1 Your Office Fit Out Checklist Plan your office refurbishment from start to finish with our definitive Office Fit Out Checklist. We ll take you through the planning process step-by-step, to help ensure your office transformation is an enjoyable and successful one ThreeHundredAndSixty Degrees 3
2 1 Primary Concerns Are your existing facilities outdated / unusable? Has your business recently undergone an expansion, contraction or reorganisation? Are you looking to boost morale and productivity? Would you like to improve your company s image and reputation? 2 The Reason or Reasons Behind Your Planned Refurbishments Resizing Relocating Redesigning Rebranding Merging Legislation Environmental Health & Safety Improve your company profile 3 What You Are Looking To Achieve Refurbish a new office space Refurbish your existing office space CAT B fit out. Category B will incorporate everything that makes your office individual and functional, including partitions, meeting rooms, specialist lighting and facilities, breakout spaces and kitchen areas, furniture, graphics and branding CAT A fit out. Category A refers to a basic landlord fit out working from a blank canvas. This kind of fit out includes the installation of the building s mechanical and electrical services such as lighting sockets and air conditioning ducts, raised flooring, suspended ceilings, etc. CAT A and CAT B fit out ThreeHundredAndSixty Degrees 2
3 4 Identifying Your Needs Has a feasibility study been carried out to help determine how much space you need? Storage audit taken place 5 Talk to Your Landlord License to Alter obtained Renegotiated the terms of your lease Ask about landlord contributions Dilapidations clauses renewed Building survey carried out 6 Key Parties Identified Have you identified an Office Fit Out Champion? Have senior management been notified? Have all of your staff been made aware? 7 Services You Require From Your Office Design & Fit Out Company Project management of the whole project Space audits and feasibility studies Space planning Interior design Furniture selection and procurement Mechanical and electrical design, installation and data cabling Air conditioning, heating and ventilation Plumbing Building regulations approvals 2017 ThreeHundredAndSixty Degrees 3
4 Health and safety Knowledge of the Equality Act Experience of refurbishment in occupation Willing to arrange for you to visit other projects they have done Able to work to a fixed budget Good value for money Guaranteed on-time completion Environmentally conscious 8 Drawing Up a Budget Changes in occupancy costs (energy bills, maintenance costs etc.) Building control fees Insurance costs Fire plan assessments Design and fit out costs Space planning / site survey IT and telecoms equipment Furniture Waste disposal Security Temporary storage throughout project Contingency costs Mechanical and electrical works 2017 ThreeHundredAndSixty Degrees 4
5 9 Ensure You re Insured Public Liability Insurance Professional Indemnity Insurance Contractors All Risks insurance 10 Minimising Disruption Find out how much work can be done during office hours and what needs to be done out of hours. Approach other building occupants about potentially gaining access to their facilities, if needed - while the works are being carried out. 11 Establish Lead Times in Advance Heating, ventilation and air conditioning IT and telephony Furniture and storage Custom joinery 12 Health and Safety Assurance Ask your fit out contractor for health and safety advice Consider H&S arrangements for contractors access Consider H&S arrangements for contractors use of welfare 13 Managing the Movement of People During the Works Put someone in charge of managing the packing and decluttering process Talk to your IT department and get expert advice if required Make arrangements with your removal company 2017 ThreeHundredAndSixty Degrees 5
6 Arrange crates and labels for packing up Arrange temporary storage solutions 14 Design Produce a full layout (including desks, meeting rooms, kitchens, comms rooms, IT etc.) Put together some mood boards to find the look and feel that s right for your business Involve your Marketing team in agreeing a colour scheme that s right for your brand Look for ways of maximising sustainability and energy efficiency 15 Furniture That Fits Are you getting good quality for your money? Will it be practical for everyday work? Are the chairs ergonomic? Will it work with your existing computers and other equipment? Do you have enough storage? 16 Storage Needs Individual storage lockers and desks Document storage Storerooms Secure storage and safes Future needs for all of the above 17 Technology Considerations Power points Floor boxes and data points Location of printers 2017 ThreeHundredAndSixty Degrees 6
7 Comms room / cabinets Cabling Backup generator Servers Service and support Wireless sub-metering for your energy use IT management and coordination who will make sure it all works? 18 Work on Site Separate waste and recycle and plasterboard, carpet and other materials to be stripped out Follow the proper procedures to dispose of hazardous materials Run weekly site meetings Have a sign off procedure in place for any changes Take photos of the works at every stage to record defects De-snag as you go to save time later on and minimise disruption when everybody has moved Keep staff informed of key dates, so they know what s happening and when 2017 ThreeHundredAndSixty Degrees 7
OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH
1 OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH 1 OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT
More informationACTIVITIES CHECKLIST ASSIGNED TO DUE DONE
I 2 3 4 5 6 7 8 9 I0 II I2 I3 I4 I5 I6 I7 Form a Move Committee. Delegate and assign responsibilities to each member of the Move Committee. Find out if any licenses or permits are required at new facilities.
