1 Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development MAY 2011 Cheryl Bradley & Marilyn Neville PRINCIPAL AUTHORS ON BEHALF OF Foothills Restoration Forum and Native Prairie Working Group

2

3 ACKNOWLEDGEMENTS The following government ministries and agencies, companies and organizations participated in the process to develop the recommended principles and guidelines. Participation does not imply endorsement of the full content of this document. An * indicates participation in the Native Prairie Working Group. Staff of the following government ministries and agencies: Alberta Environment * Alberta Municipal Affairs - Special Areas Board * Alberta Sustainable Resource Development Fish and Wildlife * Alberta Sustainable Resource Development Land Management * Alberta Utilities Commission * Blood Tribe Land Management * Cardston County Cypress County Energy Resources Conservation Board Municipal District of Willow Creek Representatives of the following companies and organizations: Alberta Beef Producers Alberta Native Plant Council * Alta Rangeland Services Alberta Wilderness Association * Alberta Wind Energy Corporation * Anatum Ecological Consulting Calsten Consulting Inc. Chinook Area Land Users Association Enmax Corporation * Foothills Restoration Forum * Golder Associates * Grasslands Naturalists Kestrel Research Inc. Land Solutions LP * Landwise Inc. Nature Alberta NaturEner Renewable Energy * Pembina Institute Prairie Conservation Forum * Rural Road Construction Shell Canada Energy* Southern Alberta Land Trust Society Stantec * Suncor Energy * Tessolini Consulting TransAlta Corporation * Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May 2011 i

4 The Foothills Restoration Forum provided resources and expertise to coordinate the process to develop the guidelines. Financial contributions were provided by: Alberta Municipal Affairs Special Areas Board Alberta Native Plant Council Alberta Prairie Conservation Forum Alta Rangeland Services Ltd Cypress County Enmax Larry Frith Landwise Inc. Rural Road Construction Silvatech Consulting Ltd. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May 2011 ii

5 Table of Contents 1.0 INTRODUCTION OVERVIEW OF PROCESS OUTCOMES AND OUTPUTS RECOMMENDED PRINCIPLES AND GUIDELINES AND IMPLEMENTATION CONSIDERATIONS... 9 A. PLANNING FOR AVOIDANCE OF NATIVE PRAIRIE B. PLANNING TO MINIMIZE DISTURBANCE OF NATIVE PRAIRIE WHERE AVOIDANCE IS NOT ACHIEVED C. MINIMIZING DISTURBANCE DURING CONSTRUCTION, SITE MAINTENANCE, MONITORING AND RESTORATION/RECLAMATION APPENDIX 1 - CURRENT ENVIRONMENTAL REGULATORY FRAMEWORK REGARDING WIND ENERGY PROJECTS IN ALBERTA ALBERTA UTILITIES COMMISSION ALBERTA ENVIRONMENT ALBERTA SUSTAINABLE RESOURCE DEVELOPMENT FISH AND WILDLIFE DIVISION ALBERTA SUSTAINABLE RESOURCE DEVELOPMENT PUBLIC LANDS SPECIAL AREAS BOARD FEDERAL GOVERNMENT Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May 2011 iii

6 Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May 2011 iv

7 1.0 Introduction This document contains recommended principles and guidelines for minimizing surface disturbance of wind energy projects on native prairie in Alberta. The recommended principles and guidelines and implementation considerations have been defined by a variety of stakeholders and are primarily based on existing principles and guidelines that apply to oil and gas development in native prairie. If adopted by regulators the principles and guidelines would complement and/or improve current guidelines of Alberta Fish and Wildlife that provide guidance on protecting bats, birds and other species of conservation concern when locating wind turbines. The recommended principles and guidelines have been developed for use not only by regulators but also by wind energy developers, consultants, conservationists and landowners. Currently in Alberta, wind power projects occur only on private land. As owners of freehold land, landowners have the discretion for those aspects of project siting, construction, operations and reclamation that affect their use of the land and that are not regulated by municipal, provincial or federal governments. The guidelines recognize the role and responsibilities of private landowners and are developed to assist landowners in their stewardship of native prairie. 2.0 Overview of Process A workshop to review Sustainable Resource Development Fish and Wildlife Division Wildlife Guidelines for Alberta Wind Energy Projects was held February 10 th and 11 th, 2010 in Cochrane, Alberta. A gap in the guidelines was identified with respect to a broader approach for maintaining biodiversity by minimizing disturbance to native ecosystems, including wetlands. Currently, wind energy projects, approved and proposed, are concentrated in the Grassland, Parkland and Montane natural regions of southern and central Alberta where grasslands naturally occur. A working group, known as the Native Prairie Working Group, comprised of representatives from the wind energy companies, government agencies, and environmental/reclamation interests was formed to define and recommend guidelines for wind energy development on native prairie and with regard to wetlands. The Native Prairie Working Group met on May 28 th, A decision was made to compile and summarize information on existing information letters, principles and guidelines for minimizing native prairie disturbance as well as the regulatory framework for addressing the environmental effects of wind energy development. The resulting document, Minimizing Surface Disturbance of Alberta s Native Prairie: Background to Development of Guidelines for the Wind Energy Industry, was circulated for review by working group members as well as members of the Foothills Restoration Forum and Prairie Conservation Forum. All comments and suggestions were addressed. The Native Prairie Working Group met again on September 20 th, It was agreed the background document, with minor revisions, would serve as a common base of information for moving forward in developing guidelines regarding wind energy and native prairie. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

8 The Native Prairie Working Group requested that the Foothills Restoration Forum organize a field tour and workshop that would bring together key interests to share information and review current native prairie principles and guidelines with respect to their appropriateness for application to the wind energy industry. Sources of current principles and guidelines for minimizing disturbance of native prairie are: ERCB IL Principles for Minimizing Surface Disturbance in Native Prairie and Parkland Areas SRD IL Foothills Fescue Grassland Principles for Minimizing Surface Disturbance SRD 2006 Wildlife Guidelines for Alberta Wind Energy Projects A field tour and workshop were held on October 27 th and 28 th, 2010 in Cowley. The 35 participants came from a broad variety of backgrounds and interests and included wind energy developers, landowners, range specialists, environmental consultants, mitigation/reclamation specialists, and representatives of non-government environmental organizations as well as representatives from Blood Tribe Lands and municipal and provincial government agencies. Participants considered the appropriateness of applying current principles and guidelines to wind energy development and any modifications needed. Barriers or challenges and opportunities with respect to applying existing principles and guidelines to the wind energy industry were identified and discussed. Implementation processes and tools were also identified. A report of the results of the workshop, Principles/Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development: Results of a Workshop and Field Tour held October 27 and 28, 2010 in Cowley AB, was provided to all participants and invitees for their consideration and for broader circulation among others who may be interested in reviewing it, including members of the Foothills Restoration Forum Technical Advisory Committee and of the Prairie Conservation Forum Board. In particular, comments were sought on suggested principles and guidelines and implementation considerations. Fifteen responses were received. Responses were integrated into the revisions of the draft principles and guidelines. The Native Prairie Working Group held two additional meetings on February 14 th and April 4 th, 2011 to review and finalize the recommended principles and guidelines. This report is being provided to staff in Alberta Sustainable Resource Development (ASRD) Fish and Wildlife for their consideration in updating the Alberta Wildlife Guidelines for Alberta Wind Energy Projects and for broader considerations relevant to the Department s role in reviewing applications for wind energy projects. In addition, all participants in the process are being provided the report. During the process to develop recommended principles and guidelines for minimizing disturbance of native prairie from wind energy development, participants raised questions, issues and concerns regarding provincial regulation of the wind energy industry and also provided suggestions for improvement in the regulatory framework. These comments have been compiled and summarized in a separate document that will be provided to all participants. Addressing these matters is beyond the scope of this process. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

