Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C

Size: px
Start display at page:

Download "Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C"

Transcription

1 Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C Project Name: Former ANG Coos Head AOC C Groundwater Project Address: Coos Head Road, Coos Bay, Oregon (See Figure 1) Location: Lat , DEQ Project Manager: Norman Read Project Manager Approval Toxicologist Approval Norman Read Susan Turnblom Date: March 8, 2017 ECSI Number: 3833 Responsible Party: US Air National Guard 1. Background and Scope of Environmental Work and NFA Determination DEQ recommends that the former Air National Guard (ANG) Coos Head Area of Concern (AOC) C Groundwater receive No Further Action (NFA) determination. The groundwater at AOC C and for the entire site has now been determined to be safe for any use and therefore an NFA is being issued. All other contaminated areas of the site have already been successfully addressed, including AOC B (Wash Rack Area), AOC C (Outfall 1), AOC C (Outfall 2), AOC C (Building 13 soils), and AOC K (Fire Training Area), The primary soil objectives for those areas of concern were: A. AOC B - removal and off-site disposal of benzo (a) pyrene-contaminated soil exceeding the mg/kg remedial action goal from the former wash rack drain area. B. AOC C (Outfall 1) - excavate and dispose offsite Outfall 1 soils contaminated with arsenic, benzo (a) pyrene, and heptochlorodibenzo-p dioxin (HpCDD) which exceeded the remedial goals of 6 mg/kg, mg/kg, and 4.4 X 10-6, respectively. C. AOC C (Outfall 2) - excavate and dispose offsite Outfall 2 soils contaminated with arsenic and benzo (a) pyrene which exceeded the remedial goals of 6 mg/kg and mg/kg respectively. Page 1 of 33

2 D. AOC C (Building 13 Soils) - demolish Building 13, excavate the underlying contaminated soil, and dispose the volatile organic compounds (VOC) - contaminated soils off-site. E. The AOC K (Fire Training Area) excavate and dispose off-site the benzo (a) pyrenecontaminated soils which exceeded the mg/kg remedial action goal. These areas of concern have already been issued an NFA. The completion of the remediation work at AOC C Groundwater is addressed in this staff report. The NFA for groundwater concludes the remediation work for the entire Coos Head property owned by the Confederated Tribes of the Coos, Lower Umpqua, and Siuslaw Indians (Confederated Tribes). 2. Documentation used as basis for NFA decision: The basis for the NFA recommended in this Staff Report is the December 2016 No Further Response Action Planned Decision Document, Groundwater at AOC C Building 13/Multiple Former Underground Storage Tanks Former 104th Air Control Squadron, Coos Bay, Oregon. Most of the information in this Staff Report is provided from that document. 3. Remedial Investigation Site Background Site location: Coos Head Road, Coos Bay, Oregon. See attached Figures 1 and 2. The site is located approximately one-half mile west of the city of Charleston, Oregon, and about 5 ½ miles southwest of the city of Coos Bay. Site Description: No water supply wells are reported to be on-site. Future land uses at the site will be community and residential. The Naval Ocean Processing Facility (NOPF) lies adjacent to AOC C. It is an active facility that is still owned and operated by the US Navy. Ownership and operating history Coos Head is in the ancestral territory of the Confederated Tribes. It has been occupied and administered by the US military from the 1874 until The Coos Head location was first developed by the US Government when it was withdrawn from public domain by the Bureau of Land Management for military use on June 14, Until recently, Coos Head was used by the both the Air National Guard and US Navy. The Coos Head military base has been closed since In 2005, the United States deeded the 43-acre Air National Guard portion of Coos Head to the Tribes. The NOPF is a small compound within Coos Head adjacent to AOC C, and it remains under the ownership and control of the US Navy. The Confederated Tribes intend to use Coos Head for housing for tribal members, as administrative offices, and as an interpretive center. Page 2 of 33

3 Environmental Setting Climate information: There are two distinct seasons, a warmer drier season from May through September, and a wet season from October through April. About 60 inches rainfall occurs annually, primarily between October and April. Topography: The top of Coos Head is nearly level, and the head itself is elevated about 100 to 130 feet above the sea. Sandy bluffs on the west and north sides of Coos Head lead down to the beach zone. Coos Head slopes gently down to the east. Surface water hydrology: The closest significant surface waters are the Pacific Ocean and Coos Bay, lying to the west and north of the Coos Head, respectively. Several small springs or seeps are present on Coos Head, but not in the study area of AOC C. Regional and site geology and soils: Coos Head is mostly composed of poorly indurated sandstones or silty sandstones. Soils at the site are mainly sand or sandy loam. Hydrogeology: Depth to groundwater at Coos Head ranges from 12 to 69 feet bgs, and groundwater is often found to be perched upon a bed of shaley siltstone. No water supply wells are known to exist on-site. Locality of the Facility The locality of the facility for groundwater is shown on Figure 2. It encompasses the area that could possibly be affected by the groundwater contamination. Land and Water Use Determinations Current and future land use: Coos Head is not currently occupied (except for a security guard and his family), however, the Confederated Tribes have plans to use the site for any uses. The site is intermittently occupied by workers who come to check on automated equipment. Beneficial use of water: Surface water has not been and has not been impacted by contaminants at the site. No groundwater supply wells are in the area. However, the Confederated Tribes intend to maintain the right to use groundwater in the future. Public water is supplied to the subject properties. The property is owned by the Confederated Tribes, who intend to use it for a variety of purposes, including residential. Page 3 of 33

4 4. Description of Selected Remedy The September 2012 Record of Decision (ROD) presented the selected remedies for AOC C and the remedial goals for the contaminants of concern in groundwater. The remedy selected for AOC B, AOC C Outfall 1, AOC C Outfall 2, and AOC K was excavation and offsite disposal. The remedy selected for soils at AOC C Building 13/Multiple USTs included excavation and offsite disposal for soils in the source area. The remedy selected for AOC C groundwater was in situ air sparging of the groundwater plume. The Record of Decision (ROD) identified four groundwater COCs (benzene, ethylbenzene, naphthalene, and TCE), and the following remedial action objectives (remedial actionos): Reduce COC concentrations in groundwater to levels that allow for future unrestricted use. Prevent human exposure to COCs present in soil and groundwater at concentrations exceeding acceptable risk levels for the residential ingestion, dermal contact, and inhalation exposure pathways. Reduce COC concentrations in soil to levels that protect human and ecological receptors and future groundwater use as a drinking water source. The December 12, 2013 DEQ staff report describes the soil cleanup efforts. Achievement of the acceptable risk level for soil was done at each soil AOC by extending the excavation bounds to or beyond clean sample locations. Post-excavation confirmation samples showed that the actual excavation bounds exceeded the design bounds. The soil remedial goals were achieved as specified by the ROD. A range of remedial action alternatives were developed in the Final Corrective Action Plan in 2012 to address contaminated soil and groundwater associated with AOC C Building 13/Multiple Former USTs. Based on the comparative evaluation of remedial action alternatives, open pit and in situ air sparging was identified as the preferred alternative for treatment of groundwater with COC concentrations exceeding DEQ residential tapwater RBCs. The major components of the preferred alternative as described in the corrective action plan included the following: Open-Pit air sparging. Conduct air sparging in the AOC C Building 13/Multiple Former USTs excavation for 2 days following removal of the contaminated soil. Air sparging was done by attaching a perforated pipe to the excavator arm/bucket and hydraulically pushing the pipe below the water table surface. Then compressed air was injected through the pipe, sparging the exposed soil and groundwater. Concurrent with the air sparging step, the excavator bucket was used to mechanically agitate water saturated soil and groundwater. In situ air sparging. Air sparging was done in the groundwater plume as follows: A design test was done to confirm the radius of influence (ROI) for a typical air sparging well at varying air flow rates/injection pressures. Use the information from Page 4 of 33

