1 Engineering Specification Signalling L1-CHE-SPE-040 Interfacing Road Safety Cameras (Red light) with Level Crossing Equipment Version: 1 Issued: December 2016 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

2 Approval Amendment Record Approval Date Version Description 01/12/ Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 6

3 Table of Contents 1 Purpose Scope Abbreviations Definitions References & Legislations General Rail Industry Standards/Documents Related Documents Technical Requirements Design and Implementation Constraints Installation Requirements... 6 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 6

4 1 Purpose This Specification covers the requirements and guidance for interfacing of Department of Justice and Regulation (DJR) Road Safety Cameras (RSC) with Railway Level Crossing (LX) equipment. It is a supplement to TCG088 where RSC are used for LX enforcement. 2 Scope This document describes the interface between RSC and LX equipment where Traffic Light Controller (TLC) equipment has not been installed or the traffic lights are not a control device at the LX. Where TLC has been installed and the traffic lights are a control device at the LX the RSC should be implemented without an additional interface with the LX equipment (refer to TCG008). The TLC equipment and its interface with the LX equipment shall be in accordance with TCS Abbreviations DJR Department of Justice and Regulation FCR Flashing Control Relay LX Railway Level Crossing MTM Metro Trains Melbourne PTV Public Transport Victoria RSC Road Safety Camera SSC Signal Sighting Committee TLC Traffic Light Controller VRIOGS Victorian Rail Industry Operator Group Standard 4 Definitions Shall Should Standard VicRoads Is used as the descriptive word to express a requirement that is mandatory to achieve conformance to the standard. Is used as the descriptive word to express a requirement that is recommended in order to achieve compliance to the standard. Should can also be used if a requirement is a design goal but not a mandatory requirement. A set of high level requirements that are mandatory to be adhered to achieve MTM s objectives. Road Authority responsible for Traffic Light Controllers. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 6

5 5 References & Legislations Rail Safety Act 2013 (Vic) 5.1 General References, where used, refer to the latest revision of the document. 5.2 Rail Industry Standards/Documents Document Number VRIOGS VRIOGS PTV Infrastructure Drawing Standards Title Signalling Design and Documentation Signalling Construction PTV Infrastructure Drawing Standards 6 Related Documents TCS066 TCG008 VicRoads Specification Linking Traffic Signals To Railway Level Crossings VicRoads Specification Interfacing Road Safety Cameras with VicRoads Assets 7 Technical Requirements All control equipment associated with the RSC installation should be located within an additional cabinet specifically for the RSC system outside of the rail corridor. Where practicable, the power supply for the RSC system shall not be supplied from railway infrastructure. The cables supplying power to the RSC system (and related infrastructure), shall not be run in conduits for railway systems and shall be treated as a 3rd party service where it needs to cross the rail corridor. The LX equipment shall provide a separate, voltage free, normally open contact (i.e. LX Controls not operating) from the Flasher Control Relay (FCR) for the RSC system to interface with for indicating the operation of the flashing lights. If there are no spare contacts available within the location, a new relay shall be provided to repeat the function of the FCR. All drawings produced or modified describing changes of railway infrastructure shall comply with the PTV Infrastructure Drawing Standards. The RSC (with respect to the flashing lights at the LX) shall functionally be programmed to operate for compliance/enforcement purposes in accordance with DJR requirements. The external interface shall be in accordance with TCS066. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 6

6 8 Design and Implementation Constraints Where practicable, all RSC system infrastructure and other related equipment shall be installed on the relevant road authority s land (i.e. outside of the designated rail corridor). The location and focus of flash units shall be subject to review by the Signal Sighting Committee (SSC) during the concept stage of the project. 9 Installation Requirements The cable route and installation requirements outside of the railway corridor shall be in accordance with applicable road authority standards and specifications. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 6

MTM REQUIREMENTS SPARES FOR NEW ASSETS

MTM REQUIREMENTS SPARES FOR NEW ASSETS MTM REQUIREMENTS L1-CHE-STD-006 Version: 1 Effective from: 14 th November 2011 Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne

More information

RECYCLED GLASS SAND SPECIFICATION

RECYCLED GLASS SAND SPECIFICATION Engineering Specification L1-CHE-SPE-313 Version: 1 Approval Amendment Record Approval Date Version Description 02/10/2018 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