9 In addition, participants in the field tour provided observations and suggestions for specific beneficial practices in construction, operations and reclamation of wind energy projects. These ideas have been compiled and summarized for use in any future effort to more clearly define beneficial practices. These are available on the website of the Foothills Restoration Forum. 3.0 Outcomes and Outputs The following short-term outputs and long-term outcomes are sought from this process: Outputs (short-term): Recommended guidelines for minimizing disturbance of native prairie and wetlands that: Outcomes (long-term): are based on best available science and traditional knowledge; have broad agreement; provide guidance rather than prescriptive requirements; define a suite of practices for minimizing disturbance through regional and project planning and during project construction, operations, maintenance and restoration; encourage ongoing improvement, and are useful and practical for wind energy developers, consultants, landowners, conservationists, and regulators. Disturbance of native prairie and wetlands is minimized. Environmental risks of developing on native prairie are well understood. Expectations for planning and development of wind energy projects with respect to native prairie and wetlands are consistent among all interests. Industry practices are well defined and continue to improve. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

10 Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

11 4.0 Recommended Principles and Guidelines and Implementation Considerations Three principles are defined. Associated with each principle are more specific guidelines. A principle is defined as a basic generalization that is accepted and can be used as a basis for conduct. A guideline is defined as a general statement of desired practices. Some guidelines may be supported by regulation. Implementation considerations include key points that arose during development of the guidelines and that support understanding and implementation of the guidelines. The principles and guidelines for wind energy development are derived from the following key sources: ERCB IL Principles for Minimizing Surface Disturbance in Native Prairie and Parkland Areas SRD IL Foothills Fescue Grassland Principles for Minimizing Surface Disturbance SRD 2006 Wildlife Guidelines for Alberta Wind Energy Projects AENV 2010 Reclamation Criteria for Wellsites and Associated Facilities for Native Grasslands SRD 2010 Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta These original sources are referenced for each principle and guideline. During the process to develop guidelines specific to the wind energy industry, some of the statements from the original sources were modified and merged, however the intent of the original statements is maintained. Native prairie is used synonymously with native grasslands as defined in the 2010 Reclamation Criteria for Wellsites and Associated Facilities for Native Grasslands (p. 5) found online on the Alberta Environment website. The Grassland Reclamation Criteria should be used for native grasslands and modified native grasslands, (not tame grasslands which are dominated by agronomic species and have been ploughed or tilled). Native grasslands commonly present a mixture of different native grass species, forbs (flowering/broad-leaved species), shrubs (woody species) and tree species. Modifed native grasslands are ones where native species integrity has been altered by past disturbance, and where more than 70% of community is composed of nonnative plant species. Native grassland plant communities vary with the Natural Region [Grassland, Parkland, Foothills, Rocky Mountain]. Plant Community Guides for many of the Natural Subregions can be found online on the Sustainable Resource Development website. The range plant community information describes the unique characteristics of each Natural Subregion in terms of climate, soils, vegetation, landform and topography. Appendix 1 summarizes the current environmental regulatory framework regarding wind energy projects in Alberta. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

12 RECOMMENDED PRINCIPLE Principle A: Surface disturbance of native prairie should be avoided. To the extent possible fragmentation of large blocks of native prairie and other areas of high value for maintenance of biodiversity must be avoided. (Source: ERCB IL , SRD IL ) IMPLEMENTATION CONSIDERATIONS This principle is applied in planning at the regional and municipal level. In Alberta, wind energy projects occur only on private land. Application of the principle on private land would occur through Alberta s Land Use Framework, municipal land use plans, and stewardship among all stakeholders. Areas of high value for maintenance of biodiversity include intact and fully functioning native prairie and parkland ecosystems, connecting corridors for species migration and isolated habitats (e.g. wetlands) that retain diverse communities of native species (Alberta Prairie Conservation Action Plan ). Principle B: Where avoidance of native prairie is not achieved, disturbance must be minimized. (Source: ERCB IL ) This principle is applied at the project planning level. Complete avoidance of native prairie may not occur in situations where a decision is made to proceed with planning a wind energy project on private lands that are not designated for conservation purposes. Encourage knowledge and consistent application of this principle among all interests. Practices to achieve the end goal of minimum disturbance are not yet well defined and are expected to improve over time. Principle C: Where disturbance of native prairie occurs the goal of reclamation during project planning, construction, operation and at decommissioning is restoration (Source: AENV 2010). Ecological restoration is defined as the process of re-establishing the structure, function and integrity of native ecosystems and their habitats (Society for Ecological Restoration 1993). In practical terms restoration involves returning a disturbed site to the ecosystem characteristics that existed prior to surface disturbance, usually based on the characteristics of an adjacent reference or control site. Native grassland vegetation is an indicator of equivalent land capability, ecosystem function and/or operability (AENV 2010). Alberta Environment s 2010 Reclamation Criteria for Wellsites and Associated Facilities for Native Grasslands provides guidance on reclaiming native grasslands. Considerable economic investment and long term commitment may be required to accomplish the goal of native plant community restoration. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

13 RECOMMENDED GUIDELINE IMPLEMENTATION CONSIDERATIONS A. Planning for Avoidance of Native Prairie Guideline A - 1: A cumulative effects management approach is applied to planning wind energy development and other land uses at the regional level. This approach establishes outcomes by considering the combined effects of past, present and foreseeable human activities, over time, on the environment, economy and society in a particular place. Large contiguous blocks of native prairie, connecting corridors (ridges, river valleys), environmentally significant and sensitive areas, other important wildlife habitats and areas of cultural and historical significance must be identified and should be avoided. Avoidance is accomplished by preferentially siting development within or adjacent to existing man-made disturbances or non-native prairie areas. (Source: ERCB IL , SRD IL , SRD 2006) Regional and municipal plans may identify priority areas of native prairie where there would be a high environmental and/or economic risk to development. The information base for such an assessment includes the Grassland Vegetation Inventory, Environmentally Significant Area studies, Prairie Conservation Action Plan , identification of critical wildlife habitat including for provincially and/or federally listed species at risk, and other information in databases of the Alberta Conservation Information Management System (ACIMS) and Fisheries and Wildlife Management Information System (FWMIS). Protective Notations (PNTs) placed on specified public lands known to include foothills fescue grassland are an indication of the value society places on native grasslands. The PNTs were applied because of the high conservation value of fescue grasslands and the difficulties in restoration (Ref: SRD IL ). Similar societal values regarding native grasslands on private lands may be expressed in regional land use planning. Land use planning would direct wind energy development to areas that are largely cultivated (only remnants of native prairie remaining) and away from areas that are largely native prairie (relatively contiguous blocks of native prairie). There may be constraints and setbacks associated with other land uses (e.g. transportation corridors) that also need to be considered. Cultural and historical significance must be considered. Compliance with the Historical Resources Act is required. Resources of cultural and historical significance, especially for aboriginal communities, may be linked to native prairie landscapes. There are options for compensating landowners who forgo development to protect native prairie. Land pooling arrangements among neighbouring landowners is one such approach (Pembina Institute 2010). Outcomes for optimal wind energy development in Alberta also need to be considered. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

