1 DEFICIENCY REPORT FOR THE Providence Corner HOA Upper Providence Township, Pennsylvania Project Number: Date: July 8, 2016 W:\2015\ \CORR\Deficiency\Providence Corner Deficiency Report doc
2 DEFICIENCY REPORT INDEX SECTION PAGE NUMBER Introduction 1 Community Narrative 3 Deficiencies 5 Survey and Results TOTAL SYSTEMS ENGINEERING SERVICE
3 Introduction This introduction contains the necessary clarifications and qualifications for the Deficiency Report of the site elements of the Providence Corner Homeowners Association complex, located in Royersford Mills, Pennsylvania. This report will provide a narrative description of building and site components and associated deficiencies found with those components. Excerpts from codes and manufacturers information that support the Deficiency Report are included as an Appendix. Also included in the Appendix are the results we received from the questionnaires which were mailed to the residents. This report and the Engineer's identification of deficiencies do not relieve the Developer from delivering a properly constructed and code compliant facility. Such responsibility includes proper inspection and quality control procedures which remain exclusively his and do not devolve onto the Association or their consultants. The Developer is required to correct the deficient condition wherever it occurs in the project. His responsibility for the correction of deficiencies is not limited to the identified locations in this report and the Engineer is not to be considered his inspecting agent. In performing this inspection, it is necessary for us to utilize plans provided by the association. It is not possible for us to know if these were in fact, the original plans, or if revisions of these plans were used in the construction. All buildings were inspected to the extent limited by access. Certain limitations are inherent in an inspection at this stage of the construction. Hidden construction such as foundations, piping, wiring, ductwork, material labels that have been covered by building materials and finishes or otherwise not readily visible and all other aspects of the construction that requires inspection during construction cannot be dealt with in this study. All observed deficiencies are noted in this report but due to the above mentioned limitations, and the sampling procedure utilized for a transition phase inspection, the total deficient condition requires correction whether noted in this report or not. The scope of this project does not include items such as property metes and bounds, subsurface soil conditions and environmental issues. 1 TOTAL SYSTEMS ENGINEERING SERVICE
4 In the review of this complex, references may be made to the International Building Code, the International Mechanical Code, the International Plumbing Code, the National Electrical Code, or State Fire Codes. Also, referenced are the installation instructions, specifications, and recommendations of various manufacturers and trade associations for the products used at this complex. The Uniform Construction Code dictates that when the above mentioned Sub-codes are silent in respect to any material, equipment, system, or method of construction, a manufacturer's recommendation shall be considered to be accepted engineering practice. It is also necessary to establish that when the Code is silent or ambiguous on an issue, established practice is accepted as being in the public's best interest, and becomes a code established requirement. In this report examples are given of identified deficiencies. These examples are illustrations only and should not be considered inclusive of the deficiency in its entirety. The information in this report is current as of its commencement. Certain deficiencies may have since been corrected. Michael J. Barlow Senior Project Manager Raymond R. Russ Fernandes, RS Principal/Senior Vice President ICC Building Plans Examiner July 8, 2016 July 8, 2016 Date Date Part 2
