1 Connecting Rural America Rural Utilities Service WELCOME Please Sign In Pick up RUS handout/ comment sheet? Meet the RUS Representatives Turn in comment sheet or provide to RUS within 30 days to Lauren lauren.cusick@wdc.usda.gov or: Rural Utilities Service Nemadji Trail Energy Center Attn: Steve Thornhill 9400 Ward Parkway Kansas City, MO 64141
2 Nemadji Trail Energy Center REGULATORY PROCESS We Are Here PUBLIC WORKSHOP A public workshop is an opportunity to provide feedback and ask questions about the project. DRAFT ENVIRONMENTAL ASSESSMENT A draft environmental assessment (EA) reviews the potential effects a project might have on human and natural resources. PUBLIC COMMENT PERIOD After the draft EA is published, the public is allowed to comment on if the EA appropriately analyzed potential effects. FINAL ENVIRONMENTAL ASSESSMENT The Rural Utilities Service (RUS) will review and consider all comments received on the EA and modify the document before publishing a Final EA. RUS will either make a decision that they can sign a Finding of No Significant Impact or proceed with an Environmental Impact Statement (EIS).
3 PRELIMINARY RESOURCE LIST In the Environmental Assessment (EA) the Rural Utilities Service (RUS) will evaluate the project s potential effects on environmental resources, such as: Geology & Soils Wetlands Land Use Vegetation Surface & Ground Water Transportation Wildlife Floodplains Socioeconomics Special Status Species Water Resources Environmental Justice Cultural & Historic Resources Farmland Air Quality Visual Resources Health & Safety Noise
4 PURPOSE AND NEED Enable renewable energy Replace recently retired generation facilities Add new generating Ensure reliability and Nemadji Trail Energy Center capacity to the current resource mix resource adequacy during unforeseen events Support customer load Secure capacity and energy resources
5 COMBINED-CYCLE NATURAL GAS PLANT The Nemadji Trail Energy Center will generate megawatts. 1 megawatt powers ~1,000 homes. This facility captures waste heat to create steam that spins a second turbine. Natural Gas Fuel Supply Natural gas is burned to Steam Turbine Generators produce high-pressure, hightemperature gas that spins a turbine. Gas Turbine Energy from the turbines flows Transformer to a transformer and continues through the electric grid to power homes and businesses.
6 SHOVEL-READY PROJECT SITE The proposed project is located in an industrial area and has access to existing electrical and natural gas infrastructure. The project will require these additional components: Approximately seven-mile natural gas pipeline using existing right-of-way Approximately four-mile, 345kV transmission line parallel to existing right-of-way Approximately 10-acre substation associated with the transmission line
7 N PROPOSED FACILITY SITE Construction Laydown Construction Parking Relocated Transmission Lines Well Stormwater Pond Switchyard Sheet Pile Wall Office Trailers Steam Turbine Generator/Control Combustion Turbine Generator Gas Metering Well Aqueous Ammonia Storage Water Treatment Future Fuel Oil Storage Demin Water Storage Tank Service Water Storage Tank Cooling Tower Future Demin Water Storage Tank Well Well Old 11 Rd 31st Ave E Grand Ave Nemadji River N ALTERNATE FACILITY SITE Construction Entrance Road North 28th Street Hill Avenue Plant Entrance Road Construction Laydown Office Trailers Construction Parking Ammonia/Fuel Oil Pump Building Water Treatment Fuel Oil Storage Aqueous Ammonia Storage Service Water Storage Tank Demin Water Storage Tank Cooling Tower Switchyard Steam Turbine Generator/Control Gas Metering Combustion Turbine Generator
8 PROJECT SCHEDULE Permit Application Regulatory Engineering Operation Development/ Review & & Submittal Approval Construction Public participation/comment period.