5 the design test to develop the air sparging system design and implementation strategy. This work was completed as described in the Remedial Design Investigation Results report (ANG, 2013a). Install an air sparging system, including an array of vertical well points to treat the groundwater plume in accordance with the ROD and results of the remedial design investigation, and the remedial design drawings and specifications. Perform operation and maintenance (O&M) on the air sparging system. Conduct quarterly groundwater monitoring to assess air sparging treatment performance, and continually optimize the implementation strategy. Evaluate and present monitoring results in semiannual progress reports. In the event that remedial goals were not achieved and it was no longer costeffective or technically feasible to continue operating the air sparging system, the ANG as the lead agency, in consultation with DEQ, Confederated Tribes, and the Navy, evaluated the feasibility of implementing other technologies, including monitored natural attenuation for the portion of the plume where the remedial goals were not achieved. The elements of the remedial action objectives related to soil were achieved through completion of the soil remedial action as described in December 12, 2013 DEQ staff report and in the Final Remedial Action Completion Report for Source Area Soil at AOC B Drain Line, AOC C Outfalls 1/2, AOC K Fire Training Area, and AOC C Building 13/Multiple Former USTs (ANG, 2013b). The remedial action objectives were developed based on the current and reasonably anticipated future land and groundwater use. As described in the December 12, 2013 DEQ staff report and in the Final Remedial Design Report/Remedial Action Work Plan for AOC B Drain Line, AOC C Outfall 1/Outfall 2, AOC K Fire Training Area, and AOC C Building 13/Multiple Former Underground Storage Tanks, Former 104th Air Control Squadron, Coos Bay, Oregon (ANG, 2012e), the air sparging system was designed to be operated for a period of up to 2 years; until remedial goals were achieved or the system was no longer effective, or the O&M costs were disproportionate relative to the levels of risk reduction realized. In 2016, an Explanation of Significant Differences (ESD) (ANG, 2016) was prepared in accordance with Section 117(c) of CERCLA and Code of Federal Regulations Title 40 Part (c)(2)(i), to document a significant difference to the groundwater portion of the remedy for AOC C Building 13/Multiple Former USTs by incorporating updated toxicity and exposure information that modifies the remedial goals specified in the ROD for the COCs. These changes were necessary to incorporate the following: The current COC toxicity factor and exposure parameter information that changed since the ROD was issued in This information was obtained from DEQ and U.S. Environmental Protection Agency (EPA) risk assessment guidance. Consideration of central tendency exposure (CTE), per Oregon Administrative Rule (OAR) (1) (g) and Human Health Risk Assessment Guidance Page 5 of 33

6 (DEQ, 2010) requirements, when remediation to remedial goals based on reasonable maximum exposure (RME) RBCs is impractical. Modification of the remedial goals for the groundwater COCs does not change or restrict groundwater use at the Site, and still allows for unrestricted use of the land and/or groundwater per the ROD. Based on current toxicity factors and the CTE scenario, the remedial goals specified in the ROD were updated in the ESD, as shown in following table. Details of the CTE remedial goals are as follows: COC Remedial Goal a Basis for Clean Up AOC C Building 13 and Multiple Former USTs Groundwater (µg/l) Benzene 1.3 CTE Residential RBC for ingestion and inhalation of tap water Ethylbenzene 5.1 CTE Residential RBC for ingestion and inhalation of tap water Naphthalene 0.48 CTE Residential RBC for ingestion and inhalation of tap water TCE 0.89 CTE Residential RBC for ingestion and inhalation of tap water Risk at Remedial Goal 1 in 1,000,000 1 in 1,000,000 1 in 1,000,000 1 in 1,000,000 a Values shown are the lowest of (a) residential exposure (soil ingestion, dermal contact, and inhalation) or (b) residential leaching to groundwater. µg/l micrograms per liter TCE trichloroethene 5. Analytical Results Sampling and analysis of groundwater samples collected from the monitoring wells located in the vicinity of AOC-C Building 13/Multiple Former USTs, where the air sparging remedy was operated from March 2014 to March 2016, shows that the concentration of the site-related COCs identified in the ROD have been reduced to a level that allows for site closure as demonstrated by the residual risk assessment presented in this document. The laboratory analysis results for the groundwater samples collected during the February 2016, May 2016, and August 2016 events are presented in Table 3, and the results for each of the four COCs summarized in the following subsections. Changes in COC concentrations observed between the August 2012 baseline event and August 2014 reflect changes attributable to pulsed air sparging operations, whereas COC concentration changes observed between August 2014 and February 2016 are attributable to continuous air sparging operations. Concentrations present in the May 2016 and August 2016 events show groundwater quality under high and low elevation conditions, respectively, following shutdown of the air sparging system on 17 March Page 6 of 33

