1 ADDENDUM 1 TO: FROM: RE: Vendors Salena Yarbrough INVITATION TO BID NUMBER ITB/DA-17/18-36 REBID STORM WATER IMPROVEMENTS AT THE PLANT CITY STATE FARMERS MARKET This addendum is to provide all potential bidders with revisions as well as answers to questions in reference to Invitation to Bid ITB/DA-17/18-36 REBID. REVISIONS BBE has made revisions to the plans per these bid questions. All revisions are clouded with a revision labeled Per Bidding Questions with a date of 04/11/18. Please refer to the new set of plans located at: The revisions mainly consist of the following: a. Width of trench for installation of storm pipes has been increased. This trench width varies per pipe size and is based on the city s trench detail that can be found on sheet 9. The area of pavement removal and replacement has been updated and clouded accordingly. b. A new Type D structure has been added. This revision is clouded accordingly. c. One (1) existing inlet that was to be removed is now to remain and an additional length of 15 RCP has been added to connect this existing inlet to a proposed inlet. This change is clouded accordingly. d. An additional existing sanitary sewer manhole will need to have the rim adjusted to proposed grade. This change is clouded accordingly. Questions / Answers 1. What permits are needed to be acquired by the contractor, and are there any costs associated with them? BBE obtained permits from SWFWMD ERP exemption, City of Plant City Engineering Department approval and NPDES Notice of Intent to Use Generic Permit for Stormwater Discharge. The awarded contractor will receive a copy of these approved permits and a stamped set of civil construction plans at the mandatory pre-construction meeting with the City of Plant City. Concerning contractor-pulled permits, the contractor is responsible for contacting the City of Plant City for determination of any required permits, including work in city right-of-way and the associated fees. 2. Are there any soil borings? No geotechnical work has been performed.

2 Page 2 3. Structures D-17 and D-19 show the Future Phase RCP coming out of them. S hould these structures be built with the hole installed in them and bricked up or built with a solid wall? These structures should be built with a hole for future knock-out. 4. The sanitary sewer data shown on plan sheet 8, is this for reference only? Refer to the Sanitary Sewer Data on sheet 8. The rim of some existing structures will need to be modified to match proposed grade. The contractor is to understand the existing underground utilities shown on the plans are per the survey, which shows underground utilities based on aboveground indicators. Please refer to the utility sheet of the revised set of plans at the link listed above. 5. If utility conflicts are encountered, how will they be paid for it offsets are needed? Utility conflicts, or unforeseen conditions, shall be documented in writing and reported to the owner immediately upon discovery. Such conflicts will be evaluated on a case by case basis and will be addressed as necessary for completion of the project. Changes or additions in the scope of work due to such conflict will be covered under the owner s project budget when authorized or appropriate. 6. There are two different asphalt restoration details on plan sheet 9, one calls for 6 crushed concrete and 2 of asphalt 9.5 or 12.5, the other detail calls for 8 of crushed concrete and 1.5 of S-3. A majority of the asphalt restoration is within the trench detail, which restoration should be used? The trenching detail and pavement section shown in that detail is a City of Plant City detail and is for work in the right-of-way. The asphalt pavement section detail that is in lower left corner of sheet 9 is for on-site. 7. Plan sheets 6A, 6B, 6C and 6D show the quantity of asphalt that needs to be replaced. The trench width on these sheets are not wide enough to install 36 & 30 RCP. Will the owner pay for the additional asphalt needed to install the RCP, or should the contractor figure the additional asphalt needed? Width of trenches for removal of existing pipes and installation of proposed pipes has been revised per the city s trenching detail. Refer to revised set of plans at the link listed above. 8. We are assuming that the Future Phase pipe and structures will be installed on a different project, even though quantities for specific size pipe are show and information is provided for structures. Please advise. The items labeled as Future Phase are not to be constructed at this time. The quantities are shown for the benefit of the owner and as required by BBE s permitting procedures. 9. Plan sheet 5 shows removing sections of concrete slabs in three locations. Plan sheets 6A and 6B show putting asphalt back in these locations. Is this correct, or should concrete be put back? Asphalt pavement is proposed where existing concrete pavement is being removed, except for under a covered area. Please see response to question #23 and refer to revised set plans at the link listed above. 10. Does the dewatering plan need to be signed and sealed by a professional engineer per drainage notes on plan sheet 4? Plan sheet 4 indicates the contractor is responsible for the dewatering plan and any permitting associated with the dewatering plan, including with the City of Plant City and SWFWMD.