5 Narrative The Providence Corner HOA community is a 188 unit Home Owners Association located in Upper Providence Township, Pennsylvania. The community consists of 57 single family homes and 27 multi-family buildings with a total of 131 townhouse units. Access to the complex is by Plymouth and Shelton Drive off of Rittenhouse Road. The buildings in the community are designed as two story wood framed buildings that are constructed on concrete foundations. The exterior walls are covered with a combination of concrete stone veneer and vinyl siding. The roofs are covered with architectural grade, laminated shingles and roof drainage is provided by gutters and leaders that are connected to a subsurface drainage system. Each unit has a concrete entry porch in front and a wood frame deck in the rear. The units have concrete entry walkways and asphalt paved driveways with concrete road aprons. The roadway is paved with asphalt and lined with Belgium stone curbing. Storm water inlets are located in the roadway and yard areas. These inlets are connected to the underground storm water piping system that is terminated in the four onsite storm water basins. For this report visual inspections of site common elements including storm basins, storm inlets, retaining walls and sidewalks were conducted. This inspection process also included obtaining core samples of the asphalt paved roads. As the Association is only responsible for the common site elements of the community, inspections of dwelling units or the building exteriors inspections were not included in our inspections. 3
6 Deficiency Items 4
7 1. Deficiency: Bare Soil/Dead Grass Location: Citation: Basin 1, Basin 2, Basin 3, Basin 4, Surrounding Basin 2, Open space behind 103 Fairfield East, Front 107 Fairfield East, behind 79, 73, 71, 69, 67 Fairfield East, behind 226 Fairfield West, along Plymouth between Fairfield West corners, Rear 114 Fairfield East, Rear 261 Fairfield West, Rear Fairfield West, Rear 257 Fairfield West, Rear 242 Fairfield West, Rear 254 Fairfield West, 220 Fairfield West, Fairfield West. According to sheet 24.01, 24.03, 24.04, Landscape And Site Lighting Plan, prepared by Langan Engineering, last revised 4/7/08, basins shall receive Meadow Mix A on the sides of the basin and Meadow Mix B on the bottom of the basin. According to general landscape planting Note 13 on sheet 24.00, Master Landscape And Site Lighting Plan, prepared by Langan, last revised 4/7/08, plant material shall be guaranteed to be alive and in vigorous growing condition for a period of two years following the acceptance by the owner. Comments: All eroded areas or bare must be repaired and stabilized. PHOTOGRAPH 1 - BASIN 1 5
8 PHOTOGRAPH 2- BASIN 1 PHOTOGRAPH 3 - BASIN 2 6
9 PHOTOGRAPH 4 - AREA SURROUNDING BASIN 2 PHOTOGRAPH 5 - BASIN 3 7
10 PHOTOGRAPH 6- BASIN 3 PHOTOGRAPH 7 - BASIN 4 8
11 PHOTOGRAPH 8 - BASIN 4 9
12 Deficiency: Missing Stone Rip Rap Location: Citation: HW-3, HW-10, CB-119, & HW-6, HW-13 According to sheets 21.01, 21.03, 21.04, titled Post Construction Stormwater Management Plan, prepared by Langan, last revised 11/26/12, discharge pipes at headwall structures into and out of the basin must be stabilized with rip rap. Comments: Either rip rap is partially missing or completely missing from the specified areas on the plan. The areas should receive rip rap according to the plan. The headwall for HW-3 and HW-13 have been partially undermined due to the lack of rip rap. These areas should be repaired. PHOTOGRAPH 9 - HW-6 10
13 PHOTOGRAPH 10 - HW-3 PHOTOGRAPH 11 - HW-3 11
14 PHOTOGRAPH 12 - HW-10 PHOTOGRAPH 13 - CB
15 2. Deficiency: Missing Mortar from Pipe to Structure Connection Location: HW-3, HW-6, HW-8, HW-9, HW-10, & HW-13, Inlet behind 70 Plymouth Inlet at base of retaining wall behind 114 Fairfield East. Citation: Utility Note 14 on approved site plans according to sheet 23.00, Master Utility Plan, prepared by Langan, last revised 4/7/08, all storm drainage manholes and sanitary manholes shall be water-tight. Comments: Grout/mortar is missing from the interface of the headwall and HDPE and allowing water to seep beneath the headwall. This should be repaired to be water-tight. PHOTOGRAPH 14 - HW-3 13
