1 Response to new york energy highway Request for InfoRmatIon BY GENON ENERGY, INC. MAY 30,
2 Contents Introduction Required Information Respondent Information Project Description Bowline 3 Generation Project Project Justification Financial Permit/Approval Process Other Considerations if Applicable Additional Information Property Projected In-Service Date and Project Schedule Interconnection Technical Construction Operational Socio-Economic Financial Environmental Project Contract / Request for Proposal (RFP) Status Public Outreach and Stakeholder Engagement Appendix Appendix A: Bowline site--current aerial overview photo Appendix B: Bowline 3 Construction Site Current Aerial Photo Appendix C: Conceptual Layout of Bowline 3 Appendix D: Conceptual Bowline 3 Facility Profile
3 Introduction GenOn Energy, Inc. ( GenOn ) through one of its indirect subsidiaries is pleased to participate in the State of New York s Energy Highway Request for Information ( RFI ). GenOn intends to offer attractive solutions to New York s energy challenges. Our proposal focuses on developing a clean generating power project at our existing GenOn Bowline Station, a brownfield site in Haverstraw, New York. In addition to our proposal for the Bowline site, we are eager to work with New York to also develop a project at our GenOn Lovett location, a developable brownfield site in Stony Point, New York. Each of these sites is located near existing interconnection infrastructure and is ideal for serving the energy needs of the downstate and Lower Hudson Valley regions. Both Bowline and Lovett present unique opportunities to deliver safe, affordable, and reliable energy for New York State. We are willing to tailor our projects to meet the needs of the State and look forward to engaging in a partnership that will serve the interests of the State with our projects. Required Information Respondent Information GenOn Energy, Inc. (NYSE: GEN) is one of the largest competitive generators of wholesale electricity in the United States, with power generation facilities located in key regions of the country and a generation portfolio of approximately 23,700 megawatts. GenOn has approximately 3,400 employees and is headquartered in Houston, Texas. GenOn s portfolio of power generation facilities consists of 47 stations in 12 U.S. states and includes baseload, intermediate and peaking units using coal, natural gas and oil to generate electricity. The company has owned and operated electric generation facilities in the state of New York since Currently, GenOn owns and operates the Bowline generation facility in Haverstraw, New York, which consists of two natural gas/oil units with a combined nominal capacity of 1,139 MW and owns the Lovett site located in Stony Point, New York. Maintaining a strong organizational focus on safety and the environment is a core value at GenOn. The company is committed to a fleetwide "Zero Incident Culture and strives to ensure that appropriate resources and training are provided at all levels of the enterprise in order to consistently achieve industry-leading safety performance. GenOn uses a comprehensive environmental management system, integrating environmental considerations into business operations and strategy. The company fosters a culture of continuous improvement, always driving for better, more effective, more efficient environmental performance. GenOn possesses significant experience and capabilities in the development of new power generation stations. Since the late 1990s, GenOn has successfully developed over 12,000 megawatts of natural gas-fired simple cycle and combined cycle power generation facilities throughout the United States. GenOn s development capabilities are comprehensive and include permitting, engineering, procurement and construction (EPC) management, project financing, and plant operations. The company also has extensive experience with 1
4 a wide range of power generation technologies (e.g., GE, Siemens, Mitsubishi, and Alstom) and both wet and dry cooling equipment. GenOn has successfully developed power plants on greenfield sites as well as redeveloped existing brownfield sites to host new generation assets. A recent example of GenOn s brownfield development experience is the Marsh Landing Generating Station located just outside of San Francisco, California. This 760 megawatt peaking facility is being built near GenOn s existing Contra Costa generating units, which are scheduled for retirement in This brownfield development project was specifically designed to maximize the use of existing site infrastructure such as natural gas pipelines and electric transmission lines, enabling the state of California to preserve greenfield sites for other development needs or as open space. Marsh Landing's output is fully contracted to California utility Pacific Gas and Electric Company (PG&E) under a long-term tolling agreement. The project benefited from a very efficient development and permitting schedule, with less than 2 1/2 years from the initial permit application to the start of construction. This highly successful project included full permitting as well as contracting for procurement of power island equipment and fullwrap, fixed-price EPC services. The estimated cost of the Marsh Landing project is approximately $700 million. Funding for the project consisted of a combination of GenOn equity and a bank debt facility arranged by GenOn. Questions or requests for additional information regarding this Energy Highway RFI response document may be addressed to: Mr. Gary Kubik Vice President Northeast GenOn Energy, Inc. President GenOn Bowline, LLC 140 Samsondale Avenue West Haverstraw, New York (832) gary.kubik@genon.com Project Description Bowline 3 Generation Project GenOn is pleased to submit for consideration as part of New York s Energy Highway initiative our proposal for "Clean Gen on the Hudson" the Bowline 3 generation project. Upon the finalization of commercial arrangements with the State, and the construction that would follow, Bowline 3 will be a highly efficient, clean, 2 x 1 combined cycle gas turbine (CCGT) electric generating station in the town of Haverstraw, New York (Rockland County, NYISO Zone G). The capacity of this new facility will be approximately 775 MW (ISO). Bowline 3 is a brownfield development project that will be built adjacent to existing Bowline Units 1 and 2 on approximately 25 acres of previously-cleared land. 2
5 The Bowline 3 CCGT will use efficient combustion turbine technology and will have stateof-the-art emissions control equipment. The primary fuel for Bowline 3 will be natural gas. If desired, Bowline 3 could utilize ultra-low sulfur #2 diesel fuel as a backup fuel source. Natural gas will be delivered to Bowline 3 via an existing 4.2 miles of 24-inch diameter natural gas pipeline lateral, which connects directly to the Millennium pipeline. The pipeline lateral is capable of delivering 12,000 mmbtus of natural gas per hour to Bowline, which is more than sufficient to support operation of the planned new unit. Bowline 3 will use a state-of-the-art Air Cooled Condenser (ACC) unit to handle the cooling portion of its steam cycle. Air cooling will reduce overall plant water requirements by approximately 95% when compared to traditional wet cooling. Bowline 3 will not require intake structures on, nor require water from, the Hudson River. Consumptive water used by Bowline 3 will be obtained via available local supplies. Safe and affordable electricity generated by the Bowline 3 facility will be delivered to the grid via a 345 kv transmission line. This new line, approximately 7 miles in length, will commence at the existing Bowline switchyard and will be constructed on land or easements owned by GenOn as well as utility rights-of-way owned by Orange & Rockland (O&R). The line will connect to the bulk electric grid at O&R s Ladentown substation located in the town of Ramapo, NY. A key attribute of Bowline 3 is its emphasis on brownfield development. The project will repower the current Bowline facility through the extensive reuse of existing and unutilized assets, including: A previously-cleared, shovel-ready site immediately adjacent to the existing Bowline generation units; A 24-inch natural gas pipeline lateral; A river terminal facility for delivery of ultra-low sulfur diesel #2 fuel oil to the facility via marine barge (if a dual fuel option is desired); A fuel oil storage tank for on-site storage of up to 140,000 barrels of ultra-low sulfur diesel #2 fuel oil (if a dual fuel option is desired); Land and easements owned by GenOn as well as existing utility rights-of-way for transmission interconnection; NOx and VOC emissions reduction credits (ERCs) in GenOn s current inventory to support the operation of the new Bowline 3 facility plus a pending application for PM 2.5 ERCs to complete the portfolio of ERCs required for the issuance of an air permit for the Bowline 3 project. The actual project schedule and estimated in-service date for Bowline 3 will be driven by the Governor's Energy Highway process. GenOn is confident that Bowline 3 can be online within 3 ½ years of receipt of final regulatory and contractual approvals. GenOn recognizes an opportunity for public-private collaboration to secure the future of this project. 3