3 Page There is a concrete power pole in front of Fred s Market that is in conflict with the proposed 36 RCP. Who will be responsible for relocating this power pole? BBE is working with the City of Plant City to determine whether the city will have this pole relocated or the city will have TECO hold the pole. Once we have a response back from the City, we will provide additional information. 12. Is builder s risk insurance required for this project? There are no structures being erected. The contractor shall carry appropriate builder s risk insurance as defined in the bid package documentation. 13. If some of this work is done at night, in order to not affect businesses, will there be additional cost for inspection? The contractor shall coordinate a work schedule with the owner that is efficient and minimizes excessive costs. The contract period is intended to accommodate successful completion of the work during normal business hours. Work shall be conducted during normal business hours unless approved by the owner. Night shifts, weekends or overtime, etc. are not mandatory and are not authorized without owner consent. 14. On sheet 8 of the plan, the utilities sheet, they show several utilities other than the storm sewer, some which is shown darker than others which makes it appear that some of the sanitary sewer gets updated, which from the pre-bid made it sound like the only thing they were focusing on was the storm sewer. Does any sanitary or water utility need worked on in this phase? The only utility improvements consist of altering the grade of the existing rim of some structures. Refer to the revised Sanitary Sewer Data table on sheet 8 of the set plans at the link listed above. 15. Can excess excavated material be left on-site, or does it need to be hauled off-site at the contractor s expense? Excess excavated material that is determined not suitable to be used as backfill, etc. must be hauled offsite at the contractor s expense. All load tickets are to be provided to the owner. 16. In order to reduce the cost to the owner, can material excavated to install the new stormwater system be considered acceptable backfill above the springline of the pipes? Excess material excavated from the site cannot be assumed to be clean soil suitable for backfill. The contractor may utilize clean excavated material that consists of fine to slightly silty fine sand (SP/SP- SM,) provided it is free of organic or deleterious materials and provided the contractor obtains appropriate backfill tests. These tests shall be performed by a licensed geotechnical engineer, and all test reports shall be provided to the EOR and owner. 17. In order to reduce the cost to the owner can on-site material excavated to install the new stormwater system be considered acceptable backfill for the FDOT Top Zone (12 above top of pipe to base or final grade)? Excess material excavated from the site cannot be assumed to be clean soil suitable for backfill and/or sub-grade. The contractor may utilize clean excavated material provided the contractor obtains appropriate backfill/sub-grade tests. All tests shall be performed by a licensed geotechnical engineer, and all test reports shall be provided to the EOR and owner.