9 Nemadji Trail Energy Center BENEFITS Largest private investment in Douglas County $ Over $1 billion in regional economic benefit over 20 years Create 260 jobs during peak construction and up to 25 full-time permanent jobs $ Artistic Rendering Approximately $1 million in local tax benefit
Project Location Village of Lordstown, Ohio
Project Location Village of Lordstown, Ohio Project Location 0 0.25 0.5 1 Miles Project Site Characteristics Potential Laydown Area Project Site Warehouse Laydown Area Laydown Area Electrical Route Utility
More informationNew 790-Megawatt Unit. Council Bluffs Energy Center
New 790-Megawatt Unit Council Bluffs Energy Center JUST THE FACTS Council Bluffs Energy Center s New 790-Megawatt Unit Background To ensure a long-term positive impact on Iowa's economy and a secure supply
More informationBEFORE THE OHIO POWER SITING BOARD
BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Table of Contents Page No. List of Figures... xii List of Tables... xiii List of Appendices...xv
More informationFERC approves Transco natural gas pipeline expansion
FERC approves Transco natural gas pipeline expansion HOUSTON, Nov. 22 11/22/2013 By OGJ editors Williams Partners LP has received approval from the US Federal Energy Regulatory Commission for the $300
More informationPublic Scoping Meeting
Public Scoping Meeting University of Connecticut Main Accumulation Area Presented by: Rich Miller, Director of Environmental Policy, UConn Erik Mas, Fuss & O Neill, Inc. May 1, 2013 Tonight s Agenda Welcome
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT
Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,
More informationBusiness Advisory Committee. July 12, 2016
Business Advisory Committee July 12, 2016 1 Today s Topics Approval of Meeting Minutes Cost Participation Adjusted Project Scope and Cost Estimate Recommendation Environmental Update 2 3 Cost Participation
More informationList of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...
BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Blue Creek Wind Farm Amendment Table of Contents Text sections that have been updated for
More informationNational Geospatial-Intelligence Agency (NGA) NEXT NGA WEST (N2W) Draft Environmental Impact Statement (DEIS)
National Geospatial-Intelligence Agency (NGA) NEXT NGA WEST (N2W) Draft Environmental Impact Statement (DEIS) NGA NEEDS A NEW CAMPUS NGA needs a modern campus for high-tech missions The current facility
More informationLOCATING NEW POWER LINES
Members of utilities, agencies, environmental groups and other civic groups jointly Please visit us today at / Macro corridors are used to focus data collection. A grid of 100-square foot cells Using higher
More informationSeptember 16, EQB Board Members. George Edwin Johnson EQB Staff
September 16, 2004 TO: FROM: SUBJECT: EQB Board Members George Edwin Johnson EQB Staff 651 296-2888 Two Permits for Mankato Energy Center (MEC) Site Permit (655 megawatt Large Electric Power Generating
More informationIsland Park Energy Center A Repowering of E.F. Barrett Power Station Informational Open House
Island Park Energy Center A Repowering of E.F. Barrett Power Station Informational Open House Project Proposal and Development Schedule Table Tripod Boards Project Proposal National Grid, under its current
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7 From: Date: Staff July 17, 2009 Council Meeting Subject: Florida Power and Light Company Riviera Beach Energy
More informationSUNDANCE 7 January 2014
Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location
More informationLorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department
Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Sept. 16, 2013, Lost Hills Recreation Building, Lost Hills Park, Highway 46, Lost Hills, CA 1. To Introduce the
More informationA proposed new gas-fired power station on the Wilton International site
TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant
More informationWelcome. Napanee Generating Station Jobs Information Session
Welcome Napanee Generating Station Jobs Information Session Napanee Generating Station Jobs Information Session Why are we here? To provide you with information regarding: Future employment opportunities
More informationMARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,
MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia 24148 May 8, 2018 MEETING OVERVIEW AND OBJECTIVES Introduce study
More informationCOMMUNITY OPEN HOUSE MANITOBA HYDRO BRANDON GENERATING STATION ENVIRONMENTAL LICENSE REVIEW PROCESS
COMMUNITY OPEN HOUSE MANITOBA HYDRO BRANDON GENERATING STATION ENVIRONMENTAL LICENSE REVIEW PROCESS Manitoba Hydro is conducting a review of the Brandon Thermal Generating Station Environmental License.