6 GenOn will procure state-of-the-art combustion turbines, heat recovery steam generators, steam turbine, air cooled condenser, and balance-of-plant equipment for the construction of Bowline 3. These technologies are widely available in the marketplace and have strong, well-documented performance track records. GenOn will seek to utilize qualified providers of equipment, materials and services located in the New York State region where possible and practical. Project Justification Bowline 3 addresses key objectives and goals of the New York Energy Highway initiative as enumerated in the RFI. 1. OBJECTIVE: Reduce constraints on the flow of electricity to, and within, the downstate area; and expand the diversity of power generation sources supplying downstate. Assure that long-term reliability of the electric system is maintained in the face of major system uncertainties. Downstate New York, and the Lower Hudson Valley in particular, faces the possibility of significant near-term retirements of generating capacity due to weak market conditions and pending environmental regulations. These retirements threaten to jeopardize electric grid reliability in this critically important region of New York's bulk electrical system. Bowline 3, as an efficient CCGT facility capable of operating at a high capacity factor, will provide the replacement voltage support and power necessary to deliver safe and affordable grid reliability in the Lower Hudson Valley region. Maintaining voltage levels in the Lower Hudson Valley is critical to optimizing New York s ability to transfer energy efficiently to, and within, the downstate region, which is the largest driver of the statewide economy. 2. OBJECTIVE: Encourage development of utility-scale renewable generation resources throughout the State. As New York adds more renewable generation, the intermittent nature of these power resources will create challenges for system operators seeking to maintain a constant balance between load and generation. In this instance, the burden of maintaining system reliability will fall increasingly on the flexible operation of well-located thermal generation units. Bowline 3, as a state-of-the-art CCGT unit, will provide operational flexibility and load-following capability that will contribute to safe and affordable grid reliability and facilitate the transfer of renewable energy to the downstate region. This capability will be especially critical if high capacity factor, baseload generation units currently serving the downstate region are removed from the generation mix. 3. OBJECTIVE: Increase efficiency of power generation, especially in densely populated urban areas. As a CCGT unit with an ISO heat rate of approximately 6,800 mmbtu/kwh and designed to burn low-cost natural gas, Bowline 3 will be much more efficient and environmentally friendly than the older, less efficient gas/oil boiler units, which constitute 4
7 a large proportion of the downstate generation fleet. Bowline 3 s streamlined permitting status and high capacity factor operation will allow for the displacement or later re-powering of older, less efficient units, including those located in densely populated urban areas, and result in lower overall emission levels in New York. Moreover, as a brownfield development project, Bowline 3 will be an efficient and cost-effective alternative to the development of new sites and requisite interconnections in congested urban and suburban areas as well as to the long-distance delivery of energy over already-congested transmission lines. 4. OBJECTIVE: Create jobs and opportunities for New Yorkers. Bowline 3 is expected to create 700 skilled construction jobs and approximately 25 high-quality, permanent jobs for personnel to operate the plant once it is completed. The project will also support hundreds of local jobs among vendors and suppliers. In addition, Bowline 3 will play an integral role in securing safe and affordable grid reliability for the region, spurring additional job creation and economic development. 5. OBJECTIVE: Contribute to an environmentally sustainable future for New York State. Bowline 3 will be outfitted with state-of-the-art technology designed to protect environmental quality for Haverstraw, the region and the Hudson River. The integration of air cooling technology will eliminate any environmental impact on the Hudson River and reduce overall plant water requirements by approximately 95% when compared to traditional wet cooling. In addition, highly-efficient, clean, state-of-the-art combustion turbine generation technology will be minimally impactful on local air quality. Brownfield development projects such as Bowline 3, by definition, minimize impacts on the environment and the surrounding community. Financial GenOn intends to fund Bowline 3 with a combination of equity and long-term project financing debt. Given this, the commercial arrangements must allow for the project to be financeable. To construct Bowline 3, GenOn will procure state-of-the-art technologies and EPC services from leading manufacturers and providers. Equipment and services of this type are long lead time items and must be ordered well in advance of breaking ground. Having developed and constructed over 12,000 MW of gas-fired power plants in the United States, GenOn is very experienced in managing the price and schedule risks typically associated with complex infrastructure construction projects. Permit/Approval Process GenOn has made significant progress in its permitting effort for Bowline 3 and is actively carrying forward efforts to reflect design enhancements that will improve the environmental qualities of the project. These enhancements include improved turbine technology and converting from wet cooling to dry cooling. Because Bowline 3 has progressed favorably with the State and because the proposed changes benefit the environment, GenOn believes Bowline 3 will not face material permitting uncertainties and can quickly satisfy State permitting requirements. 5