L1-CHE-SPE-304 AC SHELF RELAYS

L1-CHE-SPE-304 AC SHELF RELAYS Engineering Specification Signalling L1-CHE-SPE-304 AC SHELF RELAYS Version: 1 ENGINEERING SPECIFICATION AC SHELF RELAYS L1-CHE-SPE-304 Version: 1 Effective from: 1 st July 2018 Approval Name Position

More information

Electrical Networks Principles and Performance

Electrical Networks Principles and Performance Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT

More information

L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM

L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM Engineering Specification Signalling L1-CHE-SPE-272 TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM Version: 1 ENGINEERING SPECIFICATION TWISTED 6 PAIR COPPER SIGNALLING CABLE 7/0.50 MM L1-CHE-SPE-272

More information

L1-CHE-SPE-300 BATTERIES FOR RAILWAY SIGNALLING APPLICATIONS

L1-CHE-SPE-300 BATTERIES FOR RAILWAY SIGNALLING APPLICATIONS Engineering Specification Signalling L1-CHE-SPE-300 BATTERIES FOR RAILWAY SIGNALLING APPLICATIONS Version: 1 ENGINEERING SPECIFICATION BATTERIES FOR RAILWAY SIGNALLING APPLICATIONS L1-CHE-SPE-300 Version:

More information

ENGINEERING STANDARDS DEVELOPMENT PROCEDURE

ENGINEERING STANDARDS DEVELOPMENT PROCEDURE Approval Amendment Record Approval Date Version Description 21/12/2016 1 Initial Release of MTM Engineering Standards Development Procedure PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

L1-CHE-SPE-171 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE

L1-CHE-SPE-171 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE Engineering Specification Electrical Networks L1-CHE-SPE-171 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM OR COPPER CONDUCTOR 3.8/6.6kV XLPE INSULATED WITHOUT METALLIC SCREEN PVC Version:

More information

L1-CHE-SPE-294 CONNECTORS FOR SIGNALLING INTERFACE

L1-CHE-SPE-294 CONNECTORS FOR SIGNALLING INTERFACE Engineering Specification Signalling L1-CHE-SPE-294 CONNECTORS FOR SIGNALLING INTERFACE Version: 1 ENGINEERING SPECIFICATION CONNECTORS FOR SIGNALLING INTERFACE L1-CHE-SPE-294 Version: 1 Effective from:

More information

L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT

L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT Engineering Specification Signalling L1-CHE-SPE-302 GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT Version: 1 ENGINEERING SPECIFICATION GENERAL REQUIREMENTS FOR LABELLING OF SIGNALLING EQUIPMENT

More information

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 22 kv, SINGLE CORE, 95mm 2 COPPER

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 22 kv, SINGLE CORE, 95mm 2 COPPER Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR ELECTRIC CABLE Version: 1 Issued: March 2014 Owner: Electrical Networks Asset Manager Approved By: George Marulli Electrical Networks

More information

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITH METALLIC SCREEN

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITH METALLIC SCREEN Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Engineering Standard Signalling L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Version: 1 ENGINEERING STANDARD SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION L1-CHE-STD-067 Version:

More information

MCST METROPOLITAN RAILWAY STATIONS

MCST METROPOLITAN RAILWAY STATIONS Engineering Standard Structures and Facilities Version: 3 Issued: December 2016 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET

More information

3.3kV Essential Services Distribution System

3.3kV Essential Services Distribution System Engineering Specification Head of Engineering Electrical L1-CHE-SPE-154 3.3kV Essential Services Distribution System Version: 1 Issued: July 2016 Owner: Head Of Engineering Electrical Approved By: Phil

More information

WTT NETWORK CONFIGURATION GOVERNANCE (L1-CHE-MAN-010)

WTT NETWORK CONFIGURATION GOVERNANCE (L1-CHE-MAN-010) WTT NETWORK CONFIGURATION GOVERNANCE (L1-CHE-MAN-010) WTT NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31 st March 2017 Approval Name Position Signature Document Author Bryan

More information

MTST TRACK DESIGN AND CONSTRUCTION

MTST TRACK DESIGN AND CONSTRUCTION Engineering Standard Track and Civil Version: 2 Issued: November 2016 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE

More information

L1-CHE-SPE-293 IMPEDANCE BONDS

L1-CHE-SPE-293 IMPEDANCE BONDS Engineering Specification Signalling L1-CHE-SPE-293 IMPEDANCE BONDS Version: 1 ENGINEERING SPECIFICATION IMPEDANCE BONDS L1-CHE-SPE-293 Version: 1 Effective from: 1 st July 2018 Approval Name Position

