1 SS 1~A ABBOTSFORD Report No. ENG COUNCIL REPORT Regular Committee March 14,2014 File No: To: From: Subject: Mayor and Council Tony Seibert, Drainage Engineer Waechter Creek Culvert Emergency Repair at Simpson Road Extension RECOMMENDATIONS 1. THAT the proposed Waechter Creek Culvert Emergency Repair budget be approved in amount of $750,000; 2. THAT the $450,000 project shortfall in the current capital plan be funded from the General Capital Reserves; 3. THAT work be awarded to Strohmaier's Excavating Ltd. in the amount of $589,200; and 4. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter. SUMMARY OF THE ISSUE A portion of the culvert at Waechter Creek has collapsed. Emergency repair IS recommended as there is significant potential for further collapse, which will lead to upstream property flooding, potential washout of 22m high fill embankment and the sanitary sewer trunk main within it, negative impact on FortisBC gas lines and downstream environmentally-sensitive habitat. This report discusses the background of the issue and recommends next steps. BACKGROUND The City has a 106m long, 1050 x 900mm oval reinforced concrete culvert that is set in Waechter Creek (Culvert), near the east end of Simpson Road Extension (see Attachment A - for Location Map). This Culvert was originally installed in early 1900s to allow the railway to build an embankment 22m high across a small valley and convey the creek flows (1: 1 00 year event). The City acquired the property and associated liabilities in In 1979, the City installed a 600mm diameter reinforced concrete sanitary trunk main across the old railway alignment to take advantage of the suitable grades for gravity flow. This trunk main runs near the top of the old railroad grade, generally perpendicular to the Waechter Creek Culvert. The sanitary main conveys a large area, including; West Abbotsford, Pepin Brook and Sun Valley Developments. In late 2013, the Culvert was inspected using a robotic camera. The results indicated that the entire length of Culvert is in structurally poor condition, with a 5m section partially (50%) collapsed. The collapse is most likely due to the age of the pipe, the height of the fill, large trees growing in the fill over the Culvert and a potential loss of bedding due to groundwater and/or surface water carrying fine soils away.

2 Report No. ENG Page 2 of 3 High pressure distribution gas mains (Fortis BC) are located 75m south of the culvert. In addition, the Creek is environmentally sensitive fish habitat. The Culvert needs to be repaired as soon as possible as there is significant potential for further collapse. The present (and any future) blockages of flow have potential to cause flooding of upstream property, washout the fill and the sanitary sewer mainline within it and negatively impact the FortisBC gas lines and environmentally-sensitive habitat (see Attachment B - for a summary of site challenges). DISCUSSION Seven contractors were asked through a December 29, 2013 Request for Response (RFR) to propose a design build solution to the failing culvert. The firms invited have successfully completed previous work with similar challenges, are considered specialists in this type of work, have positive references and completed similar emergency repair work for the City in the past. Three responses were received on January 23, The summary of responses is as follows: Proponent Point Repair m Complete Repair - 106m (excluding tax) (excluding tax) Strohmaier's Excavating Ltd $283,171 (permanent) $589,200 PW Trenchless Construction Inc. $239,915 (temporary) $681,775* Sandpiper Contracting LLP $980,000 n/a *Not Including bypass pump operating costs Clarifications and revisions to reflect site conditions were requested after the RFR closed. Further information was received from Strohmaier's and PW Trenchless on their responses. Adjustments were made to the prices as a result of the clarifications, which are reflected in the above prices. The Responses were evaluated in relation to standard criteria by a three member evaluation team. Strohmaier's Excavating Ltd. ranked the highest as they can meet the project technical requirements, including environmental, scheduling and access and they provided a competitive-priced response, with least risk in comparison to the other responses. Given that the entire length of the Culvert is in poor condition, and the lower per meter rate to replace the whole Culvert (approximately $5,660/m versus $13,800/m for partial repair), it is recommended that complete repair of the Culvert be undertaken. Based on the review team's evaluation, it is recommended that the proposed Waechter Creek Culvert Repair work be awarded to Strohmaier's Excavating Ltd. in the amount of $589,200. The work will replace the existing culvert with a new culvert with an expected 100 year life cycle. The scope of work includes temporary Creek by-pass using a horizontally directional drilled 300mm diameter high density polyethylene (HOPE) pipe, and to pipe jack and burst a new 1050mm diameter steel culvert in place of the existing concrete culvert for the full 106m length. Pipe bursting is a trenchless replacement method in which an existing pipe is split, using an internal bursting tool. At the same time, a new pipe is pushed through the existing pipe. It is anticipated that the project will commence immediately following a!;>signment award in the week of April 14, The project duration is approximately 3.5 months, with anticipated completion by early August 2014.

