FW: 2017 AEIR South Plant Landfill, Albemarle South Plant, Permit No S, AFIN: SPLF AEIR Inspection RPT ( ).

Size: px
Start display at page:

Download "FW: 2017 AEIR South Plant Landfill, Albemarle South Plant, Permit No S, AFIN: SPLF AEIR Inspection RPT ( )."

Transcription

1 Blue, Karen From: Sent: To: Subject: Attachments: Cusher, Annette Friday, August 24, :58 PM Blue, Karen FW: 2017 AEIR South Plant Landfill, Albemarle South Plant, Permit No S, AFIN: SPLF AEIR Inspection RPT ( ).pdf From: Sessions, David Sent: Friday, August 24, :31 PM To: Johnson, Charles Cc: Cusher, Annette; Fortenberry, Trey; Radaich, Denise Subject: 2017 AEIR South Plant Landfill, Albemarle South Plant, Permit No S, AFIN: Dear Mr. Johnson, Please find attached the 2017 Annual Engineering Inspection Report for the South Plant Class 3N Landfill, Permit No S, located at the Albemarle South Plant in Magnolia. If you have any questions, please feel free to contact Steve Card with Albemarle at or myself. David Sessions Project Manager, Remediation, Gulf/Southwest D david.sessions@aecom.com AECOM 7389 Florida Boulevard Suite 300 Baton Rouge, LA 70806, USA T aecom.com Built to deliver a better world LinkedIn Twitter Facebook Instagram Rec d Digitally AFIN: PMT#: 0175-S By Karen Blue at 10:16 am, Aug 27, 2018 DOC ID#: TO: AC>FILE <KMB S W M D 1

2 2017 ANNUAL ENGINEERING INSPECTION REPORT ALBEMARLE CORPORATION SOUTH PLANT LANDFILL CLASS 3N LANDFILL PERMIT NO S AFIN: Prepared for: Albemarle Corporation 2270 Highway 79 South Magnolia, Arkansas (870) August 2018 AECOM File: Florida Blvd., Suite 300 Baton Rouge, LA Tel:

3 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: TABLE OF CONTENTS ADEQ ANNUAL ENGINEERING INSPECTION REPORT FORM... 1 List of Attachments Attachment A Updated Drawings Attachment B Leachate Analytical Report Attachment C Updated Financial Assurance Attachment D Closure Plan I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

4 ANNUAL ENGINEERING INSPECTION REPORT (AEIR) FORM Reporting Year: Note: Check applicable landfill class. Class 1 (Reg (b)), Class 3 (22.522(a)) X, Class 4 (22.619(b)) 2017 Facility Name: Albemarle South Plant Landfill AFIN: Permit #: 0175-S Landfill Class: 3N Report Submittal Date: August 24, 2018 Date of Landfill Site Inspection by Certifying Engineer: June 22, 2018 Complete the form as indicated Instructions are bolded and italicized. Regulation Reference (b)(1) (a)(1) (b)(1) Item Item Description COLUMN TO BE COMPLETED BY REPORTER Report Information/Comments/Remarks Remaining volume in current cell. a) 1,018 cubic yards Projected date of opening new cell. b) Date: Greater than 40 years, based on current utilization. Attachment Reference (b)(2) (a)(2) (b)(2) Remaining volume of all permitted units. a) 18,125 cubic yards Total air space used during the reporting period. b) 59 cubic yards (b)(3) (a)(3) (b)(3) Estimated remaining site life (years) based on utilization rate during the reporting period. Note: Itemize current permitted unit/cell information - use attachment if necessary. Documentation of fill progression in compliance with permit plans, specs and operating plan and narrative. Note: Provide narrative regarding fill progression during the reporting period. Be specific about landfill unit/cell designations (example: Cell 1, Phase A completely filled; Cell 2, Phase A, 50% full, being filled south to north as of December 31). Specifically note any overfill conditions. c) Landfill Unit/Cell remaining life: Landfill unit/cell South Plant Landfill Current Cell, 20.5 years. Landfill unit/cell, years. Landfill unit/cell, years. d) Entire permitted landfill: >100 years remaining life. a) Progression narrative: The open South Plant Landfill (Area IV) is approximately 54.7% full. The fill progression is generally from the north to the south in the active area. The landfill, is being filled using open trench-fill areas, to the maximum capacity that can be reached without affecting the efficiency of waste placement. Overfill conditions have not been observed. AEIR Form (Rev. Jan 2013) Page 1 of 5

5 (b)(4) (a)(4) (b)(4) Documentation of compliance with regulatory operating requirements, permit conditions, approved operating plan, and other applicable regulations. Note: Review current operating plans, and permit conditions. Include photographs of engineer s inspection as Attachment A. Check for weekly/monthly operational logs, waste volume records in and out of landfill, unauthorized waste form sheets, waste cover maintenance, stormwater reports to ADEQ, and wet weather repair information. a) Weekly/monthly operational logs exist (Y/N)? Y b) Photos of AEIR inspection attached (Y/N)? N (raining day of visit) c) Waste volume in and out records exist (Y/N)? Y d) Unauthorized waste forms exist (Y/N)? Y e) Daily/weekly cover adequate at time of inspection (Y/N)? f) Alternative Daily Cover (ADC) Plan located onsite (Y/N)? Y N/A Operations in compliance with ADC Plan (Y/N)? N/A g) Liquid Waste Management (LWM) Plan located onsite (Y/N)? N/A Operations in compliance with LWM Plan (Y/N)? N/A h) Liquids received to be bulked during reporting period: gallons tons i) Waste cover of inactive areas maintained adequately (Y/N)? Y j) Net amount of waste disposed in landfill during reporting period: N/A cubic yards 7.3 tons k) Leachate head level less than 1' on liner at time of inspection (Y/N)? Y (b)(5) (a)(5) (b)(5) Updated contour map that depicts: Note: Provide updated drawing(s) and final cover permit drawing as Attachment B discuss any discrepancies. Max. contour interval = 2 feet) a) Updated contour drawing attached (Y/N)? b) Final cover permit drawing attached (Y/N)? c) List all discrepancies here: N/A Y Y A (i) horizontal and vertical extent of active and inactive fill areas; (ii) status of all permitted units/cells; (Note: Label all active (working face, bulking area, stockpiles), inactive, closed and interim cover areas). d) Is there an overfill condition (Y/N)? a) Currently, does the facility have sufficient on-site quantities and types of soils for liner and cover construction of permitted units/cells (Y/N)? Y b) If not, where will deficiency shortfalls be obtained (be specific)? N (iii) survey grid (required by ); Note: Include benchmarks and horizontal controls c) Is the current Design Narrative earthwork balance accurate (Y/N)? Y (iv) location of other visible surface features or improvements (e.g., roads, buildings, gas control systems, etc..); Note: Include leachate risers, manholes, monitoring wells, gas wells, etc. AEIR Form (Rev. Jan 2013) Page 2 of 5