More information

STANDARD WAIVER PROCEDURE

STANDARD WAIVER PROCEDURE Engineering Procedure Chief Engineer L1-CHE-PRO-001 STANDARD WAIVER PROCEDURE Version: 2 Issued: September 2012 Owner: Chief Engineer Approved By: Norm Grady Chief Engineer Authorise For Use By: Norm Grady

More information

L1-CHE-SPE-292 Flashing Light Units

L1-CHE-SPE-292 Flashing Light Units Engineering Specification Signalling L1-CHE-SPE-292 Flashing Light Units Version: 1 ENGINEERING SPECIFICATION FLASHING LIGHT UNITS L1-CHE-SPE-292 Version: 1 Effective from: 1 st July 2018 Approval Name

More information

MTM Standards Induction for the Signal Test Roles

MTM Standards Induction for the Signal Test Roles MTM Standards Induction for the Signal Test Roles Version 1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW to be familiar

More information

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN Engineering Specification Electrical Networks MESP 030000-04 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN Version: 1 Issued:

More information

L1-CHE-STD-061 INTERNAL 22kV DISTRIBUTION

L1-CHE-STD-061 INTERNAL 22kV DISTRIBUTION Engineering Standard Electrical Networks Version: 1 Approval Amendment Record Approval Date Version Description 01/07/2018 1 Initial Release PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR

More information

SIGNALS RAIL SAFETY WORKER COMPETENCE

SIGNALS RAIL SAFETY WORKER COMPETENCE Engineering Standard Signals L1-CHE-MAN-003 SIGNALS RAIL SAFETY WORKER Version: 3 Issued: February 2018 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER

More information

L1-CHE-SPE-298 POWER SUPPLY UNITS FOR SIGNALLING EQUIPMENT - BATTERY CHARGERS

L1-CHE-SPE-298 POWER SUPPLY UNITS FOR SIGNALLING EQUIPMENT - BATTERY CHARGERS Engineering Specification Signalling L1-CHE-SPE-298 POWER SUPPLY UNITS FOR SIGNALLING EQUIPMENT - BATTERY CHARGERS Version: 1 ENGINEERING SPECIFICATION POWER SUPPLY UNITS FOR SIGNALLING EQUIPMENT - BATTERY

More information

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL Approval Name Position Signature/Date Document Author Adam Graves Network Program Planning Manager Document Endorsers Approving Manager Scott Short Karen Wilson Robb van Toledo Manager, Network Scheduling

More information

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT Approval Amendment Records Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

Earthworks & Formation Standard

Earthworks & Formation Standard Engineering Standard Track and Structures Earthworks & Formation Standard Version: 2 Issued: December 2017 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE;

More information

High Voltage Cable Routes

High Voltage Cable Routes Engineering Specification Electrical L1-CHE-SPE-070 High Voltage Cable Routes Version: 2 Issued: October 2017 Owner: Chief Engineer Approved By: Andrew Russack Head of Electrical Engineering PRINTOUT MAY

More information

L1-CHE-SPE-295 SOLDERLESS TERMINALS AND CABLE LUGS FOR SIGNALLING APPLICATIONS

L1-CHE-SPE-295 SOLDERLESS TERMINALS AND CABLE LUGS FOR SIGNALLING APPLICATIONS Engineering Specification Signalling L1-CHE-SPE-295 SOLDERLESS TERMINALS AND CABLE LUGS FOR SIGNALLING APPLICATIONS Version: 1 ENGINEERING SPECIFICATION SOLDERLESS TERMINALS AND CABLE LUGS FOR SIGNALLING

More information

Engineering Standard- Design Electrical Networks MEST TRACTION SUBSTATIONS AND TIE STATIONS

Engineering Standard- Design Electrical Networks MEST TRACTION SUBSTATIONS AND TIE STATIONS Engineering Standard- Design Electrical Networks MEST 000002-01 Version: 1 Issued: May 2013 Owner: Chief Engineer Approved By: Norm Grady Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET

More information

MTM DESIGN PRACTICE NOTE USE OF GUARD RAILS

MTM DESIGN PRACTICE NOTE USE OF GUARD RAILS Approval Amendment Record Approval Date Version Description 24/08/2016 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 6 Table of Contents 1. Purpose...