8 Substantive local permitting provisions will be addressed with the Article X Certificate. Finally, GenOn will pursue required federal permits, if any. Other Considerations if Applicable NYISO Transmission Queue: GenOn has recently submitted to New York Independent System Operator (NYISO) an application to connect Bowline 3 to the New York transmission grid. We are concerned that the many uncertainties currently facing New York's electrical system (e.g., pending generator retirements and proposed upgrades to the NYISO transmission system) may complicate NYISO s ability to evaluate the impact of interconnecting new generation projects. GenOn is requesting close and careful coordination between Governor Cuomo's Energy Highway Task Force and NYISO in order to ensure that the potential transmission system impacts of high-potential projects currently in the transmission queue are able to be evaluated in a timely fashion. New Generation at Lovett Site: The information in this RFI response addresses the potential for new generation at GenOn s existing Bowline site. In addition, GenOn is evaluating several options for the addition of new generation at the GenOn Lovett site. The Lovett site is on the Hudson River in Stony Point, New York approximately 5 miles north of Bowline. Formerly the site of coal and natural gas generation units, Lovett is now a completely cleared brownfield site consisting of approximately 58 developable acres. The site is located on the high demand side of major New York transmission constraints and is close to major natural gas pipelines and electric transmission lines. Overall, Lovett is a highly attractive location for the construction of new generating units, and GenOn is evaluating which of several new generation configurations (e.g., combined cycle or peaking units) it will seek to permit at Lovett. GenOn welcomes the opportunity to discuss with New York officials the type of new generation at Lovett that will best fit the needs of the Energy Highway initiative. Recommended Evaluation Criteria: In order to provide maximum benefit to New York energy consumers, we recommend that the State of New York, when evaluating projects for inclusion in the Energy Highway initiative, give priority consideration to projects that demonstrate the following characteristics: 1. Emphasis on brownfield development Projects that use existing power generation sites, gas and electric transmission infrastructure and rights-of-way, emissions credits, and fuel supply and storage infrastructure will enable the state of New York to achieve the goals of the Energy Highway initiative in a manner that is cost-effective, low risk, and minimally impactful on local communities and the environment. 2. High executability The New York Energy Highway initiative seeks to identify projects that can provide reliable power to the state's consumers for the next half-century. As such, New York should prioritize projects that: a. Rely on proven, widely available technologies; b. Are backed by financially-sound and committed sponsors with a proven track record of permitting, constructing, financing, owning, and operating similar projects; and 6
9 c. Provide certainty of execution that result from the presence of existing site infrastructure, the availability of gas and electric interconnections, and a beneficial location within the transmission system. 3. Capable developers, operators and owners A key goal of the Energy Highway initiative is to maximize the role of private investment in developing new energy infrastructure in New York. In general, New York should seek to partner with private companies that possess strong balance sheets, have excellent reputations within the banking community, and are willing to and capable of making financial commitments to the projects that they propose for inclusion in the Energy Highway initiative. Additional Information Property The site on which Bowline 3 will be constructed is part of the existing Bowline generation facility and is owned by a wholly-owned, indirect subsidiary of GenOn Energy, Inc. In general, the Bowline 3 site is ideally suited for large-scale construction and efficient operations that minimize the facility s impact on neighboring communities given the following site characteristics: The Bowline 3 site has already been cleared, which will allow for the immediate commencement of foundation and other construction-related work; Marine barges carrying heavy equipment have easy access to the site given Bowline 3 s direct frontage on the Hudson River; The plant s existing bulkhead dock on Bowline Pond (which opens directly to the Hudson River) allows for safe, efficient unloading of heavy equipment delivered to the site via marine barge; Bowline 3 is located within 1 mile of CSX rail siding, which provides an additional means of delivering other equipment to the site; Fuel is supplied to the site by an existing, fully permitted, 24 inch natural gas pipeline on property either owned by GenOn or part of existing utility rights of ways or easements granted to GenOn; and Power from the site can be delivered to the electrical grid via a 345 kv transmission interconnect to be constructed on property either owned by GenOn or part of existing utility rights of ways or easements granted to GenOn. 7
10 Projected In-Service Date and Project Schedule The actual project schedule and estimated in-service date for Bowline 3 will be driven by the time frame of the Energy Highway process and achieving all regulatory and contractual approvals. The indicative schedule below is based on GenOn s recent development experience with new generating units of similar size and technology as Bowline 3. The schedule demonstrates that all required steps to reaching commercial operation of Bowline 3, including project financing, will be achieved within 3 1/2 years of final regulatory and contractual approvals. Bowline 3 Indicative Schedule Months Regulatory/Contractual Approvals Financing Finalize Engineering & Order Equipment Construction Testing and Commissioning Commercial Operations Months Interconnection Connecting the highly efficient Bowline 3 to the electrical grid at a location that is on the high-demand, high-price side of major New York transmission system constraints (e.g., the East-West and UPNY-SENY interfaces) will provide economic benefits to New York consumers and will mitigate reliability impacts that may result from generator retirements in downstate New York in general and in the Lower Hudson Valley in particular. GenOn also believes that connecting to the grid downstream of major points of constraint will minimize overall system upgrade costs required to make Bowline 3 s energy and capacity deliverable to the bulk electric system. Technical As is customary for high-value projects of this nature, GenOn will seek comprehensive warranties for two years or more on all equipment, materials, and workmanship utilized during the construction process. The anticipated design life of CCGT facilities such as Bowline 3 is at least 30 years. Construction GenOn development projects typically provide attractive opportunities for local manufacturers, assemblers, construction firms, and workers. GenOn will seek to utilize qualified providers of equipment, materials, and services located in the New York State region where possible and practical. To facilitate the financing of a project such as Bowline 3, GenOn typically seeks to execute a full-wrap, fixed-price, date-certain, turnkey EPC contract with an experienced, nationally recognized firm. This type of contract benefits project owners and lenders because it provides an attractive combination of cost efficiency, schedule certainty, and performance guarantees. 8
11 Having owned and operated electric generation facilities in New York since 1999, GenOn is very familiar with issues related to the local availability of labor, materials, and installation equipment. In general, we anticipate that the Bowline 3 project will be built utilizing a skilled unionized workforce in a manner similar to other construction projects that GenOn is currently executing in other parts of the country. Depending on market conditions at the time construction commences, we believe that skilled, unionized labor will be available in sufficient quantities, either locally or from neighboring regions, to execute the project in a cost-effective and timely manner. GenOn historically has enjoyed good relations with building and construction trades groups. The ongoing construction of the company s Marsh Landing plant in California, for example, has benefited substantially from the highlyproductive, quality-focused efforts of numerous building and construction trades groups working on the project. Operational GenOn has significant experience with the ownership and operation of power generation facilities that contain explicit guarantees related to project availability and performance. Although GenOn is not yet aware of the exact structure that New York will offer in support of Energy Highway projects, it is our expectation that such structures will require Bowline 3 to operate at a high level of availability and performance. GenOn has a strong, company-wide commitment to safety. We