More informationA GUIDE TO Office Interior Design & Development Terminology
A GUIDE TO Office Interior Design & Development Terminology 1 Experts In Creating Amazing Work Space Environments. 2 Contents Introduction 4 Design And Visual Terminology 5 Contract Related Terminology
More informationSUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR
1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR There are many reasons
More informationMOVE PLANNING CHECKLIST
MOVE PLANNG CHECKLIST PRELIMARY Finalize Lease for new location Notify present Landlord of termination date Advise staff of date and location of move Engage designer for new premises (if required) Create
More informationFitout Planning Design Budgeting Fitout Process Post-Construction
A guide to provide you with all the general information involved in planning an office fitout. For further details or to get an exact quote for your project arrange a free consultation with Cadwell. Fitout
More informationCDM FAQ Sheet
CDM 2015 - FAQ Sheet 1. The change to the regulations means Domestic works are now included. What if you are doing DIY in your own house? Do the regulations apply to this? If the home owner is doing the
More informationEmergency Response Checklist. Laboratories and Research Facilities
Emergency Response Checklist THIS PAGE INTENTIONALLY LEFT BLANK Ver. 1.0 01/2018 ii Record of Changes Description of Change Date of Change Entered By Date Entered Ver. 1.0 01/2018 iii TABLE OF CONTENTS
More informationRecommended Further Reading. A Guide to Managing Health and Safety in Construction, published by the
Recommended Further Reading and References ClOB Handbook of Fadlities Management, ed. Alan Spedding, 1994, published by Longman Scientific & Technical Fadlities Management: Theory and Practice, Keith Alexander,
More informationDesigning for Flexible Building Services in Office-Based Environments. James Brittain Denice Jaunzens Hywel Davies
Designing for Flexible Building Services in Office-Based Environments Understanding Client Needs James Brittain Denice Jaunzens Hywel Davies ABS consulting BRE CIBSE Summary As the pace of change increases
More informationSPECIFICATIONS SYSTEMS NEW INSTALLATION
MINIMUM PERCENTAGES: SPECIFICATIONS SYSTEMS NEW INSTALLATION Bidders must offer a minimum percent discount from published catalog price list of 65% on Systems and Metal Case Goods and must submit a discount
More informationotel business, from housekeeping to banqueting everything in be-
Talk to us and rest assured we will deliver... e understand every aspect of the hotel business, from housekeeping to anqueting and everything in between. We draw on this knowledge to ring you service that
More informationBUILDING ENERGY EFFICIENCY CERTIFICATE
BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name 390 St Kilda Road Certificate no. Owner's name Building address The Trust Company (Australia) Limited 390 St Kilda Road, Melbourne,
More informationPlease make sure you have taken the following steps in preparation for your scheduled move on
Individual Move Checklist, for the Downtown Campus Center Move. Please make sure you have taken the following steps in preparation for your scheduled move on. Table of Contents Packing Checklist 3 Office/Workstation
More informationOffice Interiors. Office partitions, furniture, shelving, storage, space planning and refurbishment.
