1 TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL IL FUTURO DI SELI GEOLOGICAL CONDITIONS Condivisione di obiettivi e traguardi Remo Grandori_Swiss Tunnel Society September 2010

2 TBM TUNNELING SCIENCE TECHNOLOGY AND ART Soft ground TBM tunnelling Rock TBM tunnelling

3 SOFT GROUND TUNNELING Mix of science and technology Ground normally homogeneous Shallow cover and water pressure Risks more predictable, limited to man made actions/objects Procedures and discipline in operation and maintenance

4 ROCK TUNNELING Technology, art and small science No homogeneous (Rock to mud) High cover and water pressure Risks difficult to be predicted (poor science) Force of nature may become impressive, normally were not expected

5 EXAMPLE OF EXTREME EVENT IN ROCK TUNNELLING The GIBE II CASE

6 The Gilgel Gibe II Hydro-Power Plant 240km from Addis Ababa, in Ethiopia, between Gibe and Omo Rivers. PURPOSE TUNNEL LENGHT EXCAVTION DIAMETER Tab.1 Water Conveyance project main data HPP (432MW) 25,8 km 7,0 m DESIGN DISCHARGE 100 m 3 /s DESIGN INTERNAL PRESSURE SEGMENT TYPE min.2 bar max.7 bar Tab.2 Lining geometrical characteristics 4 HEXAGONAL SEGMENT THICKNESS SEGMENTAL LINING OUTSIDE DIAMETER SEGMENTAL LINING FINAL INTERNAL SEGMENT WIDTH 25 cm mm mm mm

7 Figure 1. Typical lining section

8 EVENT AT THE CHAINAGE FROM INTAKE HEADING The tunnel face moved towards and pushed back the TBM at mm/hour. The measured pressure of mud was 40 bars

9 TBM SHIELD DEFORMED

10 LINING DAMAGED

11 BORE HOLES FOUND MUD AT 40 BAR AND OVER 40c Figure 6. Mud poured out from one of the borehole

12 BACK CHAMBER DESIGN (BY LOMBARDI ENGINEERS)

13 BY PASS TUNNEL AND BACK CHAMBER

14 MUD EXTRUDED AND FLOWING INSIDE THE LEFT BY PASS TUNNEL

15 Extruding mud in the Exploratory Adit

16 Figure 12. Extruding mud in the Exploratory Adit

17 Figure 13. Extruding mud at the Adit Portal

18 Extruded mud at the Adit Portal

19 Extruded mud in the Power Tunnel

20 Consolidated mud filling the Power Tunnel

21 FOR N.3 TIMES THE LEFT ADIT AND THE TUNNEL WERE FLOODED BY THE MUD Water pressure (manometer BH n 2 Back Chamber) 26,0 p [bar] 24,0 22,0 20,0 18,0 16,0 14,0 12,0 1st Event BH-SM-1 BH-SM-3 BH-SM-9 BH-SM-11 BH-SM-15 BH-SM ,0 8,0 6,0 2nd Event 4,0 2,0 3th Event 0,0 12/5 22/5 1/6 11/6 21/6 1/7 11/7 21/7 31/7 10/8 20/8 30/8 9/9 19/9 29/9 9/10 19/10 29/10 8/11 18/11 28/11 8/12 18/12 28/12 7/1 17/1 27/1 4th Event days Pressure variation measured in the Back Chamber

22 A NEW STRATEGY WAS DEFINED the mud was removed from tunnel the Back-Up was extracted to portal new drainage drilling performed Exploratory Adit on the Right side (40m behind)

23 RIGHT END SIDE BY PASS

24 Rescue Chamber to recover the TBM

25 BY PASS TUNNEL SCHEME Fault TBM ri-assembly tunnel By pass tunnel Concrete Plug

26 PRODUCTION AFTER RESTART OF EXCAVATION. Figure 28. TBM production chart after the excavation resuming

27 The Tunnel excavation completed on June 6 th 2009, the two TBMs meet at the ch.: 8+520,8

28 EVENT OCCURRED AFTER START OF OPERATION Remo Grandori

29 ALMOST CM OF MUD, SAND, BOULDERS AND BLOCKS ENTERED THE TUNNEL Remo Grandori

30 FROM A SECTION OF m OF TUNNEL

31 SO WE WERE AGAIN IN THE...TO THE NECK

32 SIX MONTH AFTER...ALMOST OUT

33 NEVER GIVE UP EVEN THE WORSE SITUATIONS CAN BE OVERCOME BY ENGINEERING SPECIAL MEASURES AND DEDICATED EXPERT CREWS THIS IS WHAT MAKES TUNNELLING SUCH A WONDERFUL WORK