More information

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Engineering Specification Track MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Version: 2 Issued: December 2015 Owner: Engineering Division Approved By: Liam Palmer Cannon A/Head of Engineering Track

More information

TRACK SPECIFICATION LOW PROFILE CONCRETE SLEEPERS

TRACK SPECIFICATION LOW PROFILE CONCRETE SLEEPERS Approval Amendment Record Approval Date Version Description 19/04/2013 1 Initial issue under MTM. 19/02/2014 2 Details for Train Stop sleepers added and figures updated 27/04/2015 3 Amended the design

More information

I Effective from: 23rd February Approval. Position. General Manager SEQ Systems. Head of Engineering - Track & Structures

I Effective from: 23rd February Approval. Position. General Manager SEQ Systems. Head of Engineering - Track & Structures MMe,Ro ENGINEERING AND DESIGN RAIL SAFETY L2-SQE-MAN-001 Version: 2 I Effective from: 23rd February 2018 Approval Name Position Document Author Matt Sekulitch General Manager SEQ Systems Liam Palmer Cannon

More information

L1-CHE-SPE-297 ENVIRONMENTAL CONDITIONS

L1-CHE-SPE-297 ENVIRONMENTAL CONDITIONS Engineering Specification Signalling L1-CHE-SPE-297 ENVIRONMENTAL CONDITIONS Version: 1 ENGINEERING SPECIFICATION ENVIRONMENTAL CONDITIONS L1-CHE-SPE-297 Version: 1 Effective from: 1 st July 2018 Approval

More information

MTM REQUIREMENTS METROPOLITAN TRAIN STABLING

MTM REQUIREMENTS METROPOLITAN TRAIN STABLING Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version. Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

ELECTRIC LINE CLEARANCE PLAN

ELECTRIC LINE CLEARANCE PLAN L2-INF-PLA-001 ELECTRIC LINE CLEARANCE PLAN 2015-2016 Version: 6 Issued: 27 March 2015 Owner: Head of Infrastructure Delivery PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO MTM INTRANET FOR THE LATEST VERSION

More information

L1-CHE-STD-040 BRIDGE STANDARD

L1-CHE-STD-040 BRIDGE STANDARD Engineering Standard L1-CHE-STD-040 Version: 2 Approval Amendment Record Approval Date Version Description 22/12/2017 1 Initial issue under MTM. Supersedes VRIOGS 011.1 (draft), L1-CHE-INS-013, L1-CHE-INS-026,

More information

BUSHFIRE MITIGATION PLAN

BUSHFIRE MITIGATION PLAN L2-ELN-PLA-003 BUSHFIRE MITIGATION PLAN 2016-2017 Version: 6 Owner: Chief Engineer Revised: November 2016 Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET

More information

SUPPLY OF RESILIENT RAIL FASTENING ASSEMBLIES. MTSP L2-TRK-SPE-004 Version: 4 Effective from: 27 th April Approval.

SUPPLY OF RESILIENT RAIL FASTENING ASSEMBLIES. MTSP L2-TRK-SPE-004 Version: 4 Effective from: 27 th April Approval. Approval Amendment Record Approval Date Version Description 20/05/2013 1 Initial issue under MTM. 02/08/2013 2 Alterations made to the maximum allowable axle load and line speed. Amendments added to include

More information

Generic ICT communications pathways specification

Generic ICT communications pathways specification Generic ICT communications pathways specification Telecommunications Document information HPRM Ref: Security class: Unclassified Document review and approval record Version 1.0 Amendment record Change/review

More information

ELECTRIC LINE CLEARANCE PLAN

ELECTRIC LINE CLEARANCE PLAN L2-INF-PLA-001 ELECTRIC LINE CLEARANCE PLAN 2016-2017 Compliance to Electric Safety (Electric Line Clearance) Regulations 2015 Version: 7 Revised: 24 March 2017 Owner: Head of Infrastructure Approved By:

More information

VERTICAL TRANSPORT LIFTS

VERTICAL TRANSPORT LIFTS Engineering Specification Structures and Facilities L1-CHE-SPE-130 Version: 1 Issued: October 2017 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER

More information

Performance Measures for Track and Civil Infrastructure

Performance Measures for Track and Civil Infrastructure Discipline: Engineering Category: Procedure Measures for Track and Civil ETP-00-02 Applicability ARTC Wide CRIA (NSW CRN) Document Status Version Date Reviewed Prepared by Reviewed by Endorsed Approved

More information

DESIGN PRACTICE NOTE EARTHING OF TCA SURGE ARRESTORS

DESIGN PRACTICE NOTE EARTHING OF TCA SURGE ARRESTORS DESIGN PRACTICE NOTE EARTHING OF TCA SURGE ARRESTORS L1-CHE-INS-016 Version: 2 Effective from: 21 st August 2015 Table of Contents 1. Purpose... 3 2. Scope... 3 3. Abbreviations and Acronyms... 3 4. Background...

