1 Schedule of Items Page: MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (MIN.-PLAN) LUMP SUM LUMP SUM GRADING LUMP SUM LUMP SUM BORROW EXCAVATION CY 0050 ATTD SELECT MATERIAL 8 INCHES CONCRETE CLASS A3 MISC CY UNDERDRAIN UD OUTLET PIPE ENDWALL EW " PIPE " PIPE " PIPE " X 14" ELLIPTICAL CONC. PIPE " X 19" ELLIPTICAL CONC. PIPE

2 Schedule of Items Page: " END SECTION ES-1 OR " END SECTION ES-1 OR DROP INLET DI-3A DROP INLET DI-3B,L=8' DROP INLET DI-3C,L=20' MANHOLE MH FRAME & COVER MH EROSION CONTROL SE CLASS A1 EC EROSION CONTROL SE CLASS I, EC AGGR. BASE MATL. TY. I NO. 21B ASPHALT CONCRETE TY. SM- 19.0A ASPHALT CONCRETE TY. SM- 12.5D ASPHALT CONCRETE TY. IM- 19.0A

3 Schedule of Items Page: FLEXIBLE PAVEMENT PLANING 0" - 2" 1, ASPHALT CONC. BASE COURSE TY. BM-25.0A PLAN SAW-CUT ASPH CONC FULL DEPTH 0-9" 1, STD. COMB. CURB & GUTTER CG RADIAL COMB. CURB & GUTTER CG ENTRANCE GUTTER CG-9D ENTRANCE GUTTER CG HYDRAULIC CEMENT CONC. SIDEWALK 4" SAW CUT H.C.C. ITEMS FULL DEPTH MEDIAN STRIP MS ALLAYING DUST TYPE 3 BARRICADE 4' TEMPORARY (CONSTRUCTION) SIGN SF

4 Schedule of Items Page: TRUCK MOUNTED ATTENUATOR GROUP 2 CHANNELIZING DEVICES 4, DAY PORTABLE CHANGBLE MESSAGE SIGN 1, ELECTRONIC ARROW BOARD FLAGGER SERVICE 2, ATTD POLICE PATROL UNIFORMED FLAGGER DEMOLITION OF PAVEMENT (FLEXIBLE) PLAN REMOVE EXIST. CONCRETE SIDEWALK PLAN REMOVE EXIST. CG PLAN REMOVE EXISTING ES ATTD ROCKFILL PLAN TOPSOIL CLASS B 3" ACRE TEMPORARY SEED 2

5 Schedule of Items Page: REGULAR SEED OVERSEEDING HYDRAULIC EROSION CONTROL PRODUCT TYPE HYDRAULIC EROSION CONTROL PRODUCT TYPE 2 1, HYDRAULIC EROSION CONTROL PRODUCT TYPE HYDRAULIC EROSION CONTROL PRODUCT TYPE 4 1, FERTILIZER (NITROGEN - N) FERTILIZER (PHOSPHOROUS - P) FERTILIZER (POTASSIUM - K) LIME ROLLED EROSION CTRL PRODUCT EC-2 TYPE ROLLED EROSION CTRL PRODUCT EC-2 TYPE SILTATION CONTROL EXCAVATION CY

6 Schedule of Items Page: INLET PROTECTION TYPE B TEMP. FILTER BARRIER 1, ATTD UTILITIES TEST HOLE IN ASPHALT NON PAVED AR 0700 ATTD UTILITIES TEST HOLE IN ASPHALT PAVE. AR SIGN PANEL SF SIGN POST STP-1, 2 1/2", 10 GAUGE CONCRETE FOUNDATION STP-1, TYPE A TRAFFIC SIGNAL HD SECTION 12" LED CONCRETE FOUNDATION CF SIGNAL POLE MP-3, TYPE B MAST ARM 60' VIDEO DETECTION CAMERA /4 CONDUCTOR CABLE

7 Schedule of Items Page: /7 CONDUCTOR CABLE CONDUCTOR CABLE #8 BOND WIRE CONDUCTOR CABLE 6/ ATTD CONDUCTOR CABLE CAT5E DIRECT BURIAL HANGER ASSEMBLY SM-3, ONE WAY REMOVE EXISTING POLE REMOVE EXISTING CAMERA REMOVE EXISTING ELECTRICAL SERVICE 0880 ATTD CAT. 5 OUTDOOR CABLE ATTD 360 DEGREE VIDEO DETECTION CAMERA TYPE III CONTROLLER TYPE REMOVE EXISTING CONTROLLER CABINET

