1 Office of Public Works Arterial Drainage Maintenance An Environmental Approach Richard Dooley, Engineer Gr. 1, Galway, Ireland. Acknowledgements Thanks to Nathy Gilligan, Environment Section OPW, John Murphy, Regional Engineer, West Region and Dr. Jimmy King of the Central Fisheries Board for their assistance.

2 OPW role in Arterial Drainage Maintenance OPW are in existence for 150 years. Drainage and flood relief works commenced under the 1842 Drainage Act. Body through which Central Government exercises its statutory responsibilities in respect of: (a) River Drainage (b) Flood Relief

3 1945 Arterial Drainage Act Investigation & preparation on whole catchment basis. Some sixty catchments identified. Thirty four catchment schemes completed together with four Estuarine Embankment Schemes. 260,000 Hectares of land benefited. Statutory maintenance responsibility.

4

5 1995 Amendment to the 1945 Act In response to major Urban Flooding in 1994/1995. Empowered the Commissioners to carry out drainage schemes for the alleviation of localised flooding. Ten schemes have been carried out, three others at works stage.

6 Maintenance Data 11,504 Km of Channel (90% < 3metre base width) 733Km of Embankment 18,500 Bridges Sluices, Pumping Stations and Barrages 2000 Km of channel maintained annually

7 Resources on Maintenance A trained permanent direct labour workforce of over 300. Engineering expertise. An annual budget of over 13 Million. A fleet of 80 dedicated excavators. Jeeps, Low Loaders, Tractors, Trucks and ancillary equipment.

8 Annual Maintenance Programme Prepared by each Region towards the end of the preceding year. Programme compiled for individual machine units - detailed by channel. Programme includes inspections, repairs/replacement of structures & embankments.

9 Traditional Channel Maintenance Removal debris, silt deposits, in channel vegetation and clearing of bank slopes. Restoration of the design trapezoidal section. Input sought from the Regional Fisheries Boards and account taken of their concerns.

10 Traditional Channel Maintenance

11 Changes in Drainage Maintenance Use of modern fleet of low ground pressure hydraulic machinery. Increased liaison with Regional Fisheries Boards & Dúchas the Heritage Service. Central Fisheries Board Experimental Drainage Maintenance Programme Commenced in the East Region in 1990 Extended to all Regions in 1997

12 Consultations with Regional Fisheries Boards Regional Fisheries Boards Consultation at all levels - Formal Meeting On more sensitive schemes bi-monthly meetings are held Timing of entry onto spawning, nursery and angling channels.

13 Channel redefined Stone weirs reconstructed Fishery enhancement works

14 Consultations with Dúchas - The Heritage Service Programmes copied to Regional Managers Formal meetings arranged by OPW Consultation and notifications to District Conservation officers when entering on or directly impinging upon National Heritage Areas (NHA s) Special Areas of Conservation (SAC s) Special Protection Areas (SPA s)

15 Experimental Drainage Maintenance Programme Fully funded by the OPW - drawing on the expertise of Central Fisheries Board Staff Experimental environmentally friendly approaches were assessed. Training Course in Environmentally Sensitive Channel Maintenance was developed jointly by the OPW & CFB - Training has been provided for all outdoor staff.

16 Central Fisheries Board - EDM Programme Ten key environmentally friendly initiatives identified on channel maintenance Culminating in the identification of changes in practice

17 1. Working on one bank only

18 2. Restrict maintenance to channel Remove Retain and top berm Retain marginal grass

19 3. Deposit spoil on Bank Full, not Bank Slope

20 4. Selective Vegetation Removal Canary grass Phalaris Bullrush Scirpus

21 5. Leave sections untouched

22 6. Management of Trees

23 7. Replace boulders - to break up flow and create fish lies

24 No. of redds 8. Loosen spawning Gravels Control Experimental 1990/ / /93 Years

25 9. Manage berms - two stage channel

26 10. Excavate Pools Too wide & shallow Pool excavated

27 Further initiatives Draft protocols have been introduced to address the level and format of our interactions with: Dúchas Regional Fisheries Boards Central Fisheries Board Ensuring continued compliance with existing Irish and EU Environmental Legislation. GIS presently being developed as primary data management tool.

