US 84 Mississippi River Bridge
|
|
- Marcus Francis
- 5 years ago
- Views:
Transcription
1 US 84 Mississippi River Bridge U29 And U49 Pin and Link Replacement James Gregg, PE HNTB Project Manager
2 Quick Facts WPA Project #1126 Constructed 1940 Built for: City of Natchez Total Cost $3,562, Substructure: Dravo Corp. Superstructure: Bethlehem Steel Designed by: Ash-Howard- Needles &Tammen (HNTB) Emmanuel Howard designed toll facility (H in HNTB) 2
3 Location of Pins Link and Pin Anchor Arm Quasi-Suspended Spans Suspended Span Anchor Arm 3
4 Location of Lower Pins 10 f Upper Pin (Upper pin is longer than lower pin) 10 x 16 x 7-6 Link 10 f Lower Pin 4
5 U49 Lower Pin U49 Upper Pin U49 Lower Pin 5
6 U29 Downstream Truss (Upstream Side) East West Rotated 2 ¾ (Ave.) 6
7 U29 Downstream Truss (Downstream Side) West East Rotated 2 ¾ (Ave.) 7
8 U49 Upstream Truss (Upstream Side) East West Not measured (Ave.) 8
9 U49 Upstream Truss (Downstream Side) West East Not measured (Ave.) 9
10 Pin Rehabilitation Options Considered 4 options (Option 4 chosen) Option 1 Restrain and Monitor Low cost option that is less intrusive Option 2 Reset Pins Repeat of the 1996 attempt Option 3 Replace Pin Replace lower pin but not link Option 4 Replace Lower and Upper Pins and Links Remove and replace existing pin with new pin and retainer plate Option Chosen by MDOT and Louisiana DOTD 10
11 Pin Rehabilitation Option 4 Replace Link and Pins Cantilever Span Suspended Span C T Zero Force Member 11
12 Pin Rehabilitation Option 4 Replace Link and Pins Cantilever Span Splice Plate Suspended Span Upper Longitudinal Restraint Diagonal Bypass Lower Longitudinal Restraint Bypass Load Path A (Diagonal Bypass) 12
13 Pin Rehabilitation Option 4 Replace Link and Pins Cantilever Span Suspended Span Shims Bypass Load Path B (False Chord/ Top Chord) 13
14 Pin Rehabilitation Option 4 Replace Link and Pins Cantilever Span Suspended Span Splice Plate Bypass Load Path C (Slice Plate) 14
15 US 84 Mississippi River Bridge Construction Request for construction qualifications MDOT shortlisted 2 qualified contractors Awarded to low bid Contract award date: November 2014 Contract amount: $3.8 M Selected contractor: CEC Bridge closed to traffic for 11 weeks Traffic put head to head on new bridge 15
16 Pin Rehabilitation Option 4 Sequence of Construction 1. Tension Diagonal Bypass Propose: Remove and bypass load on link and diagonal U49 Tensioned diagonal bypass to 836 kips L48-U49 D = 850 kips DL in member 761 kips (Tension) Link D = 660 kips DL in member = 655 kips (Tension) 16
17 Pin Rehabilitation Option 4 Sequence of Construction 2. Tension Upper Longitudinal Restraints Purpose: Prevent thermal/ longitudinal movement in truss Truss pin side being replaced Tensioned to 80 kips Diagonal bypass also has horizontal component Opposite side Tensioned to 180 kips 40 degree temperature drop from installation 17
18 Pin Rehabilitation Option 4 Sequence of Construction 3. Weld Templates for Splice Plate Purpose: Allow contractor to field drill splice plate 18
19 Pin Rehabilitation Option 4 Sequence of Construction 4. Field Drill and Install Splice Plate Purpose: lock joint from moving, secondary bypass, alternate load path U49 U /8 f A490 bolts 300-7/8 f A490 bolts 19
20 Pin Rehabilitation Option 4 Sequence of Construction 5. Install Top Strut Plates Purpose: Provide additional lateral resistance between cantilever and suspended span truss 20
21 Pin Rehabilitation Option 4 Sequence of Construction 6. Tension Lower Longitudinal Restraints Purpose: secondary load path 21
22 Pin Rehabilitation Option 4 Sequence of Construction 7. Cut Pins Cut four faces of pin 1.5 hrs per face of pin 1 full day of cutting 22
23 Pin Rehabilitation Option 4 Sequence of Construction 7. Cut Pins kip D in link when pins were cut Remaining load transferred to splice plate 1.0 to 3.0 increase in stress in splice plate when pin was cut 23
24 Pin Rehabilitation Option 4 Sequence of Construction 7. Cut Pins 24
25 Pin Rehabilitation Option 4 Sequence of Construction 8. Remove Link 25
26 Pin Rehabilitation Option 4 Sequence of Construction 9. Install and Temporarily Fasten New Eyebars Purpose: field drill holes and temporarily support new eyebars 26
