1 Advanced Metering Infrastructure (AMI) Studies Update Planning Committee February 9, 2016

2 Overview AMI Approach Lessons Learned METERS FY16-17 Initiatives RADIO TRANSMITTER Next Steps LEAK DETECTOR 2

3 District AMI Approach Cautious, measured approach Test of evolving AMI technology Learn from pilots and experiences of others Evaluate operational and integration challenges Leverage AMI installations with other projects to maximize benefits/minimize cost Phase AMI installations 3

4 Planned and Existing AMI Installations 4

5 AMI Installations in California City Units Status Vendor Web Interface San Francisco 172k 95% Aclara Yes DSRSD 19k 100% Sensus Yes Santa Rosa 53k Just starting Sensus Planned Pleasanton 21k Just starting Aclara Planned Redwood City 27k 50% Sensus Yes Hayward 35k Just starting Aclara Planned Sacramento 140k 50% Badger Planned Truckee Donner 10K Completed Aclara Planned Beverly Hills 15K Completed Aclara Yes Huntington Beach 55K 80% Aclara Planned San Diego 270k 10k Itron Planned Eastern MWD 145k 40% Sensus Planned Fresno 133k 100% Badger Yes 5

6 Lessons Learned Real vs Apparent Losses 6

7 Lessons Learned District Metered Areas Area Blackhawk Kensington Miles of pipe 6 miles 5.6 miles # Customers Pipe Newer pipe Older pipe (history of leaks) Area demand 0.4 MGD 0.3 MGD

8 Lessons Learned Pipe Assessments 8

9 Lessons Learned Meter Accuracy Flow (gpm) ½ ¼ 1/8 1/16 1/32 % accy Meters decay at low end first Customer leaks are typically at low flows 5/8-inch meter std. of ¼ gpm is too high AMI can help size meters 9

10 Lessons Learned Customer Leak Detection Before with 1,000 gal/hr. leak running 24/7 After leak repaired; est. 200,000 gals. saved over 3 mos. 10

11 Lessons Learned Irrigation Controller Technology July 2013 Irrigating 6days/wk. Use 23,000 gal/mo. July 2014 Installed ET controller Use 18,000 gal/mo. July 2015 Use 13,000 gal/mo. 2 days/wk. watering 11

12 FY16-17 Initiatives Evaluating AMI Business Case Water conservation Water loss control Demand forecasting Energy management Customer service Revenue loss recovery Facility sizing Climate change considerations System water quality improvements Integration with SCADA Asset management and predictive maintenance System reliability Meter management and replacement Security 12

13 FY16-17 Initiatives AMI Fixed Network Coverage 13

14 FY16-17 Initiatives USBR AMI Grant Application Submitted January 2016 $300K to $1M grants 500 to 3,000 AMI endpoints 7 to 15 AMI collectors EBMUD larger customers Awards in June

15 FY16-17 Initiatives Water-Energy Nexus Study CPUC ruling requires investor-owned utilities to propose joint AMI pilot projects with water agencies Proposed project Targets residential customers (randomly selected) Compare up to 5,000 AMI uses with 5,000 nonparticipants PG&E funds additional AMI collectors, endpoints UC Davis water-energy savings analysis EBMUD provides and funding (potentially grant eligible) Project plan due February 16, 2016 Project duration: months

16 Next Steps Continue AMI evaluations and strategic planning toward phased, selective implementation Adopt District AMI standards Install AMI-related equipment based on largest benefit (e.g., conservation, water loss, revenue) Pursue additional AMI grant and partnering opportunities 16

17 Food Waste Program Update Planning Committee February 9, 2016

18 Agenda City of Oakland Update City of Berkeley Update Harvest Power Project Update Preliminary Engineering Amendment Facility O&M Approach Site Utilities and Improvements Project Next Steps 2

19 City of Oakland Update Staff has initiated discussions with Waste Management and City of Oakland staff regarding extension process Submitted letter requesting outside date of December 31, 2017 Ability to accept waste upon notification of readiness WM has agreed to extension with several conditions: Accommodation fee of $9.83 per ton during extension - ~$85k over 6 months District agrees not to pursue material if we miss outside date Meeting with City and WM in next couple of weeks 3

20 City of Berkeley Update Significant opportunity to provide service to Berkeley synergy between District and City goals Estimated 25 tpd of commercial source-separated organics Current City-Recology contract allows diversion of material to EBMUD Contract is on month-to-month basis following end of term in January 2016 New Zero Waste RFP anticipated in next 60 days Staff working with City staff to develop partnership for directing material to EBMUD 4

21 Harvest Power Project Status of Negotiations District and Harvest Power staff have reached agreement on a Term Sheet Contract drafting continues Staff is targeting bringing the full project contract for Board consideration in March Construction would begin in April/May

22 Harvest Power Project Key Issues Timing California Energy Commission grant for Renewable Natural Gas Facility must be operational in 2016 Oakland deadline for accepting material in 2017 Capital Cost Capital cost projected to be higher than previously estimated Working with Harvest to broaden pool of bidders District will perform independent review of cost and schedule Performance Guarantees System performance greatly affects financial assumptions District negotiating mechanisms to address Harvest performance 6

23 Harvest Power Project Financial Review Increased Capital Cost: $25M -> $36M Lowered CNG price: $1.93 -> $1.80 Increased LCFS values: $ > $75.00 District 25-year NPV Previously: $23M Current: $18M

24 Harvest Power Project Commodity Prices $120 LCFS Price $100 $80 $60 Model Assumption ($75) $40 $20 $0 CNG Price Source: CARB LCFS Credit Trading Activity Reports Model Assumption Source: DOE Clean Cities Alternative Fuel Price Report 8