28 Environmental Channel Maintenance - The future Environmental guidance document for machine operatives. Monitoring of level of compliance with environmental methods adopted from the Experimental stage. Channel categorisation by Habitat.

29 OBJECTIVE Arterial Drainage with improved habitat & wildlife.

Funded by the Irish Government under the National Development Plan Document Number: DC093

Funded by the Irish Government under the National Development Plan Document Number: DC093 Funded by the Irish Government under the National Development Plan 2000-2006 Shannon Internatiional Riiver Basiin Diistriict Project Freshwater Morphology POMS Study Work Package 2 Programme of Measures

More information

Gravel rehabilitation/restoration

Gravel rehabilitation/restoration THE CHALKSTREAM HABITAT MANUAL sheet 1 of 4 Gravel rehabilitation/restoration Issues Many of Britain's chalkstreams have been subject to extensive reprofiling. Land drainage for agricultural 'improvement',

More information

FLOOD RISK MANAGEMENT AND THE OPW IN 2012 (How We Do Business)

FLOOD RISK MANAGEMENT AND THE OPW IN 2012 (How We Do Business) FLOOD RISK MANAGEMENT AND THE OPW IN 2012 (How We Do Business) TOPICS Legislative Framework Preliminary Flood Risk Assessment (PFRA) Catchment Flood Risk Assessment and Management Plans (CFRAM) Flood Relief

More information

SNIFFER with ICE: a taster of barrier assessment issues

SNIFFER with ICE: a taster of barrier assessment issues University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Fish Habitat Protection Development Permit Area

Fish Habitat Protection Development Permit Area Appendix A2 3 Fish Habitat Protection Development Permit Area 1.0 PURPOSE: The area shown on Map No. 7 as the Fish Habitat Protection Development Permit Area is designated for the purpose of protecting

More information

Enhancing Straightened River Channels

Enhancing Straightened River Channels .6 Creating a sinuous low flow channel in an over-widened river River Dearne Location - Mexborough, West of Doncaster, South Yorkshire SE484012 Date of construction - Summer 1995 Length - 500m Cost - 4,000

More information

Irrigation Structures 1

Irrigation Structures 1 CHAPTER 8 Irrigation Structures 1 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 20 Diversion Head Works Definition: The works, which

More information

COMPETITION NOTICE and JOB DESCRIPTION. Open Recruitment Competition. South West Arterial Drainage Maintenance and Construction Division

COMPETITION NOTICE and JOB DESCRIPTION. Open Recruitment Competition. South West Arterial Drainage Maintenance and Construction Division COMPETITION NOTICE and JOB DESCRIPTION Open Recruitment Competition South West Arterial Drainage Maintenance and Construction Division Fixed Term Contract of 12 months duration in the position of Safety

More information

Good Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy

Good Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy Good Practice Guide Technical Guidance: Flood risk activity exemptions Date Published: April 2016 GPG 221 Document Owner: Flood Risk Strategy Page 1 of 41 Version History: Document Date Summary of Changes

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Dunkellin River and Aggard Stream Flood Relief Scheme

Dunkellin River and Aggard Stream Flood Relief Scheme Dunkellin River and Aggard Stream Flood Relief Scheme Environmental Impact Statement (EIS) Volume I October 2014 MGE0260 rpsgroup.com Dunkellin River and Aggard Stream Flood Relief Scheme Environmental

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Request for Proposal (RFP) Lower Kings River Fishery Habitat Characterization and Identification of Restoration Opportunities.

