1 VALIDATION OPINION - CREDITING PERIOD RENEWAL BK Energia Itacoatiara Project in Brazil (UNFCCC Registration Ref. No. 0168) REPORT NO REVISION NO. 01

2 Report No: , rev. 01 VALIDATION OPINION - CREDITING PERIOD RENEWAL Date of first issue: Project No.: 28 July 2010 PRJC CCS-BRA Approved by: Organisational unit: Michael Lehmann Climate Change & Environmental Services Client: BK Energia Itacoatiara Ltda. Client ref.: Isaac Barrêto DNV CLIMATE CHANGE SERVICES AS Veritasveien 1, 1322 HØVIK, Norway Tel: Fax: Org. No: NO MVA Project Name: BK Energia Itacoatiara Project Registration Ref No: 0168 Country: Brazil Methodology: AMS-I.D Version: 17 Sectoral scope: 1 Methodology: AMS-III.E Version: 16 Sectoral scope: 13 GHG reducing Measure/Technology: GHG emission reductions from electricity generation from biomass residues ER estimate: tco 2 e over 7 years or tco 2 e/year Size Large Scale Small Scale Validation Phases: Desk Review Follow up interviews Resolution of outstanding issues Validation Status Corrective Actions Requested Clarifications Requested Full Approval and request for renewal Rejected In summary, it is DNV s opinion that the BK Energia Itacoatiara Project in Brazil, as described in the project design document of 23 August 2011 (version 4.6), meets all relevant UNFCCC requirements for the renewal of the crediting period. Hence DNV requests the renewal of the crediting period of the project. Report No.: Subject Group: Environment Indexing terms Report title: Key words BK Energia Itacoatiara Project in Brazil Climate Change Kyoto Protocol Validation Clean Development Mechanism Work carried out by: Luis Filipe Tavares, David Freire da Costa, Lumír Němeček, Andrea Leiroz Work verified by: Felipe Lacerda Antunes, Fernando Sasdelli Date of this revision: Rev. No.: Number of pages: 2 September No distribution without permission from the client or responsible organisational unit free distribution within DNV after 3 years Strictly confidential Unrestricted distribution 2009 Det Norske Veritas AS All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by any means, including photocopying or recording, without the prior written consent of Det Norske Veritas AS. Head Office: Veritasvn. 1, N-1322 HØVIK, Norway Renewal of Crediting Period Report Template, version 04,

3 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 Table of Content Page 1 EXECUTIVE SUMMARY VALIDATION OPINION INTRODUCTION METHODOLOGY Desk review of the project design documentation Follow-up interviews with project stakeholders Resolution of outstanding issues Internal quality control Validation Team 15 4 VALIDATION FINDINGS Participation of project participants Validity of selected baseline and monitoring methodology Applicability of selected baseline and monitoring methodology Validity of baseline Validity of monitoring plan Estimate of GHG emissions 23 Appendix A Validation Protocol Appendix B Curricula vitae of the validation team members Validation opinion for renewal of crediting period Report No , rev. 01 i

4 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 Abbreviations CAR Corrective Action Request CCEE Câmara de Comercialização de Energia Elétrica / Chamber for the Commercialization of Electric Power CDM Clean Development Mechanism CEAM Companhia Energética do Amazonas / Amazonas Energetic Company CEF Carbon Emission Factor CER Certified Emission Reduction(s) CH 4 Methane CO 2 Carbon dioxide CO 2 e Carbon dioxide equivalent DNV Det Norske Veritas DNA Designated National Authority ERU Emission Reduction Units(s) FAR Forward Action Request GHG Greenhouse gas(es) GWP Global Warming Potential INMETRO Instituto Nacional de Metrologia, Normalização e Qualidade Industrial / Metrology National Institute IPCC Intergovernmental Panel on Climate Change MME Brazilian Ministry of Mines and Energy MP Monitoring Plan N 2 O Nitrous oxide NGO Non-governmental Organisation ODA Official Development Assistance ONS National Electric System Operator PDD Project Design Document PROINFA Programa de Incentivo às Fontes Alternativas de Energia Elétrica / Alternative Electricity Sources Incentive Program SWDS Solid Waste Disposal Site UNFCCC United Nations Framework Convention for Climate Change UTE Unidade Termo Elétrica / Thermo Electric Unit VVM Validation and Verification Manual Page 2

5 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev EXECUTIVE SUMMARY VALIDATION OPINION DNV Climate Change Services AS (DNV) has performed an assessment of the request by BK Energia Itacoatiara Ltda. to renew the crediting period of CDM project activity 0168 BK Energia Itacoatiara Project in Brazil. The assessment was performed in accordance with the Procedures for renewal of the crediting period of a registered CDM project activity (version 05) and included an assessment of: (a) An impact of new relevant national and/or sectoral policies and circumstances on the baseline taking into account relevant EB guidance with regard to renewal of the crediting period at the time of requesting renewal of crediting period; (b) The correctness of the application of an approved baseline methodology for the determination of the continued validity of the baseline or its update, and the estimation of emission reductions for the applicable crediting period. The review of the project design documentation and the subsequent follow-up interviews have provided DNV with sufficient evidence to determine the update of the original baseline through an assessment. The project correctly applies the baseline and monitoring methodologies AMS-I.D (version 17) GHG emission reductions from electricity generation from biomass residues and AMS-III.E (version 16) GHG emission reductions from electricity generation from biomass residues. In summary, it is DNV s opinion that the CDM project activity BK Energia Itacoatiara Project in Brazil meets all relevant UNFCCC requirements for the renewal of the crediting period. Hence DNV requests the renewal of the crediting period of the project. Rio de Janeiro and Oslo, 2 September 2011 David Freire da Costa CDM Validator DNV Rio de Janeiro, Brazil Michael Lehmann Director of Servies and Technologies DNV Climate Change Services AS Page 3

6 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev INTRODUCTION BK Energia Itacoatiara Ltda. has commissioned DNV Climate Change Services AS (DNV) to perform an assessment of the continued validity of the baseline for the renewal of the crediting period of the BK Energia Itacoatiara Project, located in the city of Itacoatiara, State of Amazonas, north region of Brazil in order to request the renewal of the projects crediting period. The assessment was performed in accordance with the Procedures for renewal of the crediting period of a registered CDM project activity (version 05) and included an assessment of: (a) An impact of new relevant national and/or sectoral policies and circumstances on the baseline taking into account relevant EB guidance with regard to renewal of the crediting period at the time of requesting renewal of crediting period; (b) The correctness of the application of an approved baseline methodology for the determination of the continued validity of the baseline or its update, and the estimation of emission reductions for the applicable crediting period. This re-validation report summarises the findings of the assessment of the continued validity of the baseline, as well as criteria given to provide for consistent project operations, monitoring and reporting. UNFCCC criteria refer to Article 12 of the Kyoto Protocol, the CDM modalities and procedures, the simplified modalities and procedures for small-scale CDM project activities and the subsequent decisions by the CDM Executive Board, in particular the Procedures for renewal of a crediting period of a registered CDM project (version 05) /18/. The BK Energia Itacoatiara Project was registered on 12 May 2006 as a CDM project with a renewable 7 years crediting period starting from 1 November 2002 to 31 October The project activity is a renewable energy project, which consists of the generation of electricity with a 9.0 MW thermoelectric power plant using wood residues from wood processing companies, located in the city of Itacoatiara, State of Amazonas, Brazil. Following the implementation of this project, BK Energia Itacoatiara Ltda. was able to sell electricity (generated by GHG neutral biomass) to the local isolated grid. The project activity also involves the avoidance of methane emissions by avoiding the disposal of the biomass residues from decaying in the open field stockpiles. In the absence of the project, the fresh wood residues (wood chips and sawdust), which are used in the thermoelectric plant, would continue to be decay under anaerobic conditions in the stockpiles, thus emitting methane. The other wood residues (road & forest cleaning) used as biomass were not considered for calculation of methane avoidance, once this biomass was not considered as decay on anaerobic conditions. The project was implemented as described on the PDD and the plant includes a boiler (model 45 V-2-S) manufactured by Equipalcool with a steam capacity of 45 tonnes/h at 42 kgf/cm 2 /34/, a steam turbine manufactured by Dresser-Rand (model ET1HB7, serial number ET-103, installed capacity 9.0 MW ( KVA) at rpm) and a electrical generator manufactured by Toshiba (type TABL RCC, serial number , rated capacity kva at 13.8 kv, 60 Hz), as confirmed through a visual assessment of the equipment s nameplates during the site visit. Page 4