Office Interiors Office partitions, furniture, shelving, storage, space planning and refurbishment www.avantauk.com 600 Series partitioning Our full range of Office Partitioning is available at www.avantauk.com
More information2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES. Alberta Construction Safety Association (ACSA)
2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES Alberta Construction Safety Association (ACSA) CLOSING DATE: February 9 th, 2018 SECTION 1 PURPOSE AND CONTENT 1.1 We are Alberta s partner in construction
More informationSPECIFICATIONS SYSTEMS MATCHING EXISTING. This Matching Existing Furniture Contract will be for the following Manufacturer s only:
SPECIFICATIONS SYSTEMS MATCHING EXISTING This Matching Existing Furniture Contract will be for the following Manufacturer s only: Haworth Herman Miller Steelcase Global Hon Kimball Allsteel Knoll Maxon
More informationBUILDING ENERGY EFFICIENCY CERTIFICATE
BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name BEEC Example Building Certificate no. Owner's name Example Company Name Issue date 6/10/2011 Building address 123 ANYWHERE STREET BRISBANE
More informationBox Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments
Box Clever Consulting Executive Summary Project Report July 2017 Strand Plaza Liverpool for Primesite Developments Author - Graham Flynn Issued - 05/08/17 Strand Plaza - Liverpool Status Report @ End of
More informationENVIRONMENTAL AUDITING GUIDE TD 16/16/E
ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationJob Description IT & FACILITIES TECHNICIAN (MAINTENANCE)
Job Description IT & FACILITIES TECHNICIAN (MAINTENANCE) Job Title: Department: Responsible to: IT & Facilities Technician (Maintenance) IT & Facilities IT & Facilities Manager Main purpose of job: To
More informationMATERIALS AND RESOURCES
MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide
More informationCargotec Supplier Requirements
Cargotec Supplier Requirements 2015-02-17 CSR V2.0 1 Management Responsibility... 6 1.1 Business Plan... 6 1.2 Key Performance Indicators... 6 1.3 Financial Stability... 6 1.4 Quality Management System...
More informationCIC Guidelines Preliminary Design
Version 1.0 / August 2016 Stage 3 of 8 Approval: Of previous stage, design documentation, updated programme and cost plan. List matters from previous stage to be addressed in current stage. Documentation:
More informationIMPORTANT (Please read this before using the checklist).
PRE-ASSESSMENT ESTIMAT IMPTANT (Please read this before using the checklist). This pre-assessment checklist allows a quick evaluation of the rating, that could be achieved, under a formal BREEAM Offices
More informationFacilities Officer Job Profile
Facilities Officer Job Profile About the HCPC The Health and Care Professions Council (HCPC) is the regulator of 16 different health and care professions. Our primary function is to protect the public.
More informationAMP 5 Excellence in Health & Safety Awards Excellence in Health and Safety Innovation
AMP 5 Excellence in Health & Safety Awards 2011 Excellence in Health and Safety Innovation Table of Contents Introduction...3 1. Tangible Benefits to Health and Safety, Including Cost and Risk Reduction...4
More informationHOMEBUILDING PROCESS TIMELINE. 13 Steps from Start to Finish HOMEBUILDING RESOURCE GUIDE
HOMEBUILDING PROCESS TIMELINE 13 Steps from Start to Finish HOMEBUILDING RESOURCE GUIDE INTRODUCTION Building a new home can feel like a daunting process, especially if you have never done it before. However,
More informationHazardous Waste Management Policy
Level 3 - H&S Policy Structure Hazardous Waste Management Policy BACKGROUND The University produces hazardous waste from all areas, not just laboratories and workshops, which means that this policy potentially
More informationWest One Wellington Street A popular West End location in the heart of professional Leeds.
West One 110 114 Wellington Street A popular West End location in the heart of professional Leeds. A statement West End location Choosing the right address can be crucial to the success of your business.
More informationGuide to Leasing Retail Business Space
Guide to Leasing Retail Business Space Are you looking for retail space for your new or existing business? It s an important decision that can help boost your bottom line. This guide will walk you through
More informationSOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS
Buyer s Guide HOMES 1300 985 110 LIVING SUPPORT SOLUTIONS 2 BCDS0868 Contents Just imagine the space you can create 4 More reasons to choose SmartSpace 8 SmartSpace Project Planner 9 Design your SmartSpace
More information3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information:
3.0 BUILDING SAFETY INSPECTIONS 3.1 General Information In order to maintain safe working environments for all University employees and students, quarterly building safety inspections are required. To
More informationSite Waste Management Plans A guide for the construction industry and supply chain
GG899 www.envirowise.gov.uk Envirowise Advice Line: 0800 585794 Notes:...... Envirowise - sustainable practices, sustainable profits. Envirowise is a Government-funded programme dedicated to putting the
More informationLegionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes
Document Control Revision No. Date Document Reviewed Publication on Web Site Date of next Review Summary of main changes Draft May 2017 New version of document 1 May 2017 May 2017 May 2018 Update of document
More informationTHE FLORIDA BAR S LAW OFFICE MANAGEMENT ASSISTANCE SERVICE NEW LAW PRACTICE // NEW OFFICE CHECKLIST
THE FLORIDA BAR S LAW OFFICE MANAGEMENT ASSISTANCE SERVICE NEW LAW PRACTICE // NEW OFFICE CHECKLIST OPENING DAY (visit us at www.flabar.org/newflabar/memberservices/lomas) CATEGORY Accountant Accountant
More informationEnvironmental Performance Plan !