6 (b)(6) (a)(6) (b)(6) (v) the person responsible for gathering the survey data and the date survey data was taken to prepare the map. Reminder: Reporting period is calendar year. Survey data should be collected to reflect the AEIR reporting period. Quantity, location, and characteristics of leachate collected, recirculated, and disposed. Note: Provide analytical report as Attachment C. Provide brief narrative on this form in space provided about leachate sources, how leachate is collected, measured and disposed. Also, explain how the leachate head on the landfill liner is monitored and measured. a) Name: Philip Laine Stockwell, PLS b) Name of person using the data to produce contour map: Greg Thornton/Denise Radaich, P.E. c) Date survey data was collected: May 30, 2018 a) Leachate Collected: 1,079,777 gallons b) Leachate Disposed: 1,079,777 gallons c) Leachate Recirculated: 0 gallons d) Leachate Recirculation Plan exists (Y/N)? N ADEQ approval Doc # N/A e) Leachate operating records exist (Y/N)? Y f) Leachate analytical report attached (Y/N)? Y g) Leachate narrative (collection, measurements and disposal): Leachate is collected from the plant-wide perimeter French drain and in-cell dewatering sump pump. Both sources drain to Sump 13. From Sump 13 leachate is pumped to the facility wastewater treatment system. The analytical reports may show constituents not attributable to the landfill. Since the drain collects subsurface water from other areas of the plant. Sumps 4 and 13 are in the vicinity of the landfill. B h) Leachate narrative (verifying <1' head on liner system): A temporary sump pump operates and pumps stormwater and leachate to collection Sump 13 through dual wall HDPE piping. The open cell floor had <1 ft of water at the time of inspection (b)(7) (a)(7) (b)(7) Maintenance of stormwater controls and best management practices for erosion control. Note: List any upset conditions during the reporting period (i.e., washouts, etc ). Also, include narrative about vegetation maintenance and repair. a) Briefly list maintenance activities and upset conditions here: Stormwater within the constructed area is collected and transferred to the facility wastewater treatment system. Maintenance is performed when necessary to maintain compliance with ADEQ regulations (b)(8) (b)(8) Status of capping and closure of completed areas. Note: List areas with acreage that have received interim or final cover. Include total landfilled area acreage not yet under final certified closed cover. Note: "Certified closed" means the facility has received an approval letter from ADEQ accepting the engineer's closure certification report. a) Lndfl unit/cell SPL, 5.0 acres. Intrm or Final Cover (I/F): I b) Lndfl unit/cell, acres. Intrm or Final Cover (I/F): c) Lndfl unit/cell, acres. Intrm or Final Cover (I/F): d) Lndfl unit/cell (I/F):, acres. Intrm or Final Cover e) Acres of disposed waste not under final certified cover: 6 acres f) Acres of disposed waste area that have interim cover: 5 acres (b)(9) (a)(8) (b)(9) Status of remedial or corrective action activities. Note: List corrective action events during reporting period (e.g., seeps and erosion correction, leachate spills, unauthorized waste handling and removal, etc ), and indicate whether action was taken in a) Briefly list corrective actions events here: ADEQ did not identify any noncompliance issues during quarterly inspections. b) Were any of the corrective actions taken in response to an ADEQ AEIR Form (Rev. Jan 2013) Page 3 of 5

7 response to an ADEQ inspection. inspection (Y/N)? N/A c) Current status of corrective actions: d) Did corrective actions permanently solve the conditions (Y/N)? Explain briefly: N/A (b)(10) (a)(9) (b)(10) (b)(11) (a)(10) (b)(11) (b)(12) (a)(11) (b)(12) Updated Financial Assurance documentation as required by Chapter 14. Note: Include copy of most recent financial assurance documentation as Attachment D. Also, include updated closure and post closure cost estimated as an attachment recommend to use the Closure Costs and Post-closure Care Costs Worksheet located at ADEQ - Solid Waste - Technical Branch Home Page Specific links to the worksheets: pdfs/closure_costs_worksheet.xlsx and pdfs/post_closure_care_costs_worksheet.xlsx.. Show detailed calculations of cost items in tabular format with specific item breakdowns. Also, show source of unit cost information and/or inflationary factor adjustments use ADEQ factors where applicable. If updated unit cost information is used instead of inflationary factors, show the source of unit cost information. Confirm estimates are based on largest area ever requiring final cover. Revised or updated facility Closure Plan in accordance with Chapter 13. Note: Provide updated Closure Plan as Attachment E if facility obtained a permit modification during the reporting period that affects the closure and/or post closure care. Other items that affect compliance. Note: Include an ADEQ enforcement activity summary (solid waste, water, air, hazardous waste related) and, status of operating and permit fees. Also, include brief narrative concerning groundwater monitoring reports, landfill gas, leachate a) Size of the facility property under current permit? 15 acres b) Size of actual permitted disposal area? 15 acres c) What is the current total permitted disposal area that contains disposed waste but is not certified closed? 6 acres d) Updated closure cost estimate amount: $ 1,284,639 e) Is the closure cost estimate based on the largest area ever requiring closure (Y/N)? Y f) Is the existing closure financial assurance adequate for acreage not yet certified closed (Y/N)?: Y g) Updated post closure care cost estimate amount: $ 333,096 h) Is the existing post closure care financial assurance adequate for all permitted areas (Y/N)?: Y i) Is the financial assurance mechanism a trust fund (Y/N)? N j) Are the sources of information for updated unit cost line items shown on the cost estimate calculations (Y/N?): N/A k) Do the unit cost items for soil cover material include actual third party cost of materials and labor (Y/N)? Y a) Was an updated Closure Plan required during this reporting period D (Y/N)?: N b) Is an updated Closure Plan attached herein (Y/N)? N a) Are there current ADEQ enforcement actions (Y/N)? Y b) Summary of enforcement actions: The landfill is included in a plant-wide response to an order under jurisdiction of the Hazardous Waste Division. c) Are operating and permit fees payments up-to-date (Y/N)? Y C AEIR Form (Rev. Jan 2013) Page 4 of 5