3 Page 3 of 3 FINANCIAL PLAN IMPLICATION The total project cost is estimated at $750,000 including the proposed Culvert Repair work of $589,200 (Attachment C - Cost Summary). The 2014 capital plan currently includes $300,000 for this project, funded from the General Capital Reserve. Sufficient funding is available to supply the additional $450,000 required from the General Capital Reserve. ~ ' f1 \ \ ~ Reviewed and approved by the: Chief Financial Officer IMPACTS ON COUNCIL POLICIES, STRATEGIC PLAN ANDIOR COUNCIL DIRECTION The new Culvert replacing aging infrastructure will reduce flood and/or washout potential due to collapsing pipe and reduce potential for flood damage to City sanitary sewer main servicing west Abbotsford, residential properties, farmlands and downstream environment. The proposed project is directly related to Strategic Objective #1 Continue Improving our Financial Outlook. SUBSTANTIATION OF RECOMMENDATION In November 2013, the entire length of the Waechter Creek Culvert was discovered to be in poor condition, with a portion partially (50%) collapsed. The Culvert needs to be repaired as soon as possible as there is significant potential for further collapse. Blockage of flow will flood upstream property, potentially washing out the fill and the sanitary sewer mainline within it, which will also negatively impact the FortisBC gas lines and environmentally-sensitive fish habitat. A design-build proposal from Strohmaier's Excavating Ltd. to replace the entire Culvert with steel pipe at this location by using a pipe bursting process is recommended as the most economical and least risk option. It is recommended that the proposed Waechter Creek Culvert Emergency Repair budget be approved in amount of $750,000; funded from the General Capital Reserves; and that the proposed Waechter Creek Culvert Repair work be awarded to Strohmaier's Excavating Ltd. in the amount of $589,200. The project is to be completed by early August Prepared; Tony Seibert, P. Eng.. Drainage Engineer rtment Head Approval: Gordon, P. Eng. General Manager, Engineering and Regional Utilities Attachment "A": Waechter Creek Culvert Location Map Attachment "B": Site Challenges Attachment "C": Cost Summary TS/sv

4 ATTACHMENT A ~~~.A ABBOTSFORD Waechter Creek Culvert Location

5 ENG Attachment B - Project Challenges The project is challenging due to: Risk of further culvert failure - Due to the need for Emergency repair and to expedite the repair the RFR was sent to knowledgeable contractors with expertise in this type of work, and was not advertised on BC Bid "electronic tendering system". The New West Partnership Trade Agreement conditions do not apply in circumstances meeting the exception, specifically: "C. 2. (h) where an unforeseeable situation of urgency exists and the goods, services or construction could not be obtained in time by means of open procurement procedures;" Limited access - the culvert is at the bottom of a 22m high fill with steep banks, and old growth forest cover; FortisBC ROW -high pressure distribution main lines are located south of the fill; Private property to the north, south and east; Environmental - the Creek is salmon habitat, downstream are Nooksack Dase (SARA) and Salish Sucker habitat (SARA), and the area is prime Oregon Snail habitat (SARA), and old growth forest cover; Sanitary sewer /s flows, this pipe must not be disturbed and a failure could introduce untreated sanitary effluent into Waechter Creek; Waechter Creek - base-flow must be maintained at all times, and there is no easy route to divert the creek flow around the fill. Limited Construction and rehabilitation methodologies due to the depth of the culvert and the close proximity of the sanitary and high pressure distribution gas mains open cut construction method was deemed not a feasible choice. Trenchless pipe bursting and pipe jacking was deemed the most feasible methodology. Due to the size of culvert, the depth of fill and the proximity of surrounding infrastructure the methodology recommended is complex and includes risk.