Environmental Performance Plan 2011 2016! Version Date Author / Reviewers Issued Description of changes 3.0 16 March Editing clarifications 2011 Drafted by Julia Callaghan, Sustainability Coordinator and
More informationATTACHMENT N LEED PROJECT PROCEDURES
ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation
More informationStrategic Facilities Management
54 Strategic Facilities Management Andre Michau, director of Afroteq Advisory and Ronald Nothnagel, director at FM Solutions talk to GLA Can your company afford not to engage with these experts? 55 Over
More informationAnnex G to Loughborough University Facilities Management Health and Safety Procedure
Annex G to Loughborough University Facilities Management Health and Safety Procedure Working with Contractors Including the Construction (Design and Management Regulations) 2015 General 1. The Construction
More informationJOB DESCRIPTION Clerk of Works (CoW)
JOB DESCRIPTION Clerk of Works (CoW) RESPONSIBLE TO: RESPONSIBLE FOR: LOCATION OF ROLE: Senior Client Project Manager - AIEC The Clerk of Works will oversee delivery of the AIEC construction project works
More informationDOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS
DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS CONTENTS Page NHS Procurement... 3 Introduction... 4 Legislation and Codes of Practice... 5-6 Information Required by the Trust... 7 Tendering
More informationMEMBERSHIP GUIDE Canada
MEMBERSHIP GUIDE Canada TABLE OF CONTENTS 1. MEMBERSHIP COMES WITH RESPONSIBILITIES 2. HOW TO TAKE ADVANTAGE OF YOUR MEMBERSHIP 3. MEMBERSHIP SHOPPING METHODS 4. PRODUCT ORDER DETAILS 5. GETTING YOUR PRODUCT
More informationTotal Facilities Management. We enhance your energy, engineering, mechanical and maintenance issues
Total Facilities Management We enhance your energy, engineering, mechanical and maintenance issues ABOUT US Aplus is a reliable, local, professional and affordable maintenance and cleaning services company.
More informationYour guide to LEASING PREMISES
Your guide to LEASING PREMISES Follow these proven steps to achieve a better deal on better premises Introduction Thanks for downloading our eguide on Leasing Premises. It s intended to be a primer that
More informationHazardous. Scheme. the power behind your business
Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included
More informationDuctless Heat Pump Program Guidelines
Ductless Heat Pump Program Guidelines In order for Lane Electric and its members to insure quality heat pump installation, we are requiring that all systems meet the necessary qualifications for the Bonneville
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationNovartis Pharmaceuticals UK Ltd - Frimley Business Park
Novartis Pharmaceuticals UK Ltd - Frimley Business Park construction industry as a whole and Facilities Managers themselves more aware of the benefits of drawing on facilities management expertise during
More informationSUBSTANTIAL IMPROVEMENT
SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached
More informationISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY
THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION JK 5 LAST MODIFIED 2 December 2010 DATE PRINTED RIBA stages JK JK 5 ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE
More informationGuideline Leaflet PC03: Five Year Inspection Reports Church Buildings
Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings We recommend that all churches obtain a report on the condition of their building every five years. This leaflet explains what is needed
More informationConstruction Summary
Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -
More informationPortable Appliance Testing
Portable Appliance Testing 1. PURPOSE 1.1 The purpose of this procedure is to provide a standardised system for the inspection and testing of portable electrical appliances throughout the University, to
More informationPOSITION DESCRIPTION. JOB TITLE: Director, Corporate Services STATUS: Permanent. LOCATION: Sydney HOURS: 35 hours per week
POSITION DESCRIPTION Cancer Council Australia is the nation s leading non-government cancer control organisation. Cancer Council develops and promotes independent, evidence-based policy and information
More informationReduce hassle and avoid wasting money
Reduce hassle and avoid wasting money Managed Print Services Essentials you can The easy way to cut costs, and more. If you need a simple and effective way to stop unnecessarily wasting money on print,
More informationFellow and Incorporated Engineer
Fellow and Incorporated Engineer Application Guidance Independence Integrity Professionalism and sound science 1 Your pathway to recognition as a Fellow and Incorporated Engineer The Energy Institute The
More informationEnergy Efficiency in New Constructions built by Blake Taylor
Energy Efficiency in New Constructions built by Blake Taylor Yes, he builds a beautiful home. It is so full of detail. He really loves what he does, you can tell. It is so rich in architectural detail.