7 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev METHODOLOGY The validation consisted of the following three phases: I a desk review of the project design documents II follow-up interviews with project stakeholders III the resolution of outstanding issues and the issuance of the final validation report and opinion. The following sections outline each step in more detail. 3.1 Desk review of the project design documentation The following table lists the documentation that was reviewed during the assessment: Documentation provided by the project participants /1/ BK Energia Itacoatiara Ltda.: Project Design Document for the BK Energia Itacoatiara Project dated 23 November 2009 (version 1), dated 19 July 2010, dated 25 April 2011 (version 4), 16 July 2011 (version 4.4), 2 August 2011 (version 4.5) and dated 23 August 2011 (version 4.6). /2/ BK Energia Itacoatiara Ltda.: Project Design Document for the first crediting period of BK Energia Itacoatiara Project registered on 12 May /3/ EQAO: Emission reductions calculation spreadsheets: Itacoatiara_Second Period_CERs estimation_ xls, Itacoatiara_Second Period_CERs estimation_ _v.2.xls, BK Energia Itacoatiara_CERs estimation_v4_25apr11.xls, BK Energia Itacoatiara_CERs estimation_v4.4_16jul11.xls and BK Energia Itacoatiara_CERs estimation_v4.5_02sep2011.xls. /4/ Precious Woods Energia: Monthly and daily reports of biomass supplied to BK Energia Itacoatiara Project from January 2007 to December /5/ BK Energia Itacoatiara Ltda. and Manaus Energia S/A or Amazonas Distribuidora de Energia S/A: Daily electricity generation readings report and monthly consolidated energy reports, from January 2007 to December All reports are double-signed by a representative of BK Energia Itacoatiara Ltda. and by a representative of Manaus Energia S/A or by Amazonas Distribuidora de Energia S/A. /6/ BK Energia Itacoatiara Ltda.: Internal procedures: - Internal procedure # 1 for the elaboration of the biomass consumption report, first version issued on 14 February 2008 and latest revised version issued on 1 May 2010; - Internal procedure # 2 for the determination of the humidity content in the biomass, first version issued on 14 February 2008 and latest revised version issued on 1 May 2010; - Internal procedure # 3 for the troubleshooting verification in the biomass scale, issued on 15 December 2006; - Internal procedure # 4 for the energy readings obtained from the power meters, first version issued on 14 February 2008 and latest revised version issued on 1 May 2010; - Internal procedure # 5 for the readings related to the electricity exported to the grid, obtained from the GESTAL (internal supervisory system), issued on 8 January 2007; - Internal procedure # 6 for the troubleshooting verification in the power Page 5

8 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 meters owned by CEAM (Manaus Energia S/A or Amazonas Distribuidora de Energia S/A), issued on 20 January 2008; - Internal procedure # 7 for data backup, first version issued on 11 February 2008 and latest revised version issued on 5 March 2009; - Internal procedure # 8 for the calibration of scales and power meters used in the BK Energia Itacoatiara Project, issued on 5 May 2010; - Internal procedure # 9 for the capacity building and training of employees involved in BK Energia Itacoatiara Project, issued on 26 January 2009; - Internal procedure # 10 for the description and determination of the responsibilities related to the employees involved in BK Energia Itacoatiara Project, first version issued on 22 January 2008 and latest revised version issued on 5 May 2010; - Internal procedure # 11 for the biomass data crosschecking, issued on 1 May 2010; - Internal procedure # 12 for internal audits, first version issued on 12 February 2008 and latest revised version issued on 1 March /7/ BK Energia Itacoatiara Ltda.: Monthly consolidated report of the electricity exported to the MIL Madeireira Itacoatiara Ltda. by BK Energia Itacoatiara Project, obtained from the GESTAL (internal supervisory system), for the period from January 2007 to December /8/ BK Energia Itacoatiara Ltda.: Monthly consolidated report of the electricity generated by BK Energia Itacoatiara Project, obtained from the GESTAL (internal supervisory system), for the period from January 2007 to December /9/ BK Energia Itacoatiara Ltda.: Monthly consolidated report of the electricity exported to the grid by BK Energia Itacoatiara Project, obtained from the GESTAL (internal supervisory system), for the period from January 2007 to December /10/ BK Energia Itacoatiara Ltda.: Monthly consolidated report of the electricity internally consumed by BK Energia Itacoatiara Project, obtained from the GESTAL (internal supervisory system), for the period from January 2009 to December /11/ BK Energia Itacoatiara Ltda.: Monthly consolidated report of the electricity imported by BK Energia Itacoatiara Project from the grid (CEAM), obtained from the GESTAL (internal supervisory system), for the period from January 2009 to December /12/ Precious Woods Energia: Training certificates, issued on 21 March 2009, for the presentation named Forest management, FSC certification and climate change provided by Precious Woods Energia. /13/ Precious Woods Energia and BK Energia Itacoatiara Ltda.: Training certificates, issued on 21 November 2009, for the training named Updating training applicable for boilers operation provided by Precious Woods Energia and BK Energia Itacoatiara Ltda. /14/ BK Energia Itacoatiara Ltda.: Power Purchase Agreement (PPA), signed on 9 March 2001, between Companhia Energética do Amazonas CEAM and BK Energia Participações Ltda. /15/ BK Energia Itacoatiara Ltda.: Environmental control plan, issued in June 2002 Page 6

9 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 by BK Energia Itacoatiara Ltda.. /16/ BK Energia Itacoatiara Ltda.: Purchase receipts of diesel fuel from January to October /17/ EQAO: Grid emission factor calculation spreadsheet Eletrobras Itacoatiara - UTE ITAC PIE HERMASA xlsx Methodologies, tools and other guidance by the CDM Executive Board /18/ CDM Executive Board: Procedures for renewal of the crediting period of a registered CDM project activity, (version 05) and its Annex 1 Tool to assess the validity of the original/current baseline and to update the baseline at the renewal of a crediting period. /19/ CDM Executive Board: Validation and Verification Manual (version 01.2). /20/ CDM Executive Board: Appendix B of the simplified modalities and procedures for small-scale CDM project activities: Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories: AMS-I.D. Grid connected renewable electricity generation for Type I Renewable Energy Projects Activities, version 17 of EB 54. /21/ CDM Executive Board: Appendix B of the simplified modalities and procedures for small-scale CDM project activities: Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories: AMS-III.E Avoidance of methane production from biomass decay through controlled combustion, gasification or mechanical/thermal treatment for Type III Other Projects Activities, version 16 of EB 48. /22/ CDM Executive Board: Appendix B of the simplified modalities and procedures for small-scale CDM project activities: Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories: AMS-I.D Renewable electricity generation for a grid, version 6. /23/ CDM Executive Board: Appendix B of the simplified modalities and procedures for small-scale CDM project activities: Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories: AMS-III.E Avoidance of methane production from biomass decay through controlled combustion, version 6. /24/ CDM-Executive Board: Tool to determine methane emissions avoided from disposal of waste at a solid waste disposal site (version 5.1.0). /25/ CDM Small Scale Working Group (SC WG): Request for clarification F-CDM- SSCwg ver 01 SSC_521. Applicability of AMS-I.D versus AMS-I.F to a project activity supplying electricity to an isolated system (submitted 15 Feb 11 and posted in the UNFCCC CDM web site on 18 March 2011). For SC WG conclusions, refer to paragraph 38 of the meeting report of the SSC WG 30, which is also available at: /26/ CDM-Executive Board: Tool to calculate the emission factor for an electricity system (version ) /27/ CDM-Executive Board: Clarifications on procedures and documentation which need to be used for the renewal of a crediting period (EB 20, Annex 7) Documentation used by DNV to validate / cross-check the information provided by the project participants /28/ TÜV Industries Service GmbH TÜV SÜD Group: Validation Report BK Page 7