7 Overall remedial progress to date is shown by the concentration reductions that have occurred between the baseline monitoring event in August 2012 and the most recent August 2016 event. Several monitoring wells were installed or incorporated into the long-term monitoring network after August Therefore, at these wells which include MW-029 through MW-033 and TMW-02, November 2013 is used for the baseline condition. Laboratory analysis for benzene, ethylbenzene, and TCE was performed using U.S. Environmental Protection Agency (EPA) Method SW Analysis for naphthalene was performed using EPA Method SW Benzene As shown on Figure 3, the initial site groundwater contaminant plume in 2012 was characterized by three lobes extending west-northwest (downgradient) from AOC C with elevated benzene concentrations present in the southernmost lobe in the vicinity of wells MW-024, MW-014, TMW-02, and MW-032. During the February 2016 event, just before air sparging system shutdown, benzene concentrations were present at only 1 of 20 well locations at well TMW-02 (1.99 µg/l). Between the February and May 2016 sampling events, benzene concentrations decreased at well TMW-02 from 1.99 µg/l to 0.70 µg/l. Between the May 2016 (high groundwater elevation conditions) and the August 2016 (low groundwater elevation conditions) events, benzene concentrations increased at TMW-02 from 0.70 µg/l to 1.79 µg/l. Benzene concentrations also increased between the May 2016 and August 2016 events at well MW-024 from 0.36 µg/l to 2.31 µg/l and at well MW-028 from less than 0.15 µg/l (i.e., non-detect) to 1.40 µg/l. The average benzene concentration in groundwater samples collected from the AOC-C Building 13/Multiple Former UST monitoring wells, calculated using the laboratory analysis results from the four most recent monitoring events spanning a one-year climate cycle, ranged from 0.08 to 1.3 µg/l. Ethylbenzene Ethylbenzene concentrations were present at one of the 20 well locations sampled during the August 2012 and November 2013 baseline events. Ethylbenzene, was detected at well MW-032 during the May 2014 event at a concentration of 38.3 µg/l. This detection was co-located with an elevated benzene concentration also observed at this same location in May By August 2014, the concentration had declined to non-detect, where it has remained through August Ethylbenzene concentrations observed during the February, May, and August 2016 events ranged from less than 0.15 µg/l to 0.77 µg/l. Naphthalene As shown on Figure 3, the initial site groundwater contaminant plume was characterized by three lobes extending west-northwest (downgradient) from AOC C. Elevated naphthalene concentrations were initially present at wells MW-024 (0.63 µg/l), MW-017 (5.4 µg/l), and MW-031. Well MW-031 is located on the Navy property (Figure 3). Naphthalene concentrations observed at well MW-031 are associated with residual contamination from the Page 7 of 33

8 historical Navy underground petroleum storage tank on the adjacent US Navy property (DEQ LUST # ) decommissioning activities. Naphthalene concentrations observed at the AOC-C monitoring wells during the February, May, and August 2016 events (Figure 3-4) ranged from less than µg/l to 0.25 µg/l. The average naphthalene concentration in groundwater samples collected from the AOC-C monitoring wells, calculated using laboratory analysis results from the four most recent monitoring events spanning a one-year climate cycle, ranged from 0.01 to 0.24 µg/l. At well MW-031, which was only sampled in February 2016, a naphthalene concentration of 0.95 µg/l was detected. The Navy and DEQ are currently addressing petroleum hydrocarbon contamination present on the Navy property including that detected at well MW-031. Groundwater sampling and analysis at well MW-029 (Figure 1-2), which is located just beyond the southwest corner of the Navy property downgradient of well MW-031. Site investigation work on the US Navy property, has shown naphthalene concentrations ranging from less than µg/l to µg/l. The results indicate that there is no significant naphthalene migration beyond the Navy property boundary. Trichloroethene As shown on Figure 3, the initial site groundwater contaminant plume was characterized by three lobes extending west-northwest (downgradient) from AOC C, with TCE concentrations initially present in the middle lobe at wells MW-014 (0.9 µg/l), MW-012 (1.53 µg/l), and MW-025 (1.22 µg/l). TCE concentrations observed during the February, May, and August 2016 monitoring events (Figure 3-5) ranged from less than 0.15 µg/l to 0.62 µg/l. The average TCE concentration in groundwater samples collected from the 20 AOC-C monitoring wells, calculated using the laboratory analysis results from the four most recent monitoring events spanning a one-year climate cycle, ranged from 0.08 to 0.59 µg/l. 6. Remedial Action The groundwater remedy identified in the ROD was open pit and in situ air sparging. In situ air sparging was chosen to remediate dissolved COCs in groundwater by accelerating the natural biological degradation process and reducing the duration of treatment and performance monitoring. Between August 5, and September 5, 2013, 59 air sparging wells were installed. The remedial implementation was summarized in the Final Remedial Construction Report for the In Situ Air Sparge System AOC C Building 13/Multiple Former UST Groundwater (ANG, 2014a). Air for the air sparging wells was supplied by two different blowers. Each blower was capable of supplying up to 150 standard cubic feet per minute of flow. One blower supplied air to the low submergence zone wells (Zones 1 through 5) and the second to the high submergence zone wells (Zones 6 through 10). The system was equipped with data-logging, remote access, and camera surveillance capability. The air sparging blower system, instrumentation and controls, and air distribution manifolds were housed in a 40-foot-long, trailer-mounted container. Page 8 of 33

9 In September 2014, the air sparging air injection strategy was modified from pulsed to continuous operation. Under this strategy, all 10 zones were open, allowing airflow to all 60 wells, thereby increasing the volume of air injected into the aquifer. The change in operational strategy was made following observations of airflow distribution and aquifer response during the 6 months of pulsed air sparging operations. In a continuing effort to optimize air sparging system performance and accelerate achievement of remedial goals, a targeted sparging strategy was implemented in April Targeted sparging consists of reducing the number of air sparging wells operating, to maximize the effectiveness of the air sparging system, by directing the majority of the airflow to zones where COCs still exceeded remedial goals. This was accomplished by closing individual wells or entire zones in areas where remedial goals had been attained. The change reduced the number of operating air sparging wells from 60 to 31. In addition to maximizing airflow to other wells, the targeted air sparging approach allowed concentration rebound in areas or zones where remedial goals had been attained to be assessed. Following 2 years of operation, the air sparging system was shut down in March 2016, meeting the requirement of the ROD. 7. Residual Risk Human Health The groundwater remedial goals presented in the 2012 ROD were set based on the DEQ acceptable risk level of 1 x 10-6 for carcinogenic COCs and were adapted from DEQ s published RBCs. RBCs periodically change in response to new contaminant toxicity and exposure information. The ROD presented numeric RBCs for each of the four groundwater COCs, corresponding to the 1 x 10-6 acceptable risk level for residential exposure, based on the exposure assumptions and chemical toxicity values published in In November 2015, the DEQ updated its RBCs to reflect current toxicity and exposure information. The November 2015 RBCs are based on the latest DEQ published values for the RME scenario. The RME scenario uses health-protective default values for exposure duration, frequency, and the water ingestion rate. The RME scenario is considered to represent a high-end exposure scenario. DEQ cleanup rules require that CTE also be considered to provide the risk manager with added perspective especially where it is infeasible to remediate to the acceptable risk level based on RME values (Human Health Risk Assessment Guidance, DEQ, 2010). CTE and the COC exposure concentrations are based on average (i.e., the arithmetic mean) versus high-end exposure assumptions. CTE is designed to provide a more realistic exposure scenario for typical exposure conditions and is considered more applicable for the Coos Head site. The primary difference between the RME and CTE exposure scenarios are the exposure duration and the water ingestion rates for adults and children. To demonstrate that COC concentrations in AOC C groundwater meet the 1 x 10-6 acceptable risk level, the excess lifetime cancer risk was calculated at each of the AOC C monitoring wells using the CTE scenario and the average COC concentration present at the monitoring well over the most recent four quarters. Page 9 of 33