34 DON T STOP TBM DESIGN PROGRES THE PROGRESS IN TBM DESIGN WILL MORE AND MORE LIMITS THE NECESSITY OF SPECIAL MEASURES TO VERY EXTREME A ND RARE EVENTS

35 DOUBLE SHIELD DESIGN EVOLUTION Increase capacity in Hard Rock boring Increase Torque and Auxiliary Thrust New DSU TBM design Dual mode EPB DSU

36 TODAY STATE IN ROCK TBM DESIGN Short shields Conical shields Extended overboring & overcutting Extended ground and face treatment Torque and thrust same of EPB TBMs Double mode capacity (with no stand by time) were required Improve cutterhead design to cope with widest range of geological applications

37 TUNNEL DESIGN The fact that TBMs are and will be more and more capable to bore trough extremely bad ground under high cover and water pressure will move the criticality to tunnel lining and support design.

DIFFICULT GROUND SOLUTIONS:

DIFFICULT GROUND SOLUTIONS: Tunnelling April/May 2016 www.tunnellingjournal.com journal The international journal for the tunnelling industry SEE PAGE 6 SEE PAGE 12 SEE PAGE 27 WORLD NEWS MONITOR PROGRESS CUTTER CARE HIGHLIGHTS FROM

More information

TBM Selection and Specification

TBM Selection and Specification By Bradford F. Townsend and Paul E. Jenkins Date: 13 June 2009 TBM Selection - Challenges to be met TBM Technology Auxiliary Measures and Backup New Developments Summary of Selection Process Procurements

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

The Robbins Company. Bheri Babai Diversion Multipurpose Project (BBDMP) Company Facts. Headquarters

The Robbins Company. Bheri Babai Diversion Multipurpose Project (BBDMP) Company Facts. Headquarters Bheri Babai Diversion Multipurpose Project (BBDMP) Presented by Jim Clark, Projects Manager India The Robbins Company THE ROBBINS COMPANY THE ROBBINS COMPANY Company Facts More than 50 years of innovation

More information

The Brenner Challenge - TBMs versus Drill & Blast in High Cover Conditions

The Brenner Challenge - TBMs versus Drill & Blast in High Cover Conditions The Brenner Challenge - TBMs versus Drill & Blast in High Cover Conditions Detlef Jordan Robbins Europe GmbH, Germany ABSTRACT: The tunneling industry is abuzz about the upcoming Brenner Base Tunnel Project.

More information

2 Technology of closed-face tunnelling machines

2 Technology of closed-face tunnelling machines 2 Technology of closed-face tunnelling machines 2.1 Machine types There are two basic types of pressurised closed-face tunnelling systems slurry tunnelling machines (STMs) and earth pressure balance machines

More information

FOR HIGHWAY TUNNEL GALLERIA SPARVO.

FOR HIGHWAY TUNNEL GALLERIA SPARVO. HERRENKNECHT EPB SHIELD S-574 FOR HIGHWAY TUNNEL GALLERIA SPARVO. PRODUCT PORTFOLIO OF HERRENKNECHT GROUP. MECHANIZED TUNNELLING TECHNOLOGY. STEEP TUNNELLING. St. Petersburg 30 downhill EPB Shield Access

More information

Design and construction of the 5.5 km TBM excavated headrace tunnel of the Theun Hinboun Expansion Project, Lao PDR

Design and construction of the 5.5 km TBM excavated headrace tunnel of the Theun Hinboun Expansion Project, Lao PDR VII-00094.01.EN/102.1-R-247 Design and construction of the 5.5 km TBM excavated headrace tunnel of the Theun Hinboun Expansion Project, Lao PDR Selim M. Sayah 1, Remo Crapp 1, Carlo Babini 2, Ivano Andreis

