City of Miamisburg Parks and Recreation Department Park Maintenance Standards February 2005

Size: px
Start display at page:

Download "City of Miamisburg Parks and Recreation Department Park Maintenance Standards February 2005"

Transcription

1 City of Miamisburg Parks and Recreation Department Park Maintenance s February 2005

2 Table of Contents Administration & Training 3 Athletic Diamonds & Fields 3 Basketball/Tennis Courts 5 BMX Tail 5 Event Support 6 Facility Amenities 6 Landscape & Horticulture 10 Maintenance Building 10 Park Areas & Shelters 11 Playground Equipment & Areas 12 Restrooms 12 Sand Volleyball Court 13 Skate Park 13 Turf 14 Vehicle & Equipment Maintenance 14 City of Miamisburg 10/22/2010 2

3 Administration & Training Division development, discuss operations Staff meeting participation N/A N/A N/A All Employees are trained on operational safety procedures; concerns are discussed Monthly safety meeting participation N/A N/A N/A All Employees receive continual training on operational tasks and Ongoing training and professional development retain certifications N/A N/A N/A As necessary Departmental development Participation in staff meetings and retreats N/A N/A N/A All Athletic Diamonds & Fields Amenities Backstops, fences free of protruding spokes, hazards; Benches clean, planks securely fastened, Inspect, repair free of splinters, graffiti; Bleachers and planks securely connected, free of splinters, graffiti; Dugout frames & roofs free of scratches, dirt, graffiti; Gates secure, hinges & locks function properly. Tool box, fence tools Ties, clasps, bolts, nuts Safety glasses, ear plugs, gloves 2 City of Miamisburg 10/22/2010 3

4 Fence line, benches, bleachers free of overgrown grass and weeds Chemical control, remove weeds Hand sprayer, chemical signs Chemicals Rubber gloves, goggles, respirators 1 Turf (soccer and baseball/softball) Turf free of weeds, bare spots Spray, fertilize, aerate, slit seed Spreader, rake Top soil, grass seed, fertilizer Gloves 2 Ball Diamonds Diamond dirt surface graded, loose, free of rocks, weeds Re-grade, repair, drag, rake Tractor box, rake Ball diamond dirt, field dry Ear plugs, gloves 1 Diamond prepared for play Drag, line, rake, check bases, mounds, plates Tractor, drag, string, hand tools, liner, paint sprayer, tape measure Lime, paint, bases, mound Safety glasses, gloves 2 Walkways Concrete areas free of weeds, mud, water, debris Inspect, clean, blow surface Blower, litter picker, bucket, power washer, hand tools Water Gloves, safety glasses, ear plugs 1 City of Miamisburg 10/22/2010 4

5 Basketball/Tennis Courts Safe surface (smooth, free of cracks, weeds, graffiti), Paint, lines are solid (no cracks), Inspect, repair or replace Poles, rims, and nets securely connected (all screws, bolts are in place, not rusted, rims are level), Backboards free of rust, dents Bucket truck Rim, net, nuts, bolt Safety glasses, gloves 1 Nets free of rips, tears, tennis nets at correct height Inspect, repair Knife Nets, string N/A 1 Area frees of trash, debris, dirt, cigarette butts, weeds, etc. Inspect, clean Trash picker, vac/blower Graffiti remover, can liners Rubber gloves, ear plugs, safety glasses 1 BMX Trail Trail checked for ruts & protruding rocks; Ramps & Landings must be free of loose stone, ruts greater than 2 deep and/or wide & protruding rocks greater then 1 above surface. Inspect, document findings, repair, document repairs Shovel, Rake, Hose, Tamper Ball diamond clay Gloves 1 Area & surface is safe, clean (no loose rocks, water, weeds, limbs, free of trash, Inspect, clean, weed debris, cigarette butts, graffiti, stickers, etc.) Trash pickers N/A Gloves 1 City of Miamisburg 10/22/2010 5

6 Event Support Provide site preparation, set up, tear down, on-site support for events Provide items as required Specific to event Specific to event Specific to task Specific to event Facility Amenities Benches Secure, free of hazards, chipped paint, graffiti, likens Inspect, repair, clean Socket set, drill, paint brush Paint, 2x4 nuts, bolts, wood planks Safety glasses, gloves 1 Bridge/Steps Wood secure, free of protruding rails, rough edges, graffiti, hazards, annually sealed Inspect, repair, clean Tool box, paint brushes Graffiti remover, paint, sealer, nuts, bolts, screws Gloves, safety glasses, ear plugs 1 Fences Fence, posts, rails securely connected (wooden and metal); Wood treated - prevent rotting; Fence free of protruding spokes, holes, hazards; Gates, locks Inspect, repair; apply waterproofing materials as needed; trim shrubs, trees work Hammer, wire cutters, socket set WD-40, fence ties, nails Safety glasses, gloves 1 City of Miamisburg 10/22/2010 6