27 Pin Rehabilitation Option 4 Sequence of Construction 10. Line Bore new upper and lower pin hole New Pins bored level and plumb to each other 24 hr set up and measure 30 hrs of cutting 27
28 Pin Rehabilitation Option 4 Sequence of Construction 11. Install New Pins Pins packed in dry ice No problems installing pins 28
29 Pin Rehabilitation Option 4 Sequence of Construction 12. Install New Retainer Plate 29
30 30 US 84 Mississippi River Bridge Pin And Link Replacement
31 Pin Rehabilitation Lessons Learned EXISTING PIN MISSALIGNMENT 31
32 Pin Rehabilitation Lessons Learned (U49) Existing and New Pins Existing upper pin was off at 3 / 16 per foot Inboard high side Existing lower pin was plumb Plan was to use upper pin and lower pin Upper pin was not large enough Used lower pin from U29 for U49 upper pin U29 pins were left at stock length and turned down after boring Inboard gusset Outboard gusset 32
33 U49 Lower Gusset Walked 33
34 Pin Rehabilitation U49 Lessons Learned Lower Pin Gusset Lower pin inboard and outboard gussets walked out 1/2" New pin did not stick out as much as expected Inside washers were not flush between link and gusset 34
35 Pin Rehabilitation Lessons Learned Lower Pin Gusset Provide additional brace on U29 lower pin gusset to avoid walking Modified sequence of construction Leave lower blocking shims out when tensioning diagonal bypass No walking observed 35
36 Pin Rehabilitation U29 Lessons Learned U29 Truss Shift 36
37 Pin Rehabilitation Lessons Learned Cantilever Truss is Shifted 37
38 Pin Rehabilitation Lessons Learned Cantilever Truss is Shifted Suspended span cantilevered out. Final tie in was at U29 L29 38
39 Pin Rehabilitation Lessons Learned Existing Pins and Gusset Existing upper pin was not plumb Existing lower pin was close to plumb Gussets were not plumb Inboard gusset Outboard gusset 39
40 Pin Rehabilitation Lessons Learned Cantilever Truss is Shifted A490 splice plate bolts were not designed to handle of bending Add 100 additional A490 bolts in splice plate Install bracing plate 40
41 Pin Rehabilitation Lessons Learned Cantilever Truss is Shifted 41
42 Pin Rehabilitation Strain Gauges 42
43 Pin Rehabilitation U29 Lessons Learned Splice Plate Max Stresses (U29) Inboard Gusset Side 1 Stress, ksi Side 2 Stress, ksi Vertical Gage deg Gage Horizontal Gage Outboard Gusset Side 1 Stress, ksi Side 2 Stress, ksi Vertical Gage deg Gage Horizontal Gage
44 Pin Rehabilitation U29 Lessons Learned 44
45 Pin Rehabilitation Lessons Learned (New Eyebar Loads) U49 Inboard link is 17% greater than outboard link Bar 1: kips (inboard) Bar 2: kips Bar 3: kips Bar 4: kips Bar 5: kips Bar6: kips (outboard) Total Load = 763 kips Dead Load in 1940 plans: 655 kips Difference: 2.7% U29 Inboard link is 44% greater than outboard link Bar 1: 70.9 kips (inboard) Bar 2: kips Bar 3: kips Bar 4: kips Bar 5: kips Bar6: kips (outboard) Total Load = kips Dead Load in 1940 plans: 638 kips Difference: 2.8% 45
46 US 84 Mississippi River Bridge Pin Rehabilitation Owner: TEAM Mississippi Department of Transportation (lead) Louisiana Department of Transportation and Development Engineer: HNTB Contractor: C.E.C., Inc (prime) Specialty Demolition (sub) In-Place Machine (sub) BDI (sub) 46
47 47 US 84 Mississippi River Bridge Pin Rehabilitation
48 US 84 Mississippi River Bridge Pin Rehabilitation Questions? 48
US 84 Mississippi River Bridge
US 84 Mississippi River Bridge U29 And U49 Pin Rehabilitation Justin Walker, PE MDOT Director Of Structures, State Bridge Engineer James Gregg, PE HNTB Bridge Department Manager Project Location Vicksburg,
More informationUS 84 MISSISSIPPI RIVER BRIDGE TRUSS PIN AND LINK REPLACEMENT
US 84 MISSISSIPPI RIVER BRIDGE TRUSS PIN AND LINK REPLACEMENT JAMES GREGG BIOGRAPHY James Gregg is the bridge department manager for HNTB Baton Rouge, LA office. He served as the project manager for US
More informationPulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97
Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97 Route U.S. 1 & 9 (Pulaski Skyway) Contract No. 051183160 Town of Jersey City, Hudson County City of Newark, Essex County PRE-BID MEETING
More informationREHABILITATION AND STRENGTHENING OF BURLINGTON NORTHERN SANTA FE RAILWAY BRIDGE OVER THE MISSISSIPPI RIVER MEMPHIS, TENNESSEE.