promote a safe and healthful work environment, communicate safety issues, use safe work practices and provide ongoing safety training for our employees. For both construction projects and plant operations, GenOn maintains a comprehensive safety program and manual that together set a high standard for safety. In addition, we require that all our contractors commit to a set of safety procedures that are at least as rigorous and comprehensive as our own. Bowline 3 will also maintain a comprehensive plan for addressing emergency situations. In addition, we expect to contract with local entities to provide emergency response services to the plant. Socio-Economic The construction and operation of major infrastructure projects such as Bowline 3 typically provide a variety of economic benefits to the communities in which they are located. These benefits typically include the provision of well-paying jobs, tax revenue, and other forms of associated community benefits and economic development. Although construction plans remain to be finalized, projects of similar size and type as Bowline 3 are capable of creating up to 700 skilled construction jobs during the plant construction period and up to 25 high-quality, permanent jobs for personnel to operate the plant once it is completed. In addition, Bowline 3 will support hundreds of other local jobs among vendors and suppliers. As is typical for projects of this type, GenOn will seek to negotiate a PILOT (Payment in Lieu of Taxes) agreement that will represent a long-term source of revenue for the town government and the local school district. Besides assisting the local community by maintaining a stable tax base, a PILOT agreement is required to stabilize the project s long-term operating costs, which in turn is a prerequisite for GenOn to arrange a debt financing package for the project. 9
12 As part of the Bowline 3 project, GenOn will seek to continue its past track record of being an active and engaged community partner. Bowline Generation Station employees currently volunteer time and provide financial support to several community causes in Rockland County. These meaningful contributions will continue to benefit local organizations whose work advances and/or promotes health, welfare, education, economic development, or other important public interests within the local community. As a brownfield development project, Bowline 3 will minimize impacts in areas typically of concern to the local community, particularly when compared to projects utilizing greenfield sites. While we continue to investigate the impact of the proposed project, at this time GenOn does not believe that adding a third generation unit to the existing Bowline facility will have negative implications; rather, the facility will be a boon to the economic development of the area and the facility will contribute to revitalization and continued improvements in the community - the goals of a smart growth policy. Financial Please see the response provided under the Financial heading in the "Required Information"section of this document. Environmental Brownfield development projects such as Bowline 3, by definition, minimize impacts on the environment and the surrounding community. From an air emissions standpoint, the highly-efficient, clean, state-of-the-art combustion turbine generation technology that will be utilized by Bowline 3 will provide important environmental benefits to the surrounding region and the state of New York. Given Bowline 3 s high efficiency, GenOn anticipates that the plant will be dispatched ahead of older, less efficient, less clean generation units in the downstate region. This displacement of higher emissions units will constitute a net benefit to the region s air quality. Bowline 3's CO2 performance will also exceed that of units it will displace. Bowline 3 will also benefit New York s water resources. For example, we anticipate that Bowline 3 will displace the operation of once-through-cooled units in downstate New York. Adding to Bowline 3 s beneficial impact on water resources is the fact that the unit s use of dry cooling will not require cooling water discharges and therefore will not produce aquatic ecology impacts to the Hudson River from such discharges. When the Bowline 3 site was cleared and prepared for construction, a small federal wetland (which was identified as part of the U.S. Army Corps of Engineers approval) was relocated. Beyond this, GenOn expects that any additional ecological impacts will be minimal given that the site is essentially shovel-ready. GenOn does not anticipate that the project will require any significant additional mitigation measures. Project Contract / Request for Proposal (RFP) Status The Bowline 3 project has not been submitted to any New York State agency or authority in response to a request for proposals (RFP). 10
13 Public Outreach and Stakeholder Engagement GenOn seeks to be an active and engaged partner in all of the communities across the United States where we own and operate generation assets or seek to execute development projects. As an essential component of the Bowline 3 project, GenOn will seek to identify key stakeholder groups and affected individuals. The company will also seek to develop a comprehensive public outreach and information program designed to ensure that stakeholders understand the important benefits that the project will provide to the state of New York and to the surrounding community. This program will provide ample opportunities for members of the public to ask questions and discuss concerns that they may have about the project. 11
14 Appendix 12
15 appendix a: Bowline site--current aerial overview photo 13
16 Appendix B: Bowline 3 Construction Site Current Aerial Photo 14
17 Appendix C: Conceptual Layout of Bowline 3 15
18 Appendix D: Conceptual Bowline 3 Facility Profile 16
Island Park Energy Center A Repowering of E.F. Barrett Power Station Informational Open House
Island Park Energy Center A Repowering of E.F. Barrett Power Station Informational Open House Project Proposal and Development Schedule Table Tripod Boards Project Proposal National Grid, under its current
More informationNew York Energy Highway: Response to Request for Information
Mr. Gil C. Quiniones President and Chief Executive New York Power Authority 123 Main St. 16 th Floor White Plains, N.Y. 10601-3170 May 30, 2012 RE: New York Energy Highway: Response to Request for Information
More informationEDP Renewables North America
Response to New York Energy Highway RFI May 30, 2012 EDP Renewables North America Additional shunt stations and substations from Marcy to New Scotland Respondent Information EDP Renewables North America
More informationRequest for Information. May Milk Street, Suite Market Street Boston, MA Dover Plains, NY
Request for Information May 2012 Corporate Office: Community Office: 31 Milk Street, Suite 1001 5 Market Street Boston, MA 02109 Dover Plains, NY 12522 617-456-2210 845-877-0596 Table of Contents Executive
More informationBeacon Power, LLC Response to the New York Energy Highway Request for Information (RFI) May 30, 2012
Beacon Power, LLC Response to the New York Energy Highway Request for Information (RFI) May 30, 2012 RESPONDENT INFORMATION Beacon Power, LLC ( Beacon Power or the Company ), a manufacturer and merchant
More informationTHE LUYSTER CREEK ENERGY PROJECT M AY 3 0,
A S T O R I A THE LUYSTER CREEK ENERGY PROJECT M AY 3 0, 2 0 1 2 Existing Astoria Facility Introduction The Luyster Creek Energy Project The Luyster Creek Energy Project (LCEP) is a state-of-the-art repowering
More informationProgress Report Study Approach and Assumptions
Progress Report Study Approach and Assumptions Presentation to NYISO Installed Capacity Working Group Christopher D. Ungate, Senior Principal Consultant March 1, 2013 Topics Update on technology screening
More informationEDP Renewables North America
Response to New York Energy Highway RFI May 30, 2012 EDP Renewables North America Build new 345kV line from north country Respondent Information EDP Renewables North America LLC ( EDPRNA formerly Horizon
More informationBefore the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.