10 Since the actual excess lifetime cancer risk is less than or equal to 1 x 10-6, the acceptable risk level has been achieved per OAR (1) and Tables 4 through 6 present the risk calculations for benzene, naphthalene, and TCE and show the achievement of the acceptable risk level at all 20 AOC C groundwater monitoring wells. Achievement of the acceptable risk level in groundwater, in conjunction with the previous soil NFA determination, restores the Site to an unrestricted use condition. Because an unrestricted use condition is achieved, land or groundwater use restrictions are not required at a site. Ecological There are no risk factors for ecological impacts associated with the subject property. Specifically, there are no known threatened or endangered species present at the site. There is no proximal discharge of groundwater to surface waters, and there is no likelihood for groundwater to contact aquatic sediments. Furthermore, groundwater has been remediated to a level that would have no adverse ecological impact. Level I and Level II Ecological Risk Assessments have been completed. 8. Public Outreach The Confederated Tribes has been closely involved with the cleanup process and have been involved with crafting the decision documents. Therefore, a separate public comment period was deemed to be unnecessary, since Confederated Tribes are the relevant public in this case. 9. Conclusions Based on the information available to DEQ, the remediation process at the Coos Head site has been completed. DEQ supports a No Further Action recommendation for this site and will send a No Further Action letter to Confederated Tribes and ANG. The land and groundwater at Coos Head can be used without restriction. 10. Site Reference Material Most of the pertinent information regarding this staff report can be found in the January 2017 No Further Response Action Planned Decision Document Groundwater at AOC C Building 13/Multiple Former Underground Storage Tanks Former 104 th Air Control Squadron, Coos Bay, Oregon. Additional site references are as follows: 1. Air National Guard (ANG) Preliminary Assessment/Site Inspection Report, Building 13/Multiple Former USTs. November Air National Guard (ANG) Remedial Investigation Analytical Data and Quality Assurance/Quality Control Evaluation Results. February Air National Guard (ANG) Air National Guard Investigation Guidance. September. Page 10 of 33

11 4. Air National Guard (ANG) Final Remedial Investigation Report for Multiple Sites, 104th Air Control Squadron, Coos Head Air National Guard Station, Coos Bay, Oregon. February. 5. Air National Guard (ANG) Final Site Assessment Report for Former Underground Storage Tanks P2, Q, R, S, T and Five Soil Stockpiles. April. 6. Air National Guard (ANG). 2012a. Final Corrective Action Plan for Former Underground Storage Tanks P2, Q, R, S, T and Five Soil Stockpiles. February. 7. Air National Guard (ANG). 2012b. Final Proposed Plan for Further Action Sites and No Further Action Sites at the Former 104th Air Control Squadron, Coos Bay, Oregon. February. 8. Air National Guard (ANG). 2012c. Final Record of Decision for Further Action Sites and No Further Action Sites for the Former 104th Air Control Squadron, Coos Bay, Oregon. September. 9. Air National Guard (ANG). 2012d. Final Building 13 Demolition Report Former 104th Air Control Squadron, Coos Bay, Oregon. December. 10. Air National Guard (ANG). 2012e. Final Remedial Design Investigation Work Plan Former 104th Air Control Squadron, Coos Bay, Oregon. June. 11. Air National Guard (ANG). 2013a. Final Remedial Design Investigation Results at AOC B Drain Line, AOC C Outfalls 1/2, AOC K Fire Training Area, and AOC C Building 13/Multiple Former USTs. Former 104th Air Control Squadron, Coos Bay, Oregon. February. 12. Air National Guard (ANG). 2013b. Final Remedial Design Report/Remedial Action Work Plan for AOC B Drain Line, AOC C Outfall 1/Outfall 2, AOC K Fire Training Area, and AOC C Building 13/Multiple Former Underground Storage Tanks, Former 104th Air Control Squadron, Coos Bay, Oregon. June. 13. Air National Guard (ANG). 2013c. Final Remedial Action Completion Report for Source Area Soil at AOC B Drain Line, AOC C Outfalls 1/2, AOC K Fire Training Area, and AOC C Building 13/Multiple Former USTs. Former 104th Air Control Squadron, Coos Bay, Oregon. October. 14. Air National Guard (ANG). 2014a. Remedial Construction Report for the In Situ Air Sparge System AOC C Building 13/Multiple Former USTs Groundwater. 15. Air National Guard (ANG). 2014b. First Semiannual Groundwater Remedial Action Progress Report AOC C Building 13/Multiple Former USTs Groundwater. September. 16. Air National Guard (ANG). 2015a. Second Semiannual Groundwater Remedial Action Progress Report AOC C Building 13/Multiple Former USTs Groundwater. April. 17. Air National Guard (ANG). 2015b. Third Semiannual Groundwater Remedial Action Progress Report AOC C Building 13/Multiple Former USTs Groundwater. July. 18. Air National Guard (ANG). 2015c. Fourth Semiannual Groundwater Remedial Action Progress Report AOC C Building 13/Multiple Former USTs Groundwater. November. 19. Air National Guard (ANG) Explanation of Significant Difference AOC C Building 13/Multiple Former USTs Groundwater. August. 20. Battelle Air Sparging Design Paradigm. 21. (DEQ) No Further Action (NFA) Determination for LUST # Naval Ocean Processing Facility 4300 Coos Head Road, Charleston. DEQ Letter to Mr. Ken Patterson/U.S. Department of the Navy. July 29, Page 11 of 33

12 22. (DEQ) Human Health Risk Assessment Guidance. 23. (DEQ) Letter from OR DEQ to OR ANG and ANG/CEVR Regarding No Further Action for Radar Hill, Stockpile 1, AOC H, AOC F, and AOC G. June (DEQ) Partial No Further Action (NFA) Determination for Former Coos Head Air National Guard Station Coos Head Road, Coos Bay, Oregon ECSI ID No October U.S. Army Corps of Engineers (USACE) In Situ Air Sparging Manual. Engineering Manual January. 26. U.S. Environmental Protection Agency (EPA) A Guide to Preparing Superfund Proposed Plans, Records of Decision, and Other Remedy Selection Decision Documents. July. Page 12 of 33