10 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 Energia Itacoatiara Project. TUV Report , Revision N. 5, 15 March /29/ Manaus Energia S/A and Amazonas Distribuidora de Energia S/A: Monthly electricity invoices from January 2009 to December 2009, issued by BK Energia Itacoatiara Ltda. to Manaus Energia S/A (from January 2009 to June 2009) and Amazonas Distribuidora de Energia S/A (from July 2009 to December 2009). The project sold its net electricity produced to the local power utility Eletrobras Amazonas Energia (formally Manaus Energia S.A.). Since 2008 Eletrobras possesses the stock control of Manaus Energia S.A. This information was confirmed by assessing the following webpage: From January 2009 to June 2009 the name of Manaus Energia S.A. is still mentioned in the energy invoices and from July to December 2009 Amazonas Distribuidora de Energia S.A. is mentioned in the invoices. Despite the changes in the corporate name all other information of the company related to the proposed project activity remained the same during the monitored period. /30/ MIL Madeireira Itacoatiara Ltda.: Receipts of biomass purchased from MIL Madeireira Itacoatiara Ltda. by BK Energia Itacoatiara Ltda. from January 2009 to December /31/ Scale calibration certificates: - Scale verification report # , issued on 15 October 2008 by the scale manufacturer Toledo do Brasil Indústria de Balanças Ltda., for the scale model 9270, serial number The referred document provides a positive conclusion about the scale, but no details related to the average error found or the accuracy are mentioned; - Scale verification report # , issued on 31 January 2009 by the scale manufacturer Toledo do Brasil Indústria de Balanças Ltda., for the scale model 9270, serial number The referred document provides a positive conclusion about the scale, but no details related to the average error found or the accuracy are mentioned; - Scale calibration certificate # , issued on 5 April 2009 by Microprecs Euros, for the scale manufactured by Toledo, model 9270, serial number ; Average error found: 0.016% (accuracy = %), which is in accordance to the equipment s precision class of 0.02%. However, the maximum error identified during the calibration test was 0.04% which is beyond the error established by the manufacturer for the referred equipment. In this regard, considering the calibration of the scale 1 was delayed, the maximal error identified during the tests, which is beyond the maximum error as specified by the manufacturer, was deducted until the date in which the scale was calibrated; - Scale calibration certificate # , issued on 6 May 2010 by Microprecs Euros, for the scale manufactured by Toledo, model 9270, serial number Average error found: 0.001% (accuracy = %), which is in accordance to the equipment s precision class of 0.02%. /32/ Eletronorte: Calibration certificates of the power meters: - Certificate N CC , issued on 5 March 2009, for the power meter manufactured by Elo, model 2180 SP, serial number Average error found: 0.037% (accuracy = %), which is in Page 8

11 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 accordance to the precision class of 0.2%; - Certificate N CC , issued on 5 March 2009, for the power meter manufactured by Elo, model 2180 SP, serial number Average error found: 0.094% (accuracy = %), which is in accordance to the precision class of 0.2%. The referred calibration certificates provide a positive conclusion about the accuracy of the power meters. /33/ IPAAM (Instituto de Proteção Ambiental do Estado do Amazonas / Environmental Protection Institute of Amazonas State): Operation License N 355/02-05, issued by IPAAM to BK Energia Itacoatiara Ltda. on 3 February 2009 and valid for 730 days (2 years). Operation License N 355/02-06, issued by IPAAM to BK Energia Itacoatiara Ltda. on 11 April 2011 and valid for 730 days (2 years). The referred Operation Licenses confirm that BK Energia Itacoatiara Project is in compliance with the local applicable environmental laws and regulations. /34/ Equipalcool: Technical specification issued on 16 September 2002 by the biomass boiler s manufacturer, model 45 V-2-S, confirming the work pressure of 42 kgf/cm 2 and the type of fuel to be used (wood residues) in the biomass boiler of BK Energia Itacoatiara Project. /35/ CEAM: Letter provided by CEAM (Companhia Energética do Amazonas / Amazonas Energetic Company) to BK Energia Itacoatiara Ltda., issued on 2 January 2007, confirming that the power meters installed in BK Energia Itacoatiara Project are owned by CEAM and stating that the calibration frequency shall be done once every two years. /36/ Toledo do Brasil Indústria de Balanças Ltda.: Technical specifications of the biomass scale manufacturer, for the scale model 9270 / /37/ INMETRO: Directive #236 dated 22 December 1994 about Precision Class for scales, which is defined by the National Institute of Metrology - INMETRO (from the Portuguese Instituto Nacional de Metrologia, Normalização e Qualidade Industrial). Additional information is available only in Portuguese at: smfbalancas.com.br/calibracao/legislacao.htm+inmetro+directiva Dezembro+1994&cd=1&hl=pt-BR&ct=clnk&gl=br /38/ Folha de S. Paulo: News from one of the main Brazilian newspaper, issued on 10 January 2008: Energy conservation program (Procel) and Renewable sources program (Proinfa) are little more than just ecologically correct window dressing. There is little use from the wind energy potential in Brazilian Northeast region as well as from the energy generation with biomass (sugarcane bagasse) in Brazilian Southeast region, because of lack of regulation and compensating prices. There is a lot to be done. The referred information is available at the following link: /39/ Ministry of Mines and Energy (MME): SIGEL Sistema de Informações Georreferenciadas do Setor Elétrico (Georeferenced Information of the Brazilian Electric System), available at: /40/ IPCC: Revised 2006 IPCC Guidelines for National Greenhouse Gas Inventories. /41/ Ministry of Mines and Energy (MME): Brazilian Energy Balance 2009, available in Portuguese only, at: Page 9

12 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 /42/ Documents related to previous verifications from the first crediting period: - 1 st verification (monitoring period from 1 November 2002 to 30 April 2006: - Verification report, report n , revision 01, issued by DNV on 14 August 2006; - Monitoring report, version 6, issued on 18 July 2006; - 2 nd verification (monitoring period from 1 May 2006 to 31 December 2006: - Verification report, report n , revision 02, issued by DNV on 9 May 2007; - Monitoring report, issued on 8 May 2007; - 3 rd verification (monitoring period from 1 January 2007 to 31 December 2007: - Verification report, report n , version 1, issued by TÜV SÜD on 4 April 2008; - Monitoring report, version 5, issued on 4 April 2008; - 4 th verification (monitoring period from 1 January 2008 to 31 December 2008: - Verification report, report n , version 2, issued by TÜV SÜD on 13 July 2009; - Monitoring report, version 5, issued on 12 July 2009; - 5 th verification (monitoring period from 1 January 2009 to 31 October 2009: - Verification report, not public available until the last issuance of this revalidation report; - Monitoring report, version 1, issued on 19 April 2010; /43/ INMET: Technical literature from the National Institute of Meteorology (Instituto Nacional de Meteorologia INMET). /44/ SEMMA: Letter (reference number 006/2010), issued on 11 January 2010 by the Environmental Municipality Secretary (SEMMA Secretaria Municipal de Meio Ambiente) to Precious Woods Brasil. The letter confirms that the sawmill Mil Madeiras Preciosas is the only consumer of biomass residues and in a range of 50 km there is another company named Hermesa with potential to consume biomass residues for steam generation to be used and its internal industrial process. It is also confirmed that Hermesa buys biomass residues from other suppliers and it doesn t has the necessity to burn or use fossil fuels. It is concluded that there is no lack of biomass residues to be supplied to industries located at Itacoatiara city. /45/ PROINFA: Creation of PROINFA Program (renewable resources program) through the Law # issued on 26 April 2002 and regulated by the Brazilian Decree # issued on 30 March 2004, which states that PROINFA aims for the reduction of greenhouse gases as established by the United Nations Framework Convention on Climate Change (UNFCCC) under Kyoto Protocol, contributing to the sustainable development. Therefore, the program is considered as a Type E- policy and does not need to be considered in accordance to the Clarifications on the consideration of national and/or Sectoral policies and circumstances in baseline scenarios (version 02), Annex 3, EB 22. /46/ CCEE: Publication titled Background of the Brazilian Electric Sector. The referred publication has no version or issuance date available and it was assessed by DNV on 11 May 2011 through the following CCEE website: Page 10

13 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 VgnVCM100000aa01a8c0RCRD In this publication, the following Laws are also mentioned: - Law (1993): which extinguished the equalization of the tariffs that were in effect and created supply contracts between generators and distributors; - Law (1995): that created the Independent Producer of Electric Power and the concept of Free Consumer; - Laws and (dated 15 March 2004) and Decree dated 30 July 2004: the Federal Government set the bases for a new model for the Brazilian Electric Sector. All of these laws, which are still in power, were approved before the project s registration date on 12 May /47/ Amazon State Law n 3219, issued on 28 December 2007: Regulates the environmental licensing process in the Amazonas State. Information assessed on 2 June 2011 through the following link: _lei_estadual_3219_licenciamento_ambiental.pdf /48/ Amazon Institute for environmental Protection - IPAAM (form the Portuguese Instituto de Proteção Ambiental do Amazonas) Normative Ruling n 001/06, issued on 28 December 2006: Regulates the polluting sources classification with regards to the environmental licensing process. Information assessed on 2 June 2011 through the following link: /49/ Environmental Ministry - MMA (from the Portuguese Ministério do Meio Ambiente) Normative Ruling n 6, issued on 15 December 2006: Regulates the consumption of raw material from forestry activities. Information assessed on 2 June 2011 through the following link: 20-%20Instru%C3%A7%C3%A3o%20Normativa% %20rep%20florestal%20e%20consumo%20d.pdf /50/ Brazilian Institute of Environment and Renewable Natural Resources - IBAMA (from the Portuguese Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis) Normative Ruling n 96, dated March 30th, /51/ Eletrobrás Amazonas Energia: original information and raw data from October 2009 to June 2011 regarding the diesel oil consumption and gross power generation of UTE Itacoatiara and UTE Hermasa diesel fuelled thermal power plants in Itacoatiara city Letters of approval /52/ Interminesterial Commission on Global Climate Change (DNA of Brazil): Letter of approval dated 5 April /53/ Federal Office for the Environment FOEN, Climate Unit (DNA of Switzerland, Annex I Party): Letter of approval dated 25 April 2006 and Authorization Letter dated 25 March Follow-up interviews with project stakeholders On 13 May 2010, Mr. David Freire da Costa, qualified as CDM validator according to DNV s internal qualification scheme, has visited the BK Energia Itacoatiara Project located in the city of Itacoatiara, State of Amazonas, north region of Brazil and performed interviews with project stakeholders to confirm selected information and to Page 11