REHABILITATION AND STRENGTHENING OF BURLINGTON NORTHERN SANTA FE RAILWAY BRIDGE 482.1 OVER THE MISSISSIPPI RIVER MEMPHIS, TENNESSEE by: John W. Hronek & Ron G. Berry HNTB Companies 1201 Walnut, Suite 700
More informationGusset Plate Retrofit in Illinois
Gusset Plate Retrofit in Illinois Jayme F. Schiff, P.E., S.E. Repair Plans Unit Chief Illinois Department of Transportation October, 2010 1 Illinois DOT s Guidelines for Rating Gusset Plates by the Load
More informationDESIGN AND FLOAT-IN CONSTRUCTION OF A 500 FT. TRUSS SPAN
DESIGN AND FLOAT-IN CONSTRUCTION OF A 500 FT. TRUSS SPAN Kevin R. Eisenbeis, PE, SE Harrington & Cortelyou, Inc. 911 Main Street, Suite 1900, Kansas City, MO 64105 Phone: 816 421 8386 Fax: 816 471 6109
More informationSO-DEEP, 9/2015 (703) VA. Group I-DL. Group I-DL
LIMITED ACCESS HIGHWAY By Resolution of Commonwealth Transportation Board dated January 18, 2001 PROJECT MANAGER: SURVEYED BY, DATE: TIMOTHY HARTZELL, P.E. (703) 259-2749 (NOVA District) PRECISION MEASUREMENTS,
More informationCASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION
CASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION KEVIN D. SEAR, PE SUSAN STEELE, PE BIOGRAPHY Kevin Sear has been a structural engineer for over 42 years, the first 10 years
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationCIVL 3121 Trusses - Introduction 1/8
CIVL 3121 Trusses - Introduction 1/8 We will discuss the determinacy, stability, and analysis of three forms of statically determinate trusses: simple, compound, and complex. CIVL 3121 Trusses - Introduction
More informationKEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses
Replacement of the BNSF Approach Spans over the Mississippi River DAVID ROGOWSKI, P.E. AND JOSH CRAIN, Genesis Structures Inc., Kansas City, Missouri and DAN SIEVE AND KEVIN BECKER, Walsh Construction
More informationThe construction technology of Chongqing Chaotianmen Bridge
The construction technology of Chongqing Chaotianmen Bridge Zhongfu Xiang School of Civil Engineering & Architectures, Chongqing Jiaotong University, Chongqing, China Wei Xu China zhongtie major bridge
More informationPRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE
PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE Overview 1. Project Objectives 2. Bridge Data 3. Timeline 4. Existing Condition 5. Sequence of Coating and Repair Operations 6. Major
More informationWRA has been instrumental in improving society's quality of life with cleaner water, improved roads, bridges and railroads, state-of-the-art
WRA has been instrumental in improving society's quality of life with cleaner water, improved roads, bridges and railroads, state-of-the-art buildings for federal, state, local and DOD facilities, modern
More informationRetrofit Measures for Superstructures, Bearings, and Seats
Retrofit Measures for Superstructures, Bearings, and Seats Presented by Richard V Nutt Elements to be Retrofitted Bridge Decks and Girders Bearings, Anchorages and Pedestals Expansion Joints 1 Elements
More informationDesign & technology characteristics of main bridge of Chaotianmen Yangtze River Bridge
Design & technology characteristics of main bridge of Chaotianmen Yangtze River Bridge Xuewei Duan, Xiaoyan Xiao and Wei Xu China Railway Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan, China
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.