13 Figures Page 13 of 33

14 Figure 1 Site Vicinity Map Page 14 of 33

15 Page 15 of 33 Figure 2

16 Figure 3 Page 16 of 33

17 Figure 4 Site Cross Section Page 17 of 33

18 Figure 5 Groundwater Elevation Hydrograph Page 18 of 33

19 Figure 6 Page 19 of 33

20 Figure 7 Page 20 of 33

21 Figure 8 Page 21 of 33

22 Tables Page 22 of 33

23 Table 1: Former Underground Storage Tank Description Page 23 of 33

24 Table 2: Remedial Goals for Groundwater Contaminants of Concern Page 24 of 33

25 Table Table 3 Contaminants Contaminants of of Concern Concern Lab Lab Analysis Analysis Results Results Page 25 of 33

26 Table 3 Contaminants of Concern Lab Analysis Results Page 26 of 33

27 Table 3 Contaminants of Concern Lab Analysis Results Page 27 of 33

28 Table 3 Contaminants of Concern Lab Analysis Results Page 28 of 33

29 Table 3 Contaminants of Concern Lab Analysis Results Page 29 of 33

30 Table 3 Contaminants of Concern Lab Analysis Results Page 30 of 33

31 Table 4: Residual Risk Calculation for Benzene Page 31 of 33

32 Table 5: Residual Risk Calculation for Naphthalene Page 32 of 33

33 Table 6: Residual Risk Calculation for TCE Page 33 of 33

CORRECTIVE ACTION COMPLETION REPORT

CORRECTIVE ACTION COMPLETION REPORT REVISED FINAL CORRECTIVE ACTION COMPLETION REPORT IMA for the Corrective Actions at the Old Property Disposal (PDO) Yard Hunter Army Airfield, Georgia Prepared for U.S. ARMY CORPS OF ENGINEERS SAVANNAH

More information

Proposed Plan Closed Sanitary Landfill

Proposed Plan Closed Sanitary Landfill Fort George G. Meade Proposed Plan Closed Sanitary Landfill Public Meeting May 18, 2016 1 18MAY2017 Public Meeting Purpose U.S. Army is inviting the public to comment on the proposed environmental actions

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum Date: July 1, 2014 To: From: Subject: File Erin McDonnell, Northwest Cleanup Section Proposed No Further Action for Building 02 Operational

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Residual Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Background Information Linebach Funkhouser, Inc. (LFI) personnel performed permanent closure, assessment and corrective

More information

Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range

Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range 1 Presentation Agenda OU-1/FGGM-83, Former Trap & Skeet Range Focused Feasibility Study (FFS) OU-3/FGGM-87, Former Nike

More information

Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio

Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio Draft Final Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio FUDS Property Number: G05OH0149-03 Prepared for United States Army Corps of Engineers Louisville District

More information

PROPOSED PLAN for Amendment to Record of Decision

PROPOSED PLAN for Amendment to Record of Decision PROPOSED PLAN for Amendment to Record of Decision Operable Unit 1, Area 6 Naval Air Station Whidbey Island Oak Harbor, Washington November 2018 INTRODUCTION TABLE OF CONTENTS The United States Navy (Navy)

More information

Public Meeting Purpose

Public Meeting Purpose Fort George G. Meade Proposed Plan Former Pesticide Shop Public Meeting August 15, 2012 1 Public Meeting Purpose U.S. Army is inviting the public to comment on the proposed environmental actions for the

More information

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 Prepared for: THE MICHIGAN CITY REDEVELOPMENT COMMISSION 100 EAST MICHIGAN BOULEVARD

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups

Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups Walter Avramenko Colorado Department of Public Health and Environment May 3, 2012 In the beginning Evolution

More information

APPENDIX I A SITE-SPECIFIC RECAP EVALUATION FOR TYPICAL UST SITES

APPENDIX I A SITE-SPECIFIC RECAP EVALUATION FOR TYPICAL UST SITES APPENDIX I A SITE-SPECIFIC RECAP EVALUATION FOR TYPICAL UST SITES LDEQ RECAP 2003 TABLE OF CONTENTS List of Figures List of Tables List of Worksheets Page... i... i... ii I1.0 APPENDIX I UNDERGROUND STORAGE

More information

SOUTH CAROLINA RISK-BASED CORRECTIVE ACTION FOR PETROLEUM RELEASES

SOUTH CAROLINA RISK-BASED CORRECTIVE ACTION FOR PETROLEUM RELEASES Department of Health and Environmental Control SOUTH CAROLINA RISK-BASED CORRECTIVE ACTION FOR PETROLEUM RELEASES Bureau of Land and Waste Management Underground Storage Tank Program 2600 Bull Street,

More information

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin Introduction DLA Distribution Depot San Joaquin is an active distribution center operated by the Defense Logistics Agency (DLA) to supply military services with the equipment needed to fulfill their missions.

More information

U.S. NAVY ANNOUNCES PROPOSED PLAN

U.S. NAVY ANNOUNCES PROPOSED PLAN Proposed Plan for Operable Unit 2C Installation Restoration Sites 5, 10, and 12 Former NAS Alameda Alameda, California September 2012 U.S. NAVY ANNOUNCES PROPOSED PLAN The U.S. Navy requests public comments

More information

Wickes Manufacturing TCE Plume Site Mancelona, Michigan

Wickes Manufacturing TCE Plume Site Mancelona, Michigan Wickes Manufacturing TCE Plume Site Mancelona, Michigan December 2017 What is TCE? Trichloroethylene (TCE) Common Industrial Solvent Known Human Carcinogen Federal and State Safe Drinking Water of 5 µg/l

More information

IXPER 70C Calcium Peroxide CASE STUDY

IXPER 70C Calcium Peroxide CASE STUDY IXPER 70C INTRODUCTION TO ENHANCED AEROBIC BIOREMEDIATION Enhanced aerobic bioremediation is a well-established and viable remediation technology for in situ degradation of a variety of petroleum hydrocarbon

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

Proposed Plans for Soil, Sediment, and Surface Water at. Anchor Test Area and Building 1200

Proposed Plans for Soil, Sediment, and Surface Water at. Anchor Test Area and Building 1200 Proposed Plans for Soil, Sediment, and Surface Water at Anchor Test Area and Building 1200 Ravenna Army Ammunition Plant Ravenna, Ohio Presented by: Jed Thomas - Science Applications International Corporation

More information

INTRODUCTION. Camp Pendleton s Professional Military Education.

INTRODUCTION. Camp Pendleton s Professional Military Education. INTRODUCTION Marine Corps Installations West-Marine Corps Base Camp Pendleton serves as the Marine Corps premier amphibious training base offering comprehensive air, sea, and ground assault training to

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

U. S. Army Corps of Engineers In Situ Air Sparging Subsurface Performance Checklist

U. S. Army Corps of Engineers In Situ Air Sparging Subsurface Performance Checklist U. S. Army Corps of Engineers In Situ Air Sparging Subsurface Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is meant to assist the team in evaluating

More information

PROPOSED PLAN OPERABLE UNITS 1, 3, 5, AND 6, ENVIRONMENTAL RESTORATION PROGRAM MOUNTAIN HOME AIR FORCE BASE, IDAHO INTRODUCTION

PROPOSED PLAN OPERABLE UNITS 1, 3, 5, AND 6, ENVIRONMENTAL RESTORATION PROGRAM MOUNTAIN HOME AIR FORCE BASE, IDAHO INTRODUCTION PROPOSED PLAN OPERABLE UNITS 1, 3, 5, AND 6, WITH A PROPOSED REMEDY FOR SITE ST-11 AND AMENDMENT TO THE RECORD OF DECISION ENVIRONMENTAL RESTORATION PROGRAM MOUNTAIN HOME AIR FORCE BASE, IDAHO INTRODUCTION

More information

BACKGROUND OFFSITE FACILITIES/RELEASE CASES

BACKGROUND OFFSITE FACILITIES/RELEASE CASES Project No. S9955-05-02 September 18, 2017 Kemble Pope Trackside Center LLC 2940 Spafford Street, Suite 202 Davis, California 95618 Subject: ENVIRONMENTAL DATA SUMMARY TRACKSIDE CENTER 901 919 THIRD STREET

More information

Collect deeper soil samples and groundwater from beneath site?