8 Schedule of Items Page: REMOVE EXISTING FOUNDATION REMOVE EXISTING MANHOLE OR JUNCTION BOX REMOVE EXISTING SIGNAL HD 0950 ATTD UNINTERRUPTIBLE POWER SUPPLY 0960 ATTD VIDEO DETECTION CABINET HARNESS 0970 ATTD VIDEO DETECTION MONITOR AND MOUSE 0980 ATTD VIDEO DETECTION UNIT 360 DEGREE ELECTRICAL SERVICE SE-3 TYPE A TYPE A PVMT LINE MRKG 6" 1, TYPE B CLASS I PAVE. LINE MARKING 24"

9 Schedule of Items Page: TYPE B CLASS VI PVMT LINE MRKG 6" TEMP. PVMT MRKG, TY. A, 4" PVMT MB MRKG (SGL TURN ARROW) TY B, CL I PVMT MB MRKG (DBL TURN ARROW TU/LT OR RT) TY A JUNCTION BOX JB-S JUNCTION BOX JB-S ELECT. SER. GRD. ELECTRODE(10') BORED CONDUIT 2" BORED CONDUIT 3" " PVC CONDUIT " PVC CONDUIT TRENCH EXCAVATION ECI GHZ WIRELESS BROADBAND RADIO

10 Schedule of Items Page: 11 Section: 0001 Total: Total Bid:

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE

More information

Federal Project No.: NONE

Federal Project No.: NONE Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND

More information

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 The following is a complete list of special design IMPERIAL insertable sheets that will be used with the

More information

Price Proposal. Gloucester Parkway Extension A DESIGN-BUILD PROJECT. Loudoun County, Virginia. From: Loudoun County Parkway To: Pacific Boulevard

Price Proposal. Gloucester Parkway Extension A DESIGN-BUILD PROJECT. Loudoun County, Virginia. From: Loudoun County Parkway To: Pacific Boulevard Price Proposal A DESIGN-BUILD PROJECT Gloucester Parkway Extension From: Loudoun County Parkway To: Pacific Boulevard Loudoun County, Virginia State Project No.: 2150-053-052 Contract ID No.: C00104418DB68

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

Southern Arizona Paving Item No. Item Description Unit Quantity Unit Cost Extended Amount Unit Cost Extended Amount

Southern Arizona Paving Item No. Item Description Unit Quantity Unit Cost Extended Amount Unit Cost Extended Amount BID A (BASE DESIGN) LINE ITEM BID TABULATION 1070001 NPDES (ORIGINAL) L.S. 1 100,000.00 100,000.00 35,000.00 35,000.00 1070011 NPDES (MODIFICATIONS) F.A. 10,000 1.00 10,000.00 1.00 10,000.00 2010001 CLEARING

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING March 08, 2016

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING March 08, 2016 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING March 08, 2016 Letting Location: SCDOT Headquarters Building Conference Room 332-C 955 Park Street Columbia,

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

Status Report as of July 31, 2014

Status Report as of July 31, 2014 Dominion Boulevard Improvements AC # 01-6004-05 UPC: 56187 VDOT Project No: (FO) 6017-131-109, PE-101, RW-201, C-501, B608, B609, B610, B611, B614, B615, B616, D608, & C-502, B612, B613 FHWA No.: HPP-0017-5(023)

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST PAGE 1 BID OPENING: JULY 27, 2010 ENGINEER'S ESTIMATE: $18,092,457.75 CONTRACT NO.100510 SPEEDWAY BOULEVARD, CAMINO SECO TO HOUGHTON ROAD IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

At a minimum, the cost estimate should address the following specific items if applicable to your project:

At a minimum, the cost estimate should address the following specific items if applicable to your project: The Pennsylvania Department of Transportation s application process for the Green Light Go program requires the development of a project cost estimate. In order to provide consistency in the cost estimating

More information

PRELIMINARY DEVELOPMENT PLAN INFORMATION

PRELIMINARY DEVELOPMENT PLAN INFORMATION PRELIMINARY DEVELOPMENT PLAN INFORMATION SITE AREA =.0 AC. (,8,8 S.F.) BUILDING FOOTPRINT =,8 S.F. PAVEMENT/PARKING AREA = 0,98 S.F. BUILDING COVERAGE OF SITE = % SITE IMPROVEMENT PLAN NOTES. ALL UTILITY