14 RECOMMENDED GUIDELINE Guideline A - 2: Predevelopment planning and design must include analysis of resource requirements to avoid or minimize disturbance to native prairie and parkland, environmentally significant and sensitive areas, wetlands and other important wildlife habitats. (Source: ERCB IL , SRD 2006) IMPLEMENTATION CONSIDERATIONS If properly done, such planning should help to minimize environmental impacts, reduce costs for site reclamation and decrease the risk of incurring environmental liability. (Source: ERCB IL ) Predevelopment planning and analysis should include adequate biophysical inventory, assessment of environmental and socio-economic risk, potential measures required to minimize disturbance, feasibility of restoration, and scheduling to allowing sufficient time for beneficial practice. Construction and operations components of a project, as well as access and site management plans, should be carefully thought out to minimize disturbance. This should include contingency measures for unforeseen circumstances. (Source: ERCB IL ) Guideline A - 3: Notification and consultation with SRD staff and/or others knowledgeable about the environmental value and sensitivity of the area is expected to occur early in the predevelopment planning and analysis process. (Source: SRD IL ) Under Alberta s Wildlife Act and Wildlife Regulation the Minister has the authority to influence and control human activities that may have direct adverse effects on the populations and habitat of wildlife species. Nests and dens of endangered animals, upland game birds, migratory birds, and certain snakes and bats must be avoided (Wildlife Act 36(1) and Wildlife Regulations 96). Refer to Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta (ASRD Fish and Wildlife Division 2010). Critical habitat for species listed as endangered or threatened under federal legislation (Species At Risk Act) must be avoided. Guideline A - 4: Loss or degradation of wetlands associated with native prairie must be avoided. For wildlife conservation purposes, Fish & Wildlife Division recommends that there be no industrial activity within 100 m of wetlands within the Grassland and Parkland Natural Regions of Alberta. Setback distances vary based on the degree to which vegetation, soils and hydrology will be affected by the proposed development. (Source: SRD Land Use Guidelines 2010) The following Wetland Mitigation Decision Framework is included in Recommendations for a New Alberta Wetland Policy (Alberta Water Council 2008): Avoid loss or degradation of wetlands. Minimize loss or degradation, where avoidance is not fully achieved. The proponent must make a reasonable case to the regulator why the proponent cannot achieve avoidance. Compensate, as a last resort, for loss of wetland area or for wetland degradation. Compensation, as assessed by the regulator, refers to a suite of options to replace lost wetland area through science-based actions that are consistent with watershed and regional wetland objectives, where they exist. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

15 RECOMMENDED GUIDELINE Guideline A 4 Continued: Loss or degradation of wetlands associated with native prairie must be avoided. IMPLEMENTATION CONSIDERATIONS A wetland is defined as land having water at, near, or above the land surface or which is saturated with water long enough to promote wetland or aquatic processes as indicated by poorly drained (hydric) soils, hydrophytic vegetation, and various kinds of biological activity that are adapted to the wet environment (Alberta Water Council 2008). Wetlands include riparian areas. Refer to the Riparian Health Assessment for Lakes, Sloughs and Wetlands Field Workbook (2004) on the Cows and Fish website. The wetland classification system of Stewart and Kantrud (1971) is commonly applied in prairie Alberta. It categorizes wetland types based on factors such as length of time water is present, water depth and common vegetation (Alberta Water Council 2008). It includes ephemeral waterbodies; temporary ponds; seasonal ponds and lakes; semi-permanent ponds and lakes; permanent ponds and lakes; alkali ponds and lakes; and fen ponds. To determine the location, extent and type of wetlands, GIS databases of biophysical features, including the Grassland Vegetation Inventory, as well as topographic maps and air photos may be consulted. Verification through field survey is required to define the riparian area. A useful reference is the Memorandum of Understanding Between the Energy Resources Conservation Board, Alberta Environment, Alberta Sustainable Resource Development, and the Special Areas Board on the Identification and Delineation of Water Bodies (November 2010). Field survey is required to determine the occurrence of any rare plant species and communities associated with wetlands where disturbance is proposed. Potential alteration to surface and subsurface drainage, soils and vegetation need to be considered as well as feasibility to restore. Setback distance should be measured from the edge of the disturbance footprint during construction. The full project footprint, including access routes, construction lay-down areas, and operational facilities, need to be considered as well as all activities in all phases of the development. Setback distance for birds should be measured from the turbine blade tip during operations. Refer to Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta (SRD Alberta s Water Act requires that proponents obtain an approval before conducting an activity in a water body. Draft requirements for oil and gas development in or near water bodies are contained in ERCB Directive 056: Energy Development Applications and Schedules, Appendix 14: Oil and Gas Development In or Within 100 m of Water Bodies. The preference is to avoid developing within a water body or 100 m setback distance; however, in circumstances where no other viable option exists, development may be allowed to proceed provided all required approvals are in place (such as a Water Act approval), the proposed lease site and surrounding area have been assessed for sensitivities, and plans to address identified sensitivities have been developed and will be implemented. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

16 RECOMMENDED GUIDELINE IMPLEMENTATION CONSIDERATIONS B. Planning to Minimize Disturbance of Native Prairie Where Avoidance is Not Achieved Guideline B - 1: On landscapes where native prairie and important wildlife habitats occur, but on which there are a large number or high density of developments, the addition of a proposed project may exceed thresholds that would limit development. Thresholds are defined through cumulative effects assessment. To avoid exceeding the threshold, another location may be chosen, the size of the development may be reduced, the project layout may be modified or mitigation measures may be taken to reduce the cumulative impact to below the threshold. (Source: SRD 2006) The Government of Alberta is developing a Cumulative Effects Environmental Management System. Under this system, cumulative effects thresholds are defined through regional planning. Measures to reduce the cumulative impact below a defined threshold need to be defined early in project planning by the proponent and the regulators. Guideline B - 2: Overall adverse environmental effects are reduced. This principle includes the avoidance of cumulative adverse environmental effects through coordination, integration and cooperation with other prairie users. (Source: ERCB IL ) Integration of all phases and components of the project (turbines, access, collection systems, substation, transmission etc.) with other land uses must be considered at the planning stage. Early consultation and negotiation with landowners, neighbours, aboriginal communities and with other users (existing and potential) will help to identify opportunities to integrate land uses and reduce adverse environmental effects. Where opportunities exist to integrate uses to minimize disturbance, it is important to reach agreement among all users about implementing appropriate practices. The Canadian Wind Energy Association guide titled Wind Energy Development Best Practices for Community Engagement and Public Consultation (CanWEA 2010) outlines a range of practices and procedures for meaningful consultation. Requirements for setback from other facilities prescribed by municipal, provincial and federal governments (e.g. roads, oil and gas facilities) must be identified and reviewed to determine if there is flexibility to allow for reducing adverse environmental effects. Integrated access management plans, developed in consultation with other users, will minimize disturbance. Where livestock grazing occurs, range health and the response of cattle to industrial disturbances can influence overall environmental effects and reclamation potential. Early in the project planning process, it is important to identify grazing management measures to minimize disturbance and promote restoration in consultation with the landowner. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