7 Flags Poles securely installed; Lights work, illuminate sign; Rope, pulley working as Inspect, repair, replace designed; Flag in good condition (no dirt, tears, frayed edges) hanging correctly Bucket truck, knife, pliers Rope, flags, snaps, pulley, WD-40 N/A 2 Irrigation Unit and timer working, no leaks Inspect, repair PVC fittings PVC glue Gloves 2 Backflow devices working properly Annually inspect, repair Professional vendor Timer set for seasonal needs Set timers as needed for season N/A N/A N/A 1 Water turned on/off for season, blow lines Adjust water, blow lines Compressor/fitting N/A Ear plugs, safety glasses 2 Lights/Clocks/Electrical Systems Fixtures, photocell, bulbs, electric function properly; Posts, globes Inspect, repair, replace, adjust settings securely installed; Timers and clocks work and are set for proper time Bucket truck, tool box Bulbs, ballasts N/A 1 City of Miamisburg 10/22/2010 7

8 Parking Lots/Entrance Roads Free of debris, protruding branches, weeds, visual barriers; Inspect, clean, remove barriers Blower, litter picker, bucket, can liners, pruners Gloves, safety glasses 1 Surface free of pot holes, hazards; Stall lines visible, parking blocks placed as designed; Inspect, repair Guardrails secure Hand tools, in-loader Cold patch, bumper blocks Gloves, safety glasses 1 Lights function properly Inspect, schedule repair Truck N/A N/A 1 Ponds/Fountains Water free of trash, debris Inspect, clean Net, litter picker, bucket Can liner Rubber gloves 1 Aerator, pump, electric and drains work properly Inspect, schedule repair Fountain and walls clean, painted (Library Park) Inspect, clean, paint Litter picker, bucket, paint brush Paint, cleaning agents Rubber gloves, safety glasses, ear plugs 1 City of Miamisburg 10/22/2010 8

9 Walk path free of branches, leaves, weeds, animal waste (Sycamore) Clean, blow, power wash as needed Power washer, litter picker, bucket, pruner Can liners Gloves, safety glasses, ear plugs 1 Water chemically treated (Library Park) Inspect, add chemicals Sprayer Chemicals Rubber gloves, safety glasses 1 Signs Securely installed, upright; Visible, legible (not blocked by trees, paint is not faded, Inspect, repair, paint, clean chipped); Clean (no graffiti, rust, dirt), no damage; clean; sealer is applied Post driver, hammer, socket set, paint brush Bolts, nuts, signs, loppers, cleaner, graffiti remover, sealer Safety glasses, gloves 1 Walkways Accessible, path clear, free of debris protruding shrubs, ice Inspect, clear path, apply salt Liter picker, bucket, blower, spreader, pruner, hand tools, sprayer, shovel, snow blower Ice melt, chemicals, 2 cycle gas Safety glasses, rubber or coated gloves for ice melt, leather or latex gloves for trash, ear plugs 2 Surface clean, no cracks, debris Inspect, remove items, fill cracks Power washer, sprayer Cleaner, sealer Rubber gloves, safety glasses, ear plugs 1 City of Miamisburg 10/22/2010 9

10 Landscape & Horticulture Plants, trees, soil maintained as necessary for plant variety, free of dead trees & branches, weeds, dead head and disease Inspect, maintain, Remove dead trees, branches, weeds, buds and treat disease Pruners, chain saw, loppers, sprayer, rake Chemicals Safety glasses, gloves, ear plugs 1 Mulch level at recommended levels for plant life Inspect, add mulch Rakes, shovels Mulch Gloves Specific to facility Borders, rock walls securely in place Inspect, repair N/A Border, rocks N/A 1 Seasonal plants installed, maintained (deadhead buds) Prep area, install, water and maintain Shovel, garden tools Plants, water Gloves Specific to facility Maintenance Building Area is clean, organized, all items in place; Facility is free of hazards Inspect, clean, organize, repair Broom, hose, blower Gloves 1 City of Miamisburg 10/22/