14 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 resolve issues identified in the document review. The following table presents the interviewed people and the main topics of the interview: Date Name Organization Topic /54/ 13 May 2010 /55/ 13 May 2010 /56/ 13 May 2010 Isac Barreto Queiroz Roger Luis de Souza Noronha Ana Paula Veiga Operations Coordinator and Power Plant Manager BK Energia Itacoatiara Ltda. General Coordinator and Operation Supervisor BK Energia Itacoatiara Ltda. Project Manager EQAO - Site Visit - project's facility and main equipments; - Project implementation; - Baseline review, CERs calculations and related issues; - Monitoring plan review, including the assessment of monitoring instruments; - QA/QC, internal records, data management and control; - Environmental Licenses; - Evidences of all information included in the updated PDD; - Validity of the original baseline or its update through the assessment of documental evidences; - Assessment of the impact of new relevant national and/or sectoral policies and circumstances on the baseline. 3.3 Resolution of outstanding issues The objective of this phase of the assessment was to resolve any outstanding issues regarding the continuation of the baseline scenario, which needed be clarified prior to DNV's positive conclusion on the project design. In order to ensure transparency a validation protocol was customised for the project. The protocol shows in a transparent manner the criteria (requirements), means of verification and the results from validating the identified criteria. The validation protocol serves the following purposes: It organises, details and clarifies the requirements a CDM project is expected to meet; It ensures a transparent validation process where the validator will document how a particular requirement has been validated and the result of the validation. The validation protocol consists of four tables. The different columns in these tables are described in the figure below. The completed validation protocol for the project activity BK Energia Itacoatiara Project in Brazil is enclosed in Appendix A to this report. A corrective action request (CAR) is raised if one of the following occurs: (a) The project participants have made mistakes that will influence the ability of the project activity to achieve real, measurable additional emission reductions; (b) The CDM requirements have not been met; (c) There is a risk that emission reductions cannot be monitored or calculated. Page 12

15 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 A clarification request (CL) is raised if information is insufficient or not clear enough to determine whether the applicable CDM requirements have been met. A forward action request (FAR) is raised during validation to highlight issues related to project implementation that require review during the first verification of the project activity. FARs shall not relate to the CDM requirements for registration. Page 13

16 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 Validation Protocol Table 1: Requirement Checklist Checklist question Reference Means of verification (MoV) The various requirements in Table 1 are linked to checklist questions the project should meet. The checklist is organised in different sections, following the logic of the CDM-PDD Gives reference to documents where the answer to the checklist question or item is found. Means of verification (MoV) are document review (DR), interview (I) or any other follow-up actions (e.g., on site visit and telephone or interviews) and cross-checking (CC) with available information relating to projects or technologies similar to the proposed CDM project activity under validation. Assessment by DNV The discussion on how the conclusion is arrived at and the conclusion on the compliance with the checklist question so far. Draft and/or Final Conclusion is used if the information and evidence provided is adequate to demonstrate compliance with CDM requirements. A corrective action request (CAR) is raised when project participants have made mistakes, the CDM requirements have not been met or there is a risk that emission reductions cannot be monitored or calculated. A clarification request (CL) is raised if information is insufficient or not clear enough to determine whether the applicable CDM requirements have been met. A forward action request (FAR) during validation is raised to highlight issues related to project implementation that require review during the first verification of the project activity. Validation Protocol Table 2: Resolution of Corrective Action and Clarification Requests Corrective action and/ or clarification requests Ref. to checklist question in table 2 Response by project participants Validation conclusion The CARs and/ or CLs raised in Table 2 are repeated here. Reference to the checklist question number in Table 2 where the CAR or CL is explained. The responses given by the project participants to address the CARs and/or CLs. The validation team s assessment and final conclusions of the CARs and/or CLs. Validation Protocol Table 3: Forward Action Requests Forward action request The FARs raised in Table 2 are repeated here. Ref. to checklist question in table 2 Reference to the checklist question number in Table 2 where the FAR is explained. Response by project participants Response by project participants on how forward action request will be addressed prior to first verification. Figure 1 Validation protocol tables Page 14

17 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev Internal quality control This validation opinion underwent a technical review performed by a technical reviewer qualified in accordance with DNV s qualification scheme for CDM validation and verification. 3.5 Validation Team Type of involvement Role Last Name First Name Country Team leader Costa David Brazil (Validator) Validator Tavares Luis Filipe Brazil Validator Leiroz Andrea Brazil Expert Němeček Lumír Czech Republic Technical reviewer Antunes Felipe Brazil Lacerda Person with sectoral Sasdelli Fernando Brazil competence assisting technical reviewer Desk review Site visit / Interviews Reporting Supervision f work Technical review TA 1.1 competence TA 13.1 competence The qualification of each individual validation team member is detailed in Appendix B to this report. Page 15

18 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev VALIDATION FINDINGS The findings of the validation are stated in the following sections. The final validation findings relate to the project design as documented and described in the PDD of 23 August 2011 (version 4.6). 4.1 Participation of project participants There is no change with regard to the Parties and project participants participating in the project activity. The project participants described in the PDD are the same as listed on the project view page of the project on the UNFCCC website. 4.2 Validity of selected baseline and monitoring methodology The project was originally registered /2/ based on version 6 of AMS-I.D Renewable electricity generation for a grid /22/ and version 6 of AMS-III.E Avoidance of methane production from biomass decay through controlled combustion /23/. For the renewal of crediting period, the revised CDM-PDD /1/ of 23 August 2011 (version 4.6) correctly applies the latest versions of the methodologies, i.e. version 17 of AMS-I.D. /20/ and version 16 of AMS-III.E /21/. 4.3 Applicability of selected baseline and monitoring methodology The project applies the approved baseline methodologies AMS-I.D. (version 17) Grid connected renewable electricity generation /20/ and AMS-III.E (version 16) Avoidance of methane production from biomass decay through controlled combustion, gasification or mechanical/thermal treatment /21/, in combination with the Tool to determine methane emissions avoided from disposal of waste at a solid waste disposal site (version 5.1.0) /24/. The small scale methodology AMS-I.D. (version 17) is applicable to BK Energia Itacoatiara Project as the project is a grid connected renewable energy generation unit using biomass as fuel that supply electricity to a regional grid. The project activity is a new power plant at a site where there was no renewable energy power plant operating prior to the implementation of the project activity (Greenfield plant). BK Energia Itacoatiara Project is a biomass power plant and no other biomass types than renewable biomass (wood waste/residues) is used in the project plant, as confirmed by visual inspection in the project s facility during the site visit. The installed capacity of the project activity is 9.0 MW, which is within the 15 MW limit specified for type I small scale activities. DNV could confirm the installed capacity during the site visit by checking the equipment s nameplates. The project activity is a biomass power plant for electricity generation only and, therefore, there is no cogeneration system configuration. The small scale methodology AMS-III.E (version 16) is applicable to the BK Energia Itacoatiara Project as: i) In the absence of the project activity wood residues would have been left to decay under anaerobic conditions in stockpiles, as confirmed during the site ii) iii) visit; Due to the project activity, decay of the wastes is prevented through controlled combustion /34/, as verified in the site visit; The annual emission reductions avoided for the methane component are on average tco 2 e of the total tco 2 e (methane + electricity components) /3/, therefore below the tco 2 e limit; Page 16