25 Harvest Power Project Sensitivity Analysis Scenario EBMUD 25 yr NPV Difference from Baseline EBMUD 20 yr NPV Baseline $18M $9M Scenarios: Operating Costs up by 5%* $15M -$3M $6M Revenues down by 5% $12M -$6M $4M Operating Costs up by 5% and Revenues down by 5% Example Variables: $9M -$9M $2M Cake dryness of 20% (vs 22%) $17M -$1M $8M Reject rate 25% (vs 20%) $15M -$3M $6M 20% less LCSF revenue $16M -$2M $7M *Note: Operating cost contingency already built into model

26 Harvest Power Project Preliminary Engineering Harvest Power CEC grant is contingent on RNG Facility operating in 2016 Proposed Preliminary Engineering Services Addendum for Board consideration today includes engineering work for RNG as well as placing an order for RNG unit and making a down payment Placing an order now for RNG unit and is necessary to keep the Harvest project on schedule Down payment is approximately $260k, total with engineering is $365k Under a range of scenarios, payback for RNG capital is less than three years, even if the Harvest Power Project does not move forward 10

27 Facility O&M Approach Harvest Power Dedicated Dewatering Facility Operations: District Maintenance: District Operations: District Maintenance: District Recology Polisher Dedicated Digestion Operations: District Maintenance: District Operations: Harvest Power Note: Reopener in Harvest Power contract to revisit labor responsibilities in 10 years Maintenance: District Harvest Power Preprocessing Facility Harvest Power CNG Facility Operations: District Maintenance: District 11

28 Facility O&M Approach (cont.) Discussions continue with 444 Do not currently have alignment on Preprocessing Operations 444 has proposed that Harvest Power staff form 444 A Approach of employer designating a particular union as its employees exclusive representative is not legal (based on District review) Risks associated with operating Preprocessing are fundamentally different than other facilities External Oakland deadline Lack of experience handling collected material Potential for vectors, odors, permit compliance issues Financial consequences District is holding HP accountable Significant value in maintaining clarity and alignment 12

29 Site Utilities and Improvements Project In order to facilitate the Harvest Power Project, as well as the Recology Project, District must upgrade utilities and provide connection points District staff has completed in-house design and is preparing to advertise Scope includes Process water and dewatering centrate piping Digester feed and withdrawal piping Digester gas piping, header, and transfer station Site improvements Estimated $7.8M Incorporated in Project NPV analysis Anticipate Board award in April 2016 Operational completion December

30 Next Steps Continue discussions with City of Oakland staff and WM regarding schedule extension Continue contract negotiations with Harvest and finalize contract Board Consideration February 9 Amendment of Harvest Power Preliminary Engineering Agreement March 8 Amendment of Waste Management Agreement March 22 Award of Harvest Power Agreement April 12 Award of Food Waste Site Utilities Project 14

31 Lead and Copper Rule Planning Committee February 9, 2016

32 Outline Lead and Copper Rule (LCR) District compliance activities District s lead reduction activities Flint, MI LCR revision

33 Lead and Copper Rule LCR promulgated in 1991 Point of compliance moved Maximum Contaminant Level (MCL) Action Level Corrosion Control Modified in 2000, 2004, and 2007 USEPA looking to make long term revisions (2011)

34 EBMUD Compliance with LCR Date 90 th percentile lead, mg/l June November September September September September September September September Lead Action Level: mg/l

35 LCR Sampling 90 percent of sampled homes required to be under the action level Sampling sites focused on single family dwelling (100 annual) Lead service line Lead premise plumbing Copper piping with lead solder installed after 1982 Sample line is flushed for two to three minutes before water use is stopped Collect first 1-L draw after a minimum 6 hour quiescent period not to exceed 12 hours

36 District Activities Removal of District owned lead service lines (1989) AB 1953 (2006) Reduces lead content from 4% to 0.25% for faucets, fixtures, pipes, etc. EBMUD purchasing specifications require lead free Reduction of Lead in Drinking Water Act (2010) Water quality staff

37 Flint, MI Change in source water (April 25, 2014) MI Department of Environmental Quality (DEQ) approved LCR monitoring initiated (July 2014) LCR monitoring (second round; January 2015) DEQ notifies EPA corrosion control for Flint in place (February 27, 2015) DEQ notifies Flint first round of LCR monitoring (0.006 mg/l; March 30, 2015) DEQ indicates to EPA, no corrosion control treatment in place.

38 Flint, MI (cont) August 17, 2015 DEQ instructs Flint to optimize corrosion control based on second round of testing (0.011 mg/l) October 1, 2015; blood lead problem verified by MI Dept Health and Human Services October 16, 2015; Flint reconnects to DWSB Corrosion chemicals added (December 9, 2015) Emergency declared by City (December 14, 2015) Emergency declared by State (January 5, 2016)

39 EPA and Congressional Action US EPA formed Task Group Draft report released December 22, 2015 Primarily requesting data and funds to conduct work Provides a framework for the Task Group Congressional hearing on February 3, 2016 Legislation introduced to change public notification requirements Shorten the time in which the public notification occurs Proposed senate bill to provide funds for lead service line replacement

40 Revising the LCR National Drinking Water Advisory Committee (NDWAC) December 2015 released recommendations Proactive lead service line replacement Voluntary customer tap sampling program coupled with distribution system monitoring Revise public education materials Health based household action level Corrosion control tailored to source water quality USEPA Administrator stated the revised rule will be out in 2017.