8 recirculation, alternate daily cover, etc If not explain: Additional Information: d) Does the facility monitor groundwater (Y/N)?: Y If so, is it detection monitoring or assessment monitoring?: Detection Monitoring e) What is the groundwater analytical sampling frequency? 6 months f) Does the facility collect landfill gas (Y/N)?: N g) Does the facility have a Gas Monitoring Plan (Y/N)? N h) Does the facility have gas monitoring probes (Y/N)? N i) Does the facility use an alternate daily cover (ADC)(Y/N)? N If so, what type of ADC is used: N/A If so, list document id# approving ADC: j) Does the facility have a Liquid Waste Management (LWM) Plan (Y/N)? N If so, list document id# approving the LWM Plan: N/A k) Date and document id # of currently approved Operating Plan and Narrative: Date: February 16, 1981 Doc#: l) Date and document id # for currently approved Closure/ Post Closure Plan: Date: February 16, 1981 Doc#: m) Date and document id # of currently approved Permit Drawings: Date: February 16, 1981 Doc#: n) Date and document id # of currently approved Design Narrative: Date: February 16, 1981 Doc#: o) Are weigh scales utilized at the landfill (Y/N)? N p) Does the final cap include a synthetic liner (Y/N)? N q) Does the final cap include clay liner (Y/N)? Y r) Total current permitted landfill volume: 40,953 (Area IV) cubic yards (b) (a) (b) Certification of AEIR Report: I have inspected the landfill site and have prepared this report to reflect operational compliance with permit conditions, permit plans, specifications, narrative, and all applicable regulations a) Arkansas Licensed Engineer: Sign: b) License Number: c) Attach seal here: Date: 8/24/2018 AEIR Form (Rev. Jan 2013) Page 5 of 5

9 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: Attachment A Updated Drawings I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

10 MW-11 LFMW-9 LFMW-2 MW-35 MW-32 MW-17 BM-5 MW-37 LFMW-1 LFMW-8 APPROXIMATE AREA IV MW-36 BM-3 BM-4 FUTURE LANDFILL AREA LF-7 LFMW-7R LFMW-6 LFMW-12R Sump 13 LF-12 ACTIVE LANDFILL AREA (SEE NOTE) LEGEND: PLANT GRID SYSTEM LFMW-11 LFMW-5 Sump 4 LIMITS OF GRADING SURVEYED ON 05/30/18 FOR THE 2017 ENGINEERING INSPECTION REPORT SWDV-1 GROUNDWATER MONITORING WELL BENCHMARK COORDINATE TABLE PT. NO. NORTHING EASTING ELEVATION BM BM BM LFMW-10 NOTE: THE AREA IDENTIFIED ON THIS DRAWING AS ACTIVE LANDFILL AREA IS THE SOURCE OF THE CALCULATIONS FOR THE TOTAL AIR SPACE USED IN THE 2017 REPORTING PERIOD. BM-1 Sump SURVEY BENCHMARK LEACHATE COLLECTION SUMP REFERENCE DRAWINGS ALBEMARLE CORPORATION MAGNOLIA, ARKANSAS 2017 ANNUAL ENGINEERING INSPECTION REPORT 7389 Florida Blvd., Suite 300 Baton Rouge, Louisiana / SOUTH PLANT LANDFILL WASTE GRADE CONTOURS FOR THE 2017 ANNUAL REPORT SURVEY PERFORMED ON 05/30/

11 MW-11 LFMW-9 LFMW-2 MW-35 MW-32 MW-17 BM-5 MW-37 LFMW-1 LFMW-8 APPROXIMATE AREA IV MW-36 BM-3 BM-4 FUTURE LANDFILL AREA LF-7 LFMW-7R LFMW-6 LFMW-12R Sump 13 LF-12 LEGEND: PLANT GRID SYSTEM LFMW-11 LFMW-5 Sump 4 SWDV-1 GROUNDWATER MONITORING WELL BENCHMARK COORDINATE TABLE LFMW-10 BM-1 Sump SURVEY BENCHMARK LEACHATE COLLECTION SUMP PT. NO. NORTHING EASTING ELEVATION BM BM BM REFERENCE DRAWINGS ALBEMARLE CORPORATION MAGNOLIA, ARKANSAS 2017 ANNUAL ENGINEERING INSPECTION REPORT 7389 Florida Blvd., Suite 300 Baton Rouge, Louisiana / SOUTH PLANT LANDFILL FINAL WASTE GRADE

12 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: Attachment B Leachate Analytical Report I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

13

14

15

16

17

18

19

20

21

22

23 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: Attachment C Updated Financial Assurance I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

24 ALBEMARLE CORPORATION SOUTH PLANT LANDFILL CLOSURE COST ESTIMATE YEAR ESTIMATED COST IMPLICIT PRICE DEFLATOR ADJUSTED CLOSURE COST 2009 $1,130, % $1,154, $1,154, % $1,160, $1,160, % $1,176, $1,176, % $1,207, $1,207, % $1,228, $1,228, % $1,241, $1,241, % $1,259, $1,259, % $1,271, $1,271, % $1,284,639 POST CLOSURE CARE COST ESTIMATE YEAR ESTIMATED COST IMPLICIT PRICE DEFLATOR ADJUSTED POST CLOSURE COST 2009 $293, % $299, $299, % $300, $300, % $304, $304, % $312, $312, % $318, $318, % $321, $321, % $326, $326, % $329, $329, % $333,096 TOTAL ESTIMATED CLOSURE COST TOTAL ESTIMATED POST CLOSURE CARE COST $1,284,639 $333,096 I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\ Albemarle South Plant Landfill financial assurance.xlsx

25 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: Attachment D Closure Plan I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

26 2017 Annual Engineering Inspection Report Albemarle South Plant Landfill Magnolia, Arkansas August 2018 Class 3N Landfill Permit No S AFIN: The Closure and Post Closure Care Plan was not updated during About AECOM AECOM (NYSE: ACM) is a global provider of professional technical and management support services to a broad range of markets, including transportation, facilities, environmental, energy, water and government. With approximately 45,000 employees around the world, AECOM is a leader in all of the key markets that it serves. AECOM provides a blend of global reach, local knowledge, innovation, and collaborative technical excellence in delivering solutions that enhance and sustain the world s built, natural, and social environments. A Fortune 500 company, AECOM serves clients in more than 100 countries and has annual revenue in excess of $6 billion. More information on AECOM and its services can be found at Florida Boulevard, Suite 300 Baton Rouge, Louisiana I:\Projects\Albemarle\ _Swv_RaddGW\500_Deliverables\SPLF_2017 AEIR\2017 SPLF AEIR Inspection RPT ( ).docx August 24, 2018

Complete the form as indicated Instructions are bolded and italicized. Regulation Reference (b)(1) (a)(1) 22.