19 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 iv) All remaining criteria s are not applicable due to the project s characteristics, as confirmed during the site visit. Therefore, DNV concludes that the applicability criteria from the selected baseline and monitoring methodologies AMS-I.D. (version 17) /20/ and AMS-III.E (version 16) /21/ are properly satisfied by BK Energia Itacoatiara Project. The estimated amount of GHG emission reductions from the project is tco 2 e during the second crediting period (7 years) from 1 November 2009 to 31 October 2016, resulting in estimated average annual emission reductions of tco 2 e. 4.4 Validity of baseline DNV confirms that there have been no changes in the relevant national and/or sectoral regulations since the previous crediting period and that the current baseline complies with all relevant mandatory national and/or sectoral policies, which have come into effect since the initial crediting period. The baseline scenario for the methane avoidance component was updated according to the latest version of AMS-III.E (version 16) /21/ criteria and that was checked during the site visit. The power plant environmental license was issued by IPAAM (the local environmental protection agency) on 3 February 2009 (Operation License N 355/02-05), which was valid until 3 February 2011 and on 11 April 2011 (Operation License N 355/02-06), which was valid until 11 April 2013 /33/. The time gap between 3 February 2011 and on 11 April 2011 was due to bureocratic procedures for the license renewal. The referred Operation Licenses confirm that BK Energia Itacoatiara Project is in compliance with the local applicable environmental laws and regulations. The following steps from the Tool to assess the validity of the original/current baseline and to update the baseline at the renewal of a crediting period from the CDM-EB Procedures for renewal of the crediting period of a registered CDM project activity (Version 5) /18/ were applied: Step 1 Assess the validity of the current baseline for the next crediting period Step 1.1 Assess compliance of the current baseline with relevant mandatory national and/or sectoral policies During the site visit on 13 May 2010 DNV confirmed that no relevant mandatory national and/or sectoral policies applicable to the project activity came into effect after the submission of the project activity for validation /38/. Fossil fuel grid power is still available and operational in the region and there are no supply constraints. For the electricity component, DNV confirmed through the assessment of the local legislation /45//46/, information available in newspaper /38/ and through the validation team s experience that there have been no changes in the relevant national and/or sectoral regulations since the initial crediting period. For the methane avoidance component, DNV confirmed through the assessment of the local legislation /47/-/50/ that the current baseline complies with all relevant mandatory national and/or sectoral policies, which have come into effect since the initial crediting period. Step 1.2 Assess the impact of circumstances The original baseline for the methane avoidance component in the absence of the project activity is to simply dispose the biomass residues in stockpiles. The baseline scenario was updated based on the historical data from 2007 to 2009 of biomass combusted in the project activity for power generation /4/ /30/ as being the same amount that would be left for decay in the absence of the project activity. Page 17

20 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 For the electricity generation baseline scenario DNV could confirm during the site visit that the circumstances in Brazil remain the same as the ones valid at project validation time. The project activity remains connected to an isolated grid system, in which only diesel fuelled power plants are operational. Therefore, the city of Itacoatiara in Amazonas State in which the project activity is located is not connected to the Brazilian Interconnected Grid System (SIN). This information was confirmed by DNV through the assessment of the SIGEL Sistema de Informações Georreferenciadas do Setor Elétrico (Georeferenced Information of the Brazilian Electric System) /39/, developed by the Brazilian Ministry of Mines and Energy (MME). Step 1.3 Assess whether the continuation of the use of current baseline equipment(s) is technically possible This step is not applicable as the baseline is not the continuation of the current practice in the sense of the Tool to assess the validity of the original/current baseline and to update the baseline at the renewal of a crediting period contained in the Procedures for renewal of the crediting period of a registered CDM project activity (version 05) /18/. Step 1.4 Assessment of the validity of the data and parameters For the electricity component, the baseline grid emission factor was calculated ex-ante during the first crediting period and the emission factor of 0.8 tco 2 e/mwh was used, based on data available in Table I.D.1 of AMS-I.D. (version 6) /22/ applicable for diesel generating units with a load factor between 25% and 100% and with an installed capacity higher than 200 kw. For the second crediting period, the baseline grid emission factor was updated and calculated ex-post, based on AMS-I.D. (version 17) /20/ requirements. As per the small scale methodology AMS-I.D. (version 17) /20/, the baseline scenario is that the electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources into the grid. This is the case of BK Energia Itacoatiara Project. The baseline emissions are the product of electrical energy baseline (EG BL,y ) expressed in MWh of electricity produced by the renewable generating unit at BK Energia Itacoatiara Project and multiplied by the grid emission factor (EF CO2,grid,y ). Therefore, the following equation is applied: BE y = EG BL,y * EF CO2,grid,y - BE y : is the baseline emissions in year y (t CO 2 ); - EG BL,y : is the quantity of net electricity supplied to the grid as a result of the implementation of the CDM project activity in year y (MWh), and; - EF CO2,grid,y : is the CO 2 emission factor of the grid in year y (t CO 2 /MWh). The emission factor was calculated in a transparent and conservative manner using option (b) of paragraph 12 of the small scale methodology AMS-I.D. (version 17) /20/. Therefore, it was calculated through the weighted average emissions (in t CO 2 /MWh) of the current generation mix. As of today, Itacoatiara city remains as an isolated city from the national grid. The electricity supplied to Itacoatiara city comes from the plant of the project activity ( BK Energia Itacoatiara Project ) and from other two thermo power plants fuelled with diesel oil (UTE Itacoatiara and UTE Hermasa). Therefore, the emission factor of the local electricity system is the weighted average emissions of these two thermal power plants. Page 18

21 VALIDATION OPINION - CREDITING PERIOD RENEWAL Report No: , rev. 01 As per the small scale methodology AMS-I.D. (version 17) /20/, i) the data of the year in which project generation occurs must be used and ii) the calculations shall be based on data from an official source (where available) and made publicly available. Therefore, for (i), the grid emission factor (EF CO2,grid,y ) needs to be monitored and annually updated in order to be applied during the verifications of the 2 nd crediting period. For (ii), the information regarding electricity generation and diesel oil consumption of these power plants was supplied to the project participants by Eletrobrás Amazonas Energia, which is the local power utility. The emission factor was estimated considering data from /17/. However, these data is confidential. Hence, only the resultant carbon emission factor is presented in the PDD /1/. The original information and raw data /51/ as well as the emission factor calculation spreadsheet /17/ have been assessed by DNV and considered accurate and acceptable. All default data used to estimate the emission factor (such as diesel oil density, diesel oil heating value and diesel oil emission factor) is reported in section B.7.1. of the PDD /1/ and this is used to calculate the weighted average emissions of the current generation mix plus data from official sources and default IPCC values. The grid emission factor was correctly and transparently calculated as the weighted average emissions of the current generation mix resulting in an estimated value of tco 2 /MWh. For the methane avoidance component the baseline emissions calculation was updated based on the historical data from 2007 to 2009 of biomass combusted in the project activity for power generation /4//30/ as being the same amount that would be left for decay in the absence of the project activity. There was no such requirement in the earlier version of AMS-III.E (version 6). For the renewal of the crediting period it is thus reasonable to apply data from the period after project implementation, which is also in accordance with the EB s Clarifications on procedures and documentation which need to be used for the renewal of a crediting period /27/ which states that new data available will be used to revise the baseline emissions. For example, if the average of 3 most recent years data was used to determine the baseline emissions for the first crediting period, the baseline shall be updated using the average for the 3 most recent years prior to the start of the subsequent crediting period. As confirmed by DNV, the biomass data used for the calculations is taken from exact records of the last 3 years of the 1st crediting period ( ). This is the most exact data for calculating how much emissions would be generated in the absence of the project activity. Step 2 Update the current baseline and the data and parameters Step 2.1 Update the current baseline For the electricity component, the baseline grid emission factor was updated and calculated ex-post, based on AMS-I.D. (version 17) /20/ requirements as the weighted average emissions of the current generation mix resulting in an estimated value of tco 2 /MWh /17/. For the methane avoidance component, in 1997 IPAAM requested to MIL Madeiras Preciosas to stop burning the biomass residues. Since then, the company had started to store the residues in the stockpiles. This resulted in the accumulation of wood waste and the emission of methane. Additionally, from the implementation of the power plant, the main environmental impacts identified were particulate matter emissions and wastewater management. A multi-cyclone was installed to reduce particulate matter emissions and a wastewater treatment was built to mitigate wastewater impacts. These impacts are also monitored and compared with legal standards. Page 19

GOLD STANDARD VALIDATION REPORT BK ENERGIA ITACOATIARA PROJECT IN BRAZIL REPORT NO G REVISION NO. 01 DET NORSKE VERITAS

GOLD STANDARD VALIDATION REPORT BK ENERGIA ITACOATIARA PROJECT IN BRAZIL REPORT NO G REVISION NO. 01 DET NORSKE VERITAS GOLD STANDARD VALIDATION REPORT BK ENERGIA ITACOATIARA PROJECT IN BRAZIL REPORT NO. 2010-0777-G REVISION NO. 01 DET NORSKE VERITAS Date of first issue: ConCert Project No.: 10 August 2011 PRJC-226748-2010-CCS-BRA

More information

VERIFICATION / CERTIFICATION REPORT

VERIFICATION / CERTIFICATION REPORT VERIFICATION / CERTIFICATION REPORT ARAPUTANGA CENTRAIS ELÉTRICAS S. A. - ARAPUCEL - SMALL HYDROELECTRIC POWER PLANTS PROJECT, IN BRAZIL (UNFCCC Registration Ref. No. 0530) Monitoring Period: 1 January

More information

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8 Validation Report BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil Report No. 629709 2005, September 8 TÜV Industrie Service GmbH TÜV SÜD Group Carbon Management Service