More informationMezzanines By Design Page 1
SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY
More informationAMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY
More informationINDUSTRIAL BUILDINGS ARE R ENOVATION. By John M. Wathne, P.E.
R ENOVATION PRACTICAL THERMAL PRESTRESSING Existing joists in an industrial building were successfully reinforced in part through the use of thermal prestressing while still under load By John M. Wathne,
More informationPotential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about?
Potential Solutions Potential Solutions- Background: Current Designs Goals for Design What are we concerned about? Primary Goal: Get the deck on successfully Stability during deck pour Girder plumbness
More informationSECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES
SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:
More informationExecutive Summary RPT-SPE December 21. Old Spences Bridge No Inspection Report
Executive Summary The Old Spences Bridge was constructed in 1931 and crosses the Thompson River providing a link between Highway 8 and Highway 1 in the Community of Spences Bridge, BC. In 1962, a new bridge
More informationSECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES
SECTION 05 44 00 (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES PART 1 GENERAL 1.1 SUMMARY A. Section includes pre-engineered, pre-fabricated cold-formed steel framing
More informationAASHTOWare BrR 6.8. Truss Tutorial. T5 - Truss Enhancements
AASHTOWare BrR 6.8 Truss Tutorial T5 - Truss Enhancements BrR Training T5 Truss Enhancements Topics Covered Longitudinal Truss - Counters, Member eccentricity, Suspended span and Deck-through configuration
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1124 REVISION 3 November 2013 EFFECTIVE DATE November 11,
More informationTuesday, April 11, :20-12:00 AM
Tuesday, April 11, 2017 11:20-12:00 AM Presentation Overview Overview Recent Projects Bridge Configuration Project Specifics Inspection Video Load Rating Preservation Techniques Bearing Slide Questions
More information1 Exam Prep BCSI Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses Questions and Answers
1 Exam Prep BCSI Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses Questions and Answers Problem Set #1 1. According to BCSI, for lifting truss
More informationReplacing the Aging US 52 Mississippi River Bridge
2019 TRANSPORTATION & HIGHWAY ENGINEERING CONFERENCE F. Duncan, PE, G. Hasbrouck, PE and A. Dour, PE Replacing the Aging US 52 Mississippi River Bridge February 26, 2019 Project Overview US 52 / IL 64
More informationSt. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer
St. Anthony Falls I-35W Bridge Replacement ASHE National Conference June 13, 2014 Dustin Thomas, P.E. I-35W Bridge Construction Engineer The Former Bridge - 9340 Opened to traffic in 1967 Steel truss bridge
More informationSpecial Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures
STEEL MONOTUBE OVERHEAD SIGN SUPPORT STRUCTURES - Item No. STEEL COLUMN BREAKAWAY SIGN SUPPORT STRUCTURES - Item No. STEEL COLUMN NON-BREAKAWAY SIGN SUPPORT STRUCTURES - Item No. CANTILEVER STATIC SIGN
More informationSIXTH BIENNIAL SYMPOSIUM
Heavy Movable Structures, Inc. SIXTH BIENNIAL SYMPOSIUM October 30 - November 1, 1996 Doubletree Resort Surfside Clearwater Beach, Florida 106th Street Bascule Bridge - Emergency Repairs B. Robert Tessiatore,
More informationAPPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.