16 PHOTOGRAPH 15 - OCS#4 PHOTOGRAPH 16 - HW-6 14
17 PHOTOGRAPH 17 - INLET BEHIND 70 PLYMOUTH 15
18 Deficiency: Standing Water Location: Basin 2, & Basin 4 Citation: According to sheets 21.01, 21.03, 21.04, Post Construction Stormwater Management Plan, prepared by Langan, last revised 11/26/12, basins have positive drainage towards outlet control structures. Comments: Standing water was noted in several locations within the storm water basins. Basin bottoms should provide a positive slope to facilitate drainage. PHOTOGRAPH 18 - BASIN 2 16
19 PHOTOGRAPH 19 - BASIN 4 17
20 3. Deficiency: Accumulated Sediment Location: Citation: HW-2, HW-5, HW-8, HW-9 & All inlets with Snouts According to sheet 22.13, Erosion and Sediment Control Details, prepared by Langan, last revised 11/26/12 and sheets 21.01, 21.03, 21.04, Post Construction Stormwater Management Plan, prepared by Langan, last revised 11/26/12, outlets should not have standing water or accumulated sediment in pipes and the stormwater snouts should be maintained. Comments: Pipes should be cleaned of accumulated sediment and the inlets with snouts should be cleaned. PHOTOGRAPH 20 - HW-5 18
21 PHOTOGRAPH 21 - HW-9 19
22 4. Deficiency: Modification of Fence at Basin Location: Basin 4. Citation: Approved site plans. Comments: Chain link fence should be lowered to eliminate gap at bottom of fence. PHOTOGRAPH 22 - BASIN 4 20
23 5. Deficiency: Failure of Retaining Wall Location: Citation: Adjacent to Inlet CB-164 Visual observation of failure Comments: The reason for the lateral displacement of blocks should be investigated and the cause of the displacement should be identified. The wall should then be repaired and/or rebuilt as necessary. PHOTOGRAPH 23 - WALL FAILURE 21
24 6. Deficiency: Removal of Silt Fence Location: Citation: Entire Site, Inlet behind 261 Fairfield West. According to sheet 22.13, Erosion and Sediment Control Details, prepared by Langan, last revised 11/26/12, all erosion and sediment BMP controls must be removed. Comments: Silt fence should be removed once soil is stabilized. PHOTOGRAPH 24 - SILT FENCE 22
25 PHOTOGRAPH 25 - FILTER FABRIC STILL IN INLET 23
26 7. Deficiency: Scaled Concrete Sidewalk Locations: Sidewalks Fairfield East: 102, 105, 106, 107, 111, 112, 115, 116, 118, 120, 122, 125, 126, 127, 128, Between 115 and 107; Fairfield West: Fairfield North: 140, 142, 144, 146, 147, 148, 150, 160, 164, 166, 168, 171 to corner, Side of 27 Shelton; Fairfield South: 300, 302, 304, 306, 310, 312, 314, 315, 316, 317, 318, 319, 320, 321, 322, 323, 324, 325, 326, 328, 330, Between 306 and 310, Side 42 Plymouth; Plymouth: 40, 42, 44, 46, 48, 51, 53, 56, 61, 62, 63, 64, 66, 67, 68, 69, 73, 77, 72, 79, 81, 83, Side of 291 Fairfield West Side, 290 Fairfield West, Side of 300 Fairfield South; Shelton: 21, 22, 23, 25, 26, 27, 28, 30, 31, 33, 35, 36, Side 330 Fairfield South, Side 102 Fairfield East. Driveway Aprons Fairfield East: 102, 106, 107, 111, 115, 116, 118, 120, 122, 125, 126, 127, and 128; Fairfield West: 195, 254, and 280; Fairfield North: 144, 146, 148, 150, 162, 164, 166, 168, and 171; Fairfield South: 300, 302, 304, 306, 310, 312, 314, 316, 318, 320, 322, 324, 326, 328, and 330; Plymouth: 51, 53, 60, 61, 62, 63, 64, 66, 67, 69, 73, and 79; Shelton: 21, 22, 23, 24, 25, 27, 28, 30, 31, 33, 35, 36, curb ramp at corner of 31 Shelton and Fairfield North. 24
27 Citation: Section 1904 of the 2006 IBC and American Concrete Institute Standard ACI 318. Comments: Concrete that meets the durability requirements of the code would not scale with the application of deicing agent. Recommend that a petrographic analysis be performed on concrete in order to determine if the concrete durability required by the building code and ACI 318. PHOTOGRAPH 26 - SCALED SIDEWALK 25