More information

Prof. Eng. Daniele PEILA & Prof. Eng. Sebastiano PELIZZA

Prof. Eng. Daniele PEILA & Prof. Eng. Sebastiano PELIZZA Course in Tunnelling and Tunnel Boring Machine Kurs w zakresie drążenia tuneli oraz maszyny drążącej BACK FILLING Prof. Eng. Daniele PEILA & Prof. Eng. Sebastiano PELIZZA The instantaneous filling of the

More information

REHABILITATION OF THE LANGETENTAL FLOOD DIVERSION TUNNEL

REHABILITATION OF THE LANGETENTAL FLOOD DIVERSION TUNNEL REHABILITATION OF THE LANGETENTAL FLOOD DIVERSION TUNNEL Roger BREMEN Engineer of the Hydraulic Department Lombardi Engineering Limited Via Simen 19 CH 6648 Minusio Switzerland ABSTRACT: A 7.5 km long

More information

Logistics of Limited Space Urban Tunnelling at Singapore s Mega Metro

Logistics of Limited Space Urban Tunnelling at Singapore s Mega Metro Logistics of Limited Space Urban Tunnelling at Singapore s Mega Metro S. Smading The Robbins Company, Singapore ABSTRACT: Today s mega metro projects are using multiple TBMs in difficult ground, short

More information

- Case History - 8 M Diameter 7 Km Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

- Case History - 8 M Diameter 7 Km Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months RETC June, 14-17 29 - Case History - 8 M Diameter 7 Km Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months Antonio Raschillà, Site Manager, S.E.L.I. Spa

More information

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations

More information

Design and Implementation of the South Hartford CSO Tunnel

Design and Implementation of the South Hartford CSO Tunnel Design and Implementation of the South Hartford CSO Tunnel Brian Canterbury, P.E., AECOM James Sullivan, P.E., AECOM Andrew Perham, The Metropolitan District The Metropolitan District NEWEA January 22,

More information

Alaska Way Viaduct Replacement Project

Alaska Way Viaduct Replacement Project Alaska Way Viaduct Replacement Project Presented by Gregory Hauser, PE Former VP Underground Operations Retired Jan. 8, 2018 Currently Senior Technical Advisor for JCK Underground, Inc. The Existing Alaska

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights.

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights. Highlights. How to use a Jet Pump? Jet pump for HDD New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters Dr. Marc Peters, Herrenknecht AG Full-Face Hole opener & Downhole Jet

More information

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON

Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Earth Boring Co. Limited Trenchless Since 1947 Founded in Streetsville

More information

EL VALOR DE INNOVACION EN TUNELES

EL VALOR DE INNOVACION EN TUNELES EL VALOR DE INNOVACION EN TUNELES 24. - 25. NOVIEMBRE 2008 Harald Wagner, PhD, PE D2 Consult Ltda.,Linz/Austria ITA EXCO Experto Especial CONTENT 1. Preface / Introduction 2. Role of Ground Investigations

More information

IEEE 18-May Intake. Tunnel. Outlet

IEEE 18-May Intake. Tunnel. Outlet IEEE 18-May-2011 Intake Tunnel Outlet 1 Increase water diversion capacity at the Sir Adam Beck complex by 500 m 3 /s (+27%) Increase average annual energy output at the Sir Adam Beck complex by 1.6 billion

More information

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump Simon Herrenknecht, Product Manager Pipeline, Herrenknecht AG Herrenknecht Introduction Herrenknecht AG, Germany Founded

More information

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology

More information

Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT

Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT A fuzzy logic excavation system for tunnel boring machines, which

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

SETTLEMENTS DUE TO TUNNEL CONSTRUCTION

SETTLEMENTS DUE TO TUNNEL CONSTRUCTION 5 SETTLEMENTS DUE TO TUNNEL CONSTRUCTION In this tutorial the construction of a shield tunnel in medium soft soil and the influence on a pile foundation is considered. A shield tunnel is constructed by