4 Page Please provide the requirements and/or specifications for As-Built Drawings. As stated during the pre-bid meeting, the contractor is responsible for familiarizing him/herself with the as-built requirements of the governing jurisdictions. During this meeting, BBE recommended the contractor obtain the City of Plant City requirements from the city. These can be easily found on the City of Plant City s website. The contractor may utilize BBE s permitted AutoCAD files as the base of the asbuilt drawing for the city s required record drawing format. Refer to page 14 of the bid solicitation package. 19. Is the owner/engineer going to provide QA/QC testing for backfill, density, concrete, and asphalt or is the contractor to bear the cost of the QA/QC testing? The contractor is responsible for all required testing. 20. Please provide the location and limits of the contractor staging area? The location of this staging area was provided during the pre-bid meeting. The limits will be provided by the owner. 21. Will the contractor be required to stand-down at any time due to operations of the facility? If so how will these times how will the contractor be compensated? The contractor shall coordinate a work schedule with the owner prior to beginning work to avoid operational conflicts. Refer to General Contract Conditions paragraph 24 and page 13 of the bid solicitation package for additional information. 22. On Drawing Sheet 9. In the lower left corner there is detail Asphalt Pavement Section and in the upper center there is a detail Trenching & Pavement Replacement Detail. There is discrepancy in the details provided for Asphalt Replacement. Please clarify which specification is to be used? Please refer to response to question # As an alternative to the subbase/grade material for the asphalt and concrete, will the engineer permit the use of ½ the depth of subbase/grade of crushed concrete meeting LBR100, in substitute for the LBR40 material? This will reduce the overall cost of the project and minimize impacts to the tenants of the site. The percent compaction to AASHTO T-180 of the stabilized sub-grade is incorrect on sheet 9. This should be 98% instead of 90%. Asphalt Pavement: Based on the asphalt pavement section shown on sheet 9, the structural number of the asphalt pavement is Substituting the stabilized sub-grade with crushed concrete base equal to half the depth of the sub-grade (6 ) results in a structural number of 2.68, which is below the minimum. The contractor may use the following asphalt pavement section in lieu of the section shown on the plans: 2 SP 9.5 or 12.5 asphalt course and 13 inches of crushed concrete (LBR 100, 98% compaction to AASHTO T-180). Concrete Pavement: Since receiving these bid questions, BBE has revised the plans to show all proposed pavement as asphalt pavement except for the covered area west of Building #3, which is to be concrete pavement should asphalt pavement not be feasible to construct in this covered area. If the contractor elects to use concrete pavement, the two pavement section options are either per the plan (6 concrete 3,000 PSI with fibermesh 650 macro-synthetics and 8 sub-grade compacted to 98% AASHTO T-180, LBR 40) or the following section: 6 concrete 3,000 PSI with fibermesh 650 macro-synthetics and 5 crushed concrete (LBR 100, 98% compaction to AASHTO T-180).

5 Page Please provide a specification on the pipe bedding material. Bedding materials must be in accordance with FDOT Design Standards FY Can the contractor assume that the excess material excavated from the site are clean soils and can be reused? Or does the contractor need to assume that the material is contaminated and needs to go the appropriate landfill for disposal. BBE is unaware of any contaminations on the site. To the extent this addendum gives rise to a protest, failure to file a protest within the time prescribed in Section (3), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. All other terms, conditions and specifications of this Invitation to Bid will remain the same. If you have any questions regarding this addendum, please feel free to contact this office at (850)

FDOT REF. ITEM DESCRIPTION

FDOT REF. ITEM DESCRIPTION EXHIBIT B NAPLES BASIN V Stormwater Improvements BID TABULATION SUMMARY OF PAY ITEMS FDOT REF. ITEM DESCRIPTION Est. Quant. Cost 0 Mobilization LS 02 2 Maintenance of Traffic LS 3 Preconstruction Audio/Video

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 4/16/2015 RE: BID #: ITB-DOT-14/15-7013LV BID/RFP TITLE: District Seven Storm Drain Video Inspection Services OPENING DATE: April 27, 2015 @ 12:00

More information

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench SECTION 10.0 PIPE TRENCHES 10.01 Excavation and Preparation of Trench The trench shall be excavated to the proper depth to permit installation of the pipe along the lines and grades shown on the Plans.

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

City of St. Petersburg

City of St. Petersburg Page 1 of 5 QUESTIONS AND RESPONSES City of St. Petersburg IFB 7395 Lift Station 85 Albert Whitted Master 30 Force Main Part D Project No. 12013-411 November 29, 2012 Responses to Questions: Q1 R1 Q2 R2

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION

More information

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 RFP-DOT-15/16-4006PM FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: December 2, 2015 RE: RFP Number: RFP-DOT-15/16-4006PM Description: Districtwide Storm Sewer Inspection QUESTION:

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project.