28 PHOTOGRAPH 27 - SCALED SIDEWALK & DRIVEWAY APRON 26
29 27
30 28
31 8. Deficiency: Cracked Concrete sidewalks or aprons Locations: Fairfield West: 195, 207, 248, 256, 258, 290 walkway, 294, Corner Plymouth and Fairfield West; Fairfield North: 160, 165, 166, 167, 168, 169, and 171; Fairfield South: Between 306 & 310, 314, 318, and 320; Plymouth: 40, 42, 44, 46, 48, Side 290 Fairfield West, by Irrigation Valve, Corner 50, 54, 56, Walkway 56, 64, and 68; Shelton: 23, Corner 31 and Fairfield North, and 33. Citation: Failure Comments: Cracks allow water infiltration which can result in heaving and premature spalling of the concrete. Small cracks can be sealed. Replacement of slab is required in slabs that have large and or multiple cracks or cracks with displacement. PHOTOGRAPH 28 - CRACKED ENTRY WALK 29
32 PHOTOGRAPH 29 - CRACKED DRIVEWAY APRON PHOTOGRAPH 30 - CRACKED SIDEWALK 30
33 9. Deficiency: Trip Hazard Location: Plymouth - Between 65 and 67. Citation: Safety hazard. Comments: There is a vertical displacement between two sidewalk slabs of at least ¼. Vertical displacement of ¼ or more on a walking surface is considered a trip hazard. All sidewalks should be periodically inspected for safety hazards. Any slab with vertical displacement should be replaced. 31
34 10. Deficiency: Missing Trees Shrubs or plantings Location: Fairfield West: Rear 276, 262 Fairfield West front plant bed, 280 to 284 rear plant bed; Fairfield East: Basin 2, 106, , 114, 116, 118, 128; Fairfield North: Side of 31 Shelton, 31 Shelton front tree being removed; Fairfield South: Rear 300 and 304. Citation: Unfinished construction. Comments: All Missing plantings should be installed. PHOTOGRAPH 31 - MISSING TREE 32
35 PHOTOGRAPH 32 - MISSING PLANTS 33
36 11. Deficiency: Dead Trees Shrubs Location: Citation: Rear 181 Fairfield West, Rear 307 Fairfield South. Unfinished Construction. Comments: All dead plantings shall be replaced. PHOTOGRAPH 33 - DEAD EVERGREEN 34
37 PHOTOGRAPH 34 - DEAD EVERGREEN 35
38 12. Deficiency: Unsealed cracks in asphalt Location: Citation: Intersections Plymouth Drive and South Fairfield and North Fairfield. Compromise common element. Comments: Cracks allows water infiltration into the asphalt which can result in premature failure of the asphalt paving. All cracks should be sealed. PHOTOGRAPH 35 - UNSEALED ROAD CRACKS 36
39 13. Deficiency: Debris in storm inlet Location: Citation: 21 Shelton, Rear 70 & 73 Plymouth, Rear 77 Plymouth, 129 Fairfield East 114 Fairfield East, rear 36 Shelton. Unfinished construction. Comments: Debris should be cleaned from all storm water inlets. PHOTOGRAPH 36 - DEBRIS AND SILT IN STORM INLET 37
40 PHOTOGRAPH 37 - DEBRIS AND SILT IN STORM INLET 38
41 14. Deficiency: Damaged Storm Inlet Top Location: Citation: 320 Fairfield South. Damaged Common Element. Comments: The inlet top is spalling and requires replacement. PHOTOGRAPH 38 - SPALLED INLET TOP 39
42 15. Deficiency: Settlement Around Storm Inlet Location: Citation: Rear 300, 310 and 320 Fairfield South, Between 261 & 271 Fairfield West, rear 63 Plymouth, Roadway at 81 Plymouth and 36 Shelton. Improper construction. Comments: The settlement around the inlet top is due to either poor compaction around the inlet or soil that has been washed away due to the improper installation of the inlet. The cause of the soil loss must be determined so the appropriate corrective action can be taken. PHOTOGRAPH 39 - SETTLEMENT AROUND STORM INLET 40
43 PHOTOGRAPH 40 - SETTLEMENT AROUND STORM INLET PHOTOGRAPH 41 - SETTLEMENT AROUND STORM INLET 41
44 16. Deficiency: Missing Line Stripping Location: Citation: Roadways. Unfinished Construction. Comments: Approved site plans show traffic stripping. All traffic stripping must be installed. PHOTOGRAPH 42 - MISSING TRAFFIC STRIPPING 42