More information

BID FORM - LUMP SUM BID

BID FORM - LUMP SUM BID BID FORM - LUMP SUM BID PROJECT: Livingston Northside Park and Soccer Fields Phase 1 Construction LOCATION: Livingston, Montana Ladies & Gentlemen: Pursuant to and in compliance with the Advertisement

More information

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES MASTER PLAN UPDATE APPENDICES APPENDIX H Capital Improvement Program Detail Project Costs Montgomery Consulting Group August 11, 2009 Appendix H CAPITAL IMPROVEMENT PROGRAM Short Term (0-5 years) SUB-

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

EDENTON (252) GREENVILLE (252) CASTLE HAYNE (910) WILSON (252) DURHAM (919) FAYETTEVILLE (910)

EDENTON (252) GREENVILLE (252) CASTLE HAYNE (910) WILSON (252) DURHAM (919) FAYETTEVILLE (910) DIV NO. DIVISION ENGINEER 00001 Jerry Jennings, PE 00002 John W Rouse, PE 00003 Karen Eason Collette, PE 00004 Timothy M Little, PE 00005 Joseph R Hopkins, PE 00006 Gregory W Burns, PE 00007 James M Mills,

More information

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS December 2012 CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions Specifications...

More information

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M401: ITEM 615 - PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M402: DELETED M403: DETOUR NOTIFICATION [ODOT] M404: DETOUR NOTIFICATION [CITY/COUNTY] M405: DELETED M406: DELETED M407: DELETED

More information

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST Page 1 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Warranty certificates... $ 5 Supervision... $ SECTION 01 32 17 - SCHEDULE 6

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda

More information

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012 OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS -2010 PAY ITEM LIST revised 11/27/2012 Pay Item List includes all of the pay items listed in the 2010 OTA Specifications and Special Provisions. Pay

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION 601.00 RIPRAP 600.00 GENERAL CONSTRUCTION 601.01 DESCRIPTION. This work shall consist of furnishing and placing riprap protection of the type specified at the locations and in reasonably close conformity

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

Section 820. TRAFFIC SIGNALS

Section 820. TRAFFIC SIGNALS 820.02 Section 820. TRAFFIC SIGNALS 820.01. Description. This work consists of providing required components to complete the following: A. Provide complete, operating traffic and pedestrian signals, span

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

SUMMARY OF QUANTITIES

SUMMARY OF QUANTITIES SUMMARY OF QUANTITIES S.P. ITEM NO. CODE NUMBER ITEM UNIT TOTAL 1 20200100 EARTH EXCAVATION CU. YD. 59 2 20300100 CHANNEL EXCAVATION CU. YD. 76 3 2000800 FURNISHED EXCAVATION CU. YD. 123 20800150 TRENCH

More information

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

CHAPTER 2G - CONSTRUCTION PLANS SECTION 2G-1-FINALIZING PLANS...2G-1

CHAPTER 2G - CONSTRUCTION PLANS SECTION 2G-1-FINALIZING PLANS...2G-1 CHAPTER 2G - CONSTRUCTION PLANS SECTION 2G-1-FINALIZING PLANS....2G-1 Reviewing Reports Integrated Project Management... 2G-1 Resolution of Pending Construction Details... 2G-1 Special Design Drawing Request

More information

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS

More information

Chapter 9 - Storm Drains

Chapter 9 - Storm Drains Chapter 9 - Storm Drains TABLE OF CONTENTS CHAPTER 9 - STORM DRAINS... 9-1 9.1 Introduction... 9-1 9.1.1 Objective 9-1 9.2 Design Policy... 9-2 9.2.1 Definition 9-2 9.2.2 General Policies... 9-2 9.3 Design

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT February 20, 2017 NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO. 7500 PROJECT NO. 10434 UNIT WELL 31 WATER TREATMENT PLANT Revise and amend the contract document(s) for the above project as stated in this

More information

PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS. Engineering Division Division de l ingénierie

PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS. Engineering Division Division de l ingénierie PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS Engineering Division Division de l ingénierie December 18, 2006 Page 1 of 6 REVISION SUMMARY Table of Contents Division 4 Specifications Surface Works

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

Design Criteria and Plan Requirements For Public Improvement Plans 2017 Edition

Design Criteria and Plan Requirements For Public Improvement Plans 2017 Edition Design Criteria and Plan Requirements For Public Improvement Plans 2017 Edition CITY OF LENEXA Community Development Department www.lenexa.com CITY OF LENEXA Design Criteria and Plan Requirements For Public

More information

SHERWIN WILLIAMS ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL

SHERWIN WILLIAMS ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL VICINITY MAP HIGHWAY 63 SE AND 28TH ST. SE, ROCHESTER, MN SHEET INDEX C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2