Request for Proposal (RFP) Lower Kings River Fishery Habitat Characterization and Identification of Restoration Opportunities. Request for Proposal (RFP) Lower Kings River Fishery Habitat Characterization and Identification of Restoration Opportunities August 2017 The Kings River Water Association (KRWA), Kings River Conservation

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

COMPETITION NOTICE and JOB DESCRIPTION PLEASE READ CAREFULLY. OPEN Recruitment Competition for Fixed-Term (including Seasonal) positions as

COMPETITION NOTICE and JOB DESCRIPTION PLEASE READ CAREFULLY. OPEN Recruitment Competition for Fixed-Term (including Seasonal) positions as COMPETITION NOTICE and JOB DESCRIPTION PLEASE READ CAREFULLY OPEN Recruitment Competition for Fixed-Term (including Seasonal) positions as General Operative Band 2 / 360 0 Excavator Driver in the Office

More information

Case study 11. Low Stanger Floodplain Reconnection Project

Case study 11. Low Stanger Floodplain Reconnection Project Case study 11. Low Stanger Floodplain Reconnection Project Author: Ian Creighton Main driver: Flood alleviation Project stage: Completed 2015 Photo 1: Downstream breach, Low Stranger Farm (source: West

More information

FORM B: DAMMING AND DIVERSION OF WATER

FORM B: DAMMING AND DIVERSION OF WATER APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan

More information

TIMBER PLANTATIONS (HARVEST GUARANTEE) REGULATION 1997 under the TIMBER PLANTATIONS (HARVEST GUARANTEE) ACT New South Wales

TIMBER PLANTATIONS (HARVEST GUARANTEE) REGULATION 1997 under the TIMBER PLANTATIONS (HARVEST GUARANTEE) ACT New South Wales TIMBER PLANTATIONS (HARVEST GUARANTEE) REGULATION 1997 under the TIMBER PLANTATIONS (HARVEST GUARANTEE) ACT 1995 New South Wales Timber Plantations (Harvest Guarantee) Regulation 1997 1 Name of Regulation

More information

P U B L I C U T I L I T Y D I S T R I C T N O.

P U B L I C U T I L I T Y D I S T R I C T N O. P U B L I C U T I L I T Y D I S T R I C T N O. 1 o f C H E L A N C O U N T Y P.O. Box 1231, Wenatchee, WA 98807-1231 327 N. Wenatchee Ave., Wenatchee, WA 98801 (509) 663-8121 Toll free 1-888-663-8121 www.chelanpud.org

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

10: Water resource management

10: Water resource management 10: Water resource management 124 0: Facts 2008 : Energy and Water Resources in Norway 10.1. Introduction their property. These applications also take priority in the event of water shortages. Swimming,

More information

Case study 6. Chelmer Valley Local Nature Reserve

Case study 6. Chelmer Valley Local Nature Reserve Case study 6. Chelmer Valley Local Nature Reserve Author: Trevor Bond Main driver: Habitat improvement Project stage: Completed spring 2016 Photo 1: River Chelmer, Chelmer Valley Local Nature Reserve (source:

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

Hydropower Guidance Note: HGN 7 Competing Schemes

Hydropower Guidance Note: HGN 7 Competing Schemes Guidance Note Hydropower Guidance Note: HGN 7 Competing Schemes This guidance is not intended as a statement of law and should be read in combination with and in the context of the relevant enactments

More information

Version 4.3. December 2008

Version 4.3. December 2008 Natura Sites Assessment Report ------------------------------------------------------------------------------------------------------------------------------------------------------ Report for the Ecological

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: PFRA database comments (in italics):

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: PFRA database comments (in italics): Location: Aughinish CHP and ESB Sub Station Co. Limerick Unique ID: 240366 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 129250 Northing: 153000 River / Catchment / Sub-catchment

More information

Water of Leith catchment profile

Water of Leith catchment profile catchment profile Introduction The catchment covers a total area of 122 km 2 and predominantly drains the north western slopes of the Pentland Hills from its source in the Colzium springs. The natural

More information

2012 Flood Repair Projects

2012 Flood Repair Projects 2012 Flood Repair Projects Okanogan-Wenatchee National Forest Naches Ranger District 10237 U.S. Highway 12 Naches, WA 98937 (509) 653-1401 Cle Elum Ranger District 803 W. 2nd Street Cle Elum, WA 98922

More information

COTTON CREEK CULVERT REPLACMENT

COTTON CREEK CULVERT REPLACMENT COTTON CREEK CULVERT REPLACMENT Integrating Mobility with Environmental Innovation Located along a scenic section of Highway 3/95 in British Columbia, Moyie Bluffs, a 6.5 km stretch of inland highway had