6 ENG Attachment C - Cost Summary Waechter Creek Culvert Repair at Simpson Road Extension Item Description Cost Estimate 1.0 Contractor Bypass and Pipe Bursting $589, Environmental Applications, Approvals & Monitoring $9, Survey Topographic Survey & Base Map $3, Geotechnical Preliminary Investigation & Report $3, Access Agreement Temporary Working ROW & Staging $25,000 Area Preparation 6.0 Utility Sanitary & Storm Emergency back-up plans in place $25, Provisional Bypass Pumping - in the event gravity $28,000 system is not achievable 8.0 Contingency Construction Contingency $66,800 Total Cost $750,000 Details of Items 1 to 6 are described below: 1.0 Contractor Details are discussed in this Council Report ENG Environmental Approvals and Monitoring Waechter Creek is important fish habitat and the installation of a new culvert will require environmental approvals. AquaTerra provided the initial inspection and emergency notification for the site in November Staff requested a proposal from AquaTerra to complete the Environmental Approvals and Monitoring for this project because of their expertise, previous experience with Waechter Creek, competitive rates on recent proposals; and good working relationship with staff. Staff reviewed the AquaTerra proposal and considers it reasonable. The proposal is estimated $9, Topographic Survey and Base Mapping - completed by the City Surveying Department. Cost for this work $3,500.

7 ENG Attachment C - Cost Summary 4.0 Geotechnical Investigations - Due to time constraints and a need to provide the contractors with basic soil conditions, proposals were requested from two consultants, and Western Geotechnical was selected based on schedule, experience, and fees in amount $3,500. The Geotechnical Report was issued December 18, Access The City has an existing sanitary sewer right-of-way (ROW) off Mt Lehman that will be utilized to provide access to the site for material and equipment. Our Senior Property Negotiator has secured two Temporary working ROW agreements. The temporary working ROWs will provide working areas at the inlet and outlet of the culvert. There is some clearing required within the City ROW to provide a staging area for the contractor to unload, load and store material and equipment Estimated cost for preparing the staging area and negotiating ROW agreements is $25, Back up Planning - The City Waste Water Collection Department will make provision and have emergency bypass in place and ready to go (including material, equipment and staff) into operation in the event there is a leak or break in the sanitary sewer pipe during the critical construction period (when culvert is being replaced). Based on previous City experience with bypass pumping, the cost for the emergency sanitary by-pass plan is estimated to be $20,000. It is recommended that this back up plan be implemented by City staff with an estimated cost in the amount of $25, Provisional - The Contractor plans to install a 300mm HOPE pipe with suitable elevation and grades to allow for Waechter Creek to be diverted with gravity flow. However the 300mm HOPE pipe will have to be installed at the boundary layer between the native soils (clay) and the fill (pit-run), where there is potential to be fallen trees or tree roots left from time of construction of the railway fill. The initial test pit did show some wood at this boundary layer, and it is recommended that we plan for the possibility that the installation will not go in with a perfect alignment to allow for gravity flow - we will then need to bypass pump for the 10 days of actual bursting of the pipe. This cost is estimated to be $28,000 as provided by Strohmaier's Excavating Ltd.

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

TEMPORARY STREAM DIVERSION

TEMPORARY STREAM DIVERSION ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM DIVERSION (ft,) CODE 976 (Source: Aukland Regional Council Stream Facts) DEFINITION A temporary channel or pipe used to convey stream flow around

More information

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ;

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ; TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 9, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER APPOINTMENT

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

What do you mean we can t do HDD?