More information

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO (Registration Ref No. 0649) Monitoring period: 01 April 2003-30 November 2006. REPORT NO. 2006-2174

More information

Gold Standard Verification Report

Gold Standard Verification Report Gold Standard Verification Report Periodic Verification of the Registered CDM Project BK Energia Itacoatiara Project UNFCCC 0168-CDMP / GS 765 Gold Standard 1 st Periodic Verification Monitoring Period

More information

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Validation Report Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Report No. 806970, Revision 01 2006, April 12 TÜV ndustrie Service

More information

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO. 2007-1142 REVISION NO. 02 Date of first issue: Project No.: 2007-07-09 44410005-08 Approved by: Organisational

More information

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E)12-004 REVISION NO. 03 GHG CERTIFICATION OFFICE KOREA ENERGY MANAGEMENT CORPORATION Date of first issue: Project No.: 19/06/2012 GHGCC(E)12-004

More information

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT SAIHANBA EAST 45.05 MW WINDFARM PROJECT IN CHINA REPORT NO. 2006-1309 REVISION NO. 01 DET NORSKE VERITAS DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-05-26

More information

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY REPORT NO. 2006-0712 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date

More information

Validation Report. Matrix Power Pvt. Ltd. (MPPL)

Validation Report. Matrix Power Pvt. Ltd. (MPPL) Validation Report Matrix Power Pvt. Ltd. (MPPL) Validation of the 4.5 MW Biomass (Agricultural Residues) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) project Report No. 6589 Revision

More information

Initial Verification Checklist

Initial Verification Checklist Initial Verification Checklist This document is to be used during the initial verification. The document is designed as a step wise approach to the first verification and should be used in combination

More information

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02 VALIDATION REPORT Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO. 2008-9027 REVISION NO. 02 VALIDATION REPORT Date of first issue: Project No.: 2008-01-17 66010392 Approved by: Organisational

More information

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following: Registration - Information and reporting checklist (Version 2.0) Version 1.0 of the information and reporting checklist was published in June 2010. The enclosed version 2.0 of this checklist represents

More information

Risk Based Verification Cambodia cook stove project

Risk Based Verification Cambodia cook stove project Risk Based Verification Cambodia cook stove project Chee.Keong.Lai@dnv.com www.dnv.com/certification/climatechange Contents 1. Introduction of Det Norske Veritas AS 2. Risk Based Validation/Verification

More information

VALIDATION REPORT RENEWAL OF CREDITING PERIOD

VALIDATION REPORT RENEWAL OF CREDITING PERIOD VALIDATION REPORT RENEWAL OF CREDITING PERIOD Kanfeng 15MW Hydropower Station Project, Min County, Dingxi City Prefecture, Gansu province, China REPORT NO. CDM-0111-RCP1 No distribution without permission

More information

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO. 2005-1171 REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2005-09-20 28624550

More information

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT NINGXIA TIANJING 50.25 MW WIND-FARM PROJECT IN CHINA REPORT NO. 2006-1769 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-10-23 45010012-9

More information

2 nd crediting period 01/11/2016 to 31/10/2023 (GS) 1.1 Aa 28/09/2016. Brazil

2 nd crediting period 01/11/2016 to 31/10/2023 (GS) 1.1 Aa 28/09/2016. Brazil Validation report form for renewal of crediting period for GS project activities VALIDATION REPORT FOR RENEWAL OF CREDITING PERIOD (RCP) Title of the project activity BK Energia Itacoatiara Project GS

More information

VERIFICATION REPORT VEJO GUSIS,UAB

VERIFICATION REPORT VEJO GUSIS,UAB VEJO GUSIS,UAB VERIFICATION OF THE LIEPYNES WIND POWER PARK JOINT IMPLEMENTATION PROJECT MONITORING PERIOD: 1 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0075/2012 REVISION NO. 01 BUREAU VERITAS

More information

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT VCS METHODOLOGY ELEMENT ASSESSMENT REPORT Infra-red Automatic Refrigerant Leak Detection Efficiency Project REPORT NO. 2009-9189 REVISION NO. 02 Date of first issue: Project No.: 14 August 2009 99800011

More information

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT IN INDIA REPORT NO. 2006-9136-2 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-11-29 2006-9136-2 Approved by: Organisational unit: Einar Telnes

More information

VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO. 2006-1878 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2007-04-18

More information

Validation Report. Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil. Report No , Revision 01 B.

Validation Report. Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil. Report No , Revision 01 B. Validation Report USNA ALTO ALEGRE S/A - AÇÚCAR E ÁLCOOL Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Report No. 694560, Revision 01 B 2005, December 22 TÜV ndustrie Service

More information

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India Validation Report Triveni Engineering and ndustries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, ndia Report No. 877510, Revision 01 2006, December 21 TÜV SÜD ndustrie

More information

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By China Environmental United Certification Centre Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind

More information

VERIFICATION REPORT RENERGA,UAB

VERIFICATION REPORT RENERGA,UAB RENERGA,UAB VERIFICATION OF THE BENAICIAI WIND POWER PROJECT MONITORING PERIOD: 01 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0071/2012 REVISION NO. 01 Report Template Revision 4, 13/07/2011

More information

How to Select a DOE and preparation for validation and verification Presentation Report

How to Select a DOE and preparation for validation and verification Presentation Report How to Select a DOE and preparation for validation and verification Presentation Report Introduction to DOE s The two key functions of DOEs are: Validation: assessing whether a project proposal meets the

More information

Validation Report. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil. Report No , Revision 01 B

Validation Report. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil. Report No , Revision 01 B Validation Report USNA CAETÉ S.A. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil Report No. 704245, Revision 01 B 2005, December 22 TÜV ndustrie Service GmbH TÜV

More information

VERIFICATION / CERTIFICATION REPORT

VERIFICATION / CERTIFICATION REPORT VERIFICATION / CERTIFICATION REPORT 4.5 MW BIOMASS (LOW DENSITY CROP RESIDUES) BASED POWER GENERATION UNIT OF MALAVALLI POWER PLANT PVT LTD. IN INDIA (UNFCCC Ref.No. 0298) VERIFICATION PERIOD: 01 AUGUST

More information

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION... Page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01.2) CONTENTS Paragraphs Page ABBREVIATIONS... 3 I. INTRODUCTION... 1 5 4 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Rio Taquesi Hydroelectric Power Project UNFCCC Ref. No. 1031 SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

VERIFICATION REPORT CARBON RESOURCE MANAGEMENT

VERIFICATION REPORT CARBON RESOURCE MANAGEMENT CARBON RESOURCE MANAGEMENT GOLD STANDARD VERIFICATION OF THE HEBEI SHANGYI MANJING WEST WIND FARM PROJECT REPORT NO.BVC/CHINA-VR/7009/2010 REVISION NO.01 BUREAU VERITAS CERTIFICATION Great Guildford House,

More information

(CDM Registration Reference Number 0187)

(CDM Registration Reference Number 0187) JALLES MACHADO S.A VERIFICATION OF THE JALLES MACHADO BAGASSE COGENERATION PROJECT (JMBCP) (CDM Registration Reference Number 0187) REPORT NO. BRAZIL-VER/0033/2008 REVISION NO. 01 BUREAU VERITAS CERTIFICATION

More information

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA REPORT NO. 2006-9131 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date of first

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

DETERMINATION REPORT REPORT NO REVISION NO. 02

DETERMINATION REPORT REPORT NO REVISION NO. 02 DETERMINATION REPORT CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK (Donbasskaya Toplivnaya Energeticheskaya Kompanya) Project in Ukraine REPORT NO. 2008-0200 REVISION

More information

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2 Liaoning Changtu Quantou Wind Power Project in China REPORT NO. 2007-1246 REVISION NO. 03 Deleted: 2 Date of first issue: Project No.: 2007-08-16 63602308 Approved by: Michael Lehmann, Technical Director

More information

Validation Report. Equipav S. A. Açúcar e Álcool. Validation of the Equipav Bagasse Cogeneration Project (EBCP) 23/12/2005

Validation Report. Equipav S. A. Açúcar e Álcool. Validation of the Equipav Bagasse Cogeneration Project (EBCP) 23/12/2005 Validation Report Equipav S. A. Açúcar e Álcool Validation of the Equipav Bagasse Cogeneration Project (EBCP) REPORT NO. 219107, REV. 02B 23/12/2005 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management

More information

CDM What and How? /

CDM What and How? / CDM What and How? Chee.Keong.Lai@dnv.com / SEA.Climate.Change@dnv.com http://www.dnv.com/services/certification/climate_change/ Contents 1. Introduction of Det Norske Veritas AS 2. What is CDM? 3. DNV

More information

VERIFICATION REPORT for the GS VER Project Activity. Kemerburgaz Wind Farm Project

VERIFICATION REPORT for the GS VER Project Activity. Kemerburgaz Wind Farm Project VERIFICATION REPORT for the GS VER Project Activity Kemerburgaz Wind Farm Project in Turkey Report No. 21216236 Version 03, 2011-06-24 TÜV Rheinland Japan Ltd. I. Project data: Project title: Registration

More information

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01) CONTENTS Paragraphs Page ABBREVIATIONS... 4 I. INTRODUCTION... 1 5 5 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03

REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03 HIDROABANICO S.A. PERIODIC VERIFICATION OF THE PROJECT ACTIVITY ABANICO HYDROELECTRIC PROJECT REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03 Verification Type First periodic verification immediately

More information

Validation Report. Usina Nova América S/A. Validation of the. Nova América Bagasse Cogeneration Project (NABCP) 2005, December 13

Validation Report. Usina Nova América S/A. Validation of the. Nova América Bagasse Cogeneration Project (NABCP) 2005, December 13 Validation Report Usina Nova América S/A Validation of the Nova América Bagasse Cogeneration Project (NABCP) REPORT NO. 209131 REV. 2 B 2005, December 13 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon

More information

DETERMINATION REPORT. Wood waste to energy project at Sawmill-25 (Arkhangelsk) in Russian Federation REPORT NO REVISION NO.