41 Questions

Board Workshop. March 22, 2016

Board Workshop. March 22, 2016 Food Waste Program Board Workshop March 22, 2016 Agenda Background Food Waste Program Overview Harvest Power Project Design and Implementation Fiscal Impact Harvest Power Risk Summary Program Alternatives

More information

Advanced Metering Infrastructure (AMI) Pilot Studies Update

Advanced Metering Infrastructure (AMI) Pilot Studies Update Advanced Metering Infrastructure (AMI) Pilot Studies Update Finance Administration Committee November 25, 2014 Presentation Overview Water Conservation Master Plan (AMI) Strategies Review of EBMUD AMR/AMI

More information

Wastewater Collection System Infrastructure Condition Update

Wastewater Collection System Infrastructure Condition Update Wastewater Collection System Infrastructure Condition Update Planning Committee May 12, 2015 Agenda Background Condition Assessment Findings Gravity Interceptors Force Mains Pump Stations Phased Capital

More information

Resource Recovery Program Annual Update FY13

Resource Recovery Program Annual Update FY13 Resource Recovery Program Annual Update FY13 Sustainability/Energy Committee October 22, 2013 W:\NAB\ESD\R2\EBMUD Board\Board Memos and Presentations\CY 2013\WW_Resource_Recovery-Update_FY13 Presentation

More information

City of Flint Water System Update. September 2015

City of Flint Water System Update. September 2015 City of Flint Water System Update September 2015 o Recent Concerns/Typical Household Service-lines o Water System Roles and Responsibilities o Other City Actions o Lead and Copper Solutions o Infrastructure

More information

Meter Reading and Maintenance Division New Technology

Meter Reading and Maintenance Division New Technology Meter Reading and Maintenance Division New Technology Planning Committee July 9, 2013 Outline Meter Reader and Maintenance Division Meter Reading New Technology Benefits Schedule OMD Meter Reading and

More information

THE LEAD AND COPPER RULE Anne Sandvig, HDR-EES Historical Background. The Lead and Copper Rule

THE LEAD AND COPPER RULE Anne Sandvig, HDR-EES Historical Background. The Lead and Copper Rule THE LEAD AND COPPER RULE Anne Sandvig, HDR-EES 2008 Historical Background The 1986 Safe Drinking Water Act required the use of lead-free pipes, solders, pipe fittings or plumbing fixtures in the installation

More information

DRAFT DRAFT DRAFT. Distribution System Materials Inventory and Lead and Copper Tap Sampling Pool

DRAFT DRAFT DRAFT. Distribution System Materials Inventory and Lead and Copper Tap Sampling Pool Distribution System Materials Inventory and Lead and Copper Tap Sampling Pool Distribution System Materials Inventory The original Lead and Copper Rule (LCR) required each impacted water supply (WS) to

More information

West County Wastewater District Recycled Water Supply Agreement. Planning Committee January 10, 2017

West County Wastewater District Recycled Water Supply Agreement. Planning Committee January 10, 2017 West County Wastewater District Recycled Water Supply Agreement Planning Committee January 10, 2017 Agenda Background Proposed Terms for New Water Supply Agreement Financial Analysis Next Steps Water Recycling

More information

Meter Study Results-Comparative Billing Analysis

Meter Study Results-Comparative Billing Analysis Sacramento Water Service Area Large Meter Replacement Program Meter Accuracy Testing Calculating Payback Period Meter Study Results-Comparative Billing Analysis Sacramento Water Service Area Approximately

More information

Project Labor Agreements. Board Meeting February 11, 2014

Project Labor Agreements. Board Meeting February 11, 2014 Project Labor Agreements Board Meeting February 11, 2014 Outline PLA Background PLA History at the District Other Agency Experiences Pilot PLA Recommended Next Steps PLA Background Project-specific agreement

More information

Water Conservation Partnering to Save Water Essex County Environmental Commission Verona, NJ. April 4, 2016

Water Conservation Partnering to Save Water Essex County Environmental Commission Verona, NJ. April 4, 2016 Water Conservation Partnering to Save Water Essex County Environmental Commission Verona, NJ Water Conservation Typical Water Saving Measures Within the Home Wash fruits and vegetables in a pot filled

More information

Dos Osos Reservoir Replacement Project - Update. Planning Committee May 9, 2017

Dos Osos Reservoir Replacement Project - Update. Planning Committee May 9, 2017 Dos Osos Reservoir Replacement Project - Update Planning Committee May 9, 2017 Dos Osos Reservoir Replacement Project - Update Project Location and Need Project Overview Project Site Layout Environmental

More information

We are here only to share our experiences. No recommendations

We are here only to share our experiences. No recommendations We are here only to share our experiences. No recommendations Manual Reading -Employees physically visit each meter to acquire readings AMR or Automated Meter Reading- Meters can be read by touch read

More information

VA AWWA Water Quality and Research Committee Seminar July 12, Jim Moore VDH - Office of Drinking Water Lexington Field Office

VA AWWA Water Quality and Research Committee Seminar July 12, Jim Moore VDH - Office of Drinking Water Lexington Field Office VA AWWA Water Quality and Research Committee Seminar July 12, 2018 Jim Moore VDH - Office of Drinking Water Lexington Field Office 1 1. Provide a quick overview of SB 1359: Lead Testing in Virginia Schools

More information

CCA is a public-private mix

CCA is a public-private mix Community Choice Aggregation in Marin CCA is a public-private mix IOU CCA (investor-owned utility/pg&e) Public Utility (municipal utility like SMUD) IOU Purchases Power IOU Maintains Transmission Lines

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

EPA Update AWWA Canton August 17, 2017 Stivo Di Franco-Environmental Manger Northeast District Office

EPA Update AWWA Canton August 17, 2017 Stivo Di Franco-Environmental Manger Northeast District Office EPA Update AWWA Canton August 17, 2017 Stivo Di Franco-Environmental Manger Northeast District Office Overview of Updates By the Numbers Water Supply Revolving Loan Account (WSRLA) Depressurization/Loss

More information

LEAD AND COPPER RULE GUIDANCE For Small Public Water Systems (population 3,300 or fewer)

LEAD AND COPPER RULE GUIDANCE For Small Public Water Systems (population 3,300 or fewer) THE MARYLAND DEPARTMENT OF THE ENVIRONMENT WATER SUPPLY PROGRAM LEAD AND COPPER RULE GUIDANCE For Small Public Water Systems (population 3,300 or fewer) The 1986 Safe Drinking Water Act (SDWA) Amendments

More information

Funding for New Organics Infrastructure While Addressing CalRecycle s Projected Budget Shortfall