17 RECOMMENDED GUIDELINE Guideline B - 3: The multidisciplinary project team responsible for site selection and development planning may include but is not necessarily restricted to specialists with adequate qualifications and experience in biology, hydrology, rangeland agrology, reclamation and minimal disturbance construction techniques. (Source: SRD ) IMPLEMENTATION CONSIDERATIONS Where applicable, adequate qualifications may include membership in professional regulatory organizations (e.g. Alberta Society of Professional Biologists, Association of Professional Engineers, Geologists, and Geophysicists of Alberta). Guideline B - 4: Predevelopment site assessment will improve the potential to avoid or minimize disturbance of native prairie or parkland and must be conducted. (Source: ERCB IL , SRD 2006) Predevelopment site assessment would include a suite of environmental studies that are provided to Alberta Sustainable Resource Development for consideration in their advisory role to wind energy developers prior to application for a project being made to the Alberta Utilities Commission. Studies may include, but not be limited to: - Defining the project footprint for the full life cycle of the project. - Identifying and delineating native grasslands. - Identifying and delineating wetlands. - Assessing surface water and groundwater to assist in determining sensitivities regarding alteration in drainage or water quality. - Assessing the potential for soil compaction and erosion. - Assessing range and riparian health to assist in determining environmental sensitivities and to provide a benchmark for measuring reclamation success. Refer to guides for conducting these assessments on websites of Alberta Sustainable Resource Development and the Alberta Riparian Habitat Management Society (Cows and Fish). - Conducting botanical surveys to identify rare plants and ecological communities. Refer to documents for botanical surveys on the website of the Alberta Native Plant Council and to tracking lists on the website of the Alberta Conservation Information Management System. - Determining habitat for species at risk and other important wildlife habitats. Guideline B - 5: Risk assessment associated with native grassland disturbance during the planning process is required to understand restoration potential and reduce the impact of non-native plant species invasion. (Source: SRD IL ). Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

18 RECOMMENDED GUIDELINE Guideline B - 6: Where disturbance of native grasslands cannot be avoided, discussions should occur with an SRD Wildlife Biologist, range agrologist and reclamation specialist as well as potentially with other parties such as landowners, municipalities and conservation organizations to identify mitigation and restoration measures. Potential measures for no net loss through compensation, enhancement and protection of natural habitats on site or nearby should be defined. (Source: SRD Wildlife Guidelines) IMPLEMENTATION CONSIDERATIONS Considerations would include conditions regarding reclamation post-construction and at project decommissioning. There would be measurable end points to be achieved in specified time frames. Refer to the 2010 Reclamation Criteria for Wellsites and Associated Facilities for Native Grasslands available on the website of Alberta Environment. With respect to reclamation of wind energy projects, a standardized process is lacking that defines expectations for reclamation and criteria for evaluating if the goals of reclamation have been achieved. Criteria for reclamation certification are not yet defined or enforceable. This gap has yet to be addressed by regulators. Guideline B - 7: Industry is expected to take advantage of new technologies and practices designed to reduce surface disturbance and enhance restoration. (Source: IL SRD ) Practices to consider include using existing access routes, temporary access routes versus permanent ones, two-strip gravel tracks, using geotextile mats on access routes and crane pads, common corridors for access and cables, reducing cut and fill, using right-sized equipment with rubber tires, and shutdown of activities during adverse conditions including wet weather. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

19 C. Minimizing Disturbance during Construction, Site Maintenance, Monitoring and Restoration/Reclamation Guideline C - 1: An Environmental Protection Plan (EPP) that defines practices to minimize disturbance of native prairie should be developed. The EPP may include but not be limited to the following components: 1 INTRODUCTION - Pertinent Project Overview Information This section includes a high level summary of the overall project and the purpose of the document to ensure all personnel involved understand the considerations incorporated into this document. Project execution will include diverse teams, often dealing with specialized tasks or elements of work. A unified context sets the process for all. A high-level project location map could be included for reference. 2 ENVIRONMENTAL PROTECTION PLAN ORGANIZATION - Implementation Considerations This section defines the process that is to be followed to execute the project. It also provides guidance for potential situations for which measures are not clearly identified within the Environmental Protection Plan. 3 ENVIRONMENTAL COMPLIANCE - Legislation and Corporate Compliance Practices This section outlines corporate policy (e.g., Environmental Management Plan, Environmental Policy), and summarizes regulatory and legislative requirements to be met by the project. It itemizes permits and authorizations that are in place, or that need to be obtained and at what time they are required. Approaches for issues management, negotiation and defining conditions of variance are defined. Roles, responsibilities, accountabilities and communications for both the proponent as well as its contractor(s) for all stages of the project are outlined. One or more organizational charts could be used to convey this information. Documentation of compliance, including the role and authority of environmental inspectors, also is outlined. 4 GENERAL ENVIRONMENTAL PROTECTION MEASURES - Overarching Measures/Mitigations This section of the EPP details the protection measures and commitments that apply to all aspects of project development. These typically include everything from site rules, restricted areas or activities, waste disposal, fire prevention, general environmental constraints, wildlife timing restrictions, and vehicular restrictions or requirements (including adverse weather shutdown). 5 ACTIVITY SPECIFIC PROTECTION MEASURES - Construction Steps and Associated Measures Activity-specific protection measures are typically presented in grouped categories of logical development activities (access and site preparation, foundation construction, turbine installation, substation construction and collector system installation). This section details the appropriate means of execution from site preparation, soil handling, excavation practices, erosion controls, dewatering considerations, sitespecific constraints or restricted areas, and any other activity that should be planned and executed in a responsible manner. For each development activity, a map could be used to illustrate infrastructure (turbines, access roads, substation), historical resource and biophysical features, soil stripping depth and storage locations, etc. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

20 6 SITE CLEAN-UP AND INTERIM RECLAMATION PLAN This section addresses closure of each development activity (access and site preparation, foundation construction, turbine installation, substation construction and collector system installation). It clearly states what is to be partially or fully restored, and the means to accomplish that restoration/reclamation. Details of reclamation measures such as seed mixes to use and any differing practices within the project lands are presented by location. A map could be used to illustrate infrastructure (turbines, access roads, substation), seed mixes, vegetation management requirements, grazing management considerations and other mitigation measures. 7 OPERATION AND MAINTENANCE This section provides detailed considerations of all measures that need to be controlled or maintained during operation or maintenance. Typically this could include weed control measures, contingency measures for emergencies etc. 8 POST-CONSTRUCTION MONITORING This section outlines post-construction monitoring commitments made in the project Environmental Assessment (if one was prepared) and/or in regulatory permits and authorizations. 9 DECOMMISSIONING This section provides a statement of commitment for the project to progress through refurbishment or decommissioning as appropriate. Typically this infers minimally meeting current expectations, but with a commitment to adhere to the standards of the day when the project reaches this milestone. APPENDICES (as needed) Appendices may include but are not limited to: Project Contact List, Erosion and Sediment Control Measures, Traffic Management Plan, Waste Management Plan, Adverse Weather Plans, Fire Contingency Plan, Contaminated Soils and Spill Plan, Weed Management Plan, and Seed Mixes. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