What do you mean we can t do HDD? Clark Public Utilities Salmon Creek Crossing What do you mean we can t do HDD? Presented by Matt Hickey, PE Murray, Smith & Associates, Inc. and Russ Knutson, PE Clark Public Utilities Project Team Clark

More information

A PENNEY (ROAD) SAVED IS A LESSON (L)EARNED

A PENNEY (ROAD) SAVED IS A LESSON (L)EARNED Session #29 Collection System 3: Rehabilitation Issues A PENNEY (ROAD) SAVED IS A LESSON (L)EARNED New England Water Environment Association 2019 Annual Conference Marriot Copley Place, Boston, MA January

More information

3. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter. City Manager

3. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter. City Manager COUNCIL REPORT Report No. ENG 104-2017 Regular Council Date: July 21, 2017 File No: 5330-30 To: From: Subject: Mayor and Council Tony Seibert, Project Engineer Award of Request for Proposal 1220-2017-2044

More information

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

Cost Estimating Framework

Cost Estimating Framework Cost Estimating Framework Water and Wastewater Master Study Prepared by: GM BluePlan Engineering for: Project No. 717022 TABLE OF CONTENTS 1 Introduction... 1 2 Cost Estimation Framework... 2 2.1 Approach

More information

Appendix A SURVEY QUESTIONNAIRE

Appendix A SURVEY QUESTIONNAIRE Appendix A SURVEY QUESTIONNAIRE Highway stakeholders recognize the overwhelming need for effective technologies in both the structural and functional stormwater facility renewal while minimizing negative

More information

GENERAL INFORMATION AND REQUIREMENTS

GENERAL INFORMATION AND REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS 1.0 BOARD S STANDARD SPECIFICATIONS: Copies of these Standard Specifications for Water Mains, Sanitary Sewers and Sewage Pumping Stations may be purchased from the

More information

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017 Applicant s Proposed Mitigation Statements Seward Highway -, POA 2013-448, Turnagain Arm Phase 1 May 2017 Avoidance The project is geographically constrained by Turnagain Arm tidal mudflats on one side

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

4. FISH PASSAGE CONCEPTS

4. FISH PASSAGE CONCEPTS Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 4. FISH PASSAGE CONCEPTS Fish passage could be improved by rehabilitating the existing fish passage,

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

SECTION 813 SEWER FLOW CONTROL

SECTION 813 SEWER FLOW CONTROL SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

DOLOMITE RISK MANAGEMENT PROCEDURE FOR IRENE GLEN HOMEOWNERS ASSOCIATION

DOLOMITE RISK MANAGEMENT PROCEDURE FOR IRENE GLEN HOMEOWNERS ASSOCIATION DOLOMITE RISK MANAGEMENT PROCEDURE FOR IRENE GLEN HOMEOWNERS ASSOCIATION INDEX 1. INTRODUCTION 1 2. INFRASTRUCTURE MANAGEMENT PLAN 1 3. RESIDENCE MANAGEMENT PLAN 3 4. EMERGENCY REACTION PLAN 6 5. MONITORING

More information

FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011

FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011 FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN EB3679 February 2011 FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN Prepared for: The City of Westminster 511 Royal Avenue Westminster, BC V3L 1H9 Prepared

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW12.6 STAFF REPORT ACTION REQUIRED Amendment to Purchase Order No. 6038978 Professional Engineering Services During Construction and Post Construction for North Toronto Wastewater Treatment Plant CSO

More information

TECHNICAL NOTE HDPE Pipe and Utility Crossings

TECHNICAL NOTE HDPE Pipe and Utility Crossings TECHNICAL NOTE HDPE Pipe and Utility Crossings TN 5.09 April 2008 Introduction Underground utilities include storm sewer, electric, sanitary sewer, gas, water, telephone and cable. Utility conflicts are

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Report to: General Committee Date Report: February 20, Award of Tender 213-T-14 West Thornhill Phase 1B Storm Sewer and Watermain Replacement

Report to: General Committee Date Report: February 20, Award of Tender 213-T-14 West Thornhill Phase 1B Storm Sewer and Watermain Replacement SUBJECT: Award of Tender 213-T-14 West Thornhill Phase 1B Storm Sewer and Watermain Replacement PREPARED BY: Prathapan Kumar, Senior Manager, ROW Assets, Ext. 2989 Robert Muir, Manager, Stormwater, Ext.