APPENDIX B. LOAD FRAME This Appendix will describe the philosophy in the design and operation of the loading system. LOAD FRAME The large-scale gusset plate testing required a unique loading fixture. A
More informationRehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, and Repair Project
Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, and Repair Project 2013 Louisiana Transportation Conference Session 13 Durk Krone, P.E., TRC Engineers,
More informationTECHNICAL NOTE On Cold-Formed Steel Construction
TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 6a 1996 Light Gauge Steel Engineers Association Washington, D.C. Toll-Free: 1 (866) 465-4732 www.lgsea.com DESIGN GUIDE FOR PERMANENT BRACING OF COLD-FORMED
More informationFatigue Repair of the I-345 Bridges
Fatigue Repair of the I-345 Bridges Yuan Zhao, P.E., Ph.D. Bridge Presentation Webinar February 25, 2011 Fracture Critical Units NB & SB Mainlanes Louise Ave. NB & SB Collectors Ross Ave. Ramps & Connections
More informationInspection of Steel Girder Bridges
Course Outline Inspection of Steel Girder Bridges Bridge superstructure systems Defects in steel members Failure mechanics Fatigue Constrained Induced fracture (CIF) Inspection Inspection of Pin & Hanger
More informationJPods, LLC. Cost Estimate. Structural Support Systems. for 12/08/06 SHEET N 1 OF 16 CALC N
1 OF 16 12/08/06 Cost Estimate of Structural Support Systems for JPods, LLC 2 OF 16 TABLE OF CONTENTS SUBJECT: PAGE 1. Purpose.. 3 2. Methodology. 3. 3. Assumptions. 4 4. Input Data... 5 5. Loading Combinations
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY
STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of
More informationSECTION COLD-FORMED METAL TRUSSES
SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR
EXAM No.109 BRIDGE INSPECTION, MAINTENANCE AND REPAIR 1. Elements of a Bridge Maintenance Program include: A. Inspection and maintenance. B. Inspection and repair. C. Maintenance and documentation. D.
More informationSociety of Women Engineers Region H Conference
Society of Women Engineers Region H Conference Faith Duncan, PE & Greg Hasbrouck, PE Replacing the Aging US 52 Mississippi River Bridge February 27, 2016 Project Overview US 52 / IL 64 over the Mississippi
More informationFIGURE R502.2 FLOOR CONSTRUCTION
CHAPTER 5 FLOORS 11 I SECTION R501 GENERAL R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces
More informationLesson 7 REINFORCING CAGE. Version 1-1/
Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain
More informationPEDESTRIAN BRIDGE 866/
866/258-3401 WWW.BRIDGEBROTHERSINC.COM 1 Purpose and Scope These specifications are for a fully engineered clear span bridge of welded steel construction and shall be regarded as minimum standards for
More informationSeismic Evaluation of a 1930 Steel Bridge with Lightly Reinforced Concrete Piers
Seismic Evaluation of a 1930 Steel Bridge with Lightly Reinforced Concrete Piers R. Tinawi & M. Leclerc École Polytechnique de Montréal, Canada D. Mitchell McGill University, Canada A. Massad Hydro-Québec,
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.
More informationItem 442 Metal for Structures
Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings
More informationJAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET
JAMES DEAN BAKER STRUCTURAL OPTION ALCOA CORPORATE CENTER 201 ISABELLA STEET PRESENTATION OUTLINE Introduction Existing Conditions Structural Existing Conditions Design Goals and Criteria Suspension Design
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of
More informationD D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.
Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete
More informationSTEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR
STEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR 1. On site Observation Report by Recognized Engineer (PE) every year (prior to issuance of
More informationStructural Training - Part 1:
Structural Training - Part 1: Structural Training Residential Wood-Framed Construction Presented by: City of Santa Clarita Building & Safety Division February, 2014 The information provided in this presentation
More informationTo meet the special demands of modern bridge construction, equipment designers have developed innovative ways to connect steel
UNCONVENTIONAL STEEL CONNECTIONS: SOME NEW APPROACHES To meet the special demands of modern bridge construction, equipment designers have developed innovative ways to connect steel EXPECT THE UNEXPECTED
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of
More informationSpecifying Pre-Engineered CFS Floor and Roof Trusses 551f-98
Archived Technical Note Cover Page Cold-Formed Steel Engineers Institute (CFSEI) Technical Notes are reviewed and revised on a regular basis. Often, during the review process, the evaluation of the note
More informationExample of a modelling review Roof truss
Example of a modelling review Roof truss Iain A MacLeod The Structure Figure gives an elevation and connection details for a roof truss. It is supported at each end on masonry walls. The trusses are at
More informationLectures Notes (Steel I - CT122) Higher technological institute 10 th of Ramadan city Dr. Essam Abd Elaty Mohamed Amoush.