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project. TO: ALL HOLDERS OF CONTRACT DOCUMENTS FOR: City of Carlsbad, New Mexico Sanitary Sewer Interceptor 118 Upgrades Phase I Wade M. Chacon P.E. HDR Project Manager/Engineer Bid # 2016-32 ADDENDUM NUMBER ONE

More information

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension

CECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION

6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION 6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION SYSTEMS REQUIREMENTS SITE PREPARATION TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group

More information

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents CITY OF TAMARAC PURCHASING AND CONTRACTS DIVISION 7525 NW 88 TH AVENUE TAMARAC, FL 33321 Committed to Excellence...Always ADDENDUM NO. 1 BID NO.13-19B BID NO. 13-20B CITY OF TAMARAC NW 108 TERRACE / NW

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original PROJECT BID NO EPWU PEM CONSULTANT SUBMITTED ON / / as a 95% (A) original RESUBMITTED ON / / as a 95% (B) revision 1.0 FRONT COVER 1.1 1.2 1.3 1.4 Title begins with location key words, otherwise with program/project

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 2 DATE: December 28, 2011 RE: RFP NUMBER: RFP TITLE: ITS Equipment Replacement in Broward County OPENING OF TECHNICAL PROPOSAL DATE: January 5, 2012 Notice

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************

More information

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete. SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information

CAMP BULLIS ROAD 12-INCH WATER MAIN PROJECT Solicitation No.: CO RA Addendum 2 July 22 nd 2016

CAMP BULLIS ROAD 12-INCH WATER MAIN PROJECT Solicitation No.: CO RA Addendum 2 July 22 nd 2016 To Respondent of Record: CAMP BULLIS ROAD 12-INCH WATER MAIN PROJECT Solicitation No.: CO-00082-RA Addendum 2 July 22 nd 2016 This addendum, applicable to work referenced above, is an amendment to the

More information

Answer 1: The reference to CB 5 is incorrect. The correct reference should be CB 4. Question 2: Have any potential staging areas been identified?

Answer 1: The reference to CB 5 is incorrect. The correct reference should be CB 4. Question 2: Have any potential staging areas been identified? ADDENDUM NO. 1 July 26, 2017 223837 RE: FROM: TO: CITY OF BARRE HMGP STORM DRAIN IMPROVEMENT PROJECTS DuBOIS & KING, INC. P.O. Box 339 Randolph, Vermont 05060 (802) 728-3376 Prospective Bidders This Addendum

More information

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete

More information

Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA

Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA Revised May 17, 2011 Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA INTRODUCTION These criteria are established to provide uniform construction practices and

More information

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

I. General Information. A. Project Team & Contacts: Role Company Name Phone  City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 3/08/16 ITB NO. 16-012 ADDENDUM No. 1 Project.: TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY Owner: Highlands County BCC

More information

LJA Engineering, Inc.

LJA Engineering, Inc. BID OPENING DATE: TABULATION DATE: LJA JOB NO. 2085-0114D (9.2) BIDDER'S NAME TOTAL BID AMOUNT 1) CROSTEX CONSTRUCTION, INC. $535,000.00 2) BLAZEY CONSTRUCTION SERVICES, LLC $552,212.70 3) R CONSTRUCTION

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

ADDENDUM NO. 1. September 12, 2017 ST. CHARLES COUNTY HEPPERMAN ROAD RECONSTRUCTION

ADDENDUM NO. 1. September 12, 2017 ST. CHARLES COUNTY HEPPERMAN ROAD RECONSTRUCTION ADDENDUM NO. 1 September 12, 2017 ST. CHARLES COUNTY HEPPERMAN ROAD RECONSTRUCTION This Addendum No. 1 modifies original issued bid documents as follows: 1. MODIFICATIONS TO THE PROJECT BID SPECIFICATIONS:

More information

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date April 24, 2015

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date April 24, 2015 PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements

More information

TELEPHONE: (215) Addendum No. 03

TELEPHONE: (215) Addendum No. 03 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 03 Subject:

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project 00900 ADDENDUM #1 Issued to: All Document Holders of Record Date: February 16, 2016 Project: Bayfield Waterline Replacement Project This Addendum forms a part of the Contract described above. The original

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

BASE BID FORM FY 2015

BASE BID FORM FY 2015 BASE BID FORM FY 2015 STORMWATER TREATMENT AREA - BASE BID (FY2015) THE LUMP SUM (LS) PRICES FOR ITEMS 1-6 SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

ALL BIDDERS BE ADVISED OF THE FOLLOWING CHANGES TO THE ABOVE REFERENCED PROJECT AS LISTED BELOW:

ALL BIDDERS BE ADVISED OF THE FOLLOWING CHANGES TO THE ABOVE REFERENCED PROJECT AS LISTED BELOW: CITY OF HOLLYWOOD DEPARTMENT OF PUBLIC UTILITIES ENGINEERING & CONSTRUCTION SERVICES DIVISION 1621 N. 14 th Avenue Hollywood, FL 33019 Phone (954) 921-3930 Fax (954) 921-3258 ADDENDUM NUMBER 1 Date: March

More information

CITY OF TACOMA Department of Public Utilities - Water Division

CITY OF TACOMA Department of Public Utilities - Water Division CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD15-0133F Water Main Replacement Project No. MRP 2014-27,

More information

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01020 MEASUREMENT AND PAYMENT PART 1- GENERAL 1.01 DESCRIPTION A. This section describes the method used to determine quantities of Work performed or materials supplied for which a price is given

More information

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD PUBLIC NOTICE The Township of Union has adopted the Fair and Open Process of the Pay-to-Play Law (N.J.S.A. 19:44A-20a, et seq.) in its request for proposals and awarding goods and services contracts with

More information

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

SECTION TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION RFB # 18-0197 ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION The following information was conveyed and discussed

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

RIGHT-OF-WAY PERMIT SUBMITTAL CHECKLIST

RIGHT-OF-WAY PERMIT SUBMITTAL CHECKLIST RIGHT-OF-WAY PERMIT SUBMITTAL CHECKLIST Email all ROW applications to digitalpermits@cityoforlando.net In the subject line, please include ROW *More information may be required since every project is unique.

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

Special Provisions for Pavement Open Cuts

Special Provisions for Pavement Open Cuts 1. All patches are to be replaced in accordance with the following requirements and as shown in Figure 1. 2. All Excavations or Open Cuts shall comply with OSHA Technical Manual, Chapter 2, Title Excavation:

More information

CITY OF PUNTA GORDA, FLORIDA

CITY OF PUNTA GORDA, FLORIDA CITY OF PUNTA GORDA, FLORIDA PHONE: (941) 575-3351 FAX: (941) 575-3340 EMAIL: pgpurch@pgorda.us PROCUREMENT DIVISION 326 West Marion Avenue Punta Gorda, Florida, 33950 October 9, 2014 SOLICITATION #F2013124/CONS-PIPEREPL/WWTP

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

SECTION STORM SEWER PIPE

SECTION STORM SEWER PIPE SECTION 4200 - STORM SEWER PIPE 4200.1 SCOPE: This section covers the requirements for all labor, equipment and materials for the installation of storm sewers pipes. Trenching guidelines are provided in

More information

Q&A: The Block/Parsons Alley Construction RFP

Q&A: The Block/Parsons Alley Construction RFP Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

The Metropolitan Sewer District of Greater Cincinnati

The Metropolitan Sewer District of Greater Cincinnati The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information