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS C-44 Reservoir/STA System Discharge Project RFB: 6000000620 Addendum No. 1 March 2014 CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS HDR Engineering, Inc. SECTION 02401 DEWATERING, COFFERDAM AND BYPASS

More information

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No. Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

REROUTING DRAINAGE SYSTEMS

REROUTING DRAINAGE SYSTEMS MINNESOTA WETLAND RESTORATION GUIDE REROUTING DRAINAGE SYSTEMS TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-4 Publication Date: 10/14/2015 Table of Contents Introduction Application Design Considerations

More information

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH Debrob Investments Limited STORMWATER MANAGEMENT REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH PRELIMINARY NOVEMBER 2, 2011 I B I G R O U P P R E L I M I N A R Y Debrob Investments Limited

More information

The Shades Valley Transfer Line (SVT) in Jefferson County, Ala., is only 24 years

The Shades Valley Transfer Line (SVT) in Jefferson County, Ala., is only 24 years The Shades Valley Transfer Line (SVT) in Jefferson County, Ala., is only 24 years old, but high hydrogen sulfide conditions early in its operation have its owners concerned about its overall condition.

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

MWS Project Number: 11-SC-0116 Last Updated: January 19, 2016

MWS Project Number: 11-SC-0116 Last Updated: January 19, 2016 Project Name: Hurricane Creek Pipe Improvements MWS Project Number: 11-SC-0116 Last Updated: January 19, 2016 Project Scope The Hurricane Creek Pipe Improvements project includes the design of parallel

More information

Stage 4 Geotechnical Investigations Information Sheet

Stage 4 Geotechnical Investigations Information Sheet Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical

More information

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility December 16, 2014 City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility Prepared by CBBEL Project Background & Timeline June and July 2010 Severe storm events hit Elmhurst,

More information

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TM1-T2-03 Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

Temporary Stream Crossing

Temporary Stream Crossing Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Temporary Stream Crossing

Temporary Stream Crossing Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution

More information

406 - PIPE SEWERS - MTC FORM 406

406 - PIPE SEWERS - MTC FORM 406 406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength

More information

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES B-1 General Notes: SACWSD Standard Construction Drawing Notes 1. No work shall begin on any water or wastewater construction project until the construction

More information

An information series from the national authority on concrete masonry technology. Drainage swale. (optional) Cap unit. (optional)

An information series from the national authority on concrete masonry technology. Drainage swale. (optional) Cap unit. (optional) Provided by: Brown's Concrete Products Limited An information series from the national authority on concrete masonry technology ROLES AND RESPONSIBILITIES ON SEGMENTAL RETAINING WALL PROJECTS TEK 15-3A

More information

Drainage District(s):

Drainage District(s): APPLICANT: APPLICATION FOR APPROVAL OF CONSTRUCTION ACROSS ESTABLISHED SAC COUNTY DRAINAGE DISTRICTS AND ESTABLISHED MULTI-COUNTY DRAINAGE DISTRICTS Name of Individual or Company Street Address or P. O.

More information

5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM

5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM 5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM The Environmental Services Committee recommends the adoption of the recommendation contained in the following report

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Page 1 of 7 Updated 12/28/2017 Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map: Parcel: Lot: Disturbed Acreage: Engineering Firm: Phone Number:

More information

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete

More information

Appendix D. Fisheries and Oceans Canada (DFO) Letter of Advice

Appendix D. Fisheries and Oceans Canada (DFO) Letter of Advice The City of Winnipeg Bid Opportunity No. 851-2017 Template Version: C420170317 - RW Appendix D Fisheries and Oceans Canada (DFO) Letter of Advice Fisheries and Oceans Canada Pêches et Océans Canada 103-1800

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical

More information

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 2018 HDR, Inc., all rights reserved. Data Evaluation and Literature Review Presentation Outline Condition Assessment

More information

I. Environmental Impacts of the HDD Method (Backyard Alignment)

I. Environmental Impacts of the HDD Method (Backyard Alignment) I. Environmental Impacts of the HDD Method (Backyard Alignment) The WSSC design team reviewed the Environmental Impacts of the proposed Horizontal Directional Drilling (HDD) construction method. The HDD