More information

Melbourne Metro Rail Project

Melbourne Metro Rail Project Environment Effects Act 1978 Planning and Environment Act 1987 Inquiry and Advisory Committee Report Melbourne Metro Rail Project 21 November 2016 The Independent Environmental Auditor would audit key

More information

Assessing external noise impacts for apartments

Assessing external noise impacts for apartments Assessing external noise impacts for apartments Planning Practice Note 83 AUGUST 2017 This practice note gives guidance about the operation of Clause 55.07-6 (Noise impacts) and Clause 58.04-3 (Noise impacts)

More information

L1-CHE-SPE-178 EARTHWORKS & FORMATION SPECIFICATION

L1-CHE-SPE-178 EARTHWORKS & FORMATION SPECIFICATION Engineering Specification L1-CHE-SPE-178 EARTHWORKS & FORMATION SPECIFICATION Version: 2 Approval Amendment Record Approval Date Version Description Initial Release under MTM. Supersedes the following

More information

Peer review of options for proposed crossings of Leongatha rail reserve, Clyde Railway Station and associated train stabling

Peer review of options for proposed crossings of Leongatha rail reserve, Clyde Railway Station and associated train stabling Peer review of options for proposed crossings of Leongatha rail reserve, Clyde Railway Station and associated train stabling Peer Review Overview Report Reference: 239201.01 Prepared for: Metropolitan

More information

Edition 2 WARNING. Tel: +27 SABSS

Edition 2 WARNING. Tel: +27 SABSS ISBN 978-0-626-31091-2 SOUTH AFRICAN NATIONAL STANDARD Railway safety management Part 2-2: Requirements for systemic engineering and operational safety standards Track and associated civil infrastructure

More information

City of Dubuque: Smart Traffic Routing with Efficient & Effective Traffic System (STREETS) Final Report version 1.1

City of Dubuque: Smart Traffic Routing with Efficient & Effective Traffic System (STREETS) Final Report version 1.1 City of Dubuque: Smart Traffic Routing with Efficient Final Report version 1.1 June 22, 2018 Submitted to: 17J18 0640 Prepared by Iteris, Inc. Iteris, Inc. i DOCUMENT VERSION CONTROL DOCUMENT NAME SUBMITTAL

More information

WPA MCR along ARTC Freight Link Headshunt

WPA MCR along ARTC Freight Link Headshunt RRLCMR - Risk Assessment to Support Standard Waiver Application WPA MCR along ARTC Freight Link Headshunt 1.0 Risk No. 1.01 Risk Category: 1. Safety 2. Assets 3. Financial 4. Environment 5. Regulatory

More information

Managing CDM in Network Rail Telecom

Managing CDM in Network Rail Telecom Issue 1 1 st January, 2016 Managing CDM in Network Rail Telecom Simon Atterwell Director - Network Rail Telecom AUTHORISATION Approved by: Neil Marsh Head of Safety & Sustainable Development Authorised

More information

Zenith Model Recalibration and Validation Version Review of VISTA. February Public Transport Victoria

Zenith Model Recalibration and Validation Version Review of VISTA. February Public Transport Victoria Zenith Model Recalibration and Validation Version 3.0.0 Review of VISTA February 2014 Public Transport Victoria Page Intentionally Left Blank Review of VISTA Draft Report Project No. ZML-VIC-Year4 COPYRIGHT:

More information

Cable Protection Systems

Cable Protection Systems Cable Protection Systems Installation Guide V.1 2018 GR-WI-603 Page 1 Introduction This guide addresses the acceptable methods and details for installation of CABLEprotect ducting & troughing systems.