DETERMINATION REPORT. Wood waste to energy project at Sawmill-25 (Arkhangelsk) in Russian Federation REPORT NO REVISION NO. Wood waste to energy project at Sawmill-25 (Arkhangelsk) in Russian Federation REPORT NO. 2007-9061 REVSON NO. 01 Date of first issue: Project No.: 2007-04-27 7507105 DET NORSKE VERTAS Einar Telnes, Director

More information

GS-VERIFICATION & CERTIFICATION REPORT

GS-VERIFICATION & CERTIFICATION REPORT GS-VERIFICATION & CERTIFICATION REPORT GANSU ANXI WIND FARM PROJECT, 100.5 MW IN CHINA (Gold Standard Registration No. GS 554) MONITORING PERIOD: 30 December 2010 to 29 December 2011 PERRY JOHNSON REGISTRAR

More information

VCS VALIDATION REPORT

VCS VALIDATION REPORT VCS VALIDATION REPORT VCS VALIDATION OF NEW ZEALAND HOUSEHOLD ENERGY EFFICIENT LIGHTING PROJECTS (HELP) REPORT NO. 2008-0001 REVISION NO. 01 DET NORSKE VERITAS VCS VCS VALIDATION REPORT Date of first issue:

More information

DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC)

DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC) DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC) DETERMINATION OF THE Wood waste to energy in Severoonezhsk, the Arkhangelsk Region, the Russian Federation REPORT NO. RUSSIA/0055-2/2009,

More information

Concepts of Clean Development Mechanism. Confederation of Indian Industry

Concepts of Clean Development Mechanism. Confederation of Indian Industry Concepts of Clean Development Mechanism Kyoto Protocol UNFCCC & Kyoto Protocol Kyoto Treaty was drawn up in Kyoto, Japan, on 11 th December, 1997 to implement United Nations Framework Convention for Climate

More information

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PCP : Clean development mechanism project cycle procedure (version 02.0), EB 66, annex 64, 2 March 2012.

More information

VALIDATION REPORT. Ratchaburi Farms Biogas Project at SPM Farm in Thailand REPORT NO REVISION NO. 01

VALIDATION REPORT. Ratchaburi Farms Biogas Project at SPM Farm in Thailand REPORT NO REVISION NO. 01 VALIDATION REPORT Ratchaburi Farms Biogas Project at SPM Farm in Thailand REPORT NO. 2007-2047 REVISION NO. 01 VALIDATION REPORT Date of first issue: Project No.: 13 December 2007 44410160 Approved by:

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project Monitoring period: 28/05/2009 to 27/05/2010 SGS Climate Change Programme SGS United

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report CARBON ASSET MANAGEMENT SWEDEN AB Gold Standard Validation of the Ningxia Yinyi 49.50 MW Wind-farm Project, China Report No. 1053561 04 April 2008 TÜV SÜD Industrie Service

More information

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By Inner Mongolia Xinjin Wind Power Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind Power Project Version 2.0 Report ID

More information

Monitoring report form (Version 05.1)

Monitoring report form (Version 05.1) Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity CECIC Zhangbei Dayangzhuang Wind Farm Project UNFCCC reference number of the project activity 1855 Version number of

More information

KAMIRANGA CERAMIC FUEL SWITCHING PROJET VERIFICATION REPORT

KAMIRANGA CERAMIC FUEL SWITCHING PROJET VERIFICATION REPORT KAMIRANGA CERAMIC FUEL SWITCHING PROJET VERIFICATION REPORT Document Prepared By IBOPE Instituto Brasileiro de Opinião Pública e Estatística Ltda. Project Title Kamiranga Ceramic Fuel Switching Project

More information

JI DETERMINATION REPORT FORM

JI DETERMINATION REPORT FORM JI DETERMINATION REPORT FORM (F-JI-DRep) - Version 01 (By submitting this form, an accredited independent entity requests the publication of a determination pursuant to paragraph 33 of the JI guidelines

More information

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY MEASURES AND REDUCTION OF GREENHOUSE GAS EMISSIONS INTO THE ATMOSPHERE AT STATE ENTERPRISE SELIDOVUGOL INITIAL

More information

VERIFICATION REPORT SWISS CARBON VALUE LTD. National Bachu Biomass Power Generation Project GS Report No

VERIFICATION REPORT SWISS CARBON VALUE LTD. National Bachu Biomass Power Generation Project GS Report No VERIFICATION REPORT SWISS CARBON VALUE LTD. National Bachu Biomass Power Generation Project GS 1228 1 st Monitoring period: 28/01/2011 to 27/08/2013 Report No. 130104369 China Environmental United Certification

More information

VERIFICATION REPORT EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION

VERIFICATION REPORT EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION MONITORING PERIOD: 1 JULY 2008 TO 31 DECEMBER 2009 REPORT NO. LITHUANIA-VER/0003/2010

More information

VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA

VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA VCS Verification Report VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA Voluntary Carbon Standard 2007.1 Report No: VCS 009-06, rev. 03 Germanischer Lloyd Certification

More information

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALDATON REPORT LAONNG KANGPNG 24.65MW WND FARM PROJECT N CHNA REPORT NO. 2006-1174 REVSON NO. 01 DET NORSKE VERTAS VALDATON REPORT Date of first issue: Project No.: 2006-04-23 63602108 Approved by: Organisational

More information

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Validation Report Beijing Guotou Energy Conservation Company Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Report No. 712740 rev. 1 17 July 2006 TÜV SÜD ndustrie Service

More information

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO.

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO. VALDATON REPORT Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO. 2007-1017 REVSON NO. 02 VALDATON REPORT Date of first issue: Project No.: 2007-02-20 28924579

More information

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20 Validation Report Biogas de Juarez S.A de C.V Ciudad Juarez Landfill Gas to Energy Project. REPORT NO. 978560 2007, August 20 TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr. 199-80686

More information

GS VALIDATION & VERIFICATION REPORT

GS VALIDATION & VERIFICATION REPORT GS VALIDATION & VERIFICATION REPORT 4.5 MW BIOMASS (LOW DENSITY CROP RESIDUES) BASED POWER GENERATION UNIT OF MALAVALLI POWER PLANT PVT LTD, INDIA REPORT NO. 2007-4003 REVISION NO. 01 DET NORSKE VERITAS

More information

MONITORING REPORT FORM CONTENTS

MONITORING REPORT FORM CONTENTS MONITORING REPORT FORM CONTENTS A. General description of the project activity A.1. Brief description of the project activity A.2. Project participants A.3. Location of the project activity A.4. Technical

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report Thai Biogas Energy Company Ltd. (TBEC) GOLD STANDARD VALIDATION OF THE CDM PROJECT: TBEC THA CHANG BIOGAS PROJECT REPORT NO. 1237633-GS 459 21 January 2011 TÜV SÜD Industrie

More information

CDM AND VER VALIDATION PROTOCOL

CDM AND VER VALIDATION PROTOCOL APPENDIX A CDM AND VER VALIDATION PROTOCOL SAYALAR 30.4 MW WIND FARM PROJECT TURKEY FINAL REPORT NO. 2007-44003 REVISION NO. 01 Table 1 Mandatory Requirements for High Standard Voluntary Emission Reduction

More information

Brazilian Greenhouse Gases Emission Baselines from Electricity Generation

Brazilian Greenhouse Gases Emission Baselines from Electricity Generation Brazilian Greenhouse Gases Emission Baselines from Electricity Generation A. R. J. Esparta and C. M. Martins Jr. Ecoinvest Assessoria Ltda. Rua Padre Joao Manoel, 222, Sao Paulo 01411-000 SP BRAZIL E-mail:

More information

DETERMINATION REPORT. Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO REVISION NO.