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report Page 1 / 7 Reported By: Owner: Name: FRED OCASIO with KCI TECHNOLOGIES Name:, Wastewater Department Location of Overflow: 17301 BRUCE B DOWNS BLVD Address: 306 E. Jackson Street Phone Number: 813 495-2460

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

Tiered NEPA Document for Categorically Permitted Alterations to Existing U.S. Army Corps of Engineer Civil Works Projects Proposed Categorically Permitted Alterations (Check all that apply) Utilities under

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Appendix B Example of the Tiered NEPA Document to be used for Categorically Permitted Alterations PROGRAMMATIC ENVIRONMENTAL ASSESSMENT CATEGORICAL PERMISSIONS SECTION 408 ALTERATIONS TO EXISTING U.S.

More information

SepticDesign.ca Gunnell Engineering Ltd.

SepticDesign.ca Gunnell Engineering Ltd. SepticDesign.ca Gunnell Engineering Ltd. Presentation Summary Best Practices Code Context Prior to Attending the Site When on Site Site Assessment Assessing Existing Sewage Systems The Septic Test Pit

More information

Fabric Drop Inlet Protection

Fabric Drop Inlet Protection Fabric Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Block

More information

CONSTRUCTION STAKING GUIDELINES

CONSTRUCTION STAKING GUIDELINES CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING SURVEY DIVISION CONSTRUCTION STAKING GUIDELINES Gary Lee Moore, P.E., City Engineer Tony Pratt, Chief Surveyor TABLE OF CONTENTS Dec.

More information

Kathryn Wallin Bennett Trenchless. Bo Botteicher Underground Solutions. Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016

Kathryn Wallin Bennett Trenchless. Bo Botteicher Underground Solutions. Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016 www.norcalpug.com Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016 Kathryn Wallin Bennett Trenchless Bo Botteicher Underground Solutions Project Area Existing Sewers 66-inch

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed

Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed Jason Stahl, P. Eng., Project Engineer, Amec Foster Wheeler David Sinke, P. Eng., Principal, Transportation Engineering,

More information

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont. E M I R A T E S Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation i) Introduction Dubia, UAE 14 March 2017 Trenchless Middle East Faiz Alelweet & Eng. Hamza Ali Maintenance Manager

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

Current / Recent Construction Projects

Current / Recent Construction Projects Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2017 Current / Recent Construction Projects Monroe MDP - Monroe Channel Stage 4 (1-8-00071-04) In June 2017,

More information

Commercial Submittal Packet

Commercial Submittal Packet Commercial Submittal Packet City of Pepper Pike Building Department 28000 Shaker Boulevard Pepper Pike, Ohio 44124 Phone: (216) 896-6134 Fax: (216) 831-6525 www.pepperpike.org Submitting for the Architectural

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY BYPASS PUMPING SYSTEMS

STANDARD SPECIFICATIONS SECTION TEMPORARY BYPASS PUMPING SYSTEMS STANDARD SPECIFICATIONS SECTION 02960 TEMPORARY BYPASS PUMPING SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for implementing a temporary pumping system for the purpose of diverting

More information

Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018

Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018 Start 7:15 PM Approximately 27 people in attendance. Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018 Tom Grala, Meredith Raetz went through a presentation of the results of the

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

Community Meeting Lisgar District Flooding Issues

Community Meeting Lisgar District Flooding Issues Community Meeting Lisgar District Flooding Issues December 14, 2011 Lisgar Middle School 6:30 pm to 8:30 pm Agenda No. Item Speaker 1 Opening Remarks Councillor McFadden Mayor McCallion Presentation: 2

More information

ATTACHMENT A STATEMENT OF WORK RAGGED MOUNTAIN DAM PROJECT

ATTACHMENT A STATEMENT OF WORK RAGGED MOUNTAIN DAM PROJECT PROEJECT UNDERSTANDING Background ATTACHMENT A STATEMENT OF WORK RAGGED MOUNTAIN DAM PROJECT The purpose of this work scope is to develop feasible alternatives for raising the existing Lower Ragged Mountain

More information

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.

More information

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions Tanya D. Worms, P.Eng. M.Sc., Project Manager, M.D. Steele Construction Ltd. Paper prepared

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information