More information

Engineering Management Manual

Engineering Management Manual Engineering Management Manual Configuration Management ED0014 Document Category: DMS: Document Control: Procedure CRN-EPR-ENG-014 Version Date Author/discipline Reviewer Approver Remarks 1.0 13/12/2011

More information

National Transport Commission Submission to Infrastructure Victoria

National Transport Commission Submission to Infrastructure Victoria National Transport Commission Submission to Infrastructure Victoria Automated and zero emission vehicles March 2018 Submission outline 1 Introduction 3 1.1 The purpose of this submission 3 About the NTC

More information

Wayleave Application for Non-Queensland Rail Service

Wayleave Application for Non-Queensland Rail Service Wayleave Application for Non-Queensland Rail Service This form may only be used for applications lodged in the 2018-19 financial year Form Instructions This form contains important information on how to

More information

CAULFIELD GROUP OPERATING PROCEDURES

CAULFIELD GROUP OPERATING PROCEDURES The Operating Procedures contained in this document titled Caulfield Group Operating Procedures refer to the area bounded by Richmond, Sandringham, Stony Point, Cranbourne & Pakenham. Approval Amendment

More information

Document Compilation and Approval

Document Compilation and Approval Document Compilation and Approval Compiled by (for section 1 to 5 and 7 to 10) Name Position Signature Bill Kreykes Manager, Timetables Compiled by (for section 6) Endorsed by (Author) Bill Taylor Bill

More information

AsiaPacificRail Developing a Coherent and Systematic Approach to Safety Management

AsiaPacificRail Developing a Coherent and Systematic Approach to Safety Management Developing a Coherent and Systematic Approach to Safety Management AsiaPacificRail 2006 Reece Waldock Chief Executive Officer The Public Transport Authority of Western Australia Agenda Background Australian

More information

ONRSR Guideline. Asset Management

ONRSR Guideline. Asset Management Document control Objective Document ID: A389849 Version number: 2.0 Approved by: Chief Executive Date approved: 26 February 2019 Policy changes to 2.0 Periodic Review Office of the National Rail Safety

More information

Operating Requirements Manual 11 October 2015 Version 1

Operating Requirements Manual 11 October 2015 Version 1 Operating Requirements Manual 11 October 2015 Version 1 Contents 1 Introduction 1 2 Interface Risk Management 2 2.1 Interface Risk Assessment 2 2.2 Interface Risk Management Plan 4 2.3 Provision of Assistance

More information

NORTHERN IRELAND TRANSPORT HOLDING COMPANY TRANSLINK PROCUREMENT POLICY EQUALITY IMPACT ASSESSMENT REPORT FOR CONSULTATION

NORTHERN IRELAND TRANSPORT HOLDING COMPANY TRANSLINK PROCUREMENT POLICY EQUALITY IMPACT ASSESSMENT REPORT FOR CONSULTATION NORTHERN IRELAND TRANSPORT HOLDING COMPANY TRANSLINK PROCUREMENT POLICY EQUALITY IMPACT ASSESSMENT REPORT FOR CONSULTATION October 2008 Any comments or queries on this report for consultation should be

More information

Certificate of Acceptance

Certificate of Acceptance Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions

More information

CONVENTION ON INTERNATIONAL DIRECT RAILWAY TRAFFIC

CONVENTION ON INTERNATIONAL DIRECT RAILWAY TRAFFIC Annex 1 DRAFT As of 31 March 2017 CONVENTION ON INTERNATIONAL DIRECT RAILWAY TRAFFIC The Governments of the States, hereinafter referred to as the 'Contracting Parties', Recognising the importance of developing

More information

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES Bureau of Transportation Safety and Technology 700 SW Harrison, Topeka, KS 66603 July 30, 2008 Definitions Significant Project All Federal-aid

More information

ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER. [April 2017]

ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER. [April 2017] ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER [April 2017] 1. SCOPE AND PURPOSE ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER s ( Energy Queensland ) Internal Auditing (IA) function provides assurance

More information

Preparation of Rezoning or LEP Amendment Requests

Preparation of Rezoning or LEP Amendment Requests Guideline Preparation of Rezoning or LEP Amendment Requests Table of Contents 1 Introduction... 2 1.1 Requirements... 2 1.2 Other Issues for Consideration in the Request... 5 Controlled Document Information...