21 Appendix 1 - Current Environmental Regulatory Framework Regarding Wind Energy Projects in Alberta The following is a summary of the regulatory process currently governing the approval, operation and decommissioning of wind energy projects in Alberta with respect to environmental effects. Alberta Utilities Commission The Alberta Utilities Commission (AUC) regulates electric, gas and water utilities including wind energy projects pursuant to the Alberta Utilities Commission Act, and the Hydro and Electric Energy Act and Gas Utilities Act. AUC is charged to protect social, economic and environmental interests of Alberta when considering these projects. In addition to the AUC Rule 001, Rule of Practice, AUC has two Rules that apply to environmental considerations of applications for wind energy developments. These are: AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, and Industrial System Designations (Alberta Utilities Commission 2009) Applicants for wind power plants 1MW or greater are required to contact Alberta Environment to determine if an EIA is required (not mandatory) and to refer the application to Alberta Sustainable Resource Development Fish and Wildlife Division for sign-off. Other environmental information required is a general overview of environmental impacts, identification of land-use issues and evaluation of visible impacts. Clearance from Alberta Culture and Community Spirit regarding protection of historical resources according to the Alberta Historical Resources Act is also required. Consultation is required only with directly affected persons. Applications for transmission lines must include environmental information, with the level of detail needed to describe the impacts created by the project. AUC determines the detail on a case by case basis and decides if an Environmental Impact Assessment is required. The applicant also is directed to contact Alberta Environment to determine if their approval is required. AUC Rule 012: Noise Control (Alberta Utilities Commission, February 23, 2010) Applicants for wind power plants must provide a Noise Impact Assessment (NIA) which is a documented prediction of noise to be generated by proposed wind turbines. The NIA must evaluate noise to be generated by the facility(ies) proposed, ambient noise and noise from all existing and proposed energy-related facilities. The predicted cumulative noise levels must not exceed the Permissible Sound Level at the nearest or most impacted dwellings, or, in the absence of dwellings affected by noise from the proposed facility, at a distance of 1.5 km from the facility fence line. AUC does not currently administer a compliance assurance program and is assessing its compliance assurance strategies. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

22 Alberta Environment Wind energy projects consist of two activities, the first being power production from wind turbines and the second being transmission of the power from the turbines to Alberta's power grid. Power production from wind turbines is not a defined activity in the Activities Designation Regulation (ADR) of The Environmental Protection and Enhancement Act (EPEA). Therefore there are no approvals, registrations or notifications required under EPEA for power production from wind turbines. "Transmission lines" in the ADR means a transmission line as defined in EPEA, and any infrastructure in connection with that transmission line, with a voltage of 130 kilovolts or more and in respect of which an environmental impact assessment report is required. However, the Environmental Assessment (Mandatory and Exempted Activities) Regulation exempts a transmission line from requiring an environmental impact assessment. Therefore there are no approvals, registrations or notifications required under EPEA for transmission lines. Part 5 of EPEA prohibits the release of a substance into the environment that causes or may cause a significant adverse effect. If such a release occurs then it must be reported to Alberta Environment as required in the Release Reporting Regulation. The responsible party for the release has a duty to take remedial measures as described in sections 110 and 112 of EPEA. Transmission lines, as defined in EPEA, are included in the definition of "specified land" in the Conservation and Reclamation Regulation. As such, transmission lines and associated substations are to be conserved and reclaimed as required under Part 6 of EPEA. Wind power production sites are not included in the definition of specified land. Under the Water Act if the wind energy project involves any work within a water body or any dewatering of groundwater from excavations, there may be requirements under the Water Act in which case the proponent should contact the local regional Alberta Environment office for specific information. Alberta Sustainable Resource Development Fish and Wildlife Division AUC requires that applications for wind energy developments be referred to Alberta Sustainable Resource Development (ASRD) Fish and Wildlife Division for review and sign-off. Fish and Wildlife Division s Wildlife Guidelines for Alberta Wind Energy Projects (April 2006) (ASRD 2006b) provide guidance on protecting bats, birds and other species or conservation concern when locating a wind turbine on public or private land in Alberta. Consideration includes protecting habitat for species with legal designation as threatened or endangered under the Alberta Wildlife Act and/or the federal Species At Risk Act. The Fish and Wildlife Division also participated in the development of Bats and Wind Turbines. Pre-siting and pre-construction survey protocols (May 2008) (Lausen et al. 2008), which are directed at preventing bat mortality. These guidelines, available on the department s external website, are amended from time to time and have been recently updated. At the current time for projects proposed on private land, the Fish and Wildlife Division works directly with the wind power industry and the Alberta Utilities Commission to minimize impacts on wildlife. Conditions that reflect ASRD guidelines may be applied to a project approval by the Alberta Utilities Commission. Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

23 Field surveys are conducted after development to collect further information regarding wildlife in an area. Regulatory authority and responsibility for ensuring compliance with conditions applied by ASRD are unclear. ASRD does not participate in hearings of the Alberta Utilities Commission unless called to testify. Alberta Sustainable Resource Development Public Lands Approval of the allocation and use of public land for development of projects is the responsibility of Alberta Sustainable Resource Development (ASRD). Currently there are no approved wind power projects on public lands managed by ASRD. The department accepts applications for exploration for a maximum term of two years on the condition that all future decisions on land allocation are deferred pending completion of guidelines. ASRD is reviewing policy options regarding the location of long-term, permanent wind power developments on public land, including development of guidelines that will have criteria to review applications. Of particular consideration are sensitive public land areas including native prairie, high value wildlife areas, and other high value resource or conservation lands. A key principle of any development on public land is to avoid, minimize or mitigate impacts on environmentally sensitive lands, including impacts on sensitive native grasslands. ASRD is anticipating that regional plans, which are being prepared under Alberta s Land-use Framework, will provide clear guidance for managing public land, including land use decisionmaking for wind power projects. Special Areas Board Wind power project development is not allowed on public lands managed by the Special Areas Board. Federal Government Application for funding of a wind power project to the federal government (e.g. ecoenergy for Renewable Power program of Natural Resources Canada) triggers the need for a federal environmental assessment pursuant to Section 5(1)(b) of the Canadian Environmental Assessment Act (CEAA). The agency overseeing funding is the Responsible Authority under CEAA. Any project requiring federal permits from the list of regulations under CEAA must also have an environmental assessment. The Law List regulations that may apply to wind projects are The Fisheries Act and The Navigable Water Act. There are federal guidelines dealing with the assessment of effects on birds prepared by the Canadian Wildlife Service of Environment Canada (CWS 2007). Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development - May