More information

CUTTERHEAD DISC ROBOTIC CHANGING SYSTEM «TELEMACH»

CUTTERHEAD DISC ROBOTIC CHANGING SYSTEM «TELEMACH» CUTTERHEAD DISC ROBOTIC CHANGING SYSTEM «TELEMACH» Laurent DEPOORTER Plant Director - BOUYGUES TP Ludovic JEANNE- Methods Manager - DRAGAGES HONG KONG Introduction LIANTANG TBM CUTTERHEAD TELEMACH ROBOT

More information

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan West Rail Tsing Kwai Tunnel Location of major Tunnel Portal West Rail Tsing Kwai Tunnel Construction Features -

More information

Prof. Eng. Daniele PEILA

Prof. Eng. Daniele PEILA Course in Tunnelling and Tunnel Boring Machine Kurs w zakresie drążenia tuneli oraz maszyny drążącej TUNNEL FACE STABILITY WITH MECHANIZED TUNNELING GENERAL CONCEPTS Prof. Eng. Daniele PEILA 0 When tunneling

More information

BOREHOLE CONDITION ASSESSMENT

BOREHOLE CONDITION ASSESSMENT BOREHOLE CONDITION ASSESSMENT The condition of a borehole is paramount to its on going performance. Checks on newly drilled boreholes ensure that design and specification have been met and allow benchmark

More information

Presented by: Frank Guyamier

Presented by: Frank Guyamier FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal

More information

LUCOEX Conference Oskarshamn, June F. Chauvet & al. CIGEO/

LUCOEX Conference Oskarshamn, June F. Chauvet & al. CIGEO/ Lessons learnt from excavating the clayish Callovo-Oxfordian host formation at Bure URL and excavation technologies considered for the future Cigéo DGR LUCOEX Conference Oskarshamn, June 2015 F. Chauvet

More information

Principles for Tunnel Design

Principles for Tunnel Design 20th to 21st April 2017 Kuala Lumpur Tunnel Design Philosophy Bored Tunnel, Segmental Lining Design 20th to 21st April 2017 Kuala Lumpur Disclaimer a) The speakers are presenting their own personal views

More information

TBM rescue projects using shafts and ground freezing

TBM rescue projects using shafts and ground freezing TBM rescue projects using shafts and ground freezing Dipl.-Ing. Michael Löffler, Dipl.-Ing. Helmut Haß (CDM Consult GmbH, Germany) Dipl.-Ing. Thomas Ahlbrecht (Deilmann-Haniel Shaft Sinking GmbH, Germany)

More information

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR)

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) Contents 1 Canal 2 PCCP pipe 3 Tunnel 1 Canal The middle route runs from Danjiangkou Reservoir

More information

2

2 Company(ผ บรรยาย): Shimizu Corporation Technical Name(ห วข อเทคโนโลย ): High Performance TBM TBM ค ณภาพส ง Presenter: 水戸聰 Akira Mito 1 2 Example of Water Supply Tunnel High Overburden Ing-Yot Tunnel L=50.9km

More information

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. Author: Frank B. Stevens Pr. Eng, BSc (Civil), HonFIMESA, FSAICE Technical Representative for Herrenknecht AG (Utility Tunnelling). stevens.frank@herrenknecht.de

More information

TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck. Gerhard HARER

TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck. Gerhard HARER TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck Gerhard HARER 2 Project overview Koralm railway Part of the Baltic-Adriatic Core Network Corridor, which is one of the most

More information

Borehole Condition Assessment

Borehole Condition Assessment Borehole Condition Assessment The condition of a borehole is paramount to its on going performance. Checks on newly drilled boreholes ensure that design and specification have been met and allow benchmark

More information

Topic 3: 1 of 29 Tunnelling Grad Class (2012) Dr. Erik Eberhardt

Topic 3: 1 of 29 Tunnelling Grad Class (2012) Dr. Erik Eberhardt EOSC 547: Tunnelling & Underground Design Topic 3: Tunnelling Methods Soft Ground TBMs 1 of 29 Tunnelling Grad Class (2012) Dr. Erik Eberhardt Excavation Methods Selection of a tunnelling system (i.e.

