T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF
|
|
- Ashley Long
- 5 years ago
- Views:
Transcription
1 30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY , , , FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF FURNISH AND INSTALL 6" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 400 SF REMOVE AND REPLACE 6" CRUSHED AGGREGATE BASE COURSE 300 SF REMOVE AND REPLACE SANITARY MANHOLE STRUCTURE, RINGS, FRAME AND COVER REMOVE AND REPLACE SANITARY MANHOLE BLOCK, RINGS, FRAME AND COVER 5 UNIT 4, , , , , , UNIT 1, , , , , , REMOVE AND REPLACE SANITARY MANHOLE BLOCK (extra depth) 5 VF , , , REMOVE AND REPLACE SANITARY MANHOLE RINGS, FRAME AND COVER 5 UNIT , , , Page 1 of 7
2 46151 REMOVE AND REPLACE SANITARY MANHOLE RINGS 1 UNIT REMOVE AND REPLACE SANITARY MANHOLE RINGS (extra depth) 5 VF , , FURNISH AND INSTALL CHIMNEY SEAL 18 UNIT , , , , REMOVE AND REPLACE STORM MANHOLE STRUCTURE, RINGS, FRAME, AND COVER REMOVE AND REPLACE STORM MANHOLE BLOCK, RINGS, FRAME, AND COVER 3 UNIT 3, , , , , UNIT 1, , , , , , REMOVE AND REPLACE STORM MANHOLE BLOCK AND RINGS (extra depth) 5 VF , REMOVE AND REPLACE STORM MANHOLE RINGS, FRAME, AND COVER 8 UNIT , , , REMOVE AND REPLACE STORM MANHOLE RINGS 5 UNIT , , , Page 2 of 7
3 47082 REMOVE AND REPLACE STORM MANHOLE RINGS (extra depth) 5 VF , REPAIR STORM MANHOLE- MORTAR, BRICK, TUCKPOINT, AND BACKPLASTER 1 UNIT GRIND TABS ON MANHOLE COVERS 6 UNIT , REMOVE AND REPLACE CATCH BASIN STRUCTURE, RINGS, FRAME, AND GRATE 8 UNIT 1, , , , , , REMOVE AND REPLACE CATCH BASIN STRUCTURE AND RINGS 1 UNIT 1, , , , , , REMOVE AND REPLACE CATCH BASIN RINGS, FRAME, AND GRATE 2 UNIT , , , REMOVE AND REPLACE CATCH BASIN RINGS 7 UNIT , , , REMOVE AND REPLACE CATCH BASIN RINGS (extra depth) 5 VF Page 3 of 7
4 47241 REPAIR CATCH BASIN- MORTAR, BRICK, TUCKPOINT AND BACKPLASTER 6 UNIT ADD-ON PRICE FOR HIGH PRIORITY REPAIR 5 UNIT , , , REMOVE EXISTING SANITARY SEWER MAIN AND REPLACE WITH 8" PVC 5 LF 1, , , , , SPOT REPAIR OF 18" STORM SEWER PIPE 5 LF , , , , , REMOVE & REPLACE 6" CONCRETE DRIVEWAY APPROACH 400 SF , , , REMOVE AND REPLACE 8" CONCRETE DRIVEWAY APPROACH 480 SF , , , SAWCUT CONCRETE PAVEMENT 50 LF SAWCUT DRIVEWAY APPROACH 180 LF Page 4 of 7
5 50093 SAWCUT SIDEWALK 30 LF SAWCUTTING 60 LF REMOVE AND REPLACE 24" CONCRETE CURB AND GUTTER 2,200 LF , , , REMOVE AND REPLACE 30" CONCRETE CURB AND GUTTER 50 LF , , , REMOVE AND REPLACE 4" CONCRETE SIDEWALK 50 SF REMOVE AND REPLACE 6" CONCRETE SIDEWALK 200 SF , , , REMOVE AND REPLACE 8" CONCRETE SIDEWALK 290 SF , , , REMOVE AND REPLACE 4" CONCRETE CURB RAMP 3,300 SF , , , Page 5 of 7
6 50327 FURNISH AND INSTALL DETECTABLE WARNING FIELD AT CURB RAMP 40 UNIT , , , REMOVE AND REPLACE 9" P.C. CONCRETE PAVEMENT 300 SF , , , ADD'L COST FOR 9 BAG VS 6 BAG (STD) CONCRETE MIX 30 CY , , , FURNISH AND PLACE 4" ASPHALTIC CONCRETE PAVEMENT FULL DEPTH PATCH FURNISH AND PLACE 5" ASPHALTIC CONCRETE PAVEMENT FULL DEPTH PATCH FURNISH AND PLACE 6" ASPHALTIC CONCRETE PAVEMENT FULL DEPTH PATCH 2,850 SF , , , ,350 SF , , , ,300 SF , , , FURNISH AND PLACE TOPSOIL 5,500 SF , , , FURNISH AND PLACE SEED, FERTILIZER, MULCH, AND WATER 5,500 SF , , , Page 6 of 7
7 90001 PROVIDE TRAFFIC CONTROL 1 LS 5, , , , , , Bid Totals ----> $299, $327, $352, Page 7 of 7
E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17
S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationNorth Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title
TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction
More informationMONROE STREET CONTRACT NO DATE: 12/21/17
Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $100,000.00 $100,000.00 $48,300.00 $264,800.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 510.00 $15.00 $7,650.00 $10.00
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL
Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More information2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More information:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,
General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell
More informationBID FORM (LUMP SUM CONTRACT)
BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an
More informationAmendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents
General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)
BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.
More informationADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013
ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME
More informationThe Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.
1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,
More informationADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders
ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS TO: All Plan Holders and Prospective Bidders TITLE: Hills of Cedar Creek East Phase 2 PROJECT NO: LOCATION: OWNER: EGA181011 Council Bluffs, IA. City
More informationWASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO
WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35
More informationADDENDUM NO. 1 APRIL 24, 2017
DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS
More informationDOCUMENT ADDENDUM No. 2
DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.
More informationCONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION
CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice
More informationCITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES
CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and
More informationCITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS
More informationSUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT
KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT ADDENDUM #3 Date of Addendum February 23, 2018 1. The Contract Provisions
More informationD-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE
EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.
More informationKansas Department of Transportation. Counties: Project(s): 106 KA / Max: Min:
Page 1 of 11 517112 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 025200 REMOVAL OF EXISTING STRUCTURES 3 011590 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 4 025324 TRAFFIC CONTROL 5 070580
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationBIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83
Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications
More informationISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS
ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.
More informationPAGE 1 BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 21, 2012 : 7,023,234.75 CONTRACT NO.120475 DOWNTOWN LINKS - ST. MARY'S ROAD INTERSTATE 10 (I-10) TO CHURCH AVENUE ROADWAY IMPROVEMENTS 1055001 0 HR RESTAKING FEES (150.00) 0.00
More informationFebruary 1, 2018 ADDENDUM NO. 3 TO ALL BIDDER S:
CITY OF MANASSAS, VIRGINIA FINANCE DEPARTMENT PURCHASING DIVISION 8500 Public Works Drive, Manassas, VA 20110 Telephone: (703) 257-8368 Facsimile: (703) 257-5813 Website: www.manassascity.org February
More informationSummary of the 2011 Changes
The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.
