Sheet C1 Performance & Cost for Decentralized Unit Processes COLLECTION SERIES DECENTRALIZED WASTEWATER SYSTEMS What is a Gravity Sewer System? A gravity sewer system is used to collect wastewater

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS SANITARY SEWER MAIN AND LATERAL INSTALLATION JANUARY 2017

More information

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT The following checklist identifies the minimum requirements for acceptance of an application for

More information

Building Consent Process

Building Consent Process 1 Building Consent Process Other Approvals You May Need For Your Building Project 2 Contents Page Council utilities: water supply, sewage disposal, stormwater disposal 3 Sewer connection/disconnection

More information

Florida Keys Aqueduct Authority

Florida Keys Aqueduct Authority Cudjoe Regional Wastewater Treatment District Cudjoe Regional Service Area April 30, 2018 Background The Florida Keys Aqueduct Authority (FKAA) is installing a central wastewater system in the Cudjoe Regional

More information

WELCOME SEWER INFORMATION MEETING

WELCOME SEWER INFORMATION MEETING WELCOME SEWER INFORMATION MEETING 4:00 9:00 PM Please sign in Short Presentation given at 4:10 PM, 5:00 PM, 6:00 PM, 7:00 PM & 8:00 PM How Do I Give Comments? 1. Please fill in feedback form before leaving

More information

EXECUTIVE SUMMARY February 6, 2007

EXECUTIVE SUMMARY February 6, 2007 HOLLISTON BOARD OF HEALTH REGULATIONS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, REPAIR AND EXPANSION OF ON-SITE WASTEWATER DISPOSAL SYSTEMS. EXECUTIVE SUMMARY February 6, 2007 The present Board

More information

5SECTION IX - FACILITY LOAD AND OTHER DESIGN CRITERIA

5SECTION IX - FACILITY LOAD AND OTHER DESIGN CRITERIA 4 5SECTION IX - FACILITY LOAD AND OTHER DESIGN CRITERIA 9.01 SITING All proposed structures will be located above the 638 feet NGVD flood pool. Site selection will be based on environmental concerns including

More information

ON-SITE SEWAGE PERMITTING PROCESS

ON-SITE SEWAGE PERMITTING PROCESS Whitman County Environmental Health ON-SITE SEWAGE PERMITTING PROCESS STEP I. SOIL & SITE EVALUATION Complete the front page of the OSS Site Evaluation Application and schedule an appointment with an Environmental

More information

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works Sanitary Sewer 101 Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works What We Will Cover -What is Sanitary Sewer? -Components -History -What types of systems are there? -What types of materials

More information

An Introduction to Pressure Sewers. Copyright Submersible Wastewater Pump Association (SWPA)

An Introduction to Pressure Sewers. Copyright Submersible Wastewater Pump Association (SWPA) An Introduction to Pressure Sewers Copyright 2010. Submersible Wastewater Pump Association (SWPA) Page 2 A Pressure Sewer is... A sanitary sewer system that utilizes a network of grinder pumps to transport

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure

More information

South Pigeon Lake. reduced need for wastewater trucking, better protection of human health through improved wastewater management,

South Pigeon Lake. reduced need for wastewater trucking, better protection of human health through improved wastewater management, South Pigeon Lake Regional Wastewater Collection System The new regional wastewater collection system represents a notable step forward in municipal infrastructure for the residents and municipalities

More information

PERMIT APPLICATION FEES Fees must be paid at time of application

PERMIT APPLICATION FEES Fees must be paid at time of application Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful

More information

City of Marathon Sewer Lateral Connection Standards

City of Marathon Sewer Lateral Connection Standards City of Marathon Sewer Lateral Connection Standards Required Permitting, Testing and Inspections The Building Code requires that you obtain a permit from the City before you begin installation of your

More information

Mayo Sewer System. Chris Phipps, P.E., Director Jia Liu, Acting Utility Administrator, Central Maintenance Victor Kibec, Senior Engineer