Complete the form as indicated Instructions are bolded and italicized. Regulation Reference (b)(1) (a)(1) 22. ANNUAL ENGINEERING INSPECTION REPORT (AEIR) FORM Reporting Year: Note: Check applicable landfill class. Class 1 (Reg 22.423(b)), Class 3 (22.522(a)), Class 4 (22.619(b)) Facility Name: AFIN: Permit #:

More information

Rec d Digitally S W M D. West, Tommi AFIN: PMT#: 0265-S4 DOC ID#: TO: BL>File. From: Sent: To: Cc: Subject: Attachments:

Rec d Digitally S W M D. West, Tommi AFIN: PMT#: 0265-S4 DOC ID#: TO: BL>File. From: Sent: To: Cc: Subject: Attachments: West, Tommi From: Sent: To: Cc: Subject: Attachments: Lance Powell Thursday, May 10, 2012 8:41 AM Leamons, Bryan 'rebecca hosey' 2011 Annual Engineering Inspection Report USARSWMD

More information

Cusher, Annette FW: 2017 Clearwater Paper AEIR (AFIN , Permit 0102-S3N-R4) 2017 Clearwater Paper AEIR pdf

Cusher, Annette FW: 2017 Clearwater Paper AEIR (AFIN , Permit 0102-S3N-R4) 2017 Clearwater Paper AEIR pdf Blue, Karen From: Sent: To: Cc: Subject: Attachments: Arjmandi, Masoud Monday, July 02, 2018 7:46 AM Blue, Karen Cusher, Annette FW: 2017 Clearwater Paper AEIR (AFIN 21-00036, Permit 0102-S3N-R4) 2017

More information

2009 ANNUAL ENGINEERING INSPECTION REPORT

2009 ANNUAL ENGINEERING INSPECTION REPORT 2009 ANNUAL ENGINEERING INSPECTION REPORT UPPER SOUTHWEST ARKANSAS REGIONAL SOLID WASTE MANAGEMENT DISTRICT CLASS 1 WASTE DISPOSAL AREA Permit No. 265-S1-R1; CSN No. 31-00107 PREPARED FOR: UPPER SOUTHWEST

More information

Rec d Digitally S W M D. Blue, Karen AFIN: PMT#: 0267-S1-R1 DOC ID#: AC>FILE <KMB TO: state.ar.us] To: Spangler, Alan

Rec d Digitally S W M D. Blue, Karen AFIN: PMT#: 0267-S1-R1 DOC ID#: AC>FILE <KMB TO: state.ar.us] To: Spangler, Alan Blue, Karen To: Subject: Coker, Cristina RE: Beneficial reuse Sent: Monday, April 09, 2018 3:27 PM To: Coker, Cristina Cc: Tustin, Serina; Speake, Susan; Cusher, Annette; Rich, Jay; Stringer, Charles;

More information

RE: Quarterly Inspection; AFIN ; Permit Number 0307-S4

RE: Quarterly Inspection; AFIN ; Permit Number 0307-S4 Document ID # 067264 August 15, 2012 The Honorable Keith Neely Bradley County Judge Bradley County Courthouse 101 East Cedar Warren, AR 71671 RE: Quarterly Inspection; AFIN 06-00163; Permit Number 0307-S4

More information

2008 ANNUAL ENGINEERING INSPECTION REPORT

2008 ANNUAL ENGINEERING INSPECTION REPORT 2008 ANNUAL ENGINEERING INSPECTION REPORT EMS Class 3T Landfill Permit #0269-S3T-R1 PREPARED FOR: Eaton-Moery Environmental Services 1784 Hwy. 1 North Wynne, Arkansas 72396 PREPARED BY: Fields & Associates,

More information

Quarterly Inspection; AFIN ; Permit Number 0225-S1-R5.

Quarterly Inspection; AFIN ; Permit Number 0225-S1-R5. Document ID 088827 February 1, 2016 Ms. Wendy Jackson Ozark Ridge Landfill, Inc. 10140 Ozark Ridge Access Lane Danville, AR 72833 RE: Quarterly Inspection; AFIN 75-00046; Permit Number 0225-S1-R5. Dear

More information

September 24, RE: Quarterly Inspection; AFIN ; Permit Number 0249-S4. Dear Judge Ott:

September 24, RE: Quarterly Inspection; AFIN ; Permit Number 0249-S4. Dear Judge Ott: Document ID 086721 September 24, 2015 The Honorable Terry Ott Marion County Judge Ozark Mountain Regional Solid Waste Management District P.O. Box 545 Yellville, AR 72687 RE: Quarterly Inspection; AFIN

More information

If I can be of any further assistance, feel free to contact me at or

If I can be of any further assistance, feel free to contact me at or Document ID 090458 April 27, 2016 Kendrick Ketchum Cleburne Co. Transfer Station Progressive Waste Solutions of AR, Inc. PO Box 171 Heber Springs, AR 72543 RE: Quarterly Inspection; AFIN 12-00090 Permit

More information

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4.