More informationCorporate Responsibility Policy
Generator & Switchgear Services Generator & Switchgear Services Policy For further information please contact: sales@burtonwoodgroup.com Burtonwood Generator & Switchgear Services Ltd Unit 2, St Michaels
More informationPLANNING AND EVALUATION PRELIMINARY DESIGN
PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied
More informationDETAILED PLANNING AND DELIVERY THE KEY TO SUCCESSFUL RELOCATION
DETAILED PLANNING AND DELIVERY THE KEY TO SUCCESSFUL RELOCATION CONTENTS FOUR/FIVE SIX/SEVEN EIGHT/NINE TEN/ELEVEN TWELVE/THIRTEEN FOURTEEN Introduction Move management Meet the team Scale of the operation
More informationReference Designs for Standard Classroom Upgrade NELSON TWO STOREY BLOCK
Reference Designs for Standard Classroom Upgrade NELSON TWO STOREY BLOCK Version 1.0, September 2016 Document history Revision date Version Summary of changes September 2016 1.0 First version for general
More informationHOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationPhone: (+974) / Fax: (+974)
Company Profile Who we are We ARE Sky Creative! With the combined experience of over 35 years of trading and contracting experience, our team has established an enviable reputation as a global and regional
More informationSyllabus Link: Quality Assurance and Quality Control
Syllabus Link: Quality Assurance and Quality Control Quality Control and Quality Assurance Quality is the ability to meet requirements. Manufacturers set a quality standard for their products and they
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationELECTRONETICS. Scope: Prep Area
ELECTRONETICS 5S TRAINING Scope: Prep Area February 19, 2010 Sponsor Michael Quinn, VP Manufacturing Production & Assembly, Northwest Center Scott Patterson, Plant Manager, Electronetics What is 5S? It
More informationBowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.
Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page
More informationDIVISION 02 SELECTIVE DEMOLITION
DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.
More informationOur comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification.
Our comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification. We include a workbook to assist in the implementation
More informationWhy You Should Use an Architect
Why You Should Use an Architect AN ARCHICENTRE AUSTRALIA DESIGN FEASIBILITY PROVIDES THE FOLLOWING SKETCHES ALONG SIDE A REPORT: Sketch floor plan of your existing home or site Sketch floor plan of your
More informationPositive measures to. Winter-Proof Your Home. and reduce energy costs
Positive measures to Winter-Proof Your Home and reduce energy costs With temperatures plummeting and energy prices soaring - it s time to Winter-Proof Your Home At Kingspan Retrofit we know that your home
More informationHelping the A/E team. Presented by: William (Bill) Todd, RCDD/OSP. DataCom Design Group Houston, Texas
Helping the A/E team Understand ITSs Design Needs Presented by: William (Bill) Todd, RCDD/OSP Sr. Technology Design Consultant DataCom Design Group Houston, Texas Provide General Guidelines In early stages
More informationEXPERTS IN ENERGY EFFICIENCY CONSULTANCY
EXPERTS IN ENERGY EFFICIENCY CONSULTANCY Our building energy related services help customers to meet the critical need for constructing sustainable buildings and fulfill legislative requirements across
More informationSELL YOUR HOME FASTER Stephy Lim
1 0 T I P S T O H E L P Y O U T O SELL YOUR HOME FASTER Stephy Lim If you ve ever been in a situation where you need to sell a house fast, you know how frustrating it can be. Everyday, you WHAT PROBLEM
More informationTechnical information 2017
Technical information 2017 Exterior Exterior General We are proud to offer a 10 year warranty on all nhouses sold. The nhouse is constructed using Cross Laminated Timber (CLT) structural panels with exceptional
More informationA healthy appetite for business. Professional Indemnity Insurance A guide for your broker team.