More information

BC HYDRO FISH AND WILDLIFE BRIDGE COASTAL RESTORATION PROGRAM CHEAKAMUS RIVER

BC HYDRO FISH AND WILDLIFE BRIDGE COASTAL RESTORATION PROGRAM CHEAKAMUS RIVER BC HYDRO FISH AND WILDLIFE BRIDGE COASTAL RESTORATION PROGRAM 2001-2002 CHEAKAMUS RIVER Cheakamus Off-River Channel Development: "Dave's Pond Extension" Cheakamus River Off-Channel Rehabilitation 2001-2002

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES Don McEntee Chartered Engineer Dublin City Council November 2006 CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES In September 2006 the

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON

BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON SILVERTON MILL, DEVON The requirement for DS Smith to remediate the former Silverton Mill, and surrender

More information

2014 Managed Forest Inspection Program

2014 Managed Forest Inspection Program 2014 Managed Forest Inspection Program BACKGROUND The Managed Forest Council (Council) has a policy to inspect all managed forests at least once every five years, as well as to inspect new managed forests

More information

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA) Natural Flood Management Measures & Multiple Benefits Steve Rose (JBA) Definitions Natural Flood Management - NFM (SEPA): A range of techniques that aim to reduce flooding by working with natural features

More information

Quittie Nature Park Stream Restoration Phase 1 Construction Scope of Work and Budget

Quittie Nature Park Stream Restoration Phase 1 Construction Scope of Work and Budget Quittie Nature Park Stream Restoration Phase 1 Construction Scope of Work and Budget Project Management 1. Coordination with Client, Contractors, Permitting agencies, and Funder a. Coordinate with Client

More information

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact

More information

Working together To improve our water environment Glazert Water

Working together To improve our water environment Glazert Water Working together To improve our water environment Glazert Water Potential options for river restoration and natural flood management in the Glazert catchment Draft summary report 1.0 Introduction 1 Report

More information

Tiered NEPA Document for Categorically Permitted Alterations to Existing U.S. Army Corps of Engineer Civil Works Projects Proposed Categorically Permitted Alterations (Check all that apply) Utilities under

More information

Appendix B Example of the Tiered NEPA Document to be used for Categorically Permitted Alterations PROGRAMMATIC ENVIRONMENTAL ASSESSMENT CATEGORICAL PERMISSIONS SECTION 408 ALTERATIONS TO EXISTING U.S.

More information

Warwickshire Avon Catchment Partnership

Warwickshire Avon Catchment Partnership Warwickshire Avon Catchment Partnership Working in Partnership Gina Rowe Living Landscapes Manager Tim Precious Wetland Project Officer Warwickshire Wildlife Trust Creating a Living Landscape www.warwickshirewildlifetrust.org.uk

More information

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review Location: Clonfert, Co. Galway Unique ID: 252906 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 197134 Northing: 221731 River / Catchment / Sub-catchment Un-named minor

More information

Meeting with PRRD Board

Meeting with PRRD Board Received DC Office May 11/17 Site C Project Peace River Channel Contouring and Side Channel Enhancement Meeting with PRRD Board Background - The Peace River has fluctuating water levels which can cause

More information

GB River Esk from source to Baysdale Beck (Esk and Coast) Ecological Status: Moderate. Failing Elements: Fish, ph, Zinc

GB River Esk from source to Baysdale Beck (Esk and Coast) Ecological Status: Moderate. Failing Elements: Fish, ph, Zinc GB104027068090 River Esk from source to Baysdale Beck (Esk and Coast) Ecological Status: Moderate Failing Elements: Fish, ph, Zinc Costings Issues identified Solutions / work required Responsibility/Lead

More information

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Act 1979 New South Wales State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment 2010 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor,

More information

Beaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures

Beaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures Beaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures Issue: The control of beavers and removal of beaver dams and has been a long-standing issue within the Omineca Region of

More information

The KerryLIFE Freshwater Pearl Mussel Project: The Forestry Perspective

The KerryLIFE Freshwater Pearl Mussel Project: The Forestry Perspective The KerryLIFE Freshwater Pearl Mussel Project: The Forestry Perspective Kevin Collins, Forestry Inspector Forest Service-DAFM Presentation to the National Water Event Galway Bay Hotel, 8 th June 2016 Difficulties

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

Summary of Relief Sought by Transpower New Zealand Limited

Summary of Relief Sought by Transpower New Zealand Limited Summary of Relief Sought by Transpower New Zealand Limited Relief sought in Transpower s further submission and supported by evidence The following consolidates the amendments to the Proposed Southland

More information

Following the November 2009 flood event Galway County Council and the OPW have been working together on the Ballinasloe flooding situation.