More information

NR/L2/SIG/11107 Issue: 4 Date: 03/03/2012 Compliance date: 03/03/2012. Ref:

NR/L2/SIG/11107 Issue: 4 Date: 03/03/2012 Compliance date: 03/03/2012. Ref: User information This Network Rail standard contains colour-coding according to the following Red Amber Green classification. Red requirements No deviations, could stop the railway Red requirements shall

More information

EU-TYPE EXAMINATION CERTIFICATE

EU-TYPE EXAMINATION CERTIFICATE T3B EU-TYPE EXAMINATION 0402-MID-494901 Issued to S-E-G Instrument AB Box 111 43, SE-161 11 Bromma, Sweden T3B is fulfilling module B (Annex II) of directive 2014/32/EU on measuring instruments (MID),

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU

More information

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets 1993 Specifications CSJ 0331-04-050 SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets 1. Description. This Item shall govern for furnishing and installation of Equipment Cabinets for the Bridge Collapse

More information

Grenfell Tower: Lessons learned in Australia Kristin Brookfield Chief Executive Industry Policy

Grenfell Tower: Lessons learned in Australia Kristin Brookfield Chief Executive Industry Policy Grenfell Tower: Lessons learned in Australia Kristin Brookfield Chief Executive Industry Policy The Building 24 storey residential apartment building Public (social) housing Constructed in 1974 127 flats

More information

Reference Number PCS 03 - (RIC Standard: EP SP)

Reference Number PCS 03 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PCS 03 - (RIC Standard: EP 20 00 04 05 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

Worksite Safety Update Promoting safety in road construction

Worksite Safety Update Promoting safety in road construction Worksite Safety Update Promoting safety in road construction No 122 August 2012 In this Edition: Work Near Overhead and Underground Utility Services Page 1 The Regional Rail Link Experience Page 9 This

More information

1010 La Trobe Street Docklands Victoria

1010 La Trobe Street Docklands Victoria Position description Position Group Reports to Location Service Desk Administrator Telecommunications IT Service Delivery Manager 1010 La Trobe Street Docklands Victoria Date 2018 Our organisation VicTrack

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

Applying for Signals Competency

Applying for Signals Competency Engineering (Signalling) Work Instruction Applying for Signals Competency EST-20-03 Compliance Date 1 January 2011 Applicability ARTC Network Wide CRIA (NSW CRN) Document Status Version Date Reviewed Prepared

More information

Victoria s Energy Outlook

Victoria s Energy Outlook Victoria s Energy Outlook CEDA Energy Forum 10 April 2006 Matt Zema VENCorp Chief Executive Officer VENCorp roles Energy Planner (Gas and Electricity) Market Developer Gas Operator FRC Facilitator Gas/Electricity

More information

IAP the road forward // Intelligent Access Program Overview Guideline

IAP the road forward // Intelligent Access Program Overview Guideline IAP the road forward // Intelligent Access Program Overview Guideline IAP the road forward // Intelligent Access Program Overview Guideline TCA-G01-2.00 First published November 2005 Transport Certification

More information

APPLICATION FOR PIPE OR WIRE OCCUPANCY

APPLICATION FOR PIPE OR WIRE OCCUPANCY APPLICATION FOR PIPE OR WIRE OCCUPANCY Please answer all questions and direct cover letter / project description, completed application, application fee, and three (3) copies of project plans to: AECOM

More information

The Victorian Transport Plan (Department of Transport, 2008).

The Victorian Transport Plan (Department of Transport, 2008). 18 TRANSPORT Planning should ensure an integrated and sustainable transport system that provides access to social and economic opportunities, facilitates economic prosperity, contributes to environmental

More information

The Manual on Uniform Traffic Control Devices. Richard Bowden. Asst. Director Signals. BNSF Railway Kansas Avenue, Kansas City, Kansas 66106

The Manual on Uniform Traffic Control Devices. Richard Bowden. Asst. Director Signals. BNSF Railway Kansas Avenue, Kansas City, Kansas 66106 The Manual on Uniform Traffic Control Devices Richard Bowden Asst. Director Signals BNSF Railway 4515 Kansas Avenue, Kansas City, Kansas 66106 913-551-4602 Fax: 913-551-4647 Richard.Bowden@BNSF.com 1988

More information

AS THE EFFECT ON BRIDGE BARRIERS

AS THE EFFECT ON BRIDGE BARRIERS ABSTRACT AS5100.2 2017 THE EFFECT ON BRIDGE BARRIERS David Coe, Senior Principal, Pitt & Sherry The revision to AS5100 in 2017 resulted in significant changes to the design loading and impact heights for