Collect deeper soil samples and groundwater from beneath site? Uncertainties for which sampling is (i.e., to be incorporated into Work Plan). No. Uncertainty Recommended Resolution/ 1 SS005 No evidence of Acquire samples from three closest MOGas in soil. Tank as surface

More information

This document has not been reviewed Department management, who may have additional comments at a later time.

This document has not been reviewed Department management, who may have additional comments at a later time. NJDEP 11-10 14 Comments on the draft No Further Action with Monitoring of Land Use Proposed Plan for Areas F, G, I, and L Sites, including PICAs -075, -108, -122, -134, -135,- 136, - 147, -200, and -209,

More information

Methodology for Establishing Cleanup Levels for Contaminated Sites

Methodology for Establishing Cleanup Levels for Contaminated Sites Methodology for Establishing Cleanup Levels for Introduction: In Oklahoma, appropriate cleanup levels for a specific site are provided by the Department of Environmental Quality (DEQ). Achieving these

More information

Ground Water Assessment. Investigating Ground Water: Discussion Topics. Leaching. Soil Impacts to Ground Water

Ground Water Assessment. Investigating Ground Water: Discussion Topics. Leaching. Soil Impacts to Ground Water Ground Water Assessment Investigation, Protection, Classification, and Response Requirements OAC 3745-300-10 and parts of 3745-300-07 Certified Professional 8-Hour Training Investigating Ground Water:

More information

Area B Groundwater Investigation Fort Detrick

Area B Groundwater Investigation Fort Detrick Area B Groundwater Investigation Fort Detrick Progress Report to the RAB November 6, 2013 John Cherry ARCADIS Imagine 1 the result Overview of Topics Groundwater Tracer Study Overview Shallow Off-Post

More information

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE PROPOSED PLAN OF REMEDIAL ACTION 560 Terminal Avenue New Castle, DE DNREC Project No. DE 1123 October 2002 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DELAWARE CAR COMPANY Second and Lombard Streets Wilmington, Delaware DNREC Project No. DE-1059 October 2000 Department of Natural Resources and Environmental Control Division

More information

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Site Profiles - View. General Information. Contaminants: Site Hydrology: Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Tiger Cleaners Memphis, Tennessee, United States Tiger Cleaners is located

More information

15A NCAC 02L.0106 CORRECTIVE ACTION (a) Where groundwater quality has been degraded, the goal of any required corrective action shall be restoration

15A NCAC 02L.0106 CORRECTIVE ACTION (a) Where groundwater quality has been degraded, the goal of any required corrective action shall be restoration 15A NCAC 02L.0106 CORRECTIVE ACTION (a) Where groundwater quality has been degraded, the goal of any required corrective action shall be restoration to the level of the standards, or as closely thereto

More information

Risk-Based Decision Making for Site Cleanup

Risk-Based Decision Making for Site Cleanup Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk-based decision-making process to provide a framework for determining cleanup requirements

More information

St. Maries Creosote Site. February 2014

St. Maries Creosote Site. February 2014 TABLE OF CONTENTS St. Maries Creosote Site February 2014 1.0 INTRODUCTION... 1 1.1 Site Name and Location... 1 1.2 Lead and Support Agencies... 1 1.3 Statement of Purpose... 1 1.4 Administrative Record...

More information

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination.

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination. Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Rummel Creek Shopping Center Houston, Texas, United States The facility

More information

March 16, Dear Mr. Chapman:

March 16, Dear Mr. Chapman: March 16, 2011 Mr. Al Chapman State of North Carolina Department of Environment and Natural Resources Division of Waste Management, Superfund Section 401 Oberlin Road, Suite 150 Raleigh, North Carolina

More information

NAVY ANNOUNCES PROPOSED PLAN

NAVY ANNOUNCES PROPOSED PLAN Hunters Point Naval Shipyard Parcels E and UC-3 San Francisco, California February 2013 NAVY ANNOUNCES PROPOSED PLAN The U.S. Navy encourages the public to comment on its Proposed Plan* for cleanup of

More information

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A-310.65 to 310.77 North Carolina Department of Environment and Natural Resources Division

More information

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response VAP 101 - Introduction to the Voluntary Action Program Division of Emergency and Remedial Response Ohio EPA Voluntary Action Program Created in 1994 Ohio Revised Code (ORC) 3746 Final Rules went into effect

More information

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds RemTech 2017, Banff Springs Hotel and Conference Centre October 11, 2017 Presented by - Jay Dablow,

More information

Risk-Based Cleanup Actions for Closure of a Brownfield Site

Risk-Based Cleanup Actions for Closure of a Brownfield Site Risk-Based Cleanup Actions for Closure of a Brownfield Site H.W. Rice, J.F. Feild, L.C. Farr Jr. AMEC Earth and Environmental, Inc. 7376 SW Durham Road, Portland, Oregon 97224 USA ABSTRACT Operating as

More information

PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE

PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE July 1999 DNREC Project DE-245 Prepared by: Delaware Department of Natural Resources and Environmental Control Division

More information

Assessing and Communicating Risk: A Partnership to Evaluate a Superfund Site on Leech Lake Tribal Lands. Executive Summary

Assessing and Communicating Risk: A Partnership to Evaluate a Superfund Site on Leech Lake Tribal Lands. Executive Summary Assessing and Communicating Risk: A Partnership to Evaluate a Superfund Site on Leech Lake Tribal Lands Executive Summary Background This summary highlights findings and output of from a series of panels

More information

Introduction. IR Site 1111 Overview. IR Site 1111

Introduction. IR Site 1111 Overview. IR Site 1111 Department of the Navy Announces the Proposed Plan for No Further Action at IR Site 1111 within the 26 Area at Marine Corps Base Camp Pendleton July 2011 Introduction The Department of the Navy (DON),

More information

STATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL- SITE INVESTIGATION AND RESTORATION BRANCH

STATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL- SITE INVESTIGATION AND RESTORATION BRANCH STATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL- SITE INVESTIGATION AND RESTORATION BRANCH PROPOSED PLAN OF REMEDIAL ACTION May 2006 Ion Power Formally South Parcel of Metachem

More information

Site Background December 2005

Site Background December 2005 Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on

More information

Technology Presentation NEIWPCC (2016) Presenter: Noel Shenoi ( We support our men and women who have served our country

Technology Presentation NEIWPCC (2016) Presenter: Noel Shenoi (  We support our men and women who have served our country Technology Presentation NEIWPCC (2016) Presenter: Noel Shenoi (www.calclean.com) We support our men and women who have served our country Overview I. Company Background II. Equipment and Services III.