Following the November 2009 flood event Galway County Council and the OPW have been working together on the Ballinasloe flooding situation. Derrymullan, Ballinasloe Flood Defence Wall, Report October 2011 Following the November 2009 flood event Galway County Council and the OPW have been working together on the Ballinasloe flooding situation.

More information

National Peatlands Strategy. Terms of Reference

National Peatlands Strategy. Terms of Reference The Peatlands Council National Peatlands Strategy Terms of Reference The Minister for Arts, Heritage and the Gaeltacht, Mr. Jimmy Deenihan, T.D. and the Peatlands Council has invited submissions from stakeholders,

More information

THE TOKUYAMA DAM. Features of the Tokuyama Dam

THE TOKUYAMA DAM. Features of the Tokuyama Dam THE TOKUYAMA DAM Features of the Tokuyama Dam Name of dam Tokuyama Dam Name of river Ibi River, Kiso river system Purpose of dam Flood control, Maintenance flow for normal function of river, Water supply

More information

Funded by the Irish Government under the National Development Plan Document Number: DC098. DC098/lh/May 08

Funded by the Irish Government under the National Development Plan Document Number: DC098. DC098/lh/May 08 Funded by the Irish Government under the National Development Plan 2000-2006 Shannon Internatiional Riiver Basiin Diistriict Project Freshwater Morphology POMS Study Recommendatiions for Programmes of

More information

APPLICATION GUIDANCE NOTES

APPLICATION GUIDANCE NOTES APPLICATION FOR A RELAXATION OF BYELAW 10 (for any development including buildings, walls, driveways, hardstanding, land tile outfalls, services, trees, fences and landscaping across, into or within 9

More information

WATER QUALITY AND ACTIVITIES THAT CAUSE RIVER BED DISTURBANCE RMLA CONFERENCE 2002 QUEENSTOWN WORKSHOP PRESENTATION BY BILL RAINEY

WATER QUALITY AND ACTIVITIES THAT CAUSE RIVER BED DISTURBANCE RMLA CONFERENCE 2002 QUEENSTOWN WORKSHOP PRESENTATION BY BILL RAINEY WATER QUALITY AND ACTIVITIES THAT CAUSE RIVER BED DISTURBANCE RMLA CONFERENCE 2002 QUEENSTOWN WORKSHOP PRESENTATION BY BILL RAINEY Introduction My role in this workshop is to talk about activities that

More information

Code of Practice For Timber Management Operations In Riparian Areas

Code of Practice For Timber Management Operations In Riparian Areas Code of Practice For Timber Management Operations In Riparian Areas Original document produced in 1991 Queen s Printer for Ontario Document amended in April 1998 consistent with Term and Condition 76 in

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications CONSTRUCTION OF WATERWAYS September 2013 Page 1 of 9

The Manitoba Water Services Board SECTION Standard Construction Specifications CONSTRUCTION OF WATERWAYS September 2013 Page 1 of 9 September 2013 Page 1 of 9 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work shall consist of the excavation of all materials from within the limits of drains, canals, ditches and floodways, hereinafter

More information

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED Prepared for: Tom Cole, RPF Richmond Plywood Corporation 13911 Vulcan Way Richmond, B.C. V6V 1K7 March 2004 Prepared

More information

CONCEPTION OF CHIYODA EXPERIMENTAL CHANNEL

CONCEPTION OF CHIYODA EXPERIMENTAL CHANNEL Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 2002 International Association of Hydraulic Engineering and Research CONCEPTION