More information

MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China

MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China Project Director, VINCI Construction Grands Projets Shatin to Central Link Phases 1 & 2 SCL 1103 Shatin to Central

More information

SHAFT CONSTRUCTION SECANT PILE

SHAFT CONSTRUCTION SECANT PILE by Rob jameson and eric lindquist feature story SECANT PILE SHAFT CONSTRUCTION Modern Tools and Techniques Allow Excavation to Depths Previously Considered Infeasible By Rob Jameson and Eric Lindquist

More information

Risk Management of the Restoration of Shanghai Metro Line 4

Risk Management of the Restoration of Shanghai Metro Line 4 ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu

More information

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel. Rock Tunnel Engineering INTRODUCTION Tunnel a hole in the ground to provide for desired movement or as mobility channel. Serves as highway, railroad, pedestrian passageway, water conveyance, waste water

More information

United Undersea Connecting the Tunnels to Marine Risers at the Victorian Desalination Project

United Undersea Connecting the Tunnels to Marine Risers at the Victorian Desalination Project United Undersea Connecting the Tunnels to Marine Risers at the Victorian Desalination Project T Burns 1 ABSTRACT The Victorian Desalination Project is being constructed near the town of Wonthaggi, in the

More information

Pipetron Tunnel Construction Issues

Pipetron Tunnel Construction Issues Pipetron Tunnel Construction Issues James E. Friant Colorado School of Mines and Excavation Engineering Associates, Inc., 1352 SW 175th St., Seattle, WA 98166 Robert A. Bauer and David L. Gross Illinois

More information

IAC Presentation, August 17, 2017 Ground Movement Impact Assessment. Trevor O Shannessy

IAC Presentation, August 17, 2017 Ground Movement Impact Assessment. Trevor O Shannessy IAC Presentation, August 17, 2017 Ground Movement Impact Assessment Trevor O Shannessy Overview Construction Engineering Scoping requirements Existing conditions summary Assessment approach Key considerations

More information

D&B versus TBM some case stories

D&B versus TBM some case stories D&B versus TBM some case stories TBM Applications II Bergen, June 6 th and 7 th Project Manager Anne Kathrine Kalager Case stories Two different Projects Considerations regarding excavation method: New

More information

TUNNELLING ASSOCIATION OF CANADA

TUNNELLING ASSOCIATION OF CANADA TUNNELLING ASSOCIATION OF CANADA October 29, 2015 Nordic Forum - Regional Report Prepared by: Steve Skelhorn, Vice President East Contributors: Walter Trisi, Director, Ontario André Rancourt, Director,

More information

Compensation grouting for TBM tunnelling beneath shallow-cover

Compensation grouting for TBM tunnelling beneath shallow-cover Compensation grouting for TBM tunnelling beneath shallow-cover E. Chiriotti, N. Avagnina & P. Grasso Geodata S.p.A., Torino, Italy G. Tripoli IGM S.r.l., Basiglio (MI), Italy ABSTRACT: The last section

More information

SELECTION OF CONSTRUCTION METHODS IN ROCK TUNNELING

SELECTION OF CONSTRUCTION METHODS IN ROCK TUNNELING SELECTION OF CONSTRUCTION METHODS IN ROCK TUNNELING Dipl. Ing. Josef Daller ic consulenten ZT GmbH Vienna, Austria Mail: j.daller@ic-group.org Abstract For construction of long infrastructure tunnels in

More information

Shield TBM risk model based on Bayesian networks applicable in design stage

Shield TBM risk model based on Bayesian networks applicable in design stage Shield TBM risk model based on Bayesian networks applicable in design stage *Heeyoung Chung 1), In-Mo Lee 2) and Jeongjun Park 3) 1), 2) School of Civil, Environmental and Architectural Engineering, Korea

More information

Underground Construction Technology

Underground Construction Technology Underground Construction Technology Course Lectures Part 4.2 Permanent support Dr Ákos TÓTH 1 Segmental Lining in TBM Tunnelling Segmental lining is the support system for shield TBM excavated tunnels.