More information

ONRSR Policy. Private Siding Registration

ONRSR Policy. Private Siding Registration Document control Objective Document ID: A335832 Version number: 5.0 Approved by: Chief Executive Date approved: June 2017 Policy changes to 5.0 Inclusion of section 6.7 and amendment in section 6.6 to

More information

The California Public Utilities

The California Public Utilities California Public Utilities Commission Light Rail Transit Regulatory Development Program W. R. SCHULTE, M. T. FLANIGON, AND J. S. RICH The California Public Utilities Commission (PUC) has legislative authority

More information

BLACKBURN LEVEL CROSSING REMOVAL PROJECT 8 TH AUSTRALIAN SMALL BRIDGES CONFERENCE

BLACKBURN LEVEL CROSSING REMOVAL PROJECT 8 TH AUSTRALIAN SMALL BRIDGES CONFERENCE LEVEL CROSSING REMOVAL PROJECT 8 TH AUSTRALIAN SMALL BRIDGES CONFERENCE BACKGROUND In 2015 Victoria Labour Government announced to remove 50 dangerous road crossings in Melbourne's metropolitan areas by

More information

Metro Trains Melbourne Pty Ltd. Access Arrangement

Metro Trains Melbourne Pty Ltd. Access Arrangement Metro Trains Melbourne Pty Ltd Access Arrangement Contents 1 INTRODUCTION 2 1.1 Purpose of this Document 2 1.2 Commencement Date and Term 2 1.3 Composition of the Access Arrangement 2 1.4 Definitions and

More information

ASTM C857 A -16 AASHTO H -20 (for vaults beneath roadways) ASTM C857 A-8 (for vaults beneath incidental light truck traffic)

ASTM C857 A -16 AASHTO H -20 (for vaults beneath roadways) ASTM C857 A-8 (for vaults beneath incidental light truck traffic) 1 Scope This specification outlines the minimum requirements for 5i 7i (56I 84I) vaults to be used for three-phase sectionalizing cabinets and metering equipment. This specification applies to all 5i 7i

More information

Guideline Asset Management

Guideline Asset Management Guideline Asset Management Title of the document National Rail Safety Regulator Page1of28 Document reference number: A389849 Version No. Approved by Publication date 1.0 Chief Executive November 2014 1.1

More information

Communications in French Directive

Communications in French Directive Communications in French Directive Management Board of Cabinet Effective May 13, 2010 Office of Francophone Affairs TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 PRINCIPLES... 3 APPLICATION AND SCOPE...

More information

Version # Date Reviewed Prepared by Reviewed by Endorsed Approved. Description of Amendment

Version # Date Reviewed Prepared by Reviewed by Endorsed Approved. Description of Amendment Division / Business Unit: Enterprise Services Function: Engineering (Track & Civil) Document Type: Code of Practice General Appendix Structures Inventory Applicability ARTC Network Wide SMS Publication

More information

SECTION 10 UTILITIES

SECTION 10 UTILITIES SECTION 10 UTILITIES Virtually every highway construction project in the State of New Jersey impacts utility facilities. The Designer shall examine and seek alternatives to minimize or eliminate the impact

More information

Guidance on Railway Safety Cases for Acceptance by Railtrack

Guidance on Railway Safety Cases for Acceptance by Railtrack Guidance on Railway Safety Cases for Acceptance by Railtrack This Guidance Note has been produced by Synopsis This Guidance Note provides potential Operators with practical advice to assist in the preparation

More information

1. Have you translated principle 1 into clear objectives? Yes No If so what are they?

1. Have you translated principle 1 into clear objectives? Yes No If so what are they? Self assessment tool How well does your organisation comply with the 12 guiding principles of the surveillance camera code of practice? Complete this easy to use self assessment tool to find out if you

More information

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :

More information

1 18 August 2017 Version 2 (Noise and vibration)

1 18 August 2017 Version 2 (Noise and vibration) Table 8-6 s (Noise and Vibration only) EES Evaluation Noise and Vibration Health, amenity and environmental quality to minimise adverse air quality, noise and vibration effects on the health and amenity

More information

HEALTH AND SAFETY STRATEGY

HEALTH AND SAFETY STRATEGY HEALTH AND SAFETY STRATEGY 2016-2019 Version: 1.0 Ratified by: Integrated Governance Committee Date ratified: 30 September 2015 Title of originator/author: Title of responsible committee/group: Head of

More information