More information

TULLAMORE FLOOD RISK ASSESSMENT AND MANAGEMENT STUDY

TULLAMORE FLOOD RISK ASSESSMENT AND MANAGEMENT STUDY TULLAMORE FLOOD RISK ASSESSMENT AND MANAGEMENT STUDY FINAL HYDRAULICS REPORT 1794/RP/004/C June 2008 FRAM Section Engineering Services Office of Public Works Doc. No. 1794/RP/004/C ii June 2008 INDEX OF

More information

Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed

Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed Interesting Solutions for a Culvert Rehabilitation Project in a Sensitive Urban Watershed Jason Stahl, P. Eng., Project Engineer, Amec Foster Wheeler David Sinke, P. Eng., Principal, Transportation Engineering,

More information

Working on flood embankments: Essential environmental considerations

Working on flood embankments: Essential environmental considerations Working on flood embankments: Essential environmental considerations Information for project managers, engineers and contractors When undertaking any work on or adjacent to coastal and estuarine flood

More information

GUIDANCE ON THRESHOLDS AND METHODOLOGY TO BE APPLIED IN IRELAND S RIVER BASIN DISTRICTS

GUIDANCE ON THRESHOLDS AND METHODOLOGY TO BE APPLIED IN IRELAND S RIVER BASIN DISTRICTS WFD Surface Water Hydrology Risk Assessment Methodology GUIDANCE ON THRESHOLDS AND METHODOLOGY TO BE APPLIED IN IRELAND S RIVER BASIN DISTRICTS Paper by the Working Group on Characterisation and Risk Assessment

More information

Construction Environmental Sediment Management Plan

Construction Environmental Sediment Management Plan Construction Environmental Sediment Management Plan for Little Qualicum River Bridge Upgrades Prepared For: The Regional District of Nanaimo Recreation & Parks Parksville, B.C. V9P 2X4 Prepared By: D.R.

More information

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

Overview of 2 nd Cycle Draft River Basin Management Plan

Overview of 2 nd Cycle Draft River Basin Management Plan Overview of 2 nd Cycle Draft River Basin Management Plan Ken Jordan Assistant Principal, Water Division, D/HPCLG Shannon Flood Risk State Agency Co-ordination Working Group 21st March 2017 Outline Overview

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

Celbridge Draft Local Area Plan

Celbridge Draft Local Area Plan Celbridge Draft Local Area Plan 2017 2023 Dréachtphlean Ceantair Áitiúil Cill Droichid Planning Department Kildare County Council May 2017 PROPOSED MATERIAL ALTERATIONS STRATEGIC ENVIRONMENTAL ASSESSMENT

More information

The District of Maple Ridge Stream Protection Regulation Guidelines. Watermark Technologies Canada

The District of Maple Ridge Stream Protection Regulation Guidelines. Watermark Technologies Canada The District of Maple Ridge Stream Protection Regulation Guidelines Watermark Technologies Canada Outline 1. Overview On Maple Ridge GPS Stream Mapping & Inventory Information System 2. Information System

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Sustainable Natural Environment Fish Habitat

Sustainable Natural Environment Fish Habitat Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER Sustainable Natural Environment Fish Habitat BACKGROUND: Lakes, rivers, streams, ponds and many wetlands provide fish habitat. Intermittent

More information

Environmentally friendly drainage measures The use of two-stage profiles to improve diversity and water quality in agricultural streams

Environmentally friendly drainage measures The use of two-stage profiles to improve diversity and water quality in agricultural streams Environmentally friendly drainage measures The use of two-stage profiles to improve diversity and water quality in agricultural streams European River Restoration Conference 2014, Vienna 27.-29.10.2014,

More information

Filey FAS. Presentation to Planners. Stewart Rowe

Filey FAS. Presentation to Planners. Stewart Rowe Filey FAS Presentation to Planners Stewart Rowe 15.2.2016 History of Flooding There is a long history of flooding in Filey caused by extreme rainfall events. These rainfall events have resulted in widespread

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

The Irish Wildlife Trust submission to the National Peat Strategy

The Irish Wildlife Trust submission to the National Peat Strategy The Irish Wildlife Trust submission to the National Peat Strategy The draft strategic plan is composed of a number of draft documents including a National Peatlands Strategy, a National Raised Bog SAC