24 Wind Energy Development in Alberta Suggestions for Beneficial Management Practices INPUT BY PARTICIPANTS IN A PROCESS TO RECOMMEND GUIDELINES FOR MINIMIZING DISTURBANCE OF NATIVE PRAIRIE April, 2011 Cheryl Bradley & Marilyn Neville COMPILERS ON BEHALF OF Foothills Restoration Forum

25

26 SUGGESTIONS FOR BENEFICIAL MANAGEMENT PRACTICES BASED ON FIELD TOUR OBSERVATIONS On October 27, 2010, twenty-nine individuals from a broad range of interests participated in the field tour of a wind power development constructed in The site was in foothills fescue grassland near Pincher Creek. Participants were asked to record their observations regarding practices that work, those that need improvement and any innovative ideas. The following are key ideas that were provided by the ten participants who responded. These ideas may provide a useful starting point for defining beneficial management practices with respect to construction, operation, maintenance and decommissioning of wind energy projects where avoidance of native prairie is not achieved. Site wind energy projects to avoid native grassland Observations/Rationale: Siting on already disturbed land may be a preferable option to siting on native grassland as there are less environmental considerations to address. Siting considerations for wind energy developments include proximity to transmission lines and substations, wind regime for energy generation, land ownership, land use, archeological/historical sites, wildlife habitat and presence/absence of native prairie. Integrate all uses and activities on the site Avoid traditional land use sites Observations/Rationale: Aboriginal grave sites, dream beds and other sites occur on ridges with rough fescue grasslands. Unearthed rocks indicates disturbance. These sites need to be identified and avoided throughout the lifetime of the project. Plan early for grazing management Observations/Rationale: Heavy pressure from livestock grazing appears to be hampering restoration of some disturbed sites. There is a need to consider the response of cattle to the disturbances and how to avoid damage. Include grazing management details (season, intensity of use, fencing needs) in negotiations with the landholder. Fence disturbances from livestock for a few years after seeding to assist in restoration to native community Observations/Rationale: Grazing pressure and poor range health are impacting revegetation around the base of the towers, on the cable trench and along the access route. Microsites with higher moisture regime occur at the base of the towers and pugging, uneven surfaces caused by livestock hoofs, is occurring. The composition of vegetation communities is affected either due to the towers directing more water to the base of the structure and/or of cattle seeking shade and shelter. Suggestions for Beneficial Management Practices May

MAY Foothills Restoration Forum. Native Prairie Working Group

MAY Foothills Restoration Forum. Native Prairie Working Group Recommended Principles and Guidelines for Minimizing Disturbance of Native Prairie from Wind Energy Development MAY 2011 Cheryl Bradley & Marilyn Neville PRINCIPAL AUTHORS ON BEHALF OF Foothills Restoration

More information

Minimizing Surface Disturbance of Alberta s Native Prairie. Background to Development of Guidelines for the Wind Energy Industry

Minimizing Surface Disturbance of Alberta s Native Prairie. Background to Development of Guidelines for the Wind Energy Industry Background to Development of Guidelines for the Wind Energy Industry December 2010 Authors: Cheryl Bradley M.Sc., P. Biol. and Marilyn Neville Coordinator, Foothills Restoration Forum Acknowledgements

More information

SunEEarth Alberta Solar Development Inc.

SunEEarth Alberta Solar Development Inc. Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,

More information

Pteragen Canada Inc.

Pteragen Canada Inc. Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,

More information

Willow Ridge Wind Project Frequently Asked Questions. Popular Questions Who is the developer of the proposed project?

Willow Ridge Wind Project Frequently Asked Questions. Popular Questions Who is the developer of the proposed project? Willow Ridge Wind Project Frequently Asked Questions Popular Questions Who is the developer of the proposed project? Algonquin Power Co./ Liberty Power Co. is the company proposing the project and, if

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

Peatland Restoration. Environment and Sustainable Resource Development

Peatland Restoration. Environment and Sustainable Resource Development Peatland Restoration Environment and Sustainable Resource Development Why Peatland Criteria? Equivalent Capability Carbon Sequestration Water Storage Reservoir Filter Precipitation as it recharges the

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

Town of Cochrane Policy

Town of Cochrane Policy Town of Cochrane Policy Policy No.: Policy Title: Approval Date: Revision Date: Department: 1502-02 Wetland Conservation September 11, 2006 September 23, Planning and Engineering Services Introduction

More information

Tackling Restoration Issues with Science and Information Exchange

Tackling Restoration Issues with Science and Information Exchange Tackling Restoration Issues with Science and Information Exchange Presentation to 2012 Native Prairie Reclamation/ Restoration Workshop Foothills Restoration Forum February, 2012 Photo courtesy of Cheryl

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

Alberta Wetland Mitigation Directive

Alberta Wetland Mitigation Directive June 2018 Title: Number: Program Name: Water Policy Branch Effective Date: June 1, 2015 This document was updated on: Disclaimer: June 21, 2018 This publication is issued under the Open Government Licence

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010

More information

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 March 2002 Conservation and Reclamation INFORMATION LETTER C&R/IL/02-1 Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 CHANGES TO THE INFORMATION LETTER This Information

More information

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

Substation Developments Environmental Guidelines Checklist for Applicants

Substation Developments Environmental Guidelines Checklist for Applicants Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually

More information

Chapter 4. Airport Authority Governance, Statutes and Policies

Chapter 4. Airport Authority Governance, Statutes and Policies Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2

More information

Appendix 4. Soil Management Plan

Appendix 4. Soil Management Plan Appendix 4 Soil Management Plan Soil Management Plan This Soil Management Plan (SMP) has been developed for the Giscome Quarry and Lime Plant Project. The SMP is a living document and will be updated as

More information

AUMA Policy Paper 2013.A1

AUMA Policy Paper 2013.A1 AUMA Paper 2013.A1 AUMA Board of Directors Municipal Water on Wetlands WHEREAS in 2012 the AUMA Board of Directors issued the mandate of developing Municipal Water Policies and approved advancing polices

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Project siting. Lanfine. Wind resource assessment. Wind Power Project Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction

More information

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy for the Environmental Services Association of Nova Scotia By Krista Hilchey Wetland Specialist, Nova Scotia Environment To

More information

ENVIRONMENTAL SCREENING REPORT

ENVIRONMENTAL SCREENING REPORT ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling

More information

Greengate Power Corporation

Greengate Power Corporation Decision 2011-085 Blackspring Ridge Wind Project March 9, 2011 The Alberta Utilities Commission Decision 2011-085: Blackspring Ridge Wind Project Application No. 1604777 Proceeding ID No. 190 March 9,

More information

Hydrology and Watershed Management

Hydrology and Watershed Management Hydrology and Watershed Management The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT SASKATCHEWAN WATER CORPORATION BUFFALO POUND NON-POTABLE WATER SUPPLY SYSTEM EXPANSION PROJECT Introduction