Mayo Sewer System. Chris Phipps, P.E., Director Jia Liu, Acting Utility Administrator, Central Maintenance Victor Kibec, Senior Engineer Mayo Sewer System Chris Phipps, P.E., Director Jia Liu, Acting Utility Administrator, Central Maintenance Victor Kibec, Senior Engineer Department of Public Works History of Mayo Service Area Geographical

More information

AGENDA NORTH BAY VILLAGE WORKSHOP PRESENTATION ON WATER, SEWER AND STORMWATER INFRASTRUCTURE PROJECTS

AGENDA NORTH BAY VILLAGE WORKSHOP PRESENTATION ON WATER, SEWER AND STORMWATER INFRASTRUCTURE PROJECTS North Bay Village Administrative Offices 1666 Kennedy Causeway, Suite 300 North Bay Village, FL 33141 Tel: (305) 756-7171 Fax: (305) 756-7722 Website: www.nbvillage.com AGENDA NORTH BAY VILLAGE WORKSHOP

More information

PROGRAM OVERVIEW... 3 REAR YARD DRAINAGE COST SHARE PROGRAM... 3 REAR YARD DRAINAGE PROGRAM PROCEDURE... 4 RULES AND RESTRICTIONS...

PROGRAM OVERVIEW... 3 REAR YARD DRAINAGE COST SHARE PROGRAM... 3 REAR YARD DRAINAGE PROGRAM PROCEDURE... 4 RULES AND RESTRICTIONS... Village of Franklin Park Cost Share Program The Village of Franklin Park Cost Share Program includes a Rear Yard Drainage Program and an Overhead Sewer Program. Both programs have been created to assist

More information

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet. SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Memorandum. Corey Mathisen, MPCA

Memorandum. Corey Mathisen, MPCA Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: CC: From: Corey Mathisen, MPCA Diane Hankee, WSB

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM CITY OF NEW PORT RICHEY PASCO COUNTY, FLORIDA FY 2014/2015 - FY 2018/2019 Presented September 3, 2014 Rob Marlowe, Mayor Judy DeBella Thomas, Deputy Mayor Bill Phillips, Councilman

More information

Sanitary Sewer Fees 101. November 27, 2018

Sanitary Sewer Fees 101. November 27, 2018 Sanitary Sewer Fees 101 November 27, 2018 Background The City of Sausalito owns and operates a sewer collection system conveying wastewater to the Sausalito Marin-City Sanitary District (SMCSD) for treatment

More information

GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018

GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018 GWA Special Work Session - April 10, 2018 - Agenda GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018 AGENDA 1. ISSUES FOR DISCUSSION 1.1 DRAFT GWA Master Plan

More information

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE I. SCOPE This guide has been prepared to inform the residential property owner of the permitting process

More information

Wastewater Collection. (Sewer Alternatives)

Wastewater Collection. (Sewer Alternatives) Wastewater Collection (Sewer Alternatives) Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs. Wastewater Characterization Solids Liquids Pipe

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

Why is protecting the groundwater so important?

Why is protecting the groundwater so important? Protecting our water resources from infiltration has been a major concern for units of government for several years. Prompted by the Michigan Department of Environmental Quality, government officials have

More information

New York City s Watershed Protection Program. David S. Warne Assistant Commissioner New York City Department of Environmental Protection

New York City s Watershed Protection Program. David S. Warne Assistant Commissioner New York City Department of Environmental Protection New York City s Watershed Protection Program David S. Warne Assistant Commissioner New York City Department of Environmental Protection Presentation Outline Water Supply System Overview Watershed Program

More information

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 338201s CCTV Pipeline Inspection (see http://energy.ubc.ca/communityservices/contractors-developers/).2 330130.41s Cleaning of Sewers (link as above)

More information

History of the City of Keller Sanitary Sewer System

History of the City of Keller Sanitary Sewer System History of the City of Keller Sanitary Sewer System Dec. 8, 2015 Keith Fisher, P.E. Director of Public Works Sanitary Sewer History The City of Keller s introduction into the sanitary sewer service business

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information