More informationInstitute for Energy and the Environment Vermont Law School Presenters: Matthew Stern Johnathan Hladik
Institute for Energy and the Environment Vermont Law School Presenters: Matthew Stern Johnathan Hladik Special Thanks to David Contrada and Danielle Changala Ag Efficiency: Good for the Farm, Good for
More informationFinal Environmental Impact Statement Volume 1 Cricket Valley Energy Project
Volume 1 Cricket Valley Energy Project Dover, Dutchess County, New York July 2012 Lead Agency: New York State Department of Environmental Conservation 625 Broadway Albany, New York 12233 Applicant: Cricket
More informationResponse to new york energy highway Request for InfoRmatIon
Response to new york energy highway Request for InfoRmatIon BY GENON ENERGY, INC. MAY 30, 2012 WWW.GENONBOWLINE.COM Contents Introduction Required Information Respondent Information Project Description
More informationTIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING
TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require
More informationWELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING
TIER 2 EIS MEETING December 3, 2003 WELCOME TO THE FEDERAL AVIATION ADMINSTRATION MEETING Slide 1 The Federal Aviation Administration would like to welcome you here and thank you for participating in today
More informationBureau of Land Management. Public Scoping Meeting
Bureau of Land Management Public Scoping Meeting June/July 2009 FINAL 6/22/09 1 NOTICE OF INTENT Federal Register / Vol. 74, No. 102 / Friday, May 29, 2009 / Notices DEPARTMENT OF THE INTERIOR Bureau of
More informationCOMBINED PUBLIC WORKSHOP/ PUBLIC HEARING
COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County
More informationElectric Utility Regulation, Energy Needs and Emerging Issues. Florida Energy Systems Consortium Summit
Electric Utility Regulation, Energy Needs and Emerging Issues Presentation to the: Florida Energy Systems Consortium Summit Mark Futrell Office of Strategic Analysis and Governmental Affairs Florida Public
More information1.4 Analysis of Alignment Alternatives
Parkway is 20.94 miles, with 8.16 miles in Orange County, 7.37 miles in Lake County and 5.41 miles in Seminole County. SR 46 Reconstruction and Realignment, which would begin at the SR 46/US 441 interchange
More informationBC Hydro Silverdale Substation Project Ensuring a Safe and Reliable Supply of Electricity to Mission For Generations
January 11, 2012 Committee of the Whole (Planning Committee) Agenda - Item 3(b) Document Distributed at Meeting BC Hydro Silverdale Substation Project Ensuring a Safe and Reliable Supply of Electricity
More informationNOTICE OF PREPARATION AND SCOPING MEETING
April 9, 2013 NOTICE OF PREPARATION AND SCOPING MEETING SUBJECT: Notice of preparation of a Draft Environmental Impact Report (DEIR) for the California Flats Solar Project. The County of Monterey will
More informationPLANT VOGTLE UNITS 3 AND 4
PLANT VOGTLE UNITS 3 AND 4 ZERO GREENHOUSE GASES Nuclear energy facilities release zero greenhouse gases while producing electricity. A single uranium pellet the size of a pencil eraser produces as much
More informationNotice of Availability of the Draft Environmental Impact Statement for the Mount
This document is scheduled to be published in the Federal Register on 12/02/2011 and available online at http://federalregister.gov/a/2011-30926, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,
More informationI-15/US 93 Garnet Interchange & US 93 Improvements WELCOME. Public Information Meeting October 6, 2016
I-15/US 93 Garnet Interchange & US 93 Improvements WELCOME Public Information Meeting October 6, 2016 Slide 1 What to Expect Tonight Project background Project goals Alternatives considered and proposed
More informationRECORD OF DECISION IMPLEMENTATION OF ENERGY, WATER, AND SOLID WASTE SUSTAINABILITY INITIATIVES FORT BLISS, TEXAS AND NEW MEXICO
RECORD OF DECISION IMPLEMENTATION OF ENERGY, WATER, AND SOLID WASTE SUSTAINABILITY INITIATIVES FORT BLISS, TEXAS AND NEW MEXICO April 2014 This page intentionally left blank RECORD OF DECISION FOR THE
More informationWelcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.
Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?
More informationAgenda. Welcoming Remarks. Roles of Key Players Involved. NEPA / HEPA Requirements. Description of Project. Questions and Answers.
Agenda Welcoming Remarks Roles of Key Players Involved NEPA / HEPA Requirements Description of Project Questions and Answers Comments Proposed Project Proposed Action The Army proposes to lease 10.3 acres
More informationIntegrated Resource Plan Public Advisory Group
Integrated Resource Plan Public Advisory Group Meeting 10 November 2, 2017 Overview on Public Advisory Process Welcome and Introduction Schedule Overview Meeting Agenda Overview of EPE s Public Advisory
More informationPlease sign in at the front desk and provide your contact information if you would like to receive project updates.
Community Meeting Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If you have
More information10.0 ENVIRONMENTAL INTEGRATION
10.0 ENVIRONMENTAL INTEGRATION Transportation projects in the Kansas City region commonly face a range of complex, interrelated environmental and community issues. These often relate to NEPA requirements
More informationGrassy Mountain Gold Project - Environmental Evaluation and Socioeconomic Study Draft Outlines & Preliminary Schedule
Grassy Mountain Gold Project - Environmental Evaluation and Socioeconomic Study Draft Outlines & Preliminary Schedule PRESENTERS: Adam Bonin and Alison Uno November 2017 Topics 01 02 Environmental Evaluation
More informationProject Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate
Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the
More informationI-20 East Transit Initiative
I-20 East Transit Initiative Open Houses Monday, June 24 6 7 PM: Open House 7 8 PM: Presentation & Q/A City of Atlanta Old Council Chambers Atlanta City Hall 55 Trinity Avenue Atlanta, GA 30303 Tuesday,
More informationSouth Platte River Watershed Study
South Platte River shed Study Burns Meeting January 25, 2017 Sponsored by the Laramie County Conservation District Funded by the Wyoming Development Commission Meeting Outline South Platte River shed shed
More informationwrexham energy centre and connections
wrexham energy centre and connections Plans for a new gas-fired power station on Wrexham Industrial Estate webbaviation www.wrexham-power.com To Wrexham Wrexham Industrial Estate KEY Our site on the Wrexham
More informationPublic Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District
Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,
More informationWelcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!
Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this
More informationAbeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015
Abeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015 Background Energy Culture, an indigenous integrated energy company,
More informationA. Introduction. A.1 Overview of the Proposed Project
Figure A-1, Regional Overview of the Liberty XXIII Renewable Energy Power Plant Project, shows the locations of the proposed power plant facility, transportation route from Interstate 10 (I-10), and the
More informationKaren, Best regards, *National Environmental Policy Act
From: Pell, Jerry To: 'karen_goebel@fws.gov' Cc: 'Tim Murphy' ; 'Richard Williams' ; Como, Anthony ;
More informationB.4 Preliminary Feasibility Cost Estimate
B.4 Preliminary Feasibility Estimate Introduction This section presents preliminary feasibility-level cost estimates for NODOS/Sites Reservoir Project Alternatives A, B, C, and D, described in Section
More informationI have received and reviewed the Site Permit Application dated November 2002, and per our conversation I am considering it a draft version.