More information

Chapter 750 WIND POWER GENERATION FACILITIES

Chapter 750 WIND POWER GENERATION FACILITIES Chapter 750 WIND POWER GENERATION FACILITIES 750.01 Purpose 750.02 Definitions 750.03 Designated Areas 750.04 Permitted Uses 750.05 Conditional Uses 750.06 Construction Standards 750.07 Application Requirements

More information

BERGER PEAT MOSS LIMITED

BERGER PEAT MOSS LIMITED BERGER PEAT MOSS LIMITED Terms of Reference for the Big River Peat Harvest Project Submitted to: Ministry of Environment Environmental Assessment and Stewardship Branch 3211 Albert Street, 4th Floor Regina,

More information

10.0 Environmental protection, follow-up and monitoring

10.0 Environmental protection, follow-up and monitoring 10.0 Environmental protection, follow-up and monitoring 10.1 Introduction Manitoba Hydro will implement the mitigation measures, monitoring and other follow-up actions identified in chapter 8 through an

More information

Code of Practice for Exploration Operations

Code of Practice for Exploration Operations Code of Practice for Exploration Operations September 2005 Made under the Environmental Protection and Enhancement Act Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza

More information

Solar Krafte Utilities Inc.

Solar Krafte Utilities Inc. Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

3 Baseline and Existing Conditions

3 Baseline and Existing Conditions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3 Baseline and Existing Conditions The effective date of the VSP legislation is July 22, 2011. This is also the date chosen by the legislature as the applicable baseline

More information

WHO ARE WE? Willow Ridge Wind Project

WHO ARE WE? Willow Ridge Wind Project Willow Ridge WELCOME This is the Second Public Open House for the, where project staff are available to answer any questions and recieve input from attendees.this process is being undertaken as part of

More information

The Facts on Oil Sands Reclamation. By: Don Thompson July 31, 2008

The Facts on Oil Sands Reclamation. By: Don Thompson July 31, 2008 The Facts on Oil Sands Reclamation By: Don Thompson July 31, 2008 The History 1 In the Beginning The oil sands industry is ~ 45 years old 1/2 the average return period for forest fires in the region (80

More information

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities

More information

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA-2004-1223 Introduction This mitigation statement was prepared as an attachment

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

ALBERTA TRANSPORTATION TERMS OF REFERENCE

ALBERTA TRANSPORTATION TERMS OF REFERENCE ALBERTA TRANSPORTATION TERMS OF REFERENCE FOR ENVIRONMENTAL EVALUATION June 2011 Page 1 SCOPE OF ASSESSMENT The TERMS OF REFERENCE FOR ENVIRONMENTAL EVALUATION are to be utilized for those projects that

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published

More information

Alberta Conservation Association (ACA) Date: Project Name: Riparian Conservation. Land Program Manager: Darren Dorge

Alberta Conservation Association (ACA) Date: Project Name: Riparian Conservation. Land Program Manager: Darren Dorge Alberta Conservation Association (ACA) Date: 2014-2015 Project Name: Riparian Conservation Land Program Manager: Darren Dorge Project Leaders: Stefanie Fenson (Northeast Region, Riparian Conservation Program

More information

Siting Guidelines for Windpower Projects in Kansas

Siting Guidelines for Windpower Projects in Kansas Siting Guidelines for Windpower Projects in Kansas The Kansas Renewable Energy Working Group Environmental and Siting Committee Introduction The Environmental and Siting Committee of the Kansas Renewable

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

October 30, 2012 Our File:

October 30, 2012 Our File: October 30, 2012 Our File: 5000-510-5120 Minister of Environment and Sustainable Resource Development 204 Legislature Building 10800 97 Avenue Edmonton, AB T5K 2B6 Attention: Honourable Diana McQueen at

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017 FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,

More information

9.0 Environmental Protection Program

9.0 Environmental Protection Program 9.0 Environmental Protection Program 9.1.1 Overview Manitoba Hydro s Environmental Protection Program (EPP) provides the framework for the delivery, management and monitoring of environmental and socio-economic

More information

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

STANDARDS FOR HEALTHY PUBLIC RANGELANDS

STANDARDS FOR HEALTHY PUBLIC RANGELANDS STANDARDS FOR HEALTHY PUBLIC RANGELANDS Standard #1 Within the potential of the ecological site (soil type, landform, climate, and geology), soils are stable and allow for water infiltration to provide

More information

Siting an Upstream Oil and Gas Site in an Environmentally Sensitive Area on Private Land

Siting an Upstream Oil and Gas Site in an Environmentally Sensitive Area on Private Land Siting an Upstream Oil and Gas Site in an Environmentally Sensitive Area on Private Land Guidance for Private Land September 2003 R&R/03-2 As a result of revisions to Alberta Energy and Utilities Board

More information

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT I. BACKGROUND FOR MANURE STORAGE AND HANDLING SYSTEMS Supplementary Information Form on sizing and safety

More information

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION MARY L. FLYNN-GUGLIETTI AND ANNIK FORRISTAL THE 2014 PROVINCIAL POLICY STATEMENT & ENVIRONMENTAL

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on March

More information

Wetlands. Development of a Functional Matrix. Andrea Borkenhagen B.Sc., B.I.T Geetha Ramesh PhD., P.Biol

Wetlands. Development of a Functional Matrix. Andrea Borkenhagen B.Sc., B.I.T Geetha Ramesh PhD., P.Biol Wetlands Development of a Functional Matrix ndrea Borkenhagen B.Sc., B.I.T Geetha Ramesh PhD., P.Biol genda Introduction Purpose Regulations Development Example wetland assessment pplication 2 Introduction

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY POLICY TITLE ORIGIN/AUTHORITY Clause 2, Report 18 2006 of the Planning and Operations Committee; Clause 4, Report No. 16-2013 of the Planning and Operations Committee; and Hearing 3b, dated. ADOPTED BY:

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

PROJECT HIGHLIGHTS,

PROJECT HIGHLIGHTS, PROJECT HIGHLIGHTS, 2012-003 935 linear feet of fence encompassing livestock pond 1 water tank, 2 water troughs, 3800 linear feet pipeline Project: 2012-003 Watershed: Tomales Bay, East Shore Practices:

More information

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,

More information

Suncor Energy Adelaide Wind Power Project March 20, 2012 Public Meeting Comment Response Table

Suncor Energy Adelaide Wind Power Project March 20, 2012 Public Meeting Comment Response Table Suncor received a total of five written comments from the March 20, 2012 Public Meeting for the Suncor Energy Adelaide Wind Project (the Project). The following table provides an example of some of the

More information

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

14. Sustainable Forestry Principals

14. Sustainable Forestry Principals 14. Sustainable Forestry Principals Fish River Lakes Concept Plan Addendum Materials April 2018 14. SUSTAINABLE FORESTRY PRINCIPLES In response to our discussion with LUPC Staff and others on the topic

More information

APPENDIX P EL DORADO COUNTY GENERAL PLAN: APPLICABLE SECTIONS FROM CONSERVATION AND OPEN SPACE ELEMENT

APPENDIX P EL DORADO COUNTY GENERAL PLAN: APPLICABLE SECTIONS FROM CONSERVATION AND OPEN SPACE ELEMENT APPENDIX P EL DORADO COUNTY GENERAL PLAN: APPLICABLE SECTIONS FROM CONSERVATION AND OPEN SPACE ELEMENT SOIL CONSERVATION OBJECTIVE 7.1.2: EROSION/SEDIMENTATION Minimize soil erosion and sedimentation.