Direct Testimony Mark Lux Before the Public Utilities Commission of the State of South Dakota In the Matter of the Application of Black Hills Power, Inc. For the Phase In of Rates Regarding Construction
More informationWritten Statement of Thomas Rumsey Vice President External Affairs New York Independent System Operator
Written Statement of Thomas Rumsey Vice President External Affairs New York Independent System Operator Senate Energy and Telecommunications Committee Senator George D. Maziarz, Chairman Public Hearing
More informationHydrostor Terra TM. Advanced Compressed Air Energy Storage
Hydrostor Terra TM Advanced Compressed Air Energy Storage Hydrostatic pressure naturally created by water at depth makes Hydrostor Terra TM one of the cleanest, most economical bulk energy storage solutions
More informationIntroduction. Upstate New York Power Producers Response to New York Energy Highway Request for Information
Introduction The bondholders of AES Eastern Energy are preparing to take ownership of the Somerset and Cayuga power plants following the parent company filing for bankruptcy protection on December 30,
More informationCOMMENTS OF COMVERGE, INC. NEW JERSEY CAPACITY ISSUES TECHNICAL CONFERENCE
COMMENTS OF COMVERGE, INC. NEW JERSEY CAPACITY ISSUES TECHNICAL CONFERENCE Overview The Board of Public Utilities (BPU) is understandably concerned about the adequacy and composition of electric energy
More informationWritten Statement of Richard Dewey Executive Vice President New York Independent System Operator
Written Statement of Richard Dewey Executive Vice President New York Independent System Operator Senate Standing Committee on Energy and Telecommunications Senator Joseph A. Griffo, Chairman Senate Standing
More informationProject Location Village of Lordstown, Ohio
Project Location Village of Lordstown, Ohio Project Location 0 0.25 0.5 1 Miles Project Site Characteristics Potential Laydown Area Project Site Warehouse Laydown Area Laydown Area Electrical Route Utility
More informationCalifornia Resources Corporation. Health, Safety & Environmental Management System
California Resources Corporation Health, Safety & Environmental Management System Mission of CRC s HSE Management System The mission of California Resources Corporation s (CRC s) Health, Safety and Environmental
More informationRoadmaps for Demand Response & Storage
1 Roadmaps for Demand Response & Storage Jim Price, California ISO Senior Advisor, Market Development & Analysis jprice@caiso.com PSERC Summer Planning Workshop Market Stem July 15, 2015 CAISO markets
More information1,820 MW in construction or development in Ohio
Utica Summit IV Independent Generator Perspective October 11, 2016 1,820 MW in construction or development in Ohio Agenda > Introduction > Gas to Electricity > Ohio Projects > Q&A Introduction About Advanced
More informationPreliminary Cost and Performance Data Peaking Unit and Combined Cycle Technologies
Preliminary Cost and Performance Data Peaking Unit and Combined Cycle Technologies Debra Richert William Frazier Tom Vivenzio April 25, 2016 New York Independent System Operator Installed Capacity Working
More informationSTATE OF NEW YORK PUBLIC SERVICE COMMISSION. Proceeding on Motion of the Commission Regarding a Retail Renewable Portfolio Standard
STATE OF NEW YORK PUBLIC SERVICE COMMISSION Proceeding on Motion of the Commission Regarding a Retail Renewable Portfolio Standard Case 03-E-0188 PETITION FOR MODIFICATION OF RPS MAIN TIER PROGRAM Introduction
More informationPOWER. Diversifying the Power Generation Fleet
POWER Diversifying the Power Generation Fleet CURRENT OPPORTUNITIES AND CHALLENGES IN RENEWABLE ENERGY 1 GROWTH Potential for reduced greenhouse gas emissions and other environmental benefits have broadened
More informationFrom: Keith Casey, Vice President, Market and Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: August 18, 2011 Re: Briefing on Renewable
More informationUltra-Clean Efficient Reliable Power
CHP Fuel Cells for Healthcare Presentation for IDEA Annual Conference, St. Paul MN June 22, 2016 Ultra-Clean Efficient Reliable Power Fuel Cell Combined Heat & Power The benefits from installing a fuel
More informationAll Source Request for Proposals Interim Summary
All Source Request for Proposals Interim Summary Introduction and Request for Proposal Overview Northern Indiana Public Service Company ( NIPSCO ) does business in the State of Indiana as a regulated public
More informationFuture-Proof Technology for Enhanced Plant Profitability siemens.com/energy
Flex-Plant Solutions Future-Proof Technology for Enhanced Plant Profitability siemens.com/energy Flex-Plant Integrated Combined Cycles Siemens integrated technology enables unsurpassed operational flexibility
More informationCRESCENT DUNES PROJECT OVERVIEW
CRESCENT DUNES PROJECT OVERVIEW Andrew Wang Director of Development April 24, 2014 EXHIBIT I - LANDS Document consists of 14 pages. Entire exhibit provided. Meeting Date: 04-24-14 SOLARRESERVE OVERVIEW
More informationCRESCENT DUNES PROJECT OVERVIEW
CRESCENT DUNES PROJECT OVERVIEW Andrew Wang Director of Development April 24, 2014 SOLARRESERVE OVERVIEW Leading global developer of large-scale solar power projects and advanced solar thermal technology
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7 From: Date: Staff July 17, 2009 Council Meeting Subject: Florida Power and Light Company Riviera Beach Energy
More informationPOWER GENERATION COMPREHENSIVE CAPABILITIES
POWER GENERATION COMPREHENSIVE CAPABILITIES INTEGRATED APPROACH McDermott has served the power industry for more than a century. By performing every phase of a project, from start to finish, our integrated
More informationAppendix D Minimum Requirements. For Request For Proposals For Long-Term, Supply-Side Developmental Resources in In Amite South DRAFT
ESI Draft 7/14/2014 Appendix D Minimum Requirements For 2014 Request For Proposals For Long-Term, Supply-Side Developmental Resources in In Amite South Formatted: Font color: Black Formatted: Font: Tahoma
More informationDelivering Low Cost, Environmentally-Friendly Natural Gas Supplies to Fuel Power Generation and Stimulate Economic Development on Eastern Long Island
NEW YORK ENERGY HIGHWAY REQUEST FOR INFORMATION ( RFI ) ISSUED APRIL 2012 GOVERNOR ANDREW M. CUOMO TASK FORCE IROQUOIS GAS TRANSMISSION SYSTEM, L.P. ELI PROJECT A PROPOSAL TO BUILD NEW HIGH PRESSURE NATURAL
More informationJoe Galdo, Department of Energy, Office of Distributed Energy Resources Rick Weston, Regulatory Assistance Project