December 2, 2002 Mr. Michael J. Donnelly Project Manager Stanley Environmental Inc. 2658 Crosspark Road Suite 100 Coralville, IA 52241 RE: Draft Site Permit Application EQB Dear Mr. Donnelly: I have received
More informationMassachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan
Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater
More informationOPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017
FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,
More informationCRESCENT DUNES PROJECT OVERVIEW
CRESCENT DUNES PROJECT OVERVIEW Andrew Wang Director of Development April 24, 2014 EXHIBIT I - LANDS Document consists of 14 pages. Entire exhibit provided. Meeting Date: 04-24-14 SOLARRESERVE OVERVIEW
More informationCRESCENT DUNES PROJECT OVERVIEW
CRESCENT DUNES PROJECT OVERVIEW Andrew Wang Director of Development April 24, 2014 SOLARRESERVE OVERVIEW Leading global developer of large-scale solar power projects and advanced solar thermal technology
More informationTHE PROJECT. What is happening? Why is this facility needed? Why did you choose this location?
THE PROJECT What is happening? - We are proposing to build a new solar farm on our property just south of the existing E.L. Smith Water Treatment Plant (at 3900 E.L. Smith Road). - If approved, the project
More informationAPPENDIX M COMMUNITY ENGAGEMENT
APPENDIX M COMMUNITY ENGAGEMENT Project Benefits Millbrook Community Wind The Future is Green Provincial Energy Independence This project will be one of many steps to fulfill Nova Scotia s goal of 40%
More informationFINAL DETERMINATION. To Grant a. Temporary Permit/Non-Attainment New Source Review Permit. For. Concord Steam Corporation.
FINAL DETERMINATION To Grant a Temporary Permit/Non-Attainment New Source Review Permit For Concord Steam Corporation To Construct a 305 MMBtu/hr Biomass Boiler (Wood & Natural Gas), 2 Auxiliary Boilers
More information2. Chilled Water Storage: A 4.4-million gallon chilled water storage tank improves Cornell s ability to meet peak cooling needs.
SECTION 018130 ENERGY MODELING GUIDELINES APPENDIX A Modeling the District Heating and Cooling Systems of Cornell University for LEED Projects PART 1: GENERAL 1.01 PURPOSE A. Cornell is continually improving
More informationA. Cornell s district energy systems include the following components:
SECTION 018130 ENERGY MODELING GUIDELINES APPENDIX A Modeling the District Heating and Cooling Systems of Cornell University for LEED Projects PART 1: GENERAL 1.01 PURPOSE A. Cornell is continually improving
More informationWashington Dulles International Airport EXECUTIVE SUMMARY
EXECUTIVE SUMMARY The events of September 11, 2001 and the economic uncertainties facing commercial aviation have affected the timing of the Proposed Action. The Metropolitan Washington Airports Authority
More informationAgenda NC Turnpike Authority 2008 Legislative Support Garden Parkway Draft EIS Stakeholder Involvement Major Milestones The Recommended Alternative Wh
The Garden Parkway (Gaston East West Connector) The Draft EIS is Complete What Does It Mean, Where Do We Go From Here? Charlotte Chamber SouthWest Chapter May 5, 2009 Agenda NC Turnpike Authority 2008
More informationABENGOA SOLAR Solar Power for a Sustainable World
Farming the Sun: the Solana Generating Station Project Presented to: The American Society of Farm Managers and Rural Appraisers 27 February 2009 Tempe, AZ Index 1 A Little About Abengoa Solar 2 3 The Time
More informationNotice of Availability of the Draft Environmental Impact Statement for the. Converse County Oil and Gas Project, Converse County, Wyoming
This document is scheduled to be published in the Federal Register on 01/26/2018 and available online at https://federalregister.gov/d/2018-01320, and on FDsys.gov 4310-22 P DEPARTMENT OF THE INTERIOR
More information1.0 INTRODUCTION 1.1 SUMMARY OF SEQRA PROCESS
1.0 INTRODUCTION This is prepared for the Jericho Rise Wind Farm (hereafter, the Project ) pursuant to the New York State Environmental Quality Review Act (SEQRA) and its implementing regulations, 6 NYCRR
More informationCounty Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012
: CR 3 (Excelsior Boulevard) WELCOME November 1, 2012 Highway Traffic Noise Facts & FAQs Why is traffic noise analyzed? In 1972, US Congress passed legislation to provide mitigation for exterior highway
More informationA LEADER IN UTILITY SOLAR POWER TOWER WITH STORAGE
A LEADER IN UTILITY SOLAR POWER TOWER WITH STORAGE SOLARRESERVE JULY 2016 Copyright 2016. SolarReserve, LLC. All rights reserved. SolarReserve The Leading Solar Project Developer More than 3.1 GW of Concentrating
More informationCONNECTING. Big Chino Valley Pumped Storage Project. Energy Infrastructure
CONNECTING Energy Infrastructure Big Chino Valley Pumped Storage Project Brian Studenka, Director, ITC Grid Development Andrew Jamieson, Regulatory Counsel, ITC Kim Goodnight, Regional Manager, Community