More informationApril 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS
April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009
More informationADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road
Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationPUBLIC WORKS DEPARTMENT GENERAL NOTES
PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard
More information761, , ,
BID TABULATION Bid : 7001 Shore Acres Stormwater Vaults Phase 2 Project : 09053-110 Engineering & Capital Improvements Department, City of St. Petersburg, Florida Bid date: May 20,2010 Item Description
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition
CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards
More informationIndex. Composition and Order of Plan Set. Utility Plan... 5
City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC SECTION 500 PORTLAND CEMENT CONCRETE CONSTRUCTION 501 CONCRETE - GENERAL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC SECTION 500 PORTLAND CEMENT CONCRETE CONSTRUCTION Section Number Title 501 CONCRETE - GENERAL 502 MATERIAL SPECIFICATIONS - GENERAL
More information2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02
2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: March 3, 2015 To: Prospective Contractors From: Jack Fleming, PE City of El Centro 1275 W. Main St. El Centro, CA 92243 Telephone:
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More informationDIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS
OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND SECTION 500 CONCRETE CONSTRUCTION 502 MATERIAL SPECIFICATIONS - GENERAL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND SECTION 500 CONCRETE CONSTRUCTION Section Number Title 501 CONCRETE - GENERAL 502 MATERIAL SPECIFICATIONS - GENERAL 503 CONSTRUCTION
More informationHITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:
N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS
More informationSPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE
SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within
More informationFederal Project No.: STP-513-8(192), STP-5138(191)
Schedule of Items Page: 2 0010 513 00100 0020 517 00102 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (MIN.-PLAN) 0030 303 00125 LUMP SUM LUMP SUM GRADING LUMP SUM LUMP SUM 0040 303 305 00140 BORROW
More informationElectrical Work. NOV Embankments Over Swamps and Compressible Soils
GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification
More informationCIRCLE K SUB-CONTRACTOR BID FORM
CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill
More informationConstruction Specification for Utility Adjustments
Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS
More informationSouthern Arizona Paving Item No. Item Description Unit Quantity Unit Cost Extended Amount Unit Cost Extended Amount
BID A (BASE DESIGN) LINE ITEM BID TABULATION 1070001 NPDES (ORIGINAL) L.S. 1 100,000.00 100,000.00 35,000.00 35,000.00 1070011 NPDES (MODIFICATIONS) F.A. 10,000 1.00 10,000.00 1.00 10,000.00 2010001 CLEARING
More informationINSPECTION AND ACCEPTANCE FOR MAINTENANCE
Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example
More informationNOTICE TO BIDDERS. May 31, Dorothy E. Maxwell Chair
May 31, 2016 Dorothy E. Maxwell Chair Duane A. Eldred Vice Chair Timothy J Lamoreaux Member Benjamin S. Lyons Member Darrell R. Tennis Member Blair E. Ballou, P.E. Engineer-Manager Lori N. Friedlis, CPA
More informationBID FORM - LUMP SUM BID
BID FORM - LUMP SUM BID PROJECT: Livingston Northside Park and Soccer Fields Phase 1 Construction LOCATION: Livingston, Montana Ladies & Gentlemen: Pursuant to and in compliance with the Advertisement
More information10:00 AM, Wednesday, April 8, 2015
NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference
More informationTransportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013
Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 0 The City of Naperville Transportation, Engineering and Development (TED) Business
More informationFebruary 22, 2018 BIDDERS WILL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL PAGE
February 22, 2018 Addendum No. 1/Bid Postponement DWM Sewer Improvement P-2017-06 Sewer Improvement Project PN-2017-06 SPECIFICATION NO. 292687 For which bids will be opened in the office of the Department
More informationSPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013
SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR
More informationNOTICE. Registration Form and Notice of Needed Revisions
CONSTRUCTION MANUAL SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 NOTICE Registration Form and Notice of Needed Revisions Complete and return this registration form to receive revisions to this
More informationCITY OF REEDLEY MAINTENANCE WORKER I MAINTENANCE WORKER II
CITY OF REEDLEY MAINTENANCE WORKER I MAINTENANCE WORKER II DEFINITION Under immediate supervision (Maintenance Worker I), or general superv1s1on (Maintenance Worker II), to perform a variety of semi-skilled
More informationCITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS
SKAGIT COUNTY WASHINGTON SCHEDULE A - SANITARY SEWER MAINLINE REPLACEMENT SCHEDULE B - GRADING AND STORM DRAIN IMPROVEMENTS CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY TONYA BIECHE City Council RICK
More informationCity of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist
If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address
More informationSUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1
DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationUTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2
UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS
More informationENGINEERING MEMORANDUM
ENGINEERING MEMORANDUM March 12, 2018 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contracts for Bid Schedule B - 2018: C2018-1 Monterey Area Removal and
