1 Page 1 of SECTION: 01 COMMON ITEMS MOBILIZATION REMOVAL OF EXISTING STRUCTURES TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) TRAFFIC CONTROL FLAGGER (SET PRICE) CUYD HOUR 95, , , , , , $132, Section Total with LCC: $132,560.00
2 Page 2 of SECTION: KA ROAD ITEMS- DISTRICT CLEARING AND GRUBBING SIDEWALK CONSTRUCTION ( 4") SIDEWALK CONSTRUCTION ( 6") SIDEWALK RAMP ENTRANCE PIPE ( 12") (CSP) ENTRANCE PIPE ( 15") (CSP) ENTRANCE PIPE ( 21") (CSP) , , , , , , $53, Section Total with LCC: $53,935.00
3 Page 3 of SECTION: KA ROAD ITEMS- DISTRICT CLEARING AND GRUBBING SIDEWALK CONSTRUCTION ( 4") SIDEWALK RAMP SIDEWALK RAMP (DETECTABLE WARNING) HANDRAIL (METAL-GALVANIZED) ADJUSTMENT OF VALVE BOX (WATER) EACH 3, , , , , , , $155, Section Total with LCC: $155,035.00
4 Page 4 of SECTION: KA ROAD ITEMS- DISTRICT CLEARING AND GRUBBING SIDEWALK CONSTRUCTION ( 4") SIDEWALK RAMP HANDRAIL (METAL-GALVANIZED) ADJUSTMENT OF VALVE BOX (WATER) ADJUSTMENT OF METER BOX (WATER) ADJUSTMENT OF MANHOLES EACH EACH EACH 3, , , , , $92, Section Total with LCC: $92,835.00
5 Page 5 of SECTION: 05 TEMP PRJ WTR POL CTL SEDIMENT REMOVAL (SET PRICE) TEMPORARY BERM (SET PRICE) FILTER SOCK ( 8") FILTER SOCK (18") WATER (EROSION CONTROL) (SET PRICE) CUYD MGAL , , $8, Section Total with LCC: $8,521.00
6 Page 6 of SECTION: KA CONCRETE SURFACING ITEMS-DISTRICT CURB AND GUTTER, COMBINED CONCRETE PAVEMENT ( 8" UNIFORM) (PLAIN) , , $5, Section Total with LCC: $5,145.00
7 Page 7 of SECTION: KA CONCRETE SURFACING ITEMS-DISTRICT CURB AND GUTTER, COMBINED CONCRETE PAVEMENT ( 8" UNIFORM) (PLAIN) , , $58, Section Total with LCC: $58,245.00
8 Page 8 of SECTION: KA CONCRETE SURFACING ITEMS-DISTRICT CURB AND GUTTER, COMBINED CONCRETE PAVEMENT ( 8" UNIFORM) (PLAIN) , , $50, Section Total with LCC: $50,415.00
9 Page 9 of SECTION: 09 SIGNING ITEMS SIGN (REMOVE AND RESET) 3, , $3, Section Total with LCC: $3,500.00
10 Page 10 of SECTION: 10 SEEDING ITEMS , , SEEDING $20, Section Total with LCC: $20, Contract Item Totals $580, Contract Time Totals Contract Life Cycle Costs Totals $0.00 Contract Grand Totals $580, ( ) indicates item is bid as Lump Sum
11 Page 11 of 11
12 Vendor Ranking DISTRICT 2, DISTRICT 5, DISTRICT 6 BARBER, COWLEY, EDWARDS, JEWELL, MEADE, MORRIS, NESS, STATEWIDE, SUMNER Page 1 of 1 Rank Vendor ID/Name Total Bid Percent Of Low Bid BRYANT & BRYANT $580, %
Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max:
Page 1 of 11 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING
More informationKansas Department of Transportation DISTRICT 5. Project(s): Min: Max:
Page 1 of 11 518105 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025603 FIELD OFFICE 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING STRUCTURES 6 012340
More informationKansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:
Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 5 518102 EMERY SAPP & SONS INC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020001 MAINTENANCE AND RESTORATION OF HAUL ROADS
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationKansas Department of Transportation DISTRICT 5. Project(s): Min: Max:
Page 1 of 7 VENTURE CORPORATION (2) APAC-KANSAS INC SHEARS DIVISION (3) SHILLING CONSTRUCTION CO INC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 023 MOBILIZATION 2 070626 MOBILIZATION
More informationE. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17
S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00
More informationKansas Department of Transportation DISTRICT 1. Project(s): Min: Max:
Page 1 of 9 SHILLING CONSTRUCTION CO INC (2) HALL BROTHERS INC (3) APAC-KANSAS INC SHEARS DIVISION SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationKansas Department of Transportation Bureau of Construction and Maintenance Estimating Section
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 11 518122 APAC-KANSAS INC SHEARS DIVISION (2) BETTIS ASPHALT & CONSTRUCTION INC (3) CORNEJO & SONS LLC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626
More informationT. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF
30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY 50.00 29,450.00 55.00 32,395.00 50.00 29,450.00 30584 FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF 0.75 360.00 0.85
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 96-0999. Any instructions not followed will result
More informationKansas Department of Transportation DISTRICT 4. Project(s): Min: Max:
Page 1 of 7 BETTIS ASPHALT & CONSTRUCTION INC (2) EMERY SAPP & SONS INC AND SUBSIDIARIES (3) CORNEJO & SONS LLC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018040 TRACS No. Project No. County District Gross
More informationCHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS
CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3
More informationVirginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR
Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF T BDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in
More informationNew Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS
PAGE : 409-1 CONTRACT TIME : 02/28/13 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STATE ROUTE 45 ROADWAY DRAINAGE IMPROVEMENT CONTRACT DP 12409 BOROUGH OF WESTVILLE, GLOUCESTER COUNTY VENDOR
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of
More informationSECTION BID FORM. Garfield Street Drainage Improvements
SECTION 00410 BID FORM Garfield Street Drainage Improvements ARTICLE 1 - BID RECIPIENT 1.01 This Bid is submitted to: City of Lindsborg, Kansas City Clerk s Office 101 S. Main Street Lindsborg, KS 67456
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)
BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.