GTI COMMENTS December 26, TO: CC: Joe Galdo, Department of Energy, Office of Distributed Energy Resources Rick Weston, Regulatory Assistance Project GTI appreciates DOE s leadership role in recognizing
More informationGORDON BUTTE CLOSED LOOP PUMPED STORAGE HYDRO FACILITY BRIEFING DOCUMENT
GORDON BUTTE CLOSED LOOP PUMPED STORAGE HYDRO FACILITY BRIEFING DOCUMENT 1 OVERVIEW THE GORDON BUTTE PUMPED STORAGE HYDRO FACILITY IS LOCATED AT THE NORTH END OF THE CRAZY MOUNTAIN RANGE IN CENTRAL MONTANA
More informationRFI Response in Support of New York Energy Highway Initiative
RFI Response in Support of New York Energy Highway Initiative Executive Summary Saranac Power Partners, L.P., owner and operator of the Saranac Power Plant located in Plattsburgh, NY, fully support this
More informationIdentifying the Problem
June 27, 2014 New England States Committee on Electricity 4 Bellows Road Westborough, MA 01581 Attn: Heather Hunt Via email: HeatherHunt@NESCOE.com Re: Enhancing Electric Reliability in New England Spectra
More informationLearn about the Biomass Clean Energy Project proposed to be developed on the GTH site. Share your views and ideas with Project representatives
BIOMASS CLEAN ENERGY WELCOME TO OUR OPEN HOUSE Learn about the Biomass Clean Energy Project proposed to be developed on the GTH site Share your views and ideas with Project representatives PLEASE Sign
More informationEnd-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration
End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid Solutions for Wind Energy Integration There are lots of challenges involved in harnessing the
More informationRE: National Hydropower Association s Pumped Storage Development Council s Comments on the Quadrennial Energy Review
November 21, 2014 Karen Wayland Deputy Director for State and Local Outreach Office of Energy Policy and Systems Analysis U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 RE:
More informationLOS ANGELES DEPARTMENT OF WATER AND POWER
LOS ANGELES DEPARTMENT OF WATER AND POWER FISCAL YEAR 2016-2017 GOALS AND OBJECTIVES The goals and objectives of the Los Angeles Department of Water and Power (LADWP) for Fiscal Year 2016-17 are in alignment
More informationWELCOME. ? Meet the RUS Representatives. Connecting Rural America. Rural Utilities Service. Please Sign In. Pick up RUS handout/ comment sheet
Connecting Rural America Rural Utilities Service WELCOME Please Sign In Pick up RUS handout/ comment sheet? Meet the RUS Representatives Turn in comment sheet or provide to RUS within 30 days to Lauren
More informationThe Hydrogen Energy California (HECA) Project
The Hydrogen Energy California (HECA) Project N Maha Mahasenan Principal Advisor International Advanced Coal Conference Laramie, WY June 23, 2010 1 Presentation Outline (1) Introduction to the Project
More informationUry and Fisher s Getting to Yes?? This tale is more about responsibly knowing when getting to no is the right decision to make.
Thanks for the opportunity. Ury and Fisher s Getting to Yes?? This tale is more about responsibly knowing when getting to no is the right decision to make. Focused on minimizing risk and life cycle costs,
More informationGas-Electric Coordination A NYISO Perspective
Gas-Electric Coordination A NYISO Perspective Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Energy in the Northeast Boston, MA September 9, 2013 Generation Capacity
More informationTHERMAL EFFICIENCY OF GAS FIRED GENERATION IN CALIFORNIA
STAFF PAPER THERMAL EFFICIENCY OF GAS FIRED GENERATION IN CALIFORNIA Michael Nyberg Electricity Analysis Office Electricity Supply Analysis Division California Energy Commission DISCLAIMER This paper was
More informationRice Solar Energy Project
Rice Solar Energy Project Tom Georgis June 2012 Copyright 2012 SolarReserve. All Rights Reserved. Company Overview & Highlights Leading solar thermal technology lowest priced CSP, integrated energy storage
More informationAZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES
AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES 1. Analysis 1. Economy. The economy grew, on average, by 29.3% from 2005-2007 and in 2008, the gross domestic product (GDP) increased by
More informationThe South Pier Improvement Project
SOUTH PIER IMPROVEMENT PROJECT MAY 30, 2012 Gowanus Generating Station Introduction The South Pier Improvement Project The South Pier Improvement Project (South Pier) is a shovel-ready project with all
More informationREDACTED THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF JAMES G. DALY
REDACTED THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF JAMES G. DALY PETITION OF PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE D/B/A EVERSOURCE ENERGY
More informationThe Optimal Approach to Firming Windpower
5735 Hollister Avenue, Suite B Goleta, California 93117 T 805.683.9659 F 805.683.9671 www.gravitypower.net The Optimal Approach to Firming Windpower Summary As many regions of the world are staging massive
More informationLast revised: March 1, 2018 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: March 1, 2018 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Business Operations, Engineering & Process, has primary responsibility for the overall planning, operations and control
More informationEnergy Policy 2012 Annual Update
Energy Policy 2012 Annual Update May 2013 Energy Policy 2012 Annual Update May 2013 1.0 Energy Policy Update This report provides an update of 2012 activities and results related to the City of Fort Collins
More informationRevised Transmission Planning Process. Complete Final Proposal
Revised Transmission Planning Process Complete Final Proposal May 7, 2010 Complete Final Proposal 1. Introduction and Summary In this document the ISO provides a complete description of its revised transmission
More informationVersatile technology for ever changing markets
00_TS Versatile technology for ever changing markets Discover Alstom s gas portfolio Alstom s gas portfolio 01_index index Alstom s gas portfolio at a glance Clean Power Clear Solutions Gas power technology
More informationContract For Biomass-Fueled Generation. Presentation to the Gainesville City Commission May 7, 2009
Contract For Biomass-Fueled Generation Presentation to the Gainesville City Commission May 7, 2009 Presentation Outline Project History And Description Market Changes Adjustments To Original Proposal Economic
More informationPort of Vancouver Strategic Plan Update