45 17. Deficiency: Settled asphalt Location: Citation: Corner of Plymouth and Rittenhouse. Failed common element. Comments: Depressed area must be patched. PHOTOGRAPH 43 - SETTLEMENT IN ASPHALT PAVING 43
46 18. Deficiency: Lawn Irrigation system Location: Citation: Corner of Plymouth and Rittenhouse. Incomplete and In-operative common element Comments: No design or as-built drawings of the irrigation system were provided for our review or to the Association. While performing the spring startup of the irrigation system, the Association s irrigation contractor noted the following deficiencies with the system: A leaking master valve at 301 Fairfield, the rain sensor was not working, zone valves 21, 29, 59, 60 and 61 were not operating and zone valves 43, 44, 58 73, 83 and 84 were passing water. The likely cause for the inoperative valves and passing valves is contaminants in the line that were forced into the valves when the lines were blown with compressed air for winterization. Also, grounding rods are typically required approximately every 500 feet and are usually located in the valve boxes. The contractor reported that grounding rods were not observed at any of the valve boxes that were opened for inspection. The declarant should make all repairs and turnover a fully operational system and provide copies of the as-built plans to the association at transition. 44
47 Core Sample 45
48 The specified Wearing course thickness is 1.5. The specified binder course thickness 4.5. The total specified thickness of paving is 6 CORE SAMPLE RESULTS TABLE Sample Street Top Coat Thickness Binder Course Thickness Total Thickness Fairfield West Plymouth Drive Fairfield South Fairfield East 5 34 Shelton Drive 6 24 Shelton Drive Fairfield North 8 73 Plymouth Drive Core Samples 2, 3, 4, 5 and 7 do not meet the 6 thickness specified on the drawing detail. 46
49 Road section detail 47
50 Survey and Results 48
CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES
CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationFence and Wall Requirements
Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include
More informationSandstone Curb Replacement Standards
Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing
More informationEAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box Chattanooga, TN
EAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box 16187 Chattanooga, TN 37416-0187 Eagle Bluff Architectural Review Committee Duties: The EB ARC is charged with insuring that all new building in this community
More informationLOT GRADING GUIDELINES
LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 18093 came into effect on January 1, 2018 replacing previous versions of the Drainage Bylaw 16200. This Bylaw requires that all single family,
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationMarbella Isles Homeowners Association, Inc.
REQUEST FOR ARCHITECTURAL REVIEW Please Note: There is a $25.00 non-refundable processing fee for all requests. The application will not be processed if it is not included with application. Make check
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationINSPECTION AND ACCEPTANCE FOR MAINTENANCE
Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example
More informationSECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY
1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations
More informationToronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI
BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration
More informationSidewalk Repair Program. Charter Township of Canton Engineering Services
Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationStormwaterWise Landscapes: Pervious Surfaces Specifications
StormwaterWise Landscapes: Pervious Surfaces Specifications Purpose & Benefits Stormwater runoff reduction High pollutant removal Control localized drainage problems Attractive alternative for walkways
More informationOrder of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.
SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including
More informationMERRIMAC Homeowner s Association Architectural Control Committee Guidelines
MERRIMAC Homeowner s Association Architectural Control Committee Guidelines The Merrimac Architectural Control Committee (the Committee) has been established pursuant to the Merrimac Declaration of Covenants,
More informationRIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES
RIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES This Policy Document outlines the separation of responsibilities between the Rivers Edge Condominium Association (RECA) and the Unit Owners
More informationCHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.
Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North
More informationMISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM
MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM Note: This list should be used as a guide and not considered all inclusive. The offeror should use due diligence for any items
More informationSection X - Miscellaneous
Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationLOT GRADING GUIDELINES
LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...
More informationCHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT
15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in
More informationSTORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction
More informationTOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX
TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationGarage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements
General Information Site Card. Before starting construction, post the site card (issued by the City) in a front window visible from the street. Miss Dig. Before you dig, call Miss Dig at 800.482.7171 This
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationBuilding Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:
Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Copy of Alberta Government s New Home Registration
More information1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)
1420 Miner Street Des Plaines, IL 60016 P: 847.391.5380 desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) Five sets of stamped plans and specifications (six sets if food establishment),
More informationOperation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS
Operation & Maintenance (OM) Manual v01 Bioretention Systems ENGINEERED SOLUTIONS Bioretention Systems Table of Contents Overview Filterra General Description Filterra Schematic Basic Operations Design
More informationGRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW
GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation
More informationContinuing Certificate of Occupancy Pre-Inspection Checklist
Pre-Inspection Checklist INTRODUCTION: This pre-inspection checklist has been produced to assist you in preparing for a Continuing Certificate of Occupancy (CCO) inspection. The inspection criteria and
More informationSECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements
SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature
More informationCity of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES
City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES ANNUAL SUBMITTAL FORM DEADLINE: 5:00 PM ON FEBRUARY 15, 2017
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationVILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION
VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of
More informationSTRUCTURAL CONDITION ASSESSMENT
STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,
More informationFENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.
Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE
More informationEscondido Best Management Practices (BMP s)
Escondido Best Management Practices (BMP s) GROUNDS MAINTENANCE & GOOD HOUSEKEEPING Regularly dry sweep paved areas including parking lots, outdoor areas and dumpster areas. Do NOT use a hose. Collect
More informationArchitectural Guidelines
Architectural Guidelines 1 Table of Contents General Information Page 3 Building Architectural Design Requirements Page 3 Landscape Architectural Design Requirements Page 4 Submission Requirements Page
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More informationRed Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782
Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee
More informationMunicipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL
I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined
More informationB. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationTown of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects
2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD
More informationChapter 8. Inlets. 8.0 Introduction. 8.1 General
. Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria
More informationSECTION 903 EROSION CONTROL
SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,
More informationFACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES
FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth
More informationSIDEWALK PROBLEMS AND REPAIR
Borough of New Hope, Pennsylvania 41 North Main Street, New Hope, Pennsylvania, 18938 (215) 862-3347 SIDEWALK PROBLEMS AND REPAIR BACKGROUND New Hope Borough Code of Ordinance Article III, section 233-3
More informationARCHITECTURAL GUIDELINES HOLLYBROOK COVES HOA
ARCHITECTURAL GUIDELINES HOLLYBROOK COVES HOA I. General A. PURPOSE This document describes Section 5.03(c) of the Hollybrook Coves Homeowners Association By-Laws charging the Hollybrook Coves HOA with
More information5.0 EXEMPT ALTERATIONS AND CLASSES OF ALTERATIONS