More information

Infrastructure Development Institute JAPAN

Infrastructure Development Institute JAPAN Japanese Infrastructure Newsletter IDI Infrastructure Development Institute JAPAN CONTENTS [Report] Example of Construction of Deep Underground Cable Tunnel in Singapore 2 EW1 construction section Infrastructure

More information

Tunnel Boring Machines

Tunnel Boring Machines Tunnel Boring Machines IMIA WGP 60 Michael Spencer, Zurich London (Chairman) Alessandro Stolfa Generali Heiko Wannick Munich Re Ronan Gallagher Allianz John Forder Willis Beat Guggisberg Allianz Eric Bentz

More information

BRILLIANT EXPANSION PROJECT

BRILLIANT EXPANSION PROJECT BRILLIANT EXPANSION PROJECT Utilizes power tunnel 120 MW Capacity 500 GWh Energy Transmission link to Brilliant Terminal Station Will reduce TGP downstream Intake Transmission Link Transmission Link Extent

More information

NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON NOVEMBER, 2011

NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON NOVEMBER, 2011 NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON 25-27 NOVEMBER, 2011 A 15 - Members delegation of Pakistan Engineering Congress paid an extensive visit

More information

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995 2013 ASCE Agenda Introduction Difficult Ground Microtunneling in Difficult Ground Craig Camp July 31, 2013 Microtunneling Characteristics (NASTT) Earth pressure balancing Hydrostatic pressure balancing

More information

TUG - Institute of Hydraulic Engineering and Water Resources Management 1

TUG - Institute of Hydraulic Engineering and Water Resources Management 1 Large Dams Design, Construction and Performance Gerald Zenz Graz - University of Technology 1 Dam Structures & Geotechnique Design Construction / Observation Operation / Monitoring Cooperation & Transfer

More information

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur 20th to 21st April 2017 Kuala Lumpur Mechanized Tunneling (TBM and Support Systems) Thorsten Tatzki Herrenknecht Asia Headquarters Pte. Ltd. Introduction: General Overview Shield Machines and Tunnel Boring

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Ground Freezing for Tunnel, Shafts, and Adits

Ground Freezing for Tunnel, Shafts, and Adits Ground Freezing for Tunnel, Shafts, and Adits Joseph A. Sopko, Adam Curry Moretrench American Corporation Bianca Messina Skanska USA Civil Stephen Njoloma McMillen Jacobs Associates ABSTRACT Construction

More information

Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul

Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul Proceedings of the 2 nd World Congress on Mechanical, Chemical, and Material Engineering (MCM'16) Budapest, Hungary August 22 23, 2016 Paper No. MMME 113 DOI: 10.11159/mmme16.113 Analysis of the EPB-TBM

More information

Design of pipeline installation D-GEO PIPELINE

Design of pipeline installation D-GEO PIPELINE Design of pipeline installation D-GEO PIPELINE Design of pipeline installation D-GEO PIPELINE General Pipelines are an important part of the underground infrastructure. They are the lifelines of our modern

More information

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or Groundwater Recharge and Extraction Techniques D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB What is Groundwater Recharge Groundwater recharge or deep drainage or deep percolation

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

3 rd Edition of the ITA Tunnelling Awards - the winners 2017!

3 rd Edition of the ITA Tunnelling Awards - the winners 2017! Geneva, 17 th November, 2017 PRESS RELEASE 3 rd Edition of the ITA Tunnelling Awards - the winners 2017! Anyone who owns a car or has taken the metro has already experienced underground space. If tunnels

More information

Design of pipeline installation. D-Geo Pipeline

Design of pipeline installation. D-Geo Pipeline Design of pipeline installation D-Geo Pipeline Design of pipeline installation D-Geo Pipeline General Pipelines are an important part of the underground infrastructure. They are the lifelines of our modern

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless DAHLIA PONDS TUNNEL PROJECT CASE HISTORY Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Outline Owner s Approach Design & Engineering Construction

More information

The Rio Grande project - Argentina

The Rio Grande project - Argentina The Rio Grande project - Argentina Introduction The Rio Grande pumped storage project is located on the Rio Grande river near the town of Santa Rosa de Calamucita in the Province of Cordoba in Argentina.