11 Park Areas & Shelters Park Areas Grounds, tables, shelter floors, (free of trash, graffiti, weeds, etc.); Trash cans emptied to allow for daily activities, liner in place; Area Inspect, clean, empty trash, replace liner, remove hazards, sweep, blow, power wash free of hazards, debris, fallen limbs, damage Litter picker, bucket, vac/blower Can liners, graffiti remover Ear plugs, safety glasses, gloves 1 Picnic Shelters Structure secure, roof free of leaks, electric working Inspect, report to supervisor N/A N/A N/A 1 Tables Stable structure (table frames are tight, support bars are connected); Planks Inspect, repair/replace, paint secure, free of graffiti, splinters, chipped paint 9/16 wrench, paint brush Paint, bolts, nuts N/A 1 Trash Cans Drums & metal lids painted, free of large dents, stains, spills, graffiti; Lids Inspect, collect, repair, clean, distribute secure, working flap, clean (no stains, spills, graffiti) Paint brush, hammer, socket set Paint, bolts, chain Gloves, safety glasses 1 Grills Units are secure and clean Inspect, repair, clean, paint Small shovel, wire, brush Paint Gloves 1 City of Miamisburg 10/22/

12 Playground Equipment & Areas Play apparatus function as designed Inspect, document findings, repair play equipment, document repairs Inspection kit N/A N/A 1 Apparatus is painted, free of hazards; clean (no graffiti, Inspect, repair, paint, and clean trash, debris, cigarette butts, weeds, etc.) Bucket, trash picker Paint Gloves (rubber and garden) 1 Required level of safety surface exists throughout play area Add and/or level mulch, fibar (material is filled to top of boarders and equipment labels) Rake Mulch Gloves 1 Restrooms Lights, plumbing, drainage working; Partitions securely connected to wall Inspect, repair/replace, paint & floor, hinges free of rust, Walls & floors paint free of chipping & peeling Screw driver, wrench, paint brush Screws, nuts, bolts, paint N/A 1 All fixtures (toilet, sink, faucets, mirrors, grip bars) clean, sanitized; Floor, walls, partitions clean (no stains, spills, graffiti, cob webs); Trash removed, liner in cans; Toiletry items stocked Inspect, clean, sanitize fixtures; Empty cans, replace liner; Restock supplies; Document name, date and time of cleaning Plunger, broom, hose, wire brush Cleaner, can liners, toilet paper, paper towels Rubber gloves, safety glasses 1 City of Miamisburg 10/22/

13 Sand Volleyball Court Sufficient sand level, spread throughout area Inspect, level, add sand if necessary Rakes Sand Gloves 2 Nets installed, secure, free of rips, tears Inspect, repair, replace Knife Nets, string N/A 1 Official stands are sturdy and padded with barrier Install barrier, inspect & repair stand and barrier Wrench, screw driver Bolts, nuts, screws, wood, tape N/A 1 Court Border secure, sand liner covered Inspect, repair Shovel, knife Border rope Gloves 1 Skate Park Concrete checked for chips; Railings and metal edges are Inspect, document findings, repair, document repairs secure and free of protruding edges N/A N/A N/A 1 Area & surface is safe, clean (no dirt, water, leaves free of Inspect, clean, sweep, blow, power wash trash, debris, cigarette butts, graffiti, stickers, etc.) Power washer, blower, broom Graffiti remover Gloves, ear protection 1 City of Miamisburg 10/22/

14 Turf Provide quality image, curb appeal; Grass mowed to acceptable height, walkways edged; Area free of litter, fallen branches, trip hazards Mow with frequency to cut 1/3 of blade, edge, blow walks, remove hazards Appropriate mower for facility, blower, litter picker, bucket Gas, oil, trash bags, Safety glasses, gloves, ear plugs Specific to facility Amenities including trees, fences, signs, benches, sidewalks, landscape, play areas free of overgrown grass, weeds Mulch, chemical control, trim vegetation Trimmer, blower, weed puller, edger, hand sprayer, chemical signs 2 cycle, chemicals Ear plugs, safety glasses, gloves Specific to facility Turf free of weeds, bare spots, disease Chemical control, spray, fertilize, aerate, split seed Sprayer, chemical signs Chemicals Respirator, safety glasses, gloves Specific to facility Vehicle & Equipment Maintenance Equipment is cleaned, lubricated, sharpened and repaired Inspect, clean, repair Equipment manuals, inspection sheets, maintenance lists, equipment & tools designated by task Specific to task Gloves, safety glasses Specific to task City of Miamisburg 10/22/

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY PERFORMANCE MEASURES

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY PERFORMANCE MEASURES MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY RESTROOMS Toilets and urinals Clean and functional All toilets shall be clean and functional at all

More information

Nursery and Landscape Skill Events

Nursery and Landscape Skill Events 1 Nursery and Landscape Skill Events SKILL NUMBER SKILL TITLE POINTS 1 Plant Layout 100 2 Basic Program Controller 50 3 Lateral Irrigation Repair 50 4 Line Trimmer 50 5 Chain Saw 50 6 Edger 50 7 Power

More information

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM Note: This list should be used as a guide and not considered all inclusive. The offeror should use due diligence for any items

More information

UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER. General Description of Duties: Duties and Responsibilities:

UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER. General Description of Duties: Duties and Responsibilities: UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER Upper Milford Township, Lehigh County, PA, is accepting applications for the position of a Public Works Maintenance Worker.