A healthy appetite for business. Professional Indemnity Insurance A guide for your broker team. Professional Indemnity Insurance Whether your client is a local accountant, architect, large software developer
More informationGreen Retrofit buildings:
Green Retrofit buildings: from sustainability to profitability Dr. Wisdom Kwawu University of Reading On secondment to the British Institute of Facilities Management Background Corporate Social Responsibility
More informationCIC Guidelines Construction Administration and Observation
Version 1.0 / August 2016 Construction Administration Stage 7 of 8 Approval: To commence post-contract award activities. Documentation: From previous stage that forms the basis of the ongoing design. Approval:
More informationHOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS
HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement
More informationBUILDING PATHOLOGY & DILAPIDATION Unit 2 Property Surveys
BUILDING PATHOLOGY & DILAPIDATION Unit 2 Property Surveys 2.1 Learning Objectives Understand the two main types of property surveys Differentiate the different property surveys and describe their purpose
More informationThe Easy Guide to Determining Business Continuity Strategies
Continuity In Business business continuity resources for busy continuity planners The Easy Guide to Determining Business Continuity Strategies You ve got a BIA! Now you need to work out the strategies
More informationConfirm with the agent when you can pick up with keys. This will determine your moving day.
Moving into a home is a difficult, exhausting and tedious task. Below is a helpful checklist you can use to ensure you complete all of the necessary tasks during your move. 6-8 weeks before moving: Plan
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationStorm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002
Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002 Prepared For: Miriam Saliba nspection Date: 9/6/2017 Prepared By: Adam Wells TREC License # 21140 105 E Spreading Oaks Ave, Friendswood,
More informationBuilding and renovating
Building and renovating Last updated: 20 November 2017 Summary This factsheet contains information about: the laws in Victoria on building and renovating the Victorian Building Authority owner-builders
More informationPROJECT INITIATION DOCUMENT (PID)
Appendix 1 PROJECT INITIATION DOCUMENT (PID) Project Name: AGILE WORKING Project Manager: Responsible for delivery of project, day-to-day management and team leadership. Responsible for compliance with
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationBRC Global Standard for Packaging and Packaging Materials
BRC Global Standard for Packaging and Packaging Materials P556: ISO 9001: 2015 to Issue 5 upgrade tool Scope This checklist is intended to assist sites in understanding the key similarities between ISO
More informationCorporate Real Estate & Green Building
Corporate Real Estate & Green Building CoreNet Global - London Corporate Real Estate Forum Thursday 9 th June 2016 Julie Hirigoyen, Chief Executive, UK Green Building Council IDEAS FOR DISCUSSION Introduction
More informationWhether you take in a lot of money. or you collect pennies
Whether you take in a lot of money or you collect pennies ..it is important to maintain good cash handling procedures: Segregation of Duties Security Reconciliation Management Review Documentation It s
More informationTHE KEY ELEMENTS OF QUANTITY SURVEYING WORK
THE KEY ELEMENTS OF QUANTITY SURVEYING WORK A Presentation to the Institution of Surveyors of Uganda by Tom Joseph Mukasa BSc, MSc, MRICS, ICIOB, AISU 2016 1. The following are key elements (divided into
More informationFairhurst House 7 Acorn Business Park Heaton Lane, Stockport Cheshire, SK4 1AS
Fairhurst House 7 Acorn Business Park Heaton Lane, Stockport Cheshire, SK4 1AS www.redrockfacilities.co.uk 0844 800 9358 COMPLIANCE PROPERTY SPECIALIST /CLIENT DRIVE About us Red Rock offer a complete
More informationEducation Infrastructure Service. Asbestos Management Process
Education Infrastructure Service Asbestos Management Process Version 9 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by
More informationIntegrated Property Management Solution
Integrated Property Management Solution 30 minutes to discuss: Value proposition why Vision and SPM Best of Breed there is an alternative The concept incorporating good practice The process working with
More informationPlease return all requested forms and provide all information by the following deadlines:
EXHIBITION MANUAL Responsibilities of the exhibitor The exhibitor must observe and comply with all rules stated in these guidelines, and must assume responsibility for any acts performed by his/her employees,
More informationResponsible Sourcing Policy
June 2015 Document Owner Group Procurement Version 5.1 Date of Issue 08 June 2015 Creation Date: June 2015 Page 2 of 13 1 Purpose, Scope & Priorities 1.1 Purpose The purpose of this document is to describe
More informationCapability Statement
Capability Statement About Fairbrother Facility Management The Fairbrother name stands for excellence - a term that reflects the calibre of our people, the quality of our work, and the way in which we
More informationCORPORATE EVENT PLANNING CHECKLIST
CORPORATE EVENT PLANNING CHECKLIST to keep you on track every step of the way PRE EVENT Project Management Set your event objectives, budget, schedules, and deadlines. Name it. Identify key staff roles
More information