Funding for New Organics Infrastructure While Addressing CalRecycle s Projected Budget Shortfall LEGISLATIVE TASK FORCE FOR CALIFORNIA CHAPTERS Funding for New Organics Infrastructure While Addressing CalRecycle s Projected Budget Shortfall Glenn Acosta, SWANA LTF Vice Chair CALRECYCLE FUNDING NEEDS

More information

Water Distribution System Leak Detection Program. July 26, 2016

Water Distribution System Leak Detection Program. July 26, 2016 Water Distribution System Leak Detection Program July 26, 2016 Overview Background Water loss program Avoided costs Next steps Water Loss Control Guidance AWWA M36 Manual WRF Component Analysis Tool Volume

More information

Water Resources Utility Rates Review

Water Resources Utility Rates Review Water Resources Utility Rates Review Water System Overview Water System Statistics 421 Miles of water pipe 38 Potable wells 3 Nonpotable wells 22 Water storage reservoirs 11 Pressure zones 6.26 Billion

More information

Water Resources Utility Rates Review

Water Resources Utility Rates Review Water Resources Utility Rates Review Water System Overview Water System Statistics 421 Miles of water pipe 38 Potable wells 3 Nonpotable wells 22 Water storage reservoirs 11 Pressure zones 6.26 Billion

More information

ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90

ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90 ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90 5.1001 DECLARATION OF PURPOSE AND PRINCIPLES In accordance with Water Code 10632 requirements, Eastern Municipal Water District (EMWD) is responsible for conserving

More information

William Murray Jr., P.E. Public Works Director Katie Victoria, MPA Sr. Administrative Analyst

William Murray Jr., P.E. Public Works Director Katie Victoria, MPA Sr. Administrative Analyst GARDEN GROVE WATER RATE STUDY December 14, 2017 6:00 pm to 8:00 pm Water System Description and Water Rates William Murray Jr., P.E. Public Works Director Katie Victoria, MPA Sr. Administrative Analyst

More information

CITY OF DELRAY BEACH WATER METER REPLACEMENT PROGRAM EVALUATION. Project No

CITY OF DELRAY BEACH WATER METER REPLACEMENT PROGRAM EVALUATION. Project No CITY OF DELRAY BEACH WATER METER REPLACEMENT PROGRAM EVALUATION Project No. 11-091 February 14, 2012 CITY S CURRENT METER READING SYSTEM 1-way communication 20,732 total water meters (3/4 to 10 ) Touch

More information

Lead and Copper: A Quick Information Sheet

Lead and Copper: A Quick Information Sheet Lead and Copper: A Quick Information Sheet Purpose: The purpose of this document is to better inform and educate the citizens of Kennett about lead and copper levels within our water system. Applicability:

More information

Critical Infrastructure: Replacing Lead Pipes in Madison. Tom Heikkinen, General Manager Madison Water Utility

Critical Infrastructure: Replacing Lead Pipes in Madison. Tom Heikkinen, General Manager Madison Water Utility Critical Infrastructure: Replacing Lead Pipes in Madison Tom Heikkinen, General Manager Madison Water Utility Our Agenda A bit of history Madison s Lead Service Line Replacement Program Closing thoughts

More information

CCA Pilot Project Update

CCA Pilot Project Update CCA Pilot Project Update Petaluma, California October 10, 2007 Topics Project Overview Renewable Energy Supply: Highlighting Marin County s Current CCA Initiative Process & Timeline for CCA Implementation

More information

AWWA Activities, What will happen in 2016 and 2017, Impact of Flint. Presented at Water Research Foundation Symposium Philadelphia, PA March 29, 2016

AWWA Activities, What will happen in 2016 and 2017, Impact of Flint. Presented at Water Research Foundation Symposium Philadelphia, PA March 29, 2016 AWWA Activities, What will happen in 2016 and 2017, Impact of Flint Presented at Water Research Foundation Symposium Philadelphia, PA March 29, 2016 At the Forefront of Public Consciousness Flint residents

More information

Alameda Municipal Power (AMP) Advanced Metering Infrastructure (AMI) Assessment Public Utilities Board Presentation

Alameda Municipal Power (AMP) Advanced Metering Infrastructure (AMI) Assessment Public Utilities Board Presentation Alameda Municipal Power (AMP) Advanced Metering Infrastructure (AMI) Assessment Public Utilities Board Presentation Presented by: Dale Pennington and Nicole Griffin Date: January 25, 2016 Alameda Municipal

More information

LYSTEK INTERNATIONAL and AN ALTERNATIVE PROJECT DELIVERY IMPROVES BIOSOLIDS PROGRAM SUSTAINABLILTY

LYSTEK INTERNATIONAL and AN ALTERNATIVE PROJECT DELIVERY IMPROVES BIOSOLIDS PROGRAM SUSTAINABLILTY A PRESENTATION ON LYSTEK INTERNATIONAL and AN ALTERNATIVE PROJECT DELIVERY IMPROVES BIOSOLIDS PROGRAM SUSTAINABLILTY JAMES DUNBAR, P.E. General Manager California Business Development A PROGRESSIVE SOLUTION

More information

SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER I SOCALGAS AMI VISION AND POLICY

SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER I SOCALGAS AMI VISION AND POLICY Application No.: A.0-0-0 Exhibit No.: SCG 1 Date: March, 00 Witness: Michelle M. Mueller SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER I SOCALGAS AMI VISION AND POLICY Errata

More information

City of San Diego Water Department Report on Water Quality Relative to Public Health Goals

City of San Diego Water Department Report on Water Quality Relative to Public Health Goals Background: City of San Diego Water Department Report on Water Quality Relative to Public Health Goals July 1, 2004 Provisions of the California Health and Safety Code specify that the City of San Diego

More information

Automated Meter Reading Implementation. Finance, Audit and Accountability Committee Quality of Life Committee August 15, 2006

Automated Meter Reading Implementation. Finance, Audit and Accountability Committee Quality of Life Committee August 15, 2006 Automated Meter Reading Implementation Finance, Audit and Accountability Committee Quality of Life Committee August 15, 2006 Purpose Provide a recap to the committee of the development of an Automated