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 Operations and Readiness Branch PUBLIC NOTICE CATEGORICAL PERMISSION FOR SECTION 408 REQUESTS

More information

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :23:33:57

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :23:33:57 EPA Export 11-02-2014:23:33:57 P03/3343 CORRIB GAS FIELD DEVELOPMENT Prepared in respect of the proposed Bellanaboy Bridge Gas Terminal and associated Srahmore Peat Deposition Site RESPONSE TO REQUEST

More information

Audit of Forest Planning and Practices. West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41

Audit of Forest Planning and Practices. West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41 Audit of Forest Planning and Practices West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41 FPB/ARC/24 December 1999 Table of Contents A. Report from the Board B. Forest Practices Board

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Swan Lake Wetland Mitigation: Restoration/Enhancement Concept Ducks Unlimited Canada August 2017

Swan Lake Wetland Mitigation: Restoration/Enhancement Concept Ducks Unlimited Canada August 2017 Swan Lake Wetland Mitigation: Restoration/Enhancement Concept Ducks Unlimited Canada August 2017 Background: DUC has been contracted by MOTI to compensate for 2,500 m 2 (0.62 ac) of disturbed cattail marsh

More information

Draft County Wexford Development Plan Appropriate Assessment Screening Report & Determination

Draft County Wexford Development Plan Appropriate Assessment Screening Report & Determination Draft County Wexford Development Plan 2013-2019 Appropriate Assessment Screening Report & Determination Determination of the need for Appropriate Assessment in accordance with the requirements of Article

More information

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining

More information

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co.

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co. Lignite Mining and Reclamation Process Kayla Torgerson The Coteau Properties Co. 1 Presentation Overview History of Regulation The Process of Mining and Reclamation Harmony Lake 2 1 2 3 4 5 6 7 8 Which

More information

Appendix 15.3 Hydraulic Assessment of Sewers

Appendix 15.3 Hydraulic Assessment of Sewers Appendix 15.3 Hydraulic Assessment of Sewers Irish Water Arklow Wastewater Treatment Plant Project EIA Report Issue September 2018 Arup \\GLOBAL\EUROPE\DUBLIN\JOBS\247000\247825-00\4. INTERNAL\4-03 DESIGN\4-03-02

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000

More information

Unique ID: (from PFRA database) Location: Newport, Co. Tipperary. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Newport, Co. Tipperary. Stage 1: Desktop Review Location: Newport, Co. Tipperary Unique ID: 240433 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 172620 Northing: 162375 River / Catchment / Sub-catchment Newport/Mulcair

More information

COMMISSION. OGC File: LNG Canada Development Inc th Avenue SW Calgary, AB T2P 0J4. Attention: Surface Land Administrator

COMMISSION. OGC File: LNG Canada Development Inc th Avenue SW Calgary, AB T2P 0J4. Attention: Surface Land Administrator COMMISSION OGC File: 9642638 LNG Canada Development Inc. 400-4th Avenue SW Calgary, AB T2P 0J4 Attention: Surface Land Administrator Re: Approval for Changes in and About a Stream Date of issuance: July

More information

LAND MANAGEMENT AND LEGISLATION. Tim Schofield Suffolk FWAG Wednesday - 9 th December 2015

LAND MANAGEMENT AND LEGISLATION. Tim Schofield Suffolk FWAG Wednesday - 9 th December 2015 LAND MANAGEMENT AND LEGISLATION Tim Schofield Suffolk FWAG Wednesday - 9 th December 2015 TOPICS SMR /GAEC GROUND WATER PROTECTION ZONES NUTRIENT MANAGEMENT: DURING STOCKING POST STOCKING COVER CROPS CROSS

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations

Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations It is difficult to tie watershed health directly to mixed-conifer forests. Watersheds encompass a variety

More information

Environmental Assessment Registration Destination RV Resort

Environmental Assessment Registration Destination RV Resort Environmental Assessment Registration Destination RV Resort Nine Island Pond South,Newfoundland and Labrador Prepared for: Department of Environment and Conservation Environmental Assessment Division Prepared

More information