More information

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance Revised 2/15 Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance 1. DESCRIPTION The contractor shall furnish all equipment, personnel

More information

EAST BRUNSWICK PUBLIC SCHOOLS Administration JOB DESCRIPTION GROUNDS MAINTENANCE TECHNICIAN Page 1 of 9

EAST BRUNSWICK PUBLIC SCHOOLS Administration JOB DESCRIPTION GROUNDS MAINTENANCE TECHNICIAN Page 1 of 9 Page 1 of 9 Title: Grounds Maintenance Technician Reports to: Grounds Maintenance Foreperson Position Summary: Under the direction of the Grounds Maintenance Foreperson or Director of Facilities Management

More information

SANTA BARBARA COMMUNITY COLLEGE DISTRICT

SANTA BARBARA COMMUNITY COLLEGE DISTRICT SANTA BARBARA COMMUNITY COLLEGE DISTRICT CLASS TITLE: Facility Operations Manager BASIC FUNCTION: Under the direction of the Director-Facilities, prioritize, organize, direct and perform operations and

More information

FACILITIES MAINTENANCE WORKER

FACILITIES MAINTENANCE WORKER FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of

More information

Department of Defense Education Activity REGULATION

Department of Defense Education Activity REGULATION DoDEA Regulation 4210.01 Department of Defense Education Activity REGULATION NUMBER 4210.01 Date LOGISTICS DIVISION SUBJECT: References: Playground Management Program (a) Secretary of Defense Memorandum,

More information

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time:

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time: Hotel/Motel Slip, Trip and Fall Self Inspection Checklist Directions: This checklist will serve to indicate areas where you should focus attention for reducing the potential for slip, trip and fall accidents.

More information

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE TABLE OF CONTENT About RESISTO 2 Asphalt Cleaner and Degreaser 3 Oil Spot Primer 3 Liquid Crack Filler 4 Rubberized Crack Filler 4 Levelling

More information

Playground Maintenance Handbook MIRACLE DESIGNING PLAY

Playground Maintenance Handbook MIRACLE DESIGNING PLAY Playground Maintenance Handbook Playground Maintenance Checklist Location: Inspected By: Date: Time: OK Not Condition Recommendation/ Action Taken OK Survey area for dangerous trash such as, large rocks,

More information

University of New Mexico Environmental Services Design & Development Standard Requirements

University of New Mexico Environmental Services Design & Development Standard Requirements University of New Mexico Environmental Services Design & Development Standard Requirements Please review the following standards to be considered on all construction specifications. Your consideration

More information

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE HARD SURFACE INSTALLATION You will need: Tape measure Rope or spray paint Weed spray Sharp utility knife and spare blades Synthetic grass adhesive

More information

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects. New Project (replacing grass/dirt) STEP 1 PREPARING YOUR PROJECT AREA Determine how much to excavate using the example below. Remove the grass to desired depth (skim rather than dig deep) and a few inches

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

RDV STAFFING, INC POSITION DESCRIPTION PROPERTY MANAGER

RDV STAFFING, INC POSITION DESCRIPTION PROPERTY MANAGER RDV STAFFING, INC POSITION DESCRIPTION PROPERTY MANAGER REASON WHY POSITION EXISTS This position is responsible for providing preventive care and daily grounds and maintenance services at a private residence.

More information

The Otji-Toilet self builder manual The Clay House Project Otjiwarongo

The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - - The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - 2 - The Otji-Toilet self builder set Your self builder set consists of following material 1 Lid box with following parts a)

More information

Sherman Library Maintenance Handbook for Porous Asphalt

Sherman Library Maintenance Handbook for Porous Asphalt Sherman Library Maintenance Handbook for Porous Asphalt Porous asphalt systems are an effective means of stormwater management. Unlike traditional pavements, rainfall drains through the pavement surface

More information

Fairlawn Medina Landscape Supply Copley Rd, Akron Ohio (330) PRODUCT PRICE LIST

Fairlawn Medina Landscape Supply Copley Rd, Akron Ohio (330) PRODUCT PRICE LIST Fairlawn Medina Landscape Supply - 1669 Copley Rd, Akron Ohio 44320 (330)864-8031 PRODUCT PRICE LIST NAME DESCRIPTION RETAIL PRICE Bagged materials Mulch/Organic Soil/Moo Nure 25lb bag $6.00 per bag White