More information

Letter Health Consultation

Letter Health Consultation Letter Health Consultation Health Evaluation of Groundwater Samples Collected in February 2010 by U.S. EPA Contractors at the Former Benfield Industries NPL Site WAYNESVILLE, HAYWOOD COUNTY, NORTH CAROLINA

More information

FACT PATTERN THE RESERVATION

FACT PATTERN THE RESERVATION FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DRAVO SHIPYARD Operable Unit II RDC/Harbor Associates Properties Wilmington, Delaware DNREC Projects No. DE-1092 & DE-1096 February 2001 Department of Natural Resources and

More information

2013 Environmental Awards DLA Tracy Site, Path to Construction Complete Status

2013 Environmental Awards DLA Tracy Site, Path to Construction Complete Status Introduction The Tracy Site is an active distribution depot operated by the Defense Logistics Agency (DLA) to supply military services with the equipment needed to fulfill their missions. The combined

More information

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the

More information

EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan. vapor intrusion, and identifies and provides the rationale for EPA s

EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan. vapor intrusion, and identifies and provides the rationale for EPA s EPA CTS Printex, Inc. Superfund Site U.S. Environmental Protection Agency $ Region 9 $ San Francisco, CA $ June 2011 EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan 1.0 Introduction

More information

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B SITE: CHAMPAIGN FORMER MGP SITE CHAMPAIGN, ILLINOIS JULY 24, 2013 PREPARED FOR: PSC INDUSTRIAL OUTSOURCING, LP 210 WEST SAND BANK

More information

Remedy Optimization at Navy Restoration Sites

Remedy Optimization at Navy Restoration Sites Remedy Optimization at Navy Restoration Sites Tanwir Chaudhry (Consultant NAVFAC ESC) Karla Harre (NAVFAC ESC) Environment, Energy Security, & Sustainability Symposium Denver, CO June 14-17, 2010 Presentation

More information

Fort George G. Meade. Restoration Advisory Board Meeting March 25, 2010

Fort George G. Meade. Restoration Advisory Board Meeting March 25, 2010 Fort George G. Meade PERFORMANCE BASED ACQUISITION II SITE STATUS OVERVIEW Restoration Advisory Board Meeting March 25, 2010 John Cherry ARCADIS APM Tim Llewellyn ARCADIS PM 1 PBA II Site Locations Manor

More information

Informational Meeting: Onsite and Offsite Response Action Plans

Informational Meeting: Onsite and Offsite Response Action Plans Informational Meeting: Onsite and Offsite Response Action Plans Kop-Flex Voluntary Cleanup Program Site #31 June 24, 2015 BACKGROUND ONSITE AREA SUMMARY OF SITE HISTORY Koppers Company purchased the property,

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc.

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. MEMORANDUM To: From: Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. (GSI) Doug Sutton, GeoTrans, Inc. Rob Greenwald, GeoTrans,

More information

Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington

Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington Health Consultation Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington May 14, 1999 Prepared by The Washington State Department of Health Under a Cooperative Agreement with

More information

How You Can Participate

How You Can Participate Proposed Plan for Cleanup Action at the Former Facility Area Port Heiden, Alaska February 2008 You are invited to comment on the information and proposed cleanup alternatives discussed in this Proposed

More information

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination.

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination. Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Contaminants: Contaminants: Contaminants present and the highest amount

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES Preliminary Evaluation for Wells & Son Metal Recycling aka Cardinal Grain Property 607 South Chauncey Street Columbia City, Indiana 46725 1.0 INTRODUCTION This

More information

6.3.2 Exposure Assessment

6.3.2 Exposure Assessment 6.3.2 Exposure Assessment A key component of conducting a risk-based screening evaluation is identification of potential exposures. An exposure assessment includes an evaluation of potential human and

More information

Enhanced Anaerobic Bioremediation Using CAP18 as a Polishing Application for CVOC Impacted Groundwater

Enhanced Anaerobic Bioremediation Using CAP18 as a Polishing Application for CVOC Impacted Groundwater www.burnsmcd.com Author: Presented Date: Walter McClendon, Martha Hildebrandt and John Hesemann, Burns & McDonnell John Shimp, Directorate of Public Works, Fort Riley, Kan. Bradden Bigelow, Environmental

More information

Generic numerical standards.

Generic numerical standards. 3745-300-08 Generic numerical standards. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules, and federal statutory provisions

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA Introduction and Background The subject site is located at 1717 Goodrich

More information

4.1 Evaluation Criteria

4.1 Evaluation Criteria Section 4 Detailed Analysis of Alternatives A detailed evaluation of the alternatives provides the relevant information necessary for decision makers to select an appropriate site remedy. In this section,

More information

7.0 EVALUATION OF REMEDIAL ALTERNATIVES

7.0 EVALUATION OF REMEDIAL ALTERNATIVES 7.0 EVALUATION OF REMEDIAL ALTERNATIVES This section provides a description of the developed remedial alternatives based on viable remedial technologies and process options, as identified in Section 4.0,

More information

Nez Perce Tribe Groundwater Assessment and Cleanup

Nez Perce Tribe Groundwater Assessment and Cleanup Nez Perce Tribe Groundwater Assessment and Cleanup Nez Perce Tribal Response Program Multidisciplinary program, including LUST Prevention, LUST Assessment, Brownfields, and Emergency Response Two properties

More information

OSWER DIRECTIVE Role of the Baseline Risk Assessment in Superfund Remedy Selection Decisions

OSWER DIRECTIVE Role of the Baseline Risk Assessment in Superfund Remedy Selection Decisions UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE OSWER DIRECTIVE 9355.0-30 MEMORANDUM SUBJECT: FROM: TO: Role of the Baseline Risk Assessment

More information

6.1 Koppers Oroville Wood Treatment Facility, California

6.1 Koppers Oroville Wood Treatment Facility, California 6.1 Koppers Oroville Wood Treatment Facility, California The Koppers Oroville site is a former wood treating facility that operated from 1948 until it closed in 2001. The site occupies approximately 205

More information

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES Albert L. Lamarre Lawrence Livermore National Laboratory Kathy Angleberger U.S. Dept. of Energy Michael

More information

Enhanced In Situ Biodegradation of PCE Following Electrical Resistance Heating at a DNAPL Source Area

Enhanced In Situ Biodegradation of PCE Following Electrical Resistance Heating at a DNAPL Source Area Enhanced In Situ Biodegradation of PCE Following Electrical Resistance Heating at a DNAPL Source Area Casey Hudson, P.E (casey.hudson@ch2m.com) (CH2M HILL, Atlanta, GA), Dean Williamson, P.E. (CH2M HILL,