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines

More information

A Proposed Regulation under The Water Rights Act

A Proposed Regulation under The Water Rights Act A Proposed Regulation under The Water Rights Act A streamlined and balanced approach to drainage and water retention in Manitoba Public Consultation Document November 2018 MINISTER S MESSAGE Dear Manitobans,

More information

Reasons for Ministers Decision

Reasons for Ministers Decision In the matter of the Environmental Assessment Act S.B.C. 2002, c. 43 (Act) and In the matter of an Application for an Environmental Assessment Certificate (Application) by Teck Coal Limited (Proponent)

More information

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Environmental Review Process Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Outline 1. Overview of the Canadian Environmental Assessment Act (CEAA) 2. Indigenous

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22499-D01-2017 June 7, 2017 Decision 22499-D01-2017 Proceeding 22499 Application 22499-A001 June 7, 2017 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta

More information

(1) The proposed commercial solar energy generation facility is either

(1) The proposed commercial solar energy generation facility is either (2) The design and siting of these facilities shall avoid the placement of turbines on or immediately adjacent to the upwind side of ridge crests; (3) The design may include other design features to minimize

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

In 2013, Gunnison sage-grouse was proposed for an "endangered" listing by the U.S. Fish and Wildlife Service under the Endangered Species Act.

In 2013, Gunnison sage-grouse was proposed for an endangered listing by the U.S. Fish and Wildlife Service under the Endangered Species Act. Gunnison County, CO Community Development Department 221 N. Wisconsin St. Ste. D Gunnison, CO 81230 (970) 641-0360 Website: www.gunnisoncounty.org Email: planning@gunnisoncounty.org Information Sheet:

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting

More information

90% of Calgary s pre-settlement wetlands have been destroyed for urban development.

90% of Calgary s pre-settlement wetlands have been destroyed for urban development. 90% of Calgary s pre-settlement wetlands have been destroyed for urban development. 64% of Alberta s pre-settlement wetland inventory have been destroyed to accommodate population growth and economic development

More information

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

July 23, 2014 EAB File #: Transaction #: Brad Hannan Ministry of Highways and Infrastructure 1630 Park Street REGINA SK S4N 2G1

July 23, 2014 EAB File #: Transaction #: Brad Hannan Ministry of Highways and Infrastructure 1630 Park Street REGINA SK S4N 2G1 Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 July 23, 2014 EAB File #: 2014-013 Transaction

More information

Alberta Wetland Policy

Alberta Wetland Policy Table of Contents Alberta Wetland Policy Overview...2 Acknowledgements...3 Wetlands in Alberta...4 The Need for a New Provincial Wetland Policy...5 Policy Context...6 Policy Scope...7 Policy Goal and Outcomes...8

More information

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: SP-2019-02 DATE: April 8,

More information

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS SECTION 57.010, PURPOSE: The purpose of this article is to establish wind generation and wireless communication tower (Hereafter referred to

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

TABLE OF CONTENTS PAGE SECTION

TABLE OF CONTENTS PAGE SECTION TABLE OF CONTENTS SECTION PAGE 1.0 EXECUTIVE SUMMARY... 1 1.1 Project Description... 1 1.2 Project Applicant... 1 1.3 Summary of Project Purpose and Need... 2 1.4 Summary of Proposed Alternative... 2 1.5

More information

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines Golf Course and Recreational Facilities Best Management Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document

More information

SECTION 10: WETLANDS PROTECTION

SECTION 10: WETLANDS PROTECTION SECTION 10: WETLANDS PROTECTION 10-1 INTENT AND PURPOSE A. Intent 1. The City finds that wetlands serve a variety of beneficial functions. Wetlands maintain water quality, reduce flooding and erosion,

More information

Wetlands Project Guidance

Wetlands Project Guidance HABITAT Wetlands Project Guidance Stakeholder Informed Introduction Wetlands are lands saturated with water permanently or seasonally. Wetlands are typically defined by three characteristics: 1) The area

More information

Amisk Hydroelectric Project Update

Amisk Hydroelectric Project Update Amisk Hydroelectric Project Update AHP Development Corporation (AHP) is providing an update on the Amisk Hydroelectric Project ( Amisk /the Project ). Amisk is a proposed run-of-river hydroelectric project,

More information

Watercourses and Wetlands and Agricultural Activities

Watercourses and Wetlands and Agricultural Activities Watercourses and Wetlands and Agricultural Activities Watercourses and regulated wetlands can be found throughout New Brunswick, including on agricultural lands. The Clean Water Act defines a watercourse

More information

WATER AND AQUATIC ECOSYSTEMS

WATER AND AQUATIC ECOSYSTEMS WATER AND AQUATIC ECOSYSTEMS Water and Aquatic Ecosystems as Resources Properties of Water, Water Bodies and Watersheds A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 Describe the ecological,

More information

Revised Reclamation Criteria for Wellsites and Associated Facilities for Grasslands

Revised Reclamation Criteria for Wellsites and Associated Facilities for Grasslands Revised Reclamation Criteria for Wellsites and Associated Facilities for Grasslands Outline History of reclamation certification in Alberta Overview of revegetation strategies for grasslands and minimal

More information

K2 WIND POWER PROJECT DECOMMISSIONING PLAN REPORT. Prepared by: K2 Wind Ontario Limited Partnership Suite 105, 100 Simcoe Street Toronto, ON M5H 3G2

K2 WIND POWER PROJECT DECOMMISSIONING PLAN REPORT. Prepared by: K2 Wind Ontario Limited Partnership Suite 105, 100 Simcoe Street Toronto, ON M5H 3G2 K2 WIND POWER PROJECT DECOMMISSIONING PLAN REPORT Prepared by: K2 Wind Ontario Limited Partnership Suite 105, 100 Simcoe Street Toronto, ON M5H 3G2 In association with: Stantec Consulting Ltd.; SENES Consultants

More information

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements PURPOSE OF THIS DOCUMENT: This document contains preliminary draft language related to silica sand

More information

Biophysical Impact Assessment Framework

Biophysical Impact Assessment Framework Biophysical Impact Assessment Framework Prepared by: The and Urban Development Institute Calgary 2010 January 15 INTRODUCTION The requirement for Biophysical Impact Assessments (BIA) has been in place

More information

STAFF REPORT FOR POLICY PLAN AMENDMENT S10-CW-1CP

STAFF REPORT FOR POLICY PLAN AMENDMENT S10-CW-1CP STAFF REPORT FOR POLICY PLAN AMENDMENT S10-CW-1CP EXECUTIVE SUMMARY This Plan Amendment would serve to clarify policy guidance regarding circumstances under which proposals for disturbances to Environmental

More information

AND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech;

AND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech; PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT PREMIER TECH HORTICULTURE LTD. SMOKEY RIDGE PEAT HARVESTING PROJECT WHEREAS

More information