More information

The Future of Water Supply for California s Cities. March 2, 2016

The Future of Water Supply for California s Cities. March 2, 2016 The Future of Water Supply for California s Cities March 2, 2016 Current Situation End of a four-year drought? Supplies stretched but not broken Significant and unprecedented state action Relatively modest

More information

M A R C H 7, KC Water Cost of Service Task Force Meeting #10

M A R C H 7, KC Water Cost of Service Task Force Meeting #10 M A R C H 7, 2 0 1 7 KC Water Cost of Service Task Force Meeting #10 Agenda Findings and Recommendations Recap Customer Assistance System Development Charges Adjusting Rates to Cover Costs Irrigation Charge

More information

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations CHAPTER 8 UTILITIES WATER SYSTEM Summary & Recommendations The Waldoboro Water Company is a small water utility serving the downtown area of Waldoboro. The Water Company has 299 residential, 57 industrial

More information

Main Wastewater Treatment Plant Odor Control Program Update. Planning Committee October 9, 2018

Main Wastewater Treatment Plant Odor Control Program Update. Planning Committee October 9, 2018 Main Wastewater Treatment Plant Odor Control Program Update Planning Committee October 9, 2018 Agenda Key Performance Indicator (KPI) Capital Investments Improvements to Operational Practices Odor Management

More information

Village of Corinth Water System Improvements Project DWSRF No Water Meter Project Additional information and FAQ s Last Revised July 19, 2017

Village of Corinth Water System Improvements Project DWSRF No Water Meter Project Additional information and FAQ s Last Revised July 19, 2017 Page 1 of 7 Village of Corinth Water System Improvements Project DWSRF No. 17623 Water Meter Project Additional information and FAQ s Last Revised July 19, 2017 Below please find water meter project questions

More information

CCA Pilot Project Update

CCA Pilot Project Update CCA Pilot Project Update Santa Barbara, California July 13, 2007 Topics Project Overview Renewable Energy Supply: Highlighting Marin County s Current CCA Initiative Process & Timeline for CCA Implementation

More information

Ready or Not Conservation Is Here & You Will Have to Implement It

Ready or Not Conservation Is Here & You Will Have to Implement It Ready or Not Conservation Is Here & You Will Have to Implement It Gerry Nakano Presentation Outline Why Conserve Water? Benefits Interface with 2010 UWMP Update and SB 7 Legislation Examples/Case Studies

More information

Representing 50 members across all waste and technology sectors, including project developers, technology providers, waste and compost companies,

Representing 50 members across all waste and technology sectors, including project developers, technology providers, waste and compost companies, Representing 50 members across all waste and technology sectors, including project developers, technology providers, waste and compost companies, public agency and local government adopters Focus on supporting

More information

Midwest RCAP Midwest Assistance Program (952) Southern RCAP Community Resource Group (479)

Midwest RCAP Midwest Assistance Program (952) Southern RCAP Community Resource Group (479) Controlling Lead and Copper in Drinking Water Chad Ham, Fayetteville Public Works Commission Your name and contact info Developed by RCAP/AWWA and funded by the USEPA Acknowledgement: EPA National Priority

More information

Lead and Copper Rule. Lehigh County Authority Program. March 14, 2016

Lead and Copper Rule. Lehigh County Authority Program. March 14, 2016 Lead and Copper Rule Lehigh County Authority Program March 14, 2016 What is the Purpose of the Lead and Copper Rule? To protect public health, primarily by reducing water corrosivity, the Lead & Copper

More information

Orange County Water Loss Control Program

Orange County Water Loss Control Program Orange County Water Loss Control Program A New Model for Regional Collaboration Striving to Achieve an Economically Optimized Level of Water Loss North American Water Loss Conference 2017 Who Is MWDOC?

More information

Tyler Converse, Superintendent Water Department City of Canton

Tyler Converse, Superintendent Water Department City of Canton Tyler Converse, Superintendent Water Department City of Canton Jeff Swertfeger, Superintendent Water Quality and Treatment Division Greater Cincinnati Water Works Water Utility Council, Ohio AWWA Who are

More information

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager How to Read Your Water Bill and related topics Tom Heikkinen, General Manager All about us INTRODUCTION Our History In The Beginning 1870s: Water from Madison s private wells and lakes was unfit to drink

More information

Comparison of At-the-Tap and Profile Sampling for Lead

Comparison of At-the-Tap and Profile Sampling for Lead New York City Department of Environmental Protection Bill de Blasio, Mayor Emily Lloyd, Commissioner Comparison of At-the-Tap and Profile Sampling for Lead Carla Glaser NYC DEP Bureau of Water Supply Division

More information

LCRA Water Conservation Incentives Program

LCRA Water Conservation Incentives Program LCRA Water Conservation Incentives Program May 2012 www.lcra.org 1.0 INTRODUCTION... 3 1.1 BACKGROUND... 3 1.2 INCENTIVES PROGRAM OVERVIEW... 5 1.2.1 RESIDENTIAL INDOOR CONSERVATION... 5 1.2.2 RESIDENTIAL

More information

Request for Proposal. Advanced Metering Infrastructure (AMI)

Request for Proposal. Advanced Metering Infrastructure (AMI) Request for Proposal Advanced Metering Infrastructure (AMI) For City of Sullivan, IL 2 W Harrison St Sullivan, IL 61951 March 2, 2018 1. Overview The City of Sullivan, IL, is a town with a population of

More information

ATTACHMENT A SUMMARY COMPARISON OF PROPOSALS FOR CCCSWA COLLECTION, PROCESSING, TRANSFER, AND DISPOSAL SERVICES

ATTACHMENT A SUMMARY COMPARISON OF PROPOSALS FOR CCCSWA COLLECTION, PROCESSING, TRANSFER, AND DISPOSAL SERVICES ATTACHMENT A SUMMARY COMPARISON OF PROPOSALS FOR CCCSWA COLLECTION, PROCESSING, TRANSFER, AND DISPOSAL SERVICES A.1 Collection A.2 Recyclables Processing A.3 Green Waste/Food Scraps Processing A.4 Commercial