COMMUNITY OPEN HOUSE # SUMMARY Date / Time: Tuesday, June, 4: : PM Location: Gaiser Student Center, Clark College Attendees: 5 people signed in Comment forms submitted: 5 Dots placed:,5; 5 green, blue
More information2012 Grid of the Future Symposium. Evolution of the US Power Grid and Market Operations through the next Decade
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Evolution of the US Power Grid and Market Operations through the next Decade A. OTT,
More informationSouthwest Renewable Energy Conference
Southwest Renewable Energy Conference James Sahagian Vice President Commercial Development 9/11/09 2009 Sempra Global. All copyright and trademark rights reserved. Sempra Energy Sempra Energy Develops,
More informationCHAPTER 6 - Load Forecast & Resource Plan
CHAPTER 6 - Load Forecast & Resource Plan Introduction This Chapter describes the electric resource portfolio that may be acquired to meet the energy requirements of MBCP customers. The following overarching
More informationSRP RESOURCES AND STEWARDSHIP FOR A SUSTAINABLE FUTURE FISCAL YEAR 2010
SRP RESOURCES AND STEWARDSHIP FOR A SUSTAINABLE FUTURE FISCAL YEAR 2010 WHO WE ARE Serving central Arizona since 1903, SRP (Salt River Project) was created through provisions of the National Reclamation
More informationMeeting Natural Gas/Electricity Challenges in New England
N O V E M B E R 1, 2 0 1 3 W A S H I N G T O N, D C Meeting Natural Gas/Electricity Challenges in New England 2013-2014 Winter Energy Outlook Eric Johnson D I R E C T O R, E X T E R N A L A F F A I R S
More informationEXECUTIVE SUMMARY. Supplemental Environmental Impact Statement Jericho Rise Wind Farm
EXECUTIVE SUMMARY This (SEIS) has been prepared for the proposed Jericho Rise Wind Farm (the Project). LLC (the Applicant), a wholly owned subsidiary of EDP Renewables (EDPR), is proposing to construct
More informationGRDA Expands Utilization of Maximo to its New Combined Cycle Unit, Hydro Plants, and Transmission Facilities.
GRDA Expands Utilization of Maximo to its New Combined Cycle Unit, Hydro Plants, and Transmission Facilities. Tim Brown, Executive Vice President, Chief Operating Officer Grand River Dam Authority GRDA
More information2 Demanding Markets. 3 Competitive Solutions. 4 International Presence. 6 Gas Turbines and Combined Cycle Plants. 10 Steam Power Plants.
ENERGY 2 Demanding Markets 3 Competitive Solutions 4 International Presence 6 Gas Turbines and Combined Cycle Plants 10 Steam Power Plants 12 Renewables 14 Turn-key Experience Demanding Markets Competitive
More informationPLANT VOGTLE UNITS 3 AND 4
PLANT VOGTLE UNITS 3 AND 4 ZERO GREENHOUSE GASES Nuclear energy facilities release zero greenhouse gases while producing electricity. A single uranium pellet the size of a pencil eraser produces as much
More informationIndian Point Replacement Analysis: A Clean Energy Roadmap
Indian Point Replacement Analysis: A Clean Energy Roadmap A Proposal for Replacing the Nuclear Plant with Clean, Sustainable Energy Resources Prepared for the Natural Resources Defense Council and Riverkeeper
More informationIndian Point Replacement Analysis: A Clean Energy Roadmap
Indian Point Replacement Analysis: A Clean Energy Roadmap A Proposal for Replacing the Nuclear Plant with Clean, Sustainable Energy Resources Prepared for the Natural Resources Defense Council and Riverkeeper
More informationStephen Nelson COO. Longview Power, LLC
Stephen Nelson COO 1 Longview Power, LLC Longview Power Overview 778 MW gross (700 MW net) coal fired plant located near Morgantown, WV New plant started operations in December 2011 while PJM coal fleet
More informationEnergy Department Report on Electricity Markets and Reliability
Quick Insights Energy Department Report on Electricity Markets and Reliability RESEARCH QUESTION What are the key findings and recommendations from the Staff Report to the Secretary on Electricity Markets
More informationNon-Technical Summary
Construction of a 410 MW Combined Cycle Gas Turbine Power Unit at the existing Combined Heat and Power Plant in Krasnodar (Subsidiary of OAO UGK TGK-8 ), Russian Federation Non-Technical Summary February
More informationExpanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA
DATE: February 21, 2018 Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA-0001886 SUBJECT: Request for Information (RFI) RESPONSE DUE: April 6, 2018
More informationIn Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012
In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012 Spectra Energy Corp ( Spectra Energy ) appreciates the opportunity to provide comments to the New York Energy
More informationUtilities Strategic Plan Strategic Objectives
Statement Customer and Community Perspective C1. I receive Customers expect that Utilities services are provided on a continuous basis, safe and without interruption. In addition, customers expect that
More informationWaste to Energy The Palm Beach County Experience
The 2016 Bi-annual Meeting of the Global WTERT Council www.swa.org October 6, 2016 Waste to Energy The Palm Beach County Experience Dan Pellowitz Managing Director Solid Waste Authority of Palm Beach County
More informationA Path To New York's Energy Storage Goal
Portfolio Media. Inc. 111 West 19 th Street, 5th Floor New York, NY 10011 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com A Path To New York's Energy Storage Goal
More informationU.S. Bancorp Environmental Responsibility Policy
U.S. Bancorp Environmental Responsibility Policy This Policy supersedes any policy, procedure, guideline, or any other like policy or previous practice if there is a conflict. Environmental Responsibility
More informationApproaches to Generation Dispatch in Transmission Planning
21, rue d Artois, F-75008 PARIS Paper 135 GUILIN 2009 Approaches to Generation Dispatch in Transmission Planning P. J. PALERMO KEMA, Inc. USA SUMMARY A critical factor affecting transmission system development
More informationLOS ANGELES DEPARTMENT OF WATER AND POWER
LOS ANGELES DEPARTMENT OF WATER AND POWER FISCAL YEAR 2015-2016 GOALS AND OBJECTIVES The goals and objectives of the Los Angeles Department of Water and Power (LADWP) for Fiscal Year 2015-16 are in alignment
More informationMICROGRIDS, MACRO BENEFITS: How to talk to decision makers about building your own electrical power system
MICROGRIDS, MACRO BENEFITS: How to talk to decision makers about building your own electrical power system The electric grid of the future must be resilient, reliable, and local. This means MICROGRIDS.