DETERMINATION REPORT. Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO REVISION NO. DETERMINATION REPORT Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO. 2008-1624 REVISION NO. 01 DET NORSKE VERITAS DETERMINATION REPORT Date of first

More information

Validation Report. Report No , Revision , March 16

Validation Report. Report No , Revision , March 16 Validation Report AGCERT NTERNATONAL LMTED, RELAND VALDATON OF THE AWMS GHG MTGATON PROJECT BR05-B-03, BRAZL Report No. 645204, Revision 01 2006, March 16 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon

More information

DETERMINATION REPORT. CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine

DETERMINATION REPORT. CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine DETERMINATION REPORT CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine Title of the project in Ukrainian language: УТИЛІЗАЦІЯ ШАХТНОГО МЕТАНУ

More information

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT Document Prepared By (Zhijie Duan, South Pole Carbon Asset Management Ltd.) Contact Information (j.duan@southpolecarbon.com)

More information

Ceran s Monte Claro Run-of-river Hydropower Plant CDM Project Activity (CDM Registration Reference Number 0773)

Ceran s Monte Claro Run-of-river Hydropower Plant CDM Project Activity (CDM Registration Reference Number 0773) CLEAN DEVELOPMENT MECHANISM MONITORING REPORT Ceran s Monte Claro Run-of-river Hydropower Plant CDM Project Activity (CDM Registration Reference Number 0773) Monitored Period: 01 March 2005 to 31 December

More information

VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO KOREAN FOUNDATION FOR QUALITY REVISION NO. 04.

VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO KOREAN FOUNDATION FOR QUALITY REVISION NO. 04. VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO. 2007-04 REVISION NO. 04. KOREAN FOUNDATION FOR QUALITY Report No : 2007-04, rev. 04 VALIDATION REPORT Date of first

More information

MARE MANASTIR 39.2 MW WIND FARM PROJECT, TURKEY

MARE MANASTIR 39.2 MW WIND FARM PROJECT, TURKEY page 1 GOLD STANDARD VOLUNTARY EMISSION REDUCTION 3 RD PERIODIC MONITORING REPORT MONITORING PERIOD: 01/01/2009 28/02/2010 MARE MANASTIR 39.2 MW WIND FARM PROJECT, TURKEY CONTENTS A. General project activity

More information

Criteria Catalogue: VER+

Criteria Catalogue: VER+ Criteria Catalogue: VER+ Prepared / changed: IS-CMS-MUC approved: IS-CMS-MUC page 1 of 10 CONTENTS Acronyms...3 Definitions...3 A. CRITERIA CATALOGUE... 4 1. Eligibility Criteria...4 2. Additionality...4

More information

VER MONITORING REPORT

VER MONITORING REPORT VER MONITORING REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT Monitoring Period: From 3 December, 2005 to 31 March, 2007 Version 2 April 14th,

More information

Approved baseline methodology AM0019

Approved baseline methodology AM0019 Approved baseline methodology AM0019 Renewable energy s replacing part of the electricity production of one single fossil fuel fired power plant that stands alone or supplies to a grid, excluding biomass

More information

VALIDATION REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT

VALIDATION REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT REPORT NO. BVQI/BRA/2006-002 REVISION NO., 06 BUREAU VERITAS QUALITY INTERNATIONAL Date of first issue:

More information

International Water Purification Programme

International Water Purification Programme GOLD STANDARD FINAL VERIFICATION /CERTIFICATION REPORT International Water Purification Programme Report No.: EC09(B)2016006 Report Date: 13/03/2018 China Classification Society Certification Company 40,

More information

Energy Efficiency Improvement of the District Heating System in Drobeta Turnu-Severin

Energy Efficiency Improvement of the District Heating System in Drobeta Turnu-Severin Energy Efficiency Improvement of the District Heating System in Drobeta Turnu-Severin Monitoring Plan Guidelines and Procedures Version 4 2009-11-07 1. Monitoring Requirements 1.1 Objective of the Monitoring

More information

VER + Verification Report

VER + Verification Report VER + Verification Report Enecore Carbon Initial Verification and Verification of the First Monitoring Period of the Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural Gas

More information

THE WORLD BANK PROTOTYPE CARBON FUND CZECH UMBRELLA JI PROJECTS

THE WORLD BANK PROTOTYPE CARBON FUND CZECH UMBRELLA JI PROJECTS VERIFICATION REPORT - 3 RD PERIODIC THE WORLD BANK PROTOTYPE CARBON FUND CZECH UMBRELLA JI PROJECTS Period of District Heating Projects: 01.04. 2006 31.12.2007 Period of Small Hydro Projects: 01.01.2006

More information

Bulgarian JI Guidelines. 2006, September

Bulgarian JI Guidelines. 2006, September Bulgarian JI Guidelines 2006, September Table of Contents BULGARIAN JI GUIDELINES... 1 1. International Requirements... 1 2. JI Process in Bulgaria... 3 3. Participants... 4 Step 6: Request for Letter

More information

Bagasse-based cogeneration project in Brazil. Summary

Bagasse-based cogeneration project in Brazil. Summary Bagasse-based cogeneration project in Brazil Summary March, 2005/04/19 Association of International Research Initiatives for Environmental Studies Mitsubishi Research Institute Inc. 1. Background 1.1

More information

CDM Validation Report

CDM Validation Report Project Title Qinghai Jingneng Ge'ermu Solar PV Power Project ERM CVS Project Reference Client Name 2401.v1 Qinghai Jingneng Construction Investment Co., Ltd. Client Address Floor 3, Jingfa Building, Kunlun

More information

Overview of the CDM in the agriculture sector

Overview of the CDM in the agriculture sector Overview of the CDM in the agriculture sector Grant A. Kirkman Team Leader CDM Methodologies Methane to Markets 30 October 1 November 2007 Beijing China United Nations Framework Convention on Climate Change

More information

VALIDATION REPORT. Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India

VALIDATION REPORT. Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India REPORT NO. 2007-9103-04 REVISION NO. 03 Date of first issue: Project No.: 2007-04-20 46069103 Approved

More information

Clean Development Mechanism (CDM)

Clean Development Mechanism (CDM) 566 S 8QLW Clean Development Mechanism (CDM) 1 st Arab CP Workshop, Amman - Jordan 4-6 / 4 / 2006 www.cp.org.jo The Greenhouse Gases (GHGs) The atmospheric gases responsible for causing global warming

More information

AMAYO PHASE II WIND POWER PROJECT

AMAYO PHASE II WIND POWER PROJECT AMAYO PHASE II WIND POWER PROJECT Report No: 8000402033-11/558 Date: 2012-03-21 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany Phone: +49-201-825-3335 Fax: +49-201-825-3290

More information

Validation Report. Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project. Report No , Revision 0 20/12/2005

Validation Report. Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project. Report No , Revision 0 20/12/2005 Validation Report Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project Report No. 691171, Revision 0 20/12/2005 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr.

More information

Determination Report

Determination Report Determination Report Determination of the Pilot programmatic Joint Implementation project in North Rhine- Westphalia (JIM.NRW) JI Program of Activities in Germany (Track 1) Report No. 987901 2007-11-14

More information

In the following text the request for review to the PP/DOE are italicized and the comments of the Project Participants (PPs) are given in blue.

In the following text the request for review to the PP/DOE are italicized and the comments of the Project Participants (PPs) are given in blue. Page 1 of 7 Reference: Clarifications on issues associated - Ceran's Monte Claro Run of River Hydropower Plant CDM Project Activity (0773) In the following text the request for review to the PP/DOE are

More information

VERIFICATION REPORT SIA VIDZEME EKO

VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION OF THE WASTE HEAP #1, #2, #3 AND #5 DISMANTLING OF FRUNZE MINE WITH THE AIM OF DECREASING GREENHOUSE GASES EMISSION INTO THE ATMOSPHERE INITIAL AND FIRST

More information

Draft Small-scale Methodology SSC-III.BG: Emission reduction through sustainable charcoal production and consumption

Draft Small-scale Methodology SSC-III.BG: Emission reduction through sustainable charcoal production and consumption CLEAN DEVELOPMENT MECHANISM CDM-SSCWG39-A03 Draft Small-scale Methodology SSC-III.BG: Emission reduction through sustainable charcoal production and consumption Sectoral scope(s): 04 COVER NOTE 1. Procedural

More information

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS Page 1 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES (Version 19.0) CONTENTS Paragraphs I. Introduction... 1 3 2 A. Background... 1 2 2 B. Objectives... 3 2 II. Scope and applicability... 4 5 2 III. Terms

More information

Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat

Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat Procedures available for Post registration changes Four (4) procedures have been developed to facilitate

More information