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4. Document ID 074717 November 15, 2013 Robert Hendrix Craighead SWDA P.O. Box 16777 Jonesboro, AR 72401 RE: Quarterly Inspection; AFIN 16-00 ; Permit Number 0254-S1-R4. Dear Mr. Hendrix, On November 8, 2013,

More information

Inspection Report. Re: Keystone Ash Disposal Site Annual CCR Unit Inspection Report No. 1

Inspection Report. Re: Keystone Ash Disposal Site Annual CCR Unit Inspection Report No. 1 Inspection Report To: From: Mark Jacklin (NRG Keystone Generating Station) Jesse Varsho, P.E. Re: Keystone Ash Disposal Site Annual CCR Unit Inspection Report No. 1 Inspection Report January 12, 2016 INTRODUCTION

More information

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 217 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 2-S3N-R2 AFIN: 32-42 JANUARY 17, 218 217 Landfill Inspection Report Entergy Independence Plant Class 3N

More information

Certified Mail # Return Receipt Requested. November 20, 2018

Certified Mail # Return Receipt Requested. November 20, 2018 105513 Certified Mail # 9489 0090 0027 6022 1795 39 Return Receipt Requested November 20, 2018 The Honorable Jim Hudson Ashley County 205 E. Jefferson, Suite 14 Hamburg, AR 71646 RE: Quarterly Inspection

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

November 26, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

November 26, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 Document ID 081094 November 26, 2014 The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 RE: Quarterly Inspection; AFIN 10-00062; Permit Number 0044-S4

More information

October 20, Mr. Kevin Nolan Environmental Coordinator Weyerhaeuser Mountain Pine Mill P.O. Box 7 Mountain Pine, AR 71956

October 20, Mr. Kevin Nolan Environmental Coordinator Weyerhaeuser Mountain Pine Mill P.O. Box 7 Mountain Pine, AR 71956 October 20, 2006 Mr. Kevin Nolan Environmental Coordinator Weyerhaeuser Mountain Pine Mill P.O. Box 7 Mountain Pine, AR 71956 RE: AFIN 26-00015 Permit 0304-S3N Dear Mr. Nolan: On October 20, 2006, I performed

More information

0225-S1-R5 FW: WM Ozark Ridge Landfill - Proposed/Revised Recirculation Plan-2014

0225-S1-R5 FW: WM Ozark Ridge Landfill - Proposed/Revised Recirculation Plan-2014 West, Tommi From: Sent: To: Subject: Attachments: Importance: Rec d Digitally Matoska, Maria AFIN: 75-00046 Tuesday, May 27, 2014 10:17 AM West, Tommi; Leamons, Bryan PMT#: 0225-S1-R5 FW: WM Ozark Ridge

More information

CCP Annual Inspection Report

CCP Annual Inspection Report CCP Annual Inspection Report Brickhaven No. 2 Mine Tract A Structural Fill DWM Permit 1910, DEMLR Permit 19-25 Charah, Inc. Moncure, North Carolina February 2018 This page intentionally left blank. Charah,

More information

RE: Quarterly Inspection; AFIN ; Permit Number 0102-S3N-R4

RE: Quarterly Inspection; AFIN ; Permit Number 0102-S3N-R4 Document ID 094867 January 23, 2017 Clearwater Paper Corporation Attn: Ms. Kelly Bryant P. O. Box 727 McGehee, AR 71654 RE: Quarterly Inspection; AFIN 21-00036; Permit Number 0102-S3N-R4 Dear Ms. Bryant:

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

cc: Tammie Hynum, Acting Sr. Operations Manager, Office of Land Resources

cc: Tammie Hynum, Acting Sr. Operations Manager, Office of Land Resources Document ID 093817 November 09, 2016 The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 RE: Quarterly Inspection; AFIN 10-00062; Permit Number 0044-S4-R1

More information

RE: Quarterly Inspection; AFIN Permit Number 0289-S3T-R3

RE: Quarterly Inspection; AFIN Permit Number 0289-S3T-R3 Document ID 090997 May 27, 2016 JAN SMITH PROGRAM DIRECTOR WHITE RIVER REGIONAL SOLID WASTE MGMT DISTRICT PO BOX 2396 BATESVILLE AR 72503 RE: Quarterly Inspection; AFIN 73-00029 Permit Number 0289-S3T-R3

More information

Appendix 9. Wright Landfill Stabilization Report 2013

Appendix 9. Wright Landfill Stabilization Report 2013 Appendix 9 Wright Landfill Stabilization Report 2013 Board of County Commissioners State of Florida October 30, 2013 Ms. Dawn Templin Northwest District Florida Department of Environmental Protection 160

More information

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4.

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4. Document ID 077112 April 4, 2014 Robert Hendrix Craighead SWDA P.O. Box 16777 Jonesboro, AR 72401 RE: Quarterly Inspection; AFIN 16-00 9 ; Permit Number 0254-S1-R4. Dear Mr. Hendrix, On March 18, 2014,

More information

Table of CONTENTS. ATTACHMENT A - Closure Plan from Existing Landfill Permit

Table of CONTENTS. ATTACHMENT A - Closure Plan from Existing Landfill Permit CLOSURE PLAN CFR 257.102(b) CCR Landfill Turk Plant Fulton, Arkansas September, 2016 Prepared for: Southwestern Electric Power Company Prepared by: American Electric Power Service Corporation 1 Riverside

More information

April 10, Mr. Randy Melton, Site Manager Ozark Ridge Landfill, Inc Ozark Ridge Access Lane Danville, AR 72833

April 10, Mr. Randy Melton, Site Manager Ozark Ridge Landfill, Inc Ozark Ridge Access Lane Danville, AR 72833 April 10, 2008 Mr. Randy Melton, Site Manager Ozark Ridge Landfill, Inc. 10140 Ozark Ridge Access Lane Danville, AR 72833 RE: AFIN: 75-00046 Permit Number: 0225-S1-R5 Dear Mr. Melton: On March 17, 2008,

More information

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706) Memo To: From: cc: Local Issuing Authorities, Design Professionals, Plan Reviewers and Other Interested Parties The Georgia Soil and Water Conservation Commission and the Georgia Environmental Protection

More information

SOLID WASTE MANAGEMENT FACILITY Permit No PERMIT TO CONSTRUCT PERMIT TO OPERATE. PERMIT FOR CLOSURE Not Applicable

SOLID WASTE MANAGEMENT FACILITY Permit No PERMIT TO CONSTRUCT PERMIT TO OPERATE. PERMIT FOR CLOSURE Not Applicable Pat McCrory Governor North Carolina Department of Environmental Quality Division of Waste Management Page 1 of 12 Donald R. van der Vaart Secretary STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY

More information

December 21, Mr. Jeff Pittman, PE Cooperative Energy P.O. Box Hattiesburg, MS 39402