More information

SOCALGAS DISTRIBUTED ENERGY RESOURCE TARIFF

SOCALGAS DISTRIBUTED ENERGY RESOURCE TARIFF 1 SOCALGAS DISTRIBUTED ENERGY RESOURCE TARIFF Distributed Energy Resources (DER) Tariff» Summary: The DER tariff is an optional cost-based service which allows SoCalGas to design, install, own, operate,

More information

Indiana Chapter National Association of Water Companies 2017 Water Summit. Mary E. Hollingsworth, Drinking Water Branch Chief September 21, 2017

Indiana Chapter National Association of Water Companies 2017 Water Summit. Mary E. Hollingsworth, Drinking Water Branch Chief September 21, 2017 Indiana Chapter National Association of Water Companies 2017 Water Summit Mary E. Hollingsworth, Drinking Water Branch Chief September 21, 2017 What Happened In Flint June 2013 - City of Flint decides

More information

Village of Bear Lake HIGH LEAD LEVEL INVESTIGATION MIKE SMITH

Village of Bear Lake HIGH LEAD LEVEL INVESTIGATION MIKE SMITH 2016 Village of Bear Lake HIGH LEAD LEVEL INVESTIGATION MIKE SMITH February 5, 2016 Background In July 2015 the Village of Bear Lake collected First Draw (collecting the water sample directly from a kitchen

More information

EBMUD s Renewable Energy Initiatives

EBMUD s Renewable Energy Initiatives EBMUD s Renewable Energy Initiatives David R. Williams Director of Wastewater Presentation to: Metropolitan Water Reclamation District of Greater Chicago September 30, 2011 Topics Historical overview of

More information

SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018

SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018 SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018 Salem City (City) is now accepting Proposals for the development of a comprehensive Salem City Culinary Water and Secondary

More information

Customer Engagement Plan

Customer Engagement Plan Customer Engagement Plan Stakeholder Collaboration Meeting June 02, 2016 1 Agenda AMI Project Update Collaboration Goal & Objectives Customer Engagement Plan Overview Topic Areas Next Steps 2 AMI Project

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

City of Flushing. Water and Sewer Rates

City of Flushing. Water and Sewer Rates City of Flushing Water and Sewer Rates Current Water Rates $10.00 per month readiness to serve fee (billed on a quarterly basis at $30.00) 5.40 per 1,000 gallons used The City of Flushing s last water

More information

San Diego Gas & Electric MDM Project Approach

San Diego Gas & Electric MDM Project Approach San Diego Gas & Electric MDM Project Approach Jerry Sugerman October 21, 2008 What s Driving our AMI Project? California has a significant issue meeting the current and anticipated future demand for electricity

More information

City of Palo Alto 2016 Public Health Goals Report

City of Palo Alto 2016 Public Health Goals Report Table of Contents 1. Background and Key Terms a. How is Water Quality Regulated and What are Public Health Goals? b. Reporting Requirements c. Best Available Technologies and Detection Limits d. Guidelines

More information

Appendix A: Business Cases

Appendix A: Business Cases 1.0 Royal Flush Toilet Replacement Program 2.0 Blue Built Home Program 3.0 Home Visits / Audits Program 4.0 Multi-Residential Rebate Program 5.0 Multi-Residential Sub-metering Program 6.0 Water Smart Business

More information

Lead and Copper Rule Revisions

Lead and Copper Rule Revisions Lead and Copper Rule Revisions Office of Ground Water and Drinking Water Federalism Consultation Meeting January 8, 2018 1 Purpose & Overview Purpose: To obtain input from State and Local Government Officials

More information

FAIRFIELD-SUISUN SEWER DISTRICT AND LYSTEK INTERNATIONAL A COLLABORATION TO DELIVER A SUSTAINABLE BIOSOLIDS PROGRAM

FAIRFIELD-SUISUN SEWER DISTRICT AND LYSTEK INTERNATIONAL A COLLABORATION TO DELIVER A SUSTAINABLE BIOSOLIDS PROGRAM FAIRFIELD-SUISUN SEWER DISTRICT AND LYSTEK INTERNATIONAL A COLLABORATION TO DELIVER A SUSTAINABLE BIOSOLIDS PROGRAM GREG BAATRUP, P.E. FSSD General Manager JAMES DUNBAR, P.E. Lystek General Manager NACWA

More information

Village of Corinth Water System Improvements Project DWSRF No Water Meter Project Additional information and FAQ s Last Revised April 18, 2018

Village of Corinth Water System Improvements Project DWSRF No Water Meter Project Additional information and FAQ s Last Revised April 18, 2018 Page 1 of 8 Village of Corinth Water System Improvements Project DWSRF No. 17623 Water Meter Project Additional information and FAQ s Last Revised April 18, 2018 Below please find water meter project questions

More information

Actions Related to the Agreement with Taxi San Jose for the On-Demand Ground Transportation Program

Actions Related to the Agreement with Taxi San Jose for the On-Demand Ground Transportation Program CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: SEE BELOW It) COUNCIL AGENDA: 11-^-15 ITEM: 6.1 Memorandum FROM: Toni J. Taber, CMi City Clerk DATE: 10-22-2015

More information

Actions Related to the Agreement with Taxi San Jose for the On-Demand Ground Transportation Program

Actions Related to the Agreement with Taxi San Jose for the On-Demand Ground Transportation Program CITY OF SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: SEE BELOW COUNCIL AGENDA: 11-03-15 ITEM: 6.1 Memorandum FROM: Toni J. Taber, CM 1 City Clerk DATE: 10-22-2015 SUBJECT:

More information

City of Solana Beach

City of Solana Beach City of Solana Beach City of Solana Beach Peer Review of Community Choice Aggregation Study April 6, 2017 Prepared by: 570 Kirkland Way, Suite 100 Kirkland, Washington 98033 A registered professional engineering