More informationMinnesota State Permitting Process for Large Wind Energy Conversion Systems
Minnesota State Permitting Process for Large Wind Energy Conversion Systems Deborah Pile, supervisor Energy Facility Permitting Office of Energy Security Minnesota Department of Commerce Minnesota Energy
More informationElectric Resource Planning. City Commission Target Issues Workshop May 19, 2004 Part 1 of Presentation
City Commission Target Issues Workshop May 19, 2004 Part 1 of Presentation Questions to be Considered How much energy will our customers use in the future? Will we be able to meet the projected energy
More informationAddison Natural Gas Project
0 Addison Natural Gas Project Addison County Regional Planning Commission November 14, 2012 Outline Vermont Gas The Addison Natural Gas Project Overview Route Design Town Benefits Route Sections ACRPC
More informationProject siting. Lanfine. Wind resource assessment. Wind Power Project
Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction
More informationChapter 5 Renewable Energy. Helping to Sustainably Power the Town of Veteran into the Future
Chapter 5 Renewable Energy Helping to Sustainably Power the Town of Veteran into the Future VISION: The Town of Veteran understands the potential to diversify their energy mix and is encouraging the deployment
More informationNotice of Intent to Prepare an Environmental Impact Statement for the. Proposed Upland Pipeline in Williams, Mountrail, and Burke Counties,
This document is scheduled to be published in the Federal Register on 04/15/2016 and available online at http://federalregister.gov/a/2016-08638, and on FDsys.gov Billing Code: 4710-09 DEPARTMENT OF STATE
More informationWelcome Mohawks of the Bay of Quinte
Welcome Mohawks of the Bay of Quinte Napanee Generating Station Open House Napanee Generating Station (NGS) Open House Objective: Introduce the proposed NGS, the Environmental Review process and the NGS
More information1.4. Wrexham Power Limited has employed a project team comprising:
Wrexham Power Limited Proposed Wrexham Energy Centre Project summary INTRODUCTION 1.1. Wrexham Power Limited is promoting the development of a new gas fired power station at Wrexham in North Wales. The
More informationThermal Performance Training Course Outline
Introduction Company Backgrounds Resources (cards, websites, what we do) Instructor Backgrounds Student Introduction (pass around sign up) Class Layout and Overview - Schedule Class Purpose Why? Talk about
More informationI-20 East Transit Initiative
I-20 East Transit Initiative Technical Advisory Committee (TAC) Meeting June 11 th, 2013 Introductions Purpose of Today s Meeting Project Review Preliminary Environmental Findings Next Steps Project Status
More informationOakland International Airport Airport Perimeter Dike Improvement
Oakland International Airport Airport Perimeter Dike Improvement Environmental Assessment and Initial Study Public Scoping Workshop January 13, 2011 5:30 to 6:30 PM Oakland International Airport, Terminal
More informationNotice of Availability of the Final Environmental Impact Statement for the Monument
This document is scheduled to be published in the Federal Register on 06/24/2016 and available online at http://federalregister.gov/a/2016-15023, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau
More informationWind Powering America Clean Energy for the 21st Century
Wind Powering America Clean Energy for the 21st Century What is wind energy? How much energy can wind supply? Can wind power my home? What are the environmental benefits? How do wind turbines work? Is
More informationSouthern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015
Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015 Awareness of the Master Plan Recommendations (Proposed Action) Understanding of the Environmental Assessment (EA) purpose and content
More informationEnvironmental Workshop Presentation
OAK HILL PARKWAY (US 290 / SH 71) Environmental Workshop Presentation June 23, 2016 6 8 PM Oak Hill United Methodist Church Fellowship Hall OAK HILL PARKWAY (US 290 / SH 71) Environmental Workshop SCIENCE
More informationDairyland Power Cooperative: CapX 2020 Hampton-Rochester-La Crosse. ACTION: Notice of Intent to Extend Public Comment Period for a Draft Environmental
This document is scheduled to be published in the Federal Register on 01/17/2012 and available online at http://federalregister.gov/a/2012-00705, and on FDsys.gov DEPARTMENT OF AGRICULTURE Rural Utilities
More informationMinnesota Energy Facility Permitting
Minnesota Energy Facility Permitting Large Wind Energy Conversion Systems Large Electric Power Generating Plants High Voltage Transmission Lines Pipelines Wind Development In Minnesota 1,299 MW in Minnesota.