Downtown Oakville Heritage Conservation District 5-1 5.0 EXEMPT ALTERATIONS AND CLASSES OF ALTERATIONS 5.1 INTRODUCTION Under Section 42 of the Ontario Heritage Act, a permit is required for the erection,
More informationSECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS
SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS 14.1 GENERAL USE REGULATIONS 14.1.1 PERMITTED USES No land, building, or structures shall be used or erected in the General Industrial Zone (M2) unless
More informationExtended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]
Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended
More informationPARKING LOT AND ROADWAY MAINTENANCE
Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationMISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY PERFORMANCE MEASURES
MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY RESTROOMS Toilets and urinals Clean and functional All toilets shall be clean and functional at all
More informationCREEKWOOD CHAPPELLE PHASE 2 RSL ALLDRITT HOMES, BUILDER ARCHITECTURAL REQUIREMENTS March 15, 2013
CREEKWOOD CHAPPELLE PHASE 2 RSL ALLDRITT HOMES, BUILDER ARCHITECTURAL REQUIREMENTS March 15, 2013 1.0 INTRODUCTION This document outlines the Alldritt Homes, Builder Architectural Requirements for the
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationREQUEST FOR ARCHITECTURAL REVIEW AND HOA APPROVAL - PHEASANT WALK HOMEOWNERS ASSOCIATION, INC.
REQUEST FOR ARCHITECTURAL REVIEW AND HOA NAME: ADDRESS: LOT: PHONE: (H) _(W) Directions: 1. Fill in requested information 2. Sign and Date Form 3. Mail with proper postage or deliver to: Pheasant Walk
More informationCity of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX
City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE14-00XXX Applicant: Job Description:
More informationCITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August
More informationSECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1
CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1
More informationInstallation and Maintenance of Erosion Control BMPs
Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving
More informationPART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS
PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm
More informationFlood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013
United States Department of Agriculture Natural Resources Conservation Service Denver Federal Center Building 56, Room 2604 P.O. Box 25426 Denver, CO 80225 720-544-2818-OFFICE alton.albin@co.usda.gov Flood
More informationBIOPOD TM BIOFILTER WITH STORMMIX BIOFILTRATION MEDIA. Inspection and Maintenance Guide
BIOPOD TM BIOFILTER WITH STORMMIX TM BIOFILTRATION MEDIA Inspection and Maintenance Guide BioPod Biofilter with StormMix Biofiltration Media Description The BioPod Biofilter System (BioPod) is a stormwater
More informationIndex. Composition and Order of Plan Set. Utility Plan... 5
City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading
More informationAPPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT
APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:
More informationWhitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities
Whitewater River Region SWMP APPENDIX L June 2009 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies for management of Urban Runoff in the Whitewater
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationInfiltration Trench. Image: Cahill Associates, Inc.
Infiltration Trench Image: Cahill Associates, Inc. An Infiltration Trench is a linear infiltration system, designed like an infiltration basin, yet shaped like a trench (long and thin). The Trench is topped
More informationReems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC
www.reemscreekhoa.com rcgchoa@yahoo.com Welcome to the Reems Creek Golf Community! One of the pleasures of living in a shared community is knowing that all residents have a desire for the same high quality
More informationADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013
ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME
More informationCity of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development
City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit
More informationWINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes
WINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes In accordance with Article VIII Section I of the Declaration of Covenants, Conditions/ and Restrictions for
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationSECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...
SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...
More informationDTE Energy St. Clair Power Plant
DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,
More informationInfiltration Guidelines
Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage
More information7.0 Design Guidelines
7.0 Design Guidelines 7.1 Scotia s Historic/Cultural Resources Inventories of Scotia s historic and cultural resources are included in the Appendices. Contributing and non-contributing resources are shown
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationDIVISION 5 STORM DRAINAGE CRITERIA
DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationPlan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA
EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction
More informationForsyth County Procurement
August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank
More informationARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.
ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.
More informationBuilding Permit Submittal Requirements
CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)
More information