Introduction A truss is a structural system constructed of linear members forming triangular patterns. The members are assumed to be straight and connected to one another by frictionless hinges. All loading
More informationSection 713. BRIDGE REHABILITATION STEEL
713.01 Section 713. BRIDGE REHABILITATION STEEL 713.01. Description. This work consists of repairing and replacing portions of structural steel bridges. A redundant structure consists of supporting elements
More informationOpen-Web Truss Long Span Installation Guidelines
TECHNICAL BULLETIN #301 Open-Web Truss Long Span Installation Guidelines RedBuilt has maintained a policy of manufacturing and marketing products of the highest quality to our customers. We guarantee the
More informationI-74 Corridor in the Quad Cities A State of the Art Design
I-74 Corridor in the Quad Cities A State of the Art Design Mid-Continent Transportation Research Symposium August 16-17, 2017 Presented By: Norm McDonald, Iowa DOT State Bridge Engineer PRESENTATION OUTLINE
More informationKINETICS Pipe & Duct Seismic Application Manual
QUICK START READ ME FIRST I1.1 Seismic Restraint Categories and Types: Seismic restraints for pipe and duct are generally separated into to two categories. 1. Transverse Seismic Restraints: These act to
More informationA 2" MICHIGAN DEPARTMENT OF TRANSPORTATION. 1" (Min.) \ Bracket to \ bottom chord. 24-3" (Max.) 45 (Typ.) * W40 x 149. or l5 x 5 x 1/2 (see
For Information Only This Type of Support Has Varies To Be Analyzed For Each Case. 1/2 Detail A 2-6" (Max.) 3/8 5/8 " Stiffener \ Column 3/4 " Plate 7/16 7/16 24 - (Max.) to \ bottom chord * 1/4 1 1/ Plate
More informationSTEEL COLUMNS. Er. RAJINDER KUMAR (M.E. CIVIL) Sen. LECTURER G.P. COLLEGE, BATALA.
STEEL COLUMNS Er. RAJINDER KUMAR (M.E. CIVIL) Sen. LECTURER G.P. COLLEGE, BATALA. DEFINITION Members which are subjected to compression are called compression member and load in all such members may be
More informationDELAWARE RIVER TURNPIKE BRIDGE FRACTURE REPAIR
DELAWARE RIVER TURNPIKE BRIDGE FRACTURE REPAIR RICHARD SCHAEFER FRANK A. CORSO, JR BIOGRAPHY Richard Schaefer is an associate vice president and chief bridge engineer for the New Jersey office of the HNTB
More informationSteel Expansion. Located along the Grand River in
Steel Expansion by Michael Gustafson, P.E. The DeVos Place convention center in Grand Rapids, MI, is undergoing a multi-year expansion featuring steel-framed column-free exhibit space. Located along the
More information(a) Pin-Pin P cr = (b) Fixed-Fixed P cr = (d) Fixed-Pin P cr =
1. The most critical consideration in the design of rolled steel columns carrying axial loads is the (a) Percent elongation at yield and the net cross-sectional area (b) Critical bending strength and axial
More informationProvide heavy hex nuts for the temporary hanger rods according to ASTM A 563 Class 10S, and washers according to ASTM F 436.
713.01 Section 713. BRIDGE REHABILITATION - STEEL 713.01 Description. Repair and replace structural steel portions of bridges. A redundant structure is a structure whose remaining supporting elements will
More informationGraphic truss analysis. Graphic truss analysis Copyright Prof Schierle
Graphic truss analysis Graphic truss analysis Copyright Prof Schierle 2011 1 Truss examples Oakland Bay Bridge Truss joists Graphic truss analysis Copyright Prof Schierle 2011 2 Stadium roof Milan Airport
More informationBRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS # 3. Restraint systems
SEISMICALLY BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT DESIGN CRITERIA # 2 NON-STRUCTURAL ELEMENTS # 3 Restraint systems The next step in the non-specific design pathway in NZS
More informationWALL MOUNTED ARTICULATING JIB CRANE
SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationCross Frame Design for Curved and Skewed Bridges
Cross Frame Design for Curved and Skewed Bridges Using AASHTO LRFD, 8 th Edition Travis Butz, PE To View Presentation on Your Mobile Device: www.burgessniple.com/event/2018/otec Cross frames in the 8 th
More informationOpen-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance
Open-Web Trusses Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses Download your free copy at RedBuilt.com. Specify Open-Web trusses for your next project using RedSpec single-member sizing software.
More informationSECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System
SECTION 05 5200 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install stainless steel railings and components. 1.02 REFERENCE
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 21, 2017 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural
More informationOpen-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance
Open-Web Trusses Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses Download your free copy at RedBuilt.com. Specify Open-Web trusses for your next project using RedSpec single-member sizing software.
More informationOpen-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance
Open-Web Trusses Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses Download your free copy at RedBuilt.com. Specify Open-Web trusses for your next project using RedSpec single-member sizing software.
More informationVOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)
DIVISION 94 VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.) SEC. 91.9401. PURPOSE. (Amended by Ord. No. 172,592, Eff. 6/28/99,
More informationSECTION STRUCTURAL STEEL
SECTION 05120 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN
More informationInvestigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri.
Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri. U.S. Department of Labor Occupational Safety and Health Administration Directorate of Construction October 2018
More informationREHABILITATION PACKAGE 4-a
4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.
More informationINSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE
INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE Xiaohua H. Cheng 1, Gregory Renman 1 and Richard Dunne 1 Abstract The superstructure of Rt.72 over Manakawkin Bay Bridge consists of
More informationTOWN OF BRADFORD WEST GWILLIMBURY DECK PACKAGE
GWILLIMBURY DECK PACKAGE Property Address: Deck Size: Width: Length: Material: Deck Height: Ground to top of decking: Stair Steps (pg. 5): Rise: Run: Decking: Size: Material: Guard: Height: Type: 1. Cantilevered
More informationSECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationAISC Live Webinars. Thank you for joining our live webinar today. We will begin shortly. Please standby.
! The Most Common Source of AISC Live Webinars Thank you for joining our live webinar today. We will begin shortly. Please standby. Thank you. Need Help? Call ReadyTalk Support: 800.843.9166 AISC Live
More informationIronton Russell Bridge Project
Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015
More informationMERLIN-TRAP. Steel Truss Rating and Analysis Program
MERLIN-TRAP Steel Truss Rating and Analysis Program MERLIN-TRAP Development Began in 1976 Basic program completed in 1978 Microcomputer version in 1986 used in FHWA truss rating study, numerous major truss
More informationUS-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer
US-131 Over the Muskegon River Corey Rogers, P.E. Bridge Construction Engineer NB and SB US-131 Each bridge is a three-span, 580 foot long, cast-in-place, post-tensioned concrete box girder structure resting
More informationRESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES
CHAPTER 2 RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES 2.1 PURPOSE The purpose of this chapter is as follows: 2.1.1 To define and draw attention to the typical duties
More informationPRECAST CONCRETE GIRDER ERECTION
7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks
More informationGUSSET PLATES IN RAILROAD TRUSS BRIDGES FINITE ELEMENT ANALYSIS AND COMPARISON WITH WHITMORE TESTING
GUSSET PLATES IN RAILROAD TRUSS BRIDGES FINITE ELEMENT ANALYSIS AND COMPARISON WITH WHITMORE TESTING Walid S. Najjar, Ph.D., P.E. 1, Frank DeOrtentiis, P.E. WSP SELLS 555 Pleasantville Road, Briarcliff
More informationSherman Minton Bridge
Sherman Minton Bridge Project Background Metropolitan Louisville Metropolitan Area Area Location I-64 over Ohio River Link between IN & KY ridge Sherman Minton Bridge Structure Information Tied Arch 2
More informationES230 Strength of Materials Exam 6 - Compilation Prof. Kurtz, ES230 STRENGTH OF MATERIALS Exam 6 Wednesday, April 26, 2017, 7pm
Given Formulae Bending M/EI = 1/ = -y/ =My/I = E Beam Shear Stress = VQ/It q = VQ/I q = F/s Torsion I = ( /4)r 4 for a solid, circular shape of radius r Pressure Vessels hoop = Pr/t long = Pr/2t ES230
More informationSTEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 2: Concept Design
STEEL BUILDINGS IN EUROPE Single-Storey Steel Buildings Part 2: Concept Design 2.4 Airbus Industrie hanger, Toulouse, France The Airbus production hall in Toulouse covers 200000
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More information