More information

TIRIMOANA PRIMARY SCHOOL JOB DESCRIPTION Caretaker

TIRIMOANA PRIMARY SCHOOL JOB DESCRIPTION Caretaker TIRIMOANA PRIMARY SCHOOL JOB DESCRIPTION Caretaker OVERVIEW The Caretaker is responsible for the safety and cleanliness of the grounds and buildings, the security of the school, attend to the heating plant,

More information

Escondido Best Management Practices (BMP s)

Escondido Best Management Practices (BMP s) Escondido Best Management Practices (BMP s) GROUNDS MAINTENANCE & GOOD HOUSEKEEPING Regularly dry sweep paved areas including parking lots, outdoor areas and dumpster areas. Do NOT use a hose. Collect

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

SKIRTED BATHTUB INSTALLATION MANUAL

SKIRTED BATHTUB INSTALLATION MANUAL SKIRTED BATHTUB INSTALLATION MANUAL 33778 North Railway Ave Mission, BC, V2V 1H6 Canada Toll free: 1-877 - 398-8827 Email: purchasing@valleyacrylic.com www.valleyacrylic.com INTRODUCTION products. Thank

More information

TrowelPave Concrete - Regular Set (20lb 40lb Bucket Kit)

TrowelPave Concrete - Regular Set (20lb 40lb Bucket Kit) For more information, visit FEATURES & BENEFITS: TrowelPave Concrete - Regular Set is a cold mix, cold applied concrete patching repair product. The patented technology is commonly used for both aged and

More information

POSITION DESCRIPTION City of Monett

POSITION DESCRIPTION City of Monett POSITION DESCRIPTION City of Monett monjobgmwlg JOB TITLE: Cemetery Maintenance DEPARTMENT: Cemetery SALARY RANGE: Payroll Level 1 IMMEDIATE SUPERVISOR: Cemetery Foreman ESSENTIAL FUNCTIONS I. Maintenance

More information

CHAPTER 2 CUSTOMIZING THE INSPECTION AND MAINTENANCE PROGRAM

CHAPTER 2 CUSTOMIZING THE INSPECTION AND MAINTENANCE PROGRAM CHAPTER 2 CUSTOMIZING THE INSPECTION AND MAINTENANCE PROGRAM 2-1. Introduction No two CDC play areas are identical, Each play area contains different pieces of play equipment, different site elements,

More information

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET Dy-Mark EPOXY COAT WATER-BASED DIRECTIONS FOR USE Dy-Mark All-In-One Epoxy Coat Water-Based is a fast dry floor coating that gives a professional finish to interior bare concrete floors. Epoxy Coat resists

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

SCOPE DOCUMENT. Competition Year. Trade Name. Post- Secondary

SCOPE DOCUMENT. Competition Year. Trade Name. Post- Secondary SCOPE DOCUMENT Competition Year Competition location Trade Number Trade Name Level 2012 Edmonton, AB 37 Landscape Gardening Post- Secondary 1. INTRODUCTION 1.1 Purpose of the Competition. To evaluate the

More information

University of Toronto Cleaning Specifications

University of Toronto Cleaning Specifications Revised/Updated February 1-2013 University of Toronto Cleaning Specifications AREA TYPE Task To Be Completed Frequency Main Entrance 1 Clean both sides of door glass including side lights. Daily & 2 Clean

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

8367 TRANSPORTATION WORKER 3

8367 TRANSPORTATION WORKER 3 TRANSPTATION WKER 3 Nature of Work Under limited supervision, at the journey level performs skilled work in the construction and maintenance of highways, related buildings and structures, and erecting

More information

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE 5 pages TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE The following will describe the proper procedure to use when installing Tuff-Tac TM bridge deck membrane. The guide will cover recommended tools to

More information

Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos

Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos University of Washington Facilities Services Maintenance & Alterations 9.5.02 Work Practice for Penetrating or Removing Wallboard Systems with

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

Installation Instructions

Installation Instructions Installation Instructions Installation Instructions Playworld Systems Model XX0138 Natureforms T-Rex Hatched Egg Installation Preparation Use Zone:...Refer to the information below left User Group Age

More information

INSTALLATION INSTRUCTIONS HD MODERN TRIPOD SWING Please read the entire manual before beginning installation.

INSTALLATION INSTRUCTIONS HD MODERN TRIPOD SWING Please read the entire manual before beginning installation. INSTALLATION INSTRUCTIONS 581-240-8 8 HD MODERN TRIPOD SWING Please read the entire manual before beginning installation. 1 CTN 2 WF 7 PIPE 10 TOTAL PCS 365# WEIGHT CLASS 70 1 TAB SECTION INDEX 1. 3D AND

More information

Evaporative Cooling System End Feed

Evaporative Cooling System End Feed Evaporative Cooling System End Feed Straight End Feed 10' to 30' Installation Guide 2017 FarmTek All Rights Reserved. Reproduction is prohibited without permission. *Actual system and pump may differ.

More information

11.0 HANDLING AND STORING AGRICULTURAL INPUTS

11.0 HANDLING AND STORING AGRICULTURAL INPUTS HANDLING AND STORING AGRICULTURAL INPUTS 11.1 Pesticide Storage and Handling 11.2 Fertilizer Storage and Handling 11.3 Petroleum Storage and Handling 11.4 For More Information 79 HANDLING AND STORING AGRICULTURAL

More information

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking caulking gun acrylic latex caulk shims tape measure 1/8 drill bit Phillips screw driver cardboard china

More information

WATERPROOFING CONCRETE TIE HOLES USING XYPEX

WATERPROOFING CONCRETE TIE HOLES USING XYPEX 2016-05 There are several ways of holding forms together during placement of concrete. Most of these methods involve the use of some type of steel tie that connects the forms together and holds them from

More information

Liner Replacement Instructions:

Liner Replacement Instructions: Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working

More information

PLATON FOUNDATION WRAP

PLATON FOUNDATION WRAP DRAINAGE SOLUTIONS SINCE 1908 PLATON FOUNDATION WRAP RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM

More information

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers Page 1 IMPORTANT Please retain this instruction sheet in your files. It contains important replacement parts information. All equipment should be installed in accordance with these instructions. It is

More information

USER INSTRUCTIONS The FIT is comprised of three parts as follows:

USER INSTRUCTIONS The FIT is comprised of three parts as follows: GENERAL INFORMATION The Facility Inspection Tool (FIT) has been developed by the Office of Public School Construction to determine if a school facility is in good repair as defined by Education Code (EC)

More information

MATERIAL HANDLING, STORAGE, AND DISPOSAL

MATERIAL HANDLING, STORAGE, AND DISPOSAL SECTION 14 MATERIAL HANDLING, STORAGE, AND DISPOSAL 14.A MATERIAL HANDLING 14.A.01 Employees shall be trained in and shall use safe lifting techniques. 14.A.02 Requirements for PPE are covered in Section

More information

Installation Data Freedomline 4-Piece Showers F1364P, F1424P*, F1604P Fax on Demand # 1163

Installation Data Freedomline 4-Piece Showers F1364P, F1424P*, F1604P Fax on Demand # 1163 ADA/ANSI COMPLIANT BARRIER-FREE SHOWER STALLS For roll-in showers with beveled thresholds, build up or recess the bathroom floor 3/4 inch less the thickness of the finished floor, ensuring that the finished

More information

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET Dy-Mark EPOXY COAT DIRECTIONS FOR USE Dy-Mark All-In-One Epoxy Coat is a durable floor coating that gives a professional finish to interior bare concrete floors. Epoxy Coat resists hot tyre pick-up and

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W)

TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W) TURF-TEC 6 and 12 INCH INFILTRATION RINGS INSTRUCTIONS (IN7-W & IN8-W) Outline of Uses The Turf-Tec Infiltration Rings was specifically designed to give infiltration readings directly on site. It can give

More information

EXTERNAL/SOIL 8 ABATEMENT

EXTERNAL/SOIL 8 ABATEMENT Chapter 8 External/Soil Abatement EXTERNAL/SOIL 8 ABATEMENT In this chapter you will learn about: Protecting yourself on an outdoor or external abatement job; Steps in an external abatement setup job;

More information

Report of the Ad Hoc Committee for Community Facilities

Report of the Ad Hoc Committee for Community Facilities Report of the Ad Hoc Committee for Community Facilities Formation of this committee was approved by the Board at the March 2 meeting with the goal of identifying deferred maintenance, liability issues,

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Introduction. Before You Begin

Introduction. Before You Begin Installation Manual Introduction Thank you for choosing Valley Products. This installation mannual provides general information on the installation of our products. DO NOT lift or carry your unit by the

More information

Part 3 House Packing Facility

Part 3 House Packing Facility Part 3 House Packing Facility This is a critical area for food safety. Whatever was done to keep the produce safe during harvesting and transportation to the packinghouse can be undone in the packinghouse.

More information

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

ABOUT CONCRETE. What does it mean to "cure" concrete? Why does concrete crack? What does 28 -day strength mean?