More information

Anacostia River Tunnel Design/Build Project Washington, DC

Anacostia River Tunnel Design/Build Project Washington, DC Anacostia River Tunnel Design/Build Project Washington, DC Shane Yanagisawa Project Manager Impregilo Healy Parsons JV Stakeholders Main Components: 29km of tunnels from 7m to 5,5m diameter Drop shafts

More information

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project Lesson Learned Collapse of Diaphragm Wall Trench Case study Suez Canal Syphon Project Bauer Egypt Ashraf Wahby June, 2016 List of Contents 1. Introduction 3 2. Project Description 3 3. Collapse 4 4. Known

More information

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October Promoters Tunnel Presentation Tim Smart Head of Engineering & Operations 20 th October 2014 1 Tunnel Briefing Agenda 1. Why tunnel? 2. Operational aspects of tunnels 2.1 Safety requirements 2.2 Noise and

More information

The influence of tunnel boring on foundations and buildings in urban areas - A numerical study

The influence of tunnel boring on foundations and buildings in urban areas - A numerical study Int. Workshop on Geotechnics of Soft Soils-Theory and Practice. Vermeer, Schweiger, Karstunen & Cudny (eds.) 2003 VGE The influence of tunnel boring on foundations and buildings in urban areas - A numerical

More information

Promoters Tunnel Presentation

Promoters Tunnel Presentation Promoters Tunnel Presentation Tim Smart Head of Engineering & Operations 20 th October 2014 1 P653 (1) HOC/10009/0002 Tunnel Briefing Agenda 1. Why tunnel? 2. Operational aspects of tunnels 2.1 Safety

More information

Passage under Lövstavägen at Bypass Stockholm From Design to Realization

Passage under Lövstavägen at Bypass Stockholm From Design to Realization Passage under Lövstavägen at Bypass Stockholm From Design to Realization Roslin Mattias 1, Borio Luca 2 and Tomas Hellström 3 1 Swedish Transport Administration, Solna Strandväg 98, 171 54 Solna, mattias.roslin@trafikverket.se

More information

Current Hydro Power Plant Projects of Verbund in Austria and the use of High Strength Steel an Operators View

Current Hydro Power Plant Projects of Verbund in Austria and the use of High Strength Steel an Operators View Current Hydro Power Plant Projects of Verbund in Austria and the use of High Strength Steel an Operators View J. Mayrhuber and P. Stering VERBUND Austrian Hydro Power AG, Am Hof 6a, A-1010 Wien, Austria

More information

The South Hartford Conveyance and Storage Tunnel

The South Hartford Conveyance and Storage Tunnel The South Hartford Conveyance and Storage Tunnel South Hartford The Metropolitan District June 16 th -17 th, 2015 Purpose of This Public Meeting Communicate with Residents Directly Adjacent to the Project

More information

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject 56 THE TRENCHLESS TREND Pipeline shore crossings are often one of the most Costs and risks involved will change with every site, and every complex and technically challenging elements of any project. subsea

More information

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

Optimization of Supports in a Road Tunnel through Conglomerate during Construction Optimization of Supports in a Road Tunnel through Conglomerate during Construction Tülin SOLAK, Temelsu International Engineering Services Inc., Turkey, tulin.solak@temelsu.com.tr Bülent ULUKAN, Temelsu

More information

Tunnelling and Underground Space Technology

Tunnelling and Underground Space Technology Tunnelling and Underground Space Technology 57 (2016) 112 121 Contents lists available at ScienceDirect Tunnelling and Underground Space Technology journal homepage: www.elsevier.com/locate/tust Difficult

More information

Tunnel Boring Machines used for Irrigation in Andhra Pradesh, India. D.Harding 1 1 The Robbins Company, Solon, Ohio, USA

Tunnel Boring Machines used for Irrigation in Andhra Pradesh, India. D.Harding 1 1 The Robbins Company, Solon, Ohio, USA Tunnel Boring Machines used for Irrigation in Andhra Pradesh, India D.Harding 1 1 The Robbins Company, Solon, Ohio, USA 1 INTRODUCTION The AMR project has been planned since 1983 and will provide irrigation