More information

Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM

Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM Construction Management Plan/Materials Notebook September 25, 2013 Marty R. Halloway, P.E. VDOT Area Construction

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

PROJECT AT THE DENVER

PROJECT AT THE DENVER POROUS ASPHALT DEMONSTRATION PROJECT AT THE DENVER WASTEWATER BUILDING Ken A. MacKenzie, P.E. Manager, Master Planning Program Urban Drainage and Flood Control District 36 th Annual Rocky Mountain Asphalt

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

City of Wentzville. Standard Specifications and Construction Details Amendment List

City of Wentzville. Standard Specifications and Construction Details Amendment List Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location

More information

Independent Consulting Engineers NV Zaegersgut Rd #13 tel +(599) Date: 25 januari 2008 Project: Troy Hill Saba Projectnr:

Independent Consulting Engineers NV Zaegersgut Rd #13 tel +(599) Date: 25 januari 2008 Project: Troy Hill Saba Projectnr: (Na) (Na) (Na) 1 Preparational works 1.1 Survey roads 1 sum 25,000.00 25,000.00 1.2 Clearing terrain roads 1 sum 45,000.00 45,000.00 Main 2 Earth work 2.1 Earth work 2.11 Excavate terrain 8900 m3 30.00

More information

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report Preliminary Engineering Study Richland Avenue Pedestrian Crossing Volume I: Preliminary Report SUBMITTED TO: City of Athens Engineering and Public Works Athens, Ohio SUBMITTED BY: January 12, 2016 Prepared

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

ARCHITECT: GENERAL NOTES 1. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE THE ENGINEER OF ANY CONFLICTS OF REPRESENTATION BETWEEN DRAWINGS AND/OR SPECIFICATIONS PRIOR TO COMMENCING

More information

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts

More information

RICHFIELD CITY CONSTRUCTION STANDARDS

RICHFIELD CITY CONSTRUCTION STANDARDS CONSTRUCTION STANDARDS REVISED OCTOBER 2015 Jones & DeMille Engineering, Inc. [0711-211] 1535 South 100 West Richfield, UT 84701 Ph. 435-896-8266 Fax 435-896-8268 1675 South Highway 10 Price, UT 84501

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building PROJECT SHOWING MINUTES Route 7 Widening Project January 15, 2013 10 a.m. NOVA District Building Overview / Welcome: Michael Gleasman, PE, Area Construction Engineer (VDOT) Overview: A question and answer

More information

Connecticut DOT 2013 Cost Estimating Guidelines

Connecticut DOT 2013 Cost Estimating Guidelines I. PURPOSE These guidelines provide basic cost estimating information for Department construction projects and recent cost information for several common construction items. The guidelines work in conjunction

More information

Douglas County Traffic Signal Installation Guidelines (January 2013)

Douglas County Traffic Signal Installation Guidelines (January 2013) Douglas County Traffic Signal Installation Guidelines (January 2013) The following guidelines are minimum requirements for equipment installation. Section A. Poles and Foundations ( Wood, Concrete, Mast

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

WOOD POLE SPAN WIRE SIGNAL SYSTEMS

WOOD POLE SPAN WIRE SIGNAL SYSTEMS 7 A wood pole span wire traffic control signal system differs from a mast arm steel pole traffic control signal system in that it uses wood poles and span wires to place the signal indications in the driver

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

EXCAVATION / RIGHT OF WAY PERMIT

EXCAVATION / RIGHT OF WAY PERMIT $25 Application Fee PERMIT# EXCAVATION / RIGHT OF WAY PERMIT NOTE: No permit shall be issued without current Montana Contractors License, Insurance and Bonding on file with the Public Works Department.

More information

STANDARD TECHNICAL SPECIFICATIONS

STANDARD TECHNICAL SPECIFICATIONS CITY OF TARPON SPRINGS, FLORIDA STANDARD TECHNICAL SPECIFICATIONS FEBRUARY 2011 PUBLISHED BY: DEVELOPMENT SERVICES DEPARTMENT TABLE OF CONTENTS GENERAL CONSTRUCTION OPERATIONS...4 ACRONYMS & ABBREVIATIONS...5

More information

ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301)

ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301) April 4, 2018 ADDENDUM NO. 4 To: All Potential Bidders Re: ITB 18-12 Christopher s Crossing (Sanner) Roadway Construction Consisting of: Sign-in Sheet, Meeting Minutes, CAD File, Dry Utility Relocate,

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information