ABOUT CONCRETE. What does it mean to cure concrete? Why does concrete crack? What does 28 -day strength mean? What does it mean to "cure" concrete? ABOUT CONCRETE Curing is one of the most important steps in concrete construction, because proper curing greatly increases concrete strength and durability. Concrete

More information

ELLA LOW THRESHOLD GEL COAT SHOWERS OWNER'S MANUAL

ELLA LOW THRESHOLD GEL COAT SHOWERS OWNER'S MANUAL ELLA LOW THRESHOLD GEL COAT SHOWERS OWNER'S MANUAL REPRESENTING THESE MODEL NUMBERS: 3648 SH 1S 3P 4.0 Right Seat/Left Seat 4836 SH 4P 3.0 Center Drain 6030 SH 5P 4.0 Right/Left Drain 6032 SH 1S 3P 4.0

More information

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS Operation & Maintenance (OM) Manual v01 Bioretention Systems ENGINEERED SOLUTIONS Bioretention Systems Table of Contents Overview Filterra General Description Filterra Schematic Basic Operations Design

More information

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects. STEP 1 PREPARING YOUR PROJECT AREA Most commonly this is removing a grass area that is around your current concrete patio. You will incorporate this area into your new larger outdoor patio design. You

More information

Monday December 6, Session 4C: Sports Field Netting

Monday December 6, Session 4C: Sports Field Netting 2010 Technical Meeting Monday December 6, 2010 Session 4C: Sports Field Netting Princeton University Golf Course Objectives Potential Uses & Benefits System Design & Layout Material Considerations Structural

More information

DURO-SHIELD ROOF COATING CARE GUIDE TABLE OF CONTENTS

DURO-SHIELD ROOF COATING CARE GUIDE TABLE OF CONTENTS TABLE OF CONTENTS Overview 2 General 3 4 Inspections and Repairs 5 Semi-Annual Inspections 5 Minor Repairs 5 Emergency Repairs 5 www.duro-last.com 1 of 5 OVERVIEW Due to its constant exposure to heat,

More information

Console Table Legs & Console Table Top

Console Table Legs & Console Table Top P74055, P74056 1 2013 of 6 Kallista THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review this manual before you install your KALLISTA

More information

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com

More information

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders

More information

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township

More information

Cape town Project (Sport and development)

Cape town Project (Sport and development) Cape town Project (Sport and development) Rehabilitation and re-grassing of existing soccer sports field Technical specifications A New sods: Area 45x90=4050 m² Design: NY 49 Sports Complex The facility

More information

Opening: Facilities Technician Department: Maintenance

Opening: Facilities Technician Department: Maintenance Opening: Facilities Technician Department: Maintenance Trempealeau County Human Resource Department 36245 Main St., PO Box 67, Whitehall, WI 54773 715-538-2311 ext 224 personnel@tremplocounty.com The Trempealeau

More information

Foirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies

Foirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies 2000 Foirgniochta Marking Scheme Leaving Certificate Examination, 2000 Construction Studies Ordinary Level of site.. Adjoining. Distinct Landmarks.. site in Red.. 1: (ii) Site Boundary site. Site. Drainage

More information

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series

More information

Freedom One-Piece Barrier Free Showers Installation Instructions

Freedom One-Piece Barrier Free Showers Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive or 100% silicone adhesive (non-shrink) 20-1.25 wood screws 1-5 gallon bucket (to mix

More information

Continuing Certificate of Occupancy Pre-Inspection Checklist

Continuing Certificate of Occupancy Pre-Inspection Checklist Pre-Inspection Checklist INTRODUCTION: This pre-inspection checklist has been produced to assist you in preparing for a Continuing Certificate of Occupancy (CCO) inspection. The inspection criteria and

More information

DURA 500 THERMOPLASTIC FLAT ROOF COATING SYSTEM BY SUPERIOR POLYMERS INC.

DURA 500 THERMOPLASTIC FLAT ROOF COATING SYSTEM BY SUPERIOR POLYMERS INC. SPECIFICATION GUIDELINE FOR SMOOTH ROOF SUBSTRATES INCLUDING MODIFIED BITUMEN, SMOOTH ASPHALT, EPDM, TPO, AND PLYWOOD. Part 1 General Information For the purpose of clarification in this document, the

More information

Facility Runoff Control Plan FRCP. City of Papillion Public Works Facility

Facility Runoff Control Plan FRCP. City of Papillion Public Works Facility Facility Runoff Control Plan FRCP City of Papillion Public Works Facility Facility Draft FRCP October 13, 2015 This page intentionally left blank Facility Runoff Control Plan Table of Contents OVERVIEW

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

Assembly Instruction. wedi Fundo Primo Steam Shower System

Assembly Instruction. wedi Fundo Primo Steam Shower System Assembly Instruction wedi Fundo Primo Steam Shower System Assembly Instructions wedi Fundo wedi Fundo Steam Shower System Residential and Commercial Use Whether installed in a steam room with commercial

More information

Kelly Village Apartments 3118 Green Houston, Texas 77020

Kelly Village Apartments 3118 Green Houston, Texas 77020 Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration

More information

Installation Guide Wall Panels

Installation Guide Wall Panels Installation Guide Wall Panels Jointless or Dry-Stacked Installation (Read Prior to installation) The MStone system is a jointless / dry-stacked installation where panels and corners fit tightly together

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

DIY Decking Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintainence

DIY Decking Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintainence DIY Decking Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintainence The specifications contained within this brochure are for guideline purposes only. For further information

More information

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive (non-shrink) or 100% silicone adhesive 20-1.25 wood screws 1 - tube of non-shrink

More information

Instructions for 12 IGT system

Instructions for 12 IGT system Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and

More information

Tower Site Inspection Procedures

Tower Site Inspection Procedures Engineering, Manufacturing, Construction & Erection Specializing in Radio & TV Communication Towers 6037 S. Industrial Rd. 918-789-9020 Office 918-789-9922 Fax www.belltowercorp.com bob@belltowercorp.com

More information

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA BALCONY CARE & MAINTENANCE GUIDELINES SK&A Project No. 09%620%06 Updated June 14, 2012 Prepared By SMISLOVA, KEHNEMUI & ASSOCIATES,

More information

ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE

ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE Environmental Public Health ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE To: Amy Shun Foon Wong The Owner Albert Wong The manager And To: All Occupant(s) of the

More information

Guidelines to installing the ACO Sport range of products

Guidelines to installing the ACO Sport range of products SYNTHETIC SU POROUS OR NON-P Installation ASPHALT WEARING COURS ASPHALT BASE COURSE CONCRETE COMPACTED STONE BASE COMPACTED SUBGRAD AILER 4" MIN 4" MIN 4" MIN Guidelines to installing the ACO Sport range

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Food Safety Audit Harvest Crew v07.04

Food Safety Audit Harvest Crew v07.04 Food Safety Audit Harvest Crew v7.4 Auditor: Date Sent: Audit Start: Time/Date:: * Date Received: Audit End: Time/Date:: Foreman/Contact: Crew Name or Number: City/Location: State: Country: Scope G.P.S.:

More information

ATTENTION! READ BEFORE INSTALLING!

ATTENTION! READ BEFORE INSTALLING! ATTENTION! READ BEFORE INSTALLING! FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR This flooring replicates the look of a natural product which has natural variations in color and texture. For best visual

More information

VERMONT MAPLE SUGAR MAKERS ASSOCIATION 491 East Barnard Road South Royalton, VT SUGARING OPERATIONS CERTIFICATION SCORE SHEET

VERMONT MAPLE SUGAR MAKERS ASSOCIATION 491 East Barnard Road South Royalton, VT SUGARING OPERATIONS CERTIFICATION SCORE SHEET VERMONT MAPLE SUGAR MAKERS ASSOCIATION 491 East Barnard Road South Royalton, VT 0068 802-498-7767 mgordon@vermontmaple.org SUGARING OPERATIONS CERTIFICATION SCORE SHEET Business Name: Number of Taps Address:

More information

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,

More information

SIDER-POOL. Product Data. Features and Uses

SIDER-POOL. Product Data. Features and Uses 153 Regur Road Hawkinsville, GA 31036 USA 1.478.892.9800 888-743-3750 sales@sider-crete.com www.sider-crete.com Product Data Features and Uses A true cement-based plaster No-check cracking and no-brushing

More information

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION SILASEC WP0001 REVISED: JANUARY 2002 DESCRIPTION Bondall Silasec is a concentrated liquid waterproofing compound designed to be used with Portland type A or type GP cements to form a permanent waterproof

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of

More information

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Product Manual In this manual we will cover both normal operation of the P.R. Skate moving system and safety issues that

More information

Walking/Working Surfaces

Walking/Working Surfaces DEPAUL UNIVERSITY Walking/Working Surfaces Environmental Health & Safety May 2016 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 RESPONSIBILITIES 2 2.1 Environmental Health and Safety 2.2 Facility

More information

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT PROJECT: CONSTRUCTION OF NEW TIMBER WHARF, SOUTHERN BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DEMOLISHION WORKS 3 TIMBER WHARF CONSTRUCTION 4 CATWALK CONSTRUCTION BILL SUMMARY 5 CONCRETE WALKWAY CONSTRUCTION

More information

PARKS AND OPEN SPACES JOB DESCRIPTION Open Spaces Operative (Seasonal Gardener)

PARKS AND OPEN SPACES JOB DESCRIPTION Open Spaces Operative (Seasonal Gardener) DIRECTORATE: SECTION: POST: TRANSACTIONS AND UNIVERSAL SERVICES PARKS AND OPEN SPACES OPEN SPACES OPERATIVE (Seasonal Gardener) POST NO: GRADE: 4 ACCOUNTABLE TO: TEAM LEADER AND AREA C0-ORDINATOR. PURPOSE

More information