More informationDivision IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT
Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...
More informationKansas Department of Transportation DISTRICT 2. Project(s): 079 C / HSIP-C486(201) Min: Max:
Page 1 of 10 SIGNS UP LTD DBA HAREN'S TREES AND CRITTERS (2) HAMM CONTRACTING LLC (3) RFB CONSTRUCTION COMPANY INC SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL
More informationFederal Project No.: STP-513-8(192), STP-5138(191)
Schedule of Items Page: 2 0010 513 00100 0020 517 00102 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (MIN.-PLAN) 0030 303 00125 LUMP SUM LUMP SUM GRADING LUMP SUM LUMP SUM 0040 303 305 00140 BORROW
More informationMAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S
MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationSPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances
2004 Specifications CSJ 1316-01-034 & 0902-48-502 SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 1. Description. Furnish all materials, equipment, labor and incidentals necessary
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 07/10/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1213-12 Contract ID: Contract Description: Contract Location: Recommendation: 170022 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCONTRACT ID : COMPLETION DATE : 09/15/08 =========
PAGE : 1 COMPLETION DATE : 09/15/08 PROJECT(S): ER-1453(310)X LOCATION(S): YORK, CULVERT REPLACEMENT MAINE STATE DEPARTMENT OF TRANSPORTATION A TRUE COPY : TITLE : ATTEST : CONTRACT DESCRIPTION : YORK,
More informationADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1
CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT- ENGINEERING DIVISION ADDENDUM DATE: 10/12/15 PROJECT: BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: 41506 BID DATE: 10/27/15 ADDENDUM
More informationITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum
KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).
More informationContractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.
KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationFederal Project No.: HSIP-5A27(394)
Order : M08 Schedule of Items Page: 2 Oversight/State Project : (NFO)0250-043-797, M501 Federal Project : HSIP-5A27(394) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More information2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form
2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCity of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#
City of Kettering Bid Tabulations 05-117 2017 SWR PROJECT Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # 5212-77750 PO# Engineer's Estimate (1) America's Decorative Concrete (2) RA
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL
Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE
More informationDepartment of Transportation Mitchell Region Office
Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents
More informationADDENDUM NO. 1. ISSUED: March 23, 2018 PROJECT: Aurora, Indiana. BID DATE: March 27, 2018
ADDENDUM NO. 1 ISSUED: March 23, 2018 PROJECT: 2 nd Street CCMG Project BID DATE: March 27, 2018 The following addenda items modify, change, delete from or add to the requirements of the Contract Documents
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD
More informationYES, we received Addendum No. 1
TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION
More informationPage 1 of 7 Contract No.: 0216 OCPW Schedule Of Prices Addendum Date Created 1 07/11/2016 9:28 AM Project Number: SP 055-609-018 Project Title or Road Number: CSAH 9 Mill, Grade, Overlay Work Type: Grading,
More informationADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF
ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds
More informationImprovement Plan Cost Estimate
Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or
More informationBID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction
More informationMERCED COUNTY CAMPUS PARKWAY SEGMENT 2
MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item
More informationTO ALL PROSPECTIVE BIDDERS: The original specifications for the project noted above are hereby modified as described below:
ADDENDUM 1 February 28, 2018 CONTRACT DOCUMENTS FOR Lincoln Avenue Sidewalk Construction CITY OF TAKOMA PARK IFB PW-20180208 State Contract No. MO4665112 TO ALL PROSPECTIVE BIDDERS: The original specifications
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor
More informationEL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02
EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationNOTICE TO BIDDERS. August 24, 2016 ADDENDUM NO. 1. Gosling Road Pedestrian, Bike & Related Improvements
NOTICE TO BIDDERS August 24, 2016 ADDENDUM NO. 1 Gosling Road Pedestrian, Bike & Related Improvements TO ALL FIRMS OF RECORD: This addendum forms a part of and modifies the bidding and contract documents
More informationFORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )
PAGE 1 OF 6 FOR USE WHEN UNIT S FORM THE BASIS OF PAYMENT - TO BE USED ONLY WITH THE GENERAL CONDITIONS AND OTHER STANDARD DOCUMENTS OF THE UNIT MASTER MUNICIPAL CONSTRUCTION DOCUMENTS. Owner: Contract:
More informationMONROE STREET CONTRACT NO DATE: 12/21/17
Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $100,000.00 $100,000.00 $48,300.00 $264,800.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 510.00 $15.00 $7,650.00 $10.00
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION
CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationC. W. Matthews Contracting Co., Inc. (L)
BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00
More informationCITY AND COUNTY OF DENVER
2-1.1b REMOVE COMBINATION CONCRETE CURB, GUTTER AND SIDEWALK (3'-11") 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER S Holly: See near STA: 25+56 S Poplar 300 LF 25 LF 2-1.4 REMOVE HANDICAP CONCRETE CURB
More informationFederal Project No.: STP-670-1(013)
Order : N86 Schedule of Items Page: 2 Oversight/State Project : 0677-095-019,C501, B670 Federal Project : STP-670-1(013) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION
More informationSECTION 1500 REMOVALS
SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment
More informationRevision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:
Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360
More informationAddendum No. 1 Issue Date: March 29, 2016
Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South
More informationNew Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS
PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00
More informationFederal Project No.: STP-013-1(082)
Order : N76 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0744-013-941,C501 Federal Project : STP-013-1(082) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationEAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT
EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract
More informationAddendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018
155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross
More informationPlease ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.
No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents
More informationCUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,
CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page
More informationADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF
ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationSECTION PAYMENT PROCEDURES
SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationYES, we received Addendum No. 1
TRANSMITTAL SHEET Date sent: Friday, May 03, 2013 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 26 CONFIRMATION
More information2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO
July 27, 2018 2018 Roadway Erosion Control ADDENDUM NUMBER TWO This Addendum Number Two supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge
More informationSidewalk Assessment Restoration Process
Sidewalk Assessment Restoration Process 1. Purpose 2. Scope 1.1. To assess potentially hazardous conditions for exterior sidewalk and/or pavement surfaces which require replacement and/or repair. 2.1.
More information902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL
SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID
More informationCITY OF ELKO BID TABULATION FOR Sports Complex
CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum
More informationSUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT
CALL FOR BIDS KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT BID OPENING: DATE: FEBRUARY 27, 2018 TIME: 11:00 AM Sealed
More informationEXHIBIT E SCHEDULE OF UNIT PRICES
SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters
More informationADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS
General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO
More information33rd Street Outfall (Curtis to Lafayette) Schedule A
01-21.23.01 ALLOWANCE ACCOUNT - SEE PROJECT SPECIAL PROVISIONS Add'l Info: For coordination and installation of power supply to upgraded traffic signals at MLK and Downing and MLK and Marion. Please see
More informationITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P
BID FORM (continued) DAYTON INTERNATIONAL AIRPORT TERMINAL APRON RECONSTRUCTION PHASE 2 21% DBE PARTICIPATION) FEDERAL CONSTRUCTION FUNDS) ITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P-101-5.1.1 FULL
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability
More informationYES, we received Addendum No. 1
TRANSMITTAL SHEET Date sent: Friday, July 25, 2014 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering CONFIRMATION OF RECEIPT OF ADDENDUM PROJECT:
More informationThe Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.
1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,
More informationDISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS
DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS SUPPLEMENTARY CONSTRUCTION SPECIFICATIONS The District of Hope has adopted the Master Municipal Construction Document and Standard Detail Drawings, printed
More informationCity of Wentzville. Standard Specifications and Construction Details Amendment List
Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location
More informationOAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No
PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City
More informationOHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, DIRECTOR DATE : 02/14/97 PAGE : TABULATION OF BIDS
047-1 ODOT PROJECT NUMBER : 970047 AWARDED VENDOR NUMBER : 31-0889208 CALL ORDER : 047 CONTRACT ID : CADA16278 COUNTIES : ADAMS LETTING DATE : 02/04/97 10:00 AM DISTRICT : 09 CONTRACT TIME : 10/31/97 COMPLETION
More informationLump Sum L.S. (15") EA
Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E
More informationPlease note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.
Kansas Turnpike Authority Project 5677 Note regarding schedule of prices: Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract