L1-CHE-STD-040 BRIDGE STANDARD

Size: px
Start display at page:

Download "L1-CHE-STD-040 BRIDGE STANDARD"

Transcription

1 Engineering Standard L1-CHE-STD-040 Version: 2

2 Approval Amendment Record Approval Date Version Description 22/12/ Initial issue under MTM. Supersedes VRIOGS (draft), L1-CHE-INS-013, L1-CHE-INS-026, L1-CHE-INS-027, L1-CHE-INS-034, L1-CHE-INS-068. Refer to MOC # /07/ Standard updated to reflect release of L1-CHE-STD-025 Transit Space Clearance Standard. Refer to MOC #44753 for details. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 39

3 PREFACE Metro Trains Melbourne (MTM) Standards have been developed to ensure common approaches are employed when designing, constructing or testing any part of the Melbourne Metropolitan Rail Network. It is important to understand that Standards are living documents which take into account learnings to achieve best practice. All MTM Standards are periodically reviewed and new versions published which incorporate learnings and Technical Notes (TNs). TNs are issued between editions which correct any errors or ambiguities contained in an MTM Standard. Standards may also be withdrawn and replaced. As Standards are uncontrolled once printed, it is imperative to check the currency of the Standard on the MTM Intranet or MTM External Document Portal. In the event of conflicts or discrepancies between Documents, refer to the order of precedence as defined in Chief Engineer s Guideline Engineering Standards Listing (L1-CHE-GDL-005). Note: Any clarification described in a TN shall take precedence over the impacted clause or clauses in the associated MTM Standard. In the event a clause within a Standard is not achievable a waiver must be raised in accordance with Engineering Waiver Procedure - L1-CHE-PRO-001. Note: MTM does not have the authority to grant waivers to any Standards which relate to Government Regulations or Legislation, e.g. Disability Discrimination Act. Application of this Standard This Standard is applicable from the approval date. It shall be applied to all projects and renewals works on the MTM Infrastructure Lease commencing after the approval date. It shall also be applied to projects and renewals works that are in the delivery phase where there is a requirement for compliance to AS PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 39

4 Table of Contents 1 Purpose Scope Abbreviations and Acronyms Definitions References & Legislations... 9 General... 9 MTM References... 9 Industry References Australian References and Legislation Related Documents Safety & Environmental Design of New Bridges, Underpasses and Soil Retaining Structures General Requirements Minimum Clearances General Overbridges Underbridges Additional provisions for through-girder Underbridges Drainage Walkways and Handrails Derailment Management on Rail Structures Track Structure Protection Beams Soil Retaining Structures Adjacent to Rail Application of AS Bridge Design Assessment and Load Rating of Underbridges General Requirements Reporting of Assessment and Load Rating Factors Application of AS Bridge Design Structural Modification of Bridges Application General Requirements Loading Clearances Drainage Walkways and Handrails Collision Protection PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 39

5 Protective Screens Appendix A Documentation Requirements General Requirements All design drawings shall be produced in accordance with the conventions detailed in L1-CHE-POL-001 Engineering Drawings Management Policy (IFC/As Builts), and PTV s Infrastructure Drafting Standards Specific Requirements Appendix B Indicative Underbridge Arrangements Appendix C Load Rating Tables Appendix D Load Rating Details List of Tables Table 1 - Derailment Management Systems Table 2 PTV Asset Integrity Requirements for Elevated Railway Track Table 3 Application of AS Bridge Design for New Bridges Table 4 Bridge Specific Design Parameters for the Rational Method Table 5 Load Rating Section Loss Categories Table 6 Application of AS 5100 for Load Rating and Assessment Table 7 AS Collision Loading Categories List of Figures Figure 1 - Soldier pile and shotcrete soil retaining structure PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 39

6 1 Purpose The purpose of this document is to provide technical requirements for the: Design of Bridges, Underpasses, Soil Retaining Structures, Culverts and associated civil infrastructure within the rail corridor or the MTM Infrastructure Lease; Design of structural components related to Tunnels or Underpasses where they are not covered by other MTM standards; and Structural assessment and load rating of existing Bridges, Underpasses, Soil Retaining Structures, Culverts and associated civil infrastructure within the rail corridor or the MTM Infrastructure Lease. 2 Scope This Standard shall be read in conjunction with AS This standard sets out MTM requirements for the design of Bridges, Underpasses, Soil Retaining Structures, Culverts and associated civil infrastructure in the MTM Infrastructure Lease. Note: Road and pedestrian Bridges shall comply with the requirements of L1-CHE-STD-025, VicRoads and AS 5100 unless specifically varied by the requirements of this Standard. This standard sets out the requirements for structural assessment and load rating of Bridges, Underpasses, and Culverts in the MTM Infrastructure Lease. Note: This standard does not provide requirements for when structural assessment and load rating is undertaken. This is covered by the appropriate Technical Maintenance Plan and project scope where relevant. This standard is mandatory for all proposed works in the MTM Infrastructure Lease. This Standard does not include specifications for the construction, deconstruction, installation and placement of Bridges and Bridge materials. 3 Abbreviations and Acronyms DMS Drawing Management System (managed by PTV) DPN Design Practice Note KE Kinematic Envelope (refer to STD_R0009) MTM Metro Trains Melbourne PTV Public Transport Victoria RSNL Rail Safety National Law SFAIRP So Far As Is Reasonably Practicable PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 39

7 4 Definitions As-Is Load Rating As-New Load Rating Bridge Cant Chord Effect Critical Load Rating Factor Culvert Design Life Generally Accessible Areas Handrails Infrastructure Lease Kinematic Envelope Load Rating Overbridge Load rating based on the current condition of the Bridge including all structural modification. Load rating assuming the Bridge, including all structural modification, is in as-new condition. An Overbridge, Underbridge, Culvert, suspended station concourse or pedestrian/cyclist Bridge. The vertical distance that the outer rail is raised above the inner or grade rail of a curve. Also known as superelevation. The effect resulting from curved track geometry on straight bridge elements The lowest Component Load Rating Factor which determines the load rating factor for the Bridge. An Underbridge having a deck supported on continuous integral walls and (usually) base slabs whose function is to allow water to flow under the track. The period adopted for design purposes for which a structure or structural element is required to perform its intended purpose with periodic maintenance but without replacement or major structural repairs. Areas accessible to the general public such as parklands; station platforms, stairways, ramps and concourses; roadways, carparks, pedestrian and cycling paths. A system of posts, rails and/or panels that provides protection at the edge of a floor or platform or walkway. Note: This definition corresponds to the term guardrailing in AS1657. The term handrails is used in this standard to avoid confusion with guard rails which are a derailment control measure. The Land and Infrastructure as defined in the Train Infrastructure Module of the MR4 Franchise Agreement. A two dimensional cross-section of the shape of a rail vehicle that consists of the static outline plus the maximum permitted allowance for vertical and lateral movements. It also includes any Cant and curve effect associated with curved track and dynamic movements in response to track irregularity. Refer drawing STD_R0009. The process of determining a load-rating factor as defined in AS A non-rail Bridge that crosses over track. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 39

8 Pedestrian and/or Cyclist Path Bridge Position of Safety Protection Barrier Refer to clause Rail over Rail Bridge Shall Should A Bridge or station concourse spanning over rail and beyond and intended solely for pedestrian and/or cyclist use; but may include use by maintenance traffic or emergency vehicles. For the purpose of this standard, a pedestrian Bridge includes any associated stair and ramp approaches and landings. As defined by L1-SQE-PRO-054 Planning Work Site Protection in the Rail Corridor: a place where people or equipment cannot be struck by rail traffic. An Underbridge crossing over track. Note: The requirements for both Underbridges and Overbridges shall apply to Rail over Rail Bridges. The term shall is used to express a clause that is mandatory to achieve conformance to the standard. Is used as the descriptive word to express a requirement that is recommended in order to achieve compliance. Should can also be used if a requirement is a desirable but not a mandatory requirement. Soil Retaining Structures Structural walls whose primary function is to retain soil whilst in some cases also being required to withstand collision loads from derailed trains. Structural Modification Through-Bridge Tunnel Underbridge Soil retaining structures may be of, but are not limited to, the following types: Soil nail walls Diaphragm walls Secant and contiguous pile walls Sheet pile walls Reinforced soil walls Solder piles with infill walls Underpass walls Cantilever walls. Widening, extending or replacement of Bridges or any other modification that alters their structural capacity and/or function. Structural modification does not include repair, like for like replacement or maintenance works An Underbridge where the Bridge structure extends above track level (e.g. through-girder, through-arch, through-truss or cable stayed Bridge). An Underpass constructed typically using either boring or mining techniques. A Bridge supporting track. Indicative Underbridge arrangements are given in Appendix B. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 39

9 Underpass A below ground-level structure for the passage of rail vehicles, road vehicles, maintenance vehicles, and/or pedestrians and cyclists. Constructed typically using eithercut and cover or tunnelling techniques. 5 References & Legislations General Bridges, Underpasses and Soil Retaining Structures shall be designed and constructed in accordance with this standard, other relevant MTM and Australian standards and MTM requirements documents Where a conflict arises between documents, or where clarification on the applicability of a standard, specification or a part of either is required, the matter shall be referred to the MTM Chief Engineer or delegate for determination. MTM References Document Number L0-SQE-PLA-005 L0-SQE-PRO-031 L0-SQE-PRO-040 L0-SQE-MAN-002 L0-HMR-MAN-001 L1-NAM-PRO-002 L1-SQE-PRO-054 L1-CHE-GDL-005 L1-CHE-STD-010 L1-CHE-STD-025 L1-CHE-STD-030 L1-CHE-STD-035 L1-CHE-PRO-001 L1-CHE-POL-001 L1-CHE-PRO-031 L2-STF-PRO-003 Title Environmental Management Plan Enterprise Risk Management Procedure Interface Agreements - Procedure Safety Management System Manual. Business Rules Manual for the Contracting Rail Safety Worker Design and Technical Review Procedure. Planning Work Site Protection in the Rail Corridor Chief Engineer s Guideline Engineering Standards Listing Railway Bridges Electrical Protection and Bonding Transit Space Clearances Track Drainage Standard Lighting and Power Design and Construction Standard Engineering Waiver Procedure Engineering Drawings Management Policy (Issued for Construction/ As Built drawings) Engineering Change Procedure Rail Over Road Bridges Bridge Strike Impact PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 39

10 Industry References Document Number PTV-ED-002:2017 Title PTV Infrastructure Drafting Standard Public Transport Victoria Engineering Directive Track and Structures Asset Integrity Requirements for Elevated Railway Track Infrastructure STD_E0001 Standard Drawing for Overhead Conductor Clearance and Protective Requirements at Overline Bridges STD_R0009 Maximum Rolling Stock Outline Kinematic Diagram Type 1 Single Deck Cars UIC 717-2R Vicroads Bridge Technical Note BTN004 Vicroads Bridge Technical Note BTN005 Vicroads Bridge Technical Note BTN006 Vicroads Bridge Technical Note BTN007 Vicroads Bridge Technical Note BTN008 Vicroads Bridge Technical Note BTN009 Vicroads Bridge Technical Note BTN010 Vicroads Bridge Technical Note BTN011 Vicroads Bridge Technical Note BTN016 Vicroads Bridge Technical Note BTN018 Laying of track on a reinforced concrete deck Bridge joints FRP for strengthening of bridge structures Bonded anchors Noise attenuation walls Mechanical anchors RC panels for reinforced soil structures Integral and semi integral bridges Approach slabs Design of large box culverts Step joints VicRoads Specification for Roadworks and Bridgeworks 600 Series - Bridgeworks VicRoads Road Structures Inspection Manual PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 39

11 Australian References and Legislation Document Number AS 5100 AS 1657 AS AS 7633 AS 7636 RISSB Guideline SA HB 198 Title Bridge design Fixed platforms, walkways, stairways and ladders Design, construction and installation Design for access and mobility Railway Infrastructure: Clearances Railway Structures Refuges Bridges and Tunnels Guide to the specification and testing of slip resistance of pedestrian surfaces Rail Safety National Law Application Act 2013 (Vic) Victorian Occupational Health and Safety Act 2004 S.R. No. 22/2017 Victorian OHS Regulations 2017 WorkSafe Victoria Industry Standard Construction and Erection of Bridge Beams 6 Related Documents Document Number L1-CHE-STD-039 Title Track Design and Construction 7 Safety & Environmental The general requirements in relation to safety are included in MTM s Safety Management System Manual (L0-SQE-MAN-002). The design and construction of infrastructure shall comply with the MTM Environmental Management Plan (L0-SQE-PLA-005). All rail safety workers shall comply with Business Rules Manual for the Contracting Rail Safety Worker (L0-HMR-MAN-001) and have the appropriate competencies to undertake their role. Under RSNL (s46) MTM is required to: a. Eliminate risks to safety so far as is reasonably practicable (SFAIRP); and b. If it is not reasonably practicable to eliminate risks to safety, to minimise those risks so far as is reasonably practicable. Under RSNL (s47), reasonably practicable means that at a particular time, MTM were able to demonstrate how the risk/s can be reasonably managed to ensure safety, taking into account and weighing up all relevant issues including: a. The likelihood of the hazard or the risk concerned occurring; b. The degree of harm that might result from the hazard or the risk; PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 39

12 c. What the person concerned knows, or ought to reasonably know, about: i. the hazard or risk, and ways of eliminating or minimising the risk; ii. the availability and suitability of ways to eliminate or minimise the risk; and d. After assessing the extent of the risk and the available ways of eliminating or minimising the risk, the cost associated with available ways of eliminating or minimising the risk, including whether the cost is grossly disproportionate to the risk. Under RSNL (s50), rail safety is a shared responsibility of: a) Rail transport operators; and b) Rail safety workers; and c) Other persons who: i. Design, commission, construct, manufacture, supply, install, erect, maintain, repair, modify or decommission rail infrastructure or rolling stock; or ii. iii. Supply rail infrastructure operations or rolling stock operations to rail operators; or In relation to the transport of freight by railway load or unload freight on or from rolling stock. Safety and risk assessments shall be undertaken to inform the design. It shall take into account safety considerations for construction and maintenance personnel and any other party, including operations personnel who may be required to use the track. Risk assessments shall be conducted in accordance with the MTM Enterprise Risk Management Procedure L0-SQE-PRO-031. Where new equipment or systems are proposed to be introduced, the materials and equipment shall be subject to MTM Type Approval processes for use on the metropolitan train network. For any structures above, below, or within the MTM Infrastructure Lease, but not inspected or maintained by MTM, a Safety Interface Agreement shall be prepared in accordance with L0-SQE-PRO-040. Where new rail over road bridges are introduced, or existing rail over road bridges are substantially modified, L2-STF-PRO-003 Bridge Strike Impact procedure shall be revised. 8 Design of New Bridges, Underpasses and Soil Retaining Structures General Requirements The design of Bridges shall comply with the documentation requirements outlined in Appendix A Documentation Requirements New Bridges, Underpasses and Soil Retaining Structures shall be designed to meet project specific functional requirements described in the relevant MTM Final Operational Requirements and Final Impact Statement for the project Underbridges and Underpasses shall be designed to not preclude any future tracks and/or track realignments specified by PTV Earthing and bonding of Bridges shall comply with L1-CHE-STD-010 Railway Bridges Electrical Protection and Bonding. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 39

13 8.1.5 Designs shall comply with the Vicroads requirements referenced Section 5.3 current at the commencement of design Bridges shall be designed to minimise disruption to train services and normal railway activities during construction and maintenance. Bridges shall be designed so that they do not diminish the safety of railway operations, or the safety of persons whose duties take them on or near the line, by: avoiding potential arcing of traction power equipment, providing signal sighting for train drivers, providing sighting for authorised track staff, providing positions of safety from passing trains for authorised personal and tresspassers, providing emergency access, and providing reasonable inspection and maintenance access to all parts of the structures, including the interiors of box girders and the like The design shall incorporate measures to enable the safe ongoing inspection and maintenance of Bridges (including individual asset components that are integral or attached to the Bridge) with minimum train service disruption. The design shall mitigate the risk of falls in accordance with Victorian OHS Regulations and Worksafe Victoria Guidelines Approved construction materials for main structural elements are steel and concrete. Timber materials shall not be used as permanent structural elements Materials shall be selected to avoid colours similar to those used for railway signalling, or that may exhibit reflectivity that may diminish the visibility of train drivers or safety workers Buried metal structures, such as steel anchor straps, ties and fitments for reinforced soil retaining structures, steel sheet piles, steel tubular piles and steel H-piles, are considered to be generally unsuitable for use in direct current electrified zones and shall not be used as permanent structural materials unless approved by the MTM Chief Engineer or delegate. Where MTM has approved their use, buried steel structures shall be treated in compliance with Cause and due allowance made for the loss of steel due to chemical and electrolysis corrosion over their life. Sheet pile walls shall be capped with concrete beams of sufficient strength and stiffness to maintain their line and level. Corrugated metal pipe Culverts and arches shall not be used anywhere in the MTM network To allow for use by maintenance vehicles and plant, Underbridges shall be designed for loading from a pair of A160 axles spaced at between 2 metres and 10metres longitudinally apart. This loading shall be applied with the most adverse axle spacing at any location on the Bridge deck accessible by the vehicle. Dynamic load allowances and load factors shall be applied as specified by AS Bridge designs shall minimise the number of movement joints and bearings as far as is reasonably practicable. Decks shall be continuous and waterproof between movement joints without gaps or openings. Where the beams are not continuous, the deck slab shall be continuous and waterproof. Movement joints and other gaps in ballasted decks shall be protected against ballast loss by cover plates with a minimum Design Life of 50 years. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 39

14 Movement joints located above Generally Accessible Areas, or above critical operational infrastructure such as track, overhead wiring and signalling or communication equipment shall be designed to be waterproof. They shall also be able to intercept stormwater overflow resulting from failure of the movement joint waterproofing and discharge it into a suitable drainage system. Bridge deck surfaces shall be graded to drain stormwater away from movement joints and into suitable collection points. Top-down insitu concrete Bridge decks shall be provided with waterproofing membranes and their construction joints suitably treated to ensure their watertightness Permanent halving joints shall not be used to support main load carrying elements of an Underbridge Hatches shall be provided for access to the interior spaces of Bridges when required for inspection or maintenance and shall comply with AS1657. Opening and locking of hatches shall be capable of being undertaken using one hand only Hatches located in the soffits of Bridges shall be located above safe accessible areas away from rail and road traffic. Hatch covers shall be in-swinging only, hinged, lockable from the outside and lockable in the open position from the inside Underbridges on curves are not required to have superelevated decks where Cant can be accommodated by the trackform Underbridges shall be provided with approach slabs at both ends. Approach slabs shall be a minimum length of 4 metres measured perpendicular to the Bridge abutments. The outer (ground supported) ends of approach slabs shall be perpendicular to the track centre-line. The inner (abutment supported) end of an approach slab shall be connected to the abutment so as to prevent lift-off and to allow the slab to rotate if its outer end settles Net uplift forces shall not occur at a bearing of an Underbridge under any serviceability limit state load combination The vertical deflection (up or down) at the end of an Underbridge deck (due to the deck extending beyond the line of support) shall not exceed 2mm under any serviceability limit state load combination For ballasted Underbridges, ballast mats should be considered for attenuating sound in noise sensitive areas and for reducing ballast degradation where the minimum depth of ballast is less than 300mm On ballasted steel Through-Bridges, the trackside faces of the girders shall not act as ballast kerbs. The steel surfaces shall be accessible for inspection and maintenance Piers, parapets and any other parts of Bridges vulnerable to graffiti vandalising should have uniform surfaces to facilitate graffiti removal or over-painting Bridges shall incorporate features to prevent birds nesting on and in the Bridges. Bird proof screening shall be provided at all openings in box girder Bridges Utilities and services supported off Bridges shall be coordinated with the relevant utilities owners to ensure the location, fixing and replacement of services are designed so inspection and maintenance is safe and unimpeded. Services shall be positioned so that they do not encroach on the safe working area or create a trip or other safety hazard. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 of 39

15 Feature or security lighting and interior safety lighting of Bridges shall use LED systems in accordance with L1-CHE-STD All new Bridges, Underpasses and Culverts shall be fitted with a unique Asset ID number engraved on a durable metal plaque and installed in a clearly visible location on each abutment or wall of the structure Reinforced Soil Walls shall be designed in accordance with NSW Roads and Maritime Services QA Specification R57. Minimum Clearances General The minimum clearance dimensions in section 8.2 apply only to the structural components of a Bridge unless stated otherwise. They do not apply to non-structural Bridge attachments (e.g. overhead wiring and signalling structures, handrails) The minimum clearance dimensions specified shall be increased where required to ensure safe signal sighting for train drivers and sufficient Position of Safety for authorised personnel The minimum clearance dimensions specified are for tangent track. For track on a horizontal curve of any radius the clearance dimensions shall be increased to allow for curve and Cant effect of a rail vehicle For track on a horizontal or vertical curve, the horizontal and vertical clearance dimensions shall be increased to allow for the Chord Effect of the structure The design shall demonstrate that in all cases the required clearances have been achieved Access between the track and the Position of Safety should avoid requiring more than one single 300mm step, as defined by AS1657. Where it can be demonstrated to the MTM Chief Engineer, or delegate, that this cannot be reasonably achieved, an alternate access arrangement may be accepted following demonstration the risk of a person reaching a Position of Safety is safe SFAIRP A one metre horizontal clearance should be maintained between adjacent Bridges to allow access for Bridge inspection and maintenance. Where this is not achievable, the designer shall demonstrate that all inspection and maintenance tasks can be safely completed For the avoidance of doubt the following requirements of L1-CHE-STD- 025 shall not apply: Section 9.2 Envelope E shall not apply to the structural components of an Underbridge, except where specifically referenced in this standard. Section 9.3 Envelope N shall not apply to the structural components of a Bridge or derailment protection and ballast retention structures on the Bridge. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 of 39

16 8.2.2 Overbridges Overbridge clearances shall provide a structure gauge envelope defined by the requirements of L1-CHE-STD-025 unless approved by otherwise by the MTM Chief Engineer, or delegate Where an overbridge spans tracks managed by multiple accredited rail transport operators, approval shall be sought from all the affected accredited rail transport operators for any variance to L1-CHE-STD Underbridges The minimum horizontal clearance from design track centreline to any part of the structure above top of rail level shall be 2400mm Elements designed to provide derailment protection or ballast retention and not exceeding a height of 200mm above top of rail may be located within 2400mm of the nearest track centreline providing a minimum clearance of KE +200mm safety margin is provided and access to a Position of Safety complies with clause Any reduction in safety margin will be subject to acceptance by the MTM Chief Engineer or delegate. For elements exceeding 200mm above top of rail refer to clause For ballasted track, a minimum 400mm wide ballast shoulder shall be provided between the end of sleeper and any part of the Bridge structure, derailment protection structure or ballast retention kerb Additional provisions for through-girder Underbridges Drainage The minimum horizontal clearance from the adjacent track centreline to any part of a through-girder bridge (including protection barriers) shall comply with the requirements of Where it can be demonstrated to the MTM Chief Engineer, or delegate, that compliance with cannot be reasonably achieved, a reduced clearance may be accepted for structural elements exceeding a height of 200mm above top of rail as follows: KE +200mm for any structure 1080mm above adjacent rail level. Provision of 2400mm horizontal clearance on one side of a single track or on the outside of multiple track sections with access to a Position of Safety that complies with clause Underbridge drainage shall be designed in accordance with the drainage principles specified in L1-CHE-STD-030 Track Drainage Standard For other than rail over rail Bridges the drainage from Overbridges and their approaches shall not be discharged into the railway drainage system Drainage from the Underbridge approach embankment shall be intercepted so that it does not drain onto the Underbridge deck Drainage from the Underbridge deck shall be intercepted so that it does not drain onto the Underbridge approach embankment. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 16 of 39

17 8.3.5 Underbridge decks and underslung pipes shall have a minimum longitudinal grade of 0.3 percent to provide positive drainage. Underbridges carrying one track shall have a transverse grade towards the side of the structure (one-way crossfall or with a central crown) Underbridges carrying two tracks shall have a transverse grade towards the side of the structure (one-way crossfall or with a central crown), or a transverse grade from each side to the centre of the structure. The transverse slope shall be not less than 1% The design of ballast and derailment kerbs shall allow for cross drainage of the deck On ballastless Bridges, grated inlets shall be readily accessible for maintenance and inspection, and protected from damage by maintenance activity On ballasted Bridges drainage points shall be provided at a maximum spacing of 5m. Ballast shall not be used as a drainage medium for longitudinal flow other than between drainage points. Ballast cages shall be utilised at all grated inlets to allow maintenance access The longitudinal drainage system shall be constructed from robust materials capable of supporting the applied construction, operation and maintenance loads. The longitudinal drainage system shall be provided with rodding and flush-out points that are accessible from the Bridge walkway On Underbridges secondary drainage outlets shall be installed to allow flow in excess of the 1 in 100 year annual recurrence interval event to discharge from the Bridge The minimum pipe size on Bridges shall be 150mm internal diameter. Pipes shall be UV resistant and have the same Design Life as the structure The superstructure shall be detailed to prevent water running onto beams or web faces. Drip lines may be provided as a means to achieve this Bridge designs should avoid pockets or depressions that may create water ponding. Walkways and Handrails On single track Underbridges, a walkway shall be provided on at least one side of the Underbridge. Where only one walkway is provided, it should be provided on the side of the structure that provides a continuous access path for maintainers without the need to cross the track Where there are two or more tracks, a walkway shall be provided on both sides of the Underbridge The minimum clear walkway width shall be 1000mm Where required, access from walkways to tracks, or to an adjacent section of continuous access path, shall comply with AS Walkway surface finishes shall be non-slip and shall comply with classification P4 (wet pendulum test) or R11 (oil-wet inclining platform test) as required for external ramps in Table 3B of SA HB Walkways shall not obstruct or reduce the performance of track drainage systems. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 17 of 39

18 8.4.7 The minimum horizontal clearance from the adjacent track centreline to the inside edge of a maintenance walkway shall be 2400mm. Where this is not possible, a minimum horizontal clearance of 2135mm may be accepted providing: A handrail is positioned between the Position of Safety and adjacent track. The handrail shall be compliant with AS1657 with each section no longer than 2m with a gap of m between sections to allow access to/from track. It shall be vandal proof; removable by conventional railway hand tools; simple to re-establish if damaged; and arranged to accommodate conventional maintenance activities. A continuous painted line at surface level is provided between the position of safety and adjacent track. The walkway is positioned to provide access to the position of safety that complies with clause Walkways shall be continuous between Underbridge abutments and shall be suitably transitioned back to the formation level on the approach embankments for use by maintainers and de-trained passengers Handrails shall be provided in the following locations as a minimum: On the outside edge of an Underbridge with a fall height greater than 1000mm to provide fall protection for maintenance staff. One the outside or inside edge of a walkway with a fall height greater than 1000mm to ground or track level Handrails shall comply with AS Handrails on the outside edge of the structure shall have infill welded mesh comprising 3mm diameter galvanised wires at 25 mm x 25mm centres and securely fixed to the posts and rails, or an alternative mesh that provides equivalent screening and rigidity Handrails installed within 2400mm from track centreline shall not interfere with maintenance tasks and shall be positioned to provide sufficient clearance for curve and Cant effect of a rail vehicle, Chord Effect of the structure, and a safety margin of KE +200mm All handrails shall have toeplates that comply with AS1657 unless the intent is met be alternate means. Derailment Management on Rail Structures Unless specified otherwise on a project specific basis, derailment management systems shall be installed on rail structures in the following situations: Underbridges over 20m in length. Underbridges over or adjacent to roads, waterways, public spaces or populated areas. Underbridges adjacent to high risk infrastructure (e.g. aviation fuel pipelines) Derailment management systems are not required for the inner tracks of multipletrack Bridges. For example, if an Underbridge has three tracks, the centre track does not require derailment management devices. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 18 of 39

19 8.5.3 Derailment management systems shall, so far as is reasonably practicable, ensure that the proposed derailment management systems would in the event of a derailment: keep derailed wheels tracking parallel and in close proximity to their running rails. minimise consequential harm to persons and damage to rolling stock and infrastructure. greatly increase the likelihood that a derailed rail vehicle would be kept upright and within gauge of the track that it was travelling on. prevent derailed rail vehicles from striking critical above-rail structural elements Derailment management systems shall comprise one or more of the devices listed in Table 1 that shall be designed to act individually, or in combination where compatible, to meet the functional requirements specified in clause Table 1 - Derailment Management Systems Device Close Containment Devices Derailment Kerbs Protection Barriers Description Devices designed to retain derailed vehicles in close proximity to the running rails. Examples include guard rails and integrated track systems that replicate the function of guard rails. They may only be used to supplement other containment devices listed below in this table. Kerbs integrated with the Bridge deck and located in accordance with section 8.2 and AS clause Their primary function is to retain derailed rail vehicles on the Underbridge deck. Where a conflict exists between derailment kerb height and step height to a Position of Safety, priority should be given to the derailment kerb height. Barriers designed to protect above-deck critical structural members, such as through-girders, through-arch members and through-truss members and cable-stay anchorages, from glancing collisions by derailed rail vehicles within the Bridge. Deflection Walls Walls designed to protect piers and abutments that support rail, road or pedestrian Overbridges from the impact of derailed trains. Walls designed to protect above-track critical structural members of Through-Bridges and Tunnel or Underpass portals from head-on collisions from derailed trains Derailment management systems shall be continuous for the full extent of the Underbridge, including approach slabs, without snag points and without horizontal or vertical deviations greater than 10 degrees. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19 of 39

20 Track Structure The track structure above an Underbridge shall comply with the PTV Engineering Directive PTV-ED-002:2017. An extract of the requirements of this directive relating to track structure are outlined in Table 2. The mandatory requirements of this Directive are network level requirements which MTM cannot grant a waiver against. Table 2 PTV Asset Integrity Requirements for Elevated Railway Track 1 Length m 2 Length > 500m Ballastless track shall be adopted for elevated railway infrastructure including, but not limited to, Bridge, viaduct and station structures between 150metres and 500metres in length. However if, following a risk and economic analysis to the approval of MTM, it can be demonstrated that there would be significant economic benefit with no reduction in the safety, reliability, availability and maintainability by adopting ballasted track, ballasted track may be used for the elevated railway track structure subject to approval by MTM. Ballastless track shall be adopted for elevated railway track infrastructure greater than 500metres in length For ballasted track, the bridge deck and approach slabs shall be designed to allow for a minimum 300mm ballast depth below sleepers and be designed with ballast walls to ensure the lateral retention of the ballast along the length of the structure / slab. Note: approach slabs typically have 210mm deep guard rail sleepers Track transitions between ballasted and ballastless trackforms shall demonstrate sufficient management of the track stiffness transition and change in deflection under load, in addition to the transition requirements between the Bridge structure and the abutment / earthworks. Protection Beams Where vertical clearance to a railway Underbridge from a road does not meet the minimum specified in Clause 13.7 Vertical clearance at structures of AS , protection beams shall be installed to prevent impact of road vehicles with the Bridge superstructure The design of protection beams shall provide sufficient structural integrity so that on impact, the structure remains whole and collapse does not occur. Safety chains at each end of the protection beam shall be installed which are capable of supporting its dynamic weight in the event of dislodgment from its supports with a factor of safety of Infill materials, where used, should not be considered to act compositely for strength purposes. Infill material however may be considered to serve the functions of providing restraint to buckling of webs, the distribution of collision loading and the provision of a measure of internal corrosion protection, where necessary. Drainage shall be incorporated where necessary to prevent water pooling The supports of a protection beam shall be integrated with the Bridge substructure The soffit of protection beams shall be installed a minimum of 20mm below soffit line of the structure it is to protect. The leading face side of a protection beam shall be positioned to ensure that it takes the initial strike. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20 of 39

21 8.7.6 Adjustments in the level, along the longitudinal axis of a protection beam, shall also be made to allow for geometric conditions of road and rail Protection beams shall be aligned perpendicular to the horizontal alignment of roadway below so far as reasonably practical. All skewed protection beams shall be subject to approval of the MTM Chief Engineer or delegate Protection beams shall be placed with a minimum horizontal clearance from the structure of 100mm plus the calculated mid-span horizontal deflection of the protection beam under impact at the ultimate limit state. Access for maintenance of the protection beam and the protected structure shall be considered when determining the clearance value Protection beams shall be painted, signed and marked in accordance with the requirements of the relevant road authority. Notices shall be fixed to the Bridge in prominent positions to provide information on the relevant authorities to contact in the event of a Bridge strike Protection beams shall be fitted with vehicle collision detection and monitoring equipment as specified by MTM. Soil Retaining Structures Adjacent to Rail Soil Retaining Structures shall be designed to comply with AS 5100 with particular reference to AS clause 11.4 for train collision loads Anchoring systems that extend under the track (e.g. soil nails, rock anchors, wall straps, tie backs) should be avoided where they could restrict the installation of future below-ground rail infrastructure such as foundations for overheads and signalling, drainage or cable trenches The trackside faces of Soil Retaining Structures in the zone extending from 150mm below finished ground level to a minimum height of 2400mm above the top of the nearest rail: Shall be continuous and free of abrupt changes in direction greater than 10 degrees on the approach to a retained abutment. Shall be free of catch features greater than 25mm. Catch features exceeding this limit shall be protected by 10 degrees maximum robust approach surfaces which shall be structurally integrated with the parent wall, as illustrated in Figure 1. For shotcrete faces, the surface finish face shall comply with VicRoads Specification Section Finishing. Shall be treated with 20mm minimum render where steel fibre reinforced shotcrete is used adjacent to maintenance or public paths. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 21 of 39

22 Figure 1 - Soldier pile and shotcrete soil retaining structure Application of AS Bridge Design The design of Bridges shall comply with the requirements of AS Bridge Design except as specified in Table 3. Where a conflict exists between the requirements of this standard and AS 5100, the requirements of this standard shall take precedence. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 22 of 39

23 TRACK AND STRUCTURES AS 5100 Clause reference Part 1 Cl 8.1 Requirement Table 3 Application of AS Bridge Design for New Bridges All Bridges in urban areas and visually important sites in rural areas shall be given appropriate aesthetic design consideration. Supplementary cladding systems shall not be used unless specified otherwise on a project specific basis. Cladding shall not cause impairment to visibility or physical access to structural elements for inspection and maintenance. Part 1 Cl 8.2 Bridges including rail, road and pedestrian support structures and elevated concourses 100 years Part 1 Cl 9 Part 1 Cl 11.1 Part 1 Cl 12 Embankments and retaining walls, including reinforced soil structures and soil nail walls Culverts and major drainage structures including tanked structures Foundations for Bridges Protection beams Architectural cladding Bridge bearings and movement joints excluding replaceable components such as deck joint seals Hot dip galvanised systems Painting systems (to first major recoating) Products not covered by this Standard Cast-in, post-fixed components and fasteners, and services that cannot be readily maintained or presents maintenance access restrictions 100 years 100 years 100 years 100 years 60 years 50 years 50 years 20 years Subject to MTM Type Approval Same Design Life as the element in/to which they are fixed. Risk assessments shall be conducted in accordance with the MTM Enterprise Risk Management Procedure L0-SQE- PRO-031. The afflux limit shall be as specified by the relevant water authority. Design shall comply with the relevant requirements of L0-SQE-PLA-005 MTM Environmental Management Plan. Part 1 Cl The minimum distance between handrails of a station pedestrian Bridge shall be 2.4 m. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 23 of 39

24 TRACK AND STRUCTURES Part 1 Cl Part 1 Cl 15 Part 1 Cl Part 1 Cl Part 1 Cl 16.3 Pedestrian only Underpasses under rail shall comply with the maximum grade requirements of the Disability Discrimination Act and, where appropriate, AS A design report on the measures adopted for collision protection shall be submitted with the associated design drawings and documentation. For abutments located within 10m from the centre-line of the nearest existing or future track, the geometric requirement for walls to have a minimum thickness of 800mm may be varied as follows subject to the approval of the MTM Chief Engineer or delegate: a) For soldier pile walls, the requirement shall be deemed to be satisfied by wall systems comprising reinforced concrete piles of 900mm minimum diameter at 2.0m maximum spacing with a reinforced concrete infill of minimum thickness 150mm. Wall systems shall be designed for the collision loads specified in either Clause or Clause of AS as applicable, and the reinforced concrete infill shall be designed for the loads specified in Clause of AS b) For reinforced soil abutment walls which also act to protect abutment piles from the collision loads, the 800mm minimum thickness may be reduced if the designer can satisfy the MTM Chief Engineer or delegate that the wall systems can withstand the design collision loads whilst still maintaining the structural integrity of the abutment piles. Deflection walls shall be designed so as to not unnecessarily impede inspection or maintenance operations. The geometric requirement for a deflection wall to have a minimum thickness of 500mm shall be deemed to be satisfied by a soldier pile wall comprising reinforced concrete piles of minimum 750mm diameter at 2.0m maximum spacing with a reinforced concrete infill of minimum thickness 150mm. Deflection walls provided to protect the ends of Through-Bridges may be made integrated with their abutments provided that they do not impose unacceptable forces or movements on primary Through-Bridge members when subjected to the ULS collision loads. Similar provisions would apply to deflection walls protecting the portals of Underpasses and Tunnels. Electrification protection screens shall be provided where required by, and shall comply with, Standard drawing STD_E0001A Overhead Conductor Clearance and Protective Barrier Requirements at Overline Bridges. Electrification protection screens within the conductor fault zone as identified in L1-CHE-STD-010 Railway Bridges Electrical Protection and Bonding shall be electrically isolated from the support structure to remove the requirement to bond screens to rail. If electrical isolation is not achievable, the screen shall be bonded in accordance with L1-CHE-STD-010. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 24 of 39

25 TRACK AND STRUCTURES Part 1 Cl 16.4 Part 2 Cl 6.1 Part 2 Cl 6.3 Part 2 Cl 6.5 Part 2 Cl 8.1 Part 2 Cl 8.2 Protection screens for objects falling or being thrown shall be fitted along the outer edges of publicly-accessible areas above and adjacent to tracks. Along the edge of Overbridges carrying road vehicles, pedestrians or cyclists, screens shall have a minimum height of 2.4 m above the roadway, walkway surface, or ledge that people can stand on, and in other respects shall be as shown in illustrations (a) and (b) of AS Figure On ramps, staircases and station concourses, and along the top of retaining walls, wing walls and significant embankments located adjacent to and overlooking the tracks, the extent and height of protection screens shall be specified on a project specific basis. The minimum height should be 1.8 m above the roadway, walkway surface, or ledge that people can stand on. The protection screens shall be detailed to prevent climbing on the pedestrian side. In order to prevent access to the rail corridor side of the screen, consideration shall be given to the use of return screens or screen extensions. The design of screens shall be modular, so that individual panels can be easily removed and replaced if damaged without requiring access to the rail corridor. Panels shall be securely fixed to the frames. Where screw fixings are used they shall be tamper-proof. Wire mesh panels shall be constructed with welded mesh. Protection screens within the conductor fault zone as identified in L1-CHE-STD-010 Railway Bridges Electrical Protection and Bonding shall be electrically isolated from the support structure to remove the requirement to bond screens to rail. If electrical isolation is not achievable, the screen shall be bonded in accordance with L1-CHE-STD-010. The density used in the calculation of all precast concrete elements shall be given on the drawings, and for the purpose of cranage, transportation and erection shall not be less than 2,700 kg/m 3 in accordance with the WorkSafe Victoria Industry Standard Construction and Erection of Bridge Beams. Special cases load factors shall not be used for permanent and removable superimposed dead load on Underbridges. The minimum superimposed dead load of sleepers and rail shall be 6 kn/m per track. Where more than 2 rails are used per track (dual gauge track or guard rails), the weight of the additional rails shall be added. The superimposed dead load of ballast shall be calculated using a ballast density of 19 kn/m 3 as listed in AS Table 6.1(A) with no reduction based on the density of the proposed ballast material (this allows the use of heavier ballast materials during the Design Life). The top of ballast shall be assumed level with the top of sleeper at sleeper end. The ballast profile shall be assumed to extend horizontally. The ballast volume shall not be reduced by the volume occupied by sleepers. Paragraph 2 of AS Clause 6.5 shall not apply. A minimum design load of 5kPa shall be used with no reduction for loaded area. Service walkways shall be designed for a concentrated loading applied through a 150mm 150mm pad of not less than 2.2kN, in addition to the loading of 5kPa. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 25 of 39

MTM DESIGN PRACTICE NOTE USE OF GUARD RAILS

MTM DESIGN PRACTICE NOTE USE OF GUARD RAILS Approval Amendment Record Approval Date Version Description 24/08/2016 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 6 Table of Contents 1. Purpose...

More information

MTST TRACK DESIGN AND CONSTRUCTION

MTST TRACK DESIGN AND CONSTRUCTION Engineering Standard Track and Civil Version: 2 Issued: November 2016 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

Earthworks & Formation Standard

Earthworks & Formation Standard Engineering Standard Track and Structures Earthworks & Formation Standard Version: 2 Issued: December 2017 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE;

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

DESIGN OF ROAD OVERBRIDGES

DESIGN OF ROAD OVERBRIDGES Civil Engineering Technical Requirement CIVIL-SR-001 DESIGN OF ROAD OVERBRIDGES Revision: G Updated: 30 May 2011 Queensland Rail 2011 Reproduction by any means (including electronic, mechanical, photocopying,

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT Approval Amendment Records Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

L1-CHE-STD-061 INTERNAL 22kV DISTRIBUTION

L1-CHE-STD-061 INTERNAL 22kV DISTRIBUTION Engineering Standard Electrical Networks Version: 1 Approval Amendment Record Approval Date Version Description 01/07/2018 1 Initial Release PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR

More information

Version # Date Reviewed Prepared by Reviewed by Endorsed Approved. Description of Amendment

Version # Date Reviewed Prepared by Reviewed by Endorsed Approved. Description of Amendment Division / Business Unit: Enterprise Services Function: Engineering (Track & Civil) Document Type: Code of Practice General Appendix Structures Inventory Applicability ARTC Network Wide SMS Publication

More information

Standards Respecting Railway Clearances. May 14, 1992 (TC E-05)

Standards Respecting Railway Clearances. May 14, 1992 (TC E-05) Standards Respecting Railway Clearances May 14, 1992 (TC E-05) STANDARD RESPECTING RAILWAY CLEARANCES 1. APPLICATION OF STANDARD 1.1 This Standard shall apply on all tracks owned or operated on by a railway

More information

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE 1) PAVEMENT 1.1 Ride quality All roadways have a smooth surface course (including bridge deck approaches, covers, gratings, frames and boxes). 24 hours 28 days 6 months a. Measurement of International

More information

Electrical Networks Principles and Performance

Electrical Networks Principles and Performance Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT

More information

Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS. Revision: 3 Updated: 13/01/2017

Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS. Revision: 3 Updated: 13/01/2017 Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS Revision: 3 Updated: 13/01/2017 Queensland Rail 2017 Reproduction by any means (including electronic, mechanical, photocopying, microcopying

More information

Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment

Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 8th Australian Small Bridges Conference 2017 Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment Level Crossing Removal Project 1 Burke Road, North Road, McKinnon Road and Centre

More information

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Engineering Standard Signalling L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Version: 1 ENGINEERING STANDARD SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION L1-CHE-STD-067 Version:

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

RHINO-STOP Modular Vehicle Impact Barriers

RHINO-STOP Modular Vehicle Impact Barriers RHINO-STOP Product Manual Ref: PM 019/05 Leading Safety Full-scale crash tested systems Compliance to AS/NZS 2890.1 Parking Facilities Compliance to AS/NZS 1170.1 Structural Design Actions BCA compliant

More information

MCST METROPOLITAN RAILWAY STATIONS

MCST METROPOLITAN RAILWAY STATIONS Engineering Standard Structures and Facilities Version: 3 Issued: December 2016 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET

More information

The Design of Vehicle and Pedestrian Parapets

The Design of Vehicle and Pedestrian Parapets The Design of Vehicle and Pedestrian Parapets DN-STR-03011 January 2016 DN Design Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

Safety Documents > Safety Manual > Scaffolds

Safety Documents > Safety Manual > Scaffolds Safety Documents > Safety Manual > Scaffolds D. Scaffolds 1. General Requirements for All Scaffolds a. Scaffolds shall be furnished and erected in accordance with this standard for persons engaged in work

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES INCLUDING KERB & GUTTER (CHANNEL) C224 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C224 ISSUE: NO:1 October 2007 TABLE OF CONTENTS

More information

Recommendations for the Design of Bridges

Recommendations for the Design of Bridges Recommendations for the Design of Bridges Synopsis This Railway Group Approved Code of Practice gives recommendations for the design and loading for bridges. It supports Railway Group Standards GC/RT5112

More information

AS THE EFFECT ON BRIDGE BARRIERS

AS THE EFFECT ON BRIDGE BARRIERS ABSTRACT AS5100.2 2017 THE EFFECT ON BRIDGE BARRIERS David Coe, Senior Principal, Pitt & Sherry The revision to AS5100 in 2017 resulted in significant changes to the design loading and impact heights for

More information

The Design of Road Bridge Parapets

The Design of Road Bridge Parapets Volume 2 Section 3 Part 3 NRA BD 52/07 The Design of Road Bridge Parapets April 2007 St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660 2511 Fax +353 1 668 0009 Email : info@nra.ie Web : www.nra.ie

More information

Design of the grade separation of Gippsland Railway at Narre Warren Cranbourne Road

Design of the grade separation of Gippsland Railway at Narre Warren Cranbourne Road Design of the grade separation of Gippsland Railway at Narre Warren Cranbourne Road K. Srivelan, Project Engineer, Connell Wagner Pty Ltd John de Araugo, Principal, Connell Wagner Pty Ltd Michael Hirons,

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

Crash Barrier on Reinforced Earth Wall Liverpool Parramatta Transitway

Crash Barrier on Reinforced Earth Wall Liverpool Parramatta Transitway Crash Barrier on Reinforced Earth Wall Liverpool Parramatta Transitway Ros MacKinlay Design Engineer, Wyche Consulting Joe Wyche Director, Wyche Consulting SYNOPSIS Reinforced earth walls are increasing

More information

Draft. Not yet Approved

Draft. Not yet Approved 2016 Part 3.2.5 Recommended Design Criteria and Functional/Operating Guidelines for Overhead Bridge and Cantilever Structures and Placement of Grade Crossing Warning Devices Revised 2017 (8 Pages) A. Purpose

More information

Technical Guidance Note

Technical Guidance Note Technical Guidance Note THE BUILDING REGULATIONS 2004 EDITION ENGLAND AND WALES REQUIREMENT A3 DISPROPORTIONATE COLLAPSE 1. INTRODUCTION (a) This technical guidance note outlines NHBC s interpretation

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

DESIGN OF BUILDINGS OVER OR NEAR RAILWAYS

DESIGN OF BUILDINGS OVER OR NEAR RAILWAYS Civil Engineering Technical Requirement CIVIL-SR-005 DESIGN OF BUILDINGS OVER OR NEAR RAILWAYS Revision: D Updated: 30/05/2011 Queensland Rail 2011 Reproduction by any means (including electronic, mechanical,

More information

MTM REQUIREMENTS SPARES FOR NEW ASSETS

MTM REQUIREMENTS SPARES FOR NEW ASSETS MTM REQUIREMENTS L1-CHE-STD-006 Version: 1 Effective from: 14 th November 2011 Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne

More information

MTM REQUIREMENTS METROPOLITAN TRAIN STABLING

MTM REQUIREMENTS METROPOLITAN TRAIN STABLING Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version. Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

ENGINEERING STANDARDS DEVELOPMENT PROCEDURE

ENGINEERING STANDARDS DEVELOPMENT PROCEDURE Approval Amendment Record Approval Date Version Description 21/12/2016 1 Initial Release of MTM Engineering Standards Development Procedure PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

3.4.2 DESIGN CONSIDERATIONS

3.4.2 DESIGN CONSIDERATIONS 3.4.2 DESIGN CONSIDERATIONS Formwork Where Flatdeck sheet is used as formwork, the profile provides resistance to wet concrete (G) and construction loads (Q). Maximum formwork spans given in Section 3.4.4.1

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Modular System Advantages

Modular System Advantages Modular System Advantages The Modular System advantages can be summarised as follows: Truly Modular Off-site build Competitive cost Multi-storey capability Fits any shape, any size Fast programme completions

More information

TRACK SPECIFICATION LOW PROFILE CONCRETE SLEEPERS

TRACK SPECIFICATION LOW PROFILE CONCRETE SLEEPERS Approval Amendment Record Approval Date Version Description 19/04/2013 1 Initial issue under MTM. 19/02/2014 2 Details for Train Stop sleepers added and figures updated 27/04/2015 3 Amended the design

More information

Concrete Sleepers - Design

Concrete Sleepers - Design Division / Business Unit: Function: Document Type: Enterprise Services Track & Civil Standard Concrete Sleepers - Design Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents Table of Contents 1. Purpose... 2 2. Scope... 2 3. Roles and Responsibilities... 2 3.1 Manager/Supervisor... 2 3.2 Workers... 2 3.3 Technical Specialist/Engineer... 2 4. Definitions... 2 5. Procedure...

More information

RECYCLED GLASS SAND SPECIFICATION

RECYCLED GLASS SAND SPECIFICATION Engineering Specification L1-CHE-SPE-313 Version: 1 Approval Amendment Record Approval Date Version Description 02/10/2018 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

Standard Respecting Railway Clearances

Standard Respecting Railway Clearances Standard Respecting Railway Clearances May 14, 1992 TM Standard Respecting Railway Clearances Effective: May 14, 1992 CONTENTS 1. APPLICATION OF STANDARD 2. INTERPRETATION 3. STANDARD CLEARANCES 4. LESS

More information

Switches and Crossings

Switches and Crossings Switches and Crossings Synopsis This document sets out general requirements for the design, inspection and maintenance of switches and crossings (S&C). It also defines particular requirements for fixed

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM

L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM Engineering Specification Signalling L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM Version: 1 ENGINEERING SPECIFICATION TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM L1-CHE-SPE-272

More information

Lysaght Bondek. Structural steel decking system Design and Construction Manual

Lysaght Bondek. Structural steel decking system Design and Construction Manual Lysaght Bondek Structural steel decking system Design and Construction Manual Excellent spanning capacities for greater strength and less deflection Acts as permanent formwork with minimal propping and

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01

More information

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Design of the Main Spans of the Chongqing Caiyuanba Bridge ARCH 04 M.C. Tang and J. Sun @CIMNE, Barcelona, 2004 DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Man-Chung Tang* and John Sun+

More information

Leasing of Railway Land

Leasing of Railway Land Discipline: Engineering (Track & Civil) Category: Standard Leasing of Railway Land ETD-17-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard EGS 08 Document Status Version

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES GENERAL C220 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C220 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...

More information

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT Construction Safety Education Forum 6 March 2013 Scaffolding Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT SRWSD in confidence 1 Presentation Outline Introduction

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL Approval Name Position Signature/Date Document Author Adam Graves Network Program Planning Manager Document Endorsers Approving Manager Scott Short Karen Wilson Robb van Toledo Manager, Network Scheduling

More information

Landscaping and Fencing

Landscaping and Fencing Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing

More information

For New Zealand Building Code Clause F4 Safety from Falling

For New Zealand Building Code Clause F4 Safety from Falling Acceptable Solutions and Verification Methods Prepared by by the the Ministry of of Business, Innovation and and Employment For New Zealand Building Code Clause F4 Safety from Falling F4 Status of Verification

More information

NATIONAL ANNEX TO STANDARD. SFS-EN EUROCODE 1: ACTIONS ON STRUCTURES Part 1-7: General actions Accidental actions

NATIONAL ANNEX TO STANDARD. SFS-EN EUROCODE 1: ACTIONS ON STRUCTURES Part 1-7: General actions Accidental actions ANNEX 37 NATIONAL ANNEX TO STANDARD SFS-EN 1991-1-7 EUROCODE 1: ACTIONS ON STRUCTURES Part 1-7: General actions Accidental actions Preface This National Annex is used together with the Standard SFS-EN

More information

Dear Customer. Section Old F4 January 2017 Amendment 2. Remove title page and document history page 1-2B

Dear Customer. Section Old F4 January 2017 Amendment 2. Remove title page and document history page 1-2B Dear Customer Please find enclosed Amendment 2, effective 1 January 2017, to the Acceptable Solution and Verification Method for Clause F4 Safety from Falling of the New Zealand Building Code. The previous

More information

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored. Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.

More information

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Engineering Specification Track MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Version: 2 Issued: December 2015 Owner: Engineering Division Approved By: Liam Palmer Cannon A/Head of Engineering Track

More information

Bridge (East) Street Rail Underbridge Replacement for the Albury Wodonga Hume Freeway Project

Bridge (East) Street Rail Underbridge Replacement for the Albury Wodonga Hume Freeway Project Bridge (East) Street Rail Underbridge Replacement for the Albury Wodonga Hume Freeway Project John Steele BE (Hons 1) M Eng SC, Associate SKM Sydney Gillian Sisk BEng PhD MIEI CEng, SKM, Sydney Andrew

More information

PARAPET STANDARD & SPECIFICATION UPDATES

PARAPET STANDARD & SPECIFICATION UPDATES PARAPET STANDARD & SPECIFICATION UPDATES Richard Bowen Engineering Inspector National Roads Authority National Roads Authority Standards Section Training for New Developments April 2013 Context Presentation

More information

Surface Transport Master Plan Addendum 3 Transit Corridor Safeguarding Basis of Design. Revision A

Surface Transport Master Plan Addendum 3 Transit Corridor Safeguarding Basis of Design. Revision A Surface Transport Master Plan Addendum 3 Transit Corridor Safeguarding Basis of Design Revision A October 2008 Department of Transport PO Box 20 Abu Dhabi United Arab Emirates Surface Transport Master

More information

CD 360 Use of Compressive Membrane Action in Bridge Decks

CD 360 Use of Compressive Membrane Action in Bridge Decks Design Manual for Roads and Bridges Highway Structures & Bridges Design CD 360 Use of Compressive Membrane Action in Bridge Decks (formerly BD 81/02) Revision 1 Summary This document provides requirements

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

SUPPLY OF RESILIENT RAIL FASTENING ASSEMBLIES. MTSP L2-TRK-SPE-004 Version: 4 Effective from: 27 th April Approval.

SUPPLY OF RESILIENT RAIL FASTENING ASSEMBLIES. MTSP L2-TRK-SPE-004 Version: 4 Effective from: 27 th April Approval. Approval Amendment Record Approval Date Version Description 20/05/2013 1 Initial issue under MTM. 02/08/2013 2 Alterations made to the maximum allowable axle load and line speed. Amendments added to include

More information

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng. SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical

More information

Design of Steel-Concrete Composite Bridges

Design of Steel-Concrete Composite Bridges Design of Steel-Concrete Composite Bridges to Eurocodes Ioannis Vayas and Aristidis Iliopoulos CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis

More information

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS McGrath Industries Ltd. 2017. All rights reserved. Ed04, CJM. ELEVATORS SERVICE

More information

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure C.Y. Shao Shanghai Municipal Engineering Design & Research General Institute (Group) Co. Ltd.,

More information

Annerley Road Bridge Strike Protection Beams

Annerley Road Bridge Strike Protection Beams Annerley Road Bridge Strike Protection Beams Sunthara Trang Senior Bridge Engineer & Pam Howell Senior Structural Engineer, KBR, Australia ABSTRACT Two existing railway bridges span over Annerley Road

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN

More information

Seismic Design of a Railway Viaduct in a High Seismic Zone

Seismic Design of a Railway Viaduct in a High Seismic Zone Seismic Design of a Railway Viaduct in a High Seismic Zone 9 th Small Bridges Conference, Australia 2019 Seismic Design of a Railway Viaduct in a High Seismic Zone 1. Project Overview 2. Typical Project

More information

L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT

L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT Engineering Specification Signalling L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT Version: 1 ENGINEERING SPECIFICATION GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Basic High-Speed Train Tunnel Configuration TM 2.4.2 Prepared by: Signed document on file 29 June 2009 Jimmy Thompson Checked by: Signed document on file 15 July 2009_ Gary McClellan

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

Loading Requirements for the Design of Bridges

Loading Requirements for the Design of Bridges May 1997 Loading Requirements for the Design of Bridges Synopsis This sets out the minimum loading requirements to be considered in the design of bridges. Signatures removed from electronic version Submitted

More information

roofing ROOFING Design of the base ROOFING DETAILS

roofing ROOFING Design of the base ROOFING DETAILS DETAILS The general arrangement details and the principles to be followed at skirtings, upstands, abutments, verges, gutters and expansion joints are as details illustrated. SELECTION PARAMETERS It is

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Supported Scaffold Inspections

Supported Scaffold Inspections Supported Scaffold Inspections May 2016 Inspect scaffolds and scaffold parts daily, before each work shift, and after any event that may have caused damage. Check to see if power lines near scaffolds are

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Barriers and highway accessory supports

Barriers and highway accessory supports 12.4 BARRIERS... 2 12.4.1 General... 2 12.4.2 Barrier joints... 3 12.4.3 Traffic barriers... 3 12.4.3.2 Test level... 3 12.4.3.2.1 General... 3 12.4.3.2.5 Test level for barriers on low volume roads...

More information

The difference is Guidance for the preparation of Deck Manufacturing Schedules

The difference is Guidance for the preparation of Deck Manufacturing Schedules The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule

More information

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format Basic Construction of the CANADACAR System The CANADACAR System is a prefabricated, engineered and constructed freestanding parking garage structure that utilizes superior technology combining pre-cast

More information

[Bobade*et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

[Bobade*et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116 [142] IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY PARAMETRIC STUDY OF SKEW ANGLE ON BOX GIRDER BRIDGE DECK Shrikant D. Bobade *, Dr. Valsson Varghese * M-Tech Student, Structural

More information

CHAPTER 11: WALLS.

CHAPTER 11: WALLS. CHAPTER 11: WALLS MODULAR BLOCK WALL (DRY CAST) Rather than being pre-approved as systems, the components of Modular block walls (dry cast) are pre-approved separately. The approved MBW components are

More information

Specification for Road Works Series Road Restraints Systems (Vehicle and Pedestrian)

Specification for Road Works Series Road Restraints Systems (Vehicle and Pedestrian) Specification for Road Works Series 400 - Road Restraints Systems (Vehicle and Pedestrian) CC-SPW-00400 March 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS

More information

Interfacing Road Safety Cameras (Red light) with Level Crossing Equipment

Interfacing Road Safety Cameras (Red light) with Level Crossing Equipment Engineering Specification Signalling L1-CHE-SPE-040 Interfacing Road Safety Cameras (Red light) with Level Crossing Equipment Version: 1 Issued: December 2016 Owner: Engineering Approved By: Phil Ellingworth

More information

Australian Standard. The design and installation of corrugated fibre-reinforced cement roofing and wall cladding AS

Australian Standard. The design and installation of corrugated fibre-reinforced cement roofing and wall cladding AS AS 1639 1990 Australian Standard The design and installation of corrugated fibre-reinforced cement roofing and wall cladding This Australian Standard was prepared by Committee BD/40, Fibre Cement Building

More information

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 APRIL 2004 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES

More information

Description Accessibility Standards. AODA OBC 2015 Ramps

Description Accessibility Standards. AODA OBC 2015 Ramps Ramps OBC Ammendments are related to the following accessibility standards: The ramp must have a minimum clear width of 900 mm. The ramp must have a clear height that provides a minimum Tactile Attention

More information

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage

More information

Blaxland's Crossing Bridge, Wallacia NSW Bearing Replacement

Blaxland's Crossing Bridge, Wallacia NSW Bearing Replacement Blaxland's Crossing Bridge, Wallacia NSW Bearing Replacement ABSTRACT Ken Maxwell, Arcadis Australia Pacific, Sydney, Australia The existing bridge (known as Blaxland s Crossing) carries Silverdale Road

More information

Recommendations for the Design of Bridges

Recommendations for the Design of Bridges Document Withdrawn as of February 2009 Railway Approved Code of Practice Recommendations for the Design of Bridges Synopsis This document gives recommendations for the design and loading for bridges. It

More information

Introduction 2 The Guidance Existing Buildings Technical Specifications Materials and Workmanship Interpretation. Part K : The Requirement 3

Introduction 2 The Guidance Existing Buildings Technical Specifications Materials and Workmanship Interpretation. Part K : The Requirement 3 Contents Page Introduction 2 The Guidance Existing Buildings Technical Specifications Materials and Workmanship Interpretation Part K : The Requirement 3 Section 1 STAIRWAYS, LADDERS AND RAMPS 4 Introduction

More information

PRECAST CONCRETE GIRDER ERECTION

PRECAST CONCRETE GIRDER ERECTION 7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks

More information

FUNCTIONAL REQUIREMENTS

FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 7.6 BALCONIES Workmanship i. All workmanship must be within the tolerances defined in Chapter 1 of this manual. ii. All work is to be carried out by a technically

More information

Introduction to the Guidance on Measuring and Pricing

Introduction to the Guidance on Measuring and Pricing Introduction to the Guidance on Measuring and Pricing October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving

More information