December 21, Mr. Jeff Pittman, PE Cooperative Energy P.O. Box Hattiesburg, MS 39402 December 21, 2018 Mr. Jeff Pittman, PE Cooperative Energy P.O. Box 15849 Hattiesburg, MS 39402 Re: Annual CCR Landfill Inspection Report for 2018 Revision 1 R.D. Morrow, Sr. Power Generating Station Purvis,

More information

HOT SPRINGS VILLAGE CEDAR CREEK CLASS 1 LANDFILL 2004 ANNUAL ENGINEERING INSPECTION REPORT

HOT SPRINGS VILLAGE CEDAR CREEK CLASS 1 LANDFILL 2004 ANNUAL ENGINEERING INSPECTION REPORT HOT SPRINGS VILLAGE CEDAR CREEK CLASS 1 LANDFILL 2004 ANNUAL ENGINEERING INSPECTION REPORT PERMIT #0192-S; AFIN 26-00105 PREPARED FOR: HOT SPRINGS VILLAGE POA 895 DESOTA BLVD HOT SPRINGS VILLAGE, AR 71909

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan SWEPCO John W. Turk, Jr. Power Plant Fulton, Arkansas Permit No. 0311-S3N-R1 AFIN: 29-00506 October 2016 Terracon Project No. 35167133 Prepared for: SWEPCO 3711 Highway

More information

Mr. Wayne Mangum, District Manager Two Pines Landfill 100 Two Pines Drive North Little Rock, AR

Mr. Wayne Mangum, District Manager Two Pines Landfill 100 Two Pines Drive North Little Rock, AR Mr. Wayne Mangum, District Manager Two Pines Landfill 100 Two Pines Drive North Little Rock, AR. 72117 January 22, 2009 Mr. Wayne Mangum, District Manager Two Pines Landfill 100 Two Pines Drive North Little

More information

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST Facility Information: Facility Name: On-Site Inspection Start Date: 06/05/2008 On-Site Inspection End Date: 06/05/2008 WACS : 73114 Facility Street Address: STOCKADE RD @ CR846 City: IMMOKALEE County Name:

More information

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Prepared for TransAlta Centralia Mining LLC December 5 East Front Street Suite Boise, Idaho 87 /6/5 This document was prepared under direct

More information

EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide your user ID or password.

EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide your user ID or password. Rec d Digitally Taylor, Dianna From: Sent: To: Subject: Attachments: Leamons, Bryan Wednesday, December 10, 2014 1:24 PM Taylor, Dianna FW: Entergy, Independence Class 3N AR-14-065.PDF AFIN: 32-00042 PMT#:

More information

West, Tommi; Leamons, Bryan. Kool Response _opt.pdf

West, Tommi; Leamons, Bryan. Kool Response _opt.pdf Rec d Digitally West, Tommi From: Matoska, Maria AFIN: 19-00410 Sent: Thursday, May 23, 2013 4:56 PM To: West, Tommi; Leamons, Bryan PMT#: 0028-SWTP Subject: FW: Kool Metal Recycling Response AFIN: 19-00410

More information

On behalf of Green Meadow, LLC and Charah, Inc., HDR provides the enclosed Addendum 3 regarding the permit application entitled:

On behalf of Green Meadow, LLC and Charah, Inc., HDR provides the enclosed Addendum 3 regarding the permit application entitled: March 13, 2015 Mr. Ed Mussler, III, PE, Supervisor Permitting Branch, Solid Waste Section Division of Waste Management, NCDENR 1646 Mail Service Center Raleigh NC 27699 Dear Mr. Mussler, On behalf of Green

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Texas Commission on Environmental Quality Permit For Municipal Solid Waste (MSW) Management Facility Issued under provisions of Texas Health and Safety Code Chapter 361 MSW Permit No.: 2383 Name of Site

More information

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL ENVIRONMENTAL STANDARD OPERATING PROCEDURE 2 HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL 1. Version, Date. 3, 05 March 2014 (EMS) 2. Purpose. This Environmental

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: SOUTH DADE LF On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 56824 Facility

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION SOLID WASTE MANAGEMENT FACILITY INSPECTION CHECKLIST

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION SOLID WASTE MANAGEMENT FACILITY INSPECTION CHECKLIST FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION SOLID WASTE MANAGEMENT FACILITY INSPECTION CHECKLIST Facility Name: SEBRING LANDFILL. INC. CONSTRUCTION & DEMOLITION DEBRIS DISPOSAL FACILITY WACS No.: 75434

More information

August 30, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

August 30, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 Document ID 073311 August 30, 2013 The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 RE: Quarterly Inspection; AFIN 10-00062; Permit Number 0044-S4. Dear

More information

Jim Bridger Power Plant

Jim Bridger Power Plant 2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December

More information

November 22, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

November 22, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 Document ID 074865 November 22, 2013 The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923 RE: Quarterly Inspection; AFIN 10-00062; Permit Number 0044-S4.

More information

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2015 LANDFILL INSPECTION REPORT GERS-15-021 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: BASELINE LANDFILL CLASS I On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 20906

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: WACS : INSPECTION PARTICIPANTS: (Include

More information

cc: Charles M. Johnson, Senior Manager, Regulated Waste Operations, Office of Land Resources

cc: Charles M. Johnson, Senior Manager, Regulated Waste Operations, Office of Land Resources 103947 July 31, 2018 Mike Vernon Russellville Yard Waste Facility 203 South Commerce Ave. Russellville, AR 72801 RE: Quarterly Inspection conducted on 7/10/2018 AFIN 58-00741 Permit Number 0053-SCYW Dear

More information

Mr. Warren Atkins Solid Waste Services Manager City of Little Rock Solid Waste Disposal Facility Ironton Cutoff Little Rock, AR 72206

Mr. Warren Atkins Solid Waste Services Manager City of Little Rock Solid Waste Disposal Facility Ironton Cutoff Little Rock, AR 72206 Document ID 089131 February 17, 2016 Mr. Warren Atkins Solid Waste Services Manager City of Little Rock Solid Waste Disposal Facility 10803 Ironton Cutoff Little Rock, AR 72206 RE: Quarterly Inspection;

More information

RE: Inspection of the Arkansas Resources Management Land Application Facility (Searcy Landfarm)