More information

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISCO Treatment Program: O&G Superfund Site Site O&G Superfund Drum Reconditioning Site;

More information

Summary of Investigations & Remedial Activities

Summary of Investigations & Remedial Activities Summary of Investigations & Remedial Activities Former Farmland Industries Nitrogen Manufacturing Plant Lawrence, Kansas November 9, 2009 Topics of Discussion Previous Investigations/Remedial Actions (Pre-2000s)

More information

APPENDIX K-2 IRP SITES

APPENDIX K-2 IRP SITES APPENDIX K-2 IRP SITES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SCHOFIELD BARRACKS In order to prioritize the investigation and remediation activities

More information

U.S. NAVY PROPOSES NO FURTHER ACTION FOR SOIL

U.S. NAVY PROPOSES NO FURTHER ACTION FOR SOIL Proposed Plan for Installation Restoration Site 30 Soil Former NAS Alameda Alameda, California November 2008 U.S. NAVY PROPOSES NO FURTHER ACTION FOR SOIL The U.S. Navy requests public comments on its

More information

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES SECTION.0500 - RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES 15A NCAC 02L.0501 PURPOSE AND SCOPE (a) The purpose of this Section is to establish procedures for risk-based assessment

More information

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA Identification of Major Risk Drivers and Contaminants of Potential Concern for a Complex Groundwater Aquifer 14350 Alaa Aly *, Donna Morgans * * INTERA ABSTRACT This paper presents a three-pronged process

More information

MINNESOTA POLLUTION CONTROL AGENCY SITE REMEDIATION SECTION

MINNESOTA POLLUTION CONTROL AGENCY SITE REMEDIATION SECTION MINNESOTA POLLUTION CONTROL AGENCY SITE REMEDIATION SECTION GROUND WATER POLICY DOCUMENT WORKING DRAFT, August, 1998 Fax (651) 296-9707 NOTICE THIS DOCUMENT IS AN. The of MPCA is developing guidelines

More information

FY2013 PHOENIX MILITARY RESERVATION

FY2013 PHOENIX MILITARY RESERVATION FY213 PHOENIX MILITARY RESERVATION Army Defense Environmental Restoration Program Installation Action Plan Printed 27 September 213 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

May 5, Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118

May 5, Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118 May 5, 2015 Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118 Re: Response to ADEQ Correspondence Dated March 30, 2015 Whirlpool Corporation

More information

United States Navy October 2013

United States Navy October 2013 United States Navy October 2013 Proposed Plan Site 16 Creosote Dip Tank Area, Fire-Fighting Training Area, and Former Building 41 Area (OU 9) Former Naval Construction Battalion Center, Davisville, Rhode

More information

Niagara Falls Storage Site Remedial Investigation Report Addendum

Niagara Falls Storage Site Remedial Investigation Report Addendum NFS Niagara Falls Storage Site Remedial Investigation Report Addendum U.S. Army Corps of Engineers Building Strong Buffalo District Formerly Utilized Sites Remedial Action Program (FUSRAP) April 2011 Completion

More information

K ATALYST, INC. adding value to our natural resources facilitating community change

K ATALYST, INC. adding value to our natural resources facilitating community change GROUNDWATER INVESTIGATION: City of Medford Maintenance Center, Medford Oregon (ODEQ # 15-96-0066) Prepared for: Brice Perkins, P.E., City of Medford Prepared by: Robert Coffan, Principal Hydrologist and

More information

Fort George G. Meade. Proposed Plan Architect of the Capitol Site. Public Meeting August 7, 2014

Fort George G. Meade. Proposed Plan Architect of the Capitol Site. Public Meeting August 7, 2014 Fort George G. Meade Proposed Plan Architect of the Capitol Site Public Meeting August 7, 2014 1 Public Meeting Purpose U.S. Army is inviting the public to comment on the proposed environmental actions

More information

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE.

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE. ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE Prepared for: City of Belfast 131 Church Street Belfast, Maine Prepared

More information

Phase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station

Phase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station Phase 1 ESA Phase 2 ESA Site Assessment Cleanup Planning Cleanup CNFA NFA Gas Tank Removal at Closed Gas Station Hazardous Substance - Hazardous waste, CERCLA hazardous substances, petroleum, other substances

More information

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites Bud Ivey Ivey International SMART Remediation Ottawa, ON February 16, 2017 SMART is Powered by: www.vertexenvironmental.ca

More information

Marine Corps Base Camp Lejeune (MCB Camp Lejeune) Restoration Advisory Board (RAB) Meeting Minutes

Marine Corps Base Camp Lejeune (MCB Camp Lejeune) Restoration Advisory Board (RAB) Meeting Minutes MEETING SUMMARY Marine Corps Base Camp Lejeune (MCB Camp Lejeune) Restoration Advisory Board (RAB) Meeting Minutes MEETING DATE: December 7, 2016 LOCATION: Coastal Carolina Community College, Business

More information

The Use of A Horizontal Extraction Well In Conjunction with Air Stripping to Intercept A MTBE Plume and Protect a Municipal Water Supply Well

The Use of A Horizontal Extraction Well In Conjunction with Air Stripping to Intercept A MTBE Plume and Protect a Municipal Water Supply Well The Use of A Horizontal Extraction Well In Conjunction with Air Stripping to Intercept A MTBE Plume and Protect a Municipal Water Supply Well James A. Berndt, CGWP, Mundell & Associates; Owen R. Schwartz,

More information

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014 Fort George G. Meade Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014 1 Presentation Agenda Status of the CERCLA Process for AOC Site Information Location

More information

RCRA CORRECTIVE MEASURES IMPLEMENTATION REPORT THE ENSIGN-BICKFORD COMPANY SPANISH FORK, UTAH

RCRA CORRECTIVE MEASURES IMPLEMENTATION REPORT THE ENSIGN-BICKFORD COMPANY SPANISH FORK, UTAH RCRA CORRECTIVE MEASURES IMPLEMENTATION REPORT THE ENSIGN-BICKFORD COMPANY SPANISH FORK, UTAH Prepared for: and The Spanish Fork Technical Committee Prepared by: 4505 South Wasatch Boulevard, Suite 360

More information

DuPont Chambers Works FUSRAP Site Proposed Cleanup Plan Meeting Agenda. Meeting Logistics

DuPont Chambers Works FUSRAP Site Proposed Cleanup Plan Meeting Agenda. Meeting Logistics Proposed Cleanup Plan Meeting Agenda Greetings and Introductions Project History/Overview Proposed Cleanup Plan Questions Public Comment Meeting Logistics Meeting transcript Questions? Formal comment period...for

More information

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation. Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation February 2014 FACT SHEET State Superfund Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: Powers Chemco

More information