More informationPteragen Canada Inc.
Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,
More informationNorthwest State Route 138 Corridor Improvement Project
Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816
More informationEnvironmental Considerations: Renewable and Conventional Power Plant Siting
Environmental Considerations: Renewable and Conventional Power Plant Siting 2 Environmental Considerations Acronym Glossary BLM Bureau of Land Management CatEx Categorical Exclusion CAA Clean Air Act CEQ
More informationDraft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements
JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN
More informationNotice of Intent to Prepare a Draft Environmental Impact Statement for the
BILLING CODE: 3720-58 This document is scheduled to be published in the Federal Register on 02/10/2017 and available online at https://federalregister.gov/d/2017-02779, and on FDsys.gov DEPARTMENT OF DEFENSE
More informationTable of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation
Table of Contents Acronyms and Abbreviations Secretary s Certificate on the EENF Executive Summary 1 Introduction and Background... 1-1 1.1 Introduction... 1-1 1.2 Project Summary... 1-2 1.3 Permits and
More informationWELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet
WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4G From: Date: Subject: Staff May 16, 2008 Council Meeting Intergovernmental Coordination and Review Log The
More informationSolar Power and the Future. Bryan Whitcomb General Manager, Solar Star Project October 18, 2016
Solar Power and the Future Bryan Whitcomb General Manager, Solar Star Project October 18, 2016 Topics Covered Berkshire Hathaway Energy (BHE) introduction Solar Technologies Photovoltaic (PV) and Concentrated
More informationAberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE
Aberdeen Airport Drainage Study Todd Yerdon, PE Al Erickson, PE INTRODUCTIONS Project Background In 2009, HDR was hired to provide a drainage study for the Aberdeen Airport as part of an Environmental
More informationCity of Medora, ND Wastewater Infrastructure Needs Assessment November 2012
City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and
More informationSACRAMENTO LOCAL AGENCY FORMATION COMMISSION 1112 I Street, Suite #100 Sacramento, California (916)
SACRAMENTO LOCAL AGENCY FORMATION COMMISSION 1112 I Street, Suite #100 Sacramento, California 95814 (916) 874-6458 December 1, 2004 TO: FROM: RE: Sacramento Local Agency Formation Commission Peter Brundage,
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL DRAFT M E M O R A N D U M To: Council Members AGENDA ITEM 4I From: Date: Staff June 22, 2007 Council Meeting Subject: Florida Power & Light Company Ten Year Power
More informationQUESTIONS: BASED UPON THE FACTS PRESENTED ABOVE, TAXPAYER REQUESTS ADVISEMENT ON THE FOLLOWING ISSUES:
Executive Director Leon M. Biegalski QUESTIONS: BASED UPON THE FACTS PRESENTED ABOVE, TAXPAYER REQUESTS ADVISEMENT ON THE FOLLOWING ISSUES: 1. ARE THE LABOR AND OTHER SERVICES ASSOCIATED WITH THE CONSTRUCTION
More information