RE: Inspection of the Arkansas Resources Management Land Application Facility (Searcy Landfarm) September 25, 2014 Jackie Lackie Arkansas Resources Management, LLC Searcy Landfarm P.O Box 17469 North Little Rock, AR 72117 RE: AFIN: 73-01055 Permit Number #: 5040-WR-3 County: White RE: Inspection

More information

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI INITIAL PREPARATION DATE: October 11, 2016 TABLE OF CONTENTS 1. CERTIFICATION

More information

CERTIFICATE OF APPROVED REGISTRATION J. T. BAKER CHEMICAL COMPANY. Sanitary Landfill. Harmony Township. Warren 2110B

CERTIFICATE OF APPROVED REGISTRATION J. T. BAKER CHEMICAL COMPANY. Sanitary Landfill. Harmony Township. Warren 2110B State of New Jersey SOLID WASTE ADMINISTRATION BEATRICE S. TYLUTKI CERTIFICATE OF APPROVED REGISTRATION Under the provisions of N.J.S.A. 13:lE n as the Solid Waste Management Act, this registration is

More information

TABLE OF CONTENTS PART III. REVISION 0 6-ii

TABLE OF CONTENTS PART III. REVISION 0 6-ii TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 6-1 2.0 GENERAL LANDFILL GAS AND SITE CHARACTERISTICS [330.371(b)(1)(A)-(E)... 6-2 2.1 INTRODUCTION... 6-2 2.2 SOIL CONDITIONS... 6-2 2.3 FACILITY STRUCTURES...

More information

BIOREACTOR LANDFILLS: AN INNOVATIVE TECHNOLOGY FOR SUSTAINABLE MANAGEMENT OF SOLID WASTE. Rao Y. Surampalli

BIOREACTOR LANDFILLS: AN INNOVATIVE TECHNOLOGY FOR SUSTAINABLE MANAGEMENT OF SOLID WASTE. Rao Y. Surampalli BIOREACTOR LANDFILLS: AN INNOVATIVE TECHNOLOGY FOR SUSTAINABLE MANAGEMENT OF SOLID WASTE Rao Y. Surampalli Bioreactor Landfills Municipal solid waste landfills that utilize bulk liquids in an effort to

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO S3N AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO S3N AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO. 0303-S3N AFIN: 47-00461 JANUARY 15, 2016 PLUM POINT ENERGY STATION CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

CCP Annual Inspection Report

CCP Annual Inspection Report CCP Annual Inspection Report Brickhaven No. 2 Mine Tract A Structural Fill DWM Permit 1910, DEMLR Permit 19-25 Charah, Inc. Moncure, North Carolina October 2016 This page intentionally left blank. Charah,

More information

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station) Inspection Report To: From: David Burton, Facility Manager (NRG Indian River Generating Station) Richard Southorn, P.E., P.G., CPSWQ Re: Indian River Landfill Annual CCR Unit Inspection Report No. 2 Inspection

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN:

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN: LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT

More information

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated

More information

2016 ANNUAL STRUCTURAL STABILITY INSPECTION REPORT

2016 ANNUAL STRUCTURAL STABILITY INSPECTION REPORT Prepared for: FORT ARMISTEAD ROAD LOT 15 LANDFILL, LLC 3601 Fort Armistead Road 21226 2016 ANNUAL STRUCTURAL STABILITY INSPECTION REPORT Per Requirements of 40 CFR 257.84(b)(2) Prepared by: 10211 Wincopin

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: WACS : INSPECTION PARTICIPANTS: (Include

More information

Eric Grambo, Operations Manager Republic Services 2500 State Road 60 W Bartow, FL

Eric Grambo, Operations Manager Republic Services 2500 State Road 60 W Bartow, FL December 6, 2018 Eric Grambo, Operations Manager Republic Services 2500 State Road 60 W Bartow, FL 33830 egrambo@republicservices.com Re: Cedar Trail Landfill WACS 51484 Polk County Dear Mr. Grambo: Department

More information

2018 JRPS LANDFILL INSPECTION REPORT CITY UTILITIES OF SPRINGFIELD, MISSOURI

2018 JRPS LANDFILL INSPECTION REPORT CITY UTILITIES OF SPRINGFIELD, MISSOURI 2018 JRPS LANDFILL INSPECTION REPORT CITY UTILITIES OF SPRINGFIELD, MISSOURI PREPARATION DATE: January 11, 2019 i TABLE OF CONTENTS INSPECTION REPORT CERTIFICATION... Page 1 WEEKLY LANDFILL INSPECTIONS

More information

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1 March 2, 2012 Mr. John R. Reynolds Dan Reynolds Company P. O. Box 457 Camden, AR 71701 RE: AFIN: 52-00598 Permit Tracking No.: 0487-WG-SW-1 Dear Mr. Reynolds: On, February 28, 2012, Chris Voss, ADEQ Inspector,

More information

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Turk Plant Fulton, Arkansas. September, 2016

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Turk Plant Fulton, Arkansas. September, 2016 POST CLOSURE PLAN CFR 257.104(d) CCR Landfill Turk Plant Fulton, Arkansas September, 2016 Prepared for: Southwestern Electric Power Company Prepared by: American Electric Power Service Corporation 1 Riverside

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1 April 7, 2010 Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas 72718 RE: Cave Springs Wastewater Treatment Plant #1 AFIN: 04-01642 Permit #: 4893-WR-1 Dear Mayor Reeves: On March

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: INSPECTION PARTICIPANTS: (Include ALL Landfill and Department Personnel with Corresponding Titles)

More information

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE

More information

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for: Initial Closure Plan Slag Pond Prepared for: Wisconsin Power and Light Company 11999 County Highway VV Cassville, Wisconsin 53806 Prepared by: SCS ENGINEERS 2830 Dairy Drive Madison, Wisconsin 53718-6751

More information

Attachment 1 FDEP Form (28)

Attachment 1 FDEP Form (28) Attachment 1 FDEP Form 62-701.900(28) Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 DEP Form # 62-701.900(28), F.A.C. Form Title:

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session. Douglas T. Mandeville, P.E.

SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session. Douglas T. Mandeville, P.E. SWANA NEW YORK CHAPTER Landfill/Bioreactor/Leachate Recirculation Design and Operations Training Session Douglas T. Mandeville, P.E. Columbia MD 410.381.4333 dmandeville@geosyntec.com 8 November 2006 Presentation

More information

Cell 2 Composite Liner Design Certification

Cell 2 Composite Liner Design Certification Cell 2 Composite Liner Design Certification SWEPCO John W. Turk, Jr. Power Plant Class 3N Landfill Permit No. 311-S3N-R1 AFIN: 29-56 July 16, 218 Project No. 35177127 Prepared for: Southwestern Electric

More information

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company POST CLOSURE PLAN CFR 257.104(d) Pond 1 Clinch Power Plant Russell County, West Virginia November 2016 Prepared for: Appalachian Power Company Prepared by: Amec Foster Wheeler Environment & Infrastructure,

More information

The above items require your immediate attention. Please submit a written response to this finding to the following address:

The above items require your immediate attention. Please submit a written response to this finding to the following address: May 6, 2009 Ted Suhl Rolling Hills Investments, Inc. 1033 Old Burr Road Warm Springs, AR 72478-9077 RE: Sunset Bay AFIN: 04-00464 Permit No.: 4543-W Dear Mr. Suhl: On April 30, 2009, I performed a routine

More information

December 19, GEI Project No Mr. Tim Muehlfeld, P.E. WEC Business Services, LLC 333 W. Everett Street, A231 Milwaukee, Wisconsin 53203

December 19, GEI Project No Mr. Tim Muehlfeld, P.E. WEC Business Services, LLC 333 W. Everett Street, A231 Milwaukee, Wisconsin 53203 Consulting Engineers and Scientists December 19, 1 GEI Project No. 115 Mr. Tim Muehlfeld, P.E. WEC Business Services, LLC W. Everett Street, A1 Milwaukee, Wisconsin 5 Re: Landfill Inspection Report We

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

If I can be of any further assistance, feel free to contact me at (501) or

If I can be of any further assistance, feel free to contact me at (501) or Document ID 092606 September 6, 2016 The Honorable Jerry Holmes Cleburne County Judge 301 W. Main Street Heber Springs, AR 72543 RE: Quarterly Inspection AFIN: 12-00039 Permit Number: 0280-S4-R1 Dear Judge

More information

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO: PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS

More information

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: GILCHRIST COUNTY CENTRAL WASTE MANAGEMENT FACILITY - On-Site Inspection Start Date: On-Site Inspection

More information

APPENDIX I. Plan Reviewer Checklist

APPENDIX I. Plan Reviewer Checklist APPENDIX I Plan Reviewer Checklist PLAN REVIEW CHECKLIST Annual Standards and Specifications The ESC/SWM Plan clearly indicates the version of Virginia Tech Annual Standards and Specifications applicable.

More information

VISUAL SITE INSPECTION REPORT

VISUAL SITE INSPECTION REPORT VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED

More information

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square. Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

If I can be of any further assistance, feel free to contact me at or

If I can be of any further assistance, feel free to contact me at or Document ID 092109 August 3, 2016 Honorable Jimmy Jones Dallas County Courthouse Third & Oak Streets Fordyce, AR 71742 RE: Quarterly Inspection; AFIN 20-00045; Permit Number 0210-S4 Dear Judge Jones: On

More information

FINAL REPORT COME BY CHANCE SECURE LANDFILL GROUNDWATER DRAINAGE SYSTEM. Submitted to:

FINAL REPORT COME BY CHANCE SECURE LANDFILL GROUNDWATER DRAINAGE SYSTEM. Submitted to: FINAL REPORT COME BY CHANCE SECURE LANDFILL GROUNDWATER DRAINAGE SYSTEM Submitted to: Department of Environment and Conservation 4 th Floor West Block, Confederation Building P.O. Box 8700 St. John s,

More information

If I can be any further assistance, feel free to contact me at (501) or at the address below.

If I can be any further assistance, feel free to contact me at (501) or at the address below. ADEQ A R K A N S A S Department of Environmental Quality October 24, 2003 Mr. Thomas Hodges City of Searcy 401 West Arch St. Searcy, AR 72143 RE: AFIN Nbr: 73-00054 Permit Nbr. 0009-SG-CYW Dear Mr. Hodges:

More information

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Page 1 of 7 Updated 12/28/2017 Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map: Parcel: Lot: Disturbed Acreage: Engineering Firm: Phone Number:

More information

Rec d Digitally S W M D. West, Tommi AFIN: From: McConnell, Melissa Sent: Thursday, November 01, :56 AM PMT#: 0028-SWTP TO: BL>File

Rec d Digitally S W M D. West, Tommi AFIN: From: McConnell, Melissa Sent: Thursday, November 01, :56 AM PMT#: 0028-SWTP TO: BL>File West, Tommi From: Sent: To: Subject: Attachments: Leamons, Bryan Thursday, November 01, 2012 10:51 AM West, Tommi FW: Joint Inspection of Kool Metal Recycling Kool Metal.pdf Can you log this in Kool metal?

More information

2. A couple of rock cheek dams also need maintaining. It was noted that stormwater was bypassing the rock check dams.

2. A couple of rock cheek dams also need maintaining. It was noted that stormwater was bypassing the rock check dams. December 21, 2009 George Sheffer Southwestern Energy Company P.O. Box 789 Conway, AR 72033 RE: Hart 09-06, #1-31 H, 00909-WG-P Dear Mr. Sheffer: On December 14, 2009, Dawn Keller and I performed an inspection

More information

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Flint Creek Plant Gentry, Arkansas. September, 2016

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Flint Creek Plant Gentry, Arkansas. September, 2016 POST CLOSURE PLAN CFR 257.104(d) CCR Landfill Flint Creek Plant Gentry, Arkansas September, 2016 Prepared for: Southwestern Electric Power Company Prepared by: American Electric Power Service Corporation

More information

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN) Narrative Report Information Worksheet City and County of Denver, Demolition and Construction Activities Stormwater Management Plan (SWMP) Revised 2/12/2013 as entry form A. PROJECT LOCATION Name of Project

More information

RE: Harris #1-22 Logan County, State Permit #00267-WG-P

RE: Harris #1-22 Logan County, State Permit #00267-WG-P February 9, 2009 Mr. Mike Cardwell, Landman Hanna Oil and Gas Company P.O. Box 1356 Fort Smith, AR 72902 RE: Harris #1-22 Logan County, State Permit #00267-WG-P Dear Mr. Cardwell: On January 29, 2009,

More information