More information

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018 Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties September 13, 2018 Agenda Opening remarks Eileen White, Director of Wastewater

More information

Drinking Water from the Ohio EPA Perspective. Susan K. Schell Environmental Manager Ohio EPA Division of Drinking and Ground Waters

Drinking Water from the Ohio EPA Perspective. Susan K. Schell Environmental Manager Ohio EPA Division of Drinking and Ground Waters Drinking Water from the Ohio EPA Perspective Susan K. Schell Environmental Manager Ohio EPA Division of Drinking and Ground Waters Overview Legislation update Asset Management Lead Contingency Plans Operator

More information

Less Loss is our Gain Water Loss Control in Los Angeles

Less Loss is our Gain Water Loss Control in Los Angeles Less Loss is our Gain Water Loss Control in Los Angeles December 5, 2017 Peter Dugan, Water Loss Task Force Project Engineer Reynold Wong, Water Loss Task Force Project Engineer LADWP California s Largest

More information

ENGINEERING AND INFORMATION TECHNOLOGY COMMITTEE MEETING SUMMARY MINUTES Wednesday, August 8, :15 p.m.

ENGINEERING AND INFORMATION TECHNOLOGY COMMITTEE MEETING SUMMARY MINUTES Wednesday, August 8, :15 p.m. ENGINEERING AND INFORMATION TECHNOLOGY COMMITTEE MEETING SUMMARY MINUTES Wednesday, August 8, 2018 4:15 p.m. ATTENDANCE Director: John Weed (Chair), Aziz Akbari ftdr2_. Staff: Ed Stevenson, Toni Lyons,

More information

Published 3Q Betsy Loeff Industry Analyst. Jevan Fox Research Analyst

Published 3Q Betsy Loeff Industry Analyst. Jevan Fox Research Analyst EXECUTIVE SUMMARY: Smart Water Meters Advanced Metering Infrastructure for Water Utilities: Market Drivers, Technology Issues, Deployment Case Studies, Key Industry Players, and Market Forecasts Published

More information

Jeff Austin Utility Service Group

Jeff Austin Utility Service Group Jeff Austin Utility Service Group Provide water system Asset Management Services through Maintenance Program (MP) which cover: Storage Tanks (Steel and Concrete) Water Quality (THM Removal, Tank Mixing,

More information

Water Conservation Incentives Update. Finance Committee April 28, 2015

Water Conservation Incentives Update. Finance Committee April 28, 2015 Water Conservation Incentives Update Finance Committee April 28, 2015 Presentation Overview Rebate Design Criteria and Trends Summary Rebate Program Statistics FY15-16 Incentive Amounts Pilot Research

More information

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network PG&E SmartMeter Program Overview Megan O Brien Associate Project Manager Energy Information Network The PG&E SmartMeter Program Automated meter reading for all customers 10 Million meter upgrades A network

More information

Form 370: Drinking Water State Revolving Fund Preapplication

Form 370: Drinking Water State Revolving Fund Preapplication Form 370: Drinking Water State Revolving Fund Preapplication The purpose of this preapplication is to gather information concerning potential projects eligible for funding from the Drinking Water State

More information

The 2018 Legislative Session

The 2018 Legislative Session Item 2 SILICON VALLEY CLEAN ENERGY The 2018 Legislative Session Hilary Staver September 12, 2018 Item 2 Calendar Updates The legislative session ended August 31, 2018 Governor Brown has until September

More information

Five Year Strategic Plan. Alameda County Water District

Five Year Strategic Plan. Alameda County Water District Five Year Strategic Plan Alameda County Water District 2018 ACWD Strategic Plan TABLE OF CONTENTS Introduction... 1 Mission Statement... 2 2018 Strategic Goals... 2 Strategic Goal #1 Cost Effectiveness

More information

City of Flint October, 2015 Quarter Water Quality Report

City of Flint October, 2015 Quarter Water Quality Report Customer Service Center City Hall 1101 S. Saginaw St. Postage Flint, MI 48501 City of Flint October, 2015 Quarter Water Quality Report The Quarterly Water Quality Report provides important information

More information

CITY OF SANTA ROSA CITY COUNCIL RESOLUTION APPROVING SOLID WASTE COLLECTION SERVICES AGREEMENT BETWEEN THE CITY OF SANTA ROSA AND RECOLOGY

CITY OF SANTA ROSA CITY COUNCIL RESOLUTION APPROVING SOLID WASTE COLLECTION SERVICES AGREEMENT BETWEEN THE CITY OF SANTA ROSA AND RECOLOGY CITY OF SANTA ROSA CITY COUNCIL Agenda Item # 14.1 For Council Meeting of: August 29, 2017 TO: FROM: SUBJECT: MAYOR AND CITY COUNCIL GLORIA HURTADO, DEPUTY CITY MANAGER RESOLUTION APPROVING SOLID WASTE

More information

City of Santa Rosa Groundwater Master Plan. Presentation to BPU Study Session June 6, 2013

City of Santa Rosa Groundwater Master Plan. Presentation to BPU Study Session June 6, 2013 City of Santa Rosa Groundwater Master Plan Presentation to BPU Study Session June 6, 2013 Presentation Outline Groundwater Policy Background Groundwater Master Plan Objective How Did We Get Here? Key Groundwater

More information

Regulatory Report LGSEC Quarterly Meeting

Regulatory Report LGSEC Quarterly Meeting Regulatory Report LGSEC Quarterly Meeting Jody London July 16, 2015 jody_london_consulting@earthlink.net 510-459-0667 Today s Report CPUC CEC Governor s Goals Legislation 2 Energy Efficiency (R.13-11-005)

More information

Public Water Supply District No. 3 of Franklin County 150 Old Hwy. 100 PO Box 160 Villa Ridge, MO