More informationM E M O R A N D U M. Location Description Cost. Demolish the existing structure. Construct 52 x25 Atlas block
CONSULTING ENGINEERS M E M O R A N D U M TO: FROM: RE: Tiffany Staheli Matt Hartvigsen, P.E. City Engineer 2014 Grant Application City Park Projects Budgetary Cost Summary Date: November 8, 2014 We understand
More informationCITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way
CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way
More informationMFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS
MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS Presented By: Joe Lombardo, ASA Regional Vice President Suncorp Valuations Ltd. Overview of
More informationCity of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)
FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents
More informationPUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE
PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined
More informationProject Need and Evaluation
City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the
More informationSTANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS
STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking
More informationSECTION 806 MANHOLE REHABILITATION
SECTION 806 MANHOLE REHABILITATION 806-1 DESCRIPTION: This specification consists of all work, materials, labor and equipment required for manhole rehabilitation for the purpose of eliminating infiltration
More informationIndependent Consulting Engineers NV Zaegersgut Rd #13 tel +(599) Date: 25 januari 2008 Project: Troy Hill Saba Projectnr:
(Na) (Na) (Na) 1 Preparational works 1.1 Survey roads 1 sum 25,000.00 25,000.00 1.2 Clearing terrain roads 1 sum 45,000.00 45,000.00 Main 2 Earth work 2.1 Earth work 2.11 Excavate terrain 8900 m3 30.00
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION
601.00 RIPRAP 600.00 GENERAL CONSTRUCTION 601.01 DESCRIPTION. This work shall consist of furnishing and placing riprap protection of the type specified at the locations and in reasonably close conformity
More informationENGINEERING DESIGN & IMPROVEMENT STANDARDS
ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments
More informationPARKING LOT AND ROADWAY MAINTENANCE
Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and
More informationRequest for Proposal: Due October 11, :00 pm
Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,
More informationInfrastructure Evaluation. Preliminary Scope and Cost Estimates
Infrastructure Evaluation Preliminary Scope and Cost Estimates January 25, 2016 Infrastructure Evaluation Existing Conditions Street Improvements Pavement Management Street Condition Inventory Underground
More informationStrong-Seal Sealant Specification, a permanent method of sealing the interior of the chimney and casting in manholes and catch basins.
Strong-Seal Sealant Specification, a permanent method of sealing the interior of the chimney and casting in manholes and catch basins. Intent: A method of providing corrosion protection and a flexible
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson
More informationNIAGARA PENINSULA STANDARD CONTRACT DOCUMENT
NIAGARA PENINSULA STANDARD CONTRACT DOCUMENT SPECIAL PROVISIONS CONTRACT ITEMS SPECIAL PROVISIONS - CONTRACT ITEMS INDEX Page GENERAL A1 Bonding 1 A2 Preconstruction Survey 1 A3 Site Office 1 A4 Construction
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING December 12, 2017
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING December 12, 2017 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia,
More informationCHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS
CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS Storm Sewer System: 1. Detention/retention of stormwater runoff shall be provided in accordance with the requirements of the DuPage County Countywide Stormwater
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationGENERAL CONSTRUCTION SPECIFICATIONS
GENERAL CONSTRUCTION SPECIFICATIONS PREPARED BY: CITY OF VALPARAISO ENGINEERING DEPARTMENT 166 LINCOLNWAY VALPARAISO, IN 46383 219-462-1161 Last Revision December 18, 2008 These specifications are intended
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationENCROACHMENT/EXCAVATION PERMIT APPLICATION
PERMIT / PROJECT INFORMATION: PARCEL INFO: APPLICANT S INFO: Public Works/Engineering 595 SILVER LACE BLVD, FERNLEY, NV 89408 (775)-784-9910 ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT APPLICATIONS,
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationCITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)
CITY OF ATLANTIC BEACH BID NUMBER 1314-08 PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA 32233 (904) 247-5880 REQUEST FOR BID CONTRACT - CONCRETE REPAIRS FOR THE PUBLIC WORKS/UTILITIES
More informationCHAPTER 6. Sanitary Sewer
CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide
More informationSunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014
Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District
More informationPuerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration
Puerto Rico Pavement Preservation Conference and Technology Implementation US. Department of Transportation Federal Highway Administration Cold In-Place Asphalt Recycling Overview Michael L. Polak E.J.
More informationSandstone Curb Replacement Standards
Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing
More informationMunicipal Engineering Standards Development Agreement Request Form
Appendix A-1 Development Agreement Request Form Development Agreement Request Form To: Project Leader, Approvals and Technical Services : City of Spruce Grove, Planning and Infrastructure 315 Jespersen
More informationSPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project
RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY
More informationPART 5 WATER SYSTEMS
PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete
More information