More informationNew 790-Megawatt Unit. Council Bluffs Energy Center
New 790-Megawatt Unit Council Bluffs Energy Center JUST THE FACTS Council Bluffs Energy Center s New 790-Megawatt Unit Background To ensure a long-term positive impact on Iowa's economy and a secure supply
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT
Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,
More informationCase Studies and Approach
Incorporating Renewable Energy into Performance Contracts Case Studies and Approach Steven Spanbauer Energy Systems Group August 10, 2016 Rhode Island Convention Center Providence, Rhode Island Agenda
More informationNew York Independent System Operator System Reliability Impact Study Criteria and Procedures
New York Independent System Operator System Reliability Impact Study Criteria and Procedures Note: Project Developers are advised that these documents do not address cost allocation Approved by the Operating
More informationGreenhouse Gas Emissions. Climate Change: Taking Action for the Future
Greenhouse Gas Emissions Climate Change: Taking Action for the Future The energy industry across the United States is undergoing a major transformation by seeking lower-carbon energy sources while meeting
More informationWillis Lateral Project to serve Entergy Texas, Inc. San Jacinto County March 2018
October 11, 2013 Boardwalk Annual Customer Meeting Nashville Customer Meeting Gulf South Pipeline Company, LP Boardwalk s Response to the Changing Market Kathy Kirk, Senior Vice President Marketing & Origination
More informationATCO HEARTLAND GENERATING STATION PHASE 2
ATCO HARTLAND GNRATING STATION PHAS 2 Project Information Package August 2015 Conceptual drawing of ATCO Heartland Generating Station with Phase 2 on the upper left Project Overview ATCO Power is proposing
More informationL A Z A R D ' S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S V E R S I O N 7. 0
C O N F I D E N T I A L A U G U S T 2 0 1 3 L A Z A R D ' S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S V E R S I O N 7. 0 Introduction Lazard s Levelized Cost of Energy Analysis ( LCOE )
More informationKeeping maintenance costs in line over the long haul
Keeping maintenance costs in line over the long haul Long-term service agreements might be the right choice for gas power plants Of special interest to: Chief financial officer Chief operating officer
More informationUnderstanding Microgrids
With the increased focus on renewable energy, efficiency and the need to make the business case for the smart grid, a growing number of stakeholders are focusing on smart microgrids as a viable approach
More informationFacility Site Proposed Laydown/Parking
Site Location Document Path: T:\GIS\_Power_Station\MXD\Required_Maps\Figure_01-1 Facility_Location.mxd Legend Facility Site Proposed Laydown/Parking County, OH 0 500 1,000 2,000 Feet O USGS 7.5 Minute
More informationNew England s Changing Energy Landscape
A P R I L 1 7, 2 0 1 4 N A T I O N A L C O N F E R E N C E O F S T A T E L E G I S L A T U R E S New England s Changing Energy Landscape Reliability, Risk and Energy Diversity -- National Conference of
More informationNYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market
NYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market March 2013 Evaluation of the New York Capacity Market Introduction In an effort to evaluate and, where appropriate,
More informationAssumptions and Input Data for Localized, Levelized Cost of Peaking Units
Assumptions and Input Data for Localized, Levelized Cost of Peaking Units Design of Units: Item Technology Base Options Comments LMS100 LM6000 (50,512 kw) and 7EA (85,970 kw) best peaking duty selections.
More informationPJM Interconnection, L.L.C. ( PJM ) submits hereby submits its responses to the United
PJM Interconnection, L.L.C. 2750 Monroe Boulevard Audubon, PA 19403 Jacqulynn B. Hugee Associate General Counsel T: (610) 666-8208 F: (610) 666-8211 jacqulynn.hugee@pjm.com Via WPTORFI@ee.doe.gov Hoyt
More informationWashington Conservation and Respect Report 2016
Washington Conservation and Respect Report 2016 Protecting and enhancing the environment is a core principle for Pacific Power. While providing safe, reliable electric service to our customers, we strive
More informationSCE s Experience In Energy Storage
SCE s Experience In Energy Storage October 19, 2016 Dhaval Dagli Principal Manager, Regulatory Policy Regulatory Affairs Southern California Edison Southern California Edison (SCE) Highlights One of the
More informationAmerican Electric Power
American Electric Power Utility Perspectives on 21 st Century Power Generation Matt Usher, P.E. Director New Technology Development & Policy Support AEP Generation Agenda AEP Overview Issues Impacting
More information10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS
10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS Engineering, Procurement and Construction Management (EPCM) costs for Balance of Plant (BOP) installations seriously
More informationOur Solar Energy Business
Our Solar Energy Business Our Business Operations Based in Juno Beach, Florida, NextEra Energy Resources, LLC, is the competitive energy subsidiary of NextEra Energy, Inc., a Fortune 200 company and a
More informationThe Benefits of Cogeneration Case Study: Upper Chesapeake Medical Center
The Benefits of Cogeneration Case Study: Upper Chesapeake Medical Center Energy & Structured Finance Development Group within Clark Construction Group Develops alternative energy systems Evaluates existing
More informationHydrostor. Advanced Compressed Air Energy Storage (A-CAES)
Hydrostor Terra TM Advanced Compressed Air Energy Storage (A-CAES) Hydrostor Terra is the most cost-effective and flexible bulk energy storage solution, delivering hundreds of MWs and GWhs. Low cost Lowest
More information