Public Water Supply District No. 3 of Franklin County 150 Old Hwy. 100 PO Box 160 Villa Ridge, MO Public Water Supply District No. 3 of Franklin County 150 Old Hwy. 100 PO Box 160 Villa Ridge, MO 63089 636-742-5200 Superintendent: Bob Hathcock Operations Supervisor: Terry McDaniel 2018-2019 COMMERCIAL

More information

Ordinance establishing a Community Choice Aggregation Program in accordance with

Ordinance establishing a Community Choice Aggregation Program in accordance with FILE NO. ORDINANCE NO. 1 [Ordinance establishing a Community Choice Aggregation Program to allow San Francisco to aggregate the electrical load of San Francisco electricity consumers and to accelerate

More information

Lead Over Time in Chicago

Lead Over Time in Chicago Lead Over Time in Chicago Andrea R.H. Putz Alan E. Stark City of Chicago Department of Water Management Thomas H. Powers, P.E., Commissioner Water System Overview Protecting public health & safety 2 Cribs

More information

Tacoma Public Utilities Water Conservation Goal and Plan DRAFT October 2, 2017

Tacoma Public Utilities Water Conservation Goal and Plan DRAFT October 2, 2017 Tacoma Public Utilities Water Conservation 2018 2027 Goal and Plan DRAFT October 2, 2017 Background Since the 1980s, Tacoma Water has been committed to implementing an effective conservation plan as part

More information

Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges. How to Submit a Protest

Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges. How to Submit a Protest 220 Nellen Ave. Corte Madera, CA 94925 Notice of Public Hearing on Proposed Water Service Rates, Fees and Charges The Marin Municipal Water District (MMWD) Board of Directors will hold a public hearing

More information

Water Supply Availability & Deficiency Report

Water Supply Availability & Deficiency Report Water Supply Availability & Deficiency Report Board of Directors May 10, 2016 EBMUD Draft UWMP 2015 Public Hearing Established by Urban Water Management Planning Act in 1983 EBMUD sponsored legislation

More information

Water Energy Nexus. Alexander R. Coate October 24, 2012

Water Energy Nexus. Alexander R. Coate October 24, 2012 Water Energy Nexus Alexander R. Coate October 24, 2012 Overview Background EBMUD and State Energy Use Energy Use and Water Supply Energy Management Strategy Summary EBMUD Service Area EBMUD Background

More information

Trailblazing Organics Programs

Trailblazing Organics Programs Trailblazing Organics Programs Presented to SWANA Huntington Beach, CA Prepared By: Laith Ezzet, April Hilario and Haley Kunert HF&H Consultants, LLC September 8, 2016 Today s Topics 1. Who s doing what?

More information

Water Loss. Water Research Foundation How to use the Free Water Loss Audit Software v 5.0

Water Loss. Water Research Foundation How to use the Free Water Loss Audit Software v 5.0 Water Loss Water Research Foundation How to use the Free Water Loss Audit Software v 5.0 2 What we will be covering Getting a handle on water loss How much How risky How to calculate Determining the cost

More information

Drought Financial Management Drought Rates. Board of Directors August 12, 2014

Drought Financial Management Drought Rates. Board of Directors August 12, 2014 Drought Financial Management Drought Rates Board of Directors August 12, 214 Workshop Topics Workshop 1 Introduction Workshop 2 Reserves Workshop 3 Drought Rates Workshop 4 Capital Plan Workshop Rates

More information

Public Water Supply District No. 3 of Franklin County 150 Old Highway 100 PO Box 160 Villa Ridge, MO

Public Water Supply District No. 3 of Franklin County 150 Old Highway 100 PO Box 160 Villa Ridge, MO Public Water Supply District No. 3 of Franklin County 150 Old Highway 100 PO Box 160 Villa Ridge, MO 63089 636-742-5200 Superintendent: Bob Hathcock Operations Supervisor: Terry McDaniel 2018-2019 WATER

More information

UNIVERSITY OF CALIFORNIA Building a foundation to enable operational and financial collaboration.

UNIVERSITY OF CALIFORNIA Building a foundation to enable operational and financial collaboration. UNIVERSITY OF CALIFORNIA Building a foundation to enable operational and financial collaboration. Current State 2 Each campus has a different chart of accounts and must map to the OP chart of accounts.

More information

CWEA MEDIA KIT cwea.org. Reach 10,000+ ca clean water pros. Photos by CWEA members Ralph Palomares and Ddaze Phuong

CWEA MEDIA KIT cwea.org. Reach 10,000+ ca clean water pros. Photos by CWEA members Ralph Palomares and Ddaze Phuong CWEA MEDIA KIT 2019 Reach 10,000+ ca clean water pros cwea.org Photos by CWEA members Ralph Palomares and Ddaze Phuong 10,200 Members Over 1,000 California Cities, Agencies & Facilities Represented A FEW

More information

Getting to Net Zero Energy and Water Use and Beyond In Existing Multifamily Buildings

Getting to Net Zero Energy and Water Use and Beyond In Existing Multifamily Buildings Building Bridges to Net Zero Getting to Net Zero Energy and Water Use and Beyond In Existing Multifamily Buildings Amy Dryden October 29, 2015 1 1 Agenda Framework for Thinking about ZNE, ZNW, ZNC Amy

More information

Community Choice Energy for Alameda County

Community Choice Energy for Alameda County Community Choice Energy for Alameda County Status Update Put Name of City and Date of Session Here What is Community Choice Energy? CCE enables local governments to procure and/or develop power on behalf

More information

NOTICE OF PUBLIC HEARING PROPOSED CHANGES IN WATER, WASTEWATER, AND RECYCLED WATER RATES AND FEES

NOTICE OF PUBLIC HEARING PROPOSED CHANGES IN WATER, WASTEWATER, AND RECYCLED WATER RATES AND FEES Este aviso está disponible en español. Se puede encontrarlo en Utility Billing dentro de City Hall o por medio de Internet en www.escondido.org. NOTICE OF PUBLIC HEARING PROPOSED CHANGES IN WATER, WASTEWATER,

More information