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

Brief Discussion on Application of Guided Boring Non-excavation Technology in Repair of Sewage Pipes Mei-Di SHAN1,a,*, Feng ZHOU2,b

Brief Discussion on Application of Guided Boring Non-excavation Technology in Repair of Sewage Pipes Mei-Di SHAN1,a,*, Feng ZHOU2,b 2nd Annual International Conference on Advanced Material Engineering (AME 2016) Brief Discussion on Application of Guided Boring Non-excavation Technology in Repair of Sewage Pipes Mei-Di SHAN1,a,*, Feng

More information

MALCOLM. support of excavation. Provides Excavation Support for Miami Tunnel. Introduction

MALCOLM. support of excavation. Provides Excavation Support for Miami Tunnel. Introduction C o v e r F e a t u r e MALCOLM Provides Excavation Support for Miami Tunnel By Charles W. Bartlett, P.E., and Nick J. Turus, E. I, Malcolm Drilling Co., Inc. Miami, Florida, USA Introduction The Florida

More information

Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines

Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines GHD Energy & Resources Brendan Henry Manager, Tunnels and Underground Spaces Safety Commitment Safety

More information

Steel Fiber Reinforced Concrete (SFRC) for TBM Tunnel Segmental Lining Case Histories in the Middle East. 1 Ing. Guido Castrogiovanni, COWI

Steel Fiber Reinforced Concrete (SFRC) for TBM Tunnel Segmental Lining Case Histories in the Middle East. 1 Ing. Guido Castrogiovanni, COWI Steel Fiber Reinforced Concrete (SFRC) for TBM Tunnel Segmental Lining Case Histories in the Middle East 1 Ing. Guido Castrogiovanni, COWI COWI COWI BTM participates in some of the world s landmark projects

More information

ORAL PAPER PROCEEDINGS

ORAL PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE ORAL PAPER PROCEEDINGS Use of two-component mortar in the precast lining Backfilling of mechanized

More information

Field trips 7, 14, 15. Brenner Base Tunnel

Field trips 7, 14, 15. Brenner Base Tunnel Geo.Alp, Vol. 13 2016 205-214 Field trips 7, 14, 15 Brenner Base Tunnel Ulrich Burger 1, Georg Orsi 1, Roland Arnold 1, Andrea Lussu 1, Heimo Schierl 1 1 Brenner Basistunnel BBT-SE, Amraser Str. 8, 6020

More information

INTERNATIONAL DESIGN & CONSTRUCTION

INTERNATIONAL DESIGN & CONSTRUCTION INTERNATIONAL DESIGN & CONSTRUCTION 40 September 2013 ROADS&BRIDGES Sea and seismicity Istanbul Strait Tunnel overcomes unique set of risks By Sanja Zlatanic, P.E., and Nasri Munfah, P.E. Contributing

More information

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ Hudson

More information

The MDC s South Hartford Conveyance and Storage Tunnel

The MDC s South Hartford Conveyance and Storage Tunnel The MDC s South Hartford Conveyance and Storage Tunnel Presentation to CONN-OSHA Roundtable Andrew Perham, CHMM - MDC Brian J. McCarthy, PE, CCM, PMP September 19, 2017 Safety Moment Storm Watch: Be Prepared

More information

4th International Engineering and Construction Conference - July 28, 2006

4th International Engineering and Construction Conference - July 28, 2006 4th International Engineering and Construction Conference - July 28, 2006 BOX-JACKING - A USEFUL CONSTRUCTION TOOL By Anthony Lynn, Berkeley Engineering Company, Inc. Box jacking is jacking a large precast

More information

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS 4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS This section discusses the geology, soils, seismicity, hazardous materials, and subsurface obstructions along Flower Street, and evaluates their potential

More information

Performance review of a pipe jacking project in Hong Kong

Performance review of a pipe jacking project in Hong Kong Geotechnical Aspects of Underground Construction in Soft Ground Ng, Huang & Liu (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-48475-6 Performance review of a pipe jacking project in Hong Kong

More information

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11 CHAPTER 11 INTRODUCTION The open-trench method of placing underground conduits is commonly used on new construction of culverts, sewers and underpasses. Interference with traffic, as well as inconvenience